Earnings call
Azad Engineering Q1 FY27 earnings call: Azad Engineering is targeting working capital at around 200 days in H1 and in the range of 160 to 180 days by H2
By DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person.
Transcript filed .
The company is targeting working capital at around 200 days in H1 and in the range of 160 to 180 days by H2. Each of Azad Engineering's 8 plants at Tunikibollaram is poised to generate INR150 crores to about INR180-odd crores at full utilization and full capacity, giving roughly INR1,200 crores of revenue from the newer plant. Standalone revenue from operations grew 26.8% year-on-year to INR170.5 crores from INR134.5 crores in Q1 FY26. The company has long-term contracts that give it visibility over 5, 7, 8 years.
The numbers management gave
Results
- Standalone revenue from operations grew 26.8% year-on-year to INR170.5 crores from INR134.5 crores in Q1 FY26.
Show source
Revenue from operations grew by 26.8% year-on-year, reaching to INR170.5 crores, up from INR134.5 crores in Q1 FY26.
- Standalone reported EBITDA grew 32.1% year-on-year to INR64 crores, reflecting the compounding benefits of operating leverage.
Show source
Reported EBITDA expanded at a faster pace of 32.1% year-on- year to arrive at INR64 crores, reflecting the compounding benefits of our operating leverage.
- Standalone EBITDA margin was 37.6%, up from 36.1% in the same quarter last fiscal.
Show source
EBITDA margins expanded to robust 37.6%, up from 36.1% in the same quarter last fiscal.
- Standalone profit after tax grew 21.2% year-on-year to 36.4%, maintaining a PAT margin of 21.3%.
Show source
Page 3 of 18 Azad Engineering Limited August 08, 2026 Profit after tax registered a healthy growth of 21.2% year-on-year to stand at 36.4 % maintaining an exceptional PAT margin of 21.3%.
- Consolidated revenue was INR172.6 crores, EBITDA was INR64.4 crores and PAT was INR35.2 crores in the first quarter earnings conference call for fiscal year 2027.
Show source
On a consolidated level, our revenues came in at INR172.6 crores with an EBITDA of INR64.4 crores and PAT of INR35.2 crores.
- Standalone revenue from operations reached INR170.5 crores, growing 26.8% year-on-year from INR134.5 crores in quarter 1 FY26.
Show source
Our standalone revenue from operations reached INR170.5 crores, reflecting a stellar growth of 26.8% year -on-year basis against INR134.5 crores in quarter 1 FY26.
Show 12 more statements
Results
- Standalone revenue grew 8.3% sequentially over INR157.4 crores reported in quarter 4 FY26, highlighting acceleration in customer schedules and manufacturing delivery at the start of the fiscal year.
Show source
Page 4 of 18 Azad Engineering Limited August 08, 2026 On a sequential basis, our revenue grew by 8.3% over INR157.4 crores reported in quarter 4 FY26.
- Standalone reported EBITDA was INR64 crores, growing 32.1% year-on-year from INR48.5 crores in quarter 1 FY26 and 10.9% sequentially from INR57.8 crores in quarter 4 FY26.
Show source
Our reported EBITDA grew at an impressive pace, hitting INR64 crores, representing a growth of 32.1% year-on-year basis from INR48.5 crores in quarter 1 FY26 and strong sequential jump of 10.9% from INR57.8 crores in quarter 4 FY26.
- Standalone reported EBITDA margin was 37.6% in the first quarter earnings conference call for fiscal year 2027.
Show source
This outpaced growth directly expanded our standalone reported EBITDA margin to 37.6%.
- Standalone PAT grew 21.2% year-on-year to INR36.4 crores from INR30 crores in quarter 1 FY26.
Show source
Our standalone PAT grew at 21.2% year-on-year basis to INR36.4 crores, up from INR30 crores in quarter 1 FY26.
- Standalone net profit grew 3.5% sequentially from INR35.1 crores reported in quarter 4 FY26.
Show source
Sequentially, net profit grew at 3.5% against 35.1% (To be read as INR 35.1 crores) reported in quarter 4 FY26.
- Standalone PAT margin was 21.3%, with EPS of INR5.63 per share in the first quarter earnings conference call for fiscal year 2027.
Show source
This yield an exceptional standalone PAT margin of 21.3%, basis EPS of INR5.63 per share.
- Consolidated revenue from operations grew 25.9% year-on-year to about INR172.6 crores, driven by steady delivery schedules and operational execution across all its facilities.
Show source
Consolidated revenue from operations grew at 25.9% year-on-year basis to close at INR122.6 crores (Wrongly spoken on the call; Correct number is Rs.172.6 crores) .
- Consolidated EBITDA was INR64.4 crores, with an operating margin of 37.3%, and consolidated PAT was INR35.2 crores in the first quarter earnings conference call for fiscal year 2027.
Show source
Consolidated EBITDA at INR64.4 crores, yielding an operating margin of 37.3%, while consolidated PAT reached INR35.2 crores.
- Aerospace and Defense segment grew 24.7% year-on-year, reflecting increased share of wallet with global aviation majors and initial tailwinds from advanced propulsion and defense system deliveries.
Show source
Aerospace and Defense also registered one of the highest growth acceleration, up approximately about 38.4% (Wrongly spoken on the call; Correct is 24.7%) year-on-year, reflecting our increased share of wallet with some global aviation majors and initial tailwinds from our advanced propulsion and defense system deliveries.
- Energy and oil and gas segment grew 26.7%, driven by healthy demand across gas turbine components and the operational launch of new customer dedicated production lines.
Show source
And our energy and oil and gas vertical also grew by 21.6% (Wrongly spoken on the call; Correct is 26.7%), driven by healthy demand across gas turbine components and operational launch of a new customer dedicated production lines.
- The company said its work-in-progress cycles are around 90 to 120 days, and it keeps inventory to cater to quarter 3 and quarter 4 sales.
Show source
Our WIP cycles are around 90 to 120 days, and we have to keep the inventories into place to cater to the quarter 3 and quarter 4 sales where all the spinners are running for quarter 3 and quarter 4.
- The company reported INR600 crores in the full financial year. Replaced by a later filing.
Show source
We have done INR600 crores in the full financial year.
What it expects ahead
What management expects
- The company is targeting working capital at around 200 days in H1 and in the range of 160 to 180 days by H2.
Show source
And coming to the specific question of when it get tapered, so we are targeting H1 around 200 days.
- The company expects its current debtor stage of around 170 to 180 days to go down to 90 days, largely through the bill discounting facility.
Show source
So this is largely back on the bill discounting facility where our current debtor stage, which are around 170, 180 days will go down to 90 days.
- The company says its guidance for calculation purposes is a 32% to 35% window, while it has been delivering above 35%.
Show source
But the guidance, what we are always on it and for the calculation purpose, it's always nice to use a 32% to 35% window.
- The company says it will change its 25% plus revenue growth guidance as it shifts to the next level.
Show source
As we shift to the next level, we'll change this guidance.
What it is building and selling
Projects and capacity
- Each of Azad Engineering's 8 plants at Tunikibollaram is poised to generate INR150 crores to about INR180-odd crores at full utilization and full capacity, giving roughly INR1,200 crores of revenue from the newer plant.
Show source
Page 12 of 18 Azad Engineering Limited August 08, 2026 And what is going to happen there is each of these plants overall -- without getting into specifics at a customer level, I'd like to say that each of these plants are poised to generate at full utilization and full capacity from INR150 crores to, let's say, about INR180-odd crores, right?
- Civil construction for the remaining units at Azad Engineering's new plant, Azad Center of Excellence, is on track to wrap by the end of this financial year.
Show source
Civil construction for the remaining units at the new plant, Azad Center of Excellence is on track to wrap by the end of this financial year.
- Machine installations at the new plant are being executed in modular back-to-back phases aligned with its customers' road map.
Show source
Machine installations are being executed in modular back-to-back phases aligned strictly with the road map of our customers.
Deals and partners
- The company has long-term contracts that give it visibility over 5, 7, 8 years.
Show source
We have the best long-term contracts, which give us visibility over 5, 7, 8 years.
Risks, rules and outside factors
Outside factors
- The company said rupee depreciation could help it by 5%, 6%, but is not an important factor in its business planning.
Show source
But you're right to mention that rupee depreciation could probably help us to an extent of 5%, 6%.
- The company said local supplies from Sunflag and Star Wire provide a price benefit and a transportation-cost benefit because their transportation cost is around 4% to 5% compared with global transportation when materials are imported from overseas.
Show source
So there, we are getting a benefit of the price benefit and also transportation cost benefit since these are the local supplies, which have a very less transportation cost compared to a global transportation cost when we import these materials from overseas, which is around 4% to 5% type of situation.
What the company said on its earnings call, taken from its own transcript. Not advice.
Questions and answers
Question
Vikas Singh: Noted. And on the capacity buildup road map? Rakesh Chopdar Yes. So that is all planned. If you talk about the coming years, I'll ask Vishnu to jump in this question. And what we see is major plan is from FY29 is what we have to start sketching -- already sketched, but we have to really work on it. I'll pass on this remaining answer to Vishnu.
Answer, vishnu malpani
Vishnu Malpani: So, thank you, Mr. Chopdar, for this. Vikash ji, the idea for us is we fill capacity basis the contracts that we have to deliver every year. Now for us, we have been working on quite a few Page 8 of 18 Azad Engineering Limited August 08, 2026 opportunities that are there right now at Azad, and we are evaluating what is the total need that we would need over the next 5 to 6 years, and we are doing that planning. But as for the next couple of years, Azad has built -- deployed and built capacity to cater to the next couple of years in terms of where we want to grow in terms of revenue. However, you are absolutely right in spotting the fact that there are opportunities that we are working on. So, we're doing our math internally to figure out what is the capital -- how much is the quantum of capital do we need and when do we actually need that. So once that internal discussion gets closed and that loop gets closed, I think we should be able to maybe address this in the next quarter with far more accuracy in my view.
Question
Vikas Singh: Noted. And sir, if I can pitch in one last question. Our mostly sales in export markets, so I presume it's a dollar-denominated. So, the rupee depreciation benefit is built in above EBITDA in the margins or below basically?
Answer, ronak jajoo
Ronak Jajoo: This is below the EBITDA margin, this is not build into the EBITDA margin.
Answer, rakesh chopdar
Rakesh Chopdar: Okay. Amit ji, I'll try to recollect the first question you have. So the first question, what you asked is on the stabilization of the hot section, the market. Now as you are aware, how critical these components are, it's not -- of course, the cold section itself is so tough to come where we are -- Azad is playing around with that. But in the hot section, definitely, other OEMs have shown super interest and asking us when is your facility ready. The beauty, the best point is the facility what we are going to set up -- what we are setting up for Mitsubishi can -- is exactly a model, which will be utilized for other OEMs as well. Page 9 of 18 Azad Engineering Limited August 08, 2026 And another good news, I'll tell you, it's not just for the land base, it's not just for the energy, the same facility will cater the hot section of the -- for the aviation engines as well.
Answer, rakesh chopdar
So the first point is to establish this, which is around 7 to 8 months away from now. And then we do the qualification. While we do the qualification, we will invite the other OEMs. And to be honest, we don't need to invite. They're already here. So that answers the thing. Any other questions you have on this, Amit ji?
Question
Amit Dixit: No, no. I mean, that's fine. I just wanted to get the broad time line, that's fine, yes. And the B part was on actually the growth that we are seeing in this market. You mentioned in your prepared remarks that the -- both the vectors are seeing excellent tailwinds. Now as I mentioned that some of the peers, Howmet and all they have -- despite being a much higher base, they have reported like 37.7% EBITDA margin, 50% EBITDA growth. So what is the growth trajectory for Azad we see? And are there any constraints that you see at your end to grow by that number?
Answer, rakesh chopdar
Rakesh Chopdar: No, no. Actually, it's a very valid and very nice question, Amit ji. People who know about this subject, they will also obviously know this is not a million story. This is all a billion story. And we also know, as you could name only 2 or 3 in our names, there are only 2 or 3 players in the world who have cracked this. Azad will be the next to crack this. Once this is cracked, the league itself will change. So if you talk about engines, that is a different league.
Answer, rakesh chopdar
Now we talk about this hot section, this itself is in a big league. So definitely, the market is massive, and there is a long queue of the products what are required in this field and Azad is preparing for that. So, it's a very, very good situation now. On the margins, you can imagine these high-cost countries like U.S. and Europe are making that healthy EBITDA margins. So definitely, what would Azad make? It's a good thing to understand and guess.
Question
Amit Dixit: Great. Great. That's reassuring. The second question is essentially on the working capital side. Now in Q1 FY27, we saw that there was a bit of increase in finance costs, possibly due to the working capital thing. Now since we are in expansion mode, so I mean, I'm not asking for a time line, but just wanted to understand that this working capital in terms of days, when we can expect it to plateau?
Answer, ronak jajoo
Ronak Jajoo: Yes. This is Ronak. So, from the finance cost side, if you see, I have already told FY26 presentation, I have told that finance cost will going to continue because you have a bill discounting charges, which will go into the finance cost only. So, there is a betterment of the cash flow -- operating cash flow, not on the financial cost side. And coming to the specific question of when it get tapered, so we are targeting H1 around 200 days. And by H2, we are targeting in the range of 160 to 180 type of days. So this is largely back on the bill discounting facility where our current debtor stage, which are around 170, 180 days will go down to 90 days.
Answer, ronak jajoo
That's how we look at this entire situation to be unfold. Page 10 of 18 Azad Engineering Limited August 08, 2026 Moderator: Our next question comes from the line of Gaurav with Avendus.
Answer, rakesh chopdar
Rakesh Chopdar: (35:11) Lot of work this side.
Answer, rakesh chopdar
Rakesh Chopdar: No, but we have done everything in-house. There's nothing that we have outsourced any of the parts or something. Maybe some small washers or some we have gone with -- some specific requirement, which Azad's capability is not available. We have gone to GTRE, and they have either done it in-house or they have got it done by their approved sources. So it's not that we have gone out somewhere, except from small washers or some kind of small machining or some kind of welding operations. So that's all. Gaurav: All right.
Answer, rakesh chopdar
Okay. And the second question was on the margin bit. For last 2 years, you are consistently doing about 27%, 38% EBITDA margin, which used to be about 30% to 35% before in the prior years. Now you continue to guide your margins around 35% level. What I'm trying to understand is that you are doing 37%, 38% margin when you are yet to utilize the facility. So why is the conservative guidance on the margin split when there will be a little bit of operating leverage, which would come back from the new facilities there?
Answer, rakesh chopdar
Rakesh Chopdar: Yes. Gaurav, as you can see, we are consistent 30%, 35% plus. But the guidance, what we are always on it and for the calculation purpose, it's always nice to use a 32% to 35% window. Of course, you can see that we have been delivering precisely going above 35%. But for calculation purpose and for the guidance purpose, I think 32%, 35% is a good number, which we are holding for since long. Gaurav: Is it possible to kind of explain what has led to this margin range shifting from 35% to 37%, 38% in the last 1.5 years. What is the sustainability of these margins?
Answer, rakesh chopdar
Rakesh Chopdar: Yes, it's the skill set what we are obtaining on the shop floor and this continuous improvement, which is not only the last 3 years, we've been seeing since inception, where we -- I remember the days, we were operating at 18%, 19% EBITDA. On the same product line, we are now operating this EBITDA level. So definitely, there's some magic happening on the floor. Gaurav: So, you mean the process engineering or...
Answer, rakesh chopdar
Rakesh Chopdar: It's not just process. There are many factors which we should be -- if at all, I would love to take it on the floor, and I would like to demonstrate what exactly lies between these margins and where -- what all is lying from 18% to 35%, 36%, why not we can see further also. So we are trying to find where we find, we'll pick it up. Page 11 of 18 Azad Engineering Limited August 08, 2026 Moderator: Our next question comes from the line of Subhi Gupta with Trinetra Asset Managers.
Question
Subhi Gupta: Yes, sir, I'm saying that congratulations on the turbojet engine. Since you'll be looking at double- digit growth in similar kind of projects moving forward, so what is the margin that we are looking at for these kind of projects?
Answer, rakesh chopdar
Rakesh Chopdar: Okay. Thank you so much. We have just finished -- we have just made the first engine, okay? We can never come to a costing out on the first engine as it takes a lot of time to stabilize in the production. So we have been producing the first 20 engines. So it would be appropriate for me to answer this question once we have done at least 5, 6 engines in a row, and then we can come to a level what we hold and how do we fare in this.
Question
Subhi Gupta: And if you could just tell me what would be the time line for these 4, 5 engines?
Answer, rakesh chopdar
Rakesh Chopdar: I think it's just not far away, 8 to 12 weeks or you can say, 3 to 4 months. And it is a continuous process, which we are going to see. So maybe by next call, when we see you or you'll be free, you are most welcome to visit us, and we can share more details with you here.
Question
Subhi Gupta: Okay. And sir, Rolls-Royce deal, the time for that?
Answer, rakesh chopdar
Rakesh Chopdar: Yes. So, I think very soon, within this quarter, I think we should be delivering the first batch of the qualification parts. It's almost finished. The first delivery is quite nearby. Moderator Our next question comes from the line of Aditya Bhartia with Investec. Aditya Bhartia: Congratulations on a lot of positive development. My first question is on our asset base and the revenue potential from that asset base.
Answer, rakesh chopdar
Now in the last 1.5-odd years, we have undertaken a big capex plan. And including capital WIP, I think we may end the year with maybe INR1,200 crores, INR130-odd crores of net block, maybe around INR1,500-odd crores of gross block. Just wanted to understand what will be the peak revenue generation potential from this capacity, at what utilization we may be operating in some of the earlier ships that we have made operational? And how would you anticipate it to be ramping up?
Answer, vishnu malpani
Vishnu Malpani: Hi, Aditya, Vishnu here. Thank you for your question. So, Aditya, I think I will take you back to our conversation that we had a few months ago. So this entire Tunikibollaram plant that we are building is built with a mindset of building dedicated factories for all of our customers. So we are building 8 plants there, and each of these plants would be dedicated to a certain customer, right? Page 12 of 18 Azad Engineering Limited August 08, 2026 And what is going to happen there is each of these plants overall -- without getting into specifics at a customer level, I'd like to say that each of these plants are poised to generate at full utilization and full capacity from INR150 crores to, let's say, about INR180-odd crores, right? So that would give you a good sense of roughly about INR1,200 crores out of the newer plant revenue, right?
Answer, vishnu malpani
And then as and when we keep growing based on the contracts that we have, we will keep building capacity as well. So our idea is to finish this plant from a civil construction perspective by this financial year. And then while the plants are in our control, we are constantly going to focus on improving the utilization and capacity ramp-up on that, right? But we are fully geared up for the contracts that we're supposed to be delivering over the next 2 years in terms of capacity or in terms of infrastructure. So we don't have any risk from there.
Question
Aditya Bhartia: Sure, sure, sure. That makes sense, Vishnu. And Vishnu, we also spoke about acceleration in revenue momentum from second half. So is it because of maybe some qualifications that are pending for some of these new ships? And as they happen from second half onwards, we would anticipate a much stronger revenue momentum?
Answer, rakesh chopdar
Rakesh Chopdar: I'm Rakesh this side. So we knew that this is a plant, okay? And maybe last 2 or 3 calls, if you can recollect what has been mentioned FY26 Q4, we could up these buildings, got the machines inside, done the foundations, do the delta qualifications. And then Q1 was something we switched on a lot of machines, production started very slowly, the qualifications were done. Now as we speak, in Q2, those machines are now on full throttle production ongoing right now as we speak, okay? And to reflect these numbers, you could see reflection from Q3 onwards, the sales what we do. And this is exactly consistently we have been guiding the market last 3, 4 quarters what exactly is the status.
Answer, rakesh chopdar
So that's what I mean is 80% done is these plants where the machines have been deployed, foundation done, qualification done. And these are not -- this doesn't happen in 1 week, 10 days. You know that very well, right? So it takes a lot of time, there's customs, there's travel plans, each and every parts being reproduced, requalified. So that all is done now. It's -- 80% is done now and the production is switched on. So that's the whole reason we say that we see a major breakthrough coming next.
Question
Aditya Bhartia: Understood. And instead of just looking at this 1 year, let's say, we look at a slightly longer-term picture, a 3-year period, then where do you see the company's revenue number kind of settling in? Do you think that instead of this 25%, we should be looking for a much stronger growth, maybe closer to 35%-odd on an annual basis as we'll be having capacities, we already have certifications. We already have some decent sized orders. So it's just about getting some of the formalities done and we can scale up the business at a much faster pace.
Answer, rakesh chopdar
Rakesh Chopdar: Of course, Aditya, of course. See, right now, the reason we are guiding 25% plus because we know what situation we are in. As we shift to the next level, we'll change this guidance. What's your second question? Page 13 of 18 Azad Engineering Limited August 08, 2026 Aditya Bhartia: Understood.
Question
My second question is, given that a lot of our contracts will be maybe dollar- denominated, do we get a big benefit out of rupee depreciation? Is it a case that this year, maybe revenues get a lift of maybe 7%, 8% purely on account of how forex numbers have moved? And to that extent, even if volume growth is somewhat similar to what we are speaking about, in revenue terms, we may end up doing a lot better.
Answer, rakesh chopdar
Rakesh Chopdar: I would say one thing, Aditya, it can be. It is not a significant number. It can be some -- few percentages, which in large growth of this should not be really taken as a beneficiary thing or it changes the volume because we also import a lot of things, right? So, we also import a lot of things. So it is vice versa, what we see is not a major benefit we see or a major problem to be seen. So we should consider this as a normal thing. Being natural -- you can say it's a natural hedging.
Show 5 more questions
Question
Aditya Bhartia: Sure, sure. No, I'm saying from the perspective that our material cost is not very high. So to that extent, we don't get significantly impacted by rupee depreciation on the cost side, but we may have a disproportionate benefit on the revenue side. So which is why I was just trying to understand that can it really boost the revenue growth as well? Can it be an additional lever from the perspective of this year, given how sharply rupee has depreciated in the last couple of months?
Answer, vishnu malpani
Vishnu Malpani: Aditya, Vishnu here. I think -- see, we don't look at that largely when we're looking at business growth, etcetera, right? Our revenue growth is a function of how capacity is coming up online because we know this is -- this could be a factor for a particular quarter or for a particular year. So that is not really something that we do. But you're right to mention that rupee depreciation could probably help us to an extent of 5%, 6%. That's true, but not that an important factor for us while we are planning our business. We don't look at it from that lever at all.
Answer, vishnu malpani
Vishnu Malpani: So just to quickly address this. So one is our capex deployment in the current plant will be to bring the balance plants up and to ramp up the existing that have been operational to add further capacity to it, right? So over the next couple of years, whatever revenue or production output that we need, we are deploying capital in a phased manner to address that. So from a revenue perspective, we are tracking right to the contracts that we have to deliver over the next year, right? And coming to the second question, yes, you're right to point out that there could be a larger capex requirement, given that Azad is surrounded with a lot of opportunities, but this is not needed for the next couple of years for whatever guidance we've given. We need them to collect these opportunities in bag and start working on them so that this could fuel the next level of growth from Azad's perspective. Page 14 of 18 Azad Engineering Limited August 08, 2026 There is a lot of excitement, a lot of opportunities that we're working on right now.
Answer, vishnu malpani
And I think maybe in a quarter or so, we should be able to give a more comprehensive perspective that should probably address all of these things at a granular level.
Question
Kamlesh Bagmar: Great. I appreciate that. And secondly, like you pointed out that you will guide in next quarter. But can we be looking at, like, say, investment castings and other segments because that also is booming in a big way. And there also, the margins are far superior. So can that agency be looked at in terms of investment and driving further growth?
Answer, vishnu malpani
Vishnu Malpani: So Kamlesh ji, I mean, sorry, I have to reiterate this, but it will be difficult to comment on what opportunities we will be going forward next. Why don't we have a meeting in person and show you the kind of opportunity that we're working on right now. But to put our pin down on a particular opportunity and talk about it, it would be slightly difficult on this call. However, I can only assure you that there is a lot of work across sectors and not just one area that you mentioned. I think there are quite a few areas where there are opportunities that are getting unlocked. And given the bandwidth that we have, given the focus that we have, we will take the right calls, and we will be able to update you maybe in the coming call. And if there is a meeting that happens in Azad, we'll also share the developments that are coming forward in the next few quarters.
Question
Kamlesh Bagmar: And lastly, like say, it may be particular to this particular quarter only. But if we see the global peers, the way they have grown like say, 25%, 26%, and that also in dollar terms. So were there some hiccups in terms of stabilization of new lines because 23%, 24% growth looks to be a little less, given the fact that rupee depreciation has also benefited us a lot. See in the dollar terms...
Answer, vishnu malpani
Vishnu Malpani: Kamlesh, I think we are not comparing the right things, right? These companies have been building capacities or have built capacity several decades ahead of the curve, right? And the scale at which they are operating, obviously, is very different than the scale that we are operating at. We are in the process of starting to run off spindles, right? We are building capacity to address that. So for us, like we also spoke to Mr. Chopdar when he was talking about the quarter that this is the stabilization that we achieved in the last year. Foundation has been set.
Answer, vishnu malpani
Now we are at the right point to gain an access to all of the growth drivers that are there in the industry and the tailwinds that are there. But you have -- it will happen in the coming few quarters, right? But I don't see -- there are no hiccups. I mean, just because a larger player in this space is growing at a certain rate does not mean we have hiccups, right? I mean they are -- they do $2 billion plus a quarter, right? How much are we looking at? We have done INR600 crores in the full financial year.
Answer, vishnu malpani
So I think it's not right to compare that because capacities are online there. They have qualifications. They've been around for decades. So I would say no hiccups, again, summarizing it, but the growth is going to unlock basis stabilization that we are doing. The foundation is laid right now, and you will see this in the coming quarters. Page 15 of 18 Azad Engineering Limited August 08, 2026 Moderator: Our next question comes from the line of Prateek Shrivastava from Nivesh Wisdom.
Answer, vishnu malpani
Vishnu Malpani: So thank you, Prateek, for your kind words, and we really appreciate whatever you said. Now as you've rightly pointed out, I think this is a sector that needs extremely high engineering skills, etc.. But if you look back at how Azad was built, it starts right from our founder, right? We believe that every technical person can -- our founder who was a high school dropper and he's built the most advanced precision manufacturing company that India has today, right? So that culture is there everywhere in our business from the bottom to the top, right? So you would see that we have several training programs in the organization that bring in normal diploma operators. We put them through 60 to 90 days of training. He has trained people that are now training people, right?
Answer, vishnu malpani
So that culture is a continuous program. We've now built an engine of hiring roughly about 150 to 200 people every month, putting them into a 90-day training program. So this is a continuous cycle. And I think -- see, we think India has the talent, right? I think India just needs the right opportunity. So we are providing a platform to anybody who has engineering skills and then we are upgrading them to suit our sector. They also -- when people are deployed in the sector, they shadow the senior resources and then when they are ready, they get deployed on the real world.
Answer, vishnu malpani
So that's why you see that we have more people than what we actually require for our revenue because we are also trying to create a bench strength of people that can be quickly deployed on the floor.
Answer, ronak jajoo
Ronak Jajoo: Sure. I will take you through the 2 line item what you have asked me. First coming to the consumption part. Consumption part has 2 things. One is the raw material cost and other is the process content of the WIP, what is there in the inventory. So raw material, what we are buying till last year are more or less imported. Page 16 of 18 Azad Engineering Limited August 08, 2026 And as I told you over the previous call also, we have tried to get 2 main qualified in India, Sunflag and Star Wire for a few of the critical raw material grades where we are getting the benefit of the cost for 1, 1.5 year, we have helped them to get qualified with the giants like GE and the Siemens, not for India, but for the global supply chain picture.
Answer, ronak jajoo
So there, we are getting a benefit of the price benefit and also transportation cost benefit since these are the local supplies, which have a very less transportation cost compared to a global transportation cost when we import these materials from overseas, which is around 4% to 5% type of situation. So that is one lever. The other lever is also the process content because historically, we are chasing our lower sales and now the quarter we have closed with INR170 crores, but we are chasing a larger quarter in coming months that Mr. Chairman and Mr. Vishnu has also mentioned in their various questions and the speech. So that 2 put together has implemented this particular thing from that particular perspective, and we are quite confident this margin can be sustainable over coming quarters and so. And coming to your second question of employee, Vishnu mentioned in the previous questions that we don't require that much of manpower to cater to the sales what we are doing. This is for the future sales what we are targeting in quarter 3, quarter 4. Our WIP cycles are around 90 to 120 days, and we have to keep the inventories into place to cater to the quarter 3 and quarter 4 sales where all the spinners are running for quarter 3 and quarter 4.
Answer, ronak jajoo
So that's why you see an employee cost on the face elevated, which will be normalized by coming in quarter 3 and 4 and the absorption will go down over a period of time. Hope it is clear to you.
Question
Basant Bansal: What about other expenses? What has led to the increase in other expenses?
Answer, ronak jajoo
Ronak Jajoo: Other expenses, if you see as a percentage of sales is more or less stable. I don't think it has increased. The major costs that include are the power cost, tool cost, distros, maintenance and the job work, which we do the outsourcing are the 4, 5 major heading to that. You can go through the schedule of FY26 once it is published through the annual report. And if you have any further questions on that, more than happy to discuss the individual line items.
Question
Basant Bansal: Okay. Now the other question, which is more of a strategic in nature from your opening remarks and also from the various question answers, one gets the impression that everything seems to be good and company is moving into a very positive direction. So what are the challenges that makes you worried?
Answer, vishnu malpani
Vishnu Malpani: So thank you. This is Vishnu here. So I think challenges are also the same. So while we are looking at doing this, this is -- from an execution perspective, this is a complex thing, right? Because if you imagine what we are attempting to achieve as an organization, our team put together, we are building factories at the same time, ramping up capacities in some hiring people, training people, growing and catering to all contracts. Page 17 of 18 Azad Engineering Limited August 08, 2026 So this is a really large execution thing. And for us, we are trying to do everything, right?
Answer, vishnu malpani
So from our perspective, we have all the opportunities. I think it's just about stretching all of these things together. We have the right customers in the sector. We cannot have better customers. There are -- all the customers that are noteworthy in the sector are with us. We have the best long-term contracts, which give us visibility over 5, 7, 8 years. We have capital, we have capability, and we have consistently proven that we can deliver over time.
Questions about this call
- When was the Azad Engineering Q1 FY27 earnings call transcript filed?
- Azad Engineering filed the transcript with the exchange on 14 Aug 2026. This page is built from that transcript.
- What does this page list?
- 28 statements from the transcript across 5 topics, 25 of them with a figure. Each statement is shown with the transcript sentence it came from.
- Are the analysts' questions included?
- Yes. 15 questions and management's answers are listed in the order they were asked, as the transcript prints them.
- Who wrote this page?
- DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.