DLF Q4 FY24 earnings call: DLF Limited sees the potential for Cyber City rents to increase a little higher than 10% compared to the weighted average rate already in the portfolio

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

The transcript describes the period as "Q4 and 2024-25 Year". Its filing date would suggest a different quarter; this page follows the transcript.

The company sees the potential for Cyber City rents to increase a little higher than 10% compared to the weighted average rate already in the portfolio. The company expects to complete approvals for IREO sometime this year and, if all goes well, launch the IREO pieces next fiscal; IREO is an 8.5-acre parcel made up of two distinct parcels. The two Privana projects sold last year were trading at a premium of INR 2,500 to INR 4,000 a square foot at the time of the call. Dividend per share increased from INR 2 to INR 3, INR 4, INR 5 and INR 6 over the last 4 years.

The numbers management gave

Money and capital

  • Dividend per share increased from INR 2 to INR 3, INR 4, INR 5 and INR 6 over the last 4 years.
    Show source
    But if you look at the last 4 years, our dividend has been growing from INR 2, INR 3, INR 4, INR 5 and INR 6.
  • Dividend inflow from Cyber City has been growing year-on-year.
    Show source
    And in all fairness, the dividend inflow from Cyber City has also been growing year- on- year.
  • The company says its development business is now a zero-leverage company, removing the earlier pressure of being caught in a down cycle with debt.
    Show source
    Also, structurally, we are now a zero -leverage company on the development business.

What it expects ahead

What management expects

  • The company sees the potential for Cyber City rents to increase a little higher than 10% compared to the weighted average rate already in the portfolio.
    Show source
    Sriram Khattar: I think maybe a little higher than 10% compared to the weighted average rate that is already there in the portfolio.
  • The company does not want to make a speculative statement about its dividend outlook, cannot comment on the dividend number for the following fiscal, and hopes to sustain some form of its dividend growth strategy.
    Show source
    I can't comment on exactly what number it will be for the following fiscal, but we do hope that we can sustain some form of a growth strategy that we have had on dividend.
  • The company expects to bring the next Privana phase to market very soon after its RERA paperwork is completed.
    Show source
    I think as soon as we have our paperwork in terms of RERA and all done, we will be in the market very soon.
  • The company is working towards launching Privana and the Bombay project in Q1.
    Show source
    Aakash Ohri: The timing of launches are now in Q1 and for the first two , Privana and Bombay we are working towards the Q1 story.
  • The company does not discount its products and has planned a structured launch with some towers now and some in the following quarters.
    Show source
    So, I think at this point in time, we have planned a structured launch to do some towers now and some in the following quarters.
  • The company will return to the planning stage for the next phase in Delhi next year.
    Show source
    So, Delhi, we will get back to the next year to the planning stage.
Show 1 more statement

What management expects

  • Return on equity targets move from a double-digit target to early-teens and mid-teens after reaching double digits.
    Show source
    Having done that, now obviously, after double-digit, early -teens and mid -teens come, but let's see how the process runs.

What it is building and selling

Projects and capacity

  • The company expects to complete approvals for IREO sometime this year and, if all goes well, launch the IREO pieces next fiscal; IREO is an 8.5-acre parcel made up of two distinct parcels.
    Show source
    And if all goes well, IREO pieces should be launched next fiscal.
  • The company is building in excess of almost 45 million square feet, including rental buildings and sales commitments, and that number will keep on growing.
    Show source
    The key for us continues to be how do we sustain ourselves not only on the sales cycle, but also on the execution cycle because now between the rental buildings that we are building and the sales commitments that we have made, I think we are already building now in excess of almost 45 million square feet, which is under construction today.
  • The company expects RERA approval for the Bombay project in June and says its delay of a few weeks was caused by the multiple approvals required from the slum rehab societies, not by RERA.
    Show source
    But I think we are now looking good, as Akash said, for hopefully RERA in June for sure.
  • The company has completed OneMidtown in Mumbai, apart from some residual sales that remain.
    Show source
    Mumbai, we have completed OneMidtown apart of some residual sales that remain.

Demand and pricing

  • The two Privana projects sold last year were trading at a premium of INR 2,500 to INR 4,000 a square foot at the time of the call.
    Show source
    Also to let you know that presently, the 2 Privanas that were sold last year are trading at a premium of INR 2,500 to INR 4,000 a square foot at present, as I speak to you, which is also very heartening and good to know.
  • The present Privanas are being traded at a premium of INR 2,500 to INR 4,000 a square foot.
    Show source
    And the present Privanas are being traded at a premium of INR 2,500 to INR 4,000 a square foot.
Show 9 more statements

Demand and pricing

  • Current rental for the minimum space that is vacant and for term expiries in Cyber City is about INR 125 to INR 135.
    Show source
    We have the current rental for the minimum space that is vacant and for the term expiries is in the ballpark of about INR 125 to INR 135.
  • The rental in Downtown 4, the last building, or Atrium Place, which DLF Limited has just leased, is about INR 160 to INR 170.
    Show source
    And that if you say, compare with Downtown 4, which is the last building or to say, Atrium Place, which we have just leased, which is in the ballpark of INR 160 to INR 170.
  • The company is trying to achieve an additional 10% on its older buildings.
    Show source
    As Mr. Khattar also said that even Page 15 of 16 DLF Limited May 20, 2025 on the older buildings, he keeps on trying to see how we can squeeze an additional 10% there.
  • The company says there is reasonable demand for the new Privana offering and people are waiting for it, and it will enter the market post-RERA.
    Show source
    And therefore, there is a reasonable demand for the new offering now and people are waiting for it.
  • The company has sizable demand for both Privana and Mumbai from micro geographies, the rest of the country and NRIs.
    Show source
    I can't go beyond that today to explain to you, because you understand why, but there is a sizable demand for both the products, both here in Privana and Mumbai, both from the micro geographies, rest of the country as well as the NRIs.
  • The company says the timing of the Privana launch is a logistics matter because it is close to quarter end and June is a time when people in North India generally travel; it says demand is in a good place.
    Show source
    Otherwise, as far as demand is concerned, right now, so far, we are in a good place.

Segments

  • The company has two parts to its business, development and rental; the rental business provides stability and gradual increase, while the development business involves taking risk and pursuing growth while encountering cycles.
    Show source
    And in some sense, the rental business provides stability and gradual increase, while the development business basically is the one where you take risk, hopefully grow a lot and then unfortunately, also encounter a few cycles when it happens.
  • The company says the combination of its development and rental businesses provides a natural institutional hedge against an all-or-nothing outcome that may affect developers operating in only one side of the business.
    Show source
    So, A) the combination of these 2 provides natural institutional hedge against a completely all or nothing story, which may impact developers who are only in one side of the business.
  • The company says Mumbai interests it because it is the largest real estate play in the country, but its center of gravity will overwhelmingly remain NCR.
    Show source
    But having said that, I don't think that we have any doubts in our mind that our center of gravity will overwhelmingly remain NCR.

Risks, rules and outside factors

Risks and disputes

  • The company says it is reasonably well covered for most normal business cycles, although its residential business will have cyclicity at some stage.
    Show source
    But for most normal business cycles, I think we are now reasonably well covered.

Everything else said on the call

What management stressed

  • The company internally focuses on free cash flow and embedded margins; it wants annual embedded margins to remain in the 5-figure range, supported by sales.
    Show source
    So, we clearly want to be in a situation where our embedded margins on an annual basis continue to be in the 5-figure range , and the sales that supports it.
  • The company will continue to be razor-focused on PAT, EBITDA, cash flow, rental run rates and rental rates. Replaced by a later filing.
    Show source
    On all the financial metrics, as we mentioned, we will continue to be razor-focused on PAT, on EBITDA, on cash flow, on rental run rates, on rental rates.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Pritesh Sheth: Thanks for the opportunity and congrats on a great year across the residential and commercial segment. First question is on the launches. So, INR 17,000-odd crores of launches planned for next year. Obviously, a few of them we know, which is Privana, third phase, Mumbai and Goa. If you can share, apart from these three, what are the other launches, which are planned , specifically interested to know whether do we have launches planned for DLF City or IREO Land towards the later part of the year? That's my first question, yes.

    Answer, aakash ohri

    Aakash Ohri: So, right now we have got these 3 big launches in the pipeline. Then we have got the Dahlias also as you know, we will come back some time in Q3 andso, that is going to keep us busy. With regard to the other two launches at this point in time, we are still in various stages of development and discussions. So, there will be something, say, in Q4, but at this point of time, we won't be able to speculate on that or to confirm. But there are two -three things that are being discussed. So, this year, we have got our hands full already and lots happening actually. Page 4 of 16 DLF Limited May 20, 2025 Pritesh Sheth: Got it.

  2. Question

    Pritesh Sheth: Perfect.

    Answer, aakash ohri

    Aakash Ohri: That, plus the Dahlias revenues will continue.

  3. Question

    Pritesh Sheth: Yes Okay. And second, on the commercial side. So, I suppose, 4.6 million square feet of office space between DLF and DCCDL, plus 1.4 million square feet of malls would be delivered in FY '26 itself. So, exit rentals by FY '26 would be INR 7,000- odd crores, if I am not wrong, sir?

    Answer, sriram khattar

    Sriram Khattar: Exit rentals by FY '26 should be about INR 6,700 crores. But that's because these assets which are getting completed this year, we will not have the advantage of rentals for the full 12-month period. Then FY '27, we will see a further jump in the rentals because we would have had the advantage of these for the full year.

  4. Question

    Pritesh Sheth: Correct. And nothing getting delivered in FY '27, right, incrementally? Now whatever we do will be 2, 3 years later?

    Answer, sriram khattar

    Sriram Khattar: Yes. So next year, the only delivery will probably be the D ata Center 3 in Noida. And the year after that, again, we will see a spurt of completions.

  5. Question

    Praveen Choudhary: Hello, Mr. Tyagi, hello Khattar sir, hello Mr. Ohri and Badal. First of all, I just wanted to congratulate for a phenomenal result. And then I have literally one question, which is if you can guide us about your operating cash flow outlook for FY '26 FY'27 as well as CAPEX, including construction that will be helpful for us to think about for the next couple of years.

    Answer, ashok tyagi

    Ashok Tyagi: Okay. So, Praveen, thank you. As you know, we typically do not guide in a very specific manner on the forward-looking detailed financial data. But if you have seen now for the Fiscal‘25, I think our total free cash flow was INR 6,200-odd crores. And now it's running at a rate of m aybe Page 5 of 16 DLF Limited May 20, 2025 this quarter was a slight hike because of One Midtown completion. But it's clearly running at INR 1,500 crores per quarter sort of a run rate, if you will, which should only keep on growing over time. So, you could make your own assumption basis that.

  6. Question

    Praveen Choudhary: It was mostly about construction expenses and CAPEX .

    Answer, sriram khattar

    Sriram Khattar: Yes. So, the CAPEX spends in RentCo, which again, if I may say, the combination of DCCDL, DLF and Atrium Place, i n FY '26 and in FY '27 will be in the ballpark of INR 5,000 crores. And this is a big jump of what we used to see earlier, because the pace of execution of the downtowns and the completion of Atrium Place etc. and the certain approval fees that has to be paid for incremental FAR will take it to about INR 5,000 crore number this year and also next year.

  7. Question

    Praveen Choudhary: Okay. So that's very clear. And as you have mentioned, you're definitely spitting a lot of cash, based on this free cash flow that you just explained, and we are seeing growth. And you also grew dividend this year. Can you just rehash one more time going forward, how should we think about the dividend outlook, please?

    Answer, ashok tyagi

    Ashok Tyagi: So look, again, I would not want to make a speculative go-forward statement, Praveen. But if you look at the last 4 years, our dividend has been growing from INR 2, INR 3, INR 4, INR 5 and INR 6. And in all fairness, the dividend inflow from Cyber City has also been growing year- on- year. So, both our outflow and inflow from Cyber City have both been growing. I can't comment on exactly what number it will be for the following fiscal, but we do hope that we can sustain some form of a growth strategy that we have had on dividend.

  8. Question

    Abhinav Sinha: Hi. Congrats on a strong quarter. Tyagi sir, any guidance for presales that you would like to give for next year?

    Answer, ashok tyagi

    Ashok Tyagi: Any guidance for sales? Badal Bagri : Presales. Ashok Tyagi: Okay. So, if you could recall, Abhinav, when you were here in March, and we had that big Analyst Day, we had said that we would continue to be broadly at this level, what we have achieved last year. So, I still say that we should be in the 20,000 to 22,000 range for next year. But again, as Aakash has consistently outperformed in the last 3 years, I don't see why he can't again. But right now, our guidance will be 20,000 to 22,000.

  9. Question

    Abhinav Sinha: Okay. That's very helpful. My next question is for Mr. Ohri. Sir, on the Privana side, how are we looking at the next Phase-currently? And what the product and the size looks like? And what's the timing here? Thank you.

    Answer, aakash ohri

    Aakash Ohri: Okay. So the Privana North is a far more evolved product. It is quite a nice product, allow us a little more time to come to the market to come and talk about it for compliance reasons. But like anything else, it is the natural progression. The area has been pretty well received and established. It abuts a great green lung. It's got great infrastructure where 5 minutes, you are in various parts of well-connected expressways.

    Answer, aakash ohri

    The 2 products themselves , the 2 launches have been so well received. Previously, as you are aware, South and West, it's a very homogeneous setup in terms of both the product offering as well as the crowd. So overall, the Privana, it's like one contiguous 116 acres of a thing which is of a piece of land, which has really been received very well by the people. So, I feel that is something people look forward to. It's now an established brand. Within the DLF stable, Privana is an established brand. It's got a very healthy and very eclectic mix of people, who bought Privanas in the previous lots also, where there are all sorts of people who have taken it.

    Answer, aakash ohri

    And the good part is that since we know most of them, they have taken it for their own purpose to reside. So, I think that has kept the stickiness. Also to let you know that presently, the 2 Privanas that were sold last year are trading at a premium of INR 2,500 to INR 4,000 a square foot at present, as I speak to you, which is also very heartening and good to know. And that's the kind of demand that the present set of Privanas have. And therefore, now the next phase. I think as soon as we have our paperwork in terms of RERA and all done, we will be in the market very soon. You should hear about it soon.

  10. Question

    Akash Gupta: Hi, everyone. Congratulations on a great set of numbers. Sir, my first question is on the timing of the launches for Privana and the Bombay project and the next Phase-of Dahlias. So how are we looking at these timing of launches?

    Answer, aakash ohri

    Aakash Ohri: The timing of launches are now in Q1 and for the first two , Privana and Bombay we are working towards the Q1 story. And Dahlias, obviously, as I mentioned to you, once the experience center is ready, which should be some time in November -December, we will then do the show and tell and bring it . In fact, this particular thing, the main launch is slated for the Dahlias. But for the Privana and Bombay, it's now Q1.

Show 14 more questions
  1. Question

    Akash Gupta: Okay. Sir, so like are we sure that we will get RERA approval for the Bombay project in the first quarter?

    Answer, ashok tyagi

    Ashok Tyagi: So I think we will. But frankly, the reason for the delay of a few weeks on the Bombay project has actually had nothing to do with RERA. It's that because it's a slum rehab society with multiple societies whose approval and all of those things have to be taken. It's just the multiplicity of the small approval, which has led to a delay. But I think we are now looking good, as Akash said, for hopefully RERA in June for sure.

  2. Question

    Akash Gupta: Got it, sir. And my, sir, the second question is about the Privana North product. So sir, your previous Privanas have been sold out, so with like awesome demand. So I wanted to understand like what interest is this product generating?

    Answer, aakash ohri

    Aakash Ohri: So as I was saying just about in the previous question, Privana has got an established ecosystem today. There is a very good demand for the Privana. And the present Privanas are being traded at a premium of INR 2,500 to INR 4,000 a square foot. And therefore, there is a reasonable demand for the new offering now and people are waiting for it. So, as far as we are concerned, we will get into the market post-RERA and then get down to doing what it is. But right now, overall, because I am not in the market, so I can't give you an exact statement here. But what I hear is that there is a reasonable amount of demand, and people are looking forward to the launch.

  3. Question

    Pritesh Sheth: Okay. I think it was answered in a bit in the previous question, just on Privana again, previous 2 phases has been sellout with the kind of expectations that's already built in since we are closer to launch. If not during launch, but if there is a demand, would we still look to sell it out by this year? What's your base expectation for Privana North for this year? And similar question for Mumbai as well. We have been hearing about a lot of demand coming from NCR and especially from Gurgaon as well for Mumbai project, but just your initial thoughts on the kind of interest that we have got for Mumbai as well.

    Answer, aakash ohri

    Aakash Ohri: Yes. So you're right, Pritesh, so a DLF product today is agnostic to geography in terms of investors. So today, you are looking at various sets of people who are wanting to pick up a DLF home. And as I said previously also why they're looking at, because these are not dead assets. Not only do they make money in capital appreciation, but they also, you know, once you lease them out, you have recurring income also. So it's like good for both investors, to people who want to live in them. So today, right now, as I see it, there is a sizable demand.

    Answer, aakash ohri

    I can't go beyond that today to explain to you, because you understand why, but there is a sizable demand for both the products, both here in Privana and Mumbai, both from the micro geographies, rest of the country as well as the NRIs. So, we will cross the bridge when we come to it, just give us a little more time. I think we will have more answers for you, and you'll hopefully hear about it. But I'd just like to leave it here right now that based on how we want to do it. But yes, as you know, we don't discount our products. We don't do that. So, I think at this point in time, we have planned a structured launch to do some towers now and some in the following quarters.

    Answer, aakash ohri

    But I think let's see how it goes and also because Mumbai, it will start raining from June end. So, I think our window is very short in June for both Mumbai and then, of course, as soon as Privana comes in before that. So, both are going to almost run concurrently.

  4. Question

    Pritesh Sheth: Okay. So, phasing out of towers that you have mentioned is for Mumbai project. And Privana would be like all opened up all together, right?

    Answer, aakash ohri

    Aakash Ohri: No, Privana also, like I said, it's too close to the quarter end. And also being both June is the time where North India generally travels. Most of the people are out for vacations. So it's just the timing. So otherwise, there is a good amount, I am only talking about logistics. So right now, just to manage logistics, that's all. Otherwise, as far as demand is concerned, right now, so far, we are in a good place.

  5. Question

    Manish Dhariwal: Thank you very much for this opportunity. Great numbers, great performance. And year -on- year, as the MD mentioned that it's been an incremental improvement year-on -year. So all that's like very good news. See, the thing is that my question was a little long-term -ish in nature. And I wanted to understand how is the management attempting to build DLF into a structural business, not a hardcore cyclical business that a typical real estate development business is. See, you're a great brand, okay? So that's a great strength that you have an advantage of, also a great rental business, the biggest in the country. So how is it that maybe the structural story? Or is that even a th

    Answer, ashok tyagi

    Ashok Tyagi: Yes. So Manish, a very interesting question, frankly. Clearly, we have 2 parts of the business, the development and the rental business. And in some sense, the rental business provides stability and gradual increase, while the development business basically is the one where you take risk, hopefully grow a lot and then unfortunately, also encounter a few cycles when it happens. So, A) the combination of these 2 provides natural institutional hedge against a completely all or nothing story, which may impact developers who are only in one side of the business. That is clearly one. B) from an institutional and from a management standpoint, we have clearly been strengthening all streams of our management over the last few years now in that sense.

    Answer, ashok tyagi

    And I think we feel that now we have the where with all, if something like a COVID happens in a big way, nothing for 6 months, you may have to ride it through. But for most normal business cycles, I think we are now reasonably well covered. Yes, the residential business will, at some stage, have cyclicity to it but when will it come honestly, I don't think anybody has a crystal ball on that. But I think we are reasonably well captured. Also, structurally, we are now a zero -leverage company on the development business. So that entire pressure that we used to have earlier of being caught in a down cycle with no debt. So that is gone now.

  6. Question

    Manish Dhariwal: Yes.

    Answer, ashok tyagi

    Ashok Tyagi: Thank you. So Manish, first of all, obviously, while our sales are running at this INR 20,000 crores approximately levels, I think we internally chase 2 metrics, which is, A ) the free cash flow that we are generating; and B) the embedded margins that we are generating. You could have developers who are doing INR 35,000 crores of sales and generating embedded margins of maybe INR 7,000 crores, while there are developers who are INR 20,000 crores, can generate embedded margins of INR 12,000 crores. We would like to be in the latter category. So, we clearly want to be in a situation where our embedded margins on an annual basis continue to be in the 5-figure range , and the sales that supports it. While Mumbai is a geography which interests us, because it is the largest real estate play in the country for sure. But having said that, I don't think that we have any doubts in our mind that our center of gravity will overwhelmingly remain NCR.

    Answer, ashok tyagi

    That's for clear even in that sense. And NCR today is one of the deepest and one of the widest sort of markets that exist in the country. There are pockets of NCR, we are not present in also today. So I think there's enough to grow in NCR itself.

  7. Question

    Manish Dhariwal: Thank you.

    Answer, sriram khattar

    Sriram Khattar: Question about the structural stability or institutionalization, I may just add to 1 or 2 points, which Ashok mentioned. As we have declared, we have adequate freehold license land to take forward our growth for the next several years, whether it is on the residential side or on the rental side. And I think that is a very- very big competitive advantage that we have over the other developers, who are continuously scouting for land, and therefore, have to be on the edge at all points of time to grow.

  8. Question

    Hi, thanks. Good evening. Sorry, I just missed the time lines on launches of Goa and IREO. And also if you can comment on our Delhi subsequent phases as what will be the time line of launching that?

    Answer, ashok tyagi

    Ashok Tyagi: Kunal, half of your question, I think, was muted at that time. So can you please repeat?

  9. Question

    Kunal Lakhan: Yes. Sir, I just wanted the time line for launches of Goa, IREO and also the Delhi subsequent phase?

    Answer, ashok tyagi

    Ashok Tyagi: So IREO, I think we should be in a position, hopefully, with all the approvals. IREO was, as you know, it's 8.5-acre parcel, but it is 2 distinct parcels. So , I think we should hopefully have all our approvals done sometime this year. And if all goes well, IREO pieces should be launched next fiscal. Mumbai, we have completed OneMidtown apart of some residual sales that remain. So, I think Mumbai will get back to the planning stage, it's not Mumbai, Delhi. So, Delhi, we will get back to the next year to the planning stage.

    Answer, ashok tyagi

    But the Delhi launch of the next phase-may not happen next year.

  10. Question

    Kunal Lakhan: Okay. Okay. And Goa?

    Answer, ashok tyagi

    Ashok Tyagi: Goa should happen sometime this year, I presume, yes.

  11. Question

    Kunal Lakhan: Understood. Thanks. My second question was to Khattar Ji. Sir, if you look at the Cyber City portfolio, right, which is I wouldn't say mature yet , because when I look at the rentals, let's say, about INR 110, INR 115 bucks. And when I look at the rentals in our newer blocks that we are leasing, like INR 145, INR 175. What's the rerating potential there in terms of rent over the next few years? Page 13 of 16 DLF Limited May 20, 2025 Sriram Khattar: So, let me take Cyber City, which is really a legacy asset.

    Answer, sriram khattar

    We have the current rental for the minimum space that is vacant and for the term expiries is in the ballpark of about INR 125 to INR 135. And that if you say, compare with Downtown 4, which is the last building or to say, Atrium Place, which we have just leased, which is in the ballpark of INR 160 to INR 170.

  12. Question

    Kunal Lakhan: Sure, understood. But probably, it will never reach those levels because these are much newer assets. But you're saying that roughly about 10% upside potential on rent on the Cyber City portfolio, is something that we should look at?

    Answer, sriram khattar

    Sriram Khattar: I think maybe a little higher than 10% compared to the weighted average rate that is already there in the portfolio.

  13. Question

    Kunal Lakhan: Understood, sir. And secondly, so on the ROE target, we have reached 10% plus, so that's a great thing. But on a sustainable basis over the next say, 2 to 3 years, where do we aspire to be?

    Answer, ashok tyagi

    Ashok Tyagi: Kunal, about 4 years back, we were told that ideally we should at least target at a double-digit first. Having done that, now obviously, after double-digit, early -teens and mid -teens come, but let's see how the process runs.

    Answer, sriram khattar

    Sriram Khattar: On a lighter way, triple digit is still a little beyond.

  14. Question

    Abhinav Sinha: Great. Sir, one clarification. I think, Tyagi sir, if you can provide on the land bank, Slide # 17. So, we have this 12 million square feet of pipeline in DLF City and 9 in New Gurgaon. So, what does this refer to specifically among the projects?

    Answer, ashok tyagi

    Ashok Tyagi: So, the DLF City refers to primarily the IREO timeline at Sector 61, and it refers to some pockets that we have for group housing in DLF City in the erstwhile DLF Phase-1 to 4. And Privana is affected in New Gurgaon. Abhinav Sinha: Okay. And metros will be Mumbai then?

    Answer, ashok tyagi

    Ashok Tyagi: Metros are Mumbai, Delhi and Goa. Abhinav Sinha: Okay. Thank you.

    Answer, ashok tyagi

    Ashok Tyagi: So, thank you so much for joining this call. As I think we sort of presented, and I think a lot of questions also are on the same tune that it's been a pretty strong performance. The key for us continues to be how do we sustain ourselves not only on the sales cycle, but also on the execution cycle because now between the rental buildings that we are building and the sales commitments that we have made, I think we are already building now in excess of almost 45 million square feet, which is under construction today. And that number will keep on growing, but that's the number that we have to track, because selling is exciting, but you also have to eventually deliver those products, and we have had a pretty strong track record of delivery. On all the financial metrics, as we mentioned, we will continue to be razor-focused on PAT, on EBITDA, on cash flow, on rental run rates, on rental rates. As Mr. Khattar also said that even Page 15 of 16 DLF Limited May 20, 2025 on the older buildings, he keeps on trying to see how we can squeeze an additional 10% there. So we will continue to be extremely focused on all of that.

    Answer, ashok tyagi

    And hopefully, we look forward to reconnecting back to you guys in the June analyst call. Thank you.

Questions about this call

When was the DLF Q4 FY24 earnings call transcript filed?
DLF filed the transcript with the exchange on 22 May 2025. This page is built from that transcript.
What does this page list?
28 statements from the transcript across 7 topics, 10 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 24 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
DLF Q4 FY24 concall: DLF Limited sees the potential for Cyber City rents to increase a little higher than 10% compared to the weighted average rate already in the portfolio · DalalOS