Sterling and Wilson Renewable Energy Q4 FY26 earnings call: Sterling and Wilson Renewable Energy Limited bagged an O&M order for about 900-megawatt from Serentica, a large IPP company, in the last quarter
By DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person.
Transcript filed .
The company bagged an O&M order for about 900-megawatt from Serentica, a large IPP company, in the last quarter. Third-party O&M margins range from 20% to 25%, depending on order type and scope; the company targets more than 20% in Indian markets and says it goes for more than 25% for every single order, subject to scope. The timeline for the Adani project execution is around 13 months. The company achieved its highest annual turnover since listing of INR7,548 crores, 20% higher than FY25. Uncertainty in commodity prices reduced market traction for orders in quarter 4, and most orders slated to be concluded then shifted to quarter 1; Sterling and Wilson Renewable Energy Limited said its share had not gone down and the industry was generally seeing an order-book slowdown.
The numbers management gave
Results
- The company achieved its highest annual turnover since listing of INR7,548 crores, 20% higher than FY25.
Show source
First, we achieved our highest annual turnover since listing of INR7,548 crores, which was 20% higher than FY25.
- The company achieved its highest ever reported quarterly PAT since listing of INR142 crores in quarter 4 FY26.
Show source
And second, company achieved its highest ever reported quarterly PAT number since listing - of INR142 crores in quarter 4 FY26.
- Operational EBITDA amounted to INR444 crores in FY26 and grew 53% year-on-year.
Show source
Our operational EBITDA, which is operating revenues less recurring overheads amounted to INR444 crores this fiscal and grew 53% year-on-year.
- Operational EBITDA margin was around 5.9% in Q4 FY26.
Show source
The operational EBITDA margin was around 5.9% and we believe these are beginning to trend towards steady state levels.
- Annual recurring overheads were INR349 crores in FY26, at similar levels to last year despite higher revenue growth.
Show source
Our annual recurring overheads of INR349 crores has remained steady this year and is at similar levels compared to last year, even with higher revenue growth this fiscal.
- Reported EBITDA in Q4 FY26 was positively impacted by forex gain of approximately INR35 crores.
Show source
Our Q4 FY26 reported EBITDA was also positively impacted by forex gain of approximately INR35 crores.
Show 19 more statements
Results
- Q4 PAT was a record INR142 crores since listing.
Show source
Our Q4 PAT was a record INR142 crores since listing.
- Reported FY26 PAT was negatively impacted by exceptional items of INR611 crores, primarily related to litigation matters reported during quarter 2 and quarter 3, leading to an annual loss of INR296 crores.
Show source
Reported FY26 PAT was negatively impacted by exceptional items of INR611 crores, primarily related to litigation matters reported during quarter 2 and quarter 3, leading to an annual loss of INR296 crores.
- Hit ratio has historically been around 25% to 28%.
Show source
Thakur: Historically, if you see that our hit ratio has been around 25% to 28%, right?
- Revenue was up 80% to INR3,510 crores in first half FY '26, compared with INR1,946 crores in first half of FY '25.
Show source
For Q4 FY26, our revenue came in at INR1,946 crores.
- FY26 gross margin was 10.5%, compared with FY25 gross margin of 10.1%.
Show source
On the gross margin front, our FY26 gross margin improved to 10.5% versus 10.1% in FY25, primarily aided by International EPC segment, where margins reflated to 13.2% versus 8% in FY25.
- Top line growth was driven primarily by a growing domestic EPC business.
Show source
Our top line growth has been driven primarily on the back of a growing domestic EPC business.
- Commodity price volatility affected some supplies and material availability, leading Sterling and Wilson Renewable Energy Limited to defer some supplies and revise execution plans in Q4 FY26, which caused sequential and year-on-year declines in Q4 revenue.
Show source
Commodity price volatility impacted some of the supplies and material availability and company had to defer some of the supplies and revised the execution plans accordingly in Q4 FY26, which led to the sequential and year- on-year drop in Q4 revenue.
- Q4 FY26 gross margins were strong in International EPC because three projects achieved commissioning ahead of budgeted cost.
Show source
Q4 FY26 gross margins were strong in international EPC due to three projects achieving commissioning ahead of budgeted cost, reiterating C.K.T's earlier point in his opening remarks of current international projects attractiveness in our portfolio.
- Quarterly operational EBITDA was higher due to stronger gross margins from International EPC and lower recurring overheads in Q4 FY26.
Show source
On a quarterly basis, stronger gross margins from the International EPC segment and lower recurring overheads drove the operational EBITDA higher.
- Savings against budgeted costs on three international projects nearing completion improved Sterling and Wilson Renewable Energy Limited’s overall margin, particularly through international projects.
Show source
And so there were certain savings over the budgeted cost that has improved our overall margin, particularly that came from international projects.
- The company attributed the savings to costs below budget on international projects.
Show source
Ajit Pratap Singh: It's like savings over the budgeted cost in international projects.
Money and capital
- Debt levels declined by INR149 crores compared to last quarter, reflecting stronger cash flow generation and scheduled repayments during the quarter.
Show source
Our debt levels have declined by INR149 crores compared to last quarter, reflecting stronger cash flow generation and scheduled repayments done during the quarter.
- Net working capital was negative INR329 crores compared to negative INR407 crores in the previous quarter due to a pickup in vendor payments in Q4.
Show source
Our net working capital was at negative INR329 crores compared to negative INR407 crores in previous quarter due to a pickup in vendor payments in Q4.
- The company cumulatively raised fresh credit lines to the tune of nearly INR2,800 crores.
Show source
We have cumulatively been able to raise fresh credit lines to the tune of nearly INR2,800 crores.
- The company said its INR611 crores write-off involved a payment out-go to the party, and the full amount had been paid by the end of Q4 FY26.
Show source
On that INR611 crores write-off whatever we did, there was some payment out-go from our side to the party, and we have already paid the full amount by end of this quarter.
- The erstwhile promoters paid in full around INR180 crores of claims raised on them last year.
Show source
Last year, whatever claims were raised on the promoters, they have paid in full, around INR180 crores.
- Rating was upgraded by two notches during the year to BBB+ from BBB-.
Show source
So during the year, we have been upgraded for a rating by two notch.
- The company received additional sanctions from its lead bank recently and added a few new banks to its consortium during the year.
Show source
And bankers are supporting - in fact, recently, we got additional sanctions from our lead bank also.
- Cost for LC and bank guarantees reduced significantly during the year. Replaced by a later filing.
Show source
Our cost for LC and bank guarantees also got reduced during the year significantly.
What it expects ahead
What management expects
- Third-party O&M margins range from 20% to 25%, depending on order type and scope; the company targets more than 20% in Indian markets and says it goes for more than 25% for every single order, subject to scope.
Show source
Thakur: So they are all in the range of 20% to 25%.
- The company expects to grow at a reasonably 15% next financial year, citing UOV of over INR11,000 crores and continuing order inflows.
Show source
So we'll definitely be growing at a reasonably, let's say, 15% I mean, growth, yes.
- 15% growth view is based on current order books and orders expected in quarter 3 and quarter 4, with some projects coming under execution; Reliance orders are excluded because the company cannot commit to them unless they come in.
Show source
But Reliance is excluded out of this.
- The company said battery margins would be around 8% to 10%, with BOS margins potentially a little higher and supply margins lower depending on the order type.
Show source
So it will be around 8% to 10%.
- The company expects 20% to 25% orders add-on to happen in quarter 2 and quarter 3, but not quarter 1.
Show source
So -- and I'll say, let's say, around 20% to 25% in the quarter 2, quarter 3, not in quarter 1, but Q2, Q3 is, I mean, 20%, 25% orders add-on will keep on happening.
- The company said over 50 gigawatt hour battery opportunities are being seen for this year and onwards, and expects to get some share of them.
Show source
So for sure, the battery market seems to be very, very good for this year and onwards, I mean, over 50 gigawatt hour battery opportunities are being seen.
Show 24 more statements
What management expects
- The company expects 20% of new orders to come from battery and the rest from solar, depending on the opportunities that flow in the remaining quarters.
Show source
So on the conservative number, you can say that, let's say, in our new orders books, I'm expecting 20% order to come from the battery, rest will be from the solar.
- The company said the overall opportunity was over INR50,000 crores, possibly INR55,000 crores, and that its market share would continue to be 25%; it expected its order book to be around 15% more than the order book that year.
Show source
So order books would be in the range of -- I mean 15% more than the order book that we have this year, something like this.
- The company said it conservatively felt it must grow at a 15% growth rate from last year, while noting that this depended on factors including geopolitical wars.
Show source
So conservatively, we feel that we must be growing at 15% growth rate, from last year.
- The company said its overheads would be in the range of 4% to 4.5% maximum.
Show source
So our overheads would be in the range of 4% to 4.5% max to max.
- The company expected orders in the battery and storage segment to account for around 20% of the overall market, with hybrid portions adding to the opportunity.
Show source
So keeping that opportunity in mind, we expect that our orders would be also adding around, let's say, 20% of the overall market in the segment of the battery and storage.
- The company said gross margin for a stand-alone battery project could be 10% if it involved only the balance of supply, or 8% if it included battery supply.
Show source
If it is including the supply of the battery, then it could be 8%.
- The company anticipates Domestic EPC gross margins of 8-10%, depending on contract (turnkey/BOS).
Show source
Page 4 of 18 STERLING & WILSON~ Sterling and Wilson Renewable Energy Limited 7) April 24, 2026 We reiterate that we anticipate EPC gross margins to range between 8% to 10%, depending on whether they are turnkey or BOS orders.
- The company expects gross margins for EPC businesses to stabilize around 8-10%, depending on Turnkey/BOS, and O&M at ~20%.
Show source
On the O&M side, we expect the gross margin to stabilize at around 20% level.
- The company expects third-party O&M orders to continue to flow in, in addition to its own EPC O&M orders, as opportunities emerge from projects whose trial operation has been completed.
Show source
So we are expecting apart from our own EPC O&M orders, the third-party orders will continue to flow in.
- The company has been deeply engaged with Reliance on technical parameters and project configurations, and expects traction in this financial year.
Show source
And traction would be seen in this financial year, I'm sure.
- The company expects better traction from wind projects this year and expects to add a few more wind projects.
Show source
So with one project which we are doing is already on track, we are expecting that we'll be adding a few more into the wind side.
- The company expects execution or order inflow for Reliance New Energy in the current year, but cannot specify whether it will happen this quarter or next.
Show source
But I mean, just to pinpoint that it is going to happen this quarter or next, I'm not in a position to tell you now, but this year, definitely it should happen.
- The company expects to get the largest share from Reliance when the project reaches final rollout stage.
Show source
And then once it comes for the final rollout stage, then I mean, our expectation is that we should be getting the largest share from them.
- The company is hopeful of obtaining additional credit lines based on requirements when it gets additional orders and has better revenue visibility.
Show source
And the moment, we'll get additional orders, and we have better visibility in terms of revenue, we are hopeful to get additional credit lines based on the requirement.
- The company expects to participate in Coal India tenders.
Show source
With this, we are expecting that we should be participating in the Coal India tender side.
- The company expects a skew toward international projects in its order bookings this year, with focus on Africa, Middle East and select countries in Europe.
Show source
On the international order booking side, yes, I mean, this year, you can see some skewness towards the more international projects.
- The company expects the financial year to witness a combination of solar and battery. Replaced by a later filing.
Show source
Thakur: So, this financial year will definitely witness the combination of solar plus battery.
- The company is engaging with the project stakeholders to support their understanding of the technical parts of the project; it will provide the order size and timing when available. Replaced by a later filing.
Show source
And as and when it comes, then we'll come back to you on the size of the orders and the timing of the orders and all.
- The company said it is deeply engaged with the project stakeholders and the project is ongoing, and may expect a larger share from projects entering the EPC stage. Replaced by a later filing.
Show source
And I mean, the larger share maybe we'll be expecting out of the projects that will be coming for EPC stage.
- The company expects its order book position and market to be more than last years, and is working closely on several fairly large projects that it is in a better position to win. Replaced by a later filing.
Show source
We are closely working on a few of the projects, which are a fairly very large size and we are in a better position to get this order.
Orders
- The company bagged an O&M order for about 900-megawatt from Serentica, a large IPP company, in the last quarter.
Show source
In the last quarter, we have also, I mean, bagged one order from the large IPP company, Serentica, for about 900-megawatt O&M order.
- Three Sterling and Wilson Renewable Energy Limited orders are still awaiting NTP; those projects are expected to take 14 to 15 months, with part of the work falling in this fiscal.
Show source
So those projects would be, let's say, for 15 months, 14 months, but part of that will be coming in this fiscal.
- Current order book includes close to INR300 crores from battery, out of an order book of INR11,000-odd.
Show source
Thakur: At this stage, out of our -- the current order book, when you say INR11,000-odd we have around INR300 -- close to INR300 crores coming from the battery.
- The company has been declared L1 for the Coal India project; the NTPC result is still awaited.
Show source
And of course, we have been declared L1, NTPC is still awaited.
What it is building and selling
Projects and capacity
- The timeline for the Adani project execution is around 13 months.
Show source
So basically, the timeline for this project execution is around 13 months.
- The Nigeria project is proceeding at a slow pace, and may take much longer; it may not happen in this financial year.
Show source
It may not be happening in maybe this financial year.
- The company said Khavda and Kutch are large projects whose technologies are being evaluated, and that its role starts once the project can be fully launched.
Show source
Finally, once they come to a point where they feel that the project is now, I mean, can be fully launched on - thereafter, only our role starts.
- The company is doing one wind energy project for a client, and the project is on track.
Show source
Thakur: So we are doing one project for one of our clients and the project is on track.
- The company sees capex opportunities in battery, solar and wind. Replaced by a later filing.
Show source
So from the capex perspective, we see then there's a huge opportunities coming from, I mean, all three.
Demand and pricing
- Uncertainty in commodity prices reduced market traction for orders in quarter 4, and most orders slated to be concluded then shifted to quarter 1; Sterling and Wilson Renewable Energy Limited said its share had not gone down and the industry was generally seeing an order-book slowdown.
Show source
So all those orders that were slated to be concluded in quarter 4, most of them have been shifted to quarter 1.
Show 8 more statements
Demand and pricing
- Solar market share is around 25%, more than 25%, based on last year's orders and its overall market positioning; management expects its market share to be more than 25% with the run rate toward the 2030 target.
Show source
Page 15 of 18 STERLING & WILSON~ Sterling and Wilson Renewable Energy Limited 7) April 24, 2026 So with this run rate, our market share would be definitely more than 25%.
- The company said the battery market in India is not very mature.
Show source
So I mean, this is why I'm telling you this is because the battery market in India itself is not very mature.
Segments
- Projects built only as solar are adding battery capacity of 20%, 15% or 10%, depending on the hours of energy requirement.
Show source
Thakur: No, there are, I mean, stand-alone BESS project also because as per all those projects that have been built only as a solar, they are also as per the obligations now they are adding some 20%, 15%, 10%, I mean, depending upon the hours of energy requirement.
Deals and partners
- Third-party O&M contracts are multi-year, at least 2 to 3 years; some are 2 years, most are 3 years, and a few are for a very long time.
Show source
Thakur: They are all multi-years, at least for 2 to 3 years.
- The company engages battery manufacturers on a project-by-project basis and discusses prices with them before submitting a bid to lock prices and limit the effect of fluctuations during execution on supply patterns and the bottom line.
Show source
So before a bid is submitted, we definitely get into the dialogue with the manufacturers to lock our prices with them so that any fluctuations during execution is not, I mean, affecting us on our supply patterns or on the bottom line.
- The company is engaging with Reliance on a large development project; Reliance is the developer and Sterling and Wilson Renewable Energy Limited is an EPC player, while the execution mode and scope are being discussed.
Show source
Thakur: So on Reliance, we are the EPC players, Reliance is developer, right?
- The company has a long-term understanding with Adani that orders will keep flowing.
Show source
And then orders will keep on flowing I believe, that's our long-term understanding with Adani.
- The company is discussing technologies and potential tie-ups with battery manufacturers. Replaced by a later filing.
Show source
I mean discussions are happening on the technologies and all those kind of tie-ups and things by them.
Risks, rules and outside factors
Risks and disputes
- The company is out of money for around more than INR200 crores on the US cases, predominantly backed by the promoters under an indemnity agreement.
Show source
Ajit Pratap Singh: We are out of money for around more than INR200 crores and that is predominantly backed by the promoters under indemnity agreement on the US cases.
- The promoters' indemnity backs Sterling and Wilson Renewable Energy Limited's around more than INR200 crores of out-of-pocket money on the US cases.
Show source
Ajit Pratap Singh: But that's backed by promoter's indemnity.
- Exposure on the cases could be more than INR200 crores.
Show source
Thakur: Could be more, in fact.
- The company is already cash out on INR200 crores, most of which is indemnified, and the company expects the promoters to pay it once the case is settled.
Show source
It is money that will come to the company from the promoters once the case is settled.
- The company said the INR611 crores write-off related to a non-indemnified matter and nothing could be recovered from the promoter in that case.
Show source
So there is nothing which can be recovered from the promoter on this particular case.
- The company said it can raise claims on the erstwhile promoters for other cases based on crystallization of liability and closure, for cases crystallized by 30th September, and would do so based on the outcome of those cases.
Show source
On other cases, based on the crystallization of the liability and closure of the cases, we can raise the claim on the erstwhile promoters for whatever cases are crystallized by 30th September, and we'll do that based on outcome of all those cases.
Show 11 more statements
Risks and disputes
- If litigation cases go adversely against Sterling and Wilson Renewable Energy Limited, it may face additional costs, including litigation costs; the amount can only be ascertained when the litigations are finally resolved.
Show source
So those are additional things and those can only be ascertained at the time that the final resolution on those litigations happen.
- If the litigation cases are resolved in Sterling and Wilson Renewable Energy Limited's favor, the company will not have to pay anything.
Show source
If it is in our favor, we won't have to pay anything.
- If the litigation cases go against Sterling and Wilson Renewable Energy Limited, there could be additional costs, and the company is unable to put a number to them at this point.
Show source
And that's exactly the reason why we are unable to put a number to it at this point of time as well.
- Ajit Pratap Singh said the chances of Sterling and Wilson Renewable Energy Limited losing the case are very remote.
Show source
Ajit Pratap Singh: Yes, if we lose the case, which chances are very remote.
- The company said the out-of-court settlement announced in its press release had neither upside nor downside, and the case was closed without liability or payment obligation to either party.
Show source
The case has been closed and without any liability or payment obligation to either of the party.
- The company seeks to settle cases in its favor on its terms and conditions; otherwise, the cases proceed in arbitration or court for a judgment. Replaced by a later filing.
Show source
But our efforts are always there to settle, if it comes to our terms and conditions.
Outside factors
- The company said domestic supply is mostly purchased from India under fixed contracts, so fluctuations do not affect it; it expects to benefit from variations in international markets.
Show source
For international, I think we'll be benefiting from the variations.
- The company has a natural foreign-exchange hedge because its revenues are also in USD, so it does not expect a significant impact from foreign-exchange variation.
Show source
So there won't be any significant impact in terms of foreign exchange variation.
- A depreciating rupee is beneficial to Sterling and Wilson Renewable Energy Limited in the international market.
Show source
Thakur: Yes, for the international market, sure.
- The company said a surge in LME prices for copper, aluminium and other commodities from January led developers to take a back seat, contributing to the slowdown in the last quarter.
Show source
So for the last quarter slowdown, I will say that there was basically commodities price surge, from January onwards if you see the LME prices for copper, aluminium other things going up.
- The company said connectivity in Rajasthan was a reason for the slowdown in order pace.
Show source
And then for larger industrial perspective, if you see, the connectivity is particularly in one of the regions at Rajasthan.
What the company said on its earnings call, taken from its own transcript. Not advice.
Questions and answers
Question
Saurabh Srivastava: First of all, congratulations on a very good numbers, sir. And my first question is, sir, there has been a decent traction in the operation and maintenance. Sir, what sort of view will you give going forward, especially the third-party operation and maintenance projects first? Page 5 of 18 STERLING & WILSON~ Sterling and Wilson Renewable Energy Limited 7) April 24, 2026 And sir, in the last con call, you said that in the fourth quarter, we may see something from Reliance New Energy. So is there any clarity, any vision? And what sort of margins can we expect from those projects if any data available? And sir, any update on Nigeria project, sir? Is it still on, sir?
Answer, c.k thakur
In the last quarter, we have also, I mean, bagged one order from the large IPP company, Serentica, for about 900-megawatt O&M order. And the last years, all those projects which have been trial operation that has been completed for them, the opportunity is only coming up. So we are expecting apart from our own EPC O&M orders, the third-party orders will continue to flow in.
Question
Saurabh Srivastava: Sir, are the third-party orders annual or multiyear contracts, sir?
Answer, c.k thakur
C.K. Thakur: They are all multi-years, at least for 2 to 3 years. Some contracts are 2 years. Most of them are for 3 years. And a few of them are also for a very, very long time.
Question
Saurabh Srivastava: What sort of margins do we plan to settle for these third-party O&Ms, sir?
Answer, c.k thakur
C.K. Thakur: So they are all in the range of 20% to 25%. So it all depends on what kind of orders or what kind of the scopes are, but it is not fixed. Basically for every single order, we go for more than 25%. But of course, I mean, this all depends on the scope. So in Indian markets, we are targeting for more than 20% as of now.
Question
Saurabh Srivastava: Right, sir.
Answer, c.k thakur
C.K. Thakur: On the second question of Reliance. So Reliance, as we have been guiding the markets also, we have been deeply engaged with them. So there has been discussions on the technical parameters, the kind of configuration of the projects that they're going to have and all. So on all fronts, we are deeply engaged with them. And traction would be seen in this financial year, I'm sure.
Question
Saurabh Srivastava: And the Nigerian one, sir?
Answer, c.k thakur
C.K. Thakur: So Nigeria, yes, so basically, it's on a slow pace. Again, I mean, the election coming in and all. So I mean, you can say that, this will take much longer time. It may not be happening in maybe this financial year. Page 6 of 18 STERLING & WILSON~ Sterling and Wilson Renewable Energy Limited 7) April 24, 2026 Saurabh Srivastava: Thank you, sir.
Question
Sameer Dalal: Yes, hi. Congratulations on the good profitability. I have two questions. The first is we saw some amount of slowdown or no pickup per se, if you can say, in the order execution given our order backlog, right? Q4 degrowth in the top line. So if you can throw some understanding on why this is? And the second question, would you be willing to give us some sort of guidance on what kind of revenue we can expect in the next financial year, given the fact that order book is more or less, I think, INR1,000 crores more than what it was last year when we finished the previous year. So does that mean that growth is going to taper down? Or do you think that order inflow in the first half
Answer, c.k thakur
C.K. Thakur: Yes. So, Sameer, so on the quarter 4 order pickup, so the market has been generally been showing less traction because of some uncertainties in the commodity prices and all. So all those orders that were slated to be concluded in quarter 4, most of them have been shifted to quarter 1. And not that our share has gone down. In general, the industry was seeing slowdown on the order book side. Your second question was on the revenue guidance, right?
Answer, c.k thakur
So last year, our track record has been very good. And with the UOV, pretty good UOV of over INR11,000 crores and orders will keep on flowing. So there's no question of tapering down. So we'll definitely be growing at a reasonably, let's say, 15% I mean, growth, yes.
Question
Sameer Dalal: The 15% growth that you're targeting, does this include maybe future orders from Reliance or that would be an add-on to the 15% that you're giving us kind of a view on based on your current order book?
Answer, c.k thakur
C.K. Thakur: No. So this is based on to the current order books and the orders that we'll be getting in quarter 3 and quarter 4 because some of the projects would definitely be coming under execution. So the orders in hands and the few of the orders will be coming in Q3, Q4. But Reliance is excluded out of this. We don't consider Reliance in this portfolio because Reliance orders, unless it comes in, we can't commit anything on this, right?.
Question
Sameer Dalal: Fair enough. And last question, if you allow me. You talked about doing the battery energy storage part of it. So what kind of tie-ups do you have with companies that are making all these batteries when you set up your storage? Page 7 of 18 STERLING & WILSON~ Sterling and Wilson Renewable Energy Limited 7) April 24, 2026 And if you do like a fully integrated project with setting up the solar plant with battery energy storage, I mean just to understand, how would the revenue look for a similar project where you're purely doing a solar park versus with the battery energy storage? And what would be the margin profile of that kind of orders and business?
Answer, c.k thakur
C.K. Thakur: So, this financial year will definitely witness the combination of solar plus battery. As far as our strategic tie-up with a few of them is concerned, I don't have, as of now, the full tie-up, but we keep on engaging with the manufacturers based on the opportunities coming on project-on- project basis. So before a bid is submitted, we definitely get into the dialogue with the manufacturers to lock our prices with them so that any fluctuations during execution is not, I mean, affecting us on our supply patterns or on the bottom line. So I mean, this is why I'm telling you this is because the battery market in India itself is not very mature. So I mean, there is no point at this stage when getting a stuck up with one and then getting into trouble. So that is on the battery part.
Question
Sameer Dalal: How would the revenue profile change? And how would the margin profile change when we do these combined?
Answer, c.k thakur
C.K. Thakur: Margin profile on the battery also will remain same. I mean we have been, let's say, working depending upon the supply of battery in our scope or only BOS for the battery. So it will be around 8% to 10%. So if it is only -- I mean, let's say, the BOS margin could be a little more. If it is supply, then the margin would be less depending upon the type of the order that is coming on. So -- and I'll say, let's say, around 20% to 25% in the quarter 2, quarter 3, not in quarter 1, but Q2, Q3 is, I mean, 20%, 25% orders add-on will keep on happening.
Answer, c.k thakur
I mean -- so that kind of traction is being seen. So for sure, the battery market seems to be very, very good for this year and onwards, I mean, over 50 gigawatt hour battery opportunities are being seen. So out of that, definitely, we'll be getting some part of our share.
Answer, c.k thakur
C.K. Thakur: Just before this question, while I was addressing to Sameer, I addressed this part. So I told you that we are deeply engaged with them. I mean discussions are happening on the technologies and all those kind of tie-ups and things by them.
Question
Bhavik Shah: So actually, I just wanted to understand where is it getting hindered? Like what is making it delay? Page 8 of 18 STERLING & WILSON~ Sterling and Wilson Renewable Energy Limited 7) April 24, 2026 C.K.
Answer, c.k thakur
Thakur: No, I can't be discussing more on these kind of things. But of course, I mean, Khavda being a large project -- I mean, the Kutch being a very, very large project. So they are evaluating the pros and cons on the various technologies and all, right? Finally, once they come to a point where they feel that the project is now, I mean, can be fully launched on - thereafter, only our role starts. So we are fully engaging with them to support all those things in terms of understanding of the project technical parts and other things. And as and when it comes, then we'll come back to you on the size of the orders and the timing of the orders and all.
Show 15 more questions
Question
Bhavik Shah: Okay. So until now, we don't see any clarity in near term, right?
Answer, c.k thakur
C.K. Thakur: Clarity is that, we are deeply engaged with them and the project is on with them. And I mean, the larger share maybe we'll be expecting out of the projects that will be coming for EPC stage.
Question
Bhavik Shah: Okay. And sir, in terms of our margins this quarter, was there any one-off in terms of completion or anything, because we have not seen such margins when our revenue has dropped, but our gross margins have improved. So what are those reasons which led to that improvement?
Answer, ajit singh
Ajit Pratap Singh: So there were 3 projects, international projects, which were towards fag end of completion. And so there were certain savings over the budgeted cost that has improved our overall margin, particularly that came from international projects.
Question
Bhavik Shah: Okay. Because in the presentation, you have guided like we'll continue to do at 8%, 10% gross. So that's the reason I'm asking. So is it a one-off we should consider?
Answer, ajit singh
Ajit Pratap Singh: It's like savings over the budgeted cost in international projects.
Question
Bhavik Shah: So when you say 6, 9, 12 months is my project execution and I have INR11,000 crore order book, so can we INR10,000 crores, INR11,000 crores execution this year then?
Answer, c.k thakur
C.K. Thakur: So I mean these orders, 3 of them are orders where the NTP is still to be received. So those projects would be, let's say, for 15 months, 14 months, but part of that will be coming in this fiscal. So the -- on the revenue side, I mean, we will be growing, let's say, at the 15% growth rates from the last year.
Answer, c.k thakur
C.K. Thakur: Not really, not really because so if you see the dollar valuation part of things, that is not to our account. Basically, most of the -- for domestic supply, we are purchasing from India. So they're all fixed contracts and such fluctuations is not impacting us. For international, I think we'll be benefiting from the variations.
Answer, ajit singh
Ajit Pratap Singh: And international. There is a natural hedge available because our revenues are also in USD. So there won't be any significant impact in terms of foreign exchange variation.
Question
Jayesh Shroff: All right. So net-net, depreciating rupee is actually beneficial to us. I mean that's what is reflected in this quarter's result also?
Answer, c.k thakur
C.K. Thakur: Yes, for the international market, sure.
Question
Jayesh Shroff: Okay. Secondly, in terms of our wind escalation to get into wind energy projects, what is the status there?
Answer, c.k thakur
C.K. Thakur: So we are doing one project for one of our clients and the project is on track. And to remove the intermittency and all the orders inflow this year, we are expecting a few -- I mean, there will be better traction from the wind projects. So with one project which we are doing is already on track, we are expecting that we'll be adding a few more into the wind side.
Question
Jayesh Shroff: All right. Okay. Just one more thing. I know you've been asked a lot of times about Reliance New Energy, you've answered so many of them. But any guidance or any idea in terms of when could the execution start or at least when could the order inflow start for us?
Answer, c.k thakur
C.K. Thakur: So current year, it should happen. But I mean, just to pinpoint that it is going to happen this quarter or next, I'm not in a position to tell you now, but this year, definitely it should happen.
Question
Jayesh Shroff: No, forget the provision, but what is the value of the total contract or for the cases that we are fighting for?
Answer, ajit singh
Ajit Pratap Singh: We are out of money for around more than INR200 crores and that is predominantly backed by the promoters under indemnity agreement on the US cases.
Question
Jayesh Shroff: So INR200 crores is the worst-case scenario if we lose all the cases?
Answer, ajit singh
Ajit Pratap Singh: But that's backed by promoter's indemnity.
Question
Jayesh Shroff: Yes. That's backed by promoter. But I mean, at least we'll have to take the hit first and then recover the money. But INR200 crores is the worst-case scenario, right?
Answer, c.k thakur
C.K. Thakur: Could be more, in fact. We'll come back to you. So I think on these numbers, we'll come back to you.
Question
Jayesh Shroff: I mean because this is important because you know the performance of stock has gone down drastically primarily because we've taken so much of a hit. So now after taking so much of a hit, you're still saying that it could be a bigger number. I mean that's -- so how big that number could be? You know how many cases you are fighting for and what is the total amount of cases that we are fighting for?
Answer, sandeep mathew
Sandeep Thomas Mathew: See, I think at this point, since it is in litigation and it is expected to take time, it is difficult to ascertain a certain number. I think what Ajit has already alluded to is the point that as a company, we are already cash out on INR200 crores and most of it is indemnified. So there's no question of taking any hit on this INR200 crores. It is money that will come to the company from the promoters once the case is settled. What C.K.T. was alluding to and what we have always maintained is if the case goes adversely against us, then there is always a chance that there may be additional costs, like, for example, in the last US case, there were litigation costs which we had to bear, which was over and above the settlement that had to happen. So those are additional things and those can only be ascertained at the time that the final resolution on those litigations happen. If it is in our favor, we won't have to pay anything.
Answer, sandeep mathew
But if it goes against us, then there could be additional cost. And I think that's the point that C.K.T. was trying to allude to here. And that's exactly the reason why we are unable to put a number to it at this point of time as well. Page 11 of 18 STERLING & WILSON~ Sterling and Wilson Renewable Energy Limited 7) April 24, 2026 Jayesh Shroff: No, I completely agree.
Question
Jayesh Shroff: Okay. So there could be additional penalties. I mean this is the worst-case scenario, again, I'm repeating, but there could be additional penalties over above INR200 crores. That's what you're saying?
Answer, ajit singh
Ajit Pratap Singh: Yes, if we lose the case, which chances are very remote.
Question
Jayesh Shroff: Okay. And we've settled a few cases earlier where it's -- I mean, both the parties have withdrawn the cases and all. So I mean, considering large write-offs that we've taken, are there any chances of recoveries or we would want to settle it where both the parties just withdraw the cases?
Answer, c thakur
C. K. Thakur: No. So our efforts are always to mutually agree and settle the case in our favor. If that happens, then that is a win-win situation, And if it doesn't happen, then in any case we are either in the arbitration or we are into the court. So then we will wait for the judgment from the either arbitration panel or from the court. But our efforts are always there to settle, if it comes to our terms and conditions.
Question
Jayesh Shroff: Okay. That’s it from my side. Thank you, sir. Page 12 of 18 STERLING & WILSON~ Sterling and Wilson Renewable Energy Limited 7) April 24, 2026 Moderator: Next question comes from the line of Nirmal with Aditya Birla Sun Life AMC Limited.
Answer, c.k thakur
So -- I mean, as of now, when we give the guidance for the -- our revenue growth, this would be mix of the battery and then the solar and the part of wind also. So from the capex perspective, we see then there's a huge opportunities coming from, I mean, all three. Nirmal: Okay. So like a stand-alone project, what capex intensity like...
Answer, c.k thakur
C.K. Thakur: At this stage, out of our -- the current order book, when you say INR11,000-odd we have around INR300 -- close to INR300 crores coming from the battery. But the orders that will flow, that will come as the inflow in the rest of the quarters will determine on the kind of the opportunity that will be coming in. So on the conservative number, you can say that, let's say, in our new orders books, I'm expecting 20% order to come from the battery, rest will be from the solar. Nirmal: Okay, sir. And just one last question. So currently, when you are approaching customers, they are preferring hybrid over stand-alone.
Answer, c.k thakur
Thakur: No, there are, I mean, stand-alone BESS project also because as per all those projects that have been built only as a solar, they are also as per the obligations now they are adding some 20%, 15%, 10%, I mean, depending upon the hours of energy requirement. So that is also coming up. So that both ways. So the projects that will be coming, that will be coming as a hybrid for solar and battery or maybe wind and battery or maybe solar, wind and battery and there will be a stand-alone battery also. So both -- all three kinds of -- I mean, the market opportunities are being seen.
Answer, c.k thakur
C.K. Thakur: So on Reliance, we are the EPC players, Reliance is developer, right? And since it is a large development project by them, so the mode of executions are being decided by them. So supply to their scope, part supply in the EPC scope, executions by EPC or the construction company, all these things are being discussed. Since it is a huge investment, therefore, it's important that there should be enough time for them also to give on the selection of the technology and all those kinds of things. So our involvement in this practice is that we as a very strong and maybe India's number one EPC player in solar, we have been, I mean, deeply engaging with them in discussions of every single bit of things, right? And then once it comes for the final rollout stage, then I mean, our expectation is that we should be getting the largest share from them.
Answer, ajit singh
Ajit Pratap Singh: First question, there's no downgrade in the rating. We are rated as BBB+, while in the beginning of the year we were rated a BBB-. So during the year, we have been upgraded for a rating by two notch. In terms of support from the bank, we have been able to secure broadly INR2,800 crores new credit lines during the last fiscal. And bankers are supporting - in fact, recently, we got additional sanctions from our lead bank also. And we have added a few new banks in our consortium during the year. So we are getting support from the banks.
Answer, ajit singh
Our cost for LC and bank guarantees also got reduced during the year significantly. And the moment, we'll get additional orders, and we have better visibility in terms of revenue, we are hopeful to get additional credit lines based on the requirement. Page 14 of 18 STERLING & WILSON~ Sterling and Wilson Renewable Energy Limited 7) April 24, 2026 Fazal Hawa: Sir, about Adani orders, do you think that goes may be much quicker because they are already on the board in Khavda and generally, we are much more agile in the solar space?
Answer, c.k thakur
C.K. Thakur: Yes. So basically, the timeline for this project execution is around 13 months. And the project is doing really well. So that's the pace that we are keeping. And then orders will keep on flowing I believe, that's our long-term understanding with Adani. Fazal Hawa: And sir, how do you see the international space going?
Answer, c.k thakur
C.K. Thakur: Coal India, they have a good portfolio basically coming in. So that was I think, second project of the large size. And they were quite a few numbers of the bidders in this, including L&Ts and the larger players. And of course, we have been declared L1, NTPC is still awaited. With this, we are expecting that we should be participating in the Coal India tender side. So on the PSU front, if you say NTPC, Coal India, SJVN they remain to be the large developers.
Answer, c.k thakur
On the international order booking side, yes, I mean, this year, you can see some skewness towards the more international projects. That's the traction we can clearly see -- and our focus area still remain the Africa, Middle East and select countries in Europe. So the size and the quantum of the orders, I can't comment to you at this stage. But then you can always expect that from the last years, the order book position and in terms of the market will definitely be more than that. We are closely working on a few of the projects, which are a fairly very large size and we are in a better position to get this order.
Answer, c.k thakur
C.K. Thakur: Historically, if you see that our hit ratio has been around 25% to 28%, right? And even today, with respect to the last year's orders and the overall market positioning that we have, our market share in the solar space is around 25%, more than 25%.So -- and with the next couple of years, 4 years to -- I mean, to achieve the target of 2030 - the opportunities are -- if not, I mean we will say, I mean, it is more than the opportunity that have been made available in the last year also. Page 15 of 18 STERLING & WILSON~ Sterling and Wilson Renewable Energy Limited 7) April 24, 2026 So with this run rate, our market share would be definitely more than 25%. That's what I can give you a at this stage.
Question
Amish Kanani: Sure, sir. That's helpful. And sir, what are the key reasons why the slowdown has happened recently and because of which this fourth quarter order book was a bit slower. And historically, we understood the execution time line was 6% to 9% in our case, but you're mentioning one of the faster moving order also is now, say, 13 months. Maybe our ticket size of the order book has grown, which is probably taking this. So if you can give us some sense of, one, outstanding order book execution time line for the order book? And second, sir, what are the key reasons which is holding up this overall order pace -- is it more due to this international issues that you had mentioned about pri
Answer, c.k thakur
C.K. Thakur: Yes. So basically, there are a couple of reasons. So for the last quarter slowdown, I will say that there was basically commodities price surge, from January onwards if you see the LME prices for copper, aluminium other things going up. So the developers chose to probably take a back seat for some time, I mean just suppose, so that was one. And then for larger industrial perspective, if you see, the connectivity is particularly in one of the regions at Rajasthan. I mean there have been 2 major areas in India - Rajasthan and Gujarat.
Questions about this call
- When was the Sterling and Wilson Renewable Energy Q4 FY26 earnings call transcript filed?
- Sterling and Wilson Renewable Energy filed the transcript with the exchange on 30 Apr 2026. This page is built from that transcript.
- What does this page list?
- 86 statements from the transcript across 10 topics, 32 of them with a figure. Each statement is shown with the transcript sentence it came from.
- Are the analysts' questions included?
- Yes. 25 questions and management's answers are listed in the order they were asked, as the transcript prints them.
- Who wrote this page?
- DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.