Ambuja Cements’ WHRS and solar power would provide 60% of the power requirements of the planned 140 million tons through green power; on clinkerisation, the share of green power would rise to 83%. The company secured 631 million tons of new limestone reserves in this quarter. Ambuja Cements, ACC Ltd. and Sanghi Industries Ltd. achieved consolidated quarterly revenue of INR 9,329 crores, with blended cements at 82% and premium products as a percentage of trade sales volume increasing by 400 bps to 26 percentage in the quarter ended 31st December 2024. The company is nearing 27% premium products share of the trade. Ambuja Cements, ACC Ltd. and Sanghi Industries Ltd.’s consolidated cash and cash equivalents stood at INR8,755 crores as on December 31.

The numbers management gave

Results

  • Ambuja Cements, ACC Ltd. and Sanghi Industries Ltd. achieved consolidated quarterly revenue of INR 9,329 crores, with blended cements at 82% and premium products as a percentage of trade sales volume increasing by 400 bps to 26 percentage in the quarter ended 31st December 2024.
    Show source
    The consolidated quarterly Y-o-Y performance, we achieved a revenue of INR 9,329 crores, driven by strong focus on micro market management strategy, expansion of dealer network, blended cements at 82%, increase in premium products as a percentage of trade sales volume by 400 bps to 26 percentage.
  • Ambuja Cements, ACC Ltd. and Sanghi Industries Ltd.’s operational costs were INR 4,618 per ton in the quarter ended 31st December 2024.
    Show source
    Page 2 of 20 Ambuja Cements Ltd., ACC Ltd. and Sanghi Industries Ltd. January 29, 2025 Operational costs for the quarter is at INR 4,618 per ton.
  • Ambuja Cements, ACC Ltd. and Sanghi Industries Ltd.’s energy cost declined 7% in the quarter ended 31st December 2024 owing to better fuel management and strong focus on green power.
    Show source
    This is driven by a 7% decline in energy cost owing to better fuel management and strong focus on green power.
  • Ambuja Cements, ACC Ltd. and Sanghi Industries Ltd.’s kiln fuel costs reduced by 10% to INR1.66 from INR1.84 per 1,000 kilocal in the quarter ended 31st December 2024.
    Show source
    The kiln fuel costs reduced by 10% to INR1.66 from INR1.84 per 1,000 kilocal.
  • Ambuja Cements, ACC Ltd. and Sanghi Industries Ltd.’s transportation costs declined by 6% to INR1,239 per ton in the quarter ended 31st December 2024 on account of footprint optimization.
    Show source
    The transportation costs declined by 6% at INR1,239 per ton on account of footprint optimization.
  • Ambuja Cements, ACC Ltd. and Sanghi Industries Ltd.’s direct dispatch to customers increased by 700 bps to 57% in the quarter ended 31st December 2024.
    Show source
    Direct dispatch to customers increased by 700 bps to 57%.
Show 26 more statements

Results

  • Ambuja Cements, ACC Ltd. and Sanghi Industries Ltd. achieved EBITDA of INR1,712 crores, a margin of 18.4% and EBITDA per ton of INR1,038 in the quarter ended 31st December 2024, with improvements on the cost front.
    Show source
    With improvements mentioned on the cost front, EBITDA stood at INR1,712 crores at a margin of 18.4% and EBITDA per ton of INR1,038.
  • Ambuja Cements, ACC Ltd. and Sanghi Industries Ltd. reported consolidated 9 months Y-o-Y revenue of INR25,156 crores, operational cost of INR4,520 per ton, EBITDA of INR4,103 crores, an EBITDA margin of 16.3% and EBITDA per ton of INR881.
    Show source
    The consolidated 9 months Y-o-Y performance, the revenue at INR25,156 crores, operational cost at INR4,520 per ton, EBITDA stood at INR4,103 crores and a margin of 16.3% and EBITDA per ton at INR881.
  • Ambuja Cements’ power and fuel costs decreased 7% to INR1,262 per ton in Q3 FY '25 from INR1,355 per ton in Q3 last year, driven by better fuel management and structural initiatives including a better fuel mix and increased share of green power.
    Show source
    Driven by better fuel management and structural initiatives, our power and fuel costs have decreased 7% to INR1,262 per ton in Q3 FY '25 from INR1,355 per ton in Q3 last year.
  • Ambuja Cements’ share of green power in its power mix increased to 21.5% from 15.8%.
    Show source
    The share of green power in power mix has increased to 21.5% from 15.8%.
  • Ambuja Cements’ logistics costs were reduced by 6% to INR1,239 per ton in Q3 FY '25 from INR1,322 per ton in Q3 FY '24 because of its logistics initiatives.
    Show source
    Because of these initiatives, our logistics costs have been reduced by 6% to INR1,239 per ton in Q3 FY '25 from INR1,322 per ton in Q3 FY '24.
  • The company used 4.8 million tons of waste-derived resources in Q3, which otherwise would have been dumped into the environment.
    Show source
    In Q3, we used 4.8 million tons of waste-derived resources, which otherwise would have been dumped into the environment.
  • Ambuja Cements' overall volume grew by 17% in the quarter ended 31st December 2024, including about 1.4 million tons from Sanghi and Penna.
    Show source
    Overall, I think our volume has grown by 17%.
  • The MSA volumes for the quarter ended 31st December 2024 were about 4.5 million tons overall, more or less equally divided between ACC and Ambuja.
    Show source
    So, the MSA volumes for this quarter were total about 4.5 million tons overall, more or less equal for both the companies.
  • Sanghi's cement utilization was 37% in the quarter ended 31st December 2024, compared with 22% in the same quarter last year and 23% in the sequential previous quarter.
    Show source
    The 37% is the Sanghi cement utilization for this quarter, which was 22% same quarter last year.
  • Penna's clinker utilization was 78%, while its cement utilization was below 40%.
    Show source
    And Penna, I like to mention what my colleague, Vinod, just mentioned, the clinker utilization of Penna is as high as 78% already.
  • Sanghi's cost is at least 10% to 15% higher than Ambuja's cost, and Ambuja expects the per-ton cost of Sanghi and Penna to reduce by 10% to 15%, possibly 15%.
    Show source
    So, we expect 10% to 15% -- 15% maybe reduction in the cost of both the companies on a per ton basis.
  • The cost is closer to INR4,600, with an end state of INR3,700, INR3,650-odd.
    Show source
    It's closer to INR4,600 and end state is INR3,700, INR3,650-odd.
  • One acquired asset is operating below 40% and another below 50%; ramping both to 80% is expected to reveal the cost numbers discussed.
    Show source
    Currently, one asset is sub-40%, one asset is sub-50%.
  • Ambuja Cements’ overall lead reduced by 4Km, from 289 km to 285 km.
    Show source
    Overall, lead distance reduced by 4 kilometers to 285 kilometers.
  • The incentive for the previous period in the previous quarter related to Sankrail; the current-period incentive related to Himachal, as disclosed in the financial statement notes.
    Show source
    This time, it is for the Himachal, which is disclosed in the notes of the financial statements as well.

Money and capital

  • Ambuja Cements, ACC Ltd. and Sanghi Industries Ltd.’s consolidated cash and cash equivalents stood at INR8,755 crores as on December 31.
    Show source
    As on December 31, the consolidated cash and cash equivalents stood at healthy INR8,755 crores.
  • Ambuja Cements’ tangible assets were almost 75% of its net worth, and cash and cash equivalent comprised 15% of its net worth.
    Show source
    Ambuja's tangible assets, most importantly, out of this net worth, the tangible assets are almost 75% of the net worth and in our press release also, we have highlighted 15% of this net worth is comprised of cash and cash equivalent.
  • The company consolidated had an incentive bucket of almost INR4,500 crores to be received in due course.
    Show source
    Even as we speak, for example, like as an Ambuja consol, we are sitting on a larger incentive bucket of almost INR4,500 crores to be received in due course.
  • The company expects to spend INR2,000 crores to INR2,500 crores on capex in the March quarter, with facilities including Sankrail, Bhatapara, Marwar, Sindri and Salai Banwa in their last leg.
    Show source
    So almost INR2,000 crores to INR2,500 crores will be for the March quarter.
  • The expected outgo for Orient is around INR4,000-odd crores.
    Show source
    On the first question, Prateek, in terms of the expected outgo for Orient, that is ballpark around INR4,000-odd crores, which will be there.
  • Around INR1,000 crores between the two entities is needed for various initiatives, and this is in the cash flow plan going forward.
    Show source
    So, I would say a ballpark figure of closer to INR1,000 crores between the 2 entities in various initiatives is what is needed, which is very much in our cash flow plan going forward.
  • Ambuja Cements' tangible net worth was closer to INR43,000 crores, almost 73% of its overall net worth; it was represented by cash and cash equivalents of almost INR10,135 crores, PPE of almost INR29,000 crores and NWC close to INR4,000 crores.
    Show source
    I'm glad to share that we have achieved a net worth of almost INR63,000 crores, which was in April INR51,000 crores, so almost up by INR12,000 crores.
  • Ambuja Cements' capex was almost INR5,000 crores, its investment primarily in Penna was INR7,800 crores, dividend outgo was around INR560-odd crores, and changes in net working capital were close to INR4,000-odd crores.
    Show source
    I think our number for the full year should be around INR6,800 crores to INR7,000 crores.
  • The company remained nil debt and had the highest rating of AAA.
    Show source
    And we remain nil debt and with the highest rating of AAA.
  • The company said that incentive cash flows were coming back to the balance sheet, releasing working capital that had been blocked.
    Show source
    And likewise, the good thing is that at least these cash flows are now coming back to the balance sheet, which were lying somewhere, the working capital was getting blocked.
  • Ambuja Cements’ higher cash outgo resulted from its announced long-term strategic plan. Replaced by a later filing.
    Show source
    This has also resulted into higher cash outgo as informed above.

What it expects ahead

What management expects

  • Ambuja Cements’ WHRS and solar power would provide 60% of the power requirements of the planned 140 million tons through green power; on clinkerisation, the share of green power would rise to 83%.
    Show source
    Both WHRS and solar power would ensure that 60% of our power requirements are -- of the planned 140 million tons would be through green power.
  • Ambuja Cements’ green power plan would help reduce power cost by around INR100 per ton by FY '28.
    Show source
    This would help in reducing the power cost by around INR100 per ton by FY '28.
  • Ambuja Cements’ new capacities, almost 45-50% of its current base, will be highly efficient in capex, opex, green power and railway infrastructure, and organic growth will help increase market share and support its cost leadership journey.
    Show source
    The organic growth will not only add to the overall capacity but also help us increase our market share and foremost be great in terms of adding in our cost leadership journey since the new capacities, which is almost 45-50% of our current base, will be highly efficient in capex, opex, green power and railway infrastructure.
  • The company stated a cost reduction target of INR530 per ton in December 2023 and aspires to reach INR3,650 per ton by FY '28.
    Show source
    In December 2023, if you remember, we have indicated a cost reduction target of INR530 per ton, wherein we aspire to achieve and reach to INR3,650 per ton by FY '28.
  • Sanghi and Penna are expected to reach utilization levels above 70% in the next financial year as the assets ramp up and cost-reduction initiatives take effect.
    Show source
    But both of them should hit 70% plus utilization levels in the next financial year.
  • Sanghi's assets were expected to reach almost 80% to 85% utilization by March end after repairs and maintenance.
    Show source
    But I'm very confident that with all these repairs and maintenance, which was very much needed, I think by March end, these assets should start delivering almost 80%, 85% utilization.
Show 10 more statements

What management expects

  • Incentives were historically around INR100-odd crores per quarter, almost INR400 crores for a year, and were expected to increase to INR600 crores to INR650-odd crores prospectively as new capacities came in and provided incentive benefits.
    Show source
    But this will actually now start moving up to INR600 crores, INR650-odd crores prospectively with new capacities coming in and giving the benefit of incentives.
  • Ambuja Cements' end-state target is to reduce total cost to about INR3,700-3,800 over the next couple of years.
    Show source
    So, I think increasingly, what Vinod mentioned in the beginning, our end-state target is to drop down the total cost to about INR3,700-3,800 over the next couple of years, that's the target.
  • The company expects to reach 83% green and reduce its power cost to INR3.50.
    Show source
    That will reduce my power cost to INR3.50.
  • The company expects a cost reduction of about INR100 next year and another INR150 the following year, with a large part of the cost benefit arriving when coal mines start coming in.
    Show source
    Ajay Kapur: I think if I'm looking at, you can say about INR100 next year, another INR150 following year.
  • With more units, Ambuja Cements Limited expects logistics cost savings of INR100 around 2026, '27, based on logistics cost of INR4 per kilometre for 100 kilometres.
    Show source
    So, if you take another INR100 from there, so I think a large part of it will come around 2026, '27.
  • When captive coal mines come in, Ambuja Cements Limited expects a drop of INR0.30 to INR0.40 in coal cost and sizable savings.
    Show source
    The years when they come, you suddenly see a drop of INR0.30, INR0.40 in the coal cost.
  • The company expects benefits from investments to yield cost savings progressively, with benefits from railways, renewable capacities, WHRS and AFR laid out over the next 2 to 3 years; captive coal is expected to have a major impact when the coal mines start supplying it.
    Show source
    Vinod Bahety: But good thing is, Sumangal, that this will be progressive, like so every passing quarter, you will find the benefits of these investments yielding the savings on the cost, and we are going to be more highlighting it with each of the press releases.
  • A higher share of coal from Ambuja Cements’ captive mines and the opportunity to buy imported pet coke will further lower its fuel cost.
    Show source
    A higher share of coal from captive mines and the opportunity to buy imported pet coke will further lower our fuel cost.
  • The company will continue to grow at a faster speed than the industry. Replaced by a later filing.
    Show source
    Ambuja Cements will continue to grow at a faster speed than the industry.
  • The pace of capex at Ambuja Cements has increased, which will help achieve targeted growth ahead of time. Replaced by a later filing.
    Show source
    The pace of capex has increased, which will help to achieve targeted growth ahead of time.

What it is building and selling

Projects and capacity

  • The company secured 631 million tons of new limestone reserves in this quarter.
    Show source
    631 million tons of new limestone reserves were secured by us in this quarter.
  • Ambuja Cements’ total capacity is expected to hit 104 million tons by Q4 FY '25 with Orient acquisition at advanced stage.
    Show source
    With Orient acquisition at advanced stage, the total capacity by Q4 FY '25 to hit 104 million tons.
  • The company commissioned 8 new ready-mix plants in Q3 FY '25, reaching 100 ready-mix plants.
    Show source
    We have commissioned 8 new ready-mix plants in Q3 FY '25 thereby reaching a milestone of 100 ready- mix plants.
  • The company plans to expand its cement capacity to 140 million tons by FY '28.
    Show source
    As we plan to expand our cement capacity to 140 million tons by FY '28, we are pacing well to achieve the stated target.
  • Ambuja Cements’ grinding unit at Salai Banwa in Uttar Pradesh is to be commissioned in Q1 FY '26.
    Show source
    The grinding unit of Salai Banwa in Uttar Pradesh to be commissioned in Q1 FY '26.
  • Ambuja Cements’ brownfield expansions of the Bathinda grinding unit in Punjab and Marwar grinding unit in Rajasthan are to be commissioned in Q2 FY '26.
    Show source
    And the brownfield expansion of Bathinda grinding unit in Punjab, Marwar grinding unit in Rajasthan to be commissioned in Q2 FY '26.
Show 25 more statements

Projects and capacity

  • Ambuja Cements’ Kalamboli unit expansion in Maharashtra, Dahej grinding unit expansion in Gujarat, Jodhpur Penna grinding unit and Krishnapatnam grinding unit are to be commissioned in Q3 of FY '26.
    Show source
    The Kalamboli unit expansion in Maharashtra and Dahej grinding unit expansion in Gujarat, Jodhpur Penna grinding unit, Krishnapatnam grinding unit to be commissioned in Q3 of FY '26.
  • Ambuja Cements’ 4-million-ton clinker line in Bhatapara had overall project progress of 78%, with all major equipment received at the site and erection in progress; expected completion is Q4 FY '25.
    Show source
    For all the new facilities of 4-million-ton clinker line in Bhatapara, the overall project progress is at 78%.
  • Ambuja Cements’ corresponding grinding units at Farakka and Sankrail in Bengal had overall project progress of 87% and 82%, respectively.
    Show source
    For its corresponding grinding units at Farakka and Sankrail in Bengal, the overall project progress is at 87% and 82%.
  • The company expects completion of its 2.4 million ton grinding unit at Salai Banwa in UP by Q1 FY '26; 50% of civil work had been completed and 47% delivery of major equipment had been received at the site.
    Show source
    We expect completion by Q1 FY '26.
  • Major equipment ordering for Ambuja Cements’ roller press at Bathinda grinding unit, fly ash grinding and blending system at Kalamboli and grinding unit at Dahej in Gujarat has been completed, and all 3 projects are under execution.
    Show source
    Major equipment ordering for roller press at Bathinda grinding unit, fly ash grinding and blending system at Kalamboli and grinding unit at Dahej in Gujarat has been completed and all the 3 projects are under execution.
  • Ambuja Cements’ WHS capacity is 197 megawatts.
    Show source
    Currently, the WHS capacity is at 197 megawatts.
  • Ambuja Cements’ previously announced investment in 1,000 megawatts RE is expected to be commissioned by FY '26.
    Show source
    We had earlier announced our investment in 1,000 megawatts RE, which is expected to get commissioned by FY '26.
  • The company won bids for another 2 mines in MP and Karnataka having reserves of 631 million tons to secure limestone supplies in Q3 FY '25.
    Show source
    To secure our limestone supplies in Q3 FY '25, we have won bids for another 2 mines having reserves of 631 million tons, one in MP and one in Karnataka.
  • The company has ordered waste heat recovery for Sanghi Line 2, which takes about 12 months to come in, and expects the impact in the next financial year.
    Show source
    Number two, all the initiatives, which is like waste heat in Sanghi Line 2, which we have now ordered, it takes about 12 months to come in.
  • The company expects 800 megawatts of green power, completion of the entire waste heat program in the next 12 months and completion of the entire alternate fuel journey in the next 24 months.
    Show source
    See there are other initiatives of waste heat, solar power, as I mentioned, Vinod mentioned, so 800 megawatts green will happen.
  • The company expects to add almost 40 new grinding units over the plan period, when it reaches 140 million to 150 million tons.
    Show source
    Mind you, our number of locations, we'll add almost 40 new grinding units over Page 18 of 20 Ambuja Cements Ltd., ACC Ltd. and Sanghi Industries Ltd. January 29, 2025 the plan period when we hit 140 million, 150 million tons.
  • Ajay Kapur said about 10-12 grinding units have active work going on, and their capex will also come in.
    Show source
    As I also mentioned, there are about 10-12 grinding units for which active work is going on.
  • After completion of the Orient Cement transaction, operating cement capacity will go up to 97 million tons.
    Show source
    With the acquisition of Orient Cement, our operating cement capacity will go up to 97 million tons post completion of the Orient transaction.
  • Ambuja is on course to commission its 4 million tons clinker unit in Bhatapara in Chhattisgarh and associated grinding units in Sankrail and Farakka in West Bengal and Sindri in Jharkhand by the end of this financial year.
    Show source
    We are on course to commence -- commission our 4-million-ton clinker unit in Bhatapara in Chhattisgarh and associated grinding units of Sankrail, Farakka, both in West Bengal, and Sindri in Jharkhand by the end of this financial year.
  • Ambuja expects its 4 million ton Maratha clinker unit in Maharashtra and grinding unit at Warisaliganj in Bihar to be commissioned by the end of FY '26, enabling capacity of 118 million tons by the end of next financial year.
    Show source
    Further clinker unit of 4 million tons at Maratha in Maharashtra and grinding unit at Warsaliganj in Bihar are also expected to be commissioned by the end of FY '26, enabling us to reach 118 million tons capacity.
  • Ambuja is targeting to increase its waste heat recovery capacity from 40 megawatts at the time of takeover to 218 megawatts by March '25; current WHRS capacity is 196 megawatts.
    Show source
    Our waste heat recovery capacity at the time of takeover was 40 megawatts which we are now targeting to increase to 218 megawatts by March '25.
  • The company has successfully commissioned its 200 MW solar power project in Khavda and started power transmission from it.
    Show source
    On this account, 200-megawatt solar power at Khavda in Gujarat has been commissioned in Q3.
  • Contracts for Ambuja Cements’ grinding unit at Marwar Mundwa in Rajasthan and Warsaliganj in Bihar were awarded to an EPC vendor, and both projects are under active execution.
    Show source
    Contracts awarded for grinding unit at Marwar Mundwa in Rajasthan and Warsaliganj in Bihar to EPC vendor, and both projects are also under active execution.
  • The company is bidding for coal mines in the auctions being conducted by the government to meet its requirements.
    Show source
    As a result, we are bidding for coal mines in the auctions being conducted by the government.
  • The company has set up the CNOC (Cement Network Operating Centre) at its headquarters in Ahmedabad.
    Show source
    Some of you must have already experienced the CNOC, what we say is the Cement Network Operating Centre set up in the headquarters in Ahmedabad, and we are adding more and more features to our digital platform with every passing day.

Demand and pricing

  • The company is nearing 27% premium products share of the trade.
    Show source
    And I think as a company, we are now nearing 27%.
  • By the end of the current financial year, India is expected to have demand of 450 million to 460 million and total capacities closer to 700 million, of which capacity that can produce cement is 100 million tons lower.
    Show source
    Today, India is -- I think by the time we finish this current financial year, we will hit more like 450 million, 460 million demand and maybe closer to 700 million total capacities, of which the capacity which can produce cement would be 100 million tons lower.
  • If India grows at about 8%, growth of 450 million or 500 million is close to 30 million tons, requiring 2.5 million tons of additional volume from existing capacity or new capacity.
    Show source
    Now if India grows at about 8%, so 8% on 450 million or 500 million is close to 30 million tons, which basically means you need to add 2.5 million tons additional volume either from the existing, the base or add new capacity.
  • Ambuja and ACC brands sell in category A, compared with the previous brands used by Sanghi and Penna, which sold in category B and C, requiring substantial market investments.
    Show source
    However, the cement utilization is sub-40%, which it takes time to ramp up because, mind you, both Sanghi and Penna, we have transited to Ambuja and ACC brands, which are obviously selling in category A versus the previous brands, which were selling in category B and C. So obviously, that needs substantial investments in the market.

Deals and partners

  • The company partnered with Finland-based Coolbrook to implement its proprietary zero-carbon heating technology, cutting fossil fuel use in manufacturing.
    Show source
    As a step closer to this goal, we recently partnered with Finland-based Coolbrook to implement its proprietary zero-carbon heating technology, cutting fossil fuel use in manufacturing.

Risks, rules and outside factors

Outside factors

  • Ajay Kapur expects standard inflation of 2% to 3%, but says energy and fuel have been more stable over the last few years and that globally increasing green fuel availability may mean less inflation on that count.
    Show source
    So, I think -- I believe there will be less inflation on that count.

Everything else said on the call

What management stressed

  • Securing major raw materials at cost-competitive prices and efficiency and productivity improvement capex will further help Ambuja optimize by 8% to 10%.
    Show source
    Securing major raw material at cost competitive prices and efficiency and productivity improvement capex will help further reduce cost by 8% to 10%.
  • Ambuja Cements’ digitization of the entire value chain from quarry to lorry is intended to bring more efficiency in operations and become a catalyst of growth and EBITDA expansion.
    Show source
    I'm also excited to share our foundation work on digitization of the entire value chain from quarry to lorry, which has gone extremely well, which will bring more efficiency in operations and also become an important catalyst of our growth and EBITDA expansion.

Group structure

  • The approved schemes are expected to come within the next 7 to 9 years.
    Show source
    Vinod Bahety: Rahul, as per the approved schemes, this should come within next 7 to 9 years.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Amit Murarka: Yes. So just on the operating performance, frankly, like adjusted for incentives, it seems like quite a weak quarter operationally and in terms of EBITDA per ton, it's only INR537 per ton, if I just remove the onetime incentive in the numbers. So just wondering why the performance has dropped so much sequentially like it is lower realization as well as higher costs, so just wondering about the numbers here.

    Answer, ajay kapur

    Ajay Kapur: Yes. So good question. So, if you see, we have done well on the volume growth. Overall, I think our volume has grown by 17%. However, as you know, we also have now volume of Penna and Sanghi in the overall consol volumes. So about 1.4 million tons is coming out of Sanghi and Penna. And also, the cost structures of both the companies are currently under the phase where we are launching various initiatives to reduce cost.

    Answer, ajay kapur

    The capacity utilization also of these two entities is still sub-40%. So, I think some part of that cost is obviously now coming into the consol cost of Ambuja and ACC. Besides that, there were 4 big plants of Ambuja, and ACC, which were under shutdown during this phase. And some of those plants, whether it was Wadi and Kymore for ACC, Maratha and Rabriyawas for Ambuja. Some of them were going in for retrofitting of coolers upgradation and 1 or 2 plants were for routine maintenance. So, I think as a result of that, there was more drawdown from the inventory. So, you also have inventory impact, and also about INR100-150 impact because of the newly acquired assets, which are currently under ramping-up phase.

    Answer, ajay kapur

    My estimate is in the next financial year, both the assets should go up, I think Sanghi earlier and Penna because it's also in the market where it takes time to ramp up. But both of them should hit 70% plus utilization levels in the next financial year. And thereby, with our initiatives on costs that we have launched, I think we should start seeing this coming down. So, this is more of a one-off rather than a standard.

    Answer, vinod bahety

    Vinod Bahety: A couple of points, Amit, so that it will also pre-empt for other questions as well. See, when we compare Y-on-Y, this is like first full-fledged quarter which will have Sanghi, Penna, Asian and Tuticorin assets. So, like if you compare, say, December '23 versus December '24, December '23, Sanghi was just consolidated for hardly 15-20 days of operation because in December’23, we achieved the closing of Sanghi. And even for the September’24 quarter, Penna was only for partial period of the quarter, when we acquired in somewhere, 16th of August, it got effectively consolidated. So only 1.5 months was there for September’24 quarter. So, Q-on-Q or Y-on-Y, whatever you take, this is the first Page 7 of 20 Ambuja Cements Ltd., ACC Ltd. and Sanghi Industries Ltd. January 29, 2025 quarter where all these 4 acquisitions, Sanghi, Penna, Asian and Tuticorin, are getting consolidated. Therefore -- you will compare it with this background as well.

    Answer, vinod bahety

    Second point, while I don't understand like in terms of how people would look at it, but incentives are very much part and parcel of this business. And with every investment which is being made is entitled for incentives. Even as we speak, for example, like as an Ambuja consol, we are sitting on a larger incentive bucket of almost INR4,500 crores to be received in due course. And even the earlier incentives, which have been in arrears, which will be received. Therefore, if you see even September, there has been an income of incentive for the past period. And likewise, the good thing is that at least these cash flows are now coming back to the balance sheet, which were lying somewhere, the working capital was getting blocked. So therefore, given the legacies of these companies, good thing is the business is able to resolve many of these cases because the next question will also come in terms of the direct taxation where we have also added some of the provisions back and on -- both on the direct tax and the indirect tax, lots of efforts are going on to basically set the disputes and resolve them and bring the money back into the balance sheet.

    Answer, vinod bahety

    So, incentives plays an extremely important role in the overall business.

  2. Question

    Amit Murarka: And -- but realization is also down Q-o-Q. So, I was a bit surprised with that also because we know that there were price hikes in December, and January. I mean industry has seen improvement, but here both ACC and now even Ambuja has reported a Q-o-Q drop?

    Answer, ajay kapur

    Ajay Kapur: So, as I mentioned, 1.4 million tons of sales in this quarter that we've reported is coming out of markets and also consolidated of performance of companies, which earlier were almost operating at 0% utilization in the base period. So south, Penna is almost 1 million tons. And the prices in south are more depressed. So that is also having an impact. The December price increases happened towards the mid of December, and you will see impact of that in the Q4.

  3. Question

    Amit Murarka: Sure, sure. And just quickly, could you provide the MSA volume also in the quarter, both ACC, Ambuja?

    Answer, ajay kapur

    Ajay Kapur: Sure. So, the MSA volumes for this quarter were total about 4.5 million tons overall, more or less equal for both the companies.

    Answer, vinod bahety

    Vinod Bahety: Navin, good observation. And this also has the same reference to what I highlighted. When you compare again Y-on-Y, there is a sharp jump on other expenses on account of, a: because of consolidation of say, Penna, Sanghi and other assets here. And therefore, the fixed overheads of those companies will get consol here, number one. Number two, there have been a higher consumption of stores and spares and on account of shutdown of some of the kilns, which also we had informed about the plant shutdowns and all. So, some of these kilns like Marwar, Rabriyawas, it has gone through. And especially like for Penna, just to keep it up and running, Ganeshpahad and Tandur also we incurred some of these efficiency investments.

    Answer, vinod bahety

    And I'm so happy that the investments have started giving very good results because Penna kilns are operating at very good capacities. And on top of it, if you see the volume growth 17%, that also has been on account of, say, a good level of, say, investment on the branding and marketing, which has seen a higher investment this quarter. And with this market share, which has been sustained and captured more with these investments, I'm sure this will yield much more better expansion of EBITDA given that Sanghi, Penna, Tuticorin all will now start delivering sizable volumes with the foundation work which has been incurred for this quarter. I mean, it is a highly operating leverage business. So, like the investment which go in one quarter will start yielding sizable returns being an operating leverage concept in the coming quarters.

  4. Question

    Navin Sahadeo: Yes, helpful. And second, just a question was on the MSA volume. Ajay ji did mention that total volumes we got from Sanghi and Penna together is about 1.4 million for the quarter. How much would be Sanghi out of that? I mean, if you could just break up.

    Answer, ajay kapur

    Ajay Kapur: 0.4 million would be Sanghi and I think -- 0.5 million is Sanghi and 0.9 million is Penna. Navin Sahadeo: Correct. So -- yes, yes, sorry, you did mention about that. So, Sanghi per se, I just observing some numbers because in Q4, March quarter, it had did almost 8 lakhs, and 0.4 million is very similar to what we saw in Q2 also. So is it still in the ramp-up phase because that's -- all said and done, it's a 6 million ton -- 6.6 million tons clinker and 6-million-ton cement. So, Is it still being highly underutilized? Are there challenges there of evacuation?

    Answer, ajay kapur

    Ajay Kapur: No. So, Navin, very good question. As I mentioned in the previous section, Sanghi has two kilns. We have already completely done cost optimization and shutdown optimization of one kiln. Second kiln, as I speak to you, is currently shut down, and we are taking all major repairs and maintenance. One of our power plants is also under shutdown and also being taken into full repairs and maintenance. The 37% is the Sanghi cement utilization for this quarter, which was 22% same quarter last year. And in the sequential previous quarter, it was 23%.

    Answer, ajay kapur

    Page 9 of 20 Ambuja Cements Ltd., ACC Ltd. and Sanghi Industries Ltd. January 29, 2025 So, in the market, the growth is coming in, however, at a slightly lower pace. But I'm very confident that with all these repairs and maintenance, which was very much needed, I think by March end, these assets should start delivering almost 80%, 85% utilization. So, there is no issue on evacuation. There's purely issue on maintenance, and that's also some of the money which has gone in this quarter in our shutdown expenses. And Penna, I like to mention what my colleague, Vinod, just mentioned, the clinker utilization of Penna is as high as 78% already. However, the cement utilization is sub-40%, which it takes time to ramp up because, mind you, both Sanghi and Penna, we have transited to Ambuja and ACC brands, which are obviously selling in category A versus the previous brands, which were selling in category B and C. So obviously, that needs substantial investments in the market. We are also putting more troops on the ground, so that needs more hiring in the front-line sales and then brand and distribution investments.

  5. Question

    Ashish Jain: Okay, okay. Sir, secondly, looking at the numbers, so I understand your point on consol numbers. But if I look at Ambuja standalone also, that also is showing a significant jump in costs both on a sequential basis and very flattish cost on a Y-o-Y basis. So other expenses bit, I think, is what you explained in terms of repair and maintenance and all which includes Ambuja facility as well. But apart from that also looks like costs have inched higher on both sequential and Y-o-Y basis. Can you...

    Answer, ajay kapur

    Ajay Kapur: So, what happens, Ashish, this I think I'll address for others also who'll come in the queue. I mentioned this last time also. Increasingly, we have to look at Ambuja as a consol balance sheet because when Ambuja does its business, it looks at the -- we cannot look at some of parts. We look at the whole. And at a whole level, we try and optimize each area, for example, Penna assets immediately in the first quarter of -- second quarter, we have taken it to 78%. Whereas the Sanghi, we have not been able to take because of some plant-related issues. So, I would rather focus on overall Ambuja cost because that's the way I look at the balance sheet now.

    Answer, vinod bahety

    You will see that the raw material cost has gone up on account of purchase clinker. Now between the companies, Ambuja standalone says purchase, but on a consol it gets eliminated. So therefore, as rightly said by Ajay ji, we will have to look it on a consol, else you'll find little aberration in some line items.

  6. Question

    Ashish Jain: Got it, got it. That helps. Sir, just one last question. So, Sanghi and Penna volumes are flowing both in ACC and Ambuja or it's largely Ambuja where they are flowing in?

    Answer, ajay kapur

    Ajay Kapur: That's true. What we follow is whichever brand has a bit of brand value in the market, we position that as a lead brand. But in some markets, both the brands are lead brands. So, this is more to acquire market share at a highest possible price. That's why I said, sum of parts, it would be very difficult for me to answer. If I look at consol, that's the best way to answer.

    Answer, vinod bahety

    Vinod Bahety: No. So, Raashi, I'm sure you're looking at consol numbers, and on a consol number, if you see, last quarter, for example, we had incentives coming for one of the plants for the previous period, which is for the Sankrail. Now if you remove that also, say, closer to INR135 crores, if I remember, and then you will see that the numbers which you will find is almost INR100 crores between both say September and say for that matter for December also. However, as I said, now, for example, the way we are focusing on all these incentives, you will find some of these items of the previous years, which will keep building on and which is also actually going to help me to release the working capital. So, to summarize, Sankrail was in the previous quarter. This time, it is for the Himachal, which is disclosed in the notes of the financial statements as well.

  7. Question

    Raashi Chopra: Sorry, what was the Sankrail amount in the previous quarter?

    Answer, vinod bahety

    Vinod Bahety: Ballpark around INR130 crores to INR135 crores.

  8. Question

    Raashi Chopra: So, if I have to just take normalized incentives for you, not based on prior period accruals, what would that be like on a per ton basis?

    Answer, vinod bahety

    Vinod Bahety: It would be on increasing trend now. Historically, say, it was around, say, INR100-odd crores of incentive per quarter, almost INR400 crores for a year. But this will actually now start moving up to INR600 crores, INR650-odd crores prospectively with new capacities coming in and giving the benefit of incentives. So yes, INR400 crores to INR500 crores in the past and now INR600 crores to INR650 crores and prospectively going further up. Page 11 of 20 Ambuja Cements Ltd., ACC Ltd. and Sanghi Industries Ltd. January 29, 2025 Raashi Chopra: Okay.

  9. Question

    Secondly, on the cost side, I think I just missed some of the breakdown from Mr. Kapur on what are all the cost savings would be. Like logistics, I think you mentioned was INR100. What were the other components on the cost savings going forward from here?

    Answer, ajay kapur

    Ajay Kapur: Raashi, I mentioned about coal costs coming down. I mentioned about Khavda 200 megawatts green which got commissioned in Q3. I think you will see the full effect of that coming in Q4, but still better effect coming in first quarter of next year because it takes time to stabilize. As I speak to you, we have almost reached full potential of 200 megawatts in the last week of December -- sorry, January. So, I believe in February, March, I should see a much better impact of the Khavda 200-megawatt Green project. Waste heat recoveries are further going up. So, I think that you'll see in time to come, the cost improvement.

    Answer, ajay kapur

    Freight, we continue to be best in class amongst the large cement companies. If you look at benchmarking also, our drop in freight and forwarding cost will be the best. With the investment, as I mentioned in my opening on bulk cement wagons for fly ash, as they start coming in every month or every quarter, this will continue to further improve our fly ash cost. So, I think increasingly, what Vinod mentioned in the beginning, our end-state target is to drop down the total cost to about INR3,700-3,800 over the next couple of years, that's the target.

  10. Question

    Raashi Chopra: And this target still holds despite the Penna, Sanghi, putting all of that together? So, these are on a consolidated basis?

    Answer, ajay kapur

    Ajay Kapur: Yes. So, Penna, Sanghi were under-invested in some areas like waste heat in Penna. Sanghi line 2, we have already ordered or about to order the Waste Heat Recovery System. All these initiatives, plus the additional 800-megawatt green, which is currently approved by the Board and currently under active investment. And all the other initiatives that I mentioned, plus the entire Indian Peninsula Sea network that we are going to do through ships, both from Sanghi and then from Penna. I think all this is going to help us become lowest cost.

Show 10 more questions
  1. Question

    Raashi Chopra: Understood. Just one last question from me. On the capex side, it's INR8,000 crores for this year, the target?

    Answer, ajay kapur

    Ajay Kapur: Yes. I think our number for the full year should be around INR6,800 crores to INR7,000 crores.

  2. Question

    Raashi Chopra: And 9 months, how much is that?

    Answer, ajay kapur

    Ajay Kapur: I think 9 months, we are around INR5,500 crores, if I'm not mistaken. Around INR6,000 crores.

    Answer, vinod bahety

    Vinod Bahety: INR6,200 crores to be precise, which we have achieved so far, and we are well on our target for the financial year.

  3. Question

    Raashi Chopra: Sorry, INR6,200 crores for 9 months and INR7,000 crores for the full year?

    Answer, vinod bahety

    And so, another INR2,200 crores will go for this quarter. And that's precisely like because a lot of these 4-5 facilities, which are like in the last leg, again, to refresh, Sankrail, Bhatapara, Marwar, then we have Sindri, and then we have one more, Salai Banwa and all. So, like there's now a good level of say momentum coming in terms of the capex program. So almost INR2,000 crores to INR2,500 crores will be for the March quarter.

    Answer, vinod bahety

    Vinod Bahety: Rahul, as per the approved schemes, this should come within next 7 to 9 years.

  4. Question

    Rahul Gupta: So, is it safe to assume that you would see additional around INR500 crores every year on top of INR600 crores on the expanded capacity?

    Answer, ajay kapur

    Ajay Kapur: So, Sanghi, because it is currently not running in full load. So, I would say it's at least about 10% to 15% higher than Ambuja cost. Penna would be also the same. So, we expect 10% to 15% -- 15% maybe reduction in the cost of both the companies on a per ton basis.

  5. Question

    Indrajit Agarwal: So, once you have undertaken all your initiatives, can the costs of these companies come in line with your target of INR3,650 or there will be some cost disabilities still there in these two acquired assets?

    Answer, ajay kapur

    Ajay Kapur: Okay. So basically, if you see the end state INR3,650 has two major cost buckets, one is your cost of production and one is your logistics cost, largely, these are the biggest buckets. Now depending upon the market, some plants will be even lower than this and some plants will be slightly higher than this because the plants in North, for example, in hills, will have a different cost structure because of the hill rates of per ton per kilometer. And the plants which are sitting on road-based markets, they have a different cost structure. I think this is an average of the company. Some of the Penna plants, for example, the ones which are located close to big cities like Ganeshpahad, Tandur, I think they would end up at a very low cost. And maybe one-odd plant might be slightly higher, it all depends on because we also have kilns, which are vintage kilns.

    Answer, vinod bahety

    Vinod Bahety: Okay. On the first question, Prateek, in terms of the expected outgo for Orient, that is ballpark around INR4,000-odd crores, which will be there. And what is your second question?

    Answer, ajay kapur

    Ajay Kapur: Cost. So, I think the cost I answered already in the opening, and you will also find it in the deck that we have loaded. It's closer to INR4,600 and end state is INR3,700, INR3,650-odd.

  6. Question

    Prateek Kumar: Okay. So that will be next year. Okay.

    Answer, ajay kapur

    Some cost has been already realized in the Ambuja ACC balance sheets. However, with the acquisition of new companies, which, as I mentioned already, for the sake of repetition, are still under stabilization phase, an asset to give you its full efficiency and all KPIs needs to operate at 80--85%. Currently, one asset is sub-40%, one asset is sub-50%. As we ramp both of them to 80%, you'll start seeing the cost numbers that we are talking, number one. Number two, all the initiatives, which is like waste heat in Sanghi Line 2, which we have now ordered, it takes about 12 months to come in. So, I think in the next financial year, you will see that impact coming in. So, I would say a ballpark figure of closer to INR1,000 crores between the 2 entities in various initiatives is what is needed, which is very much in our cash flow plan going forward.

    Answer, ajay kapur

    A large part of it coming from assets where the cost structures are higher. And I think that depresses the price. I also mentioned about B2B segments where we have to participate. Wherever our existing brands exist, we continue to be on the premium end. The share of premium products of the trade have seen the highest increase. And I think as a company, we are now nearing 27%. And that focus continues.

  7. Question

    Sir, how are you looking at the industry supply curve, incremental supply additions, say, for FY '25, '26, '27? The reason is more to understand from a pricing perspective, given there is so much of supply, how are you looking at the marketplace.

    Answer, ajay kapur

    Ajay Kapur: So, Ritesh, I would answer it in a little different way. Today, India is -- I think by the time we finish this current financial year, we will hit more like 450 million, 460 million demand and maybe closer to 700 million total capacities, of which the capacity which can produce cement would be 100 million tons lower. Now if India grows at about 8%, so 8% on 450 million or 500 million is close to 30 million tons, which basically means you need to add 2.5 million tons additional volume either from the existing, the base or add new capacity. I think at 300 per capita, India being the second largest market, GDP still sub $3,000, inching towards $5,000 in the next couple of years. All this will translate into more housing demand, more infra demand, which is largely led by government. And I think the commercial demand about 15%, all of them will have their own growth trajectory. The question is if the industry does not responsibly add new capacity today, which is totally private sector investments today and totally based on free competition, consumers will end up paying prices which will be much, much higher.

  8. Question

    Ritesh Shah: Sure. Sir, my second question was, how do you look at the industry cost curve? We have given a bold number of INR530. We are actually walking the talk over there. So one is, how do you Page 17 of 20 Ambuja Cements Ltd., ACC Ltd. and Sanghi Industries Ltd. January 29, 2025 see this cost curve for rest of the industry? Will we be on the left-hand side of the cost curve given the initiatives that we are taking, which puts possibly us on the pole position? And secondly, if one had to marry that with the lease expiries come 2030, how is Ambuja, ACC placed versus the rest of the industry? Will our cost curve inflation be lower than the rest of the industry, which will still ensure tha

    Answer, ajay kapur

    Ajay Kapur: So, let me answer the first one, which is more to do with me. See, I cannot comment on whether I'll be in the pole position versus others. Every company, I'm sure, is working very hard. What we are doing, we have stated very clearly quarter after quarter in all our website posts of our analyst calls, I think you'll see this very clear number. There are clear initiatives, whether it is logistics, whether it is power and fuel, whether it's other fixed costs, whether it is brand building and marketing and whether it is going green. As I mentioned, we'll hit 83% green. That will reduce my power cost to INR3.50.

    Answer, ajay kapur

    Ajay Kapur: I think if I'm looking at, you can say about INR100 next year, another INR150 following year. And then I think a large part of the cost will come towards the end when coal mines start coming in. See there are other initiatives of waste heat, solar power, as I mentioned, Vinod mentioned, so 800 megawatts green will happen. The entire waste heat program will get over in the next 12 months. The entire alternate fuel journey will also get over in the next 24 months. The overall ramping up of newly acquired assets and bringing them at par with our structures will happen. Mind you, our number of locations, we'll add almost 40 new grinding units over Page 18 of 20 Ambuja Cements Ltd., ACC Ltd. and Sanghi Industries Ltd. January 29, 2025 the plan period when we hit 140 million, 150 million tons.

    Answer, ajay kapur

    With more units, the logistics cost of 100 kilometres that I mentioned, and each kilometre is PTPK INR4. So, if you take another INR100 from there, so I think a large part of it will come around 2026, '27. And the last piece would be the coal mines, captive coal mines. The years when they come, you suddenly see a drop of INR0.30, INR0.40 in the coal cost. And I think that's where you'll see a sizable savings.

    Answer, vinod bahety

    Vinod Bahety: But good thing is, Sumangal, that this will be progressive, like so every passing quarter, you will find the benefits of these investments yielding the savings on the cost, and we are going to be more highlighting it with each of the press releases. So, you will find the positive developments every passing quarter. Railways, Ajay ji highlighted that each quarter, we are getting at least 2 to 4 rakes. Then we are also getting new capacities of renewables with every quarter, WHRS, AFR. So, it is not back ended. It is going to be well laid out over the next 2, 3 years. But yes, major impact is when the coal mines will start giving the captive coal, that will be a game changer.

  9. Question

    Sumangal Nevatia: Understood, sir. Sir, and this is more at current commodity prices, right? Or we are also expecting some commodity price deflation, diesel price reduction or something of that sort?

    Answer, ajay kapur

    Ajay Kapur: I think there will be a standard inflation of 2% to 3% but we have seen over the last few years, both energy and fuel has been more stable. And also going forward, if globally green is the new norm, you will find a little bit of surplus availability of some of these fuels. So, I think -- I believe there will be less inflation on that count.

  10. Question

    Sumangal Nevatia: Understood. And just one last clarification on the capex. Next year, are we expecting the INR7,000 crores, INR8,000 crores kind of further increase or something on FY '26, if you can comment?

    Answer, ajay kapur

    Ajay Kapur: I think if you allow us to come back in the full year call, I can give you a much better idea because we would have finished current year. See, what the projects we are already building, which I announced already, that capex will anyway flow. As I also mentioned, there are about 10-12 grinding units for which active work is going on. That will also come in. So, while I have a number, but I'd rather wait for the financial year to get over, that's the right time for us to come and make a commentary in the next quarter. I hope you understand.

Questions about this call

When was the Ambuja Cements Q3 FY25 earnings call transcript filed?
Ambuja Cements filed the transcript with the exchange on 5 Feb 2025. This page is built from that transcript.
What does this page list?
83 statements from the transcript across 9 topics, 67 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 20 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
Ambuja Cements Q3 FY25 concall: what the company said · DalalOS