Earnings call
Ceinsys Tech Q4 FY25 earnings call: Ceinsys Tech Limited's confirmed order book stood at around INR 1,197 crores as at March 2025
By DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person.
Transcript filed .
Confirmed order book stood at around INR 1,197 crores as at March 2025. The company expects to complete a majority portion of the project, forecast at around INR 150 crores, in the first quarter and hopes to execute it within that quarter; the entire project is not expected to be completed by Q1. For the Vidarbha project, the actual letter of allotment was granted on January 13 after the award was provided in November; the government delay in giving the actual letter of award was two months, and work begins only after the letter of award. Operational revenues grew by 81.9% year-on-year to INR 142 crore in the fourth quarter ended 31 March 2025, and EBITDA grew by 116% year-on-year to INR 27 crore, with EBITDA margins at 18.82%. The allocation for CS Tech opportunities under Jal Jeevan mission is not affecting them; on a yearly budget of spend of around 110,000 crores, CS Tech's share of revenue would not be more than 3% to 4% to 5%, even at high potential.
The numbers management gave
Results
- Operational revenues grew by 81.9% year-on-year to INR 142 crore in the fourth quarter ended 31 March 2025, and EBITDA grew by 116% year-on-year to INR 27 crore, with EBITDA margins at 18.82%.
Show source
For the quarter under review, our operational revenues grew by 81.9% year-on-year to INR 142 crore and EBITDA grew by 116% year-on-year to INR 27 crore, with EBITDA margins at 18.82%.
- Net profit was INR 22 crores in the fourth quarter ended 31 March 2025, representing growth of around 89% year-on-year, and PAT margin was 15.38%.
Show source
Net profit was reported at INR 22 crores, which represents a growth of around 89% year-on-year, and PAT margin stood at 15.38%.
- Operational revenues were INR 418 crores for the financial year ended 31 March 2025, growing 65% year-on-year.
Show source
For the financial year ended 31 March, our operational revenues mounted to INR 418 crores, demonstrating a strong year-on-year growth of 65%.
- EBITDA rose almost 77% year-on-year to around INR 78 crores, with EBITDA margins of around 18.63%, for the financial year ended 31 March 2025.
Show source
EBITDA also saw a robust increase, rising by almost 77% year-on-year to around INR 78 crores, with EBITDA margins of around 18.63%.
- Net profit surged by 81% year-on-year to INR 63 crores and PAT margin was 15.12% for the financial year ended 31 March 2025.
Show source
Additionally, our net profit surged by 81% year-on-year to INR 63 crores and a PAT margin of 15.12%.
- Successful project execution drove Ceinsys Tech Limited's growth in revenue and EBITDA margins in the fourth quarter and financial year ended 31 March 2025, contributing to stronger margins.
Show source
The growth in both revenue and EBITDA margins was driven by successful execution of projects, which contributed to stronger margins.
Show 13 more statements
Results
- Ongoing operational-efficiency initiatives enabled it to handle higher volumes more effectively in the fourth quarter and financial year ended 31 March 2025.
Show source
Additionally, our ongoing initiatives to improve operational efficiency have enabled us to handle higher volumes more effectively, further boosting our performance.
- Turnover to net working capital ratio increased from 3.2x in the previous year to 4.4x in the financial year 2024-2025, indicating enhanced operational efficiency and better capital utilization.
Show source
A key highlight for the financial year 2024-2025 is a significant improvement in the turnover to net working capital ratio, which increased from 3.2x in the previous year to 4.4x in this year financial year 2024-2025, indicating again enhanced operational efficiency and a better capital utilization.
- Execution of technology solutions projects increased 3.5-fold in 2024-2025, rising from INR 60 crores last year to INR 213 crores in 2024-2025, reflecting strong demand and enhanced delivery capabilities.
Show source
Ceinsys Tech Limited Q4FY25 Results Conference call 07.05.2025 The execution of technology solutions projects witnessed a 3.5-fold increase during the year 2024-2025, rising from INR 60 crores of last year to INR 213 crores of the year 2024-2025, which reflects a strong demand and enhanced delivery capabilities.
- Employee cost as a percentage of revenue declined to 30% in this year from 35% of the previous year, reflecting enhanced operational efficiency.
Show source
Employee cost as a percentage of revenue declined to 30% in this year from 35% of the previous year, reflecting enhanced operational efficiency.
- Turnover per employee rose to around 3.34 million per employee in this year from 2.29 million per employee in the previous year.
Show source
This is further evidenced by the fact that there is a notable increase in turnover per employee, which rose to around 3.34 million per employee in this year as compared to 2.29 million per employee in the previous year.
- In FY 2025, Allegro Technologies contributed INR 83 crores in revenue and INR 10 crores as the share of profit from the JV, for a total contribution of around INR 93 crores.
Show source
I'm talking of the INR 83 crores as a part of revenue and INR 10 crores as a part of the profit.
- The company achieved INR 418 crores in the financial year ended 2025, compared with INR 252 crores in the previous year.
Show source
But there is and we have achieved INR 418 crores this year as compared to INR 252 crores in the previous year.
- Technology Solutions contributed 51% of Ceinsys Tech Limited's total turnover in the financial year ended 2025, compared with 24% of total turnover last year. Replaced by a later filing.
Money and capital
- The company invested around INR 12 crores in business development for expansion into U.S. market, and expensed the amount in the profit loss account for 2024-2025.
Show source
We have invested around INR 12 crores towards the business development for expansion into U.S. market, and this has been expensed out in the profit loss account for the year 2024-2025.
- Board recommended a dividend of 35%, compared with 25% last year, payable once approved by the members at the ensuing annual meeting; the Board has proposed a dividend at 35% on enhanced capital of Rs. 1744 lakhs, compared with 25% paid on Rs.1634 Lakhs of the previous year.
Show source
Infused with the performance, the Board has recommended a higher dividend of 35% as compared to 25% last year.
- Total trade receivables were INR 253 crores as on 31st of March 2025, including INR 135 crores of unbilled revenues.
Show source
So when we talk about the total debtors, the trade receivables, which is we are talking of INR 253 crores, this includes the unbilled amount of INR 135 crores, while the debtors have already come down as compared to the previous year.
- The company received around INR 88 crores of receivables in March 2025.
Show source
We have, in fact, in the month of March, we have received a substantial amount of receivables which were due and around INR 88 crores of the total receivable was received in the month of March.
- The company held an investable surplus of around INR105 crore for inorganic opportunities and an operational cash surplus of INR 45 crore as of year-end. Replaced by a later filing.
What it expects ahead
What management expects
- The company expects to complete a majority portion of the project, forecast at around INR 150 crores, in the first quarter and hopes to execute it within that quarter; the entire project is not expected to be completed by Q1.
Show source
Kaushik Khona No, no. The entire project, entire project is not expected to be completed by Q1. there will be majority portion, which I think we had forecasted of around INR 150 crores in the first quarter, which we hope that we will be able to do it within the first quarter.
- Target is to achieve INR 300 crores to INR 400 crores worth of order book every quarter, depending on available opportunities.
Show source
So typically, our target is to achieve INR 300 crores, INR 400 crores worth of order book every quarter, and it depends on which opportunities are available.
- Order pipeline is normally in the range of INR 300 crores to INR 400 crores every quarter and at any point of time; it had bid for around INR 355 crores and expected something to happen within the next one month or so.
Show source
So even as we speak, we have a pipeline for which we have bid in the range of around INR 355 crores.
- The company expected the disposal of at least two large projects, which could aggregate to more than INR 280 crores, within the next one month or so.
Show source
About these out of INR 355 crores, we expect the disposal of at least two of the large projects, which could be aggregating to more than INR 280 crores in the next one month or Ceinsys Tech Limited Q4FY25 Results Conference call 07.05.2025 so.
- The company will continue the growth path, but does not give forecasts or targets for 2026.
Show source
And I think what we indicated that we will continue to -- continue the growth path.
- The company expects its pipeline and contracts to expand during the current year, which is FY 2026.
Show source
And we expect that pipeline as well as those contracts in terms of longer term to expand during the current year, which is FY 2026.
Show 15 more statements
What management expects
- Appointment of Suraj is a futuristic move intended to grow international revenue and establish a presence and leadership in those markets.
Show source
The fact that we want to grow international revenue, we need a presence in those markets and we need to show those leadership moments in those markets.
- The company may eventually report separate revenue segmentation for AI as its development progresses.
Show source
And as we start developing that more and more, at some point of time, we will probably also start counting separate segmentation of revenue coming out of AI.
- The company would like to maintain and improve its margins. Replaced by a later filing.
Show source
Ceinsys Tech Limited Q4FY25 Results Conference call 07.05.2025 Deepak Poddar But we would like to maintain and improve our margins.
- Focus on the international market remains, and it will increase the revenue portion of Technology Solutions. Replaced by a later filing.
Show source
So the Ceinsys Tech Limited Q4FY25 Results Conference call 07.05.2025 focus on international market remains and still we will increase the revenue portion of the technology solutions.
Orders
- Order book as at March 2025 included INR 1,019 crores in water-domain projects and around INR 178 crores in geospatial enterprise solutions services.
Show source
Of this, projects in the water domain account for INR 1,019 crores and the geospatial enterprise solutions services contribute to around INR 178 crores.
- The company secured a Maharashtra river linking project valued at INR 381 crore of revenue during 2024-2025.
Show source
He was earlier appointed as CEO of the TA, which is a wholly owned subsidiary of the company at U.S. The year 2024- 2025 was eventful and we added major contracts secured during the financial year which include a prestigious river linking project in Maharashtra valued at INR 381 crore of revenue, an IoT based project with Maharashtra State Water and Sanitation Mission with INR 332 crore of the order value a service provider contract for implementing integrated GIS enterprise for CIDCO, which is valued at INR 29 crore the selection of system integrator for the integrated digital transformation of MHADA, which is valued at around INR 29 crores.
- Geospatial and enterprise solution order book being executed was INR 1,197 crores as on 1st on April, excluding Allygrow.
Show source
Kaushik Khona So as we already mentioned, the total order book as on 1st on April is INR 1,197 crores, which is being executed.
- Announced INR 1,197 crores order book covers geospatial and engineering services and excludes the annual contract for the Allygrow business; the INR 1,390 crores figure included around INR 130 crores for the Allegro business, which remains part of the additional order book. Ceinsys Tech Limited's revised order book would be INR 1,197 crores plus INR 130 crores, or INR 1,327 crores.
Show source
The INR 1,390 crores included around INR 130 crores Ceinsys Tech Limited Q4FY25 Results Conference call 07.05.2025 as regard to the Allegro business, which continues to be the part of additional order book.
- Orders include some orders to be executed over 3 years, 4 years, with average execution between 18 to 24 months.
Show source
But on an average, the average execution would be between 18 to 24 months.
- Of the INR 1,197 crore order book, around INR 500 crores was for Technology Solutions and the balance was for geospatial engineering services; around INR 400 crores was on water.
Show source
So out of INR 1,197 crore, the technology solutions order book is in the range of around INR 400 crores on water and around so around INR 500 crores on the technology solutions and balances geospatial engineering services.
- The Company secured a service provider contract for implementing an integrated GIS enterprise for CIDCO, valued at INR 29 crore.
Show source
He was earlier appointed as CEO of the TA, which is a wholly owned subsidiary of the company at U.S. The year 2024- 2025 was eventful and we added major contracts secured during the financial year which include a prestigious river linking project in Maharashtra valued at INR 381 crore of revenue, an IoT based project with Maharashtra State Water and Sanitation Mission with INR 332 crore of the order value a service provider contract for implementing integrated GIS enterprise for CIDCO, which is valued at INR 29 crore the selection of system integrator for the integrated digital transformation of MHADA, which is valued at around INR 29 crores.
- Confirmed order book stood at around INR 1,197 crores as at March 2025. Replaced by a later filing.
- The company secured an IoT based project with Maharashtra State Water and Sanitation Mission with INR 332 crore of order value during 2024-2025. Replaced by a later filing.
- The company was selected as system integrator for the integrated digital transformation of MHADA, valued at around INR 29 crores, during 2024-2025. Replaced by a later filing.
- Revised order book would be INR 1,197 crores plus INR 130 crores, or INR 1,327 crores. Replaced by a later filing.
What it is building and selling
Projects and capacity
- For the Vidarbha project, the actual letter of allotment was granted on January 13 after the award was provided in November; the government delay in giving the actual letter of award was two months, and work begins only after the letter of award.
Show source
Kaushik Khona So the Vidarbha project, the actual letter of allotment was granted on January 13, although the award was provided in the month of November.
- The company had deployed more than 88 newly recruited people on-site for the Vidarbha project since November, December.
Show source
In fact, we have deployed more than 88 people on-site for this new which are the new recruitees, which we have recruited since the month of November, December.
- The award for the project was delayed by two months; Ceinsys Tech Limited completed the bank guarantee and agreement formalities after the award and commenced the project on February 1, remaining as per the project charter.
Show source
Kaushik Khona So, the award itself has been delayed, as I said, by two months.
- The company had deployed the infrastructure and equipment required to carry out the DPR survey on-site for the Vidarbha project and had greatly commenced and completed the first link of the aerial lidar survey.
Show source
We also have kind of greatly commenced and completed the first link of the aerial lidar survey.
- The company will update investors about the project's Q1 progress at the next investor conference call. Replaced by a later filing.
Show source
So we will keep you updated once the in the next investor conference call about the progress which has happened on the Q1.
Demand and pricing
- The allocation for CS Tech opportunities under Jal Jeevan mission is not affecting them; on a yearly budget of spend of around 110,000 crores, CS Tech's share of revenue would not be more than 3% to 4% to 5%, even at high potential.
Show source
That itself is not anyway affecting the opportunities for CS Tech because on a yearly budget of spend of around 110,000 crores, our share of the revenue is not going to be more than let's say even if we talk about the high potential, it will not be more than 3% to 4% to 5%.
Show 17 more statements
Demand and pricing
- The geospatial part of the Jal Jeevan mission will be no more than 7%, 8%.
Show source
And in the past conference calls also, we have mentioned Ceinsys Tech Limited Q4FY25 Results Conference call 07.05.2025 that the geospatial part of the Jal Jeevan mission will be no more than 7%, 8%.
- The company attributed its competitive advantage to technical competencies, project execution, 26 years in the business and breadth of services.
Show source
We believe the reason for that is our competencies, not just technical, but also project execution and the years of experience we are in the business for 26 years and the breadth of the services.
- Jal Jeevan mission is not Ceinsys Tech Limited's only source of opportunity, and there is still potential to be tapped; the company is focused on Maharashtra and Uttar Pradesh and is tapping into some other states.
Show source
Right now, we are only focused into Maharashtra, Uttar Pradesh, and we are tapping into some other states.
Segments
- Technology Solutions contributed 51% of Ceinsys Tech Limited's total turnover in the financial year ended 2025, compared with 24% of total turnover last year.
Show source
And if you see the year this year, the Technology Solutions have contributed 51% of the total turnover as compared to 24% of the total turnover last year.
- Most of Ceinsys Tech Limited's large projects combine geospatial and technology, although some projects such as the Digital Project Management System (DPMS) can be 100% in the technology segment.
Show source
But those will be few, most of the projects, most of the large projects will be a mix of geospatial and technology combination.
- The company has been rebranded as CS Tech Ai, while the corporate name remains Ceinsys Limited.
Show source
Ceinsys Tech, which has been recently rebranded as CS Tech Ai, while the corporate name remains as Ceinsys Limited, we are a leading technology solution provider in the IT enabled sector.
- The company serves large corporates, OEMs, asset management companies and government bodies in geospatial and manufacturing and mobility sectors.
Show source
Ceinsys Tech Limited Q4FY25 Results Conference call 07.05.2025 We serve prestigious global clientele that include large corporates, OEMs, asset management companies and government bodies, highlighting our robust reputation in both geospatial and manufacturing and mobility sectors.
- The company has offices in India, United States, United Kingdom and Germany.
Show source
With offices in India, United States, United Kingdom and Germany, we combine local expertise with a broad international reach.
- The company has established an Innovation and Emerging Technologies Wing that develops technology solutions using artificial intelligence and machine learning and has provided solutions to enhance delivery efficiency in ongoing projects and develop new process technology and products.
Show source
Additionally, we have established our Innovation and Emerging Technologies Wing, which is engaged in development of new technology solutions through use of artificial intelligence and machine learning and have provided various solutions to enhance the efficiency of the delivery of the ongoing projects as well, as also for developing new process technology and the products.
- Innovation and Emerging Technologies Wing emphasizes metaverse, ad-tech, gaming and mobility.
Show source
This vertical emphasis the advancement in metaverse, ad-tech, gaming and mobility, reflecting the company's commitment to innovation and maintaining a competitive edge in a dynamic technological landscape.
- Focus is towards Technology Solutions, but it is difficult to project the percentage of revenue under each segment.
Show source
So focus is surely towards the technology solutions.
- The company has applied for IPR for its invented technology process and is already taking the benefit of that technology innovation in existing projects.
Show source
We have applied for that for the IPR, and we are already taking the benefit of that technology innovation in our existing projects.
- The company has built a team to use artificial intelligence and machine learning for geospatial work, and its in-house development is internally usable and already being used to reduce effort and improve margins.
Show source
The development which we have done in house, we are already using it for reducing efforts and improving the margins.
- The company intends to reduce geospatial content because it is a low-margin business and increase the technology portion because it is a high-margin business.
Show source
Our intent is to reduce geospatial content because it's a low margin business and increase technology portion because it's a high margin business.
- River linking project includes area LiDAR survey as a geospatial part, while processing the survey using artificial intelligence and using technology to define project parameters and provide project detailing are part of the technology side.
Show source
Prashant Kamat No, I think last meeting we said in terms of data center, we are at least right now putting those plants on the back burner.
- The company continues to enhance its focus on embedded technologies for mobility solutions. Replaced by a later filing.
Show source
Besides the company continues to enhance its focus on the embedded technologies for the mobility solutions.
Deals and partners
- The company signed one large contract and has started small execution of it. Replaced by a later filing.
Show source
We signed one large contract and we started small execution of that already.
Risks, rules and outside factors
Risks and disputes
- The company cautioned that rainy-season conditions may compound delays to API survey and soil-testing work, and did not want to give futuristic numbers on the project at the call.
Show source
Because we have received order late, there are also and we have discussed this with government, there are also possibilities of compounding delays because with the rainy season coming up, the work will be affected in terms of survey and soil testing and all of that for API.
Rules and policy
- The Jal Jeevan Mission was extended till 2028, intended for 100% coverage on various water schemes where Ceinsys Tech Limited has a huge role to play. Replaced by a later filing.
- The National Geospatial Mission using the PM Gati Shakti was announced to facilitate modernization of land records, urban planning and design of infrastructure projects. Replaced by a later filing.
Show source
Besides, it also announced the starting of the National Geospatial Mission using the PM Gati Shakti, which will facilitate modernization of land records, urban planning and design of infrastructure projects.
Everything else said on the call
What management stressed
- The company emphasizes bidding for eligible projects where it has better headwinds than others so it can be more competitive in building the order book. Replaced by a later filing.
Show source
So we cannot directly exactly Ceinsys Tech Limited Q4FY25 Results Conference call 07.05.2025 kind of speculate what will be the order book for each quarter, but our emphasis will be to bid for eligible projects where we have better headwinds as against others so that we can be more competitive than the others.
Group structure
- Mr. K.P. Surej was earlier appointed as CEO of TA, a wholly owned subsidiary of Ceinsys Tech Limited in U.S.
Show source
He was earlier appointed as CEO of the TA, which is a wholly owned subsidiary of the company at U.S. The year 2024- 2025 was eventful and we added major contracts secured during the financial year which include a prestigious river linking project in Maharashtra valued at INR 381 crore of revenue, an IoT based project with Maharashtra State Water and Sanitation Mission with INR 332 crore of the order value a service provider contract for implementing integrated GIS enterprise for CIDCO, which is valued at INR 29 crore the selection of system integrator for the integrated digital transformation of MHADA, which is valued at around INR 29 crores.
- Allygrow Technologies Private Limited, a 100% subsidiary of Ceinsys Tech Limited, has been allowed to be amalgamated with effect from 1st, April 2024 under an order of NCLT; it was already previously consolidated and the merger streamlines reporting. Replaced by a later filing.
People and governance
- Board appointed Mr. Vanish Moorthy as an Additional Director at its meeting on 3rd of May.
Show source
One of the significant moves, the Board appointed industry veteran, Mr. Vanish Moorthy, as an Additional Director at his recent meeting on 3rd of May.
- Mr. Vanish Moorthy has over 25 years of experience, has led major outsourcing deals for Fortune 500 companies and serves as a strategic consultant through Prime Enter Incorporated.
Show source
Mr. Moorthy, with over 25 years of experience has led major outsourcing deals for Fortune 500 companies and currently serves as a strategic consultant through his firm, Prime Enter Incorporated.
- The company appointed Mr. K.P. Surej as an Additional Director at its meeting on 3 of May 2025, and he is a CEO designate of the company.
Show source
Surej as the Additional Director at its meeting on 3 of May 2025 and is a CEO designate of the company.
Show 1 more statement
People and governance
- The company hired Suraj as CEO of the entire company, including the India business, while Kaushik will continue as Managing Director for India Operations.
Show source
He will be the CEO of the entire company, also the India business, even though Kaushik is going to be continuing there as a Managing Director for India Operations.
What the company said on its earnings call, taken from its own transcript. Not advice.
Questions and answers
Question
Rohit Singh Congrats for a decent set of numbers. I have three questions. One is on, our order book side. So, in this quarter, our order book declined by almost INR 190 crore, whereas the revenue book is only INR 140 crore. So, could you clarify the reasons behind this gap? And further fall in this order book in this quarter? You're suggesting a little bit lack of fresh orders received despite your guidance that we are having the annual quarterly and rate of INR 400 crore order pipeline. So, does that mean recent development like 45% proposed reduction in the center share under the JJM are affecting our inflow? And if so, do you see this leading to any near to medium term headwinds for the b
Answer, kaushik khona
Kaushik Khona So, thanks for your question and thanks for your analysis. I think the order book increase during the year was around INR 800 crores. You are talking of the quarter. You are right that the order book, which has been consumed for the execution was around INR 190 crores. And the new orders, which have been added during the quarter, was less than that. However, this is no indication that there is any dearth of opportunities or there is any dearth of new order book to be followed. As regards to announcement of the center that allocation on JJM schemes is going to be reduced, first of all, the reduction is not even right now spelled out about what amount, but we understand that the earlier allocation was asked by almost five times than the earlier the previous allocation.
Answer, kaushik khona
So, the allocation itself asked by the state was higher and the center has moderated to the reasonable number. That itself is not anyway affecting the opportunities for CS Tech because on a yearly budget of spend of around 110,000 crores, our share of the revenue is not going to be more than let's say even if we talk about the high potential, it will not be more than 3% to 4% to 5%. And in the past conference calls also, we have mentioned Ceinsys Tech Limited Q4FY25 Results Conference call 07.05.2025 that the geospatial part of the Jal Jeevan mission will be no more than 7%, 8%. So I think the Jal Jeevan mission is not the only source. But in any case, Jal Jeevan mission is also still a lot of potential to be tapped. Right now, we are only focused into Maharashtra, Uttar Pradesh, and we are tapping into some other states. So, there are a lot of potential still to be tapped.
Answer, kaushik khona
So we don't see any headwinds in the coming future. And we expect the order book to we expect new orders also to be which we already tapped for which we already applied, we will hear, some of the success stories soon. I hope it answers your question.
Question
Rohit Singh Yes. As on 31st of March as compared to December 31st.
Answer, kaushik khona
Kaushik Khona So in the order book, we have, earlier, when we talked about the order book, we are talking of only the geospatial order book. And we have order book around INR 140 crore for the mobility business, which we had not counted even at the time of which was mentioned during the call. So I think that order book has not reduced. That is the annual revenue potential, which continues to grow over there. So there is no reduction of order book in that sense.
Question
Rohit Singh Okay. And so secondly, on our trade receivable balances, our earnings have improved that good, but cash flow generation remains weak due to substantial buildup in the trade receivable. I agree Q4 is typically execution heavy and we understand some lag can be there. But there are some reports that are indicating Maharashtra government is delaying the payments to the contractors. So could you please share what percentages of our outstanding receivables are from the Maharashtra government or any other government entity for that matter? And by when do you realistically expect these deals to be collected?
Answer, kaushik khona
Kaushik Khona So one thing, let me clarify that the trade receivables also include unbilled revenues. And actually, I am happy to report that as on 31st of March 2025, our debtors have actually gone down. So when we talk about the total debtors, the trade receivables, which is we are talking of INR 253 crores, this includes the unbilled amount of INR 135 crores, while the debtors have already come down as compared to the previous year. And if you look at the percentage of Ceinsys Tech Limited Q4FY25 Results Conference call 07.05.2025 debtors and the trade receivable as compared to the turnover, it is in line or it is actually better than the previous year. The unbilled revenue is basically the execution of the project, which we are not able to build because of the certain milestones of billing not yet achieved. So therefore, the trade receivables are not a cause of worry. We have, in fact, in the month of March, we have received a substantial amount of receivables which were due and around INR 88 crores of the total receivable was received in the month of March.
Answer, kaushik khona
So there is no overdue on respect of the Maharashtra government, which is outstanding as on 31st of March. The majority of the trade receivables, as I said, is of unbilled revenue. And these are these will be billed as and when the milestone for that will be achieved. During the quarter one of 2025-2026, the outstanding receivables, which are debtors, which are the build revenues, we expect that to be received. And even in fact, in the month of April and May, we also received whatever was receivable. So there is no cause of any concern as regards outstanding dues from any government or for that matter any other receivables.
Question
Rohit Singh Understood, sir. And just last question on the Vidarbha river linking project. So what's the update on that? Specifically, how much revenue was booked from this project in Q4? And whether the execution is progressing as per the contractual timeline or if any delays are anticipated? Because if we remember, I think we started late on this project, right?
Answer, kaushik khona
Kaushik Khona So the Vidarbha project, the actual letter of allotment was granted on January 13, although the award was provided in the month of November. So there was a delay of two months from the government to give us the actual letter of award. And after the letter of award only, the work begins. So since then, we have made a considerable progress. In fact, we have deployed more than 88 people on-site for this new which are the new recruitees, which we have recruited since the month of November, December. And on-site, there is a substantial progress by deployment of all the infrastructure and all the equipment which are required to carry out the DPR survey. We also have kind of greatly commenced and completed the first link of the aerial lidar survey.
Answer, kaushik khona
The entire project is divided into three links. The first link, majority of the aerial lidar survey has been completed. And every day, almost 150 to 175 square kilometers of the aerial lidar flying is happening. We expect that flying to be completed by the end of this month 31st May, and we expect that the entire aerial lidar data processing should be over by June 30. So we are progressing as per the project charter as of now, and there is no delay. There are no pending issues at our end. There are one or two departmental consents, which are also awaited, and they are progressing well.
Answer, kaushik khona
So we on an overall basis, we don't expect any delay in the execution of this project.
Answer, ceinsys tech
Ceinsys Tech Limited Q4FY25 Results Conference call 07.05.2025 Rohit Singh So just a follow-up on your reply, are we expecting the completion of this almost, I think INR 350 crore order, it is.
Question
So are we expecting it to be completed in Q1, like the renew booking will be in the Q1 only?
Answer, kaushik khona
Kaushik Khona No, no. The entire project, entire project is not expected to be completed by Q1. there will be majority portion, which I think we had forecasted of around INR 150 crores in the first quarter, which we hope that we will be able to do it within the first quarter. I mean, this is right now as per the execution which is going on. So we will keep you updated once the in the next investor conference call about the progress which has happened on the Q1.
Question
Rohit Singh I think INR 150 crore was we were expecting earlier and now you're saying we are not on delay. So that means it should be more than that if we have to complete it because overall timeline was six months only, right?
Answer, kaushik khona
Kaushik Khona So, the award itself has been delayed, as I said, by two months. So after the award, the formality of giving the bank guarantee and further execution of the agreement, got completed. And then from February 1, we have been able to commence the project. So therefore, we are as per the project charter, as I said.
Question
Rohit Singh And out of other book -- other order book I have this contract; how much we are going to aggregate this quarter?
Answer, prashant kamat
Prashant Kamat Sorry, this is Prashant. Sorry for interruption. Just want to add one more topic to what Kaushik is saying. Because we have received order late, there are also and we have discussed this with government, there are also possibilities of compounding delays because with the rainy season coming up, the work will be affected in terms of survey and soil testing and all of that for API. Just a word of caution there. So right now, I don't think we want to give any futuristic numbers at this call. As we progress, we will definitely keep the people informed about it.
Question
My first question is about the Allygrow Technologies. So how much on the revenue contribution is there from the Allegro in FY 2025?
Answer, prashant kamat
Prashant Kamat FY 2025, was it? Kaushik, Sir, the Allegro Technologies The management numbers, they will need to....
Answer, kaushik khona
Kaushik Khona Yes, so in IN 413 crores, the Allegro Technologies and the share of the profit from the JV is around INR 90 crores, sorry, INR 93 crores. I'm talking of the INR 83 crores as a part of revenue and INR 10 crores as a part of the profit.
Question
Akshay Patel Okay. And how much do we expect in FY 2026 from that business?
Answer, prashant kamat
Prashant Kamat We generally don't give futuristic numbers, but we can tell you we expected substantial growth in the current year.
Question
Akshay Patel Okay. And sir, my second question is on the order pipeline. So how much order pipeline currently we do have and how much order inflow we are expecting in current financial year from all our segments?
Answer, kaushik khona
Kaushik Khona So Prashant, if I can just answer that.
Answer, kaushik khona
Kaushik Khona So as we already mentioned, the total order book as on 1st on April is INR 1,197 crores, which is being executed. And this is excluding the Allygrow. So I'm talking of only the geospatial and the enterprise solution order book. We keep on adding the new orders based on the new opportunities which we highlight. And we are not I mean, as in the past, we are not able to forecast what is the new order book which will be added. But we keep on tapping the new opportunities which is aligned with our focus on the emerging technologies and the more of the technology solutions as well as the geospatial. So typically, our target is to achieve INR 300 crores, INR 400 crores worth of order book every quarter, and it depends on which opportunities are available.
Answer, kaushik khona
So we cannot directly exactly Ceinsys Tech Limited Q4FY25 Results Conference call 07.05.2025 kind of speculate what will be the order book for each quarter, but our emphasis will be to bid for eligible projects where we have better headwinds as against others so that we can be more competitive than the others. So that's a team in which we work with for the building of the order book.
Show 13 more questions
Question
Akshay Patel Okay, sir. And sir, my last question is on the competition front. So in both of our segments, geospatial and technology solutions, how much other Indian companies are involved in the same segment? And what competitive edge do we have versus the other companies in winning the projects and all the things?
Answer, prashant kamat
Prashant Kamat In terms of competition, I think there are many people. So the list will be very long if we want to go through that. But in terms of competitive advantage, you can see it from the numbers. We are definitely doing much better than any other in our competition. We believe the reason for that is our competencies, not just technical, but also project execution and the years of experience we are in the business for 26 years and the breadth of the services. That's the major reason for us.
Answer, kaushik khona
Kaushik Khona Yes. So I think if you were there in the last conference call also and in the today's meeting also, I clarified that there is a what order book which we have announced right now, INR 1,197 crores, is in respect of geospatial and engineering services. We keep on there is an annual contract for the Allygrow business, which is not added. So therefore, the gap which you see is because of that. If we add that Allegro business, the order book will be the same. So there is no difference between the order book. The INR 1,390 crores included around INR 130 crores Ceinsys Tech Limited Q4FY25 Results Conference call 07.05.2025 as regard to the Allegro business, which continues to be the part of additional order book.
Answer, kaushik khona
So if you revise the order book today, it will be INR 1,197 crores plus INR 130 crores. So it will be INR 1,327 crores. So I think the numbers will be aligned to that. Pranay That's perfectly clear, sir. And I know this question has been asked to you about the order pipeline and because I think the concern is common that now we are starting a downward trend in the order book. But and while you are also justified in mentioning that you can't predict it. But what can be shared, if you wish to, is how much of orders have you paid for already, right?
Answer, kaushik khona
So what is the bid pipeline like? Is it significant? Do you expect conversions in the next six months? If you can share anything on the bid pipeline.
Answer, prashant kamat
Prashant Kamat Kaushik Jee, you answered with the numbers, but let me just try to give a little bit of flavor in terms of principles, how we are looking at this order book. Gentlemen, what we are trying to do is, if you see our growth rate this year, we want to make sure at every beginning of next year, we have a possibility to execute orders higher than this current growth rate. So Q-on-Q and Y-o-Y, our growth rates will not come down in the medium-term future. And whatever is order book required for that is what we will keep generating. One of the concerns we have in terms of keep building that order book beyond the capacity of execution is we don't want to be faltering on the timelines of the government orders which we take. This is not an excuse not to grow, but this is the planning stage at which appropriately working for the growth as well as business government as well as execution of the growth. I'm sorry, Kaushik, go ahead with your numbers.
Answer, kaushik khona
Kaushik Khona Yes, yes. No, so again, I would like to reiterate before I give the numbers. And normally, we don't discuss about the pipeline, but as we have already indicated in the past also, our pipeline normally is in the range of INR 300 crores to INR 400 crores every quarter and at any point of time. So even as we speak, we have a pipeline for which we have bid in the range of around INR 355 crores. So and that is what we expect something to happen within next one month or so. About these out of INR 355 crores, we expect the disposal of at least two of the large projects, which could be aggregating to more than INR 280 crores in the next one month or Ceinsys Tech Limited Q4FY25 Results Conference call 07.05.2025 so. That given, the point is the order book is also dependent on the opportunities which are aligned to us.
Answer, kaushik khona
So if you look at the order book buildup, last quarter 3, quarter 4 -- sorry, quarter 2, quarter 3 of last year, we build up more than INR 760 crores in two quarters. That was because of opportunities which we got at that time. And we keep on tracking those opportunities. We are seeing more opportunities happening now and for which we still believe that we are capable to deliver in this range because we also added more capabilities. So we will keep on tapping, as I said, INR 300 crores, INR 400 crores worth of opportunities every point of time, every quarter. Pranay Got it. Thank you, sir.
Answer, kaushik khona
My second question is on some of the things I've -- some of the releases about management changes and ESOP cancellations, especially in the note in the recent results. So there seems to be a new zero change. Few of the ESOPs that were granted to Mr. Kamat, about 2 lakhs were canceled. Then a large amount of ESOPs, which were allocated to Mr. John and Ms. Rashi from the U.S. team, about 10 lakhs ESOPs, I think, are canceled because of Ms. Rashi's resignation and generally targets not expected to be met. So can you give us a sense what's happening in the senior leadership team and both in India and overseas? And how should we look at this? And just a number, I think INR 13 crores was the ESOP cost in FY 2025.
Answer, ceinsys tech
Ceinsys Tech Limited Q4FY25 Results Conference call 07.05.2025 Prashant Kamat As of now, we haven't formally defined what my role will be, but my discussion with the Board is I'm not going into obligation.
Question
Ankur Kumar Got it. So next question is in terms of last quarter, we had said that we expect INR 550 crores in FY 2026. So do we see any changes increase or decrease on that front, sir?
Answer, kaushik khona
Kaushik Khona I don't think we would have given any indication of future because we don't give the forecast. But there is and we have achieved INR 418 crores this year as compared to INR 252 crores in the previous year. So we have seen a growth. And I think what we indicated that we will continue to -- continue the growth path. Now we don't give the forecast, so I would refrain from giving the targets for 2026.
Question
I have two questions I have. Just first up, the current order book of around INR 1,200 crores, what's the execution timeline? I mean, by when we need to execute this INR 1,200 crores of order?
Answer, kaushik khona
Kaushik Khona These orders include some of the orders which are to be executed over a period of 3 years, 4 years. But on an average, the average execution would be between 18 to 24 months.
Question
Deepak Poddar Okay. Fair enough. And my second question is on your margins. I mean, if I have to see horizon of next three to five years, I mean, given I mean, in the medium term, we'll keep growing, right, on a quarter-on-quarter end, YoY basis, which you mentioned. So how do you see margins? I mean, what traction or what aspiration we can have on the margin front? Because ideally, your cost will not increase at the same rate at which your revenue can increase, right? So some margin aspiration would be helpful, I mean, some kind of range would also be helpful.
Answer, ceinsys tech
Ceinsys Tech Limited Q4FY25 Results Conference call 07.05.2025 Deepak Poddar But we would like to maintain and improve our margins.
Question
Keshav Sureka Going forward, like the split from geospatial and technology, so like where can we expect the majority of revenue coming like the technology will be more or the geospatial will be more?
Answer, kaushik khona
Kaushik Khona I think, again, I answered. And if you see the year this year, the Technology Solutions have contributed 51% of the total turnover as compared to 24% of the total turnover last year. So focus is surely towards the technology solutions. However, it will be difficult to project percentage of revenue under each of the segment.
Question
Arya Oswal But, sir, in the previous call, you also mentioned that, you are focusing and focusing to improve the international revenue also. So is there any increase in the percentage of international revenue? And if you're focusing more on the technology solutions, then, are we expecting to not to stay on that or have we shifted our focus?
Answer, prashant kamat
Prashant Kamat No. We have not shifted the focus. Sorry, this is Prashant here. We have not shifted the focus. What you said is correct. Today, technology solutions is largely India, but what we said also in the earlier calls that these other solutions will also take into the international market. So the Ceinsys Tech Limited Q4FY25 Results Conference call 07.05.2025 focus on international market remains and still we will increase the revenue portion of the technology solutions. That's what we had explained last time also.
Question
Arya Oswal Okay. Thank you, sir. And sir, one last question. So out of the November total order book, as you mentioned that both geospatial and technology, including, are included in this number. So can you give the bifurcation of how much is geospatial order book and how much is technology solutions order book?
Answer, prashant kamat
Prashant Kamat Yes. So out of INR 1,197 crore, the technology solutions order book is in the range of around INR 400 crores on water and around so around INR 500 crores on the technology solutions and balances geospatial engineering services.
Question
Aman Soni Sir, just a bookkeeping question. There has been a notable increase in our intangible asset line item in FY '25. So could you please clarify the nature of these assets and whether we currently have the visibility on the tangible economic benefits expected to arrive from them?
Answer, kaushik khona
But this is in respect of our technology process, which we have invented. We have applied for that for the IPR, and we are already taking the benefit of that technology innovation in our existing projects. So I think it's as per the guideline of the accounting standard, which we have capitalized, which is hardly the amount of expenditure which is eligible for the capitalization.
Question
And lastly, on the international order side, like you mentioned, we are going to take these technology solutions to the international market. So can you just give us the insight on like what kind of developments are happening over there in the terms of the Ceinsys Tech Limited Q4FY25 Results Conference call 07.05.2025 negotiations or any order that we are looking to get in that particular area or any kind of progress that can lead to at least trigger point to start operating us to start taking our technology solutions to the international market?
Answer, prashant kamat
Prashant Kamat Yes. A lot of things are happening. It will be premature to discuss all of them today. We have a team in progress. We signed one large contract and we started small execution of that already. And we expect that pipeline as well as those contracts in terms of longer term to expand during the current year, which is FY 2026. So as you see the year unfolds, you will see all those numbers coming through.
Question
Midhun James So my first question is, we have heard the announcement of Mr. Suraj being appointed as the CEO. So is he going to be the CEO for the entire group? And if so, is he posted in is he going to be posted in U.S, considering that almost 90% of our business is coming from India? So how does this pan out? Or is it a futuristic move, assuming that the future trajectory would be more outside? So can you give a little bit of color on that, please?
Answer, prashant kamat
Prashant Kamat Sorry, I was on here. I said you already answered your question. This is a futuristic move. The fact that we want to grow international revenue, we need a presence in those markets and we need to show those leadership moments in those markets. So that's why we hired Suraj. He will be the CEO of the entire company, also the India business, even though Kaushik is going to be continuing there as a Managing Director for India Operations.
Question
Midhun James Okay, okay, sir. Got it. And my second question would be regarding the so I think last con-call also we alluded to the name change of CSTech.ai. So the question is more regarding a flavor of what we have done on the futuristic businesses. We had aspirations for data center. We also had some metaverse plans. So can you just give some color on what are we doing currently on the futuristic businesses, which can kind of justify the name change?
Answer, prashant kamat
Prashant Kamat So as the name suggests, AI, we also said in the earlier calls, we have a team built for using artificial intelligence and machine learning for the geospatial. And I think Kaushik just eluded a little bit while answering earlier one of the questions. The development which we have done in house, we are already using it for reducing efforts and improving the margins. So the work is already at a stage where it is internally usable. And as we start developing that more and more, at some point of time, we will probably also start counting separate segmentation of revenue coming out of AI. But right now, that's a little bit pretty much. The work is already happening there.
Question
And my last question would be that this is actually a part of the continuation of previous participant question. So I am still a little bit confused on the bifurcation of technology and geospatial. So for example, we said that the water river linking project comes under technology, if I'm assuming it right, whereas the MH Maharashtra Water Sanitation IoT project comes under geospatial. So how do we do this bifurcation? And it would be kind of -- it would give better clarity for us investors if we can sort of bifurcate it at the project level or even at a vertical level?
Answer, prashant kamat
Our intent is to reduce geospatial content because it's a low margin business and increase technology portion because it's a high margin business. But when we pick up a project, there is always going to be a mix of this. And that's how that's where it becomes difficult to say these are the two projects which will be in geospatial or these are the two projects in technology. Now for example, one of the projects which we did during the last third quarter, fourth quarter is the DPMS, Digital Project Management System. If there are projects like that, we can say it's 100% in the technology segment. But those will be few, most of the projects, most of the large projects will be a mix of geospatial and technology combination.
Question
Midhun James Okay, got it. So but then how do we kind of bifurcate geospatial and technology within that project? As in what are the rules that you follow? Or I'm sorry if I'm being repetitive, but Prashant Kamat No, no, no. Your question is absolutely correct. So let me take an example and explain it. So right now, we are doing the river linking project. There are multiple elements in this. So out of that survey, which we are doing right now, area LiDAR survey will be a geospatial part. But the processing of that using artificial intelligence and then using technology to define the parameters for all of those, detailing of those projects will be a part of technology side of the project. So
Answer, prashant kamat
Prashant Kamat No, I think last meeting we said in terms of data center, we are at least right now putting those plants on the back burner. If we decide to move forward, we will definitely come back and improve. But right now, we are trying planning to put them on back burner because there are more orders and more business being pursued with the existing segments. So we don't believe that management needs to defocus right now in the direction of data focus.
Questions about this call
- When was the Ceinsys Tech Q4 FY25 earnings call transcript filed?
- Ceinsys Tech filed the transcript with the exchange on 9 May 2025. This page is built from that transcript.
- What does this page list?
- 73 statements from the transcript across 13 topics, 49 of them with a figure. Each statement is shown with the transcript sentence it came from.
- Are the analysts' questions included?
- Yes. 23 questions and management's answers are listed in the order they were asked, as the transcript prints them.
- Who wrote this page?
- DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.