Exicom Tele-Systems Q1 FY26 earnings call: Exicom Tele-Systems Limited expects revenue buildup from key projects from the 1st Quarter ended June 30, 2025 onward

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

The company expects revenue buildup from key projects from the 1st Quarter ended June 30, 2025 onward. Exicom's transition will start in October 2025, but full production will not start then; complete transition will take 2 quarters, product by product and line by line. Gross margin improved to 32.7% in the 1st Quarter ended June 30, 2025, from 21.3% last quarter, driven by a richer product mix and cost optimization. Passenger-vehicle growth was roughly 70% quarter-on-quarter compared with the same quarter last year, and 15% from Q4 to the 1st Quarter ended June 30, 2025. Tritium TRI-FLEX chargers are advanced liquid-cooled chargers aimed mainly at markets in the U.S. and Europe; in India, they are in the business-development phase, with deployment expected when high-energy battery cars, trucks and buses require 10 to 20-minute charging.

The numbers management gave

Results

  • Gross margin improved to 32.7% in the 1st Quarter ended June 30, 2025, from 21.3% last quarter, driven by a richer product mix and cost optimization.
    Show source
    Despite the softer top line, gross margin improved to 32.7% from 21.3% last quarter, which is a very healthy positive up, driven by a richer product mix, cost optimization that we've done.
  • Adjusted EBITDA was INR12.6 crores, or 8.6% of the margin, in the 1st Quarter ended June 30, 2025, up from about INR10.9 crores in quarter 4, reflecting better operating leverage in EVSE segments.
    Show source
    Adjusted EBITDA also rose to INR12.6 crores, which is 8.6% of the margin, up from about INR10.9 crores in quarter 4, reflecting a better operating leverage in EVSE segments.
  • Adjusted PAT was INR1.1 crores, about 0.7% margin, in the 1st Quarter ended June 30, 2025, versus INR4.6 crores in Q4.
    Show source
    Adjusted PAT stood at INR1.1 crores, about 0.7% margin versus INR4.6 crores in Q4.
  • Consolidated revenue was INR205 crores in the 1st Quarter ended June 30, 2025; consolidated revenue was down 23% quarter-on-quarter and 19% year-on-year, reflecting a slower turnaround at Tritium and domestic project delays.
    Show source
    So the quarter-on-quarter was down, on a consolidated basis, by 23% and 19% year-on-year, reflecting a slower turnaround at Tritium along with domestic projects delay.
  • Consolidated gross margin was 39.4% in the 1st Quarter ended June 30, 2025, aided by higher-margin products sold and geography mix.
    Show source
    We were at 39.4%, aided by higher-margin products that we sold and the geography mix that we got.
  • Adjusted EBITDA was negative by INR38.6 crores in the 1st Quarter ended June 30, 2025, compared with minus INR17 crores in the previous quarter, primarily because of Tritium operational costs weighing on profitability.
    Show source
    Adjusted EBITDA was negative by INR38.6 crores and compared to minus INR17 crores in the previous quarter.
Show 16 more statements

Results

  • Exicom was PAT positive on a standalone basis in the 1st Quarter ended June 30, 2025, despite very low revenue.
    Show source
    So again, on a standalone basis, even with this very low revenue figure, we were still PAT positive.
  • R&D expense as a cost of sales would be between 3% and 5%, with EV charging broadly accounting for 60% and critical power 40% of the expense.
    Show source
    So our expense of R&D as a cost of sales would be between 3% and 5%.
  • The company maintained similar revenue in the EV sector to the previous quarter, while Critical Power was down because of the project start.
    Show source
    Page 7 of 14 Exicom Tele-Systems Limited August 13, 2025 Our Critical Power was down because of the project start.
  • Adjustments were primarily because of FX impact, which was more accounting than actual, and its VRS scheme and redundancy schemes, including redundancies in Tritium as it resized its people there.
    Show source
    The adjustments that we've done highlighted on the pages is primarily because of the FX impact, which is more in terms of accounting than actual.
  • EV business maintained year-on-year momentum, particularly in Southeast Asia and the premium OEM segment, while Critical Power performance is expected to rebound in Q2 as deferred project commencement has started.
    Show source
    The EV business maintained a strong momentum year-on-year, particularly in Southeast Asia and premium OEM segment, while critical performance is expected to rebound in Q2 as deferred projects commencement has started.
  • The company said project delays may be due to customers, product approval or project paperwork, and that the projects had been put into execution mode in the last quarter.
    Show source
    And all of those are solved and the projects have been put into execution mode in the last quarter.
  • The company may have had single-digit crore revenue from the projects whose execution had started.
    Show source
    We may not have had huge revenue from it, may have had single-digit crore revenue, but the execution has started.
  • Exicom's EV charger business gross margins are in line with expectations and better than the previous product portfolio, despite a fierce competitive market.
    Show source
    So I can't give the specific margin, but it's in line with our expectation and better than what we had in the previous product portfolio.

Money and capital

  • The company spent INR257 crores of its INR400 crores of IPO funds till March of '25 and another INR35 crores in Q1, leaving INR108 crores as of 30 June.
    Show source
    We spent INR257 crores till March of '25, another INR35 crores in Q1, and the balance as of 30 June is INR108 crores.
  • INR260 crores rights issue proceeds were allocated to repaying unsecured debt of INR55 crores, converting a promoter-given loan of INR107 crores into equity, investing INR85 crores in Tritium to support it before it turns around, and INR12 crores for corporate general purpose and issue exp; Exicom Tele-Systems Limited repaid INR55 crores of unsecured debt using rights issue funds; Exicom Tele-Systems Limited converted INR106.9 crores of debt from promoters into equity and earmarked INR85 crores for investment in Tritium.
    Show source
    Investment in Tritium to support it for a little more time before it turns around INR85 crores and then balance INR12 crores for corporate general purpose and issue expenses.
  • Promoters' overall holding in Exicom Tele-Systems Limited declined from 69.5% before the rights issue to 66.5% after it. Exicom Tele-Systems Limited's debt equity ratio decreased from 0.7% before the rights issue to 0.35% after it, giving it higher leverage and less pressure on interest cost.
    Show source
    So the overall holding of the promoters, which was pre-rights issue was 69.5%, marginal dip to 66.5%, which is again healthy.
  • Net worth increased from INR650 crores before the rights issue to INR910 crores after INR260 crores was added.
    Show source
    The post net worth has gone up to INR910 crores.
  • The company expects to utilize the majority of its IPO funds by end of September as the plant is in final stages of progress in construction.
    Show source
    Majority of these funds will be utilized by end of September as the plant is in final stages of progress in construction.
  • The company expects to see utilization of working capital funds in Q2.
    Show source
    Working capital funds, we'll see utilization in Q2.
  • The company completed a rights issue of INR260 crores, which was slightly oversubscribed. Replaced by a later filing.
  • Debt equity ratio decreased from 0.7% before the rights issue to 0.35% after it, giving it higher leverage and less pressure on interest cost. Replaced by a later filing.

What it expects ahead

What management expects

  • The company expects revenue buildup from key projects from the 1st Quarter ended June 30, 2025 onward.
    Show source
    As I mentioned, a lot of the key projects, the revenue buildup will be from this quarter.
  • Guidance was a 50% increase in revenue and 2.5x of EBITDA, and that guidance still holds good; management is confident it can hold the guidance for the remaining 9 months.
    Show source
    Shiraz Khanna: So we had given a guidance of 50% increase in the revenue and 2.5x of the EBITDA.
  • Guidance converts into 4x EBITDA on a standalone basis of what it did last year.
    Show source
    And mathematically, that guidance converts into 4x EBITDA on a standalone basis of what we did last year, so to be able to do that.
  • Exicom broadly maintains its guidance of 100% revenue growth on a consolidated basis, although Tritium taking longer to turn around may cause some shortfall in the consolidated revenue guidance; Exicom continues to maintain its guidance on a standalone basis.
    Show source
    On a consolidated basis, I think we gave a guidance of 100% revenue growth.
  • 1st Quarter ended June 30, 2025 results may not reflect the same excitement about the business, which management hopes will come to fruition in the coming quarters.
    Show source
    The quarter 1 results may not reflect exactly the same, but hopefully, you'll see that excitement coming to fruition in the coming quarters.
  • The company anticipates improvement in revenue and profitability in Q2, entering the quarter with a robust order book.
    Show source
    The company enters the Q2 with a robust order book, which Anant mentioned, and we anticipate improvement, both in revenue and profitability.
Show 5 more statements

What management expects

  • Standalone Critical Power guidance is largely backed by its existing order book, with some proportion based on business as usual and run-rate business.
    Show source
    So a lot of today's -- what I spoke about in the presentation and even from a perspective of when we gave out that guidance is really backed by in the Critical Power segment by the order book that we already have.
  • The company expects to sustain its guidance through the remainder of the quarter, as its capacities, especially after Hyderabad comes up in October, will not deter revenue recognition.
    Show source
    So that gives us confidence that will be able to sustain that guidance through the remainder of the quarter because the capacities that we have, especially after Hyderabad come up in October will not be deterrent in from a revenue perspective to be able to recognize by the company.
  • Exicom does not expect the rare-earth material delays to have a significant impact on its numbers for the overall year or quarter, or to require a change to its guidance.
    Show source
    But on an overall year basis, quarter basis, I don't think the impact will be significant, which will make a difference in numbers for us.
  • Exicom's standalone revenue growth is expected to propel profitability because low revenue provides low fixed-cost and variable-cost coverage; this is the basis for guidance of 4x EBITDA. Replaced by a later filing.
  • Exicom's guidance was for 50% revenue growth on a standalone basis and multi-fold EBITDA growth on a standalone basis; management said it felt fairly confident based on market momentum, the order book and ongoing work. Replaced by a later filing.

What it is building and selling

Projects and capacity

  • Exicom's transition will start in October 2025, but full production will not start then; complete transition will take 2 quarters, product by product and line by line.
    Show source
    So October, it will start this year, October 2025.
  • Exicom's current plant was operating at very high utilization, specifically in quarter 2, while its Hyderabad plant has capacity built for future requirements and is not yet fully utilizing its space and capacity.
    Show source
    Anant Nahata: So that -- today, we are operating at a very high utilization, specifically in quarter 2 in our current plant.
  • Exicom is installing modular plant and machinery for its next 2 years' requirement; with the current plant and machinery being installed, utilization will be north of 70% to 75%.
    Show source
    So with the current plant and machinery that we are putting, our utilization will absolutely be north of 70% to 75%.
  • The company hopes to start production at its Hyderabad plant in late September, early October.
    Show source
    Page 6 of 14 Exicom Tele-Systems Limited August 13, 2025 And we are really hoping that we'll be able to start the production here in late September, early October.
  • The company is looking at integrating a battery energy storage system with EV charging as a solution for high-power EV charging where the grid does not support such high power.
    Show source
    So a battery -- an integration of battery energy storage system and EV charging is something we are looking at.
  • The company had a pilot product last year for integrating a battery energy storage system with EV charging and is scaling it up with the learnings from the pilot.
    Show source
    We did have a pilot product last year in that, but with all those learnings, etcetera, scaling up of that.
Show 9 more statements

Demand and pricing

  • Passenger-vehicle growth was roughly 70% quarter-on-quarter compared with the same quarter last year, and 15% from Q4 to the 1st Quarter ended June 30, 2025.
    Show source
    And overall, I think on the slide, I showed you the car growth of passenger vehicles that is roughly quarter-on-quarter, like since last's year quarter versus this, is 70% even Q4 versus this quarter, it's 15%.
  • Exicom says it would have a majority share among customers deploying charging networks who have funds and investments to deploy them.
    Show source
    But most of the customers who are deploying charging networks, who have funds and investments to deploy charging networks, I think we would have a majority share in it.
  • Mahindra, Maruti and Tata are making very big investments around EV and bringing out EV models, creating tailwinds and an exciting pipeline for Exicom and its peers.
    Show source
    So all that has created tailwinds for us which has created exciting pipeline for us and for our peers as well.
  • EV prices have fallen far more than Exicom expected; Exicom says its focus on customer value has caused margin compression, while it believes its margins remain industry-leading compared with peers.
    Show source
    And by doing that, yes, there has been margin compression, I won't lie, but it is still maintaining, let's say, in my opinion, industry-leading margins compared to our peers.
  • Exicom has not seen any severe production cut by big OEMs or any major public announcement of such cuts.
    Show source
    But we have not seen any severe cutdown in production by any of the big OEMs, at least I have not seen any big public announcements in that regard.

Segments

  • Tritium TRI-FLEX chargers are advanced liquid-cooled chargers aimed mainly at markets in the U.S. and Europe; in India, they are in the business-development phase, with deployment expected when high-energy battery cars, trucks and buses require 10 to 20-minute charging.
    Show source
    So these are very advanced liquid cool chargers, which will eventually come to India, but today, it's in the business development phase.
  • Exicom's Harmony Gen 2 product offers more features, better aesthetics and durability while increasing gross margin.
    Show source
    I can't give you exact specific numbers, but this is the first time where we have been able to give a better value product in terms of features, more things, better aesthetics, better durability and increase our gross margin at the same time.
  • About 50% of Exicom's business comes from AC chargers and about 50% from DC chargers; these are directional, not exact, figures.
    Show source
    Almost 50% of our business comes from AC chargers and about 50% of the business comes from DC chargers.
  • More than 50% of Exicom's DC charger deliveries have converted to G2, and Exicom expects the conversion to reach 100% by the end of the year, except where government specifications or approval timing may require older products.
    Show source
    But I would say on an ongoing basis, more than 50% of the deliveries of DC chargers have already converted to G2.

Risks, rules and outside factors

Outside factors

  • Delays in rare-earth material availability meant production for one Exicom charger category was 80% of what the company expected last month.
    Show source
    So for one of our charger categories, for example, last month, production was 80% of what we expected because of delay in these materials.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Sahil Patani: On a consolidated basis, I think.

    Answer, shiraz khanna

    Shiraz Khanna: So we had given a guidance of 50% increase in the revenue and 2.5x of the EBITDA. And that guidance still holds good. We are confident that for the remaining 9 months, we'll be able to hold on to the guidance.

  2. Question

    Sahil Patani: And I just wanted to understand that in terms of project execution or orders, like if you can just list a couple of factors that is helping us to kind of maintain that guidance, like what is contributing to that?

    Answer, anant nahata

    Anant Nahata: Yes. So I'll first talk about the standalone basis. So a lot of today's -- what I spoke about in the presentation and even from a perspective of when we gave out that guidance is really backed by in the Critical Power segment by the order book that we already have. So I won't say 100%, but a lot of it is backed by the order book that we have. And some proportion is based on business as usual where we keep getting run rate business, etcetera. And we feel pretty strongly about it. As I mentioned, the quarter 1 revenue was more on account of project delays.

    Answer, anant nahata

    And then it's the project delays, maybe due to customers, it may be due to product approval. It may be just the paperwork concerning the project. A lot of these are not just one project, but multiple projects that happened sometimes just luck doesn't work your way. And all of those are solved and the projects have been put into execution mode in the last quarter. We may not have had huge revenue from it, may have had single-digit crore revenue, but the execution has started. So that gives us confidence that will be able to sustain that guidance through the remainder of the quarter because the capacities that we have, especially after Hyderabad come up in October will not be deterrent in from a revenue perspective to be able to recognize by the company. And mathematically, that guidance converts into 4x EBITDA on a standalone basis of what we did last year, so to be able to do that.

    Answer, anant nahata

    On a consolidated basis, I think we gave a guidance of 100% revenue growth. This is something broadly will maintain. But as Tritium is taking a little longer to turn around, there may be some shortfall in the consolidated revenue guidance. But on a standalone basis, we continue to maintain the guidance.

  3. Question

    Sahil Patani: That helps. The second question is around profitability. Obviously, this has been our like fourth quarter consecutive where we posted losses. So when do you think eventually will turning profitable? Would it still be within FY '26? Or do you think because of Tritium, we might slip into FY '27 as well in terms of profitability? Page 9 of 14 Exicom Tele-Systems Limited August 13, 2025 Anant Nahata: Yes.

    Answer, anant nahata

    So again, on a standalone basis, even with this very low revenue figure, we were still PAT positive. And if we have to scale up the revenue as we have already spoken about, that will definitely propel profitability because with low revenue, the fixed cost coverage, variable cost coverage is quite low, and that's where some of the guidance of 4x EBITDA, etcetera, is coming from. On a consolidated basis, I think profitability guidance will only be for FY '27, not for FY '26 on a consolidated basis.

  4. Question

    Samraat Jadhav: So the Harmony Gen 2 and Tritium TRI-FLEX chargers, we have received a very strong market response. What is the expected gross margin for these new products? And what is the current order backlog outlook?

    Answer, anant nahata

    Anant Nahata: Yes. So the Tritium TRI-FLEX because it's part of the portfolio we launched, that's a very high- end technology with main markets in U.S. and Europe. In India, there is no -- I wouldn't say there's an immediate market for it, but there's activities on business development, etcetera, which are taking place, and that will be really fruitful when we have really high energy battery cars and big trucks and big buses, all of them requiring 10 to 20-minute charging. So these are very advanced liquid cool chargers, which will eventually come to India, but today, it's in the business development phase. But the main launch, etcetera, was with -- for our Generation 2 product, which we call as Harmony Gen 2. I can't give you exact specific numbers, but this is the first time where we have been able to give a better value product in terms of features, more things, better aesthetics, better durability and increase our gross margin at the same time. Usually, that doesn't happen, but this time, we have been able to do that.

    Answer, anant nahata

    And that's where you want to be, right, where we're able to give 2x more value and like 1%, 2% more, but our gross margins in EV charger business are in line with our expectations. That's what I can tell you, even though it's a very fierce competitive market, right? It's a new segment. And every time there is something new businesses in India go through this period of phase where 20 people are trying to do it. But I think we have been able to convince the customers of the value that we bring, not all the customers, some we have not been able to convince and we lose them. But most of the customers who are deploying charging networks, who have funds and investments to deploy charging networks, I think we would have a majority share in it. So I can't give the specific margin, but it's in line with our expectation and better than what we had in the previous product portfolio.

    Answer, anant nahata

    That's one. You asked in terms of pipeline. Again, our 50% of the business, and this is not an exact number, just a directional number. Almost 50% of our business comes from AC chargers and about 50% of the business comes from DC chargers. So that entire pipeline of DC business as we are in the transition phase, converting customers to Gen 2. But I would say on an ongoing basis, more than 50% of the deliveries of DC chargers have already converted to G2. Page 10 of 14 Exicom Tele-Systems Limited August 13, 2025 And by end of the year, I think it will be 100% because being able to convert maybe some -- related to some government specifications, etcetera, where we may have approval for the older products and the new approval will take time, things like that, right?

    Answer, anant nahata

    But I think for all practical purposes, we have already converted everything to G2, whatever is left by end of the year.

  5. Question

    Samraat Jadhav: Great. And our Hyderabad plant would be operational, when totally?

    Answer, anant nahata

    Anant Nahata: So, we're going to start operation in October. You saw some pictures in the presentation that are at very advanced stage.

  6. Question

    Samraat Jadhav: October this year?

    Answer, anant nahata

    Anant Nahata: October this year. But that does not mean it will be at full production in October. So October, it will start this year, October 2025. And then there will be a period of 2 quarters where the complete transition will happen, right? So product by product, line by line, etcetera.

    Answer, anant nahata

    Anant Nahata: So that -- today, we are operating at a very high utilization, specifically in quarter 2 in our current plant. In the Hyderabad plant, the overall capacity that we can cater to is a lot product because that's a plant we have built for future. So today, we are not utilizing all the space and the capacities that we are building. So plant and machinery is modular being put for our, let's say, next 2 years requirement, right? And if we want to expand the space to expand more. So with the current plant and machinery that we are putting, our utilization will absolutely be north of 70% to 75%.

  7. Question

    Shashi Kant: So my second question is, so what's our view on the EV industry this year for FY '26, what kind of growth we are seeing? And secondly, what kind of tower additions we are seeing in this financial year FY '26?

    Answer, anant nahata

    Anant Nahata: So I'll answer the EV thing first. Though I've been excited by EV industry all the years since we have gotten into it since 2019, but even within those 6 exciting years, there have been -- 2 years have been very excited. One was FY '23, so calendar '22, FY '23, where we saw this thing among most of the players that everything is going to turn EV, let's invest in EV, let's not miss the bus. So that was the excitement out of, a little bit fear, a little bit about future technology. And today, the tailwinds I'm seeing in this industry is far exceeds anything that I've seen in the past. And this excitement is out of people's comfort with EV, the people understanding the TCO, people adopting EVs as the first car, government being helped ensure on making electric buses a norm. For the first time, people acknowledging that heavy vehicles, which may be large trucks and buses can go EV.

    Answer, anant nahata

    Earlier, never people promoted EV only for car and bike, it's not for buses and trucks. But today, that's not the case. Page 11 of 14 Exicom Tele-Systems Limited August 13, 2025 And more importantly, the people, the companies who matter in India to the Indian population, whether it's Mahindra, Maruti, Tata, all of them coming out with models in EV with very big investments around EV, right? So all that has created tailwinds for us which has created exciting pipeline for us and for our peers as well. And overall, I think on the slide, I showed you the car growth of passenger vehicles that is roughly quarter-on-quarter, like since last's year quarter versus this, is 70% even Q4 versus this quarter, it's 15%. So all that means charges will be required and companies like us or for that matter, any other company in the electric mobility ecosystem should gain on top of it. Yes, it's going through very intense competition.

    Answer, anant nahata

    Prices have fallen way beyond what we would have expected. But as I mentioned in the previous question, at Exicom, we believe in giving great value to the customers. And by doing that, yes, there has been margin compression, I won't lie, but it is still maintaining, let's say, in my opinion, industry-leading margins compared to our peers.

  8. Question

    Sagar Gupya: Sir, I have just one question that due to geopolitical factors, there are challenges in importing rare earth materials from China. How is this affecting Exicom and the electric vehicle industry and what measures is Exicom taking to address these challenges?

    Answer, anant nahata

    Anant Nahata: So rare earth metal and magnets -- so first of all, they have a wide variety of use, no doubt about it, right? So it impacts everyone, including us, and I'll just come to that. But we don't use these type of products in the way automobiles or some of these companies use, right? We don't use them. So the proportion of effect on us is factor of what auto companies go through. So I just want you to note that. If we buy, for example, 100 components or 1,000 components out of 1,000, maybe 5 or 10 components use that.

    Answer, anant nahata

    And we have seen delays in those components availability. But it delays in those availability, not that they are not available or we have to reshape our production entirely. So for one of our charger categories, for example, last month, production was 80% of what we expected because of delay in these materials. But on an overall year basis, quarter basis, I don't think the impact will be significant, which will make a difference in numbers for us. So, yes, realistically, to work harder, there is some impact on a minority number of components, but it's not an impact where we would -- which would lead us to change our guidance or explain or have like a significant explanation to shareholders.

  9. Question

    Sagar Gupya: But sir, like due to this EV car sales growth is declining as well the coast is affecting, then you do think that this coast will also affect the EV charger industry?

    Answer, anant nahata

    Anant Nahata: Yes. That's a very good question. So that's a very good question. So while 3 months ago, there were talks of people cutting down production, etcetera. But from whatever forecast we have Page 12 of 14 Exicom Tele-Systems Limited August 13, 2025 seen, it doesn't look like to be the case. And I read in the media the same as you do, it looks like India, China relations are improving. So again, I don't know what's happening at that level.

    Answer, anant nahata

    But we have not seen any severe cutdown in production by any of the big OEMs, at least I have not seen any big public announcements in that regard. So hopefully, that's not the case.

  10. Question

    Sagar Gupya: But sir, despite having an advantage in domestic charging and acquiring Tritium, our revenue continues to decrease while company expenses rise and our competitors like Servotech, who are relatively new to this field compared to Exicom and are demonstrating better results and growth with their investors and experiencing, if I'm saying, like significant returns over the past 5 years. Given this circumstance, why is Exicom unable to achieve, sir?

    Answer, anant nahata

    Anant Nahata: So again, on Servotech, from what I know, are a player in multiple domains, EV charging, solar, EPC of solar. So I'm not sure if the EV charging business is bigger or higher growth than us. As a full company, I'm not sure because they're engaged in multiple businesses that I know. So I would just advise to compare apple versus apple, that's a company much more focused on government business, which is good. But if we have limited capacity, we try to do business, which best serves as the return for the capacity. And at current pricing, it wasn't the PSU business in the past. In future, it may be because government has now strengthened the P&P norms, which allow people like us to compete better versus the norms in the past, but to my best of knowledge, I think from a customer perspective and revenue perspective, at least in EV charging, we would - - on a continuous basis, we would be the largest provider out there.

    Answer, anant nahata

    Now if someone's revenue are a lot bigger due to 1 or 2 tenders for 1 year, I can't say. But on a continual steady- state basis, I think we are the largest EV charging company in India.

Show 2 more questions
  1. Question

    Samraat Jadhav: So my question is on R&D. Our R&D -- how is your R&D budget allocated between Critical Power, EVSE, and emerging technologies like PC microgrid solutions or do we have any upcoming innovations, which you can highlight?

    Answer, anant nahata

    Anant Nahata: Yes. So R&D is I'll just tell you the percentage, but it's a substantial percentage of our budget. And most of our products are in-house designed, right? So just even before I go in the budget allocation and everything, we'll have about, I think, close to 160 people in R&D, almost evenly split between EV charging and critical power and the type of stuff we do, like today, the heart of EV charger is the controller, like in any product, the CPU of the charger is the controller. We are the only Indian company designing and manufacturing that in India. There is no other charger OEM who has its own controller. Again, it provides us flexibility, gives customers more confidence in longer term.

    Answer, anant nahata

    So we try to differentiate ourselves in R&D by going much deeper in technology development than what other peers are doing. Page 13 of 14 Exicom Tele-Systems Limited August 13, 2025 So the breadth of technology development we are doing in EV charger differs in 2 ways from our peers. A, we are the only company right from portable charger to high-power charger. We have the entire product portfolio. So otherwise, some of our competition is just focused on government. Some competition is just focused on bus chargers. Some competition is just focused on public charging, somebody just in home [inaudible 0:51:44] but we have the entire breadth of portfolio for not very expensive.

    Answer, anant nahata

    So our expense of R&D as a cost of sales would be between 3% and 5%. And not exactly equal, but broadly, EV charging would be, let's say, 60% of the expense, critical power would be 40% of the expense. Again, directionally, I don't know the exact numbers, but if you want...

  2. Question

    Samraat Jadhav: And any upcoming innovations, if you can highlight?

    Answer, anant nahata

    Anant Nahata: In fact, you said it. So we are continuously working on incremental innovations. So we work on 2 types of innovations. One is incremental innovation, which is more feature, taking away some pain of the customers, improving the customer experience. And sometimes we work on pathbreaking solutions. So DC, a solution for EV charging, high- power EV charging where the grid is not supporting such high power, right? So a battery -- an integration of battery energy storage system and EV charging is something we are looking at.

    Answer, anant nahata

    We did have a pilot product last year in that, but with all those learnings, etcetera, scaling up of that. So it's similar to a DC microgrid, but in some nuances. So the answer is maybe not as a product, but as a solution, we are looking at something quite novel to enable high power charging for high energy vehicles.

    Answer, anant nahata

    Anant Nahata: So I really appreciate everyone taking time and interacting with us. If you have any other questions, feel free to e-mail our Investor Relations. We'll try our best to reach out to you. We want to be transparent. We appreciate your journey as shareholders, investors in our company until now. And we are trying -- myself and my team are trying our best to meet the guidance provided by the company this year. We are excited about the business.

    Answer, anant nahata

    The quarter 1 results may not reflect exactly the same, but hopefully, you'll see that excitement coming to fruition in the coming quarters. Thank you, everyone.

Questions about this call

When was the Exicom Tele-Systems Q1 FY26 earnings call transcript filed?
Exicom Tele-Systems filed the transcript with the exchange on 18 Aug 2025. This page is built from that transcript.
What does this page list?
49 statements from the transcript across 7 topics, 27 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 12 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.