Earnings call
Interarch Building Solutions Q3 FY26 earnings call
By DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person.
Transcript filed .
The company filed one other transcript for this quarter. This page reads the one with the speakers marked, then the most statements.
The company booked orders of approximately INR550 crores during the last 3 months, averaging about INR180 crores; its monthly order book is INR200 crores, with approximately INR1,200 crores of P1 and INR 1,000 crores of P2 pipeline. The company expects to achieve INR1,900 crores this year, compared with its earlier target of INR1,710 crores or INR1,720 crores, implying nearly 30% growth instead of 17.5%. Pipeline hit rate is about 20% to 22%; pipeline 1 is about 6x its monthly average order booking and pipeline 2 is another 6x to 7 of its average monthly order book, with a mix of renewable, semiconductor and EV sectors. The company estimated the INR3.5 crores one-time labour-code impact as possibly covering the last 3 to 4 years, equivalent to INR30-40-50 lakhs a year. The company said that with 20,000-24,000 tons a year it would be a very small player in the market, based on the market build-up it had seen in the last 1 year.
The numbers management gave
Results
- The company estimated the INR3.5 crores one-time labour-code impact as possibly covering the last 3 to 4 years, equivalent to INR30-40-50 lakhs a year.
Show source
So I don't -- I think this INR3.5 crores, if I'm not mistaken, maybe last 3 to 4 years' effect.
- Volumes grew almost 40% in 9 months this year.
Show source
You have seen this year almost 40% in 9 months, even ealier years, you see the growth.
- Year-on-year volume growth was 43.8% and revenue grew 43.7%; the small difference was because raw material moved downward a little, while EBITDA remained similar and there was no effect in realization.
Show source
So the volume growth is, to be precise, year-on-year is 43.8%, whereas the revenue has grown by 43.7%, right?
- The company said the figure was about INRS73-575 crores in the quarter.
Show source
So you can say about INRS73-575 crores in the quarter.
- The company said the figure was INR1,634 crores and about INR1,600 crores for the entire 9 months.
Show source
So it was INR1,634 crores.
- The company grew 10x from Rs.15 crores to Rs.500 crores during 2004-2009.
Show source
It is not a price-driven sale.
Show 6 more statements
Money and capital
- The company expects to spend another INR30 crores on capex this year.
Show source
Arvind Nanda: Another INR30 crores, I think we are going to spend this year more.
- The company expects another INR30 crores or INR40 crores of capex outgo by March and expects to have spent about INR100 crores or INR120 crores by March.
Show source
So that by March I think we would have spent about INR100 crores, INR120 crores.
- The company expects INR120 crores of capex outgo by the end of March, with another INR30 crores or INR40 crores left for the first quarter of the next year, and expects to spend INR150 crores of capex by June or July on the two existing plants and upgrades to other plants.
Show source
So that is how we are going to be spending the INR 150 crores capex by, I think, June or July.
- The company projects total capex of about INR120-125 crores for the two projects and says the QIP will be primarily used for them, with some funding potentially generated from internal resources.
Show source
So total, we are projecting about INR120-125 crores.
- Net working capital is about 34 days, and it will try to maintain it within the same range, though it can go up a little bit here and there, as large projects and EPC contracts, including semicon, have a somewhat higher cycle time.
Show source
Manish Garg: I think our net working capital is at about 34 days, and we are right now doing very large projects wherein the cycle time is a bit higher through the EPC contracts we're doing, semicon we're doing.
- The company anticipates INR125 crores to INR130 crores for the two new additions it wants to start this year; the heavy structure addition needs about INR70 crores and Gujarat needs about INRS5 crores to INRG0 crores.
Show source
So I anticipate maybe INR125 crores to INR130 crores for the 2 new additions we want to start this year.
What it expects ahead
What management expects
- The company expects to achieve INR1,900 crores this year, compared with its earlier target of INR1,710 crores or INR1,720 crores, implying nearly 30% growth instead of 17.5%.
Show source
So instead of INR1,710 crores, INR1,720 crores, I think we will touch probably INR1,900 crores this year.
- The company projects 20% growth on INR1,720 crores next year, or about INR2,060 crores, and expects to cross INR2,100 crores next year from INR1,900 crores; it expects to cross the promised INR2,060 crores turnover for 26 27 by maybe INR50 crores to INRI00 crores, with growth of 12% to 15%.
Show source
We are building up enough capacity that we should cross that figure next year from INR1,900 crores to go up, maybe we'll cross INR2,100 crores.
- The company does not project anything different for the margins and expects them to be the same at the end of the year, allowing for 0.1% or 0.2% variation.
Show source
I think we are — at the end of the year, we will be the same.
- The company projects growth of 15% next year, rather than the previously projected 20%, after growth accelerated from 17.5% to 30% this year and increased its base period faster than capacity expanded.
Show source
So yes, I think I feel that next year we will cross -- we should touch 15% is my projection not 20% as we had projected carlier because of this extra — from 17.5% to 30% growth this year has increased our base period faster than we expanded.
- The company is building its capacity to achieve revenue of INR2,400 crores to INR2,500 crores by FY'27-'28.
Show source
And our final figure of 27-/28 was INR2,500 crores, for which also we are building up the capacity.
- The company says next year's target will be a little higher because it has achieved more this year.
Show source
Next year, the target will be a little higher because this year we have achieved more.
Show 6 more statements
What management expects
- The company says competition may prevent it from getting better prices from customers, and it is pursuing internal economies, better productivity and exports, including improvements in purchasing, waste management and scrap management, to improve or maintain margins.
Show source
I think internal economies, better productivity, trying to get into exports, I think these are the steps we are taking because there is -- in a company like us, there can be a lot of scope for internal improvements, certainly in purchasing, in waste management, scrap management, in productivity.
- The company says expenses from expansion into heavy structure and exports are occurring now, with income expected later, and that its margins can be maintained.
Show source
So there the expenses are happening now and the income will come a little later.
- The company expects to cross the promised INR2,060 crores turnover for 26 27 by maybe INR50 crores to INRI00 crores, with growth of 12% to 15%. Replaced by a later filing.
Orders
- The company booked orders of approximately INR550 crores during the last 3 months, averaging about INR180 crores; its monthly order book is INR200 crores, with approximately INR1,200 crores of P1 and INR 1,000 crores of P2 pipeline.
Show source
So that is on a total order -- monthly order book of INR200 crores, we have about INR1,200 crores of the P1 and approximately INR 1,000 crores of P2.
- The company has received 2 export orders, one in Myanmar and one in Ghana, and expects qualified export inquiries from the African continent and North America to get converted soon.
Show source
So we already received 2 export orders that I think we have mentioned, one in Myanmar and in Ghana.
- The company said JSW is a longer-term order that it could book.
Show source
Luckily, 1 or 2 orders were long term, like JSW is a little longer term order.
What it is building and selling
Projects and capacity
- Pipeline hit rate is about 20% to 22%; pipeline 1 is about 6x its monthly average order booking and pipeline 2 is another 6x to 7 of its average monthly order book, with a mix of renewable, semiconductor and EV sectors.
Show source
So both these have started, and both these will be in play in different phases between June and December.
- The company plans to prepone by 1 year and start in March and June, and finish both expansions: AP 2 as the second line of heavy structures and Gujarat as the second part of the pre-engineered building expansion.
Show source
So we will have the same thing in Gujarat.
- Each heavy structure line gives Interarch Building Solutions Limited about 20,000 tons of capacity; the company considered 20,000 tons to 24,000 tons insufficient to be a good player. Interarch Building Solutions Limited plans to double heavy structure capacity from 20,000 to 40,000 tons or 45,000 tons at a cost of about INR70 crores.
Show source
And heavy structures, we felt that each heavy structure line gives us about 20,000 tons.
- The two plants will cost Interarch Building Solutions Limited more than INR100 crores, and the balance can come from internal resources.
Show source
Both these plants will cost us more than INR100 crores, but I think balance can come out of internal resources also.
- The company says each plant is approximately 40,000 tons; its Gujarat first plant will bring utilizable capacity to approximately 200,000 tons, excluding heavy structure, and its sixth plant will also be 40,000 tons.
Show source
So the Gujarat first plant that is coming up, our capacity will or utilizable capacity will be approximately 200,000 tons, not counting the heavy structure, 200,000 tons.
- The company plans to raise additional QIP to put up its sixth plant faster than earlier planned, adding 40,000 tons of PEB capacity in Gujarat; by FY '27, total PEB capacity is planned to reach 240,000 tons.
Show source
So in total, how much of the capacity is coming live by Q2 FY 272 Arvind Nanda: FY '27, the plan is that we should have a total of 240,000 tons of PEB.
Show 20 more statements
Projects and capacity
- The company plans to start Gujarat plant 2 and AP plant 2 of the heavy structure immediately, with both projects expected to be in place by March and contribute in 27-28.
Show source
So I think if we start immediately by next March, both the new projects that we plan to start, the Gujarat plant 2 and the AP plant 2 of the heavy structure, I think by March, both should be in place.
- The company is creating capacity of about 50,000 tons, 45-50,000 tons, and said this is the market share it will get once fully operational.
Show source
Now the kind of capacity we are creating is about 50,000 tons, 45-50,000 tons.
- PEB capacity is 180,000 tons, including about 15,000-20,000 tons added by the Kiccha line and other things; AP1 adds another 20,000-22,000 tons for heavy structure, taking capacity to 200,000 tons, and the new AP and new Gujarat will add another 20,000 tons and 40,000 tons, respectively, for total capacity of 260-280,000 tons.
Show source
So total will go up to, say, 260-280,000 tons whatever.
- The company has 180,000 metric tons of annual production capacity and is planning a new plant in Gujarat that will add 40,000 capacity more, taking capacity to 2.2 lakh metric tons per annum; it is also planning another plant in Gujarat that would add another 40,000 metric tons of capacity.
Show source
That will take our capacity to 2.2 lakh metric tons per annum.
- The company has made an arrangement with the seller for the land; if the land is secured, it will need about 9 months to put the plant into production.
Show source
So if the land gets secured then we need about 9 months to put it into production.
- Ongoing first phase will finish by June and be in commercial production by August, September, with capacity of about 2022; the second phase is planned to start construction by March after Board clearance, will take another 9 months, and is expected to be in place by December, January, with completion targeted by the end of the next financial year.
Show source
And then the second phase, which we want to start construction by March, by next month now that we have the clearance from the Board, so start in March.
- The company would have spent about INR70 crores without the land on Andhra 1, and the Andhra and Gujarat plants will be duplications, with Gujarat also requiring a little bit of land.
Show source
And in the Andhra 1, we would have spent same, about INR70 crores without the land.
- The company will start its sixth fully integrated plant in Gujarat this year; its fifth plant in Gujarat is ongoing.
Show source
The sixth one also we'll start this year.
- The company is adding its sixth plant in anticipation of market demand and its ability to perform, so that the plant does not prevent it from taking orders.
Show source
But the sixth plant is being added in anticipation that if the market demands and we are able to perform, then we are ready, then the plant should not become sort of an issue that we cannot take orders.
- The company plans to double heavy structure capacity from 20,000 to 40,000 tons or 45,000 tons at a cost of about INR70 crores. Replaced by a later filing.
Demand and pricing
- The company said that with 20,000-24,000 tons a year it would be a very small player in the market, based on the market build-up it had seen in the last 1 year.
Show source
But the way that we have seen the ‘market build up in the last 1 year, we figured that with 20,000-24,000 tons a year, we'll be a very small player in the market.
- The company said its total addressable market may be 100x of what the market size is today right now.
Show source
So I would really say that the total addressable market is maybe 100x of what the market size is today right now.
- The existing sales of structural steel are close to about 0.5 million tons.
Show source
One is what is the existing sort of sales which is taking place is close to about 0.5 million tons there.
- The company is seeing demand in the market for pre-engineered building and heavy structure, with requirements coming from contractors, builders and owners of buildings and people changing their buildings to steel.
Show source
Now, while we were looking at the market in the last 6 to 8 months, we found that, as you have seen from our results, the demand is there in the market today, whether it's pre- engineered building, more so in heavy structure also.
- The company says larger orders can make more money and have higher net margins, while larger, more complex buildings and time-bound electronics and semiconductor projects may offer better pricing.
Show source
The net margins can be higher in a bigger order.
- The company said the export opportunity is very big and there are not many local manufacturers when it comes to the African continent.
Show source
There are not many local manufacturers when we come to African continent.
Segments
- The company can execute a building of INR300 crores, weighing 30,000 tons, with a height of 70-80 meters and very large spans; it has done a project worth INR300 crores and weighing 30,000 tons plus.
Show source
And T think with our experience and background and knowledge and relationships, we have improved that, that today, we can do a INR300 crores building, 30,000 tons building, high building of 70-80 meters height, very large spans.
- The company has been in the business for close to 43 years.
Show source
So the differentiator with Interarch is that, number one, we have been in this business for close to 43 years.
- The company has done a project worth INR300 crores and weighing 30,000 tons plus. Replaced by a later filing.
Deals and partners
- The company said its customers keep coming back through their different branches or segments. Replaced by a later filing.
Show source
And that is why the same customers with their different branches or different segments keep coming back to us.
Risks, rules and outside factors
Outside factors
- The company keeps about 2 months of material in stock as a strategy because suppliers are unreliable and its buildings require 7-8 different sizes or thicknesses; the stock also provides price stability, but prices can move either way.
Show source
So as a strategy, we always keep about 2 months of material in stock.
- Steel companies normally take orders up to 8 weeks delivery, and Interarch Building Solutions Limited has 8 weeks of delivery orders on them at any time; together with its stock, nearly 4 months of supply is known to the company at a fixed price.
Show source
So nearly 4 months is known to me, the price is known.
- The company says it is insulated from raw material increases for about 4 months through 2 months of physical inventory and 2 months of pipeline inventory, and its pricing mechanism lets it more or less pass raw material price changes to customers.
Show source
So to that extent, with the pricing mechanism by itself, we are able to more or less pass it on, give or take a little bit here and there.
What the company said on its earnings call, taken from its own transcript. Not advice.
Questions and answers
Question
Sudeep Bora: Good evening, everyone. On behalf of Ambit Capital, I thank the management of Interarch Building Solutions Limited for the opportunity to host their Q3 and 9MFY26 camings conference call. To discuss the results, I'm pleased to welcome Mr. Arvind Nanda, Managing Director; Mr. Manish Garg, Chief Executive Director; Mr. Pushpendra Kumar Bansal, Chief Financial Officer; and Mr. Anil Kumar Chandani, President, Corporate Finance and Strategy. Now I invite Mr. Arvind Nanda to take us through the key highlights of the quarter, post which we'll open up for Q&A. Thank you, and over to you, sir.
Answer, arvind nanda
But the whole building from design till execution is a unique piece of product. Therefore, not only do we — like we said, 4-legged animals, do the 4 legs have to be equally strong, but they have to run in a very coordinated manner. If one of them doesn't perform, the whole animal will fall down. So the coordination is a very critical element of any pre-engineered building company. And T think with our experience and background and knowledge and relationships, we have improved that, that today, we can do a INR300 crores building, 30,000 tons building, high building of 70-80 meters height, very large spans. That is the capability that we build up. Our clients will not come to the pre-engincered building industry until they see the capability.
Answer, arvind nanda
We have started new -- 2 new plants this year, which is one is the AP plant 2, which is for heavy structures in Andhra Pradesh. And the second is the Gujarat plant for pre-engineered building. So both these have started, and both these will be in play in different phases between June and December. Now, while we were looking at the market in the last 6 to 8 months, we found that, as you have seen from our results, the demand is there in the market today, whether it's pre- engineered building, more so in heavy structure also. We are seeing a lot of requirement coming up. A lot of people have changed their buildings to steel. A lot of demand is coming from contractors, builders, owners of buildings.
Answer, arvind nanda
So we will have the same thing in Gujarat. It will be 6 plants, 2 ineach. And heavy structures, we felt that each heavy structure line gives us about 20,000 tons. So we felt that 20,000 tons to 24,000 tons will not make us a good player. It will give us a safe harbour in the sense that we can try and build up the market. But the way that we have seen the ‘market build up in the last 1 year, we figured that with 20,000-24,000 tons a year, we'll be a very small player in the market. People will not come to us like they come for PEBs and give Page 4 0of 25 ¥, YEARS By et Interarch Building Solutions Limited February 03, 2026 us because a normal building or a large contract can be 10,000 to 15,000 tons.
Answer, arvind nanda
Both these plants will cost us more than INR100 crores, but I think balance can come out of internal resources also. But the idea was to start it immediately rather than wait for another 12 months when we have our own resources. And I think that will add to the bottom line in a way. It doesnt dilute any person's sharcholding value because the money is also going to come in and invest it in the capital. And I think the timing is right. That is our judgment. Now I will leave the rest of the time to your questions and try to answer them to the best of our ability.
Question
Shubhankar Gupta: Got it. So just doubling down on the same question. So I think how I thought of this was, let's say, 2, 3 key strategies, right? One is inventory management could be a way of mitigating it. Second could be fixed price versus variable price contract. And third could be hedging steel as a commodity because it's an important commodity for us, right? So within this, is there something which we are doing?
Answer, arvind nanda
Arvind Nanda: Yes, yes. See, stock management is an essential part of our business because of 2 reasons. One is the unreliability of suppliers. So we don't know whether they will supply everything on time as we ordered. And each one of our buildings could have 7-8 different sizes or thicknesses that are required. So as a strategy, we always keep about 2 months of material in stock. So that, of course, also gives you the price stability, but it can go either way.
Answer, arvind nanda
I could have bought at a higher price and selling at a lower price. That could also happen. But yes, I know my fixed price. And second is that the steel companies normally take orders up to 8 weeks delivery. So at any time I've got 8 weeks of delivery orders on them. That means another 2 months of supply is also known to me at a fixed price. So nearly 4 months is known to me, the price is known.
Question
Shubhankar Gupta: Makes sense. Makes sense. Got it. Okay. That's fair. And for my second question, Arvindji. So I was seeing that the PAT margin has fallen by 70 bps. The reason for that is exceptional items, one-time statutory impact of new labour codes. I think I'm correct. So my question is, how will that impact the EBITDA? How will this new change in the impact of new labour code change the EBITDA and PAT margin for us going forward? Page 10 of 25 ¥, YEARS 3 ! Interarch Building Solutions Limited February 03, 2026 Arvind Nanda: No, I think it's a onetime hit.
Answer, arvind nanda
So I don't -- I think this INR3.5 crores, if I'm not mistaken, maybe last 3 to 4 years' effect. So you can take it maybe INR30-40-50 lakhs a year.
Question
Shubhankar Gupta: Got it. Got it. So its spread out. And I think from a future perspective, it should not be concerned?
Answer, arvind nanda
Arvind Nanda: 1 think our utilization is pretty high now. So we are doing - let's say, if we have done INR522 crores, that means we are already doing about INR156 crores, INR157 crores a month. Probably we still have scope for another 10% increase before the next capacity will come into play. So it is mainly quantity-driven only. It is not a price-driven sale. So we are trying to add — that's why we want to add our capacity a little faster than what we had planned earlier so that the Gujarat new plant will come into play by June, July. That will give us additional capacity within a couple of months after that.
Answer, arvind nanda
And the Phase 2 of the Gujarat, first plant will also come into play by October, November. So that is already the case. So we have to ramp up our capacity. See, last year, we gave a target figure of that we will touch this year INR1,710 crores or INR1,720 crores. That was our target. So instead of INR1,710 crores, INR1,720 crores, I think we will touch probably INR1,900 crores this year. So that's like instead of 17.5% growth, nearly a 30% growth.
Answer, arvind nanda
So that has utilized a lot of our capacity. Next year, we are projecting that we will do 20% on INR1,720 crores, which comes to about INR2,060 crores, if I'm not mistaken, right? So I think we should cross that. We are building up enough capacity that we should cross that figure next year from INR1,900 crores to go up, maybe we'll cross INR2,100 crores. And our final figure of 27-/28 was INR2,500 crores, for which also we are building up the capacity. Page 11 of 25 ¥, YEARS By et Interarch Building Solutions Limited February 03, 2026 Now with the new added capacity, we might cross it. But we'll stick to that figure that 2728, we will definitely do INR2,500 crores as promised.
Answer, arvind nanda
And hopefully, with added capacity, we might even cross it. So we are well on our way to achieve our target for the capacity. We are adding capacity accordingly. We have grown a little faster this year because of the fact that we have - utilization of capacity came in faster and we managed to achieve our targets also. So that is the way we are looking at it. So our overall target for '27-28 at INR2,500 crores remains. Next year, the target will be a little higher because this year we have achieved more.
Question
Sudeep Bora: Okay. So like it would remain the same as we have seen in FY 126, right?
Answer, arvind nanda
Arvind Nanda: Yes. Just maybe 0.1% or 0.2% here or there. We don't — we are not projecting anything different. I think we are — at the end of the year, we will be the same.
Question
Sudeep Bora: In terms of capex.
Answer, arvind nanda
Arvind Nanda: Another INR30 crores, I think we are going to spend this year more.
Question
Sudeep Bora: S0 INRG0 crores is in last quarter or it's in 9 months?
Answer, arvind nanda
Arvind Nanda: Last 9 months. The plants mostly started in September, October. So I think another INR30 crores or INR40 crores will outgo by March. So that by March I think we would have spent about INR100 crores, INR120 crores. How much, Bansalji?
Answer, arvind nanda
Arvind Nanda: INR120 crores would be the outgo by the end of March because all the machinery and all will be in. Then another, I think, INR30 crores or INR40 crores will be left for first quarter of the nextyear. So that is the INRL50 crores we had projected that we will spend on these 2 existing plants and a little bit, of course, upgradation and all the other plants is constantly happening. So that is how we are going to be spending the INR 150 crores capex by, I think, June or July.
Question
So from what T understand that AP Phase 2 capex is going to be INR75 crores, which will add 24,000 metric tons of HSS, heavy steel structures. And will this also include some capex on the PEB side? And if you can quantify what will be the capacity addition in that aspect?
Answer, arvind nanda
Arvind Nanda: Yes. So we are planning 2 things. One is to double the heavy structure capacity from 20,000 to 40,000 tons or 45,000 tons. That should cost us about INR70 crores. And then have a totally new plant in Gujarat so that the sixth plant, let s say, our sixth fully integrated plant. The fifth one is ongoing in Gujarat. The sixth one also we'll start this year.
Answer, arvind nanda
So total, we are projecting about INR120-125 crores. I think we can generate some from our internal resources. So that QIP will be primarily used for these 2 projects.
Question
Vishal Mehta: So what will be the capacity addition in the Gujarat plant for the PEB?
Answer, arvind nanda
Arvind Nanda: So with the second -- each plant is approximately 40,000 tons. So the Gujarat first plant that is coming up, our capacity will or utilizable capacity will be approximately 200,000 tons, not counting the heavy structure, 200,000 tons. And the sixth plant will also be 40,000 tons. So each fully integrated plant for Interarch is approximately 40,000 tons of buildings.
Question
Vishal Mehta: And sir, if you have to quantify what is the sales potential from this expanded capacity? What would you say that would be and when would we realize that?
Answer, arvind nanda
Arvind Nanda: See, total capacity of each plant is approximately about INRS00 crores. So we have right now 4 fully integrated plants. So that gives us a capacity of about INR1,900 crores to INR2,000 crores approximately combined with our satellite plants doing certain things. The fifth plant in Gujarat will add another INRS00 crores. So that will take us to INR2,500 crores, which is what we had planned for 27-28 utilization. And the sixth Gujarat plant should take it up to INR3,000 crores. But the sixth plant is being added in anticipation that if the market demands and we are able to perform, then we are ready, then the plant should not become sort of an issue that we cannot take orders.
Show 14 more questions
Question
Raghav Maheshwari: Sorry, sir, your voice was breaking. Can you repeat?
Answer, arvind nanda
Arvind Nanda: So that will be the sixth plant. So right now, what we are doing is, our fifth plant in Gujarat. So the additional QIP which we plan to raise is because we want to put up the sixth plant faster than earlier planned. So the capacity of PEB will go up by another 40,000 tons in Gujarat with the QIP. Raghav Maheshwari: Okay. So in total, how much of the capacity is coming live by Q2 FY 272 Arvind Nanda: FY '27, the plan is that we should have a total of 240,000 tons of PEB.
Question
Rahul Kumar: Okay, okay. And sir, from your existing pipeline of the orders which are in discussion basically, can you help us understand the data center part of that order pipeline?
Answer, arvind nanda
Arvind Nanda: We are trying to pick up capacity faster. We hope that we will do at least 15% -- percentages are a little deceiving in that sense because, yes, muted in percentage it's still crossing whatever we planned. So I would say that, yes, we will do better than what we had predicted. Maybe we Page 16 of 25 Interarch Building Solutions Limited February 03, 2026 did a little bit more this year and a little less in percentage next year, which is better. I think the faster we can achieve the numbers, the better it is. So yes, I think I feel that next year we will cross -- we should touch 15% is my projection not 20% as we had projected carlier because of this extra — from 17.5% to 30% growth this year has increased our base period faster than we expanded. But let's see what happens when we put up new capacity, how fast we can do it.
Question
Nishant Sharma: All right, si, definitely. And the new -- the second phase of the new capacity, that would also come in, in FY '27 and that's where the FY '28 we can see the more -- I mean, the faster growth maybe from that perspective?
Answer, arvind nanda
Arvind Nanda: Well, that is why we are going for this QIP because rather than waiting for internal resources and then starting it next year for '27-28 or '28-29, we feel that if we prepone it by a year, it might get filled. So I think if we start immediately by next March, both the new projects that we plan to start, the Gujarat plant 2 and the AP plant 2 of the heavy structure, I think by March, both should be in place. So they should be able to contribute in 27-28 definitely. How much, we don't know?
Question
Nishant Sharma: Sir, lastly, on the margin front, while you have very clearly outlined that the margins are unlikely to fall and may be constrained also because we are preponing the capex, so margins may not be able to improve from about 9% kind of a number that we are in, in FY 267 But will the mix in terms of orders have some leeway that it can improve from, say, maybe 9% to about 10-0dd percent by FY 28 purely from a project mix perspective or may be there would be operational efficiencies may also kick in and we can reach to that number or largely, as you earlier alluded, that it is likely to remain the same?
Answer, arvind nanda
Arvind Nanda: I think its going to be a combination of many things. See, once you realize that because of competition, if we have to plan reasonably well in advance. So our feeling is that because of the competition, we may not be able to get better prices from customers. Now how do we improve our margins or keep them and go up? I think internal economies, better productivity, trying to get into exports, I think these are the steps we are taking because there is -- in a company like us, there can be a lot of scope for internal improvements, certainly in purchasing, in waste management, scrap management, in productivity. So we are looking at it like an overall picture. I would not say that just one thing will matter.
Answer, arvind nanda
Of course, if the project mix changes and you have bigger buildings, more complex building coming up, people want it faster and faster. Our government has announced a lot of plans for electronics, for semiconductor. These people are always in a great hurry because they are very time-bound. PLI schemes are in a great hurry. So you can get better pricing also from them. Page 17 of 25 Interarch Building Solutions Limited February 03, 2026 Even if not better pricing because they are larger orders, you can make more money. The net margins can be higher in a bigger order.
Answer, arvind nanda
So we are working on multiple fronts to make sure that the margins keep improving. But the results, T think we'l see. Normally, the operational leverage should have kicked in by now for our past if we hadn't kept expanding into, say, heavy structure and exports. So there the expenses are happening now and the income will come a little later. But I'm quite sure that these margins can definitely be maintained.
Question
Deepashri Joshi: Okay. Could you give an absolute pipeline | number? Page 18 of 25 Interarch Building Solutions Limited February 03, 2026 Manish Garg: Yes.
Answer, manish garg
So our average -- we booked orders of approximately INR550 crores during the last 3 months. So our average order book is about INR180 crores. So our pipeline is approximately about 200*6. So that is on a total order -- monthly order book of INR200 crores, we have about INR1,200 crores of the P1 and approximately INR 1,000 crores of P2.
Question
Deepashri Joshi: Okay. Got it. And have you received or do you envisage any receipt of export orders via your Moletek partnership?
Answer, manish garg
Manish Garg: Yes. So we already received 2 export orders that I think we have mentioned, one in Myanmar and in Ghana. And right now, our order book does include a few export orders also, export inquiries rather, qualified inquiries, which are from African continent and North America, and we expect them to get converted soon.
Question
Deepashri Joshi: Okay. So it's from North America, the U.S., and Canada?
Answer, manish garg
Manish Garg: Yes. So there are 2-3 parts of your question, sir. One is, are we able to pass on the raw material increase to the customers. In a way, like Mr. Nanda explained, we are completely sort of insulated for about 4 months with 2 months of physical inventory and 2 months of pipeline inventory. And by the time we get the inkling of the steel prices moving a lttle up or down, we adjust them in our current order taking. So to that extent, with the pricing mechanism by itself, we are able to more or less pass it on, give or take a little bit here and there. Number two, you talked about the opportunity size in domestic as well as in exports.
Answer, manish garg
I can only say that the total addressable market is enormous. Right now, I would say that we are only experiencing the tip of the iceberg. Soa lot of buildings and segments which are not using steel fully currently are converting into steel given the advantages of speed and green buildings and other things. So I would really say that the total addressable market is maybe 100x of what the market size is today right now. So there is enormous, enormous market. And the export also is a very big opportunity. There are not many local manufacturers when we come to African continent.
Question
Vivek Gautam: Yes. The last question remaining was the differentiator forus versus the competition?
Answer, manish garg
Manish Garg: So differentiator, I should say, sir, in our business, the real differentiator is your history, if I was to just say, and your credibility of having delivered complex, large projects. So the differentiator with Interarch is that, number one, we have been in this business for close to 43 years. And in this, we have created a history wherein there is no project, be it large, small, complex segment-wise, you talk of an airport, we have done T3 airport. You talk of a data center; we have done Iron Mountain. Means there is - if you talk of the largest project, yes, we have done a INR300 crores, 30,000 tons plus. You talk of the fastest executed project; we have done it. So some gentlemen also asked if a conglomerate comes in, put in INR1,000 crores, INR2,000 crores, INRS,000 crores, will they be able to beat?
Answer, manish garg
And we have been able to grow the volumes. You have seen this year almost 40% in 9 months, even ealier years, you see the growth. While you maintain volume growth, you can only maintain your realization and therefore the margins only when you have a choice to pick up the orders that customers want to give to you. So I would say differentiator is the history which has been created over the last 40 years of having done and delivered projects to any industry and in building agnostic, industry agnostic. And that is why the same customers with their different branches or different segments keep coming back to us. So anybody can copy anything, but they can't really bring in the history of 43 years with no amount of money they can bring in the history. Maybe it has taken us 43 years to create this history.
Question
So with 45,000 tons capacity, what kind of market share would we have at full scale?
Answer, manish garg
Manish Garg: Yes. So once again, sir, [ will give you the current market size, which is determined by what is the sales taking place. So as of now, the structural steel that we are referring to, I'll give you 2 answers to that. One is what is the existing sort of sales which is taking place is close to about 0.5 million tons there. Now the kind of capacity we are creating is about 50,000 tons, 45-50,000 tons. So that's the market share we will get once we are fully operational. In terms of the total addressable market, that is once again enormous.
Question
Devang Patel: Okay. And sir, last question on working capital cycle, what can we expect it to be this year? Are we seeing any change from previous year for our working capital cycle right now?
Answer, manish garg
Manish Garg: I think our net working capital is at about 34 days, and we are right now doing very large projects wherein the cycle time is a bit higher through the EPC contracts we're doing, semicon we're doing. So though we try and maintain it in the similar range through our tight operational controls, so we will try and maintain it within the same range, but it can go up a little bit here and there.
Question
Nikhil Purohit: Sure, sir. So the volume that you've given, based on that, I think there is some realization?
Answer, manish garg
Manish Garg: Only very lttle bit. So the volume growth is, to be precise, year-on-year is 43.8%, whereas the revenue has grown by 43.7%, right? So there is only very little difference. And that is because of the raw material — yes, that is because of the raw material moving downward a little bit. And because EBITDA has remained similar, therefore, there is no effect in realization as such, sir.
Question
Nikhil Purohit: So this should take it to around 280,000, right? You mentioned.
Answer, arvind nanda
Arvind Nanda: See, we are separating the heavy structure from PEB. So PEB, we have right now 200,000 - 160,000 tons and the Kiccha line and the other things have added about 15,000-20,000 tons. So say 180,000 tons is the PEB capacity right now. Then the add-on is the AP1, which we are adding for heavy structure, that's another 20,000-22,000 tons. So that takes you to 200,000 tons, right? So with the new AP will add another 20,000 tons and new Gujarat will add another 40,000 tons. So total will go up to, say, 260-280,000 tons whatever.
Question
Nikhil Purohit: Okay, okay. And lastly, so considering the strong demand that you see and since we have also revised our growth guidance for next year, where do we see our closing order book for FY 26 being at?
Answer, arvind nanda
So if next year we are projecting, say, INR2,100 crores, let us say, so our order book should be about INR1,700 crores, at least a 9-month order book, which we already have. Luckily, 1 or 2 orders were long term, like JSW is a little longer term order. So we could book those. We have to be very careful that we cannot take orders more than we deliver because then if you fail, like Manish was already mentioning, our history and our reputation is based on that. And that is more critical than taking another order and destroying everything. So I don't know how much the order book will go up. Sometimes you get a large order and the order is to be delivered over 8, 10, 12 months, so we take it.
Question
Nikhil Purohit: So this has not come on already, right? Because you had mentioned Phase 2 of AP facility is on. So that is not for heavier structure, that is for the?
Answer, arvind nanda
So you can say about INRS73-575 crores in the quarter.
Answer, manish garg
Manish Garg: Yes, yes. So it was INR1,634 crores. So I think for the entire 9 months, it's been about INR1,600 crores.
Answer, raman v
Raman K. V.: Understood, sir. And my second question is I just want to understand, I'm a bit confused with the capacity expansion. Currently, we have 180,000 metric tons of annual production capacity. And then we are planning to set up a new plant in Gujarat, which will add 40,000 capacity more. That will take our capacity to 2.2 lakh metric tons per annum. Is my understanding correct? And then we also plan to have another plant in Gujarat for which you are planning to buy the land and that will add another 40,000 metric tons of capacity?
Answer, arvind nanda
We are hoping that the land will get secured. We have already made arrangement with the seller. So if the land gets secured then we need about 9 months to put it into production.
Questions about this call
- When was the Interarch Building Solutions Q3 FY26 earnings call transcript filed?
- Interarch Building Solutions filed the transcript with the exchange on 9 Feb 2026. This page is built from that transcript.
- What does this page list?
- 53 statements from the transcript across 9 topics, 38 of them with a figure. Each statement is shown with the transcript sentence it came from.
- Are the analysts' questions included?
- Yes. 24 questions and management's answers are listed in the order they were asked, as the transcript prints them.
- Who wrote this page?
- DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.