Skip to content

Earnings call

Ceinsys Tech Q1 FY27 earnings call

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

In the first quarter of financial year 2026-'27, the build-up of Ceinsys Tech Limited's order book of INR143 crores came mostly from geospatial enterprise solutions. The company aims to increase its technology services segment revenue to beyond 51% of total segment revenue. Consolidated operational revenue was INR158 crores, up 1% year-on-year, in the first quarter of financial year 2026-'27. Grammer saw an improvement in its order book for calendar year 2026, which Kaushik Khona described as a general improvement in the Mobility business. The company received INR130 crores out of INR230 crores in March '26.

The numbers management gave

Results

  • Consolidated operational revenue was INR158 crores, up 1% year-on-year, in the first quarter of financial year 2026-'27.
    Show source
    For the quarter under review, operational revenue stood at INR158 crores registering a marginal year-on-year growth of 1%.
  • Consolidated EBITDA was INR39 crores, up 27% year-on-year, and its EBITDA margin was 24.4%, an expansion of 505 basis points over the corresponding period last year, in the first quarter of financial year 2026-'27; the improvement was supported by continued gains in project delivery efficiency, with EBITDA increasing sequentially for the eighth consecutive quarter.
    Show source
    EBITDA increased substantially by 27% on a year-on-year basis to INR39 crores, with EBITDA margins improving to 24.4%, representing an expansion of 505 basis points over the corresponding period last year.
  • Consolidated profit after tax was INR31 crores, a marginal decline, and its PAT margin was 19.6%, a contraction of around 59 basis points year-on-year, in the first quarter of financial year 2026-'27.
    Show source
    Profit after tax stood at INR31 crores, which was a marginal decline, while PAT margin stood at 19.6%, a contraction of around 59 basis points year-on-year.
  • Geospatial Engineering Services revenue increased 30% year-on-year to INR94 crores, while Technology Solutions revenue declined around 25% year-on-year to INR63 crores, in the first quarter of financial year 2026-'27.
    Show source
    In terms of segmental performance, our Geospatial Engineering Services revenue for the quarter increased by 30% year-on-year to INR94 crores, while Technology Solutions side, revenue declined by around 25% year-on-year to INR63 crores.
  • International geospatial mobility business had new business development opportunities and contract awards gaining momentum during the first quarter of financial year 2026-'27.
    Show source
    Our international geospatial mobility business showed a meaningful improvement during the quarter with new business development opportunities and contract awards gaining momentum.
  • Working capital cycle was 164 days in the first quarter of financial year 2026-'27, compared with around 162 to 164 days in each of the previous 2 quarters.
    Show source
    On working capital cycle stood at 164 days during the quarter broadly in line with the levels seen over the previous 2 quarters.
Show 7 more statements

Results

  • Margins were around 15% to 17% before 2 years and are now going up to 24%, as the business has moved from data acquisition toward enterprise solutions and is scaling up in maturity.
    Show source
    So earlier, the margins were, let's say, when we began before 2 years, margins were around 15% to 17%, and we are now going up to 24%.
  • Other unbilled revenue is already being converted into billing, while JJM-related unbilled revenue had piled up over the last 2 or 3 quarters.
    Show source
    It is just because of JJM, which last 2 or 3 quarters, it is getting piled up.

Money and capital

  • After the joint venture is formed and due diligence is carried out, Ceinsys Tech Limited plans a second phase of another INR20 crores investment from its side.
    Show source
    And then the phase of -- second phase of another investment of INR20 crores from our side will be done.
  • Board has decided and resolved to invest a total of INR25 crores in two phases: INR5 crores toward incorporation of the company and INR20 crores once due diligence of the business, including technical and market due diligence, is done.
    Show source
    Right now, the Board has decided and resolved to invest total INR25 crores in 2 phases, first INR5 crores towards incorporation of the company; and second INR20 crores once the due diligence of the business is done.
  • The company raised INR238 crores for expansion, new opportunities and acquisitions, not solely for acquisitions.
    Show source
    When we talk about the raising of INR238 crores for, it was not just acquisition, it was expansion, new opportunities, acquisition and all.
  • The company received INR130 crores out of INR230 crores in March '26.
    Show source
    Kaushik Khona: And just to clarify, out of INR230 crores, INR130 crores has been received in March '26.
  • The company received the first INR100 crores in September '24, and the majority of the fund has now been received.
    Show source
    Kaushik Khona: First INR100 crores was received in September '24, but I think the majority fund has been received now.

What it expects ahead

What management expects

  • The company aims to increase its technology services segment revenue to beyond 51% of total segment revenue.
    Show source
    As a team, the company aims to enhance its technology services segment revenue and aims to go beyond 51% of the total segment revenue.
  • The company expects the due diligence phase for the proposed joint venture to take another 3 to 4 months before it comments on the business model.
    Show source
    As we progress, I think it's still a little far off to right now comment on what will be the business model and how we will structure the business model because the phase of due diligence, etcetera, will take another 3 to 4 months.
  • The Government of Maharashtra issued a GR stating that the majority of funds previously stuck for IoT-related projects under the Jal Jeevan Mission would be disbursed; Ceinsys Tech Limited expects all overdues for IoT and other projects under the Jal Jeevan Mission to be cleared before 31st March, substantially bringing down its working capital cycle.
    Show source
    And therefore, we expect as per the process which it takes, the time which it takes, we expect that in next 2 to 3 quarters and obviously, before 31st March, all the overdues of IoT projects and other projects which are under the Jal Jeevan Mission will be cleared, which will substantially bring down the working capital cycle.
  • The company has IoT debtors and received from IP approximately UBR of around INR100 crores in total, and expects to receive these funds by the end of the third quarter, most probably.
    Show source
    Amita Saxena: We have IoT debtors and received from IP approximately UBR of around total amount of INR100 crores, and we are expecting to get these funds by end of third quarter, most probably.
  • The majority of Ceinsys Tech Limited's projects have execution timelines of 12 months to 18 months, and the company is trying to increase execution levels to sustain the continuous growth seen over the last 2.5 years.
    Show source
    There is a execution time line of 12 months to 18 months in majority of the project.
  • Some Ceinsys Tech Limited orders have execution timelines of 3 months or 6 months from receipt, so some orders will be executed within this financial year; the company did not give guidance on whether 30%, 40% or 50% of its order book would be executed in the financial year.
    Show source
    So obviously, there will be execution within this year itself.
Show 15 more statements

What management expects

  • The major portion of Ceinsys Tech Limited's unbilled revenue relates to JJM projects; it will be billed in the next 2 quarters, and the unbilled revenue will then go down as funds from those projects are received.
    Show source
    Amita Saxena: Sir this unbilled revenue, major portion is of JJM things and which we have clarified in our, just a few, in one of the calls that we have got the clarity from the department and this amount will be billed in this next 2 quarters and this unbilled revenue will automatically go down in next 2 quarters once we have this funds from the JJM projects.
  • The Maharashtra Government issued a GR to allocate substantial funds for payment of dues of IOT and other projects; this is expected to substantially improve Ceinsys Tech Limited's working capital cycle in the next 2-3 quarters.
    Show source
    We expect recent – we have received recent government institution issued by Maharashtra government towards allocation of funds for the dues related to IoT and other projects to support collection and meaningfully improve the working capital cycle over the next 2 to 3 quarters.
  • The company expects traction in the transport domain, where it has gathered capabilities to execute bids, and sees opportunities in energy and in satellite defense-related data collection, analytics and enterprise platforms.
    Show source
    Besides, we are also expecting a traction in the transport domain because there we see a lot of opportunity, and we have also kind of gathered capabilities to execute our bid for them.
  • The company is simultaneously evaluating a few investment opportunities for potentially higher returns, focused on backward or forward vertical integration within its line of business to enable margin expansion.
    Show source
    So as of now while, that was one opportunity we are also simultaneously evaluating few opportunities where we can get maybe a higher return that what we’re already getting and therefore it’s taking time.
  • The company expects to receive funds from JJM projects very soon, following clarity from the government.
    Show source
    But then once as Kaushik-ji has already shared that we have a clarity from the government, now we can expect to have these funds very soon.
  • The company expects better operating cash flow in this financial year, but could not pin down a number.
    Show source
    Obviously, we will not be able to pin down a number, but we should certainly have a better operating cash flow in this financial year.

Orders

  • In the first quarter of financial year 2026-'27, the build-up of Ceinsys Tech Limited's order book of INR143 crores came mostly from geospatial enterprise solutions.
    Show source
    Moving to our operational performance, the quarter saw continued momentum in our order inflows, with the company securing fresh contracts worth INR143 crores during the period.
  • The company received a Letter of Intent from the Director of Urban Administration and Development, Madhya Pradesh, for selection and appointment of a manpower agency for beneficiary led constant vertical under the Pradhan Mantri Awas Yojana, with a total contract value of approximately INR67 crores to be gained over the next 3 years.
    Show source
    We have received a Letter of Intent from the Director of Urban Administration and Development, Madhya Pradesh for the selection and appointment of a manpower agency for beneficiary led constant vertical under the Pradhan Mantri Awas Yojana with a total contract value of approximately INR67 crores, which is going to be gained over the next 3 years.
  • The company received a Letter of Intent from Bhandara Municipal Counsel for supply, installation and commissioning of consumer, domestic ultrasonic and electromagnetic AMR water meters under Amrut 2.0, with an order value of INR17 crores; the project is to be executed over 12 months.
    Show source
    We recently issued a Letter of Intent from Bhandara Municipal Counsel for a supply, installation, commissioning of a consumer, domestic ultrasonic and electromagnetic AMR water meters under the Amrut 2.0 with an order value of INR17 crores.
  • The company received an approximately INR4 crores order from EKS InTec India for design, planning and simulation of 4 production lines, to be executed over 3 months.
    Show source
    In the mobility segment, we have received an order of approximately INR4 crores from EKS InTec India for design planning and simulation of 4 production lines to be executed over 3 months.
  • Purchase orders from T Second included NVMe drive supply, AI-powered building and road extraction, encroachment and asset monitoring through the BRYCK AI platform, and enterprise geospatial imagery repository and AI feature extraction capabilities; the aggregate value was INR30 crores.
    Show source
    The aggregate value of these purchase orders was INR30 crores.
  • The company received an INR67 crores order for which it had been L1.
    Show source
    In fact, one of the orders which we already got was that INR67 crores worth of order where we were L1, which we mentioned at that time, although we didn't give the name.
  • For Ceinsys Tech Limited, technical evaluation and contract award typically take 2 months to 3 months after bids are invited and registered, and sometimes take longer.
    Show source
    So we continue to bid for the new opportunities and the funnel keeps on increasing as and when the final orders are awarded because once if you can understand and appreciate the bid process itself, typically, once the bids are called for invited, and finally, even if the bids are kind of registered, the evaluation, technical evaluation and the award of the contract typically takes 2 months to 3 months.
  • US subsidiary, Technology Association, secured an international order valued at around INR4 crores for beta development of a hybrid power transfer case for Emotiv Mobility USA. Replaced by a later filing.
  • The company continues to have two opportunities in the pipeline out of the three mentioned in the previous call, in addition to other opportunities. Replaced by a later filing.
    Show source
    And we continue to have other opportunities apart from the 2 which are already in pipeline out of the 3 mentioned in the previous call.

What it is building and selling

Demand and pricing

  • Grammer saw an improvement in its order book for calendar year 2026, which Kaushik Khona described as a general improvement in the Mobility business.
    Show source
    In fact, Grammer also has seen that there is an improvement in the order book for the calendar year 2026, and that is a general improvement overall in the Mobility business.

Deals and partners

  • The proposed joint venture plans to provide GPU as a service, model as a service or AI services, based on building a data center to serve the sovereign defense purpose of the country.
    Show source
    What we have envisaged is to provide the solutions in the form of either the GPU as a service, model as a service or AI services.
  • The company has approved an investment up to INR25 crores in a joint venture with AI Fabric USA, to be incorporated to create a sovereign AI new cloud in India for Indian government, citizens and companies focused on cybersecurity, services and defense, offering GPU-as-a-service, model-as-a-service and AI service, and to build or lease data center capacity. Replaced by a later filing.

Everything else said on the call

Group structure

  • The company is evaluating setting up a joint venture to build a sovereign AI cloud, primarily to pursue defense contracts with the government; if the proposal proceeds, it may offer a large business investment opportunity, to be evaluated after due diligence that may take 3 to 4 to 5 months.
    Show source
    And one of the major kind of initiative which we recently took, which I also talked about and where even the Board meeting discussions were also posted on the stock exchange, we are evaluating to kind of set up a JV, which will be into the building of a sovereign AI cloud, where the primary purpose will be to go for defense contract with the government.
  • The company says acquisitions in this segment of industry typically have EBITDA multiples ranging from 5% to 7% to 10%, depending on the phase of the target company.
    Show source
    Typically, the acquisitions, whether it is domestic or foreign, they have the EBITDA multiple ranging between anywhere between 5% to 7% to 10%, depending upon what kind of phase of that company is in.
  • AllyGram is a joint venture company in which Allygrow, Ceinsys Tech Limited's wholly owned subsidiary, has a 70% profit share and Grammer of Germany has 30% shareholding.
    Show source
    As you may recollect, Allygrow was acquired and then it's already since merged with the company.

People and governance

  • Phaneesh Murthy resigned from Ceinsys Tech Limited in April 2026 for personal reasons. Replaced by a later filing.
    Show source
    He has resigned because of his personal reasons.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Deepak Poddar: Yeah, Ma’am. Thank you very much sir for this opportunity. Sir just first, I wanted to understand this is around INR1,000 crores order that we had. What would be the execution time line? And then, what sort of order pipeline we have and order inflow target that we are looking at? Page 4 of 17 Ceinsys Tech Limited August 14, 2026 Kaushik Khona: So I will just give you the breakup of the order book.

    Answer, kaushik khona

    As I said, we have around INR990 crores order book. The execution time lines will be -- some orders have to be executive within 3 months, some 6 months, some 12 months and some of them have a plan up to 18 months. There are certain orders, which also have O&M, which goes beyond the capex position, which goes to 2 years to 5 years, the O&M position. So there are orders which have an execution time line, which are different. On an average, the execution time line weighted average will be between 12 to 18 months. I hope I answered your question. As regards to funnel, if Dr. Abhay would like to comment.

    Answer, abhay kimmatkar

    Abhay Kimmatkar: No, no. I continuing with what about Mr. Khona has said. We have the execution spread up next 2, 3 years, the first 12 to 18 months would be the capex and then later, we will have 3 or 4 years of the opex. So that order book is going to get spread and we will have that revenue coming through those, yes.

  2. Question

    Deepak Poddar: Yes, I mean going forward this.

    Answer, abhay kimmatkar

    Abhay Kimmatkar: Yes, going forward. So next 2 quarters looks very upbeat and -- as in last concall also, we said that we have a robust funnel. We were L1 still a few of them, we were still L1. We are about to receive our orders. Funnel is pretty strong and we'll see, we are surpassing our last year's numbers. That's for sure that I will maintain it and reiterate it, we have a very strong funnel across our order book.

  3. Question

    Deepak Poddar: Yes. Will it be possible for you to quantify? I mean what is the range of funnel like you're looking at?

    Answer, abhay kimmatkar

    Abhay Kimmatkar: Exact number, I wouldn't be able to tell you. But I think Mr. Khona has indicated you the kind of funnel, a number, but not exactly the number. But definitely, we have surpassed, already said that -- you also said that already cost about INR1,000 crores. So, we will be achieving a similar kind of numbers. But I will pass this question to Kaushik ji.

    Answer, kaushik khona

    Kaushik Khona: So, sir, just wanted to reiterate. We don't give the forward guidance because that's not within our policy. But we are -- as Abhay ji already indicated, we have a strong funnel. In fact, the order book within this quarter, which is around INR143 crores also shows a substantial improvement from the order book as compared to the previous 2 quarters. And as Abhay ji mentioned, there are a few opportunities where we already bid, we expect the results shortly. So, let's -- and as you are aware, as and when we get the substantial orders getting awarded, we also publish it to the Stock Exchange by way of routine declaration. So, we keep you posted about that.

  4. Question

    Deepak Poddar: Understood. And just 1 last thing from my side. Now in terms of growth, I think this first quarter, we didn't see much growth rate. So, what efforts we are doing to kind of improve our growth, and what the growth we might be looking. We have seen last 2 years, very good growth in the Page 5 of 17 Ceinsys Tech Limited August 14, 2026 range of 50%, 60% now. So how should one look at this year and what effort we are doing to improve our growth?

    Answer, kaushik khona

    Kaushik Khona: So, as I said, we are on the on the target to not only increase the growth of turnover, we are also on the target to increase the margins. And you would have seen that this quarter, the margins have shown substantial improvement. The growth, obviously, will continue as the fund is also getting built up. Some of the orders, which I already mentioned were INR143 crores, which was received, have the execution time within next 3 months, 6 months. So, you will see the growth in next 2 to 3 quarters. As I again reiterate and for the benefit of all the listeners, we don't give forward-looking statements, and therefore, we will be restricting ourselves to mention about the numbers, but we are sure to have -- continue the trend of the growth, which we have seen in the last 2.5 years.

  5. Question

    Madhur Rathi: Thank you for the opportunity, sir. So firstly, I wanted to understand regarding our order book. Sir, Last quarter, our order book was INR880 crores and that has moved to close to INR990 crores this quarter. But if I look at order that we have received of INR140 crores minus order that we executed of close to INR148 crores. So, this number is not matching. So, if you could help me understand on the same.

    Answer, kaushik khona

    Kaushik Khona: Thank you for your time and this question. I would just again clarify in the previous conference call also, we have clarified that not all the businesses go into the order book, there are certain run rate businesses, which we don't build in the order book. For example, the Mobility business, we don't build in the order book. For example, the OEM products and services, we don't build into the order book. So therefore, there are certain business segments, which do not form into the order book. And this quarter also almost say, around INR40 crores -- sorry, around INR50 crores of the turnover was without the order book because they are run rate business. And this run rate business will continue.

    Answer, kaushik khona

    So, there will be certain orders which flow into the order books and certain the execution happens without the order book also. I hope that reconciliation, if you want, I can make a reconciliation and then give it to the IR agency who can then forward it to you. So opening balance of INR880 crores. The question, just what needs to be understood is during this quarter, even after execution of INR157 crores, we have increased the net order book by around INR110 crores, which I think is a phenomenal progress. Thank you for your question. And I will pass on the information to IR Agency. Madhur Rathi: Got it, sir.

    Answer, kaushik khona

    Kaushik Khona: So FY26, we had business, as I mentioned, are the 2 segments, which are without order book was INR130 crores, which includes Mobility and the Product Solutions business. There will be some orders, which is within other existing domain, which are small run rate business, which don't go into the order book. But out of INR660 crores which we recorded last year, I think more than 20%, 22% or 25% most without the order book and which traction will continue.

  6. Question

    Madhur Rathi: Got it. Sir, just a final question from my side. This fabric AI partnership that you have created. What kind of -- so these INR25 crores investment, what is this towards, and what will be the solution -- will we set up the whole cloud infrastructure for the government and we will receive payment and for that? Or will we just become more of a EPC player for the sovereign cloud. If you could help us understand the direction in which you are planning to go?

    Answer, kaushik khona

    Kaushik Khona: So, let me clarify. This is the initial phase of evaluating the business opportunity of setting up the AI cloud for the purpose of sovereign cloud for the government. And this is basically going to cater to the defense requirement of the government is our target. The proposed JV is between AI fabric of U.S. Inc. and with the contribution of 50% each. Present situation is where we are contemplating to incorporate the JV, which should be done in the next 1 or 1.5 months. And after the JV is formed, the complete due diligence and the technical due diligence as well as the market due diligence will be carried out. And then the phase of -- second phase of another investment of INR20 crores from our side will be done.

    Answer, kaushik khona

    So that's a kind of present traction. We don't intend to be an EPC company. We intend to be the AI solutions company. That's the objective. We won't be catering to the EPC cost -- the EPC part. But obviously, when we build up our infrastructure, some of the infrastructure will be kind of constructed through contractors also. But our business will be AI solutions, not the EPC.

    Answer, kaushik khona

    Kaushik Khona: No, it will -- as of now, it will be a kind of technology platform, which will integrate the geospatial as well as the satellite data as well as the enterprise solution, which will the user- defined custom oriented based on the requirement of the customer. So right now, we don't -- we are not expecting ourselves to be the only data analytics company. It will be a complete solutions company. But as we progress, we will then keep on kind of updating the investors.

  7. Question

    Madhur Rathi: Got it. Sir, just a final question from me, how is the margin for our -- because our margin has improved. So, what has led to this margin improvement. Actually, what is the margin for the order book business versus the run rate business from the Mobility and Product Solutions. So how does the margin defer for these two segments?

    Answer, kaushik khona

    Kaushik Khona: So, margins are improving as you see. That is because we are scaling up on the kind of the kind of maturity scale of the businesses. So, we are earlier before 3, 2 years, we were into more of data acquisition. Now we are into more of enterprise solutions. So, we are -- I mean, in a scale Page 7 of 17 Ceinsys Tech Limited August 14, 2026 of growth, if typically, a business is measured on the platforms like it's a scale 1, scale 2, scale 3, scale 4, scale 4 is the highest. We don't say we are between scale 2 to scale 3 and going up. So earlier, the margins were, let's say, when we began before 2 years, margins were around 15% to 17%, and we are now going up to 24%.

    Answer, kaushik khona

    Second issue is, before 2 years, we also enabled our technology solutions as a part of new domain where the margins are slightly better. And therefore, the overall mix of margin will be improving. As regards the margin in the order book, obviously, they will be either the same or better because as we keep on executing because of the improvement in the way we execute and the economies of scale, the margins are expected to improve. But we would -- as I said in the earlier question also, we don't give guidance about what will be the margin improvement. What was the next question?

  8. Question

    Pujan Shah: Thanks for the opportunity, sir. My first question pertains to the previous participant. So, I just want to understand if you can explain in a very layman term. So, let's suppose it's a 50-50 JV. We are investing INR25 crores and additionally, we will invest INR20 crores. So that will be the infrastructure which we will be setting up. Now, I want to understand the second part is after the setting up the infrastructure, all the data we have collected will be stored over there and then we get in. So, at one type of SAAS model, we have been planning to do or we have been thinking of in terms of annuity stream, which could help into increasing yield. What is our expectation in that?

    Answer, kaushik khona

    Kaushik Khona: Let me again clarify. Right now, the Board has decided and resolved to invest total INR25 crores in 2 phases, first INR5 crores towards incorporation of the company; and second INR20 crores once the due diligence of the business is done. The due diligence will include the technical as well as the market due diligence. What we have envisaged is to provide the solutions in the form of either the GPU as a service, model as a service or AI services. And this will be based on the building up of the data center for the purpose of serving the sovereign defense purpose of the country. This is the right now objective. As we progress, I think it's still a little far off to right now comment on what will be the business model and how we will structure the business model because the phase of due diligence, etcetera, will take another 3 to 4 months.

    Answer, kaushik khona

    And by that time, we will be able to freeze the business model. I hope I answered. Page 8 of 17 Ceinsys Tech Limited August 14, 2026 Pujan Shah: Got it, sir.

  9. Question

    Pujan Shah: Yes, right. Yes. Got it. Sir, second question would be on the trade receivables. So, I just want to understand, we have seen a notification from the government that they have released some payment from JJM perspective. So, what are the trade receivables we have been stuck in and how much receivables we are expecting going in a few months? And how is the traction going forward from JJM now?

    Answer, kaushik khona

    Kaushik Khona: I would, first of all, answer the question on the overall parameter. If you see our working capital cycle this quarter is also 164 days. And the same previous quarter, previous 2 quarters was also in the range of around 162 to 164 days. So, we have maintained the working capital cycle, which means that whatever billing is happening is being recovered. That is first thing. Second thing, I also mentioned in our presentation, which is posted on the Stock Exchange that recently, I would say, before 2 weeks, the Government of Maharashtra has issued a GR where they have said that the majority of the funds which was stuck earlier for the IoT-related projects under the Jal Jeevan mission, they have already resolved that the major funds will be disbursed. And therefore, we expect as per the process which it takes, the time which it takes, we expect that in next 2 to 3 quarters and obviously, before 31st March, all the overdues of IoT projects and other projects which are under the Jal Jeevan Mission will be cleared, which will substantially bring down the working capital cycle.

    Answer, kaushik khona

    So, this is what we are expecting. However, as I already mentioned, whatever we are billing, we are collecting, so there is no additional buildup of working capital cycle. Amita ji, if you would like to clarify?

    Answer, amita saxena

    Amita Saxena: We have IoT debtors and received from IP approximately UBR of around total amount of INR100 crores, and we are expecting to get these funds by end of third quarter, most probably. So, these -- we have that thing in mind, and we have the clarity from the government also that these funds will get released very soon.

  10. Question

    Pujan Shah: And in terms of action, if you can tell something?

    Answer, kaushik khona

    Kaushik Khona: So, if you look at our execution in the past 2 quarters of conference also, we have mentioned that while Jal Jeevan Mission projects continue to be executed, our -- the focus now is also going into various other domains. So, for example, transport or energy or other geospatial and recently, if you see the wins which we have had, which is under the Madhya Pradesh Urban and Administration Development Department, there also, it is more of a geospatial. So, we are taking conscious call to see that we bid for those opportunities where there is more clarity of the funds, budget allocation is already there and funds are already arranged by the government projects. So, earlier, we had a setback for some time till November 2025 for the issues of Jal Jeevan Mission. But now since November '25, we are not seeing any buildup on that and things are more manageable. I hope these things are clarified. Page 9 of 17 Ceinsys Tech Limited August 14, 2026 Pujan Shah: Got it, sir.

Show 12 more questions
  1. Question

    And I want to understand the Allygrow visibility. So how it has been panning out? What are your expectations in terms of growth? And what is the current challenges which we have been facing over there?

    Answer, kaushik khona

    Kaushik Khona: So, I think it's been -- at least from 2025 December onwards, we are seeing positivity in the Mobility business. As you may recollect, Allygrow was acquired and then it's already since merged with the company. So right now, Mobility is a division. The only thing which remains out of this company is a JV, which is Allygram, which is JV with Grammer AG of Germany, where we are 70% stakeholder and 30% is Grammer. These results of Grammer are -- these results of Allygram are not consolidated because they are a JV. Now as regards Mobility, the things are looking better. In fact, Grammer also has seen that there is an improvement in the order book for the calendar year 2026, and that is a general improvement overall in the Mobility business.

    Answer, kaushik khona

    So, we are expecting some more traction in the Mobility. On the international side, I think the subsidiary -- wholly owned subsidiary, which has Mobility as well as Geospatial, we are seeing that there is a substantial improvement in this quarter as compared to the previous year same quarter. And even...

    Answer, amita saxena

    Amita Saxena: Top line has also increased for our overseas business in this quarter, even the margins have improved in that business. So, we foresee a good traction in the U.S. subsidiary also in this coming year.

  2. Question

    Pujan Shah: Got it, sir. And last time in our conferences, we have mentioned about the RFID of the transport, which we have been planning to scale up. Is that tendering started or it's still under the approval from the government and it will start sooner?

    Answer, kaushik khona

    Kaushik Khona: No. So as regards the ITMS and the ATMS business on the transport, which is the intelligent traffic management system, we have already gathered the capabilities. In some of the cases where we did not have, we already tied up with the partners, and we are already in discussion with the government for some more opportunities. So, we expect some positive developments in the next 1 or 2 quarters on the transport domain.

  3. Question

    Pujan Shah: Got it. And my last question would be so recently, we have seen order book pipeline has also increased by INR1,000 crores. And while we are without our order reflection, it more or less stays around 20-25%. So, are we expecting a significant revenue in FY27 with the reason being, first of all, our order book is conversion is 12 months to 18 months. And other than that our order book is doesn't include 20% of the new orders inflow. So do we expect a significant INR900 crores to INR1,000 crores mark in FY27?

    Answer, kaushik khona

    Kaushik Khona: I would just refrain from giving any guidance on the -- for the future. But our -- as you rightly observed, there is a improvement in the order book. There is a execution time line of 12 months to 18 months in majority of the project. So we are trying to push the execution to increase the kind of level of execution to have the continuous growth as we have seen in the last 2.5 years. We won't be able to give you guidance on what will be the turnover for '26-'27. Page 10 of 17 Ceinsys Tech Limited August 14, 2026 Pujan Shah: Got it sir.

  4. Question

    Thank you, thank you so much. I’ll rejoin the queue.

    Answer, kaushik khona

    Kaushik Khona: Thank you. The next question is from the line of Rohit from MAPL. Please go ahead. Rohit: Hi sir, thanks for the opportunity. Sir, my question will be on this growth side for FY27. Sir you mentioned INR990 crores of order book we are yet to execute, right?

    Answer, kaushik khona

    Kaushik Khona: I have already mentioned that the majority of the orders have the execution time line of 12 months to 18 months. So I think as we progress, some of the orders obviously will get executed. Besides I also mentioned earlier that some of the orders have the execution time line of 3 months, 6 months from the date they have been received. So obviously, there will be execution within this year itself. What percentage, whether it will be 30%, 40% or 50% of the order book in this financial year, I won't be able to give you guidance. But yes, we are on track with all the milestones, which are as per the order book. We are not behind any of the milestones.

    Answer, kaushik khona

    So we should be able to progress as per the time lines in the mentioned in the order book. Rohit: Okay. And sir, and this drivers of this growth, which segment do you think will lead for us?

    Answer, kaushik khona

    Kaushik Khona: There are 2 or 3 major initiatives which we are seeing. One is the geospatial enterprise solutions, we are seeing good traction. In fact, in the build-up of order book of INR143 crores, majority of the orders have come from the geospatial enterprise solutions. Besides, we are also expecting a traction in the transport domain because there we see a lot of opportunity, and we have also kind of gathered capabilities to execute our bid for them. And therefore, these are 2 major domains. Besides, we also see the opportunities in the energy for which some of the opportunities we are also tracking and the satellite defense-related data collection, analytics as well as the enterprise platform for those kind of services. So these are some of the traction which we continue to monitor.

    Answer, kaushik khona

    And as you already know, we are into all the infrastructure domain so the opportunities in each of the domain continue to be tracked. I hope I answered your question Rohit: Yes, yes sir understood. And sir, on the margin front, we'll be able to maintain this 22%, 23% margin?

    Answer, kaushik khona

    Kaushik Khona: This quarter, we have clocked 24.4%. So I guess we should be able to do that. Rohit: Understood, understood. Okay. Thank you so much.

  5. Question

    Gunit Singh: Hi sir, thank you for the opportunity. I have a question regarding the order book itself. So in the last con call also you mentioned that we are L1 in 3 large orders whose values were around INR350 crores, INR400 crores, correct me if I'm wrong, which is more than the total order intake last year. So I just want to understand, are we on track for that? Would you mentioned by the end of Q2 or in Q2, we should receive these orders. So can you...

    Answer, kaushik khona

    Kaushik Khona: Yes, we are on track. In fact, one of the orders which we already got was that INR67 crores worth of order where we were L1, which we mentioned at that time, although we didn't give the name. And we continue to have other opportunities apart from the 2 which are already in pipeline out of the 3 mentioned in the previous call. So we continue to bid for the new opportunities and the funnel keeps on increasing as and when the final orders are awarded because once if you can understand and appreciate the bid process itself, typically, once the bids are called for invited, and finally, even if the bids are kind of registered, the evaluation, technical evaluation and the award of the contract typically takes 2 months to 3 months. Sometimes it exceeds 2 months to 3 months also. So therefore, we are on track. We should be able to expect something more.

  6. Question

    Gunit Singh: Got it. So I mean, based on this, we can assume that, I mean, we can close about INR350 crores, INR400 crores order book intake by Q2. Is that a fair understanding?

    Answer, kaushik khona

    Kaushik Khona: Sir, as I said, we don't give any guidelines, although the funnel remains to be substantially big. The finality of awarding of an order has a lot of process. So it will be wrong for us to give you any futuristic guidance because that's not as per our policy. But as I said, you can observe that from the last quarter where we had an order book closure of INR880 crores. This quarter, we have INR990 crores after execution of INR157 crores. So obviously, there is improvement, right? And we expect that to further improve.

  7. Question

    Gunit Singh: Yes. Great to hear that. So secondly, in terms of our acquisition, we had raised funds, I think, 2 years ago for the acquisition, but it has been delayed since 2 years. So I just want to understand, I mean, what proactive measures are we taking to expedite this process? And I mean, are we currently evaluating any companies for acquisition or should we expect something in FY27 in this regard because it has already been 2 years since we have been trying to do this?

    Answer, kaushik khona

    Kaushik Khona: Yes. So I will just take this. When we talk about the raising of INR238 crores for, it was not just acquisition, it was expansion, new opportunities, acquisition and all. And one of the major kind of initiative which we recently took, which I also talked about and where even the Board meeting discussions were also posted on the stock exchange, we are evaluating to kind of set up a JV, which will be into the building of a sovereign AI cloud, where the primary purpose will be to go for defense contract with the government. Now that, if that fructifies, that also will have a large business investment opportunity, which can be evaluated after the due diligence is already completed, which may take 3 to 4 to 5 months. So as of now while, that was one opportunity we are also simultaneously evaluating few opportunities where we can get maybe a higher return that what we’re already getting and therefore it’s taking time. We don’t want to invest just for the sake of investing we want to see that investments are in line with what we are doing either it is vertical integration backward or vertical integration forward within our line of business so that it enables the margin expansion.

  8. Question

    Gunit Singh: Sir, but the funds have been idle since 2 years, and we have not been able to get...

    Answer, kaushik khona

    Kaushik Khona: And just to clarify, out of INR230 crores, INR130 crores has been received in March '26. So I mean, it’s just for your clarification.

    Answer, kaushik khona

    Kaushik Khona: First INR100 crores was received in September '24, but I think the majority fund has been received now. But I think we are on track to see that they are properly used.

  9. Question

    Sir, and if we see in the first quarter numbers also the stand-alone numbers, the revenues are by and large, flat. So when exactly will this unbilled revenue will it be billed?

    Answer, amita saxena

    Amita Saxena: Sir this unbilled revenue, major portion is of JJM things and which we have clarified in our, just a few, in one of the calls that we have got the clarity from the department and this amount will be billed in this next 2 quarters and this unbilled revenue will automatically go down in next 2 quarters once we have this funds from the JJM projects. And all other unbilled revenue is already getting converted into billing and other things, and we are, that cycle is moving. It is just because of JJM, which last 2 or 3 quarters, it is getting piled up. But then once as Kaushik-ji has already shared that we have a clarity from the government, now we can expect to have these funds very soon.

  10. Question

    Keshav Garg: Sir, now the second concern is that, sir, if you look at our stand-alone EBITDA last year, it was upwards of INR170 crores. But if we look at stand-alone operating cash flow, it was a tenth of that, like INR19 crores. And if we look at the past 3 years also, the cash conversion from EBITDA to cash flow, it is very miniscule. Sir, so though I understand the nature of the business is working capital intensive and the top line has also grown. So but after adjusting, sir, what is your view? Can we see some significant jump in operating cash flow in this year's balance sheet?

    Answer, kaushik khona

    Kaushik Khona: Sir, I think your observation is perfectly correct. The only as a part of suggest, I would say, my general submission is that when a company is growing at the rate of 50% CAGR, because the working, and you rightly observed because the working capital keeps on getting invested. Secondly, you just mentioned that UBR. So obviously, when the UBR also gets piled up because of the specific reasons, which are also getting addressed, therefore, the cash from operation was small. However, as our CFO, Amita-ji already clarified, we expect this financial year to have a better, maybe how much better? Obviously, we will not be able to pin down a number, but we should certainly have a better operating cash flow in this financial year.

  11. Question

    Keshav Garg: Now sir, if we look sir, I appreciate the answer you gave to the previous participant. And sir, even if we don't find a good acquisition opportunity, it is best not to do an acquisition, even though we might have raised capital for that purpose. Sir, now but the concern is that if we look at our stock price from April high of over INR1,200, now it is below INR800, whereas the general market trend is the opposite. So there is no smoke without fire. So I'm trying to understand that at this market cap, the stock is trading at 7x EV EBITDA. So now when we are looking to acquire any company, so are we looking to, what is the EV EBITDA that we are looking to pay for acquisition target

    Answer, kaushik khona

    And most of these deals in this kind of segment of industry are driven EBITDA multiple or turnover multiple. Typically, the acquisitions, whether it is domestic or foreign, they have the EBITDA multiple ranging between anywhere between 5% to 7% to 10%, depending upon what kind of phase of that company is in. And we will obviously evaluate what, how much that will add to our top line and bottom line, which should be incremental. So we appreciate your suggestion, and we are perfectly going to ensure that the shareholder wealth improves as for any decision which we take.

  12. Question

    Keshav Garg: Sir, lastly, if we see then in mid-November, Mr. Phaneesh Murthy resigned. And since then, only the stock price has been into a tailwind. So is it a coincidence or there is something more to it? And why exactly did he resign within a year of getting appointed?

    Answer, amita saxena

    Amita Saxena: Sir, Phaneesh Murthy-ji has resigned in the month of April 2026 and not November 2025. So there is a correction in the date. And there is no relevance of share price and exit of Mr. Phaneesh Murthy. He has resigned because of his personal reasons. So there is no correlation between November '25 or share price going down. He has resigned in April '26. If you can just go and check the...

Questions about this call

When was the Ceinsys Tech Q1 FY27 earnings call transcript filed?
Ceinsys Tech filed the transcript with the exchange on 18 Aug 2026. This page is built from that transcript.
What does this page list?
41 statements from the transcript across 8 topics, 27 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 22 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
Ceinsys Tech Q1 FY27 concall: what the company said · DalalOS