Current un-executed order book is approximately INR2,345 crores, including approximately INR170 crores worth of operation and maintenance contracts. The company expects the results for the majority of its bid pipeline to be declared in the coming 2 months-3 months. The company said the execution time for its projects averages about 2.5 years, with the completion time for the majority of projects between 2 to 3 years. Operating income for the half-yearly period was INR435.34 crores, up around 41% compared with the same period last year. The company typically pursues projects sized between INR200 crores and INR500 crores; that range covers about 90% of the projects it is interested in.

The numbers management gave

Results

  • Operating income for the half-yearly period was INR435.34 crores, up around 41% compared with the same period last year.
    Show source
    On a half-yearly basis, the operating income stands at INR435.34 crores, which has seen a growth of around 41% as compared to the same period last year.
  • EBITDA for the half-yearly period was INR121.84 crores, with growth of 30.25%, and its PAT was INR86.37 crores, with growth of 29.51%.
    Show source
    The EBITDA at INR121.84 crores with a growth of 30.25%, and PAT at INR86.37 crores with a growth of 29.51%.
  • Cash flow had improved from negative to positive as of Q2 of financial year 25.
    Show source
    Ashish Tomar: I think the cash flow situation has been drastically improved currently and from a negative cash flow to right now we are at a positive cash flow.
  • The company said its Q2 revenue growth could reflect a higher base; monsoons were significantly higher than last year, disrupting sites, delaying resumed execution until the monsoon subsided, and causing the loss of many working days in Q2 of financial year 25; Q2 is the weakest period due to monsoon in its line of business.
    Show source
    So that led to disruption at sites, and the execution could only be resumed after the monsoon subsided.
  • The company said revenue increases as project sizes and order quantum increase, while the number of projects remains somewhat constant.
    Show source
    And as the quantum of the size of the projects and all the orders increase, that is reflected in the revenue.

Money and capital

  • The company plans to use the land as collateral for its banking facilities.
    Show source
    Ashish Tomar: It is going to be used as collateral for our banking facilities.
Show 6 more statements

Money and capital

  • The company said it had secured the fundraising as an enabling document and currently had no timeline fixed for that fundraising.
    Show source
    Ashish Tomar: I think we secured that as an enabling document and currently we do not have a timeline fixed for that fundraising.
  • The company said it can comfortably meet the cash flow requirements for its projects currently in hand from internal accruals.
    Show source
    Ashish Tomar: Yes, for whatever projects that we currently have in hand, I think we can comfortably meet the cash flow requirement from our internal accruals.
  • The company said it is comfortable funding its delivered growth rate from internal accruals, but might need funding if it secures some hand projects.
    Show source
    But if we are able to secure some hand projects, then we might need some funding.
  • The only debt at the group level is for the Forbund-HAM project; EMS Limited has no other debt on its books.
    Show source
    And as far as the debt on a group level is concerned, I think the only debt that we currently have is for the Forbund-HAM project.
  • The company said banks prefer collateral in the form of property, which is why it has to make such arrangements.
    Show source
    The banks do prefer collateral to be in shape of property.
  • Discussions with the rating agency about a possible upgrade are in process, and the company will update. Replaced by a later filing.
    Show source
    Ashish Tomar: I think that is in process and we will update.

What it expects ahead

What management expects

  • The company expects the results for the majority of its bid pipeline to be declared in the coming 2 months-3 months.
    Show source
    Ashish Tomar: I think we should expect the results for the majority of this pipeline to be declared in the coming 2 months-3 months.
  • The company expects a slight fluctuation of 1% or 2% up and down in its tender-based work, and is hopeful of maintaining the trajectory it has been delivering.
    Show source
    So, a slight fluctuation of 1% or 2% up and down is expected.
  • Sector saw a slowdown in the first half of 2025 due to the election process, and the company expects much more orders to be floated by government bodies in the sector in the second half of the year.
    Show source
    And, in this second half of the year, I think we are expecting to see much more orders being floated by the government bodies in this sector.
  • The company expects to maintain its past performance and hopes to improve on it, in response to a question about previously guided top line growth of 25% to 30% and EBITDA margin of 25% to 27%.
    Show source
    Ashish Tomar: Yes, we are going to maintain the past performance and hope to improve on that also.
  • The company said its standalone figures were good, and that it would maintain 25% revenue growth with margins remaining fairly stable.
    Show source
    And as you mentioned, we'll still be maintaining our 25% growth in the revenue growth and margins would remain fairly stable.
  • The company expects about 70% to 80% of its business to continue coming from the water side and the remaining 20% to 30% may come from other infrastructure sectors, including power, building or road.
    Show source
    Ashish Tomar: So, the majority of the business, about 70% to 80% will continue to come from the water side and the rest 20% to 30% may be from other infrastructure sectors, be it power, building or road.
Show 21 more statements

What management expects

  • The company is hopeful that the matter concerning the INR34 crores order number is resolved soon.
    Show source
    Ashish Tomar: So, we are hopeful that this matter is resolved soon.
  • The company expects to complete the majority of its INR2,350 crores project work in the coming 2 years, with some work going past that.
    Show source
    Ashish Tomar: The majority of the work would be completed in the coming 2 years, with some work going past that.
  • The company hopes to maintain the ratio it has been delivering so far for orders from its bid pipeline. Replaced by a later filing.
    Show source
    Ashish Tomar: We hope to maintain the ratio that we have been delivering so far.
  • The company hopes to maintain and improve upon its past performance of CAGR delivered year on year. Replaced by a later filing.
    Show source
    Ashish Tomar: I think we would, I can comment that we hope to maintain and improve upon our past performance of CAGR that we have been delivering year on year.
  • Revenue and margins would remain stable. Replaced by a later filing.
    Show source
    Ashish Tomar: Yes, the revenue and the margins would remain stable.
  • The company said it will maintain its trajectory for FY26. Replaced by a later filing.
    Show source
    Ashish Tomar: I can only say that we will maintain the trajectory.
  • The company will be able to bid for desalination projects. Replaced by a later filing.
    Show source
    So, I think we will be able to bid for desalination projects.
  • The company said it would continue delivering the growth trajectory it had delivered over the last couple of years. Replaced by a later filing.
    Show source
    But we have been maintaining that we are going to continue delivering the growth trajectory that we have been delivering since the last couple of years.

Orders

  • Current un-executed order book is approximately INR2,345 crores, including approximately INR170 crores worth of operation and maintenance contracts.
    Show source
    The current un-executed order book for the company stands at around INR2,345 crores approximately, which includes approximately INR170 crores worth of operation and maintenance contracts.
  • Current big pipeline is approximately INR6,470 crores, and the company hopes to convert a significant amount into orders going forward.
    Show source
    The current big pipeline stands at INR6,470 crores approximately, and we hope to convert a significant amount into orders going forward.
  • Order book is approximately INR2,345 crores, an unexecuted amount to be executed in the coming 2 years-3 years.
    Show source
    This is the unexecuted amount that will be executed in the coming 2 years-3 years.
  • Order pipeline stands at INR6,477 crores.
    Show source
    And the order pipeline stands at INR6,477 crores.
  • The majority of EMS Limited's bids currently in process, worth about INR6,400 crores, are in the water sector.
    Show source
    The majority of them are in water sector only.
  • The company received an approximately INR700 crores order for a sewerage scheme from Kolkata Municipal Corporation in Q2 of financial year 25; the scheme is financed by the Namami Gange scheme.
    Show source
    Ashish Tomar: So, I think the new order that was received in this quarter, was an order for Kolkata Municipal Corporation of around INR700 crores approximately.
  • Bidding pipeline was INR6,400 odd crores at the end of Q2 of financial year 25.
    Show source
    Ashish Tomar: At the end of this quarter, the bidding pipeline was at INR6,400 odd crores.
  • The company secured one project in the power distribution sector in Uttarakhand of about INR140 crores this year.
    Show source
    Ashish Tomar: We were able to secure one project in power distribution sector in Uttarakhand of about INR140 crores this year.
  • The company is executing a building-sector project of about INR320 crores for CPWD at RBI housing colony in Navi Mumbai.
    Show source
    It is a project of about INR320 crores.
  • The company was awarded L1 status for a project worth around INR700 crores in Kolkata for Kolkata Municipal Corporation, its first order in West Bengal.
    Show source
    Ashish Tomar: So as compared to the last quarter, we currently have been awarded an L1 status in a project worth around INR700 crores in Kolkata, for Kolkata Municipal Corporation.
  • Outstanding order book was approximately INR2,350 odd crores as on today, representing the unexecuted amount.
    Show source
    Ashish Tomar: So as on today, it is at somewhere around INR2,350 odd crores approximately.
  • The company said the majority of its bid pipeline would be in the water sector.
    Show source
    Ashish Tomar: So, I think the majority would be of water sector only.
  • The company is waiting for the results on the orders in its bid pipeline. Replaced by a later filing.
    Show source
    And we are waiting for the results on these orders.

What it is building and selling

Projects and capacity

  • The company said the execution time for its projects averages about 2.5 years, with the completion time for the majority of projects between 2 to 3 years.
    Show source
    So, the average you can take about 2.5 years is the execution time.
  • The company said it has no constraint of manpower or machinery.
    Show source
    Ashish Tomar: I think there is no constraint of manpower or machinery.

Segments

  • The company typically pursues projects sized between INR200 crores and INR500 crores; that range covers about 90% of the projects it is interested in.
    Show source
    Ashish Tomar: The type of projects that we go after, the typical size is anywhere between INR200 crores to INR500 crores.
  • The company has maintained a 20% to 30% mix of executing works in other infrastructure sectors year on year since the start.
    Show source
    I think there is a huge scope for water business going forward in the country and we have already been maintaining this mix of executing works in other infrastructure sectors of 20% to 30% year on year since the start.
  • Government bodies float a fresh influx of tenders every month, and EMS Limited shortlists tenders based on their conditions, scope of work and proposed rates before bidding.
    Show source
    This is a routine process and every month there is a fresh influx of tenders that are floated by the government bodies.
  • The company bids for EPC and HAM projects with the same margins, based on a specific margin in mind for each project.
    Show source
    And be it EPC or HAM, the margins while bidding are same for us.
Show 1 more statement

Segments

  • The company does not currently have any desalination projects in its order book; a few years back, it was declared L1 for a desalination plant in Gujarat, but the project was scrapped due to permission issues.
    Show source
    But currently, we do not have any desalination projects in our order book.

Risks, rules and outside factors

Risks and disputes

  • The INR34 crores award was awarded in EMS Limited’s favour and was binding on both parties as per the contract; the company said there was no need for a provision.
    Show source
    The award has already been awarded in our favour.

Everything else said on the call

Group structure

  • Consolidated figures include only the SPVs it floated for specific tenders; 4 or 5 SPVs were in place at present, and most of its business comes from the EPC market.
    Show source
    Ashish Tomar: So, in the consolidated figures, the figures are only of the SPVs that have been floated by us for specific tenders.
  • The company is not acquiring the paper business; it is interested only in the land, and the land deal was in process.
    Show source
    Ashish Tomar: So, we are not acquiring the paper business.
  • Land deal was under process, and it hoped to close it soon.
    Show source
    Ashish Tomar: Yes, the deal is under process and we hope to close it soon.
  • The company is acquiring the company but is interested only in its land.
    Show source
    Ashish Tomar: So, we are acquiring the company.
  • If EMS Limited acquires the company by the end of March, the acquired company's numbers would be incorporated; EMS Limited was not interested in running the plant at that time.
    Show source
    Ashish Tomar: So, I think if we acquire it by end of March, then those numbers would be incorporated.
  • The company had not yet decided what to do with the plant and might scrap it.
    Show source
    We might scrap the plant.
Show 2 more statements

People and governance

  • The company is scouting for a suitable candidate and hopes to hire an independent CFO as soon as possible.
    Show source
    Ashish Tomar: We are scouting for a suitable candidate and we hope to hire an independent CFO as soon as possible.

Other

  • The government’s budget planned expenditure in the water sector for 2021-2026 was somewhere in the range of INR5 lakh crores, which would come to around INR1 lakh crores per year if spent as planned.
    Show source
    But I can say the budget planned for the expenditure in water sector for the period of 2021-2026 was somewhere in the range of INR5 lakh crores.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Garvit Goyal: Good evening, sir. Can you firstly clarify what is the current order book we have and what is the bid order pipeline? Page 2 of 13 EMS Limited November 13, 2024 Ashish Tomar: The current order book is at INR2,345 crores approximately.

    Answer, ashish tomar

    This is the unexecuted amount that will be executed in the coming 2 years-3 years. And the order pipeline stands at INR6,477 crores.

  2. Question

    Garvit Goyal: That means entire revenue will go to the top line of EMS Limited, right?

    Answer, ashish tomar

    Ashish Tomar: Yes, a significant amount of the bid pipeline that I talked about, that is 6477 crores, that comprises of projects in Amrit scheme. And we hope to convert a significant portion of them to orders. And we are waiting for the results on these orders.

  3. Question

    Garvit Goyal: So, by when do we expect something material to come to us from this bid pipeline that you mentioned?

    Answer, ashish tomar

    Ashish Tomar: I think we should expect the results for the majority of this pipeline to be declared in the coming 2 months-3 months.

  4. Question

    Garvit Goyal: And when you say a significant portion of it, like what percentage of this 6,400-bid pipeline do we expect to come to us?

    Answer, ashish tomar

    Ashish Tomar: We hope to maintain the ratio that we have been delivering so far.

  5. Question

    Garvit Goyal: Okay. Coming to the FY25 performance, like in H1 what we did, H2 is usually better than H1. So, can you comment upon like what kind of revenue are we targeting for FY25 and what kind of margin for full year do we have in consideration?

    Answer, ashish tomar

    Ashish Tomar: I think we would, I can comment that we hope to maintain and improve upon our past performance of CAGR that we have been delivering year on year.

  6. Question

    Prathamesh Dhiwar: 29% EBITDA margins for H2 also?

    Answer, ashish tomar

    Ashish Tomar: Yes. So, this is a tender based work. So, a slight fluctuation of 1% or 2% up and down is expected. But I think we are hopeful of maintaining the trajectory that we have been delivering.

  7. Question

    Prathamesh Dhiwar: Okay. And, sir, in terms of the industry outlook, are we seeing any order inflow hinges or headwinds over, let's say, last couple of months?

    Answer, ashish tomar

    Ashish Tomar: So, for the first half of 2025, there was a slowdown due to the election process that was going on. And, in this second half of the year, I think we are expecting to see much more orders being floated by the government bodies in this sector. Okay.

  8. Question

    Prathamesh Dhiwar: And, sir, if I can ask you in a geographical order mix, so how much percentage of the order comes from UP or let's say Rajasthan?

    Answer, ashish tomar

    Ashish Tomar: The majority of the bids that are currently in process, that I talked about, of about INR6,400 crores. The majority of them are in water sector only.

  9. Question

    Prathamesh Dhiwar: Any new tenders, sir, that are going to come for which we can bid in the coming time?

    Answer, ashish tomar

    Ashish Tomar: Yes, sir. This is a routine process and every month there is a fresh influx of tenders that are floated by the government bodies. And, we go through them based on the tender conditions, the scope of work and the rates that are proposed in the tender. We shortlist them and go for bidding. So, it's a continuous process.

  10. Question

    Congratulations for the good set of numbers. Can you just guide on what were the new order wins during this quarter and how many new tenders did you bid in this particular quarter, sir?

    Answer, ashish tomar

    Ashish Tomar: So, I think the new order that was received in this quarter, was an order for Kolkata Municipal Corporation of around INR700 crores approximately. It is a sewerage scheme financed by the Namami Gange scheme.

Show 23 more questions
  1. Question

    Hrishit Jhaveri: And, what was our bidding process in this quarter? How much did we bid for new tenders?

    Answer, ashish tomar

    Ashish Tomar: At the end of this quarter, the bidding pipeline was at INR6,400 odd crores. Okay.

  2. Question

    Hrishit Jhaveri: And, sir, what is our plan to improve on the cash flow from operations side? Having a robust order book, unexecuted order book, we will need a hefty working capital. Cash flow from operations have been suffering since 2 to 3 years. Do we have any plan to maintain a positive cash flow from operations at a significant level going ahead?

    Answer, ashish tomar

    Ashish Tomar: I think the cash flow situation has been drastically improved currently and from a negative cash flow to right now we are at a positive cash flow.

  3. Question

    Hrishit Jhaveri: Okay. And, sir, my last question. Earlier you have guided for at least 25% to 30% top line growth with a 25% to 27% EBITDA margin. Do we stick to that number with H2 being stronger this financial year?

    Answer, ashish tomar

    Ashish Tomar: Yes, we are going to maintain the past performance and hope to improve on that also.

  4. Question

    Hrishit Jhaveri: Okay, sir. I will get back in the queue, sir. Thank you.

    Answer, ashish tomar

    Ashish Tomar: So, in the consolidated figures, the figures are only of the SPVs that have been floated by us for specific tenders. So, those figures, I think the majority of our business comes from EPC market only. And some of the projects, they require formation of specific SPVs. I think there are 4 or 5 of them at present. So, they affect the consolidated figures, but I think if you are to take the standalone figures, they are good. Dinesh: Okay. And as you mentioned, we'll still be maintaining our 25% growth in the revenue growth and margins would remain fairly stable.

    Answer, ashish tomar

    Ashish Tomar: Yes, the revenue and the margins would remain stable. Dinesh: Okay, great. So, can you just update what has happened with the new, any update on that paper business or division which we were planning to acquire for some INR50 odd crores or something? Any update on that?

    Answer, ashish tomar

    Ashish Tomar: So, we are not acquiring the paper business. It is only the land part that we are interested in. I think that is in process. Dinesh: So, any updates on that? Like, I mean, where are we there?

    Answer, ashish tomar

    Ashish Tomar: Yes, the deal is under process and we hope to close it soon. Dinesh: Okay, fair enough. And we've already identified what are we going to do with the land, right? I mean, like, what is the next step?

    Answer, ashish tomar

    Ashish Tomar: It is going to be used as collateral for our banking facilities. Dinesh: Right. And we have some certain operations going on, some paper operations on that, right? So, we will acquire only the land or are we acquiring the whole unit as such?

    Answer, ashish tomar

    Ashish Tomar: So, we are acquiring the company. But we are only interested in the land part. Dinesh: Fair enough. But see, we'll get some additional operations of the company, which I'm not mistaken, does around INR50 crores to INR60 crores of revenue every year. So, my question is, Page 6 of 13 EMS Limited November 13, 2024 are we going to keep those INR50 crores to INR60 crores intact and continue with the operations? Are we going to just sell the, or give it on a lease of the operations of the company to some other organization? What is the plan there?

    Answer, ashish tomar

    Ashish Tomar: So, I think if we acquire it by end of March, then those numbers would be incorporated. But I think going forward, right now, we are not interested in running the plant. Dinesh: So, what will you do with it? Like, I mean, we will have the land, we will mortgage the land with the bank. But what will we do with the INR50 crores of operations? Are we going to close the operations? Are we seeing that?

    Answer, ashish tomar

    Ashish Tomar: Yes. Currently, we have not yet decided. We might scrap the plant. Dinesh: I think some more clarity is required, because I have been hearing for the last 3, 4 months. So, some news around this every now and then.

  5. Question

    Darshan Jhaveri: Okay, fair enough, fair enough, sir. And I just wanted to know, previous participant asked that question, like, on a consolidated basis, our Q2 growth has been around 11% of revenue. So, just like wanted to know, is that an impact of a higher base that we had in last year Q2? So, what kind of quarterly run rate can we see going forward? Like, just wanted to pick your brain a bit on that. So, I think we were saying we'll grow as much as we've grown in the past, so that's like around 25%-30%, and then we see a 11% figure. So, is there a slowdown happening? Could you just, you know, elaborate a bit on that, sir?

    Answer, ashish tomar

    Ashish Tomar: I think it could be a combination of higher base. Also, the monsoons this year were significantly higher than last year. So that led to disruption at sites, and the execution could only be resumed after the monsoon subsided. So, we lost a lot of working days in current Q2, that's like a… Page 7 of 13 EMS Limited November 13, 2024 Ashish Tomar: I think Q2 is the weakest due to the monsoon in our line of business.

  6. Question

    Darshan Jhaveri: And in general, just wanted to know, now we are around INR230 crores-INR240 crores quarterly run rate. So, in terms of scaling, it further maybe not this year, next year we might be even higher. So, is there any capacity constraint, how do we manage our manpower or machinery or is there some capacity constraint that we could have or is this funding the only constraint that we have? So, for higher growth, will we need any capex, or what would be required?

    Answer, ashish tomar

    Ashish Tomar: I think there is no constraint of manpower or machinery. I think the increase is due to the increase in size of the projects. So, the number of projects remain somewhat constant. And as the quantum of the size of the projects and all the orders increase, that is reflected in the revenue.

  7. Question

    Darshan Jhaveri: Okay, fair enough. And just one last question from my side, sir. We bidded for around INR6,400 crores order. So, in general, like, now, what size of orders are we bidding for? We got, like, INR700 crores. So, what size of orders are we bidding for? And what is the general execution period timeline for that, sir?

    Answer, ashish tomar

    Ashish Tomar: The type of projects that we go after, the typical size is anywhere between INR200 crores to INR500 crores. So that would cover about 90% of the projects that we are interested in.

  8. Question

    Darshan Jhaveri: Okay, fair enough, sir. And, sir, do you want to know any guidance that we would have for, FY26 in terms of revenue and EBITDA, sir?

    Answer, ashish tomar

    Ashish Tomar: I can only say that we will maintain the trajectory.

  9. Question

    Meet Jain: On the other hand, I want to understand further on the HAM project, how is the margins of the retention money in this kind of project? The executable period. Page 8 of 13 EMS Limited November 13, 2024 Ashish Tomar: The completion time for the majority of the projects is somewhere between 2 to 3 years.

    Answer, ashish tomar

    That depends project to project. So, the average you can take about 2.5 years is the execution time. And as far as the margins are considered, we bid for the project with a specific margin in mind. And be it EPC or HAM, the margins while bidding are same for us.

  10. Question

    Meet Jain: Okay. And this order book, order book as on bid and the pipeline is for majorly for water projects or it has some other infra projects as well. The bid pipeline.

    Answer, ashish tomar

    Ashish Tomar: So, I think the majority would be of water sector only.

  11. Question

    Abhishek Bhudolia: Sir, I wanted to know what will be the quantum of the road projects going forward because you said the majority of the order book is for the water projects. So, are we still on the guidance that 25% of our future revenues will be road projects?

    Answer, ashish tomar

    Ashish Tomar: So, the majority of the business, about 70% to 80% will continue to come from the water side and the rest 20% to 30% may be from other infrastructure sectors, be it power, building or road.

  12. Question

    Abhishek Bhudolia: Have we seen any traction in power sector?

    Answer, ashish tomar

    Ashish Tomar: We were able to secure one project in power distribution sector in Uttarakhand of about INR140 crores this year.

  13. Question

    Abhishek Bhudolia: And what will be the future fundraising plan you have? I mean, earlier you said you didn't have and then you went on with the QIP. So, is there any plan, do you have now that any working capital requirement you would have, for that you would be raising funds to equity division?

    Answer, ashish tomar

    Ashish Tomar: I think we secured that as an enabling document and currently we do not have a timeline fixed for that fundraising.

  14. Question

    Abhishek Bhudolia: So whatever projects we have, for that we have the necessary cash with us or we will be taking up debt?

    Answer, ashish tomar

    Ashish Tomar: Yes, for whatever projects that we currently have in hand, I think we can comfortably meet the cash flow requirement from our internal accruals.

  15. Question

    Abhishek Bhudolia: Even for the projects we have bid?

    Answer, ashish tomar

    Ashish Tomar: Yes, if we are to maintain the growth rate that we have been delivering, for that I think we are comfortable with the internal accruals. But if we are able to secure some hand projects, then we might need some funding.

  16. Question

    Hrishit Jhaveri: Yes, sir. So, we had informed that you are planning to onboard a new CFO. Any update on that, sir? Or are we hiring a new CFO on the board?

    Answer, ashish tomar

    Ashish Tomar: We are scouting for a suitable candidate and we hope to hire an independent CFO as soon as possible. And we will update you as soon as that happens.

  17. Question

    Hrishit Jhaveri: And sir, we have also forwarded into the building and construction space. Any project wins or work we have started there or we have not currently started that segment?

    Answer, ashish tomar

    Ashish Tomar: No, we are already executing a project in the building sector. It is a project of about INR320 crores. RBI housing colony in Navi Mumbai. The client is CPWD. Hrishit Jhaveri: Okay, sir. Thank you. All the best.

  18. Question

    Prathamesh Dhiwar: Yes, sir. Just wanted to know on the industry front. So, for this financial year, how much did government spend on water till now, in FY25?

    Answer, ashish tomar

    Ashish Tomar: Sir, I won't have those numbers right now present with me. But I can say the budget planned for the expenditure in water sector for the period of 2021-2026 was somewhere in the range of INR5 lakh crores. So, I think that would come out to be somewhere around INR1 lakh crores per year if spent by the government as planned. Right.

  19. Question

    Nitesh Gupta: Thank you for the opportunity and congratulations on this great set of number that you have. My question was in regards to what is the L1 status you have on any particular tenders that you have bid for? And the second question was on the line of geographical expansion, if you had any. Because in the previous concalls you mentioned that you’d be able to secure more orders in the north-eastern front of the country. So, if you can advise on that.

    Answer, ashish tomar

    Ashish Tomar: So as compared to the last quarter, we currently have been awarded an L1 status in a project worth around INR700 crores in Kolkata, for Kolkata Municipal Corporation. So, this is our first order in the state of West Bengal. Page 10 of 13 EMS Limited November 13, 2024 Nitesh Gupta: Thank you, sir.

  20. Question

    Nitesh Gupta: Thank you so much. Just one last question before I close this. Do you have any projects in the desalination front as well? Because that is one of the areas closely related to water issues.

    Answer, ashish tomar

    Ashish Tomar: So currently, sir, we do not have any desalination projects. A few years back, we were declared L1 for a desalination plant in Gujarat. But that project was scrapped due to, I think, some permission issues. So, I think we will be able to bid for desalination projects. But currently, we do not have any desalination projects in our order book.

  21. Question

    Hasan Muchhale: So, no provision has been provided on this INR34 crores number?

    Answer, ashish tomar

    Ashish Tomar: I think there is no need for provision. The award has already been awarded in our favour. So as per the contract, that award was binding on both the parties.

  22. Question

    Hasan Muchhale: Okay. Any expected timeline to realize this INR34 crores order number?

    Answer, ashish tomar

    Ashish Tomar: So, we are hopeful that this matter is resolved soon.

  23. Question

    Hasan Muchhale: Perfectly fine. Sir, I am very much happy to listen that you are entering into a new service line that is, construction contract and a project rather than the water management. So, just wanted to understand this is because we wanted to diversify our offerings or is this because you are foreseeing water business is going to mature in some couple of years?

    Answer, ashish tomar

    Ashish Tomar: No, sir. I think there is a huge scope for water business going forward in the country and we have already been maintaining this mix of executing works in other infrastructure sectors of 20% to 30% year on year since the start. Yes. So, this is not something new.

Questions about this call

When was the EMS Q2 FY25 earnings call transcript filed?
EMS filed the transcript with the exchange on 18 Nov 2024. This page is built from that transcript.
What does this page list?
55 statements from the transcript across 10 topics, 24 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 33 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
EMS Q2 FY25 concall: what the company said · DalalOS