Skip to content

Earnings call

Ceinsys Tech Q1 FY25 earnings call: Ceinsys' current order book stands at around 750 crores, and it is pursuing a bid book pipeline of around 200 crores

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

Ceinsys' current order book stands at around 750 crores, and it is pursuing a bid book pipeline of around 200 crores. Ceinsys expects growth to be in line with its targets and overall segment growth, which it expects in the range of around 20% to 25% to 30%. Ceinsys successfully implemented a major IoT project under the water domain in the 1st Quarter of Financial Year 2 025. Ceinsys reported operational revenue of Rs.74 crore in the 1st Quarter of Financial Year 2 025, an increase of around 37% year-on-year. Ceinsys' government business is in the range of around 65% to 70%.

The numbers management gave

Results

  • Ceinsys reported operational revenue of Rs.74 crore in the 1st Quarter of Financial Year 2 025, an increase of around 37% year-on-year.
    Show source
    For the 1st Quarter, the operational revenue was Rs.74 crore, representing an increase of around 37% year-on-year.
  • Ceinsys reported EBITDA of around 13 crore, up around 16% year-on-year, and an EBITDA margin of 17.9% in the 1st Quarter of Financial Year 2 025.
    Show source
    EBITDA reported was around 13 crore which grew by around 16% year-on-year and the EBITDA margin stood at 17.9%.
  • Ceinsys reported net profit after tax of around 12 crores, up around 42% year-on-year, and a PAT margin of 16% in the 1st Quarter of Financial Year 2 025.
    Show source
    The net profit after tax was reported around 12 crores, which was increases of around 42% year-on-year, while the PAT margins reported at 16%.
  • Ceinsys' geospatial and engineering solutions revenues were Rs.42 crores in the 1st Quarter of Financial Year 2 025, a decline of around 13% year-on-year due to deferred revenues on some projects.
    Show source
    On our business segments, the geospatial and engineering solutions revenues for the quarter were Rs.42 crores, a small decline of around 13% on year-on-year basis, due to some deferred revenues on some projects .
  • Ceinsys' technology solutions revenues were 31 crore in the 1st Quarter of Financial Year 2 025, almost four times year-on-year.
    Show source
    The technology solutions revenues for the quarter was 31 crore which grew by almost four times year-on-year.
  • VTS had a top line of around 3.5 million to 4 million year-on-year.
    Show source
    The company itself, had a top line of aroun d 3.5 million to 4 million year -on-year.
Show 7 more statements

Results

  • Ceinsys' margins steadily enhanced and improved from 22 to 23 to 24 over the last three years.
    Show source
    And if you see the last three years margins also they have been steadily enhancing and improving from 22 to 23 to 24 and we are on the track to see that the sustainability of the growth of margins also sustains.
  • The company had outstanding payments of hardly 15 days or 20 days on water-related, IoT-based and DPMS projects.
    Show source
    We have seen that in these projects like the water related or the IoT based projects, or the DPMS projects, the overall outstanding has been hardly 15 days or 20 days.
  • The company lost TPI turnover in the 1st Quarter in the range of around 12 to 13 crore, while costs continued to be incurred; the lost turnover is expected to be recouped over the next three to four quarters.
    Show source
    So the 1st Quarter which we lost on the TPI, the total turnover which would have lost would be in the range of around 12 to 13 crore, while the cost continued to be incurred that would be kind of recouped over the next three to four quarters.
  • AllyGram's share of profit for this quarter was around 26% in margins; grossed up, it would be in the range of around 4.2 crores.
    Show source
    Kaushik Khona: The margins are in the range of around 26% our share what you are seeing is this quarter share of 70% so if I have to gross it up, it will be in the range of around 4.2 crores.
  • Ceinsys said quarter-on-quarter fluctuations may remain because the timeline to invoice a particular element of execution may not have been attained, but performance can be measured on a seamless basis over a year.
    Show source
    So quarter-on-quarter fluctuations may remain, but because it's, as I said, it's an ongoing project, and sometimes the timelines to invoice a particular element of the execution may not have been attained, but over a year that can be measured on a seamless basis.
  • The company was waiting for fresh fund allocation on a few small projects where the government allocation had dried up, leaving amounts outstanding for two, three or four months.
    Show source
    That's where the outstanding remains due for two, three, four months.
  • AllyGram had a total top line of around 12 to 13 crores this quarter, and Grammer has advised that the business will contribute around 45 crore yearly. Replaced by a later filing.

What it expects ahead

What management expects

  • Ceinsys expects growth to be in line with its targets and overall segment growth, which it expects in the range of around 20% to 25% to 30%.
    Show source
    So we expect the growth to be in line with the targets, as well as the overall segment growth which we expect in the range of around 20% to 25% to 30%.
  • Ceinsys said projects in its pipeline have net EBITDA margins in the range of around 20%, 25%, 30%, and it expects to see sustainable improvement from the margins it has been reporting year-on-year over the financial year.
    Show source
    Kaushik Khona: Well, as I said, Yes, I don't want to again be mentioning about any guidance of future, but we have our own targets to be ahead of the industry, and we are working on all the projects, and the projects which are in pipeline have a net EBITDA margin in the range of around 20%, 25%, 30% so, over a period of this financial year we will be able to see the sustainable improvement from the margins which we have been reporting year-on-year.
  • The company expects the percentage of technology solutions in its order book to improve further if the 200 crore pipeline is awarded.
    Show source
    So if everything had to come through, Page 10 of 19 then this percentage of technology solutions into order book will further improve.
  • Within the month of September, decisions were expected on whether Ceinsys Tech Limited would be awarded almost 150 crore out of its 200 crore bid pipeline.
    Show source
    And within the month of September, almost 150 crore out of 200 crores should be decided now, whether we are awarded or not that you will be able to communicate.
  • The company said it was in growth mode but could not give guidance on whether it would grow from last year’s 250 crore to 400 crore this year.
    Show source
    And it's difficult for me to give you any guidance as to from a last years of 250 crore, whether I will be 400 crore this year, or what I will be this year, it's difficult for me to give you any guidance.
  • The company said it was not even 1% of the market and could grow substantially if it captured 2% to 3% to 5% of the market.
    Show source
    So the market is huge and if really, even if we work to get 2% to 3% to 5% of the market, we can grow substantially.
Show 14 more statements

What management expects

  • AllyGram's top line will be around 45 crore this year, with a margin of around 26%, the margin achieved in the past year; AllyGram had a total top line of around 12 to 13 crores this quarter, and Grammer has advised that the business will contribute around 45 crore yearly.
    Show source
    And on a total top line of around 12 to 13 crores of this quarter and a yearly this business will contribute around 45 crore as per the advice which Grammer has already provided .
  • Ceinsys expects to further grow VTS by deploying people there.
    Show source
    And we expect that the growth of that company, we will be able to push further once, because we also have started deploying people over there for the growth of that business segment.
  • Ceinsys expects its data center consulting business to receive focus in the coming two to three quarters to find new avenues to add to its top line.
    Show source
    And we expect that also to be given a good focus in this coming two to three quarters where we can find out new avenues to add our top line.
  • The company is aiming for sustainable margins as it grows, but Kaushik Khona said he did not want to give margin guidance.
    Show source
    Kaushik Khona: I have already made, first of all, I don't want to be a guiding , giving you guidance for the margins, but we are aiming at sustainable margins on a growth and we should see that over the year end, when we see that, and the indication of the last three years should give you an indication that we are growing.
  • Ceinsys said the tender pipeline could fructify, subject to final government approvals wherever they are in relation to the tenders and the invites. Replaced by a later filing.
    Show source
    So we hope that it could fructify, although I cannot give a guidance because that's all subject to the final government approvals wherever they are in relation to the tenders and the invites.
  • The company said its geospatial and engineering services and technological solutions segments had good visibility for the next few years. Replaced by a later filing.
    Show source
    Kaushik Khona: Well, thanks for the compliment first of all, and both the questions which you have, have little bit of challenge for me, because we are all talking about future, but I can only tell you that the two lines of segments which we are classified, which is geospatial and engineering services and technological solutions, which are the two segment bu sinesses which we have classified ourselves, seem to have a good kind of visibility for the next few years.

Orders

  • Ceinsys' current order book stands at around 750 crores, and it is pursuing a bid book pipeline of around 200 crores.
    Show source
    The current order book stands at around 750 crores, and a bid Page 3 of 19 book pipeline of around 200 crores is being pursued.
  • Ceinsys' order book of 750 crore comprises around 550 crore towards geospatial and engineering services and around +200 crore towards technology related solutions services.
    Show source
    The order book of 750 crore which I mentioned, the breakup of that mainly provides into two first of all segment wise breakup, out of that 750 crore, around 550 crore is towards the geospatial and engineering services, and around +200 crore is towards the technology related solutions services.
  • Ceinsys' order book was around 250 crore when it started 2023 -24 and around 700 crores when it closed the year 24.
    Show source
    When we closed the year 24 we were at around 700 crores.
  • The company had a confirmed order book of 750 crore; after executing around 65 crore of projects, Ceinsys' order book was again 750 crore, with a tender pipeline of around 200 crore, of which 70% of the tender pipeline was already L1.
    Show source
    After execution of around 65 crore of projects, we are again at 750 crore and I said that there is a pipeline of the tenders which we are already tracking as of now of around 200 crore of which there are 70% of the tender pipeline we are already L1.
  • The company had a pipeline of around 200 crore for bids already submitted, with final decisions on allotment or award still pending.
    Show source
    And we have a further pipeline of around 200 crore for wh ich we already have bid and the final decision for the allotment or award of the order is still pending.
  • Of Ceinsys Tech Limited’s 200 crore pipeline subject to final award, 80% was in technological solutions.
    Show source
    Kaushik Khona: So, as I mentioned around 750 crore order book has around 550 crore book of geospatial as of now, and around 200 crore of order book on technology solutions, I can also mention which I have not clarified earlier, the 200 crore pipeline which we are right now banking on, subject to the final award, 80% of that is into technological solution.
  • The company has one project with two year O&M and two projects with five year O&M, with each O&M period starting after the project CAPEX period is over.
    Show source
    There is a project where there is two year O&M, there are two projects where we have five year O&M, Page 19 of 19 and the O&M period starts after the project CAPEX period is over.
  • After executing around 65 crore of projects, Ceinsys' order book was again 750 crore, with a tender pipeline of around 200 crore, of which 70% of the tender pipeline was already L1. Replaced by a later filing.

What it is building and selling

Projects and capacity

  • Ceinsys successfully implemented a major IoT project under the water domain in the 1st Quarter of Financial Year 2 025.
    Show source
    On the operational front, the company successfully implemented major projects like IoT project under the water domain.
  • Ceinsys' projects typically span nine months to 12 months and sometimes two years.
    Show source
    Kaushik Khona: Let me first of all clarify these all projects, which we do are little long term projects in the sense, they either span from nine months to 12 months to sometimes two years also, and typically they are, we therefore have a structured way of doing business which we measure, although the measur ement obviously happens quarter -on-quarter.
  • The Lucknow TPI project could not progress during April, May and June because funds were not allotted at Uttar Pradesh SWSM and the contractor did not implement the project; funds have now been allotted, the project has started, and the project has received a substantial enhancement or extension.
    Show source
    But in that, let's say, in this quarter there is a project which is a TPI which I am doing at Lucknow, that TP I project for the entire quarter, which is April, May, June, could not progress well, because the funds were not allotted at the Uttar Pradesh SWSM, and the projects were not implemented by the contractor, because the funds were not allotted in view of the COC, now the funds have been allotted, and the project has already started, and we have also got a substantial enhancement, or I would say, the extension for the project.

Segments

  • Ceinsys' government business is in the range of around 65% to 70%.
    Show source
    The present government business is in the range of around 65% to 70%.
  • Government business accounted for 70% of Ceinsys Tech Limited’s total business and was awarded through tenders.
    Show source
    Yes, it is 70% of the total business is government business Page 9 of 19 which are awarded through tenders, and therefore they are in relation to those projects.
  • Ceinsys' government business is based on tenders, many of which relate to water-based or smart city solutions provided through geospatial.
    Show source
    As regards the government exposure, the government business is on the basis of the tenders and many of them are in respect of the same water based or the smart city solutions which we provide through geospatial .
Show 10 more statements

Segments

  • Ceinsys is trying to tap opportunities for geospatial and smart city solutions in Chhattisgarh, Madhya Pradesh, Jharkhand, Delhi and Rajasthan, where it already has people and infrastructure based.
    Show source
    We are trying to tap further into the states of Chhattisgarh, Madhya Pradesh, Jharkhand, Delhi and Rajasthan, where we already have people and infrastructure base d. So these are some of the states which we have identified to go into and tap further opportunities.
  • The company said its projects span one or two years and can extend across large geographies, sometimes covering multiple districts.
    Show source
    Kaushik Khona: So as we have been seeing that we are into a projects which span into a period of one year, two years, and because these projects are, I would say spread across large geographies, which may cover sometimes multiple districts.
  • The company was adding tech-enabled services in the form of setting up or consulting for data centers.
    Show source
    So qualitatively, as I said we have a huge capabilities of execution, the technical qualification, we are adding some more qualities of people, we have added as you said, as you already observed, we are trying to add into a new segment which is called the tech enabled services in the form of setting up or consulting for the data centers, which also we see a large Page 15 of 19 options.
  • The company had a presence in India in around seven states and was expanding its presence in the US.
    Show source
    We also have presence in US, which we are expanding further.
  • The company had a presence in the UK, Germany and Singapore.
    Show source
    We have presence in UK and Germany and also in Singapore now.
  • AllyGram is in the mobility business and provides engineering services on automotive parts.
    Show source
    The AllyGram is also into the same business as Allygrow, and which is specifically into mobility business, where we are giving them that engineering services on the automotive part, and AllyGram is a world known name Grammer.

Deals and partners

  • Ceinsys generated fresh leads for fresh and renewal of business of almost 270 crores during the quarter.
    Show source
    On the business development front during the quarter, the company was able to generate fresh leads for fresh and renewal of business of almost 270 crores.
  • Ceinsys achieved contract closures of almost 50 crore during the quarter.
    Show source
    Of these contract closures of almost 50 crore were achieved.
  • Grammer renewed its commitment for a period of three years to give AllyGram business of almost 100 crore, or almost €11 million.
    Show source
    This year , in fact we have already given kind of stock exchange clarity, where Grammer has renewed further for a period of three years, where they have committed to give us a business of almost 100 crore, which is almost I would say, €11 million, and which is Page 18 of 19 therefore a growing business as compared to what we had in the past.
  • Ceinsys implemented digital project management systems awarded by the state water and sanitation mission Maharashtra under the water domain and consulting services for third party inspection projects of various rural water supply schemes at Uttar Pradesh; these were under the technology solution segment.
    Show source
    Digital project management systems awarded by the state water and sanitation mission Maharashtra under the water domain and consulting services for third party inspection projects of various rural water supply schemes at Uttar Pradesh.

Everything else said on the call

Group structure

  • Ceinsys has set up a 100% subsidiary at Singapore for its data center consulting business, and the board has authorized investment of around 5 crore into the equity of that capital.
    Show source
    One area which we are also focusing which you must have seen, is that we are also trying to add value by focusing into setting up of the data centers which is the tech enabled center, where we are not into the provide the setting up, the physical infrastructure setting up, we are into the consulting part and we have already set up a 100% subsidiary at Singapore, for which the board has authorized for the investment of around 5 crore into the equity of that capital.
  • AllyGram is a joint venture company in which Allygrow, Ceinsys Tech Limited's wholly owned subsidiary, has a 70% profit share and Grammer of Germany has 30% shareholding.
    Show source
    Kaushik Khona: So we have a joint venture company called AllyGram, where Allygrow, which is our wholly owned subsidiary has a 70% profit share, I would say the shareholding share with Grammer of Germany, 30%, it's a 70:30 venture.
  • Ceinsys recently acquired VTS, a company in the geospatial area based in US, to establish a presence in geospatial in US.
    Show source
    We recently acquired VTS, which is in the geospatial area.
  • Ceinsys acquired VTS in the month of July; the acquisition was after the end of the quarter, so it was not included in the quarter results.
    Show source
    These companies have been taken over by an asset, and the business is now being populated and therefore it's not included in the quarter results, because the acquisition has happened after the end of the quarter.

Other

  • Ceinsys said it historically had a strike rate of almost (+90%), in the range of around (+90%).
    Show source
    And historically, we have had a strike rate of almost (+90%).
  • The Finance Minister’s budget identified a total expenditure outlay of around 1,13,000 crore on geospatial, smart city development and energy solutions, areas where Ceinsys Tech Limited is present.
    Show source
    I am sure you must have gone through the recent honorable Finance Ministers budget, where they have in fact if you look at the outlay budget, they have identified a total expenditure outlay of around 1,13,000 crore on the three elements which is geospatial, smart city development and the energy solutions.
Show 1 more statement

Other

  • Ceinsys said its strike rate had been in the range of around (+90%). Replaced by a later filing.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Suresh Pal: Sir my question is , I am new to the company so can you please explain what is the tail wind that we are seeing in our company?

    Answer, kaushik khona

    Kaushik Khona: Well, as I introduced, the company is primarily into IT enable sector, and there is a special focus on the geospatial vertical. As you may be also aware, the government of India through the recent finance budget has given a huge emphasis on the various projects which are geospatial related, including the land and other records mapping for the rural and urban area. On top of it, the company is providing the technological solutions, and it's not in the pure play of providing any products. So we are into a providing complete solutions, including development of software, wherever required. The company is in the area where there is a huge growth opportunities. The sector itself is growing substantially well as you may be aware, and the growth potential of these sectors have also been multifold through this budget which has been stipulated in the month of July 24 . And therefore we see a huge opportunity for the growth, and we see good tailwinds as regards the growth opportunity, and we don't find any headwinds in this sector as of now.

  2. Question

    Suresh Pal: So sir, can you please explain what is the rate of growth that we can expect for our company in the coming years?

    Answer, kaushik khona

    Kaushik Khona: So, as we already mentioned we would not be giving any forward looking statements, but you would be aware that the sectors which we are into are growing in the range of around 20% to 25% to 30% and we are also benchmarking our growth to the sectoral growth. We want to be better than the sector, and therefore the growth expectations could be of a similar nature. You could also see that in the performance of the past years, we have grown on a 25% to 27% in the last one year which is the history, and as we already mentioned about the order book, we have almost 750 crore worth of order book which we have to execute in the period of next two to three years. So we expect the growth to be in line with the targets, as well as the overall segment growth which we expect in the range of around 20% to 25% to 30%.

  3. Question

    Punit Singh: So you made an acquisition recently, can you just share some numbers regarding the revenue, top and bottom line of that acquisition and whether it has been consolidated in Q1 numbers? Page 4 of 19 Kaushik Khona: So thanks that you are keeping track of the company.

    Answer, kaushik khona

    We recently acquired VTS, which is in the geospatial area. And this company is based in US. It's a small company to begin with, because we wanted to have a presence in geospatial for going further into the geospatial area at US. The company itself, had a top line of aroun d 3.5 million to 4 million year -on-year. And we expect that the growth of that company, we will be able to push further once, because we also have started deploying people over there for the growth of that business segment. The VTS has been recently acquired, it is in the month of July. These companies have been taken over by an asset, and the business is now being populated and therefore it's not included in the quarter results, because the acquisition has happened after the end of the quarter.

  4. Question

    Punit Singh: So, let’s assume between 3 to 4 million top line would be added Q2 onward basically?

    Answer, kaushik khona

    Kaushik Khona: Year-on-year, that's the potential which the company had in the past. So we expect that to continue or maybe improve further , but for that, we are doing all further efforts by putting more people over there to grow the geospatial segment focus in US. Punit Singh: And what kind of margins do we see there?

    Answer, kaushik khona

    Kaushik Khona: US margins are not so heavy as in India. The company which we have acquired had the historical margins of around 14% to 15%. However, once we expand and it remains to be seen how much economies of scale we are able to obtain, but in US margins of around 10% to 15% to 18% are said to be good enough.

  5. Question

    Punit Singh: Sir we recently planned to raise money, so do we have any big acquisitions in the card this year, are we working in that direction , what kind of target acquisitions are we looking at . Can you please throw some light on that?

    Answer, kaushik khona

    Kaushik Khona: It's a very relevant question , you must have seen that in the sense March onwards 2024 , we have already authorized the company to raise fresh funds by way of preferential allotment of shares and warrants. The overall fund raise will be in the range of around $25 to $27 million all this is for the acquisition and we have already appointed the agency which is care rating, who is going to monitor the funds. The issue of the raise of the funds has still not happened, it will happen once we have timed it along with the acquisitions which are being lined up. We are in the process of, we have identified a few acquisitions, but right now it will be premature for me to identify and highlight which are the acquisition targets. The acquisitions however, I can say that they will be in -line with the existing line of business, which is the engineering solutions, the geospatial solutions, as well as technology solutions.

    Answer, kaushik khona

    One area which we are also focusing which you must have seen, is that we are also trying to add value by focusing into setting up of the data centers which is the tech enabled center, where we are not into the provide the setting up, the physical infrastructure setting up, we are into the consulting part and we have already set up a 100% subsidiary at Singapore, for which the board has authorized for the investment of around 5 crore into the equity of that capital. The company has also appointed very Page 5 of 19 renowned and experienced professional who has exposure of setting up data centers for over last 18 to 20 years in Singapore and in APAC region. And we expect that also to be given a good focus in this coming two to three quarters where we can find out new avenues to add our top line.

  6. Question

    Punit Singh: Right, sir. Is it reasonable to expect about 20 to 30 crore revenue for the potential target because of the kind of funds that we are raising and also the setting up of data centers what is the rational and what kind of leads or order pipeline, what gives us the confidence that we will be able to establish ourselves in that domain, given that we have not been present in that?

    Answer, kaushik khona

    Kaushik Khona: So one thing which gives us that confidence is first of all the investor who is , the prospect investor who is going to fund these new preferential allotment , they themselves had a very good kind of history and setting up of the data centers, and they are also giving us some leads and help onto these avenues. The data center as I said, we are not physical data center setup. Why we have identified because it's a huge tech enabled area, which we see a good focus. In fact, as per the study reports which we have had, there is a growth of the data centers business alone of more than 25% to 30% in the APAC as well as in India. And we are talking of large data centers like those set up by Amazons or Google and all. And therefore, we see a lot of potential to set up those as a additional avenues for our consulting business.

  7. Question

    Punit Singh: Right, and sir as per the target acquisition can we expect it to be 20, 25 million top line , considering the kind of funds we raise?

    Answer, kaushik khona

    Kaushik Khona: As I said we have still not signed off any further acquisition except the VTS which we already mentioned about. Once we are able to sign off, we will be able to publish that into the stock exchange, and we will be able to give you further guidance on that.

  8. Question

    Punit Singh: Perfect. Sir my last question would be regarding the EBITDA margin. So directionally, can we expect to maintain +20% margins , just in the directional sense , I don't want any specific numbers. And also, considering that the industries are in a growing at 20 %, 25% and we want to grow faster than that, so can we reasonably expect 30% to be a good number for growth for the coming three to five years?

    Answer, kaushik khona

    Kaushik Khona: Well, as I said, Yes, I don't want to again be mentioning about any guidance of future, but we have our own targets to be ahead of the industry, and we are working on all the projects, and the projects which are in pipeline have a net EBITDA margin in the range of around 20%, 25%, 30% so, over a period of this financial year we will be able to see the sustainable improvement from the margins which we have been reporting year-on-year. And if you see the last three years margins also they have been steadily enhancing and improving from 22 to 23 to 24 and we are on the track to see that the sustainability of the growth of margins also sustains.

    Answer, kaushik khona

    Kaushik Khona: Sure. So predominantly three years before we acquired Allygrow, we were more so 95% on to government businesses after the acquisitions and after going further into corporatization of the business. The present government business is in the range of around 65% to 70%. The order book of 750 crore which I mentioned, the breakup of that mainly provides into two first of all segment wise breakup, out of that 750 crore, around 550 crore is towards the geospatial and engineering services, and around +200 crore is towards the technology related solutions services. As regards the government exposure, the government business is on the basis of the tenders and many of them are in respect of the same water based or the smart city solutions which we provide through geospatial . So these are the focus areas where we are having our expertise, and we try to tap the opportunities wherever available from the government auctions, attenders, where they are available. Richa: Okay.

    Answer, kaushik khona

    Kaushik Khona: So, I would not be able to identify a one -on-one competition because we are into four or five major business segments. As we said we are into geospatial one can relate that to perhaps, to that element we can relate to the CE Infosys, which is into Map My India kind of with but it is, again a product. We are not into the product. If we look at the technology solutions, we have some companies which are based in Nagpur or who are based in Mumbai also which are of the similar size and which can b e kind of compared . But if you look at the kind of the bouquet of services which is offered by the company, I have not been able to come acros s any company which is an apple -to-apple company. So , that's my take on the competition , what was the second question I missed it? Richa: It was about the progression in the year in the order book.

    Answer, kaushik khona

    Kaushik Khona: So, I can give you the past in the sense, when we started 2023 -24 our order book was in the range of around 250 crore. When we closed the year 24 we were at around 700 crores. After execution of around 65 crore of projects, we are again at 750 crore and I said that there is a pipeline of the tenders which we are already tracking as of now of around 200 crore of which there are 70% of the tender pipeline we are already L1. So we hope that it could fructify, although I cannot give a guidance because that's all subject to the final government approvals wherever they are in relation to the tenders and the invites. And going forward, we are trying to focus more on similar exposure of geospatial and smart city solutions going into the different Page 7 of 19 states, like we are having major presence in Maharashtra and we are also having presence in Uttar Pradesh. We are trying to tap further into the states of Chhattisgarh, Madhya Pradesh, Jharkhand, Delhi and Rajasthan, where we already have people and infrastructure base d. So these are some of the states which we have identified to go into and tap further opportunities. The order book position we will be able to update it on a quarter-on-quarter basis, at the time of every periodic reports which we publish.

    Answer, kaushik khona

    Kaushik Khona: To be very frank, we apply where we feel that we have the ability to strike the deal. And historically, we have had a strike rate of almost (+90%). So it's something where after having done our diligence, after having seen that we have good capability to execute the project. There only we apply, and that's where we try to see that we meet the criteria of technical qualification, as well as ensure th at we also are kind of competitive on the commercial part. So, so far our strike rate has been in the range of around (+90%).

  9. Question

    Ankit Minocha: Overall, my first question was regarding the order book as well. So , if you are talking about a 750 crore order book in the next two years. That is substantial growth over our last year number. So firstly, do we have the execution capability currently to execute a 750 crore order book over the next two years and secondly, what would be the average, or a margin profile of this current order book?

    Answer, kaushik khona

    Kaushik Khona: A very valid question and thanks for your compliment. You are right , the order book has execution timeline of two years and two to three years in some case, because that also includes the O&M part of some of the orders. Capability wise we have added a lot of capacities over the last six months, where not only the execution part, we have also ensured that our systems are further upgraded to see that the execution are being monitored centrally, so as of now we have, the order book which we are trying to tap. We have ability of execution and the capability even on the technological side as well as management side. So we don't see any challenge in execution of even a higher order book as of now, and we are trying to therefore tap further. As regards the margins of order book, which we have already kind of signed off. The gross margins are quite good and we should be aiming as I said again, I should not be mistaken to give any kind of guidance.

    Answer, kaushik khona

    But going forward, we should be able to achieve our targets of having a higher EBITDA growth on a sustainable business between 20 % to 25% to 30% in the next one or two years. Page 8 of 19 Ankit Minocha: Thank you for the clarity.

  10. Question

    And my second question is with regard to seasonality in the business. So, I was kind of looking at the quarter-on-quarter numbers. And for example, the June quarter was very strong last year, and it also comes from this year, but then we saw some kind of a dip in quarter two and quarter three. So is there a seasonal element to the business, wherein these executions and tenders are executed more over a certain point of time, and should we be taking that into account?

    Answer, kaushik khona

    Kaushik Khona: Let me first of all clarify these all projects, which we do are little long term projects in the sense, they either span from nine months to 12 months to sometimes two years also, and typically they are, we therefore have a structured way of doing business which we measure, although the measur ement obviously happens quarter -on-quarter. But the kind of the cyclical fluctuations which could happen gets even out on a yearly performance parameter basis. So, I would rather look at the performance on a year-on-year basis and there may be various reasons for a specific quarter performance for example we just said that this quarter we had COC, which is the code of conduct. But without going into such kind of reasons, we normally have a cycle where financial year end is the measurement, because even these clients, whether it is government or corporates, they also want the project to be kind of measured at the end of the year. And therefore we would also measure our performance through the financial year performance. So quarter-on-quarter fluctuations may remain, but because it's, as I said, it's an ongoing project, and sometimes the timelines to invoice a particular element of the execution may not have been attained, but over a year that can be measured on a seamless basis.

Show 18 more questions
  1. Question

    Ankit Minocha: So, if I am understanding correctly, then Q4 is your strongest quarter usually?

    Answer, kaushik khona

    Kaushik Khona: One can, if you look at the last year quarter four, normally what happens is, financial year end is where people take, the clients ensure that let's measure our ourselves. And that's where normally whatever pending issues are normally getting addressed at that within the year itself. That's why I said we look at the financial year end. And typically quarter four happens to be that way of closure. So year-on-year, if you have seen perhaps the quarter four would be a kind of balancing quarter w here whatever has not been built , not been achieved those timelines also get fructified over there.

  2. Question

    Pritesh Vora: My question is, your margin has come off this quarter and I just also want to understand the client profile, who are our client and whom do you serve is this is a tender led business, or there is a fixed client, and if it is a client tender led business, what is our order book position as of now?

    Answer, kaushik khona

    Kaushik Khona: Thanks for joining. I guess you must have joined little later, most of the questions which you have raised, I will just repeat them. Yes, it is 70% of the total business is government business Page 9 of 19 which are awarded through tenders, and therefore they are in relation to those projects. Second is, there will be quarter -on-quarter fluctuations. So therefore we just requested all of you to kindly look at the performance on a yearly basis, rather than looking into on a quarter- on-quarter basis. The third issue is, the order book is as I said in the beginning of the year, it was around 700 crores , we are at right now 750 crore of confirm order book. And we have a further pipeline of around 200 crore for wh ich we already have bid and the final decision for the allotment or award of the order is still pending.

    Answer, kaushik khona

    So we expect the order book to continue to be strong, which will help us to perform higher execution targets year-on-year.

  3. Question

    Pritesh Vora: My second question is about, how do you rate your capability vis-à-vis other people in GIS phase, there are a couple of people in India who serve to Google and other multinational for the GIS space. How do you rate yourself in that aspect?

    Answer, kaushik khona

    Kaushik Khona: So if you ask me, we have various buckets of the business segments, and if I were to compare with any of the such competition, like those who are serving Google or we have just acquired one company which was serving Ericsson, which is also a large multinational in US. So we are serving those large clients also through such verticals. And that doesn't make , it's only a part of the whole. So we have various business segments where our focus remains on providing the smart city solutions as a sol ution, and which also therefore includes parts of that which has let's say geospatial, more on to the technological aided software development solutions, and therefore we don't only cater to the large clients like Google or Ericsson or for that matter, any of these Amazons, but these are one of the buckets which caters to such businesses which we had also in the initial Introduction we mentioned about the manufacturing and other industrial customers.

  4. Question

    Pritesh Vora: Sir will you compete with Cyient, or will you go to US and other geography to compete with Cyient and other people in this space?

    Answer, kaushik khona

    Kaushik Khona: I have little knowledge about that, so I won't be able to comment on it. Our focus right now, on US is to set up the geospatial arm, and we are trying to focus over there. And in that endeavor we have acquired one VTS company, which is into geospatial, which also I mentioned in the past. I am not quite aware about the Cyient, so kindly pardon me for that.

  5. Question

    Ankur Kumar: Sir, I wanted to ask in terms of our two segments, geospatial and technology. Is there a big difference in margins and how much of our order book can be divided into the two segments?

    Answer, kaushik khona

    Kaushik Khona: So, as I mentioned around 750 crore order book has around 550 crore book of geospatial as of now, and around 200 crore of order book on technology solutions, I can also mention which I have not clarified earlier, the 200 crore pipeline which we are right now banking on, subject to the final award, 80% of that is into technological solution. So if everything had to come through, Page 10 of 19 then this percentage of technology solutions into order book will further improve. That's a mix of the business which we are catering into. As regards margins , we have already given a kind of the margins which we have been sustaining, and we aim at improving it further on a sustainable business as we grow further.

  6. Question

    Ankur Kumar: But there is no significant difference in the margin between the two segments, is that right?

    Answer, kaushik khona

    Kaushik Khona: It doesn't make difference between overall segments. There will be some contracts which may have a higher margin because of our special exposure to that particular geography or that business. But typically, on an average, the margins for both the segments s hould be in the similar range, as I said between 20% to 25% to 30%.

  7. Question

    Ankur Kumar: Got it sir. And sir on the 200 crore bid pipe and when can we expect good numbers?

    Answer, kaushik khona

    Kaushik Khona: We will be able to communicate as soon as we get because, as per the stockation requirement also as and when we get a further order book confirmed we do publish. And within the month of September, almost 150 crore out of 200 crores should be decided now, whether we are awarded or not that you will be able to communicate.

  8. Question

    Ankur Kumar: Got it, sir. And sir any more bids in future coming as in how are the things looking on the bid side because, as you said, we get lot of confirmed orders on the basis of bids only?

    Answer, kaushik khona

    Kaushik Khona: Yes. So we continue to tap the options available , there are a lot of opportunities which are coming. I am sure you must have gone through the recent honorable Finance Ministers budget, where they have in fact if you look at the outlay budget, they have identified a total expenditure outlay of around 1,13,000 crore on the three elements which is geospatial, smart city development and the energy solutions. In which all of these we are there as a present. So not that I am saying that we will be benefiting out of that, under the 1,13,000 crore worth of outlet, but there are a lot of opportunities which we expect to happen, because the government focus on these areas is significant and has come out very starting in the budget which has been announced by the honorable finance minister on the 23rd of July. Ankur Kumar: Got it. And any comments on working capital side, how soon can we receive?

    Answer, kaushik khona

    Kaushik Khona: So as we have been seeing that we are into a projects which span into a period of one year, two years, and because these projects are, I would say spread across large geographies, which may cover sometimes multiple districts. The overall working capital cyc le may be little more, but quarter-on-quarter we have seen that the working capital cycle is now further reducing and we are able to see that the overall working capital cycle has improved substantially which can also be seen from the fact that none of our banking limits on fund based banking limits are being utilized. Right now we are sitting on a positive cash flow which even on the presentation you would have seen that we have a negative debt equity, which means that we are right now Page 11 of 19 sitting on a surplus of funds. So , working capital is not a major cause of concern, and it's a natural hazard, to this business if I can submit that way.

  9. Question

    Saurabh Sadhwani: Sir, can you please tell us what are the margin which will help you to achieve your aim for your margins of 20% to 30% range?

    Answer, kaushik khona

    Kaushik Khona: To be very frank, the kind of the expertise which we all already have built, I would not say that it's a major constraint to the new entry, but the technological knowledge which we possess, it's not easily replicable. And therefore, the margins which we are looking at is something which is always possible and therefore the levers of margin is the delivery. And as I already mentioned in the past, we have the ability to deliver. We have a good 1000 technically qualified, skilled employees with us, which help u s to execute with a good perfection. I also mentioned earlier that we are also having a technological enabled tool to ensure that all the projects are being monitored through a central database system. We also have implemented kind of certain software tools whereby the integration between diffe rent systems is also feasible and which enables the execution faster. So, the margin story of 20%, etc., is given with the kind of size of business which we are into.

  10. Question

    Saurabh Sadhwani: Okay. And sir could you give us an example of a project in both of your segments for geospatial engineering and technology section that you might have done , a use case you might have implemented?

    Answer, kaushik khona

    Kaushik Khona: Well, one very interesting project which we are right now undergoing, and that's a very large project which we are implemented within the short possible time of six months. It's called digital project management system, and this is a small project which is on the verge of completion, where we were awarded a contract through the Government of Maharashtra, where almost 900 schemes of water irrigation systems were to be integrated, for which a technological platform was to be built by us. We got all the schemes onto different formats of the documents which we converted all of them into GIS. We made them technological enabled, into a mobile platform as well as web enabled platform. We set up a system whereby a person can on an handset, go to the r espective location and do the audit. It will verify the asset, et cetera. And there would be an asset mapping also being done for the purpose of O&M, or asset tracking or the right now the Aadhaar system which is going to be implemented, will also be integrated to that.

  11. Question

    Anik Mitra: Okay. Sir, my next question is related to the data center. Is there any timeline, like when we can see some revenue coming from the data center business?

    Answer, kaushik khona

    Kaushik Khona: Well, I would not be able to give you any timeline , the segment has just started on 1st of August, in fact a very senior member perhaps, if you were on the call you would have Mr. Vijay, who is a very expert on this he has joined our Singapore subsidiary, and he has an experience of around 18 to 20 years on setting up the data centers in the Singapore as well as APAC region. And we are actively kind of tracking the possibilities for getting those kind of new options available. So, I would be able to get more specifics once I have something more to share, and as a normal transparent corporate behavior, once we have some kind of signed documents for new orders, the same will be published in the Stock Exchange. Anik Mitra: Fair enough, sir. Sir, m y final question is related to the government project. The payment history of government projects are not very pleasant in India. So as your 70%, 75% projects are from government only.

    Answer, kaushik khona

    And I would guess the government is also guided by its own parameters of corporate governance. We have seen that in these projects like the water related or the IoT based projects, or the DPMS projects, the overall outstanding has been hardly 15 days or 20 days. So, I don't think there is any major cause of concern when we look at the government projects. Yes, there are few small projects, which had perhaps the government allocation of funds was dried up, and we are waiting for the fresh allocation. That's where the outstanding remains due for two, three, four months. But that is, unavoidable when it looks to the central and these happen when there is a project which is co-funded by state government and central government. So it could be possible that state government has the funds and central government funds are awaited, or vice-versa, in which case there can be small delays.

  12. Question

    Sidhesh Saraf: Just wanted to get a sense of how you see Ceinsys going in, let's say five years from now. With regards to the current business segments we have, how big do you envision each of the three segments to be and do you plan to add any other lines of business , for example you have just added data centers, any color on how you are thinking about the business in the long run will be very helpful.

    Answer, kaushik khona

    Kaushik Khona: Well, thanks for the compliment first of all, and both the questions which you have, have little bit of challenge for me, because we are all talking about future, but I can only tell you that the two lines of segments which we are classified, which is geospatial and engineering services and technological solutions, which are the two segment bu sinesses which we have classified ourselves, seem to have a good kind of visibility for the next few years. I can't give any kind of due date for when t hey will kind of mature. And it's difficult for me to give you any guidance as to from a last years of 250 crore, whether I will be 400 crore this year, or what I will be this year, it's difficult for me to give you any guidance. And as I said, it will be a forward looking statement which I am guided not to be giving such guidance, but we are on a growth mode, which on a quarter-on-quarter you will see the results. So, I am sorry for that, I am not able to answer your questions with a clear answer.

  13. Question

    Sidhesh Saraf: No, that's all righ t. If qualitatively, you could help us understand how you deepen the capabilities in each of the segments. What can we expect in three to five years , then we can think around, how the organization is going to shape up eventually?

    Answer, kaushik khona

    Kaushik Khona: Yes. So qualitatively, as I said we have a huge capabilities of execution, the technical qualification, we are adding some more qualities of people, we have added as you said, as you already observed, we are trying to add into a new segment which is called the tech enabled services in the form of setting up or consulting for the data centers, which also we see a large Page 15 of 19 options. And right now, I would not say that we are even 1% of the market. So the market is huge and if really, even if we work to get 2% to 3% to 5% of the market, we can grow substantially. So, would fail to give any clear guidance, but, let's wait and watch for next maybe two quarters, three quarters, at the end of the year you will come to know where we are heading to.

  14. Question

    Ashish Soni: And in terms of execution what sort of risks are you seeing in next one or two years, and how are you gearing up for it?

    Answer, kaushik khona

    Kaushik Khona: Well, I first of all, there are general risk which any industry or any company would have, those risks will apply to me, but they are very general in the sense inflation or government stability, et cetera. But otherwise, I don't see any risk as regard the skill set, as regards the capability issue on the funds, as well as on the technical skills. And we are, you would have already seen that we have presence in India at around seven states as of now. We also have presence in US, which we are expanding further. We have presence in UK and Germany and also in Singapore now. So, we are trying to leverage our strength and get strength complementing from each other, that is where we are able to kind of build up our strength. So, I don't see any major risk factors other than the normal the way you mentioned when we look at a SWOT analysis, same way those peculiar risk factors will be there.

  15. Question

    Ankit Minocha: This is in reference to Slide #11 that you shared the segmental performance. So , I was just looking at the margins for the geospatial and engineering services. And I believe this quarter, the margin has significantly gone down from what the margin profile was say for Q1 FY24 or for Q4 FY24. So could you please help us with what would be the reason for this margin going down significantly for this part of the business?

    Answer, kaushik khona

    Kaushik Khona: So, I would again like to emphasize that there will be some quarterly fluctuations on the margins, mainly because there are cycles where we are, because these are projects on a ongoing basis which has a time timelines of maybe one year, two year, and therefore there will be sometimes the timelines to the issue the invoices may not have fructified, and therefore we always believe that the margin measurement or the performance measurement should be done on a yearly basis, which is on a financial year basis. So t he quarter fluctuations may be there, we would like to kind of submit that . Let’s look at the yearly review rather than the quarterly review. And if you see year-on-year performance on a margins also there have been a substantial improvement over the last three years, or on a cumulative basis if you see you go on to slide #13, you would have seen that the margins have improved from 11% to 14% to 17% in the last three years, and even now if you look at a quarter one, it still improved at around 17.9% but as I said, I don't want to give this quarter as an indication for the margin. Let's look at the financial year once it completes, we will get a better picture of a sustainable impr oved margins for going forward.

  16. Question

    Ankit Minocha: Sir that is clear, but what we are actually kind of getting to is, specifically for the geospatial and engineering services. So , if I look at the margin for quarter one, that's close to 17% versus I understand that we have to look at from year basis. But overall, last year the margin profile for the geospatial and engineering services was close to 25% . So considering if we expect a lot of the growth to come from geospatial and engineering, then in that case, is this growth margin dilutive that we are anticipating?

    Answer, kaushik khona

    Kaushik Khona: As I said again, I am perhaps putting myself into, going into minute detail, but I would just give one example, which I don't think I want to defend as an example. But in that, let's say, in this quarter there is a project which is a TPI which I am doing at Lucknow, that TP I project for the entire quarter, which is April, May, June, could not progress well, because the funds were not allotted at the Uttar Pradesh SWSM, and the projects were not implemented by the contractor, because the funds were not allotted in view of the COC, now the funds have been allotted, and the project has already started, and we have also got a substantial enhancement, or I would say, the extension for the project. So the 1st Quarter which we lost on the TPI, the total turnover which would have lost would be in the range of around 12 to 13 crore, while the cost continued to be incurred that would be kind of recouped over the next three to four quarters. So, I am just giving an example, you are well versed to understa nd the impact of it. There will Page 17 of 19 be certain projects which perform well in one quarter or which lag behind in another quarter because of some of the other external reasons, but on an overall basis, in a year these would be even out.

  17. Question

    Ankit Minocha: Understood sir, that’s right thank you. And, on the same question is 17%, it's just a continuation of the same question. So, 17% be the sustainable margin for the GIS business on a yearly basis, or 25% be a sustainable margin on a yearly basis?

    Answer, kaushik khona

    Kaushik Khona: I have already made, first of all, I don't want to be a guiding , giving you guidance for the margins, but we are aiming at sustainable margins on a growth and we should see that over the year end, when we see that, and the indication of the last three years should give you an indication that we are growing. We are not stable last year 14% or this year 17% and our aim is that, even the book which we talked has a margins, EBITDA margins on the range of around 20% to 25% to 30%. So let's look at the year end and you will see the final margins, how they have played well.

  18. Question

    Punit Singh: Yes, the other income that we get.

    Answer, kaushik khona

    Kaushik Khona: So we have a joint venture company called AllyGram, where Allygrow, which is our wholly owned subsidiary has a 70% profit share, I would say the shareholding share with Grammer of Germany, 30%, it's a 70:30 venture. Because it's a 70:30 venture we are not able to consolidate the top line. We have to only factor into the share of profit as per the accounting standards applicable. The AllyGram is also into the same business as Allygrow, and which is specifically into mobility business, where we are giving them that engineering services on the automotive part, and AllyGram is a world known name Grammer. Grammer is world known name on these engineering services, and they have a huge exposure on various automobile companies, including major stake into General Motors and all . So our business is , what we do for the business in the engineering services in Allygrow, we have AllyGram, which is supported through Grammer. This year , in fact we have already given kind of stock exchange clarity, where Grammer has renewed further for a period of three years, where they have committed to give us a business of almost 100 crore, which is almost I would say, €11 million, and which is Page 18 of 19 therefore a growing business as compared to what we had in the past.

    Answer, kaushik khona

    Kaushik Khona: The margins are in the range of around 26% our share what you are seeing is this quarter share of 70% so if I have to gross it up, it will be in the range of around 4.2 crores. And on a total top line of around 12 to 13 crores of this quarter and a yearly this business will contribute around 45 crore as per the advice which Grammer has already provided . So a top line of around 45 crore in this year with a margin of around 26% which is the past year's margin which we have achieved in this business.

    Answer, kaushik khona

    Kaushik Khona: So you are right, not all projects have O&M. If I talk about 750 crore order book, there are only four to five projects which have O &M, O&M are again, not a fixed for every contract. There is a project where there is two year O&M, there are two projects where we have five year O&M, Page 19 of 19 and the O&M period starts after the project CAPEX period is over. So out of 750 crore, the O&M part will be hardly around 55 to 60 crore. Richa: And sir my last question is , you were referring to a native working capital cycle, that is also a result of the high payable days that you enjoy, because being in the government business, the receivable days are on the higher side. But even the payable days are very strong 400 odd to 1000 odd. So what is the reasonable number that one can go with?

Questions about this call

When was the Ceinsys Tech Q1 FY25 earnings call transcript filed?
Ceinsys Tech filed the transcript with the exchange on 14 Aug 2024. This page is built from that transcript.
What does this page list?
56 statements from the transcript across 8 topics, 37 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 28 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
Ceinsys Tech Q1 FY25 concall: Ceinsys' current order book stands at around 750 crores, and it is pursuing a bid book pipeline of around 200 crores · DalalOS