The company expects its presales run rate to move towards the high 50s or low 60s after delivering more than INR40 billion of presales for 7 consecutive quarters, supported by business development and the clearing in August of environmental clearance issues that had held back approvals in Mumbai City for the last 12 months. The data center park at Palava, spread across about 400 acres and with ~400 MW capacity, will receive total benefits of over $1 billion or even higher under the Green Digital Infrastructure policy. The company achieved its best ever second-quarter presales of INR45.7 billion, up 7% year-on-year, in Q2FY26. The company delivered about 3% price growth for the first half of the year and is on track for about 5% to 6% price growth for the full year, in line with its strategy to keep price growth below wage growth and improve affordability. About 50% of Lodha Developers Limited’s sales come from the mid-income segment, about 12% to 15% from the luxury segment, and the balance from the premium segment; the company prefers this mix to avoid relying on only luxury or mid-income performance.
The numbers management gave
Results
- The company achieved its best ever second-quarter presales of INR45.7 billion, up 7% year-on-year, in Q2FY26.
Show source
In terms of our business performance, we achieved our best ever second quarter presales with presales of INR45.7 billion, which was up 7% year-on- year.
- H1 sales were about INR90 billion, 43% of its full-year guidance, and it remains on track to deliver full-year presales guidance of INR210 Billion.
Show source
With this, our H1 sales stand at about INR90 billion, which is 43% of our full year guidance. and that keeps us on track to deliver our full year presales guidance of INR210 Billion.
- Embedded EBITDA margins were about 32% in Q2FY26; JDA contributed just under 50% of presales, above its targeted mix of 40%.
Show source
This is with the JDA contributing just under 50% of presales, which is higher than our targeted mix of 40% and that shows the resilience of our business that even with a higher contribution from JDA sales, we have the attractive EBITDA margins that we've delivered.
- Pro forma PAT was about INR9.3 billion, implying a PAT margin of 20.3%, in Q2FY26, based on an embedded EBITDA margin of 32%; the company said this enabled it to deliver ROE of 20% or thereabouts, which it had delivered on an underlying basis in fiscal '25.
Show source
Based on the embedded EBITDA margin of 32%, our pro forma PAT for the quarter is at about INR9.3 billion, implying a PAT margin of 20.3%, and once again, enabling us to deliver the ROE of 20% or thereabouts, which we had already on an underlying basis delivered in fiscal '25.
- The company delivered its full-year business development guidance of INR250 billion in the first half of the year.
Show source
With this, in the first half itself, we delivered our full year business development guidance of INR250 billion.
- Last land sales at Palava were at about INR0.21 billion per acre.
Show source
However, beyond the ongoing land sales, the last land sales happened at a value of about INR0.21 billion per acre.
Show 18 more statements
Results
- The company said its sales from non-Mumbai markets had gone up about 10x in the last 4 years.
Show source
So, we've gone up about 10x in the last 4 years, and that gives an indication of the strength of the brand, and the scalability of our business.
- Adjusted EBITDA was about INR13 billion, growing about 37% year-on-year, with an EBITDA margin of about 34.4% in Q2FY26; the margin was at or above its embedded EBITDA margin, reflecting conservative embedded EBITDA estimates and continued conversion of sales into profitable margin.
Show source
Our adjusted EBITDA for the quarter was about INR13 billion, growing about 37% year-on-year with an EBITDA margin of about 34.4%.
- PAT was just under INR8 billion, up about 87% year-on-year, and its operating cash flow was about INR14.7 billion in Q2FY26.
Show source
Our PAT for the quarter came in at just under INR8 billion, which was up about 87% year-on-year, and our operating cash flow was about INR14.7 billion.
- Pune presales grew from about INR200 crores in financial year '21 to nearly INR2,500 crores in financial year '25.
Show source
Over the past 3 years, we have scaled up meaningfully in Pune from about INR200 crores of presales in financial year '21 to nearly INR2,500 crores in financial year '25.
- The company achieved about INR1,400 crores of Pune presales in the first half of financial '26, keeping it on track for its annual targets.
Show source
In the first half of financial '26 alone, we have achieved about INR1,400 crores, keeping us on track for our annual targets.
- Like-to-like product price growth is about 3%.
Show source
But overall, as we've shared on a like-to-like product, our price growth is at about 3%.
- The company has had 5 sales in its Golf View development, with apartments close to $1 million each.
Show source
We've had now 5 sales in our Golf View development, which are close to $1 million each of apartments.
- Margins in Mumbai are about 10% higher than in Pune or Bangalore; Mumbai margins are about 10% better than the rest of the country.
Show source
So, Mumbai margins in Mumbai are about 10% higher than those in Pune or Bangalore.
- In Q2FY26, Lodha Developers Limited's own-land projects had embedded EBITDA of about 37%, 38%, while its JDA, the joint development Project, contributed about 27% against the current quarter's embedded EBITDA of about 32%.
Show source
In terms of your question on this current contribution, this current quarter performance of about 32% of embedded EBITDA, our own land had an embedded EBITDA of about 37%, 38% and the JDA, the joint development Project had a contribution of about 27%.
- Embedded EBITDA margin for owned projects is typically about 10 percentage points higher than for JDAs.
Show source
That typically is the delta, about a 10- percentage delta between the embedded EBITDA margin of owned versus JDAs.
- Lodha's Revenues from Ops were INR 38.0bn, up 45% YoY, in Q2FY26.
Show source
Our revenues from operations came in at INR38 billion was up about 45% year-on-year.
- Embedded EBITDA calculation uses the actual sales price, land cost, approval costs and sales and marketing cost for the quarter, with construction cost as the only projection; contingency in construction cost estimates means actual EBITDA in the P&L tends to be higher than embedded EBITDA.
Show source
And therefore, the actual EBITDA in our P&L tends to be higher than the embedded EBITDA.
Money and capital
- Net debt stood at INR53.7 billion, about 0.25x equity and below its ceiling of 0.5x, at the end of Q2FY26.
Show source
At the end of the quarter, our net debt stood at INR53.7 billion, which is at about 0.25x equity, well below our ceiling of 0.5x.
- Overall cost of debt fell by 30 basis points to about 8% at the end of Q2.
Show source
Our overall cost of debt fell by 30 basis points to about 8% at the end of Q2.
- The company estimates the cost to build out the power shell at USD6 million to USD7 million per megawatt, and estimates that building an average of 50 megawatts a year would require USD 300 million to USD 350 million of total capex, funded with about 2/3 debt and 1/3 equity, or about $100 million of equity and the balance through debt; the estimates are early-stage and not firm.
Show source
And that, if you were to say, build out on average 50 megawatts a year, that would translate to somewhere between USD 300 million to USD 350 million of total capex and assuming the fact that you would have about 2/3 debt, 1/3 equity issue is about $100 million of equity in the balance through debt.
- The company estimates the power shell cost at USD6 million to USD7 million per megawatt.
Show source
Abhishek Lodha: USD6 million to USD7 million per megawatt.
- The company estimates the power shell cost at INR50 crores to INR60 crores per megawatt.
Show source
Abhishek Lodha: INR50 crores to INR60 crores per megawatt.
- Land spend includes acquisition spend and future obligations towards the aligned and approvals related to the land, which arise over the development phases; JDA cash outflow is more forward based while owned-land cash outflow is more front-loaded.
Show source
Our land spend comprises of the spend, which is done at the time of the acquisition of the land and then also, of course, takes into account any future obligations towards the aligned and approvals related to that land, which come in over a period of time.
What it expects ahead
What management expects
- The company expects its presales run rate to move towards the high 50s or low 60s after delivering more than INR40 billion of presales for 7 consecutive quarters, supported by business development and the clearing in August of environmental clearance issues that had held back approvals in Mumbai City for the last 12 months.
Show source
Having delivered more than INR40 billion of presales consecutively for the last 7 quarters, we are now expected to move up towards the run rate in the high 50s or low 60s and that would be a significant step-up for our business as we scale up on the back of the strong business development as well as the fact that the environmental clearance issues which had held back approvals in Mumbai City for the last 12 months were cleared in August.
- The company expects about 30% or slightly higher of its presales to come from Pune and Bangalore this year, compared with 3% of total sales from non-Mumbai markets when it did its IPO about 4.5 years ago.
Show source
This year, we expect to have about 30% or slightly higher than that of our presales coming from these 2 cities, which is a fantastic position from the fact that when we did our IPO about 4.5 years ago, our total sales from non-Mumbai markets was only 3%.
- The company plans to start its pilot in NCR in 2026 and hopes that operating in Mumbai, Pune and Bangalore and piloting in NCR will support approximately 20% annual growth and 20% ROE under its medium-term strategy.
Show source
And as we now further move over in 2026 to starting our pilot in NCR, we hope that by covering these 4 major metros, Mumbai, Pune and Bangalore already and the pilot in NCR, we will see a long runway of growth which enables our company to continue to deliver on its medium-term strategy of having the approximately 20% annual growth and 20% ROE.
- The company has 3 gigawatts of power capacity, equivalent to about 2.5 gigawatts of IT powered or IT capacity; if 10%, or 250 megawatts, were developed as IT capacity as powered shell, annualized PAT could be INR2,500 crores or thereabouts, although it will take a few years to get there.
Show source
And out of that, if you were to just do 10%, i.e., 250 megawatts of IT capacity as powered shell, the annualized PAT from that could be INR2,500 crores or thereabouts.
- The company expects sales of approximately INR12,000 crores or INR120 billion in the second half of the year, with INR70 billion to INR75 billion from non-launch sales and INR40 billion to INR45 billion from launch sales.
Show source
In terms of the second half of the year, out of our estimated sales of approximately INR12,000 crores or INR120 billion, which is expected in the second half of the year.
- If Lodha Developers Limited were to build 250 megawatts of power shell, it would generate annualized PAT of maybe INR2,500 crores or higher at today's rates.
Show source
But if we were to build 250 megawatts, that is, like I said, it's an annualized PAT of maybe INR2,500 crores or higher at today's rates.
Show 16 more statements
What management expects
- The company estimates that the power shell PAT yield could be slightly lower than 20%, but in that range.
Show source
Abhishek Lodha: It could be slightly within that range, slightly lower than 20%, I would think, but yes, in that range.
- The company expects India to have a real estate cycle of 15 to 20 years during the transition from low income to mid income, and says India is in year 4 or 5 of that cycle.
Show source
We think India is also going to have a cycle which is that long.
- The company expects the Indian real estate cycle to take off when GDP per capita crosses $4,000, $4,500, and says this is still a few years away.
Show source
I think that the real estate cycle has not even gotten started, it will only get started when GDP per capita crosses $4,000, $4,500.
- The company expects buyers from the Airoli, Mulund belt to gravitate towards Palava and buyers from Thane towards Upper Thane as two connectivity projects become operational in the next quarter or thereabouts, with a big benefit expected in the number for fiscal '27.
Show source
We expect that we will see in the near term a buyer from the Airoli, Mulund belt gravitate towards Palava and from Thane gravitates towards upper Thane as the 2 pieces of connectivity become operational in the next quarter or thereabouts.
- The company expects to enter the NCR in the next 12 months.
Show source
What we expect to see is there'll be some further launches, including at Opulis over the next 12 months.
- The company expects the finalized government of India data center policy to provide significant further benefits for operators of data centers in India, specifically in its park, and to lead to greater interest in the park.
Show source
We expect that when this draft is finalized, there will be significant further benefits for the operators who will operate data centers in India, specifically in this park and will lead to a greater amount of interest for the park.
- The company expects to continue some third-party land sales at Palava for the next few years to strengthen the data center and artificial intelligence ecosystem.
Show source
And we expect that for the next few years, we'll continue to do some amount of third-party land sales to strengthen the ecosystem of data centers and artificial intelligence at Palava.
- The company expects the benefits of connectivity and data-related value creation opportunities to drive value unlock, sales and margin growth from next fiscal as Palava transitions from a lower mid-income location to an upper mid-income and premium location.
Show source
So, all in all, Palava's transition from a lower mid -income location to upper mid- income and premium location is progressing on track, and we should start seeing the benefits of the connectivity from the next fiscal which in addition to the significant value creation opportunities in the data path also will present a significant step-up for our company in terms of value unlock as well as sales and margin growth starting from next fiscal.
- The company does not yet have a view on whether it will do powered shell on a BTS basis, a speculative basis or a combination of both.
Show source
At this stage, we don't yet have a view on what would be the nature of doing the powered shell, would that only be on a BTS basis or would that be on a speculative basis or perhaps a combination of both of those.
- The company sees the data center opportunity as additive beyond its residential growth, with residential growth plans continuing at pace and any data center contribution beyond land sales expected to be incremental.
Show source
And therefore, whatever comes from data center additionally over time, other than the land sales will be incremental.
- Initial NCR focus is most likely to be in Gurugram, though it may look at other parts of the NCR and is quite likely to start off on the Gurugram side.
Show source
Abhishek Lodha: At this stage, our initial focus is most likely to be in Gurugram, but it does not mean that we do not look at any other part of the NCR, but it's quite likely that we will perhaps start off on the Gurugram side of the NCR.
- The company expects premium category products to contribute a greater share of overall sales mix in percentage and absolute terms, and expects significant ramp-up in overall sales in the next fiscal, with an outsized benefit from premium sales, higher sales from Palava, and improved margins because premium segment sales are at a higher margin.
Show source
So overall, what I would expect to see in the next fiscal is significant ramp-up in both overall sales because the mid-income will also perform better, but we would think that the premium will have an outsized benefit, so higher sales coming through from Palava and also an improvement in margins because obviously, these premium segment sales are at a higher margin.
- The company said infrastructure will not benefit Palava in this fiscal and will benefit Palava in the next fiscal.
Show source
I don't think that any of the infrastructure will benefit Palava in this fiscal, it will be for next fiscal.
- The company has a dedicated team working on a business plan to capitalize on the data center opportunity beyond land sales, and the plan is underway. Replaced by a later filing.
Show source
Having said that, as I mentioned to you, we now have a dedicated team working to make sure that we put together a business plan to capitalize on this opportunity beyond the land sales and that business plan is currently underway.
- The company expects to provide a deeper dive into its data center business plan in its next quarterly update in January. Replaced by a later filing.
Show source
I hope that when we have our next quarterly update in January, we would be able to give you a much deeper dive into the business plan in this respect.
- The company expects its extended Eastern suburbs business to start becoming a significant step-up starting from the next quarter. Replaced by a later filing.
Show source
So, I would say that cumulatively, our extended Eastern suburbs business should start becoming a significant step-up starting from the next quarter.
What it is building and selling
Projects and capacity
- The company added a new location in MMR with a GDV of INR23 billion in Q2FY26.
Show source
As far as business development is concerned, we added a new location in MMR this quarter with a GDV of INR23 billion.
- The data center park at Palava, spread across about 400 acres and with ~400 MW capacity, will receive total benefits of over $1 billion or even higher under the Green Digital Infrastructure policy.
Show source
The total benefits to -- or the overall park, which is spread across about 400 acres will be to the tune of over $1 billion (for ~400 MW capacity) or even higher under this policy.
- The company said it has land, permits, water and power in place at its data center location and can move from start to operationalization in less than 24 months.
Show source
And with the land, the permits, the water and the power in place, we are one of the best placed travel-ready locations in the world and can get from start to operationalization in less than 24 months.
- The company has almost 3 gigawatts of power availability at its data center location through 5 different EHV lines.
Show source
In terms of the infrastructure, we have almost 3 gigawatts of power availability coming through 5 different EHV lines.
- The company has access to over 100 MLD of recycled water at its data center location, reducing power consumption and costs.
Show source
We have access to over 100 MLD of recycled water, which reduces power consumption and costs, and we have very good fiber optic connectivity.
- The company has technology in place to deliver a power utilization efficiency of about 1.2 to 1.3, a PUE of 1.2 to 1.3.
Show source
And we now have the technology in place to deliver a power utilization efficiency of about 1.2 to 1.3, a PUE of 1.2 to 1.3.
Show 30 more statements
Projects and capacity
- The company said each acre of land that may transact at about INR0.3 billion per acre can accommodate 8 to 10 megawatts of IT power capacity.
Show source
And that kind of upside compared to the land value is very much visible when we look at the fact that each acre of land, which is currently transacting perhaps can transact at about INR0.3 billion per acre, but can accommodate 8 to 10 megawatts of IT power capacity.
- The company expects metro work to be operational perhaps by 2028.
Show source
In addition to that, we have the metro work progressing very rapidly, and we should see operationalization perhaps by 2028.
- The company has 11 operating projects across all key corridors of Pune.
Show source
Our footprint has expanded to 11 operating projects across all key corridors of the city.
- The company has delivery of multiple towers and projects slated to start in the coming 12 months, which it expects will further strengthen its brand in Pune.
Show source
With delivery of multiple towers and projects slated to start in the coming 12 months, I'm confident people will be able to experience Lodha living.
- Of Lodha Developers Limited’s approximately 4,000 plus acres, only about 400 acres is earmarked for data center, and this could be scaled up if the situation warrants.
Show source
The locations are the part of the overall land that are earmarked for residential are very different from that, for what we've done for data center and allied users, for out of our approximately 4,000 plus acres, only about 400 acres is earmarked for data center.
- The company expects Airoli and Mulund to be within a 30-minute driving distance from Palava next quarter, and BKC to be door-to-door less than that time before the end of the decade.
Show source
So, like I said, Airoli and Mulund will be within that 30-minute driving distance next quarter, BKC will be door-to-door less than that time before the end of the decade.
- The company has completed a speculative office building of about 400,000 square feet and is starting to lease it.
Show source
We've completed one speculative office building of about 400,000 square feet, which we are now starting to lease.
- Jupiter hospital will be operational with 400-plus beds in Palava next quarter, as its largest facility in the country.
Show source
Jupiter hospital will be operational with 400-plus beds, their largest facility in the country next quarter.
- The Virar Alibaug Multimodal Corridor passes through the site and is starting to gain traction.
Show source
And we also have road connectivity, including the Virar Alibaug Multimodal Corridor which passes through the site now starting to gain traction.
- The company plans new launches in Pune East and West and subsequent phases of existing projects for the remainder of this year, and continues to evaluate additional opportunities across the city.
Show source
For the remainder of this year, we have planned new launches in Pune East and West along with the subsequent phases of our existing projects, we continue to evaluate additional opportunities across the city.
- The company launched Lodha Opulis at the end of last fiscal and recently launched a new villa project in Palava.
Show source
We've launched a new villa project recently.
- The company expects the Thane to Bhiwandi connection of the Mumbai-Nashik Highway to be completed either next quarter or before the next monsoon, and expects it to have an equal positive effect on Upper Thane.
Show source
To add to that point, we also expect that the Thane to sort of Bhiwandi connection of the Mumbai-Nashik Highway is also now approaching completion, should be completed either next quarter or definitely before the next monsoon.
- A nationwide environmental clearance process was stalled for almost a year from last August to this August, most impacting Mumbai and pushing out most of Lodha Developers Limited's Mumbai launches; this made second-half launches heavier than usual, and the company hopes to return to a broader and more spread-out launch system from next fiscal.
Show source
It was a nationwide order, but it most impacted Mumbai, was basically stalled for almost a year from last August to this August, and that's led to most of our Mumbai launches getting pushed out.
Demand and pricing
- The company delivered about 3% price growth for the first half of the year and is on track for about 5% to 6% price growth for the full year, in line with its strategy to keep price growth below wage growth and improve affordability.
Show source
On the price growth, in line with our guidance at the start of the year, we've delivered about 3% price growth for the first half of the year, which puts us on track to deliver about 5% to 6% price growth for the full year, in line with our strategy to keep price growth at below the wage growth and make sure that affordability keeps improving, and therefore, we keep seeing a strengthening of the cycle.
- Pune’s residential market is estimated at more than INR60,000 crores and has inventory of about a year.
Show source
And now estimated at more than INR60,000 crores.
- The company is the second largest developer in Pune and is confident of becoming the largest within the next 2 years.
Show source
As a result, we are now the second largest developer in Pune and are confident of becoming the largest within the next 2 years.
- Non-launch sales were INR3 billion; the company expects them to trend further upwards in the balance part of this fiscal, reflecting consumers buying on the basis of its product and reputation rather than an offer.
Show source
Just to correct the numbers, its INR3 billion of non-launch sales.
- Palava is now home to close to 250,000 individuals and just under 50,000 families, following a scale-up over the last few years; the Mahape job hub and the Kalyan, Dombivli area have contributed to demand and scale-up despite the lack of connectivity so far.
Show source
In spite of the lack of connectivity so far, the Mahape job hub has played a key role in addition to the Kalyan, Dombivli area in terms of the demand and the scale-up in Palava so far, where we are now close to 250,000 individuals living, just under 50,000 families, which is an amazingly large scale up over the course of the last few years.
- Newly launched projects contributed in the mid-30s to sales last year, and are expected to contribute around that number this year; about 2/3 of sales come from projects already ongoing at the start of the fiscal year, and the company expects the proportions of sales from ongoing and newly launched projects to be in the early to mid-30s for both this fiscal and future years.
Show source
But overall, the best metric to be looked at is that what percentage of the sales for the fiscal are coming from projects which were already ongoing at the start of the fiscal and what are coming from those which have been launched during the fiscal, and I think our numbers will be sort of in the early to mid-30s for both last fiscal as well as this fiscal and that's what we expect it to be in future years.
- The Palava-Airoli-Mulund freeway connectivity will bring a new catchment and higher prices within the Palava ecosystem.
Show source
And this connectivity will bring a huge new catchment as well as higher prices within the Palava ecosystem.
- Demand in Pune is gravitating towards larger, well-planned homes and branded developers like Lodha Developers Limited.
Show source
The market is becoming more selective with demand gravitating towards larger, well-planned homes and branded developers like us.
- The company maintains premium pricing to its peers, which customers find value in because of its superior designs, quality and unique living experience.
Show source
We continue to maintain a premium pricing to our peers but one that customers find value and due to our superior designs, quality and unique living experience that Lodha offers.
- The company has seen mid-income sales start picking up this year, supported by government interest rate cuts and income tax cuts, and its average blend may shift slightly this year compared to last year.
Show source
What we are seeing this year is that mid-income has started picking up on the back of the support from the government, whether it comes in terms of interest rate cuts or income tax cuts or so on.
- The company operates across the mid-income, premium and luxury segments and may have periodic variations in average price because it operates across all three segments.
Show source
And from a mix perspective, because we operate across all these 3 segments, probably the only large developer, which operates across these 3 segments, we may have periodic variations in the average price.
- Pune’s residential demand base is diversified across automobile manufacturing, defense, education and GCC sectors, alongside IT, helping the market grow steadily in recent years. Replaced by a later filing.
Show source
While IT remains an important driver, the city's demand base today is as far more diversified with automobile manufacturing, defense, education and GCC sectors all contributing strongly.
- Pune is a deep end user-led market, and Lodha Developers Limited’s growth there remains strong, disciplined and sustainable. Replaced by a later filing.
Show source
Overall, Pune is a deep end user-led market, and Lodha's growth here remains strong, disciplined and sustainable.
Segments
- About 50% of Lodha Developers Limited’s sales come from the mid-income segment, about 12% to 15% from the luxury segment, and the balance from the premium segment; the company prefers this mix to avoid relying on only luxury or mid-income performance.
Show source
We broadly have about 50% of our sales coming from the mid- income segment, which obviously, as you mentioned, is sort of lower in price point.
Deals and partners
- Encube pharma has set up a large-scale R&D setup in Palava, which is already operational.
Show source
We have Encube pharma having set up their large-scale R&D setup in Palava, and that is already operational.
- A large pharma company has taken space to set up its subsidiary offices in Palava.
Show source
They've just taken space to set up their subsidiary offices.
- The company is exploring partnerships with entities having strong AI knowledge or network. Replaced by a later filing.
Show source
We are exploring partnerships with entities having strong AI knowledge or network.
Risks, rules and outside factors
Outside factors
- Data center building costs are about $6 million to $7 million per megawatt, compared with $10 million to $12 million per megawatt in the U.S. and Europe.
Show source
This is augmented by the fact that we have one of the lowest building costs for data centers in the world coming in at about $6 million to $7 million per megawatt compared to $10 million to $12 million per megawatt, which is currently the cost in the U.S. and Europe.
- Power costs are between $0.07 to $0.08 per kilowatt hour.
Show source
Our power costs are very competitive at between $0.07 to $0.08 per kilowatt hour.
Everything else said on the call
What management stressed
- The company intends to sense market demand and build deep relationships with consumers in the warehousing and industrial parks asset classes before aligning investment risk with overall demand. Replaced by a later filing.
Show source
And then make sure that the investment risk is aligned with the overall demand, but we hope to give you a more specific insight when we speak again in the next quarter.
Other
- Almost 50% of India's data center capacity is in Mumbai.
Show source
Almost 50% of India's data center capacity is in Mumbai.
- The undersea cable landings are based in Mumbai and provide connectivity to different parts of the world; latency for transmission of data to Europe is about 140 milliseconds to 150 milliseconds and can be reduced to about 120 milliseconds with investment.
Show source
And that's on account of the fact that the undersea cable landings are based in Mumbai, and they provide some very good connectivity to different parts of the world, the current latency, which is a time taken for the transmission of data to Europe is at about 140 milliseconds to 150 milliseconds, but that can be further reduced to about 120 milliseconds with investment.
- For data routed through Europe, latency is about 220 milliseconds to 240 milliseconds and can be reduced to about 170 milliseconds.
Show source
And similar to the U.S., it's currently routed through Europe and has a latency of about 220 milliseconds to 240 milliseconds, but that can be further reduced to about 170 milliseconds.
- A powered shell can generate annualized PAT of approximately INR0.1 billion a megawatt per annum.
Show source
To give you an example, a powered shell can generate an annualized PAT of approximately INR1 billion per megawatt -- sorry, INR0.1 billion a megawatt per annum.
What the company said on its earnings call, taken from its own transcript. Not advice.
Questions and answers
Question
Pritesh Sheth: And on this power shell opportunity, if I'm correct, you're looking at least 250 megawatts of development through power shell by yourself. What kind of capex that we think we would have to spend to build? So much, obviously, over a period of time, but just in terms of economics, if you have some initial read through, how much we tend to spend on per megawatt basis? And how probably we'll look to fund this capex, yes.
Answer, abhishek lodha
Abhishek Lodha: Pritesh, it's an important question, but perhaps one which we'll best answer when we speak again in a quarter's time. As we indicated, just to give you a very early-stage numbers because I want to share with you what we know, but caveat it with the fact that we are still deep diving, so we don't have yet a firm answer is that the cost will be between $6 million to $7 million per megawatt to build out the power shell. And that, if you were to say, build out on average 50 megawatts a year, that would translate to somewhere between USD 300 million to USD 350 million of total capex and assuming the fact that you would have about 2/3 debt, 1/3 equity issue is about $100 million of equity in the balance through debt. Now obviously, whether we put in the equity, it's very likely that we will get in some partners with us who know the AI space and network in a deeper and better manner than we do at this stage because that's been our trend. We understand an industry gradually and make sure that we have good partnerships to take us through our learning curve. So, we are evaluating all of those things. But I think what's important from our perspective is that if and I'm not saying we will build 250 megawatts or not, we're not saying we'll minimum build that or not.
Answer, abhishek lodha
We're just exploratory, we are just sort of finalizing right now. But if we were to build 250 megawatts, that is, like I said, it's an annualized PAT of maybe INR2,500 crores or higher at today's rates. So that's really telling you how scalable the opportunity is and how significant it could become.
Question
Pritesh Sheth: Sure. You said $6 million to $7 million per megawatt. Is that number right? $6 million to $7 million?
Answer, abhishek lodha
Abhishek Lodha: USD6 million to USD7 million per megawatt.
Question
Pritesh Sheth: Okay, U.S. dollar.
Answer, abhishek lodha
Abhishek Lodha: INR50 crores to INR60 crores per megawatt.
Question
Pritesh Sheth: Makes sense. So, a PAT yield of roughly 20%.
Answer, abhishek lodha
Abhishek Lodha: It could be slightly within that range, slightly lower than 20%, I would think, but yes, in that range.
Question
Pritesh Sheth: And one last on the Palava residential side, now that this infrastructure is -- the key tunnel is getting completed in next quarter or so, what to look forward to from our side in terms of the product offering over next couple of quarters that one needs to follow whether that's happening or not. So just on launches or product offering, etcetera.
Answer, abhishek lodha
Abhishek Lodha: Yes. So, Pritesh, I think in our view, because this tunnel was supposed to be opened maybe 6 to 9 months ago, we have already brought into the market the products that we think will benefit from this connectivity. So, we had the launch of Lodha Opulis at the end of last fiscal. We've launched a new villa project recently. We've had now 5 sales in our Golf View development, which are close to $1 million each of apartments. So all of this product is already out there, which we think is a good position to be because the product is already under construction, sales are already happening. What we expect to see is there'll be some further launches, including at Opulis over the next 12 months.
Answer, abhishek lodha
But we also, in our opinion, see much greater traction, much greater contribution to the overall sales mix as a percentage and in absolute terms from these premium category products. So overall, what I would expect to see in the next fiscal is significant ramp-up in both overall sales because the mid-income will also perform better, but we would think that the premium will have an outsized benefit, so higher sales coming through from Palava and also an improvement in margins because obviously, these premium segment sales are at a higher margin. To add to that point, we also expect that the Thane to sort of Bhiwandi connection of the Mumbai-Nashik Highway is also now approaching completion, should be completed either next quarter or definitely before the next monsoon. And that will also have an equal positive effect on Upper Thane. So, I would say that cumulatively, our extended Eastern suburbs business should start becoming a significant step-up starting from the next quarter.
Question
Pritesh Sheth: Any number you want to put for this Palava residential out of this INR120 billion of expected presales in second half, how much you are building internally from Palava residential?
Answer, abhishek lodha
Abhishek Lodha: No, I don't have a specific number to give. I don't think that any of the infrastructure will benefit Palava in this fiscal, it will be for next fiscal.
Answer, abhishek lodha
Abhishek Lodha: So Kunal, thank you for that question. We see Palava as a location which benefits significantly from its proximity to Mumbai's critical job hubs. In spite of the lack of connectivity so far, the Mahape job hub has played a key role in addition to the Kalyan, Dombivli area in terms of the demand and the scale-up in Palava so far, where we are now close to 250,000 individuals living, just under 50,000 families, which is an amazingly large scale up over the course of the last few years. The connectivity to Airoli and Mulund will further make -- the way we look at it is what are the jobs within a 30-minute driving distance from Palava. Because that's really ultimately the most convenient location to live in, given its quality of infrastructure, quality of social life as well as schools, health care and so on. So, what this connectivity is doing is that it is making almost all of Mumbai's key job hubs within that very attractive distance from Palava. So, like I said, Airoli and Mulund will be within that 30-minute driving distance next quarter, BKC will be door-to-door less than that time before the end of the decade.
Answer, abhishek lodha
And that really makes Palava very, very convenient from our perspective of people working anywhere but living in Palava. Having said that, we continue to see the fact that now companies are locating their value-added work activities in Palava. We have Encube pharma having set up their large-scale R&D setup in Palava, and that is already operational. They've built a fantastic facility there. We now have one more large pharma company set up one of its sorts of subsidiary. They've just taken space to set up their subsidiary offices. We've completed one speculative office building of about 400,000 square feet, which we are now starting to lease.
Answer, abhishek lodha
And with this infrastructure connectivity improving, we start seeing that more of these jobs will start coming into Palava. Obviously, other than the jobs, we have 7 operating schools. Jupiter hospital will be operational with 400-plus beds, their largest facility in the country next quarter. We have world-class sports and a lot of high-quality retail already within Palava. So we really have put in the building blocks of all these elements already in place. And I think the jobs within Palava are important, but equally the jobs within 30 minutes of Palava are important, and the connectivity is going to benefit both the jobs within Palava because obviously, if it's better connected, it makes sense for people to be locating their offices there, but also the overall fact that Airoli, Mulund and then in a few years, BKC will be very well connected to Palava. Kunal Lakhan: Second question was on the business development side.
Answer, abhishek lodha
If you look at last year, we acquired projects worth INR237 billion of GDV and our land spend stood at about INR63 billion. In the first half, we have acquired about INR250 billion worth of GDV and the land spend is about INR26 billion, INR27 billion there. So just wanted to understand kind of projects that we have acquired, are there more JDAs here? Or we would see some spill over of land spend happening in second half and subsequent quarters? Just to understand like what kind of land spend we are doing and what kind of projects that we're acquiring?
Answer, abhishek lodha
Abhishek Lodha: Yes. I think that's an important and valid question. Our land spend comprises of the spend, which is done at the time of the acquisition of the land and then also, of course, takes into account any future obligations towards the aligned and approvals related to that land, which come in over a period of time. So obviously, over time, there will be further incremental expense towards this header as the projects move to their phases of development. In case of JDA, it's a more forward based cash outflow and in case of owned land, it's more front-loaded. In terms of the mix of land that we've acquired in the first half, yes, there has been a higher proportion, if you may, of JDAs. But that's just -- it's not a shift in any strategy.
Answer, abhishek lodha
It just happens to be the nature of the developments of the transactions which have concluded in the first half of the year. You may have read that in October, we acquired a land in Bangalore through the takeover of entity, which is an outright acquisition. So, it just happened to be in the -- October rather than in September. So, you'll start seeing a slightly different mix in this quarter.
Answer, abhishek lodha
Abhishek Lodha: We expect fresh transactions to be closer to the INR0.3 billion or INR300 million per acre number. So what's already agreed or what's already finalized will obviously be at the levels that they have already been finalized.
Question
Abhinav Sinha: And my second question actually is on the sales velocity and it appears that we are a little more launch dependent now or maybe it's perhaps just how this year is pacing out to be. But do you think we go back to being much more even and less launch dependent like we were, say, in the previous 2 years?
Answer, abhishek lodha
Abhishek Lodha: Abhinav, last year, our contribution to sales from newly launched projects was in the mid-30s. And this year also our contribution to sales from the newly launched projects will be around that number. So I don't think that there has been any change in the fact that all just somewhere around 2/3 of our sales come from our projects which are already ongoing as of the start of the fiscal year. It's just that we've had a very specific circumstance this year where the environmental clearance was blocked for the - preceding 12 months up to the end of Q2. And therefore, you've had more of a bunching. So we are talking about the fact that more sales will happen in H2 because more of the launches have gone into H2. But overall, the best metric to be looked at is that what percentage of the sales for the fiscal are coming from projects which were already ongoing at the start of the fiscal and what are coming from those which have been launched during the fiscal, and I think our numbers will be sort of in the early to mid-30s for both last fiscal as well as this fiscal and that's what we expect it to be in future years.
Answer, abhishek lodha
And I think that's a very different ratio from most of our peer listed companies where that ratio tends to be much higher.
Answer, abhishek lodha
Abhishek Lodha: Akash, it's a big question. One question, of course, we can have a long conversation over. But in summary, our view which we've been expressing for a few years is that the Indian housing side, India is going through a once in a lifetime transition from low income to mid income. And such transitions, wherever they've happened in large economies in the world, have always we have always witnessed a very long real estate cycle when this transition happens typically in the order of 15 to 20 years. We think India is also going to have a cycle which is that long. We are only in the year 4 or 5 out of that very long cycle. It doesn't mean that we never have a bad year.
Answer, abhishek lodha
We can, of course, have a bad year. But from a more structural perspective, this is a much longer cycle because the level of demand that India needs to produce to meet its housing needs. It's going to be a long, long time before the supply side can catch up. I think that the real estate cycle has not even gotten started, it will only get started when GDP per capita crosses $4,000, $4,500. So, we're still a few years before real estate really takes off. This is, I would say - the plane is on the runway. It's not even gotten to its kind of take-off phase, it's just sort of moving along on the runway.
Answer, abhishek lodha
That's how we think the cycle is. Yes, sometimes there will be a situation, there will be a backup on the runway. The plane will have to pause for a few minutes or it might be a few quarters in this context. We have many years ahead on the cycle in our view.
Question
Akash Gupta: And sir, just one question on the launches. Last time, our launches were more phased out through the year. Now they have bunched up towards the second half. So is this mostly due to the Thane, because the Thane launch got pushed to the second half. Is that the only reason?
Answer, abhishek lodha
Abhishek Lodha: No, I don't think there is any specificity of the Thane launch. The reason is what we've articulated earlier, that the environmental clearance process for Mumbai. It was a nationwide order, but it most impacted Mumbai, was basically stalled for almost a year from last August to this August, and that's led to most of our Mumbai launches getting pushed out. And that's the reason why the second half is heavier on launches then has usually been the case where we also prefer a much broader and more spread-out system, and we hope that we'll be back to that from next fiscal.
Answer, abhishek lodha
Abhishek Lodha: First let me explain how embedded EBITDA is calculated each quarter. It is the actual sales price of that quarter. So, there is no projection in that number. And then taking into account the actual land cost, which is known, the actual approval costs, which are known the sales and marketing cost, which are pretty steady as a percentage of sales for us. And the only projection in that is the construction cost. And the construction costs, we have a fair amount of contingency built into our construction cost estimates. And therefore, the actual EBITDA in our P&L tends to be higher than the embedded EBITDA.
Answer, abhishek lodha
You're right that Mumbai is India's most profitable market, it is also India's deepest, largest market in revenue term, but also, it's the most profitable market. And we do see that margins in Mumbai are about 10% better. So, if margins in Mumbai are x, margins in the rest of the country are probably 0.9x. So, Mumbai margins in Mumbai are about 10% higher than those in Pune or Bangalore. In terms of your question on this current contribution, this current quarter performance of about 32% of embedded EBITDA, our own land had an embedded EBITDA of about 37%, 38% and the JDA, the joint development Project had a contribution of about 27%. That typically is the delta, about a 10- percentage delta between the embedded EBITDA margin of owned versus JDAs.
Answer, abhishek lodha
Abhishek Lodha: Thanks, Biplab, for your question. Our view is that Palava and Upper Thane will attract demand from across the larger Mumbai Metro region as these connectivity points come in as I described in response to an earlier question, consumers are most comfortable traveling about 30 minutes from their place of work to home. And that gives a huge opportunity for Palava as this connectivity brings more and more places within that travel distance. We expect that we will see in the near term a buyer from the Airoli, Mulund belt gravitate towards Palava and from Thane gravitates towards upper Thane as the 2 pieces of connectivity become operational in the next quarter or thereabouts. And so, you should see a big benefit upside of that in the number for the upcoming fiscal '27. And then as further connectivity comes through the metro rail, which connects you to greater parts of Kalyan and Navi Mumbai will start seeing that benefit, then the bullet train from BKC, which will make a huge difference because there is so much work that is being created in the BKC area. And what we understand is that the Maharashtra government is going to have great connectivity to the bullet train station in BKC from the rest of Mumbai.
Answer, abhishek lodha
So you'll have the metro getting there, you'll have road getting there. And so Palava in that sense, it's not only going to get connected to BKC, but will get connected to the larger South and Central Mumbai part also because of the importance of the bullet train. So, we expect that demand will come from across Mumbai to Palava and Upper Thane. And to give context. For example, the scale of the housing market in Mumbai by the end of the decade, will be roughly about INR235,000 crores and we expect sales in Palava and Upper Thane by the end of the decade to be in the range of about INR8,000 crores. So it's about a 3.5% market share of the larger Mumbai market that we expect Palava and Upper Thane to have. And I think we find that to be quite achievable given the connectivity, but combined with the product quality and the quality of life whether it's all the factors I mentioned earlier or the better air quality, the green cover, social infrastructure, health care, schools, everything.
Answer, abhishek lodha
So, if people get great quality of living at prices which are better than that in the other suburb, and they don't have to travel long distances to get to work. We think it's a really compelling value proposition. To contrast it, Gurgaon is probably right now more than 50% of the NCR market and we are telling you that at the end of the decade, Palava and Upper Thane will be 3.5% of the MMR market. So, you can see the scale of the opportunity versus where we currently are projecting things to be.
Questions about this call
- When was the Lodha Developers Q2 FY26 earnings call transcript filed?
- Lodha Developers filed the transcript with the exchange on 4 Nov 2025. This page is built from that transcript.
- What does this page list?
- 89 statements from the transcript across 10 topics, 53 of them with a figure. Each statement is shown with the transcript sentence it came from.
- Are the analysts' questions included?
- Yes. 8 questions and management's answers are listed in the order they were asked, as the transcript prints them.
- Who wrote this page?
- DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.