Earnings call
DLF Q4 FY26 earnings call: DLF expects income from existing retail properties to grow about 10% to 11% in the current year, with new malls providing incremental growth
By DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person.
Transcript filed .
The company expects income from existing retail properties to grow about 10% to 11% in the current year, with new malls providing incremental growth. The company expects the mall to be completed sometime in August and to open 2 to 3 months thereafter. EBITDA or NOI grew 34% to 35% in FY26 because some assets were completed at the end of the previous year and their income was fully reflected after they became 100% leased in FY26. Dahlias is touching about INR 135 crores per sale. The company had converted about 4-odd million of its total SEZ portfolio of about 16 to 17 million into non-processing areas, including a small portion it had de-notified.
The numbers management gave
Results
- EBITDA or NOI grew 34% to 35% in FY26 because some assets were completed at the end of the previous year and their income was fully reflected after they became 100% leased in FY26.
Show source
As Badal was mentioning, we have a high growth in our EBITDA or NOI as we call it, a 34 to, 35% growth impact.
- The company sold about 32 Dahlias units and 2 Camellias units in the quarter.
Show source
I'm sure you'll note this quarter alone, we've done about 32 and plus 2 of the Camellias.
- Dahlias sales were about INR5,000 crores this year and are expected to be INR 5,000 crores to INR 6,000 crores next year.
Show source
Ashok Tyagi: So look, I think this year, the Dahlias sales was about INR5,000 crores and hopefully it stays to INR 5,000 crores to INR 6,000 crores next year as well.
- Overall SEZ vacancy was about 10-odd percent, with the lowest vacancy in Cyber City in Gurgaon, about 8 to 9% vacancy in Silokhera or 7% between Silokhera and Chennai, and about 17 to 20% vacancy in Hyderabad.
Show source
The overall vacancy is about 10- odd percent out of which the lowest vacancy is in the Cyber City in Gurgaon and then we've got about 8 to 9% vacancy in Silokhera or 7% we can see between Silokhera and Chennai.
Money and capital
- Cyber City's debt to NOI is at a comfortable sub 3.5 level, and it is generating more FCF and expects, hopefully, to continue growing its dividend cycle.
Show source
Cyber City, like a normal proper operating rental company with its debt to NOI at a very comfortable sub 3.5 level is generating more FCF and will continue, hopefully, growing its own dividend cycle.
- Dividend has continued to grow over the last 4 or 5 years, and the company hopes to maintain that trajectory if things stay well, but provides no dividend guidance.
Show source
But if you see the trajectory across the last 4 or 5 years, it has been one of continuing growth in dividend.
Show 5 more statements
Money and capital
- Of DLF's INR14,000 crores of cash balance, almost INR11,200 crores are sitting in RERA balance.
Show source
So Akash, as you rightly pointed out of the INR14,000 crores of cash balance, almost INR11,200 crores are sitting in RERA balance.
- Projects will start getting unlocked from FY'27, '28 onwards, when the cash will be available for different things.
Show source
And all of these projects will start getting unlocked from FY'27, '28 onwards.
- About two-third of DLF's dividend is Cyber City's dividend to DLF.
Show source
And I think broadly about two-third of this dividend is really Cyber City’s dividend.
- The company does not offer dividend guidance.
Show source
So again, we do not offer a dividend guidance.
- Approach includes increasing shareholder return from the cash perspective. Replaced by a later filing.
Show source
Number one is increasing shareholder return from the cash perspective.
What it expects ahead
What management expects
- The company expects income from existing retail properties to grow about 10% to 11% in the current year, with new malls providing incremental growth.
Show source
And we see in the current year, a growth of about 10 to 11% in our income from the existing properties, plus, of course, the Page 3of 14 DLF Limited May 14, 202 6 3 new malls that come up, that would be the incremental growth.
- The company expects total exit rental for FY27 to be about INR 8,200-odd crores.
Show source
Sriram Khattar: If I said separately, but I think the total should be about INR 8,200-odd crores.
- The company expects one big launch in DLF City in FY '26,27, in the INR 8,000 to INR 9,000 crores range, if not higher.
Show source
To the point that Puneet raised earlier, just to reiterate what Aakash said, next year, we should definitely have, in the current year, FY '26,27, we should have 1 big launch in DLF City, for sure, which should hopefully be in the INR 8,000 to INR 9,000 crores range, if not higher.
- Sales guidance is INR 20,000 crores and its new margin creation guidance is about INR 9,000-odd crores every year; the guidance can go up if demand continues to be strong.
Show source
So from a guidance standpoint, we had mentioned I think last year as well, that we believe that we will broadly stay on this trajectory of a INR 20,000 crores of sales guidance and ballpark about INR 9,000-odd crores of new margin creation every year.
- The company expects the Arbour Senior Living launch in the next few months, possibly in 1 to 3 months, and says the projects mentioned have a fair chance of launching in the current calendar year.
Show source
Ashok Tyagi: So, the Arbour senior living should happen in the next few months.
- The next valuation jump for Camellias will be at least INR 25 crores an apartment.
Show source
I feel that we will be able to achieve the next lot as far as Camellias is concerned or the next valuation will be the next jump for Camellias will be at least INR 25 crores an apartment.
Show 11 more statements
What management expects
- The company is comfortable generating INR 9,000 to INR10,000 crores of margin every year and about INR7,000 to INR8,000 crores of free cash flow every year on the Devco side.
Show source
So, we are comfortable with generating this INR 9,000 to INR10,000 crores of margin every year, generating about this INR7,000 to INR8,000 crores of free cash flow every year on the Devco side.
- The company expects sales of 13 to 14 million or 14 to 15 million from the launch pipeline.
Show source
Ashok Tyagi: We expect that the 13 to 14 million or 14 to 15 million, somewhere in that ballpark of sale to come through from that pipeline.
- The company may eventually launch a subset of its 200 billion launch pipeline.
Show source
Ashok Tyagi: Kunal, it was the 200 billion the assumption is that maybe we will eventually may end up launching a subset of 200 billion.
- The company expects the balance of INR 13,000 to INR 14,000 crores to come comfortably to reach INR 20,000 crores.
Show source
The balance, INR 13,000 to INR 14,000 crores should come comfortably for us to hit it to be on these INR 20,000 crores .
- The company said rental business was poised for an exciting phase of growth with the commissioning of the 2 Downtowns and full-throttle renting of Atrium Place.
Show source
In fact, the rental business with the commissioning of the 2 D owntowns and the full throttle going on rental of Atrium Place, plays is actually poised to see a very exciting phase of growth.
- The company said it was poised for a strong FY '26, '27, following a strong FY'25, '26.
Show source
But I think all in all, we are poised for a strong FY '26, '27 coming on the heels of a strong FY'25, '26, and look forward to connecting with all of you through the year.
- The company expects the Arbour Senior Living launch and the next phase launch of Westpark, while Dahlias will continue selling and Goa may also come into play at some stage.
Show source
We should have the Arbour Senior Living launch, which we have spoken about.
- The company will enter a virtuous cycle of completions from next year onwards from a bookkeeping standpoint.
Show source
From next year onwards, we also entered the virtuous cycle of completions from a bookkeeping standpoint.
- The company expects a virtuous cycle of free cash and healthy margins to be booked in its P&L as projects reach final delivery.
Show source
So, from there, there will be a virtuous cycle of getting free of cash and also an extremely healthy margin, which is going to get booked in our P&L, which we always share, which is kind of getting accrued and just fitting for the final delivery.
- The company expected its cash generation to continue to be extremely strong and its dividend trajectory to remain strong.
Show source
Our cash generation would continue to be extremely strong as should hopefully be our dividend trajectory.
- The company will continue to be cautious and calibrated in Mumbai, but would be open to lucrative opportunities in Mumbai. Replaced by a later filing.
Show source
We will continue to be cautious and calibrated in Mumbai, but we would be open to a lucrative and nice opportunities in Mumbai and Westpark itself should keep on going into a very strong core for us.
What it is building and selling
Projects and capacity
- The company expects the mall to be completed sometime in August and to open 2 to 3 months thereafter.
Show source
We expect the mall to be completed sometime in the month of August, and the opening will be 2, 3 months thereafter.
- Launch pipeline is almost about INR 20,000 crores and includes products in Gurugram, Mumbai and Goa, residual projects and Dahlias.
Show source
Aakash Ohri: Puneet, we've got a healthy launch pipeline, almost about INR 20,000 crores.
- The company laid out a pipeline of INR 1,14,000 crores of launches across the medium term of 5 years about 2 years back; the INR 60,000 crores launch pipeline is the update of what remains to be launched after cumulative launches.
Show source
So Nilang, basically, just to answer your earlier question also because I think you had -- I mean, the audio was slightly poor. a bout 2 years back, we had laid out a pipeline of INR 1,14,000 crores of launches across the medium term of 5 years.
- Large projects starting with Arbour will start being delivered from FY 27, 28 onwards.
Show source
All our large projects starting from Arbour will start getting delivered from FY 27, 28 onwards.
- Downtown Gurgaon Phase 2 is an integrated development of 7.5 million square feet, comprising a 2 million mall and 5.5 million of offices in Towers 5, 6, 7 and 8; Tower 7, which is 2.2 million, is nearly fully leased.
Show source
So let me start with D owntown Gurgaon Phase 2, Downtown Gurgaon, Phase 2 is an integrated development of 7.5 million square feet, out of which 2 million is the mall and 5.5 million is offices split into 4 Towers, as you rightly mentioned Tower 5, 6, 7 and 8 Out of Page 12of 14 DLF Limited May 14, 202 6 this, Tower 7, which is 2.2 million is nearly fully leased.
- The company has released Tower 5 and 6 at Downtown Gurgaon Phase 2 and they are in the process of being leased.
Show source
So now we have released Tower 5 and 6 and they are in the process of being leased.
Show 28 more statements
Projects and capacity
- The finishing timelines for Downtown Gurgaon Phase 2 are the later part of FY'28 and early '29.
Show source
The finishing time lines are later part of FY'28, early '29.
- The company will start construction of the iconic tower between the multilevel car park and Towers 2, 3 and 4 about 2.5 years from now.
Show source
And that's so to be an iconic tower that we will start the construction about 2.5 years from now.
- Construction of Downtown, Taramani, which is 3.5 million, is progressing well.
Show source
As far as Downtown, Taramani is concerned, the 3.5 million construction is progressing well.
- The company had leased about 500,000 out of the 3.5 million construction at Downtown, Taramani, and the balance leasing was underway.
Show source
Out of 3.5 million, we have already leased about 500,000 and the balance leasing is on its way.
- The company was reasonably confident of completing the 3.5 million construction at Downtown, Taramani, in Q2 of the next fiscal year.
Show source
We are reasonably confident of its completion in Q2 of the next fiscal year.
- The company created a central atrium between Towers 1, 2, 3, 4 and 5 at Downtown, Taramani.
Show source
W e have made certain project changes there because we have created a central atrium between Tower 1, 2, 3, 4 and 5, and that's turning out to be a very beautiful pl ace.
- The company expects the Dahlias Experience Centre to be ready around Diwali.
Show source
Page 6of 14 DLF Limited May 14, 202 6 Aakash Ohri: Around Diwali.
- The company is in conversations about other development options in and around Westpark.
Show source
We are also constantly looking how we can organically grow the Westpark geography and we are in conversations across with other development options in and around Westpark.
- The company had a reasonably strong launch pipeline, and Dahlias continued to be the base for its growth prospect.
Show source
We have a reasonably strong launch pipeline, and Dahlias continues to be the base for our entire growth prospect.
- The company said its exhaustive EHS and Governance checklist sometimes led to a more delayed start when launching a new project.
Show source
And our continued focus on the entire EHS and G overnance pieces continues to be extremely, extremely strong, which at times leads to a more delayed start when we launch a new project because we just go through such an exhaustive checklist of our own.
- The company and its joint venture partners continue to look at other opportunities in Mumbai. Replaced by a later filing.
Show source
And obviously frankly our Mumbai team and our joint venture partners, we continue to look at any other interesting opportunities in Mumbai.
Demand and pricing
- Dahlias is touching about INR 135 crores per sale.
Show source
Dahlias is now touching about INR 135 crores per sale, that's where we are.
- South- and North-oriented apartments have a price difference of about INR 20 to INR 30-odd crores, depending on size and PLC.
Show source
And there is a price difference between the South and North, which is about between INR 20 to INR 30-odd crores, depending on the size and PLC.
- The company apartment prices that were about INR 60 crores have risen to INR 90 crores.
Show source
As far as when we started off, what was about INR 60 crores is now INR 90 crores.
- The company apartment prices that were about INR 75 crores have risen to about INR 110 crores.
Show source
And what was about INR 75 crores is now about INR 110 crores.
- Camellias is trading between INR 80 to about INR 150 crores.
Show source
So Camellias today right now is trading between anything between INR 80 to about INR 150 crores.
- Dahlias achieved its target for per square foot realization in about 1.5 years rather than the expected 4 years.
Show source
Now the good thing is that the Dahlias has caught up much faster than we expected it to, which is we thought we will achieve this target in about 4 years, but we've done it in about 1.5 years. in terms of per square foot realization.
- Camellias or Dahlias prices, converted to carpet area, are north of INR 150,000 per square foot and INR 160,000 a square foot.
Show source
If you convert it to carpet, there'll be carpet north of INR 150,000 per square foot, INR 160,000 a square foot.
- The company has sold 100% of Dahlias, albeit in a calibrated manner.
Show source
I mean, Dahlias, of course, a calibrated soil, but we have sold 100%.
- The company said the SEZ concept was declining and existing tenants who had not exhausted their 80-I tax incentives continued to take SEZ on lease.
Show source
However, there, the existing tenants who have not yet exhausted their 80-I tax incentives continued to take SEZ on lease.
- The company said the top floors of Tower 4 and 5 in Taramani, comprising 450,000 square feet and 500,000 square feet that it had leased, were leased at INR 145 to INR 150 per square feet, and it expected average rental realization of between INR 125 per square feet and INR 130 per square feet there.
Show source
We also created a benchmark about 2 years ago in crossing a rental of INR 100 in Taramani, the 450,000 square feet, 500,000 square feet that we have leased in Tower 4 and 5, I must share that the top floors which have a 360o view of the city and the sea have been leased at INR 145 to INR 150 per square feet and we expect average rental realization of between INR 125 per square feet, INR 130 per square feet there.
- The company said it had created demand for Dahlias and made sales across the entire country.
Show source
And what has happened is right now that as far as this entire thing is concerned, we've been able to create demand, which is in fact, we've been able to do sales in the entire country, I don't think if we put all the developers together.
- Dahlias would be maybe almost at par with Camellias today on an apple-to-apple basis.
Show source
And that's where I'm saying that if you do apple-to -apple, Dahlias would be maybe almost at par at the Camellias today.
- Gurgaon super lux pricing has caught up with, if not exceeded, South Mumbai pricing.
Show source
So, I mean, Gurgaon pricing of the super lux has, frankly, caught up, if not exceeded that in South Mumbai.
- The company was slowly striving to close the gap between Cyber City rentals and SEZ rentals for new take-up in Cyber City in Gurgaon.
Show source
As far as the rentals is concerned, we are slowly striving to close the gap between the, say in Cyber City in Gurgaon, between the cyber city rentals and the SEZ rentals for the new take up.
Segments
- The company had converted about 4-odd million of its total SEZ portfolio of about 16 to 17 million into non-processing areas, including a small portion it had de-notified.
Show source
So out of our total portfolio of SEZ of about 16 to 17 million, we have already converted about 4-odd million into non -processing areas including a small portion, which we have even de-notified.
Deals and partners
- The company completed leasing the entire Tower 4 of Downtown Atrium Place to a single tenant from the US.
Show source
We've just completed leasing the entire tower of downtown of Atrium place Tower 4 to a Page 13of 14 DLF Limited May 14, 202 6 single tenant from the US.
- The company says companies and JVs want to partner with it following its Mumbai success and Panchkula.
Show source
A lot of companies and JVs are wanting to partner with them.
Everything else said on the call
What management stressed
- The company can do presales of INR 50,000 crores a year and has the land bank and demand for it, but its primary objective is chasing margins and cash flows rather than presales.
Show source
But what we have to do is chase margins, chase cash flows and where we believe our primary objective is chasing margins and cash flows and not chasing presales, frankly.
Group structure
- The company is open to opportunistic land-bank deals that it assesses to be margin accretive, and the cash pool is available for reinvestment.
Show source
And third, is, as you rightly pointed out, we already have a reasonable share of land bank, but we are always open for opportunistic deal what will be margin accretive in our assessment.
Other
- The company has limited construction capabilities in the country and says timely delivery is a concern when companies chase presales.
Show source
Aakash Ohri : Also, Mr. Tyagi, if I can just add to what you said, I'd like to address the elephant in the room that most importantly, you all need to understand that the construction capabilities in our country are still limited.
- The company follows the completed contract method (CCM).
Show source
We follow the CCM method, which is completed contract method.
What the company said on its earnings call, taken from its own transcript. Not advice.
Questions and answers
Question
Puneet Gulati: And from the taxation perspective also, should one think that you've been getting the benefit of tax refunds, is that era largely over or…?
Answer, badal bagri
Badal Bagri: So, I think in the current year, we had some accumulated losses in 1 - 2 of the legal entities where we are now comfortable and we have recognized the deferred tax assets in the last financial year. And from a refund perspective, no, I think there will be the amount which we are seeing in the current year, I think we should continue to see those kinds of flows coming through in the future as well.
Question
Puneet Gulati: Understood. That's very clear. The more important part is, how should one think about the launch pipeline for this year?
Answer, ashok tyagi
Ashok Tyagi: Okay. So Puneet, I mean Aakash , I'm not sure -- Aakash unfortunately is traveling, so his connection is patchy. So Aakash, you want to talk about the launch pipeline?
Answer, aakash ohri
Aakash Ohri: Puneet, we've got a healthy launch pipeline, almost about INR 20,000 crores. And we've got some good Gurugram products, we've got Mumbai, we've got Goa. And we've got some residual , and of course Dahlias. So we've got a good set and looking forward to that.
Question
Puneet Gulati: In Gurugram, what should be a target which all projects should we focus on? And what is the progress on Goa in terms of approvals?
Answer, aakash ohri
Aakash Ohri: No, Gurugram, we've got 2 good projects. We've got the senior living and we've got the Hamilton 2. These are good products. And Goa, of course, approvals are all done. There is a PIL, we don't want to create third-party rights just right now. We're just going to make sure that we are clear, and then we'll bring in Goa. But Goa, we're all ready to go.
Question
Puneet Gulati: Okay. And then Khattar ji, on the commercial side, any projects that you think will get completed in FY28?
Answer, sriram khattar
Sriram Khattar: Yes. So FY28, the 2 new towers totalling to 3.5 million in Downtown Taramani , will get completed.
Question
Puneet Gulati: Okay. And for FY '27, it's just the Atrium where we should expect OC?
Answer, sriram khattar
Sriram Khattar: Please don't call just the Atrium. It's 3.2 million square feet and will generate about INR 700 crores of rent. And in addition to that, the 3 malls will get completed and will be leased. The benefit of full rentals of all Atrium Place Tower s and for the 3 malls, while the income accrual will start this year, the full income will come in the following year.
Question
Puneet Gulati: Understood. And what should be the exit rental for FY27 or DCCDL separately and for the rest DLF asset?
Answer, sriram khattar
Sriram Khattar: If I said separately, but I think the total should be about INR 8,200-odd crores. Just on the lighter way, it could have been $1 billion had the Iran US war would not have happened.
Question
Nilang Mehta: Good evening, sir, and thanks for the opportunity. I just wanted to check a pipeline which we show now medium term, we're showing around INR 60,000 crores of medium-term pipeline for launch. And I just go back to our previous presentation and go back to Slide 23 of the presentation for the year end, we had INR 67,000 crores of pipeline. So in last 3 years, pipeline, at least the future pipeline seems stagnating while obviously, I understand you've done launches and grown the business or presales to the current level in the last 3 years. But just wanted to think how have you seen this number when you look at next few years, at least, maybe not next year, but why is this number n
Answer, ashok tyagi
Ashok Tyagi: So Nilang, this more or less like a status update of the INR1,14,000 crores pipeline that we had projected, I think, about 2 years back for a 5-year cycle. So every quarter, we update on how much of that INR1,14,000 crores has been launched? And what is the to be launched pipeline. Page 5of 14 DLF Limited May 14, 202 6 So basically, it needs to be connected to that INR1,14,000 crores that we had said. Obviously, this launch pipeline is not the end all. We have like the next phase also identified, but we will obviously unlock it at the pace at which the market can comfortably absorb and we're at a pace which does not overstrain our own execution capabilities.
Question
Nilang Mehta: Yes, just I think what Puneet has asked in terms of launch pipeline for next year, I missed it. So , what's the number you're looking like? And what's the pre -sale target for next year?
Answer, ashok tyagi
Ashok Tyagi: Okay. So Nilang, basically, just to answer your earlier question also because I think you had -- I mean, the audio was slightly poor. a bout 2 years back, we had laid out a pipeline of INR 1,14,000 crores of launches across the medium term of 5 years. So, every quarter, we give an update against how much has been cumulatively launched and how much is the to be launched . That's how the INR 60,000 crores number comes in. So, it's not that the INR 60,000 crores, I mean, launch pipeline that we had. We have projects lined up even once this is done. And this is being sort of phased out in a manner where we believe the market can absorb at the products that we are offering and something which we believe that we can execute well.
Answer, ashok tyagi
To the point that Puneet raised earlier, just to reiterate what Aakash said, next year, we should definitely have, in the current year, FY '26,27, we should have 1 big launch in DLF City, for sure, which should hopefully be in the INR 8,000 to INR 9,000 crores range, if not higher. We should have the Arbour Senior Living launch, which we have spoken about. We should have the next phase launch of Westpark. And Dahlias will continue selling, at some stage Goa should also come into play. So from a guidance standpoint, we had mentioned I think last year as well, that we believe that we will broadly stay on this trajectory of a INR 20,000 crores of sales guidance and ballpark about INR 9,000-odd crores of new margin creation every year. And I think we should hopefully be comfortably placed on that trajectory. Obviously, this guidance can go up if there's demand, and if the demand sort of continues to be strong, there is always an upward assessment for it and an upside risk to it.
Answer, ashok tyagi
But a 20,000 number broadly in that trajectory, I think we are comfortable.
Question
Abhinav Sinha: Hi. Sir, thanks for taking my question and just a couple of details on the project pipeline that we were just discussing. So, on Arbour Senior Living, what is the size and timing that we are looking at? And similarly, if you can update us on the Dahlias Experience Cent re?
Answer, ashok tyagi
Ashok Tyagi: So, the Arbour senior living should happen in the next few months. I mean it could be 1-month or 3 months, we'll have to see. But clearly, these projects that I mentioned have a fair chance of being launched in this calendar year, they're very comfortably. Dahlias Experience Centre, I will defer to Aakash. Aakash, what's the current time line of the Dahlias Experience Centre being ready? Page 6of 14 DLF Limited May 14, 202 6 Aakash Ohri: Around Diwali.
Answer, aakash ohri
Yes. So, we're doing something nice, something that has not been done so far, at least presentation-wise in the country. So, I think it will be nice for everyone to see, and we'll definitely organize a show for you all also.
Answer, ashok tyagi
Ashok Tyagi: Yes. The only risk we do is that by the time the Experience Centre is commissioned, you may actually have sold out a large number of Dahlias. Aakash Ohri: No, sir, may your words come true! I hope that happens because then the analysts are never happy. Then they tell us Dahlias 2. So, we'll at least have something to tell them during that show. No, but God is kind.
Answer, ashok tyagi
I think we've done phenomenally well in Dahlias. I'm sure you'll note this quarter alone, we've done about 32 and plus 2 of the Camellias. And what has happened is right now that as far as this entire thing is concerned, we've been able to create demand, which is in fact, we've been able to do sales in the entire country, I don't think if we put all the developers together. I don't think anybody has crossed to double-digit in the INR 100 crores sale mark. But I think this speaks volumes of the Dahlias and the commitment that DLF brings on the table on super luxury. So this is huge. As far as anybody is concerned, please don't judge us with the real estate thing, but I think it's phenomenal for the business and, of course, the industry as well and the demand people keep talking about, it's pretty large, very well accepted, and we're doing about 100 plus, as you know.
Answer, ashok tyagi
Dahlias is now touching about INR 135 crores per sale, that's where we are.
Question
Abhinav Sinha: Yes. Sir, on the dividend side, which has been increased this year to INR 8, I fully appreciate that. Where do you see this setting given the current pace of FCF generation?
Answer, ashok tyagi
Ashok Tyagi: Look Abhinav, dividend is driven by 2 pieces. A large chunk of this dividend is driven by Cyber City's dividend to us, frankly. And I think broadly about two-third of this dividend is really Cyber City’s dividend. Cyber City, like a normal proper operating rental company with its debt to NOI at a very comfortable sub 3.5 level is generating more FCF and will continue, hopefully, growing its own dividend cycle. DLF cash flows themselves are growing. So again, we do not offer a dividend guidance. We have never done it in the past.
Answer, ashok tyagi
But if you see the trajectory across the last 4 or 5 years, it has been one of continuing growth in dividend. And if things stay well, hopefully, that trajectory should be maintained. But again, no guidance on that, yes.
Answer, aakash ohri
And this 32, you can safely say they’ve gone about almost INR 100 crores. About INR 90-odd crores because of the South and North, there's a South orientation, and there's North orientation. North looks over the lake park and everything else and the South looks , as you know, into the Aravallis. And there is a price difference between the South and North, which is about between INR 20 to INR 30-odd crores, depending on the size and PLC. And then, of course, we've got the north side. As far as when we started off, what was about INR 60 crores is now INR 90 crores. And what was about INR 75 crores is now about INR 110 crores.
Answer, aakash ohri
So there has been a phenomenal growth, but I don't want you all to kind of look at that right now at the moment because this is just the beginning. And I feel it's more to do with what the entire offering is going to be. Once you see Experience Centre and see what we're actually up to, you would be happy to kind of acknowledge the fact that super luxury in India, the definition that is super luxury, is a completely different one as far as this is concerned. So, Dahlias is something far more superior than the Camellias which has made a benchmark for industry in the country, I think you'll all be very happy to see whether Dahlias is heading to. Also, as I said, we recently hosted a dinner for all Dahlias owners. Everybody, but Mr. Ashok Tyagi attended it. But it was good.
Answer, aakash ohri
It was phenomenal. And I wouldn't call it a show of strength, but I think more to do with building a camaraderie. And actually, a lot of people had this whole thing about they started to compare price points and all. And that's what I wanted to bring out in the open that whoever boarded this journey in the beginning obviously have benefited enormously with the kind of first stage. So , I think that's where we are Sam ir.
Show 4 more questions
Question
Samir Jasuja: Apples to apples, whatever?
Answer, aakash ohri
Aakash Ohri: Okay. So Camellias today right now is trading between anything between INR 80 to about INR 150 crores. Now the good thing is that the Dahlias has caught up much faster than we expected it to, which is we thought we will achieve this target in about 4 years, but we've done it in about 1.5 years. in terms of per square foot realization. And that's where I'm saying that if you do apple-to -apple, Dahlias would be maybe almost at par at the Camellias today. And now that is actually a pain point for me, for Camellias , because I feel there's a good headroom there. I feel that we will be able to achieve the next lot as far as Camellias is concerned or the next valuation will be the next jump for Camellias will be at least INR 25 crores an apartment. But it's going to be a progress driven by people who are wanting to live in immediately versus waiting out for about 4 years.
Answer, aakash ohri
Page 8of 14 DLF Limited May 14, 202 6 Samir Jasuja: So just to -- I still didn't get that answer.
Question
Can I take Camellias at INR 120,000 per feet on super and maybe Dahlias, I'd say, INR 95,000 per feet on super, would that be a correct estimation?
Answer, ashok tyagi
Ashok Tyagi: And Samir the interesting thing of course, since, apart from you most other people on this call would be from Mumbai, that these prices of Camellias or Dahlias today. If you convert it to carpet, there'll be carpet north of INR 150,000 per square foot, INR 160,000 a square foot. Frankly, compared with the super lux products in Mumbai, be it Worli or South Mumbai. So, I mean, Gurgaon pricing of the super lux has, frankly, caught up, if not exceeded that in South Mumbai. Aakash Ohri: So, we have exceeded Mr. Tyagi?
Answer, ashok tyagi
Ashok Tyagi: No. I don't want to say we exceeded, but only thing that we definitely hit that level for sure. Absolutely.
Answer, ashok tyagi
Ashok Tyagi: So my advice honesty will be for all analyst that presales is about the wrongest metric that you can use to track us or frankly any of the substantial real estate players. I mean, if you also look at some of the other players, some of them are no longer chasing presales. I mean we can do presales of INR 50,000 crores a year also, frankly we have the land bank, we have the demand. But what we have to do is chase margins, chase cash flows and where we believe our primary objective is chasing margins and cash flows and not chasing presales, frankly. So, we are comfortable with generating this INR 9,000 to INR10,000 crores of margin every year, generating about this INR7,000 to INR8,000 crores of free cash flow every year on the Devco side. And obviously, building a pipeline for the future. From next year onwards, we also entered the virtuous cycle of completions from a bookkeeping standpoint.
Answer, ashok tyagi
And frankly, I mean, chasing joint Page 9of 14 DLF Limited May 14, 202 6 venture deals or deals of lower-margin products or even higher margin products beyond this. I'm sure, at some stage, these numbers will grow. I'm not saying it will not. But we are not going to chase the INR35,000 crores, a INR 30,000 crores numbers just for the heck of chasing them. If you have a great product, maybe we will, we will achieve. So, there have been years and we have been the highest in presales for the year, but that was not because you were chasing presales. You were chasing margins and we were basically riding on all our products.
Answer, ashok tyagi
Akash: Understood, sir. Thank you so much. Aakash Ohri : Also, Mr. Tyagi, if I can just add to what you said, I'd like to address the elephant in the room that most importantly, you all need to understand that the construction capabilities in our country are still limited. So, everybody can chase the presales number, but who's going to deliver on time. And please understand with the monies that you are taking from yourselves as long as even if you're a consumer, how would you like it to make a commitment for your delivery and deliver in 8 to 10 years. So, I think that is something that this company is absolutely cognizant of Mr. Tyagi has told you what our capabilities of sales are and across the geographies, we are invited to participate post our Mumbai success and Panchkula as you know already. A lot of companies and JVs are wanting to partner with them.
Answer, ashok tyagi
Ashok Tyagi: So, Westpark itself, overall is a total -- I mean, the Westpark a s defined currently is a total pipeline of in excess of 5 million square feet super area. Against this, we have so far launched 900,000 square feet we should be launching the next phase of 800,000 -odd in this fiscal, maybe 500,000 or 600,000 square feet the fiscal afterwards and we change it . We are also constantly looking how we can organically grow the Westpark geography and we are in conversations across with other development options in and around Westpark. And obviously frankly our Mumbai team and our joint venture partners, we continue to look at any other interesting opportunities in Mumbai. So, we are in Mumbai now for good for sure clearly. We will continue to be cautious and calibrated in Mumbai, but we would be open to a lucrative and nice opportunities in Mumbai and Westpark itself should keep on going into a very strong core for us. Akash: Understood.
Answer, badal bagri
Badal Bagri: Yes. So Akash, as you rightly pointed out of the INR14,000 crores of cash balance, almost INR11,200 crores are sitting in RERA balance. And all of these projects will start getting unlocked from FY'27, '28 onwards. That's when these cash will be available for us different things. As stated earlier, I think we have a three-pronged approach. Number one is increasing shareholder return from the cash perspective. Second, we have an extremely healthy pipeline in DLF as well, mothership of annuity business and there is a large amount of c apex, which is already kind of committed and will be invested for building the portfolio.
Answer, badal bagri
And third, is, as you rightly pointed out, we already have a reasonable share of land bank, but we are always open for opportunistic deal what will be margin accretive in our assessment. So that cash pool is always available for reinvestment. On the second question, it's linked to the first one itself. As you know, our accounting policies are fairly conservative. We follow the CCM method, which is completed contract method. All our large projects starting from Arbour will start getting delivered from FY 27, 28 onwards. So, from there, there will be a virtuous cycle of getting free of cash and also an extremely healthy margin, which is going to get booked in our P&L, which we always share, which is kind of getting accrued and just fitting for the final delivery.
Answer, ashok tyagi
Ashok Tyagi: So look, I think this year, the Dahlias sales was about INR5,000 crores and hopefully it stays to INR 5,000 crores to INR 6,000 crores next year as well. Kunal: Sure. And then you said you have a launch pipeline of 200 billion for FY27. So, from that, you are expecting another 150 billion odd?
Answer, ashok tyagi
Ashok Tyagi: We expect that the 13 to 14 million or 14 to 15 million, somewhere in that ballpark of sale to come through from that pipeline. Kunal: And then why is that? Because typically, if you see the barring Dahlias, whatever you have launched so far have forgotten sold at launch, including Mumbai projects. So just trying to understand your assumption that by 150 billion, 130 billion out of 200 billion of launch pipeline we expect?
Answer, ashok tyagi
Ashok Tyagi: Kunal, it was the 200 billion the assumption is that maybe we will eventually may end up launching a subset of 200 billion. We, I think, you're right that so far, we have always sold 100%. I mean, Dahlias, of course, a calibrated soil, but we have sold 100%. But I don't think it's smart Page 11of 14 DLF Limited May 14, 202 6 in today's world to bank on everything to be a 3- day sale. So we do believe that of our launch pipeline. The balance, INR 13,000 to INR 14,000 crores should come comfortably for us to hit it to be on these INR 20,000 crores . Kunal: Understood.
Question
Parvez Qazi: Hi, thanks for taking my question. So a couple of questions for Sriram sir. One, on the 4 blocks, which are under construction in Gurgaon, DT 5 to 8, what is the construction timeline also same for the mall that we are making in Gurgaon. And the second question is of both, DT 5 to 8 in Gurgaon, and the Block 4, 5 in Chennai, what is the pre-leasing status considering that in our existing portfolio anyway, we don't have much to lease? Thank you.
Answer, sriram khattar
Sriram Khattar: Yes. So let me start with D owntown Gurgaon Phase 2, Downtown Gurgaon, Phase 2 is an integrated development of 7.5 million square feet, out of which 2 million is the mall and 5.5 million is offices split into 4 Towers, as you rightly mentioned Tower 5, 6, 7 and 8 Out of Page 12of 14 DLF Limited May 14, 202 6 this, Tower 7, which is 2.2 million is nearly fully leased. So now we have released Tower 5 and 6 and they are in the process of being leased. The finishing time lines are later part of FY'28, early '29. This, at the end of it will still leave Downtown as one which is in between when we have the multilevel car park today, which is in between ambience and Tower 2, 3 and 4. And that's so to be an iconic tower that we will start the construction about 2.5 years from now. As far as Downtown, Taramani is concerned, the 3.5 million construction is progressing well.
Answer, sriram khattar
We are reasonably confident of its completion in Q2 of the next fiscal year. W e have made certain project changes there because we have created a central atrium between Tower 1, 2, 3, 4 and 5, and that's turning out to be a very beautiful pl ace. Out of 3.5 million, we have already leased about 500,000 and the balance leasing is on its way.
Question
Nilang Mehta: Yes. I just wanted to get some sense on the pending area, we have on SEZ what's the house that being deployed or rented out, that's one. Second is, based on the micro markets in which we are, if you could give some colour on supply and absorption and also the rental trends, what you're seeing?
Answer, sriram khattar
Sriram Khattar: So, as a concept, SEZ is not something which is growing. It is showing a decline in trend. So out of our total portfolio of SEZ of about 16 to 17 million, we have already converted about 4-odd million into non -processing areas including a small portion, which we have even de-notified. However, there, the existing tenants who have not yet exhausted their 80-I tax incentives continued to take SEZ on lease. The overall vacancy is about 10- odd percent out of which the lowest vacancy is in the Cyber City in Gurgaon and then we've got about 8 to 9% vacancy in Silokhera or 7% we can see between Silokhera and Chennai. And Hyderabad is at about 17 to 20% vacancy. As far as the rentals is concerned, we are slowly striving to close the gap between the, say in Cyber City in Gurgaon, between the cyber city rentals and the SEZ rentals for the new take up.
Answer, sriram khattar
Sriram Khattar: So, Gurgaon, I believe we've set a certain standard and quality of the office space, and we believe this is the first call for any global blue -blooded marque company that comes in, especially with GCC. We've just completed leasing the entire tower of downtown of Atrium place Tower 4 to a Page 13of 14 DLF Limited May 14, 202 6 single tenant from the US. We believe that with the quality of offering that we have and what we create in terms of the workplace solutions and spaces, we shall continue to be a leader here. To some extent, this will also be reflected in Chennai, where we have now a fairly large operating portfolio exceeding 10 million square feet, going up to about 14 to 15 million square feet. We also created a benchmark about 2 years ago in crossing a rental of INR 100 in Taramani, the 450,000 square feet, 500,000 square feet that we have leased in Tower 4 and 5, I must share that the top floors which have a 360o view of the city and the sea have been leased at INR 145 to INR 150 per square feet and we expect average rental realization of between INR 125 per square feet, INR 130 per square feet there.
Answer, ashok tyagi
Ashok Tyagi: So, thank you once again for joining us on this year-ending call. As Badal and then Sriram mentioned, both on the DevCo and the RentCo pieces, though we continue to have a strong story. In fact, the rental business with the commissioning of the 2 D owntowns and the full throttle going on rental of Atrium Place, plays is actually poised to see a very exciting phase of growth. On the DevCo, I could sense some degree of expectations that we should have given a higher sale than 20,000, but frankly, I would still encourage that we need to not only focus on pre-sales as a metric, but on the margins and cash flows. And I think once that entire sustainability comes into play, hopefully, the presales number will grow organically. That is very clear. We have a reasonably strong launch pipeline, and Dahlias continues to be the base for our entire growth prospect.
Answer, ashok tyagi
Our cash generation would continue to be extremely strong as should hopefully be our dividend trajectory. And our continued focus on the entire EHS and G overnance pieces continues to be extremely, extremely strong, which at times leads to a more delayed start when we launch a new project because we just go through such an exhaustive checklist of our own. But I think all in all, we are poised for a strong FY '26, '27 coming on the heels of a strong FY'25, '26, and look forward to connecting with all of you through the year. Thank you.
Questions about this call
- When was the DLF Q4 FY26 earnings call transcript filed?
- DLF filed the transcript with the exchange on 18 May 2026. This page is built from that transcript.
- What does this page list?
- 66 statements from the transcript across 10 topics, 45 of them with a figure. Each statement is shown with the transcript sentence it came from.
- Are the analysts' questions included?
- Yes. 14 questions and management's answers are listed in the order they were asked, as the transcript prints them.
- Who wrote this page?
- DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.