Ceinsys Tech Q2 FY26 earnings call: Ceinsys Tech Limited's total order book stood at Rs. 1,092 crores as on September '25

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

Total order book stood at Rs. 1,092 crores as on September '25. The company anticipates its net working capital cycle to reduce to approximately 120 to 130 days in the coming quarters. The river linking project had almost 57 milestones, which were changed to some extent after the government required Phase-1 to be completed first; Ceinsys Tech Limited had completed Phase-1. The company reported operational revenue of Rs. 164 crores, up 82% year-on-year, in the 2nd Quarter Ended 30th September 2025. The company has completed proofs of concept for other customers with accuracy of more than 95% as required by the customers.

The numbers management gave

Results

  • The company reported operational revenue of Rs. 164 crores, up 82% year-on-year, in the 2nd Quarter Ended 30th September 2025.
    Show source
    For the quarter under review, our operational revenue grew by 82% year-on-year to Rs. 164 crores.
  • The company reported EBITDA of Rs. 36 crores, up 112% year-on-year, and an EBITDA margin of 21.77%, an improvement of 310 basis points year-on-year, in the 2nd Quarter Ended 30th September 2025.
    Show source
    EBITDA grew by 112% year-on-year to Rs. 36 crores, with an EBITDA margin of 21.77%, reflecting an improvement of 310 basis points year-on-year.
  • The company reported net profit of Rs. 26 crores, up 120% year-on-year, with PAT margins of 15.72% in the 2nd Quarter Ended 30th September 2025.
    Show source
    Net profit stood at Rs. 26 crores, representing a growth of 120% year-on-year, with PAT margins at 15.72%.
  • Operational revenue grew 95% year-on-year to Rs. 320 crores in the First Half Ended 30th September 2025.
    Show source
    For the first half of the year, our operational revenue grew by 95% year-on-year to Rs. 320 crores.
  • First-half operational revenue of Rs. 320 crores exceeded its consolidated revenue of Rs. 254 crores for the year 2023-24.
    Show source
    So, the first half of this year overtakes that by substantial numbers.
  • EBITDA increased 119% year-on-year to Rs. 66 crores, with an EBITDA margin of 20.56%, an improvement of 226 basis points year-on-year, in the First Half Ended 30th September 2025.
    Show source
    EBITDA increases by 119% year-on-year to Rs. 66 crores, with EBITDA margin at 20.56%, which is an improvement of 226 basis points year-on-year.
Show 29 more statements

Results

  • The company reported first-half net profit of Rs. 57 crores, up 143% year-on-year, with PAT margins of 17.93% in the First Half Ended 30th September 2025.
    Show source
    Net profit for the first half was Rs. 57 crores, a growth of 143% year-on-year, with PAT margins at 17.93%.
  • The Technology Solutions segment contributed 54% to Ceinsys Tech Limited's total turnover in Quarter 2 of FY '25-'26.
    Show source
    The Technology Solutions segment contributed 54% to the total turnover this quarter, reaffirming the company's strategic focus on the high-value digital initiatives.
  • Geospatial and Engineering Services projects grew 39% year-on-year from Rs. 54 crores in Quarter 2 of '24-'25 to Rs. 75 crores in Quarter 2 of '25-'26, reflecting sustained demand and operational excellence.
    Show source
    The Geospatial and Engineering Services projects grew by 39% year- on-year from Rs. 54 crores in Quarter 2 of '24-'25 to Rs. 75 crores of this quarter, reflecting sustained demand and operational excellence.
  • Net working capital cycle stood at 160 days in the 2nd Quarter Ended 30th September 2025, with improvements in recovery since October '25 and further expected recoveries in the next two to three months; its working capital cycle was 160 days in the quarter ended September 30, 2025.
    Show source
    The working capital cycle for this quarter ended has been at 160 days.
  • The company has maintained a working capital cycle of around 120 to 127 days in the past as a normal cycle for its business and government projects.
    Show source
    But as a normal kind of cycle, which we predict for the purpose of the business in which we are and the government project which we are, we have been maintaining a working capital cycle of around 120 to 127 days even in the past.
  • EBITDA margins improved by more than 247 basis points and 310 basis points on a year-on-year basis in the 2nd Quarter Ended 30th September 2025.
    Show source
    The EBITDA margins have improved by more than 247 basis points and 310 basis points on a year-on-year basis.
  • 80% of Ceinsys Tech Limited's debtors were less than 6 months old, 10% were more than 6 months old, and the rest were more than one year old.
    Show source
    Balance 10% is more than 6 months, and rest all is more than one year.
  • A Ceinsys Tech Limited subsidiary has been investing heavily in business development, including in the U.S. market, and expensed around Rs. 7-8 crores on business development and IP in this quarter.
    Show source
    So, if you look at this quarter also, we expensed out around Rs. 7-8 crores.
  • Total creditors increased by almost Rs. 100 crores while total receivables increased by around Rs. 140 crores; creditors increased by around Rs. 58 crores due to back-to-back payments linked to client receipts, and payments will be made once client payments are received.
    Show source
    So, if you see, the total creditors have also gone up and the total creditors have gone up by almost Rs. 100 crores, while the total receivables have gone up by around Rs. 140 crores.
  • Employee cost was around Rs. 33 crores in this quarter, the same as in the corresponding quarter last year; Rs. 32 crores worth of employee cost achieved a turnover of Rs. 90 crores.
    Show source
    And today also in this quarter also is around Rs. 33 crores.
  • The company generated turnover of Rs. 163 crores on Rs. 32 crores of employee cost in the 2nd Quarter Ended 30th September 2025.
    Show source
    This time, on a Rs. 32 crores of employee cost, we achieved a turnover of Rs. 163 crores.
  • Revenue run rate was Rs. 165 crores in Quarter 2 of the 2nd Quarter Ended 30th September 2025.
    Show source
    And if you look at the quarter run rate, it is Rs. 165 crores of Quarter 2.
  • The company had booked around Rs. 48 Cr of revenue from the river linking project in Quarter 1 and Quarter 2, in addition to a small amount billed in Quarter 4 of last year.
    Show source
    Around Rs. 48 Cr, we have already booked the revenue in Quarter 1 and Quarter 2, in addition to small numbers which was already billed in the Quarter 4 of last year.
  • The company had booked Rs. 48-49 crores of revenue from the river linking project by this quarter end.
    Show source
    So, I think by this quarter end, we are around Rs. 48-49 crores is the revenue which has already been booked from this river linking project.
  • The company reduced delivery timelines by 30% through its AI-related efficiency improvements.
    Show source
    So, we are drastically reduced by 30%.
  • Receivables more than 6 months old were 10% in the 2nd Quarter and the First Half Ended 30th September 2025.
    Show source
    Kaushik Khona: I think CFO has already clarified that more than 6-months bucket is 10%.
  • Recoveries on Ceinsys Tech Limited's government projects are typically slow during the first two quarters, as government project disbursements happen substantially during Q3 and Q4.
    Show source
    Typically, the government projects' disbursements happen during Q3 and Q4 substantially.
  • EBITDA margins improved because older, lower-margin projects are being completed and new, higher-margin projects are being executed.
    Show source
    I think it is only because the old projects which had lower margins are getting completed, and the new projects which are having higher margins are being executed.
  • Working capital cycle was 160 days in the quarter ended September 30, 2025. Replaced by a later filing.
  • Receivables are typically payable within 30-45 days; receivables on government projects were delayed because funding from the central government had not been secured, and the company expects significant debtor recoveries in November, December and January. Replaced by a later filing.
  • Revenue and EBITDA margin growth was driven by successful project execution, which contributed to stronger margins. Replaced by a later filing.
    Show source
    The growth in both revenue and EBITDA margins was driven by successful execution of projects, which have contributed to stronger margins.
  • Operational efficiency initiatives enabled it to manage higher volumes more effectively, boosting operational performance. Replaced by a later filing.
    Show source
    Additionally, our ongoing initiatives to improve operational efficiency have enabled us to manage higher volumes more effectively, further boosting our operational performance.
  • The company received one tranche of substantial recovery after the September end. Replaced by a later filing.
    Show source
    We have already got one tranche of substantial recovery in the month of quarter, which is after the September end.
  • Use of AI has improved efficiency in data processing, contained costs and benefited customers. Replaced by a later filing.
    Show source
    We have been doing a lot of tooling all this while, but since the advent of AI, we have been able to do a lot of efficiency in data processing, which has contained the costs and benefited the customer.

Money and capital

  • The company maintained an operational cash surplus of Rs. 47 crores in the 2nd Quarter and the First Half Ended 30th September 2025.
    Show source
    We also continue to maintain a solid financial position with an operational cash surplus of Rs. 47 crores.
  • The company invested Rs. 21 crores towards technology innovation and business development to further expand its presence in the U.S. market, with Rs. 13 crores already expensed out towards the profit-loss account during the 2nd Quarter Ended 30th September 2025.
    Show source
    We invested Rs. 21 crores towards technology innovation and business development to further expand our presence in the U.S. market, with Rs. 13 crores out of this already expensed out towards the profit-loss account during this quarter.
  • Since July 2024, when Ceinsys Tech Limited acquired the VTS business, it capitalized hardly Rs. 8 crores of CapEx for the acquired IP and future business prospects and expensed Rs. 36 crores on business development and promotions.
    Show source
    So, Rs. 36 crores is something which is expensed out, and Rs. 8 crores is what is capitalized.
  • Debtors were less than 120 days.
    Show source
    The UBR cycle then adds to it, which is why we said around 120 days is the overall cycle.
  • The company has filed two patents for process technology developed on its AI/ML technology.
    Show source
    We have also filed two patents for the kind of process technology which we have developed on this AI/ML technology.

What it expects ahead

What management expects

  • The company believes its working capital cycle would be somewhere near 100 at one point of time.
    Show source
    And therefore, we believe that at one point of time, the working capital cycle would be somewhere near 100.
  • The company expects its working capital cycle to remain between 120 to 130 days, given recoveries already received and expected in the next three months; it anticipates its net working capital cycle to reduce to approximately 120 to 130 days in the coming quarters.
    Show source
    Therefore, with the kind of the recoveries already happened in one tranche as well as the recovery expected in the next three months, we expect that the working capital cycle will remain between 120 to 130 days.
  • The company will try to bring its working capital cycle down further, particularly in Quarter 4.
    Show source
    However, we will try to bring it down further.
  • The company expects a way forward on two acquisition targets within the next one or two months and hopes to announce acquisitions by Quarter 3 or Quarter 4.
    Show source
    Ceinsys Tech Limited November 07, 2025 Page 11 of 25 Hopefully, by Quarter 3 or Quarter 4, we will be able to give some kind of announcement about the acquisitions which we are pursuing.
  • The company expects a bigger pipeline from the U.S. market in Quarter 4 of this year and Quarter 1 of the next year, as a result of its business-development and IP investment.
    Show source
    The result of this is what we are expecting, as we already clarified in the previous investor call, in the Quarter 4 of this year and Quarter 1 of the next year onwards, we should see a bigger pipeline.
  • The company has certain large contracts under negotiation in the U.S. market and expects to give an update in Quarter 4.
    Show source
    There are certain large contracts which are under negotiation also over there, and we expect to kind of give some kind of update on that in the Quarter 4.
Show 15 more statements

What management expects

  • The company expects major sign-offs in Quarter 3 or Quarter 4 in the range of around Rs. 700-800 crores.
    Show source
    And we also clarified in the previous Investor's Call that our pipeline is substantial, and we expect in the Quarter 3, Quarter 4, some major sign-off happening in the range of around Rs. 700-800 crores was already clarified during the Quarter 1 call.
  • The company expects a probability of winning up to 70% to 80% of the Rs. 700-800 crores of potential orders.
    Show source
    So, I can say out of the 700-800, we can win up to 70% to 80%.
  • The company expects recovery of almost all overdue debtors in November, December, and January; receivables are typically payable within 30-45 days, receivables on government projects were delayed because funding from the central government had not been secured, and the company expects significant debtor recoveries in November, December and January.
    Show source
    And we have also got feedback that in the month of November, December, January, we should be able to get a recovery of almost all the overdue debtors.
  • The company expects technology-advanced projects such as IoT, artificial intelligence, and ML projects to contribute a higher margin.
    Show source
    And we also have the statement which we mentioned in the beginning, opening statement, that our focus on the technology advanced projects like IoT or artificial intelligence, ML projects are going to contribute a higher margin.
  • The company expects its weighted average percentage of EBITDA to steadily improve based on the projects it is pursuing.
    Show source
    But based on the numbers which we have with the project which we are pursuing, we expect this to continuously, steadily improve.
  • The company expects the pending unbilled revenue from one or two old projects to be billed by March.
    Show source
    But those also are expected, as already clarified by our CFO, by March.
  • The company anticipates its net working capital cycle to reduce to approximately 120 to 130 days in the coming quarters. Replaced by a later filing.
  • The company expects to give some kind of good news on acquisitions in the next one or two months or, at most, by the next one quarter. Replaced by a later filing.
    Show source
    We have waited enough, and I think in the next one or two months or maximum by the next one quarter, we should be able to give some kind of good news.

Orders

  • Total order book stood at Rs. 1,092 crores as on September '25.
    Show source
    As on September '25, our total order book stands at Rs. 1,092 crores, reflecting healthy demand and Ceinsys Tech Limited November 07, 2025 Page 5 of 25 strong customer confidence.
  • The company secured an AEC software development project valued at Rs. 21 crores, including a three-year enterprise license commitment, during the 2nd Quarter Ended 30th September 2025.
    Show source
    These include an AEC software development project valued at Rs. 21 crores, which also includes a three-year enterprise license commitment, and two project management consulting contracts valued at Rs. 115 crores and Rs. 11 crores, respectively.
  • The company secured two project management consulting contracts valued at Rs. 115 crores and Rs. 11 crores during the 2nd Quarter Ended 30th September 2025.
    Show source
    These include an AEC software development project valued at Rs. 21 crores, which also includes a three-year enterprise license commitment, and two project management consulting contracts valued at Rs. 115 crores and Rs. 11 crores, respectively.
  • The company bagged a Rs. 115 crores project from MMRDA.
    Show source
    We just bagged a big project from MMRDA, which is Rs. 115 crores.
  • The company bids for large orders with a minimum ticket size of Rs. 50 Cr, and some orders in its pipeline could be around Rs. 100 Cr or Rs. 150 Cr.
    Show source
    So, based on our past experience of last three, four quarters, you would have seen that we look at bidding large orders, minimum ticket size of, let's say, Rs. 50 Cr. Some of the orders which we are in the pipeline could be in the range of around Rs. 100 Cr, Rs. 150 Cr also.
  • Projects have an average execution timeline of 18 to 24 months; some projects include O&M revenue for two to five years thereafter.
    Show source
    Kaushik Khona: On an average, it is around 18 to 24 months.
  • Mobility and product businesses have annual contracts worth almost Rs. 100 crores to Rs. 150 crores that are not included in its order book.
    Show source
    So, even on those, I think almost Rs. 100 crores to Rs. 150 crores of the annual business is something which is beyond the order book.

What it is building and selling

Projects and capacity

  • The river linking project had almost 57 milestones, which were changed to some extent after the government required Phase-1 to be completed first; Ceinsys Tech Limited had completed Phase-1.
    Show source
    But the milestones were then changed to some extent where the government wanted the Phase- 1 to be first completed, which we already completed.

Segments

  • The company has completed proofs of concept for other customers with accuracy of more than 95% as required by the customers.
    Show source
    However, we have done a good amount of, I would say, POC even for the other customers, and Ceinsys Tech Limited November 07, 2025 Page 23 of 25 we have been successful with the kind of accuracy more than 95% as required by the customers.
  • The company offers geospatial intelligence services including data creation, data analytics, decision support systems, and enterprise web solutions.
    Show source
    We offer a broad range of geospatial intelligence services, including data creation, data analytics, decision support systems, enterprise web solutions.
  • The company is venturing into software product development and emerging technologies through a vertical focus on artificial intelligence and machine learning and embedded electronics.
    Show source
    Additionally, the company is venturing into software product development and emerging technologies through a vertical focus on artificial intelligence and machine learning and embedded electronics.
  • The company is enhancing its AI/ML solutions in-house to improve efficiency, reduce the cost of people and increase turnaround time; it is not presently selling these solutions to customers.
    Show source
    So, I think at present, we are not selling this to the customer.
  • The company has applied AI initiatives in the river linking project and the DPMS project, and some projects have benefited from those initiatives.
    Show source
    Some of the projects which we have also used, I would say, also a little bit application has also been made in the river linking project, in the DPMS project.
Show 3 more statements

Segments

  • Geospatial technology is a remote sensing application that relies on AI.
    Show source
    Geospatial technology is more of a remote sensing kind of application, which is completely relying on the AI side.
  • The company expanded into manufacturing technology and mobility engineering solutions through AllyGrow Technologies, covering the entire product development process and industrial automation for two and three-auto wheelers, passenger cars, commercial vehicles, and off-highway equipments. Replaced by a later filing.

Deals and partners

  • The company has more than 350 corporate clients contributing renewal business, which it does not include in its order book.
    Show source
    We have more than 350 corporate clients which continue to Ceinsys Tech Limited November 07, 2025 Page 19 of 25 contribute, which have renewal business.

Everything else said on the call

Group structure

  • The company has mobilized almost US$228 million for identifying more targets for inorganic growth in geospatial and engineering services and technology solutions.
    Show source
    Since then, we are identifying some more targets for inorganic growth to Ceinsys Tech Limited November 07, 2025 Page 4 of 25 expand our horizons into the domains where the company is already operating, that is, the geospatial and engineering services and technology solutions, for which the company has already mobilized almost US$228 million.
  • The company has mobilized $28 million, which is Rs. 235 crores, and is looking at companies with potential revenue of Rs. 50, 100, or 200 crores for acquisition, rather than small companies.
    Show source
    We are looking at companies which have a potential of either generating a revenue of Rs. 50, 100, 200 crores is what we are looking at.
  • In 2022, Ceinsys Tech Limited acquired Allygrow Technologies, a specialized engineering service provider with a strong international presence, expanding into the mobility sector.
    Show source
    In the year 2022, the company strategically expanded into the mobility sector by acquiring AllyGrow Technologies, a specialized engineering service provider with a strong international presence.
  • The company successfully acquired assets of a geospatial company in the US in July 2024; the company has strong exposure to the telecom sector.
    Show source
    In the year 2024, we acquired a geospatial business of VTS in USA, which was majorly operating in the telecom domain.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Jyoti Singh: Thank you. Hello and good morning, everyone. On behalf of Arihant Capital Markets, I thank you all for joining in to the Ceinsys Tech Limited Q2 H1 FY '26 Earnings. Today, from the Management, we have Mr. Prashant Kamat, he is the Whole-Time Director, Vice Chairman and Chief Executive Officer; Mr. Surej K.P., he is the Whole-Time Director and CEO, and Mr. Kaushik Khona, he is the Managing Director (India Operations), and Dr. Abhay Kimmatkar, he is the Managing Director, and Ms. CA Amita Saxena, she is the Chief Financial Officer. So, without any further delay, I will hand over call to Mr. Kaushik Khona, Managing Director, India Operations, for his opening remarks. Over to you, s

    Answer, kaushik khona

    Kaushik Khona: Thank you, Ms. Jyoti. Thank you and good morning, everyone. It is a pleasure to welcome you to the Earnings Conference Call for the 2nd Quarter and the first half of the Financial Year 2025- 26. Let me first thank the host for today's con call, M/s Arihant Capital. In the interest of some of the people who may be new to the company, let me first start by giving you a brief overview of the company, followed by the performance highlights for the quarter and the half-year under review. Ceinsys Tech has been recently branded as CS Tech Ai, while the corporate name remains as Ceinsys Tech Limited. We are a leading technology solutions provider in the IT-enabled sector.

    Answer, kaushik khona

    We are acclaimed for our expertise in geospatial engineering as well as other engineering services and solutions. We offer a broad range of geospatial intelligence services, including data creation, data analytics, decision support systems, enterprise web solutions. In the year 2022, the company strategically expanded into the mobility sector by acquiring AllyGrow Technologies, a specialized engineering service provider with a strong international presence. This acquisition allowed the company to enhance its capabilities into manufacturing technology and mobility engineering solutions, covering the entire product development process and industrial automation for diverse sectors such as two and three-auto wheelers, passenger cars, commercial vehicles, and off-highway equipments. In the year 2024, we acquired a geospatial business of VTS in USA, which was majorly operating in the telecom domain. Since then, we are identifying some more targets for inorganic growth to Ceinsys Tech Limited November 07, 2025 Page 4 of 25 expand our horizons into the domains where the company is already operating, that is, the geospatial and engineering services and technology solutions, for which the company has already mobilized almost US$228 million.

    Answer, kaushik khona

    We serve prestigious global clientele, including large corporates, OEMs, asset management companies, and government bodies, highlighting a robust reputation in both the geospatial and manufacturing sectors. With offices in India, United States, UK, and Germany, the company combines local expertise with a broad international reach. Additionally, the company is venturing into software product development and emerging technologies through a vertical focus on artificial intelligence and machine learning and embedded electronics. This vertical emphasizes the development of AI and ML-enabled applications and solutions to enhance our delivery for the existing domains at the outset, reflecting the company's commitment to innovation and maintaining a competitive edge in a dynamic technological landscape. Now, let me come to the highlights of our financial and operational performance for the 2nd Quarter and the First Half Ended 30th September 2025: We are pleased to report another strong quarter, our best 2nd Quarter so far marked by record revenue and EBITDA. For the quarter under review, our operational revenue grew by 82% year-on-year to Rs. 164 crores. EBITDA grew by 112% year-on-year to Rs. 36 crores, with an EBITDA margin of 21.77%, reflecting an improvement of 310 basis points year-on-year.

    Answer, kaushik khona

    Net profit stood at Rs. 26 crores, representing a growth of 120% year-on-year, with PAT margins at 15.72%. This performance continues our trend of steady sequential improvement with consistent quarter-on-quarter growth for more than the last 6 consecutive quarters. For the first half of the year, our operational revenue grew by 95% year-on-year to Rs. 320 crores. If you can recollect the performance of the company for the year 2023-24, on a consolidated basis, was Rs. 254 crores. So, the first half of this year overtakes that by substantial numbers. EBITDA increases by 119% year-on-year to Rs. 66 crores, with EBITDA margin at 20.56%, which is an improvement of 226 basis points year-on-year. Net profit for the first half was Rs. 57 crores, a growth of 143% year-on-year, with PAT margins at 17.93%.

    Answer, kaushik khona

    The growth in both revenue and EBITDA margins was driven by successful execution of projects, which have contributed to stronger margins. Additionally, our ongoing initiatives to improve operational efficiency have enabled us to manage higher volumes more effectively, further boosting our operational performance. As on September '25, our total order book stands at Rs. 1,092 crores, reflecting healthy demand and Ceinsys Tech Limited November 07, 2025 Page 5 of 25 strong customer confidence. We also continue to maintain a solid financial position with an operational cash surplus of Rs. 47 crores. Execution of Technology Solutions projects saw a 2.5 fold rise in Quarter 2 of FY '25-'26, rising from Rs. 36 crores in the corresponding quarter last year to Rs. 88 crores this quarter, underscoring strong demand and enhanced delivering capabilities. The Technology Solutions segment contributed 54% to the total turnover this quarter, reaffirming the company's strategic focus on the high-value digital initiatives. Our geospatial business also delivered healthy growth, driven by increased focus on water, IoT, and enterprise solutions.

    Answer, kaushik khona

    The Geospatial and Engineering Services projects grew by 39% year- on-year from Rs. 54 crores in Quarter 2 of '24-'25 to Rs. 75 crores of this quarter, reflecting sustained demand and operational excellence. Further, our net working capital cycle stood at 160 days during this quarter, with improvements in recovery since October '25 and further expected recoveries in the next two to three months. We anticipate the cycle to reduce to approximately 120 to 130 days in the coming quarters. We invested Rs. 21 crores towards technology innovation and business development to further expand our presence in the U.S. market, with Rs. 13 crores out of this already expensed out towards the profit-loss account during this quarter. During the quarter, we secured several major contracts, which underscore the strength and diversity of our offerings. These include an AEC software development project valued at Rs. 21 crores, which also includes a three-year enterprise license commitment, and two project management consulting contracts valued at Rs. 115 crores and Rs. 11 crores, respectively. These wins reflect the breadth of our capabilities and our continued success in securing large and strategic projects across multiple domains.

    Answer, kaushik khona

    In closing, we are focused on driving growth and continuing to deliver on our commitments. We remain optimistic about the future and look forward to sharing more updates as we progress. With this, I open the floor for a question-and-answer session. Thank you.

  2. Question

    Harshal Mehta: Pardon my ignorance, sir, if I have missed any information regarding this question. But I just wanted some clarification regarding the ESOP allotment to Prashant sir and some subsequent events after that. As I believe, in June '24, Prashant sir was allotted roughly around 650,000 options at Rs. 10 per share. Later on in Q4 FY '25 con call, Prashant sir clarified that he will be surrendering the remaining ESOPs because of the new CEO coming in and again in, I guess, July '25, 400,000 more options were issued to Prashant sir at Rs. 10 per share, I guess. And recently, in the result announcement, Ceinsys Tech Limited November 07, 2025 Page 6 of 25 I guess so, it was confirmed tha

    Answer, kaushik khona

    Kaushik Khona: If I can just submit, first of all, let me clarify, the ESOPs to all so far has all been allotted only at par. There have not been any differential pricing. That is point number one. The second point is Prashant sir has been granted the balanced ESOPs during June 2025, which is part of the deliverables to him. It is only in respect of the future ESOPs which were expected are not going to be given to him because he himself has clarified that he will be active with the company till December '25. And thereafter, Surej sir, who has already been appointed on the Board, will take over as a part of the operating, the CEO of the company, of the group. So, there is absolutely no confusion.

    Answer, kaushik khona

    It is only whatever was committed and based on his performance, whatever was due has been allotted. The next tranche of, I think, around 200,000, which is not going to be due, will not be granted to him. That is what he has expressed in the, I think, previous investor call. I hope that clarifies.

  3. Question

    Jyoti Singh: Sir, just wanted to understand, our working capital cycle currently stands around 160 days. So, what are the near-term steps to bring it down to 120 to 130? And also, on the employee cost side, it has dropped 37% comparatively last year. So, what structural efficiency enabled this, and if you can share some highlight on?

    Answer, kaushik khona

    Kaushik Khona: So, thanks for the question, Jyotiji. The working capital cycle for this quarter ended has been at 160 days. In fact, in the operational highlights in our investor presentation also, we have mentioned that during the first two quarters, typically, the recoveries are slow because many of these recoveries are due from the Government projects. Typically, the government projects' disbursements happen during Q3 and Q4 substantially. We have already got one tranche of substantial recovery in the month of quarter, which is after the September end. And we have also got feedback that in the month of November, December, January, we should be able to get a recovery of almost all the overdue debtors. And therefore, we believe that at one point of time, the working capital cycle would be somewhere near 100.

    Answer, kaushik khona

    But as a normal kind of cycle, which we predict for the purpose of the business in which we are and the government project which we are, we have been maintaining a working capital cycle of around 120 to 127 days even in the past. Therefore, with the kind of the recoveries already happened in one tranche as well as the recovery expected in the next three months, we expect that the working capital cycle will remain between 120 to 130 days. However, we will try to bring it down further. And that could happen more so in the Quarter 4. I hope I answered your question, Jyotiji. Jyoti Singh: Yes, sir. And sir, on the EBITDA margin side, that we have, and this time, we have performed really well.

    Answer, kaushik khona

    Kaushik Khona: So, I am happy that you noted that our EBITDA margins are improving. If you see the last six quarters, the EBITDA margins are steadily improving. This quarter, we have seen a substantial breakthrough. The EBITDA margins have improved by more than 247 basis points and 310 basis points on a year-on-year basis. I think it is only because the old projects which had lower margins are getting completed, and the new projects which are having higher margins are being executed. And we also have the statement which we mentioned in the beginning, opening statement, that our focus on the technology advanced projects like IoT or artificial intelligence, ML projects are going to contribute a higher margin. And that is where we see that even the turnover has also been steadily increasing.

    Answer, kaushik khona

    Ceinsys Tech Limited November 07, 2025 Page 8 of 25 So, even in this quarter, we have seen that the turnover contributed on the technology solutions has been higher, which also contributes to the overall weighted average percentage of EBITDA. We expect this to continue. However, we don’t give any kind of future outlook on what numbers it will be there. But based on the numbers which we have with the project which we are pursuing, we expect this to continuously, steadily improve.

  4. Question

    Nikhil Choudhary: So, want to understand, sir, what part of the unbilled revenue in this quarter has been carried forward from the last March numbers? And second thing, how much of our billed receivables are pending more than 6 months?

    Answer, amita saxena

    Actually, our 80% debtors which we have is less than 6 months only. Balance 10% is more than 6 months, and rest all is more than one year. So, 80% of the chunk of debtors is less than 6 months.

  5. Question

    Ayush Agarwal: Sir, just a follow-up on the previous participant’s question. I wanted to understand, I mean, his question was correct that of the Rs. 130 crores of unbilled revenue as of March, how much would have moved to the billed receivable and how much still stays in unbilled? Because that will help us understand that of the H1 revenue, how much has moved to unbilled?

    Answer, kaushik khona

    Kaushik Khona: So just to, I think our CFO has already clarified that majority has also already been billed. Because typically, in our project cycle, what happens is that the unbilled revenue is only a temporary phenomenon where we have completed the execution of a particular event, and then the milestone for billing is achieved in the next quarter. So, I would say out of, let's say, Rs. 135 crores UBR, we would have more than Rs. 125 crores would have been billed so far. It is only one or two schemes where it was under the lull, as I said, part of the old projects which would have kept pending. But those also are expected, as already clarified by our CFO, by March. So, I think Rs. 8-10 crores out of Rs. 130 crores was pending, but that is also under progress, and that should also be billed. CA Amita Saxena: Actually, it is a continuous process.

  6. Question

    Ayush Agarwal: Just a follow-up on this. You mentioned that there were some recoveries in the month of October. Can you quantify that number? Ceinsys Tech Limited November 07, 2025 Page 10 of 25 Kaushik Khona: We have already received one major tranche of around Rs. 40 crores, and further recoveries of almost around, small other recoveries of around Rs. 20 crores has already been made in the month of October, last week of October.

    Answer, amita saxena

    Having said that, we are also focused into transportation. We just bagged a big project from MMRDA, which is Rs. 115 crores. I again said we have a big pipeline, which is, again, with water as well as the other domains what we have. I would not divulge into those details as it is a forward-looking statement, but there is a good pipeline wherein we will definitely get a balanced kind of projects in other domains as well. I hope I have tried to answer your question.

  7. Question

    Ayush Agarwal: And what about the acquisition, sir?

    Answer, kaushik khona

    Kaushik Khona: Surejji, would you like to take this? So acquisitions, we have been working quite actively since the last 3 quarters or 4 quarters. As already explained last time, two of the targets have been kind of on the complete due diligence part. We are expecting some kind of way forward within the next one or two months. Ceinsys Tech Limited November 07, 2025 Page 11 of 25 Hopefully, by Quarter 3 or Quarter 4, we will be able to give some kind of announcement about the acquisitions which we are pursuing. And as already clarified in the past, the acquisitions will be in the same field of the business segments which we are into, which is one is into the geospatial engineering solutions. Second is into the technology upgradation.

  8. Question

    Ayush Agarwal: Sir, one final question from my end. On the standalone part, we are doing very wonderful execution. But on the consol level, we are losing almost Rs. 6-7 crores of EBITDA every quarter. And that is a significant chunk. It becomes Rs. 25 crores on a yearly basis. So, when can we expect… Kaushik Khona: I got it.

    Answer, kaushik khona

    Let me attempt to answer this. We have also clarified that the subsidiary which has not been reporting positive performance is only because we are investing heavily into the business development over there. So, the kind of EBITDA losses which you see are more to do with investment into the business development and some of the efforts into the IP, which we are expensing out. So, if you look at this quarter also, we expensed out around Rs. 7-8 crores. And that is what has been happening in the last two-three quarters because we are substantially investing into the business development in the U.S. market. The result of this is what we are expecting, as we already clarified in the previous investor call, in the Quarter 4 of this year and Quarter 1 of the next year onwards, we should see a bigger pipeline. There are certain large contracts which are under negotiation also over there, and we expect to kind of give some kind of update on that in the Quarter 4.

    Answer, kaushik khona

    Kaushik Khona: Yes, that's correct. First of all, these are based on the deliverables which are, as per the milestone, the invoices are raised. All the receivables have typically payment within 30-45 days. It is only because most of these receivables are towards the government projects where, because of the funding which they have not been able to secure from the central government, that the funding was delayed, and therefore the debtors are there. Ceinsys Tech Limited November 07, 2025 Page 12 of 25 However, as I mentioned, some of the debtors have also been kind of recovered in the October month. And just to repeat, November, December, January, we should see a lot of recovery of the debtors. And typically, the debtors cycle should be between 30 to 45 days.

    Answer, kaushik khona

    The UBR cycle then adds to it, which is why we said around 120 days is the overall cycle. Keshav: Sir, actually, my question was towards the trade payables to the suppliers.

    Answer, kaushik khona

    Kaushik Khona: I am hearing as trade receivables. So, trade payables are those payables which are linked to the receivables. There are certain contractors who we have negotiated to pay based on the payments which are received from our clients. So, if you see, the total creditors have also gone up and the total creditors have gone up by almost Rs. 100 crores, while the total receivables have gone up by around Rs. 140 crores. So, these creditors which have gone up is only because of the increase in creditors by around Rs. 58 crores, which are linked to the back-to-back payments. So, once we receive the payments from the clients, the payments will be made. CA Amita Saxena: Even we have cleared a major chunk of payments in the month of October.

  9. Question

    I agree, we are saying like in Q3 or Q4, we will be getting some bigger orders. But I want you to share some size of these orders, like what kind of size we are expecting. And one more thing, last quarter, when the con call happened, you mentioned you will be getting some orders in two months, right? Why that did not happen, sir? So, I want you to put some color on that. That is my first question.

    Answer, kaushik khona

    So, based on our past experience of last three, four quarters, you would have seen that we look at bidding large orders, minimum ticket size of, let's say, Rs. 50 Cr. Some of the orders which we are in the pipeline could be in the range of around Rs. 100 Cr, Rs. 150 Cr also. So, as and when we are able to kind of fructify those orders, we will be able to declare that as a part of normal procedure, which we mentioned to the stock exchange. There are certain small orders which keep on coming for which either the follow-up action was done, but they are not significant for the efforts. We are only focusing on right now building up the major order book as what Abhayji is mentioning. And we also clarified in the previous Investor's Call that our pipeline is substantial, and we expect in the Quarter 3, Quarter 4, some major sign-off happening in the range of around Rs. 700-800 crores was already clarified during the Quarter 1 call. CA Garvit Goyal: So, this 700-800 is what we have bidded for, right?

  10. Question

    Like, what is the competitive intensity there?

    Answer, abhay kimmatkar

    Abhay Kimmatkar: Yes, but see, there are two parts of that. One is you bid for a L1 side, and there are a lot of competitions. Some are the technology projects where we have a niche kind of offerings and where we have an advantage over winning the tender. So, I can say out of the 700-800, we can win up to 70% to 80%. I cannot put a number to that, but that is the probability we can expect to have. CA Garvit Goyal: And did we lose any orders to our competitors in the recent times?

Show 14 more questions
  1. Question

    Darshil Jhaveri: So, what is the rough size of it? Like, for example, a Rs. 50 crores company or Rs. 20 crores company? I don't want an exact figure, but a rough range, okay, this is what we are looking at because we have improved our margins and everything very well. So, will it be margin accretive, EPS accretive? Just any kind of color on that would be really good. This is what we are looking at. I know whatever closes, then that closes, but at least that is a filter for us. CA Amita Saxena: Kaushikji, please, you can take it.

    Answer, kaushik khona

    Kaushik Khona: See, as I said, I don't want to speculate. And if you have seen our intentions, we have already mobilized $28 million, which is Rs. 235 crores. So, our target is not to look at Rs. 2, 5, 10 crores company, small companies. We are looking at companies which have a potential of either generating a revenue of Rs. 50, 100, 200 crores is what we are looking at. So, let's keep our fingers crossed. Let's wait for some more time. We have waited enough, and I think in the next one or two months or maximum by the next one quarter, we should be able to give some kind of good news.

  2. Question

    Kaushal Sharma: So, my question on your employee benefit expense, actually, I am sorry I missed that part. Your employee cost is around 36.9% in the last corresponding quarter. That has been reduced to almost half. Ceinsys Tech Limited November 07, 2025 Page 16 of 25 So, my question on your employee cost, like the corresponding last quarter, you are having around 36.9% as a turnover. Now, it's drastically reduced to 19.9%. What was the key reason of this drop?

    Answer, kaushik khona

    Kaushik Khona: If you see the numbers, I think it is very clear. The overall employee cost has been stagnant from Rs. 35 crores of employee cost last year of same quarter. Sorry, it is around Rs. 33 crores. And today also in this quarter also is around Rs. 33 crores. The overall employee cost is the same. What we have explained in the past is look at the turnover. So, the utilization of the employee from a Rs. 32 crores worth of cost, we had achieved a turnover of Rs. 90 crores.

    Answer, kaushik khona

    This time, on a Rs. 32 crores of employee cost, we achieved a turnover of Rs. 163 crores. This also speaks about the way we want to kind of project for a higher margin business, which is the technology business. And that is why we see that we are trying to optimize. One element which perhaps you would also, if you are analyzing, in the previous quarters, I think in September quarter of 2024, as well as in the June quarter of 2025, there was a slight debit of ESOP cost also. So, if you exclude that ESOP cost, you will still find that overall employee cost percentage has been improving quarter-on-quarter.

  3. Question

    Kaushal Sharma: And currently, we are having around Rs. 1,092 crores of orders. What is the execution timeline for executing these orders?

    Answer, kaushik khona

    Kaushik Khona: On an average, it is around 18 to 24 months. Some of the projects, as we already mentioned in the past, there are O&M revenue, O&M inbuilt into that, which will go up to, let's say, two to five years thereafter. So effectively, the project CapEx lifecycle will be between 18 to 24 months, average.

  4. Question

    Ankur Kumar: Sir, in the previous call, we were saying that on the revenue side, there will be Q-o-Q (inaudible 00:45:49) we will do around Rs. 600 crores to Rs. 700 crores of revenue, this run rate for this year. Do we stick to those numbers, sir?

    Answer, kaushik khona

    Kaushik Khona: Sir, I think last time also we clarified we don’t give projections, and we had asked you to kind of calculate on your own. And I think we have lived up to that. If you look at the first half, we have reached Rs. 320 crores. And if you look at the quarter run rate, it is Rs. 165 crores of Quarter 2. And if you know the industry, typically Quarter 3, Quarter 4 revenues should be a little higher. So, I guess, I mean, that is a kind of arithmetic which will help you to reach your target. And as we have been maintaining, we don’t give projections and the future outlook.

  5. Question

    Sir, you mentioned that our previous orders, which is of lower kind of margin, is actually being absorbed still. So, right now, we are having a better margin order book. So, do we expect that margin to continue?

    Answer, kaushik khona

    Kaushik Khona: That's correct. I mean, if you look at even margin numbers and percentage, technology margin has been between 27% to 32%. And the geospatial has been between, let’s say, 18% to 24%. So, obviously, the choice with the given options which we have, we will prefer for a higher margin business.

  6. Question

    Raj Sarraf: Thank you very much, sir. I hope that all these order book concerns will flush out with some upcoming months and order booking announcement.

    Answer, kaushik khona

    Kaushik Khona: Just for the sake of clarity of all, while this order book is what we are pursuing, we also have clarified that certain business, which is mobility business and the product business, we have certain commitments, annual contracts, which we don’t add into the order book. So, even on those, I think almost Rs. 100 crores to Rs. 150 crores of the annual business is something which is beyond the order book. I mean, we don’t see that as a concern because I think Abhayji has a good control on the building up the order book in the coming times.

  7. Question

    Raj Sarraf: And product services. And sir, what kind of margin we are doing in that?

    Answer, kaushik khona

    Kaushik Khona: Similar margins. There also similar 24%-25% margins in the mobility part.

  8. Question

    Raj Sarraf: And it is annuity business, sir?

    Answer, kaushik khona

    Kaushik Khona: It is not annuity, but yes, there are certain commitments which are annual contracts. So, in mobility, there are some annual contracts which continue. In product services, there are annual build-up. There are regular clients. We have more than 350 corporate clients which continue to Ceinsys Tech Limited November 07, 2025 Page 19 of 25 contribute, which have renewal business. So, those numbers continue, which we don't make part of the order book.

  9. Question

    Raj Sarraf: So, have we anything realized from that section also, sir, in our first half?

    Answer, kaushik khona

    Kaushik Khona: So, yes, we have. In fact, the mobility business is a typical corporate clients, international clients, and where the recovery cycle is hardly 30 to 45 days. So there, there is no build-up. Even on the products also, the recovery cycle is between 30 to 45 days. So, there is no major build-up on the debtor side. And on those segments, there are no UBRs as such.

  10. Question

    Raj Sarraf: So, sir, what kind of revenue percentage can we assume from that section, sir, going forward or even this year?

    Answer, kaushik khona

    Kaushik Khona: If you are projecting a turnover of Rs. 750 crores, while I am not giving you that as an indication, I am just giving you arithmetics, let's say Rs. 150 crores out of Rs. 750 crores, 20% would be those business. And the rest of the business will be the other project business.

  11. Question

    Ankit Sahay: My question was regarding the water linking project. So, what are the milestones and how much revenue is booked and unbooked? Can you give some clarity on that?

    Answer, kaushik khona

    Kaushik Khona: Sure. So, in the river linking project, I think you are referring to the river linking project, which we are doing the detailed project report. In fact, in the project, there are almost 57 milestones. But the milestones were then changed to some extent where the government wanted the Phase- 1 to be first completed, which we already completed. So, the milestones have slightly changed as compared to the original numbers. But we have already, I think, booked revenues in the range of around Rs. 48 Cr so far on the river linking. Around Rs. 48 Cr, we have already booked the revenue in Quarter 1 and Quarter 2, in addition to small numbers which was already billed in the Quarter 4 of last year.

    Answer, kaushik khona

    So, I think by this quarter end, we are around Rs. 48-49 crores is the revenue which has already been booked from this river linking project.

  12. Question

    Nirvana Laha: Sir, my question is regarding something that a previous participant asked. We are constantly investing in our subsidiary in the U.S. So, if I look, this started around Q2 FY '25, I believe. So, over the last five quarters, the P&L impact itself has been about Rs. 36 crores. And you mentioned this quarter, you have capitalized Rs. 8 crores. So, if you can give the total spend that we have done over the last 5-6 quarters, what is the P&L impact, how much we have capitalized, and of what we have capitalized, where is it going towards? What kind of IP are we building? If you can give some color on this, because we would like to understand this better.

    Answer, kaushik khona

    Kaushik Khona: I think that is a good question, and your numbers are spot on. The overall CapEx from the last, I would say, since July 2024, because that was the time when we acquired the VTS business, since then, we have capitalized hardly Rs. 8 crores, which is basically the IP and the future prospects of business which we have acquired for. That is the total CapEx. Otherwise, every quarter, whatever business development, promotions, etc., which we do, they are expensed out. So, Rs. 36 crores is something which is expensed out, and Rs. 8 crores is what is capitalized. Nothing beyond that.

  13. Question

    Athar Syed: And sir, can you please explain what are the AI solutions we provide to our customers which help them in reducing costs? This is my last question. Like, sir, what are the AI solutions we provide to our customers which help them in reducing costs?

    Answer, kaushik khona

    Kaushik Khona: So, I had already mentioned in my speech that the present AI/ML solutions we are enhancing in-house, where we are trying to improve efficiency and reduce the cost of people, and also increase the turnaround time. So, I think at present, we are not selling this to the customer. However, we have done a good amount of, I would say, POC even for the other customers, and Ceinsys Tech Limited November 07, 2025 Page 23 of 25 we have been successful with the kind of accuracy more than 95% as required by the customers. We have also filed two patents for the kind of process technology which we have developed on this AI/ML technology. So, I think presently, we have been focusing on getting efficiency benefits within the project which we are handling. Some of the projects which we have also used, I would say, also a little bit application has also been made in the river linking project, in the DPMS project. Some of the projects have benefited because of the AI initiatives which we have taken.

    Answer, abhay kimmatkar

    Abhay Kimmatkar: I will add into that. Geospatial technology is more of a remote sensing kind of application, which is completely relying on the AI side. We have been doing a lot of tooling all this while, but since the advent of AI, we have been able to do a lot of efficiency in data processing, which has contained the costs and benefited the customer. There are two direct benefits. One is the timeline wherein the delivery was happening. So, we are drastically reduced by 30%. And then, of course, the productivity on the cost side.

  14. Question

    Gunit Singh: Is it possible to give a breakdown of our top, I mean, government versus private datas and also the more-than-six-month bucket?

    Answer, kaushik khona

    Kaushik Khona: I think CFO has already clarified that more than 6-months bucket is 10%. And typically, government, because our majority projects are either government or corporations for which the debtors is there. So, I would say, almost around 80% to 82% of the debtors or the receivables will be for the government projects, and balance 18%, 19%, 20% would be for the other projects which we are doing.

Questions about this call

When was the Ceinsys Tech Q2 FY26 earnings call transcript filed?
Ceinsys Tech filed the transcript with the exchange on 12 Nov 2025. This page is built from that transcript.
What does this page list?
69 statements from the transcript across 8 topics, 51 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 24 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
Ceinsys Tech Q2 FY26 concall: Ceinsys Tech Limited's total order book stood at Rs. 1,092 crores as on September '25 · DalalOS