Tata Power Company Q1 FY24 earnings call: Tata Power won a bid through SECI for 1 unit of 330 megawatt at a very attractive tariff

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

The transcript describes the period as "Q1 of FY 2024 or 2025 or 2026". Its filing date would suggest a different quarter; this page follows the transcript.

Tata Power won a bid through SECI for 1 unit of 330 megawatt at a very attractive tariff. Tata Power plans to grow its rooftop business by about 60% to 70% this year. Tata Power had commissioned 200 and expects another 500 to be commissioned in the next few weeks. Tata Power reported PAT of INR 1,401 crores in the quarter, an 11% increase, and EBITDA of INR 4,249 crores, an 8% increase, in Q1 of FY 2024 or 2025 or 2026. Tata Power attributes the rooftop business pricing difference to different places and module types, including supply of a large quantity of 1 kilowatt under the ULA scheme of the government and supply of higher capacity using different modules.

The numbers management gave

Results

  • Tata Power reported PAT of INR 1,401 crores in the quarter, an 11% increase, and EBITDA of INR 4,249 crores, an 8% increase, in Q1 of FY 2024 or 2025 or 2026.
    Show source
    Tata Power has done exceedingly well, INR 1,401 crores of PAT in the quarter, which is an 11% increase.
  • Tata Power's renewable cluster revenue increased by 22%, EBITDA by 23% and PAT by 37% in Q1 of FY 2024 or 2025 or 2026.
    Show source
    The revenue has gone up by 22%, the EBITDA by 23% and the PAT by 37%.
  • Tata Power's renewable generation business revenue grew by 11% on a CAGR basis, EBITDA by 10% and PAT by 2%.
    Show source
    The generation business, we have seen revenue grow by 11% on a CAGR basis, EBITDA by 10% and PAT by 2%.
  • Tata Power's rooftop business EBITDA grew by 68% and profit grew by more than 67% in the last 1 year; its PAT CAGR was 84% for last 4 years.
    Show source
    Our EBITDA has grown by 68% and our profit has also grown by more than 67% in the last 1 year.
  • Tata Power's module plant crossed 1,000 megawatt in the first quarter, and the company expects module production to have virtually peaked or be peaking, while cell production is still catching up.
    Show source
    For the first time, our module plant we crossed 1,000 megawatt in the first quarter, and we expect that we have virtually peaked over there or peaking over there in terms of our module production, our cell production is still catching up.
  • Tata Projects has completed most of its legacy projects that were losing money, and about 10% of the legacy projects remain in the last stage, with cost correction taking place as a result.
    Show source
    We are at something like just 10% of the legacy projects in last stage there and cost to correction takes place because of that reason.
Show 17 more statements

Results

  • Odisha DISCOM's reported PAT grew by about 6% in quarter 1, more or less in line with what was planned.
    Show source
    Purely from a reported PAT perspective, we grew by about 6%, more or less what we are also planning in quarter 1.
  • Odisha DISCOM's total million units sold increased 10.4% in quarter 1, possibly because of the hot summer.
    Show source
    And in quarter 1, our total million units sold in Odisha increased 10.4% because of possibly the hot summer.
  • Tata Power's rooftop revenue was INR 2,300 crores last to last year and INR 4,800 crores last year.
    Show source
    Last year, we did INR 4,800 crores.
  • Tata Power's rooftop business grew from 1,000 units a month 2 years back to 30,000 units a month now.
    Show source
    Now I do 30,000 units a month.
  • Tata Power's EPC work contributed about INR 100-odd crores of PAT in the previous year.
    Show source
    We had about INR 100-odd crores of PAT coming through that.
  • Tata Power's slide 48 combines solar rooftop and solar EPC; on a like-for-like basis, the previous base usually needs INR 100-odd crores of PAT removed for EPC.
    Show source
    So on a like-for-like basis, yes, from a previous base, usually remove INR 100-odd crores of PAT.
  • Tata Power's collections are lower during a month when summer consumption and billing are high because the billing is collected the following month; for example, June collections include billing from May, while June billing is collected in July. Tata Power is on track on a 12-month basis.
    Show source
    So if you look on a 12-month basis, you will find that we are on track.
  • Tata Power is on track when assessed over a 12-month cycle, while quarterly figures are not reflective because collections vary seasonally.
    Show source
    So I think you need to look at it on a 12-month cycle, and you will see that we are very much on track.
  • Tata Power's modules production exceeded 1,000 megawatt in the quarter, while cell production reduced because of a line change; higher-efficiency cells involved some sacrifice in yield but can command a premium.
    Show source
    For the first time, we have crossed 1,000 megawatt in the quarter.
  • Tata Power’s rooftop business grew by 100% last year.
    Show source
    If you see CAGR of 4 years quarter one, it's nearly 58% for Revenue.
  • Tata Power's TBCB projects are all under construction, and their revenues in the PAT are more from a lease accounting perspective than actual sharing of EBITDA.
    Show source
    So the revenues in the PAT are more from a lease accounting perspective rather than the actual sharing of EBITDA.
  • Tata Power's actual EBITDA from transmission comes from MO transmission, a regulated business, and it also has a share of profit from some transmission assets in the resurgent platform.
    Show source
    The actual EBITDA that comes to us is from a regulatory business, which is MO transmission, which is again a regulated business.
  • Tata Power's TBCB EBITDA and PAT are currently more about construction revenue booking than pure-play EBITDA and PAT.
    Show source
    As of now, we don't have the pure-play EBITDA and PAT from TBCB is more about construction revenue booking.
  • Tata Power booked losses while wrapping up remaining EPC work this year.
    Show source
    And as a result, we have booked some losses.
  • Mundra's supplementary PPA provides coal pass-through and fixed cost, but there is some under-recovery; the effort is to ensure no loss from a return-on-equity perspective.
    Show source
    But the effort is to kind of ensure that we don't lose anything on the ROE perspective.

Money and capital

  • Tata Power spent INR 5,300 crores on capital expenditure in the first quarter.
    Show source
    On the capital expenditure, for the first time, we spent INR 5,300 crores in the first quarter.
  • Tata Power's net debt to underlying EBITDA is 3.41 and its net debt to equity is 1.25.
    Show source
    Our net debt to underlying EBITDA is 3.41 and our net debt to equity is 1.25.

What it expects ahead

What management expects

  • Tata Power plans to grow its rooftop business by about 60% to 70% this year.
    Show source
    In fact, last year, we grew by 100%, and this year also, we have plans to grow by about 60% to 70%.
  • Tata Power expects to implement INR 25,000 crores of capital expenditure this year, with 50% for renewable projects and the balance divided between FGD projects and transmission and distribution projects.
    Show source
    And we expect that the INR 25,000 crores that we have lined up for this year, we'll be able to implement.
  • Tata Power expects delayed Odisha DISCOM payments to recover in quarter 2.
    Show source
    It is just from an operations side, some of the payments got delayed, but that is something that will recover in quarter 2.
  • Tata Power expects a substantial ramp-up in commissioning in quarter 2.
    Show source
    So I think quarter 2 will see a huge and big ramp-up in our commissioning.
  • Two of Tata Power's TBCB projects will be commissioned in quarter 2, with further projects in quarter 3 and quarter 4, and their revenues, EBITDA and PAT will start flowing in.
    Show source
    So the revenues -- 2 projects will get commissioned in H2 -- in quarter 2 and then next is quarter 3, quarter 4.
  • Indonesian coal prices have gone up about 5% to 7%, and Tata Power expects coal prices to increase up to 5% over the next 9 months but does not expect too much change.
    Show source
    But yes, up to 5% over the next 9 months, you can expect.
Show 17 more statements

What management expects

  • Tata Power expects almost 40% to 45% of capex in quarter 2 to go to renewables, with the remaining amount going to other businesses; it is looking at a capex plan higher than INR 6,000 crores and possibly closer to INR 6,500 crores, with almost half going to renewables as it tries to commission almost 800 megawatts to 900 megawatts in quarter 2.
    Show source
    But yes, you can assume in our quarter 2 also, we're kind of looking at a capex plan of probably higher than INR 6,000 crores.
  • Tata Power expects a good amount of capex to go to its pipeline of more than 2,000 kilometre of transmission.
    Show source
    So a good amount of capex will also go over there.
  • Tata Power's cumulative rooftop revenue may cross INR 30,000 crores in 2029 instead of 2030.
    Show source
    This year, you can imagine what sort of -- so I think we will cross cumulative INR 30,000 crores maybe in 2029 itself, not in 2030.
  • Tata Power expects its rooftop market share to increase from 12%, 13% to 25%.
    Show source
    Praveer Sinha: I will also increase my market share from 12%, 13%, I will become 25%.
  • Tata Power is trying to maximize both yield and efficiency, and possibly in quarter 2 the results will reflect that.
    Show source
    We are trying to ensure that our -- both yield as well as efficiency now peaks and possibly in quarter 2, you will see that sort of result.
  • Tata Power has done preliminary work on nuclear opportunities and expects to come up with a firm plan once the government notifies the rules.
    Show source
    But I think once these rules are notified by the government, we'll be in a position to come up with a firm plan.
  • Tata Power expects to collect all delayed government payments in Odisha in this quarter.
    Show source
    We expect to collect all of them in this quarter.
  • Tata Power expects Odisha DISCOM collection efficiency to improve in this quarter, as delayed payments are being collected and summer consumption is billed in the subsequent month.
    Show source
    So the collection efficiency will be improving in this quarter.
  • Tata Projects may have one more quarter of financial performance impact from legacy projects before its financial performance improves.
    Show source
    And you will find that possibly maybe one more quarter will have an impact on Tata Projects.
  • Tata Power expects investments in similar projects, rather than only conventional solar, wind or hybrid projects promoted by central government agencies.
    Show source
    So there will be a lot of similar type of investments that will come up rather than the pure vanilla solar or wind or even hybrid projects, which were coming up by the states -- by the central government agencies.
  • Tata Power expects to use a mix of direct sales to DISCOMs or central agencies and bilateral arrangements with large C&I customers for its pump storage hydro projects.
    Show source
    It will not be one single solution, partly on direct basis, either to DISCOMs or to central agencies and partly we will be on bilateral basis with some of these C&I customers, the large C&I customers.
  • Tata Power may have some additional quantity of cell sales for a few more quarters because certain ALMM and imported cells can be used in some open access consumer and group captive projects; it does not expect to do too much sale in subsequent quarters.
    Show source
    But other than that, we will not be doing too much sale in subsequent quarters.
  • Tata Power's solar plant has stabilized, and management expects margin consistency in this quarter.
    Show source
    Praveer Sinha: You will see that we are one of the highest in terms of margin, and you will see consistency in this quarter.
  • Tata Projects is expected to see a turnaround in its performance going forward. Replaced by a later filing.
    Show source
    And you will see a huge turnaround in the performance of Tata Projects going forward.

Orders

  • Tata Power won a bid through SECI for 1 unit of 330 megawatt at a very attractive tariff.
    Show source
    Page 5 of 20 The Tata Power Company Limited July 28, 2026 We have been fortunate to win a bid through SECI with a very attractive tariff and for 1 unit of 330 megawatt.
  • Tata Projects has a pipeline of projects for which global marquee names have given it orders.
    Show source
    And they have a very good pipeline of excellent projects, marquee names globally who have given them orders.
  • Tata Power has no new EPC order book and is completing the remaining work, most of which is almost at the completion stage.
    Show source
    Sanjeev Churiwala: No, we don't have new order book.

What it is building and selling

Projects and capacity

  • Tata Power had commissioned 200 and expects another 500 to be commissioned in the next few weeks.
    Show source
    Already 200 was commissioned and another 500 will get commissioned in the next few weeks.
  • Tata Power expects to cross 9 gigawatts by the end of this financial year, from 6.7 gigawatts currently, after adding 2.5 gigawatts.
    Show source
    We'll cross 9 gigawatts by the end of this financial year.
  • Tata Power will start work on the 1,800 megawatt Shirwata PSP in the later part of this year, subject to approvals and Board approval.
    Show source
    We will start work on the 1,800 megawatt Shirwata PSP in the later part of this year, we are in the process of getting all the approvals.
  • Tata Power commissioned 226 megawatts in the first quarter and had a line of sight for 500 megawatts where the project was almost ready, with commissioning expected in a week or 2 weeks.
    Show source
    As we speak, while in the first quarter, we have commissioned 226 megawatts, but we already have a line of sight for 500 megawatts where the project is almost ready.
  • Tata Power's 1,000 megawatts of pump storage hydro projects comprise 3 units of 334 megawatts; the first unit was tied up through a bid process on an annuity base, and Tata Power is in discussions with Tata Steel and other steel and cement industries for the other 2 units.
    Show source
    The first one we have tied up through a bid process on an annuity base.
  • Tata Power has 2,800 megawatts of pump storage projects coming up in 2029 and 2031, and expects to come out with the next set of projects in the next 12 months.
    Show source
    I think in next 12 months, we will come out with the next set of projects because we have these 2,800 megawatts, which is coming up in 2029 and 2031.
Show 20 more statements

Projects and capacity

  • Tata Power has 5.5 gigawatts in pipeline, plus solutioning along with PSP that is required.
    Show source
    We already have 5.5 gigawatts in pipeline plus some of the solutioning along with PSP that is required.
  • Tata Power's Rithala Plant was closed in 2016 and is not an operating plant; its tariff and depreciation issues have been finalized and Tata Power has made provision for them.
    Show source
    And that has now been finalized and we have made provision for that.
  • Tata Power expects to carry out virtually 2,500 megawatt of project implementation internally and maybe a little more this year.
    Show source
    Now this year, we will set up 2,500 megawatt to 2,700 megawatt.
  • Tata Power expects the Jalpura-Khurja line to be completed in the next few days.
    Show source
    One will get completed, the Jalpura-Khurja line in the next few days.
  • Tata Power expects the Bikaner-Neemrana line to be commissioned by October.
    Show source
    The other one, the Bikaner-Neemrana line will also get commissioned by October.
  • Tata Power's pumped storage projects will require substantial capacity for pumping water and bundling power.
    Show source
    Page 9 of 20 The Tata Power Company Limited July 28, 2026 So I need a huge capacity first for pumping up water and second, for bundling that power because I need to bundle that with the pumped hydro project.
  • Tata Power's pump storage project work has started and will accelerate in the coming quarters.
    Show source
    It will only accelerate in the coming quarters.
  • Tata Power's Mumbai transmission projects are under implementation after receiving regulator approval.
    Show source
    Praveer Sinha: Yes.
  • Tata Power has implemented and put in place the back-end process systems for its rooftop business.
    Show source
    And for doing that, the whole back-end process systems have been implemented and in place.
  • Tata Power has executed no major groundwork or major capex for its remaining EPC work.
    Show source
    So yes, towards the no major groundwork and no major capex now executed over there.

Demand and pricing

  • Tata Power attributes the rooftop business pricing difference to different places and module types, including supply of a large quantity of 1 kilowatt under the ULA scheme of the government and supply of higher capacity using different modules.
    Show source
    So that's why the pricing difference you are seeing.
  • Tata Power has served 40 lakh rooftop consumers in the country, compared with 250 million consumers in India.
    Show source
    Praveer Sinha: Rooftop, what we have done in the country as such is just 40 lakh consumers.
  • Renewable auctions have been muted because PPAs auctioned by central agencies such as SECI, NHPC and NTPC have not been tied up with state governments.
    Show source
    Praveer Sinha: So the renewable auctions have been muted because, as you know, there were a large number of PPAs, which were auctioned by with the central agencies like SECI , NHPC and NTPC.
  • State DISCOMs want FDRE or RTC bids rather than only solar or hybrid bids, and are issuing customized bids for state requirements instead of standard central-level bids.
    Show source
    Secondly, they now want the FDRE or RTC bids to happen and not just solar or even the hybrid that have been taking place.
  • Tata Power's rooftop costs have come down, making rooftop economically viable.
    Show source
    So it is also making economic sense.

Segments

  • Tata Power decided to repurpose its EPC workforce and EPC resources to in-house development and discontinued third-party EPC work.
    Show source
    So as a result, we have decided to repurpose our EPC workforce and EPC resources to in-house development.
  • Tata Power is avoiding arrangements with central agencies for solar, wind and hybrid projects because demand through those agencies is much less, and is directly bidding to states except for pumped hydro.
    Show source
    So we are also avoiding that sort of arrangement, and we are directly bidding to the states, except for pumped hydro, where this is a new storage solution that is being provided.
  • Tata Power is not looking to do too much with central agencies, except for pumped hydro. Replaced by a later filing.
    Show source
    But other than that, we are not looking at doing too much with the central agency.

Deals and partners

  • Tata Power is in discussions with Tata Steel and other procurers to supply the balance 2 units.
    Show source
    And for the balance 2, we are in discussions with Tata Steel and other procurers to supply to them.
  • Tata Power's supplementary PPA is based on the actual cost of coal, with all parameters, including heat rate, also based on actuals; the arrangement is cost reimbursement and cost reflective, with no margin from the plant.
    Show source
    So it's more towards cost reimbursement and cost reflective without any margin to be made from the plant.

Risks, rules and outside factors

Outside factors

  • Curtailment was roughly 5% for the industry, including Tata Power's project, in the first quarter; Tata Power expects it to settle in the next few quarters as transmission and evacuation lines progress.
    Show source
    Sanjeev Churiwala: So I think on the first question, I think when we generally look around, including our project, there's been a general curtailment of roughly about 5%.

Rules and policy

  • The ALMM-II proviso is not moving the needle or having any impact as far as Tata Power is concerned.
    Show source
    And that is not actually moving the needle or having any impact as far as we are concerned.
  • Tata Power does not expect any major changes in the Indonesian coal market because of the new regulations; KPC was the first to comply with the requirement to supply the domestic market before exporting.
    Show source
    So we are not expecting any major changes to happen in the Indonesian coal market because of the new regulations.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Mohit Kumar: Understood. My second question, is it possible to quantify your losses due to curtailment in this quarter? And what do you make of the transmission bottlenecks for Page 8 of 20 The Tata Power Company Limited July 28, 2026 your projects? Are you seeing progress on the transmission project, which can be in the curtailment and also ensure that our RE projects get commissioned on time?

    Answer, sanjeev churiwala

    Sanjeev Churiwala: So I think on the first question, I think when we generally look around, including our project, there's been a general curtailment of roughly about 5%. And that we think is also the industry trend. But given that a lot of transmission lines and evacuation lines are in fast progression, we think that this curtailment will settle in, in the next few quarters. But yes, I think for the first quarter, generally, this has been an overall pain for the industry. On the RE perspective, I think we have made a good progress when it comes to land and connectivity that's there. As we speak, while in the first quarter, we have commissioned 226 megawatts, but we already have a line of sight for 500 megawatts where the project is almost ready. We are just in the final phase that will happen in a week or 2 weeks.

    Answer, sanjeev churiwala

    So I think quarter 2 will see a huge and big ramp-up in our commissioning.

    Answer, praveer sinha

    Praveer Sinha: So the renewable auctions have been muted because, as you know, there were a large number of PPAs, which were auctioned by with the central agencies like SECI , NHPC and NTPC. Those have not been tied up with the state governments. And now there is a growing awareness amongst state DISCOMs that they should do bidding themselves rather than having a central agency. Secondly, they now want the FDRE or RTC bids to happen and not just solar or even the hybrid that have been taking place. So they are now coming out with much customized bids for the state's requirement rather than standard bids that used to take place at the central level. So you will see that sort of -- secondly, there are a large number of projects which are coming up like we are coming up with pump storage. Page 9 of 20 The Tata Power Company Limited July 28, 2026 So I need a huge capacity first for pumping up water and second, for bundling that power because I need to bundle that with the pumped hydro project.

    Answer, praveer sinha

    So there will be a lot of similar type of investments that will come up rather than the pure vanilla solar or wind or even hybrid projects, which were coming up by the states -- by the central government agencies.

  2. Question

    Sumit Kishore: Sure. In relation to your pump storage hydro projects, would you look to tie them up into long-term contracts in terms of rupees million per megawatt per month or would you try to fashion something around feeding it renewable power and structuring it to sell on some bilateral arrangement?

    Answer, praveer sinha

    Praveer Sinha: So it will be a mix of that. Right now, like for 1,000 megawatts, there are 3 units of 334 megawatts. The first one we have tied up through a bid process on an annuity base. And there are another 2 which we are in discussions with industries. So one is with Tata Steel, the others are a number of other steel and cement industries who are in discussions. So I think we will see that it will be a mix and match. It will not be one single solution, partly on direct basis, either to DISCOMs or to central agencies and partly we will be on bilateral basis with some of these C&I customers, the large C&I customers.

  3. Question

    Sumit Kishore: Got it. Just one last clarification. In your cluster -wise results, when I look at TBCB projects line item, the EBITDA margin, which is implied is just 13% for Q1 FY27. Typically, TBCB projects should have much higher EBITDA margin given the asset profile and the depreciation that comes below the EBITDA line. What am I missing here?

    Answer, sanjeev churiwala

    Sanjeev Churiwala: So yes. It's a good observation, but I think the context is slightly different. For us, when we look at TBCB, right now, all our TBCB are under construction, right? So the revenues in the PAT are more from a lease accounting perspective rather than the actual sharing of EBITDA. The actual EBITDA that comes to us is from a regulatory business, which is MO transmission, which is again a regulated business. So over there, we look at from a return perspective. And then we have a share of profit from some of the transmission assets that we have in the resurgent platform.

    Answer, sanjeev churiwala

    So I think we'll have to look at from that different perspective. Each of the 3 cannot be p ut together in the same bucket. We can, if required, share separately with you to get the context. Page 10 of 20 The Tata Power Company Limited July 28, 2026 Sumit Kishore: Okay.

  4. Question

    So none of the TBCB projects is commissioned now and is contributing on a line-by-line basis as it would normally do?

    Answer, sanjeev churiwala

    Sanjeev Churiwala: Yes. So you will start seeing that commissioning happening from quarter 2 onwards. So the revenues -- 2 projects will get commissioned in H2 -- in quarter 2 and then next is quarter 3, quarter 4. So those revenues and the EBITDA and the PAT will start flowing in. As of now, we don't have the pure-play EBITDA and PAT from TBCB is more about construction revenue booking.

    Answer, praveer sinha

    Praveer Sinha: Yes. We have quite a few sites where we have the water reservoir. We are carrying out the DPR of some of those projects. I think in next 12 months, we will come out with the next set of projects because we have these 2,800 megawatts, which is coming up in 2029 and 2031. We want to have gaps for their implementation so that the implementation focus is there, and we are able to execute these projects on time and cost.

  5. Question

    Apoorva Bahadur: Understood. We'll look forward to that. Secondly, sir, there was also this ALMM-II implementation and then rollback, which happened during the quarter. towards the end of it. Sir, how do you see this? I mean, does this have any impact on the realizations which DCR manufacturers were charging given that there's a 6-month delay now? And secondly, how does this policy sort of flip flop impact maybe industry's commitment towards investing in the in building out ingot and wafer capacity for ALMM-III?

    Answer, praveer sinha

    Praveer Sinha: So it is not that there is a rollback. The ALMM-II continues to be there for rooftop and utility scale projects. This is only a special proviso which has been made for projects which have very limited open access arrangements or are behind the meter. So I would say that this whole thing is a very small component of the overall utilization, which has to be done under DCR. So it would be maybe 10% of the total requirement. So I think majority continues to be under the ALMM-II arrangement. And that is not actually moving the needle or having any impact as far as we are concerned.

  6. Question

    Apoorva Bahadur: Okay. Sir, also, when I see your rooftop business, and you had shared a lot of granular data over there. So for example, in this quarter, the revenue billed and the total watt- peak installed, right, if I calculate, I believe the realization is about INR 36, INR 37 per watt-peak. Now when I compare that with the order inflow, on the same metric, it comes to around INR 28 per watt-peak. So how should we decipher this? Is this a decline in realization or there's some other nuance in accounting and billing that we are missing?

    Answer, praveer sinha

    Praveer Sinha: He's saying that, we are implying a reduction in realization for rooftop.

  7. Question

    So the revenue we billed for rooftop business this quarter was about INR 1,350 crores and the megawatt installed was around 371. The order inflow, so that is about INR 36 per watt-peak of realization. The order inflow, which we have depicted in the slide is about INR 1,091 crores and 387 megawatts. So that's about INR 28 per watt-peak. So is it just the change in realization or is it when we actually build there is an additional margin, which is available, which we're not capturing in the order inflow?

    Answer, praveer sinha

    Praveer Sinha: No, there are 2 parts of this. One is different places. So 1 kilowatt, we supply a large quantity under the ULA scheme of the government. So that's a different type of modules. Then you have other places where you supply a higher capacity, different modules. So we need to look at it whether they are 450 square mm modules of 580 or 630 and all that. So that's why the pricing difference you are seeing.

    Answer, praveer sinha

    So average will be very, very wrong interpretation of what sort of realization.

  8. Question

    Apoorva Bahadur: Understood, sir. Understood. Sir, also, if I may ask about the coal business profitability, we are seeing it has started improving due to the increase in international coal prices. Can you give us some sort of guidance on the trend that you're seeing in terms of Page 12 of 20 The Tata Power Company Limited July 28, 2026 Indonesian coal prices going ahead given the on-off situation in Hormuz? And also about this change in export -- coal export regime in Indonesia, if that has any impact on our ability to export or the prices?

    Answer, praveer sinha

    Praveer Sinha: So one is that coal prices have gone up, but not very much. I would say about 5% to 7%. So in that range, the coal price increase. And we don't expect too much of changes happening. But yes, up to 5% over the next 9 months, you can expect. Secondly, we do not expect or have seen any impacts per se. Of course, there are certain conditions that you need to first supply for domestic market.

    Answer, praveer sinha

    And after meeting the domestic obligation only you can export it. So those are the type of requirements. Fortunately, the KPC is the first one to have complied with that requirement. So we are not expecting any major changes to happen in the Indonesian coal market because of the new regulations.

  9. Question

    Apoorva Bahadur: Okay. Sir, lastly, if I can ask about the breakdown for capex in this quarter between, say, renewables, distribution business and pump storage?

    Answer, sanjeev churiwala

    Sanjeev Churiwala: Almost 40% to 45% will be going in renewables and the remaining in other businesses. Of course, the PSP, the work has started. It will only accelerate in the coming quarters. But yes, you can assume in our quarter 2 also, we're kind of looking at a capex plan of probably higher than INR 6,000 crores. Maybe if everything goes well, it will be closer to INR 6,500 crores. Almost half of that will go in the renewable business because as we mentioned, we're trying to commission almost 800 megawatts to 900 megawatts in quarter 2. So that will consume a lot of capex.

    Answer, sanjeev churiwala

    PSP work is also accelerating, we'll be putting there. Plus, we already have in the pipeline that 2,000 kilometre plus of transmission. So a good amount of capex will also go over there.

  10. Question

    Apoorva Bahadur: Sure, sir. Very helpful. And sir, our Mumbai transmission plan has been approved by the regulator?

    Answer, praveer sinha

    Praveer Sinha: Yes. So the whole lot of projects are under implementation. So what happens is every year, we get large number of approvals, and they keep on getting accrued and getting implemented based on the timeline of the network.

Show 10 more questions
  1. Question

    You've taken some strategic calls, including leaving the PSP untied is now paying dividends from higher realization. But on rooftop specifically, you've been bullish. Just trying to understand this market has been growing at a very strong pace consistently quarter-on-quarter for past few quarters. Whereas initially, it seemed like it was less than 3-kilowatt segment. Where are you seeing this growth? And I believe you in annual reports have been talking about INR 30,000 crores of rooftop revenue for you by 2030. I'm not sure if we read it correctly. But where do you see this rooftop going for you for the industry? Because it has negative implication for some of the other businesses which can

    Answer, praveer sinha

    Praveer Sinha: Rooftop, what we have done in the country as such is just 40 lakh consumers. India has 250 million consumers, 25 crore consumer. So the market potential is humongous. And this is a product which is going to the poorest of the poor to take 1 kilowatt unit. And then it goes to others who take 2, 3, 5, 10, 20, and this is a phenomenal product in terms of giving independence to people to generate their power. And now that we are giving them battery also, so it makes them self-sufficient in terms of their power requirement. The cost has come down.

    Answer, praveer sinha

    So it is also making economic sense. It is good for the environment. So, my feeling is that what we have given cumulative INR 30,000 crores is possibly a little less. We have been growing at a very, very high pace. Last to last year, we were INR 2,300 crores. Last year, we did INR 4,800 crores. This year, you can imagine what sort of -- so I think we will cross cumulative INR 30,000 crores maybe in 2029 itself, not in 2030.

    Answer, praveer sinha

    So that's where -- and you see the type of growth. Every month, I'm seeing that it is becoming better than the previous month. So I think there is a huge potential. We are the biggest in the market. We have -- we command premium in the market. And we have developed the whole supply chain, channel partners, after-sales service, the digital solutions that we provide. So no one can match us in this rooftop.

  2. Question

    Satyadeep Jain: Mr. Sinha, if you look at quadrupling compared to more than quadrupling, so basically, what you're suggesting is by 2029, 2030, keeping battery aside, I know battery is also going to be some component, but we're looking at 40 gigawatt -- 30 gigawatt, 40 Page 14 of 20 The Tata Power Company Limited July 28, 2026 gigawatt of annual rooftop installation. Is that what -- because that's how you get to with your market share of 20%. Is that kind of market is what you're foreseeing by 2029, 2030 for the industry as a whole?

    Answer, praveer sinha

    Praveer Sinha: I will also increase my market share from 12%, 13%, I will become 25%. So I will be one of the biggest in the market and by a huge margin. In fact, the number 2 in the market is just 2%. So -- and this is a cash and carry business. So I think we'll be one of the biggest -- 2 years back, I used to do 1,000 units a month. Now I do 30,000 units a month. So there is a huge change that has happened.

    Answer, praveer sinha

    And for doing that, the whole back-end process systems have been implemented and in place. So I think this will be a game changer going forward, not only for us, but also in the country in terms of how power will be produced etc. Satyadeep Jain: And does it not bother you for -- if, let's say, rooftop grows so phenomenally for the next 3 years...

  3. Question

    Satyadeep Jain: Just a follow-up and just one on transmission that 2.5 gigawatt, what kind of visibility do you have for transmission connectivity this year. But rooftop, does it bother you about your distribution and IPP business if we see such phenomenal growth? Those are the questions?

    Answer, praveer sinha

    Praveer Sinha: So those are -- in 10 years, those are certain changes which will happen in the market. So one has to be ready for those. But you will still require the distribution network, you will still require devices, you will still require technology for managing multiple supplies and multiple usage of that power. So the nature of business will definitely undergo. You come and spend some time with me. I'll tell you what will happen in detail.

    Answer, sanjeev churiwala

    We already have 5.5 gigawatts in pipeline plus some of the solutioning along with PSP that is required. We'll put in a lot of amount of effort on that. So as a result, we have decided to repurpose our EPC workforce and EPC resources to in-house development. So we have discontinued doing the EPC third party. So per se, last -- previous year, we were doing some EPC work. We had about INR 100-odd crores of PAT coming through that. But this year, we are kind of wrapping up some of the remaining work.

    Answer, sanjeev churiwala

    And as a result, we have booked some losses. So the slide that you see, 48 is a combination of solar rooftop plus solar EPC. If you take out the EPC separately. EPC we have stopped. So on a like-for-like basis, yes, from a previous base, usually remove INR 100-odd crores of PAT. Anuj Upadhyay: Okay. So there -- sir, or do we still have some kind of a portion in the order book left as on date?

    Answer, sanjeev churiwala

    Sanjeev Churiwala: No, we don't have new order book. We're just completing whatever the remaining work is there. And of course, most of them are almost in the completion stage. This is the performance reviews, some large spending work in terms of punch points, final bidding, final collections. So yes, towards the no major groundwork and no major capex now executed over there. It's just completing the remaining work.

  4. Question

    Anuj Upadhyay: Sir secondly is on the TP solar, our manufacturing business, where because of the change in the clientele mix, I believe this quarter, we did a lot of third-party sale. Our margin escalated significantly. So how should we look at this? I mean like that was a quarterly event or going ahead as well, we will be having a similar kind of sales mix for the segment?

    Answer, praveer sinha

    Praveer Sinha: It was a very small quantity, not that we take a very large quantity of sale of cell. So typically, what happens is you have orders for module and some of them are DCR, some of them you can do with imported cell. So in those cases, we have some of our own manufactured cell, which is available, and we take that market benefit. But -- it's not that there is a large quantity. And going forward, it may be there for a few more quarters where we may have some additional quantity of sale because there is still certain ALMM, certain imported cells you can use in some of the projects like open access consumers and group captive. But other than that, we will not be doing too much sale in subsequent quarters. Page 16 of 20 The Tata Power Company Limited July 28, 2026 Anuj Upadhyay: Okay.

  5. Question

    Anuj Upadhyay: Okay. Sir, this was a follow-up question, sir, on previous participants where you mentioned that the discussion to do away with the intermediaries like SECI in signing new PPAs. So as a strategy going ahead, are we focusing more on signing PPAs towards C&I and data centers or even on a DISCOM side, probably we can have a more bilateral discussions in signing a PPA? How exactly we are looking at it?

    Answer, praveer sinha

    Praveer Sinha: Right now, what we are seeing is solar and wind or even for that matter, hybrid projects, the demand through the central agencies is much less. So we are also avoiding that sort of arrangement, and we are directly bidding to the states, except for pumped hydro, where this is a new storage solution that is being provided. But other than that, we are not looking at doing too much with the central agency.

    Answer, praveer sinha

    Praveer Sinha: So presently, the supplementary PPA is on actual cost of coal, and all parameters, including heat rate, also will be on actual. So it's more towards cost reimbursement and cost reflective without any margin to be made from the plant. So that's the type of arrangement, overall arrangement that we have. Bharani: So how is this different or how was this different earlier under the supplement -- sorry, Section 11 mechanism, say, 1 or 2 years back?

    Answer, praveer sinha

    Praveer Sinha: So Section 11 also gave you cost reflective, but it also protected your fixed cost to the extent. Here, the fixed cost is also on a normative basis so that you do not lose money, but also that there is no return on equity that you will get. Page 17 of 20 The Tata Power Company Limited July 28, 2026 Bharani: So how much would be the fixed cost per unit right now in this plant?

    Answer, praveer sinha

    Praveer Sinha: I didn't say that. I said fixed cost is covered, but it is cost reflective. That means whatever is your fixed cost for operating the plant, you will get that paid, but you will not get a return on equity. Bharani: Sorry, yes, that's what I meant. Okay. That clarifies.

    Answer, praveer sinha

    Praveer Sinha: Yes. As I mentioned to you, typically, in summer months, you have very large consumption and you do the billing after the end of the month and it comes after a month. So that's why your collection during that month is a little less. So just for example, June, I will collect what I billed in May. But June, there's a huge billing that takes place and that only I will get in July. So if you look on a 12-month basis, you will find that we are on track. But if you look at on just a quarterly basis, and this is true for all these throughout the year, winter months, you will have very less.

    Answer, praveer sinha

    So you will -- it will not be again reflective. So I think you need to look at it on a 12-month cycle, and you will see that we are very much on track.

  6. Question

    Uma Menon: Understood, sir. My second question is on the Rithala Plant. I see that it's not listed in the capacity this quarter. Any particular reason why, sir?

    Answer, praveer sinha

    Praveer Sinha: Rithala Plant was closed a long time back in 2016. So that's why it's not an operating plant. It had issues on tariff and its depreciation issues and all that. And that has now been finalized and we have made provision for that.

  7. Question

    So if you can give us a breakup of that number of INR 2,732 crores of top line and INR 225 crores of PAT, how much came from the coal and how much the losses from Mundra?

    Answer, sanjeev churiwala

    Sanjeev Churiwala: We don't give a separate split here, but we can get in touch with you through Anshul separately and give you some breakups. But suffice to say that the increase in the PAT that you see is because of a higher share of coal profits.

  8. Question

    Sagar Parekh: But Mundra would be under losses, right? You have to say that?

    Answer, sanjeev churiwala

    Sanjeev Churiwala: Mundra, yes, depending upon the quarter, as Dr. Sinha already said, the way the SPPA is devised that you kind of get your coal pass-through plus you get your fixed cost. And of course, to that extent, there will be some under recovery. But the effort is to kind of ensure that we don't lose anything on the ROE perspective.

  9. Question

    Sagar Parekh: So my question was your overall volumes in modules and cells have been declining Y- o-Y. How should we read into this for the full year? And secondly, in terms of margins in TP solar, you are at about 25%, 26% margins. Now I understand that in the next 6, 8 months, a lot of capacities are coming up across the industry. So how do you read the margin scenario going forward? Will the supply -- demand supply...

    Answer, praveer sinha

    Praveer Sinha: There are 2 parts of it. One is that the modules production has increased. For the first time, we have crossed 1,000 megawatt in the quarter. Secondly, the cell has reduced because there was a line change that happened. But you have to look at it from -- one is cost of production and the efficiency that has come. The second is also the products that we are making is having higher efficiency. Page 19 of 20 The Tata Power Company Limited July 28, 2026 So because of that, there was a little bit of a sacrifice on the yield, and that is why -- and when you have higher efficiency of the cell, then you can command a premium on that.

    Answer, praveer sinha

    So that's how the margin is there. We are trying to ensure that our -- both yield as well as efficiency now peaks and possibly in quarter 2, you will see that sort of result.

  10. Question

    Sagar Parekh: And in terms of margins overall for the industry and for you also, we are at about 25% broadly for TP Solar, and it has been consistently doing well since last 2, 3 quarters. How do you read this as new capacities come in?

    Answer, praveer sinha

    Praveer Sinha: You will see that we are one of the highest in terms of margin, and you will see consistency in this quarter. Now that the plant has stabilized, you will see that. I know that we are rushing through it because we have another meeting at 12. But all those, if you have any further queries, please get in touch with Anshul and Kasturi, and we'll respond to you with all details. We've made this time the presentation, more details have been provided, but we do look for your feedback. If anything extra is required, we can provide. So thank you, everyone.

Questions about this call

When was the Tata Power Company Q1 FY24 earnings call transcript filed?
Tata Power Company filed the transcript with the exchange on 31 Jul 2026. This page is built from that transcript.
What does this page list?
75 statements from the transcript across 10 topics, 43 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 20 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
Tata Power Company Q1 FY24 concall: Tata Power won a bid through SECI for 1 unit of 330 megawatt at a very attractive tariff · DalalOS