Highway Infrastructure Q4 FY26 earnings call: Highway Infrastructure Limited closed FY26 with an order book of over INR 1,000 crores, debt-to-equity at 0.45x, and return on equity at 18.4%

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

The company closed FY26 with an order book of over INR 1,000 crores, debt-to-equity at 0.45x, and return on equity at 18.4%. The company expects INR 200 crores from EPC and INR 700 crores from Toll in FY27, for a total of INR 900 crores in FY26-27. The company has been scoping one wayside amenities site of about 3 acres and another of about 30 acres, in different parts of India; one is positioned as a transport logistic center and the other as a pilgrimage center. Tollway collection business contributed 73.7% to revenue, EPC infrastructure contributed 19.8%, and Real Estate contributed 6.5% in FY26. The company has a presence across 11 states and 1 Union Territory, and is deepening its footprint in Gujarat, Rajasthan, Andhra Pradesh, and the wider Northeast.

The numbers management gave

Results

  • Tollway collection business contributed 73.7% to revenue, EPC infrastructure contributed 19.8%, and Real Estate contributed 6.5% in FY26.
    Show source
    In FY26, Tollway collection contributed 73.7% to revenue, EPC infrastructure contributed 19.8%, and Real Estate contributed to 6.5%.
  • Real Estate revenue increased from INR 8.0 crores in FY25 to INR 41.6 crores in FY26, reflecting improved monetization and stronger activity within the segment.
    Show source
    In FY26, the Real Estate revenue increased from INR 8.0 crores in FY25 to INR 41.6 crores in FY26, reflecting our improved monetization and stronger activity within the segment.
  • The company reported consolidated total income of INR 633.4 crores, up 25.6% year-on-year, EBITDA of INR 51.5 crores, up 28.4%, and PAT of INR 31.8 crores, up 42.0% year-on-year, in FY26.
    Show source
    On a consolidated basis, we reported total income of INR 633.4 crores, up 25.6% year-on-year, with EBITDA at INR 51.5 crores, up 28.4%, and PAT at INR 31.8 crores, up 42.0% year-on-year.

Money and capital

  • The company had a debt-to-equity ratio of 0.45x and net worth of INR 228.5 crores as of March 2026.
    Show source
    Our balance sheet remains robust, with debt-to-equity ratio at 0.45x and net worth at INR 228.5 crores as of March 2026, giving us sufficient flexibility to support growth while maintaining financial discipline.
  • The company had total receivables of approximately INR 65 crores in 2026, including INR 27 crores billed in March and realizable in the next three months.
    Show source
    Saurabh Mittal: The total receivables is approximately INR 65 crores in 2026, out of which we have billed INR 27 crores in March, which is realizable in the next three months.
  • The company says its balance sheet will be able to support wayside amenities capex and is currently supportive, while management will decide how to proceed when and where in time.
    Show source
    So, it is very subjective, but at the moment, we see that the balance sheet is supportive.

What it expects ahead

What management expects

  • The company expects INR 200 crores from EPC and INR 700 crores from Toll in FY27, for a total of INR 900 crores in FY26-27.
    Show source
    So we are expecting as the total INR 900 crores in FY26-27.
  • The company expects INR 1,200 crores in FY28, comprising INR 300 crores from EPC and INR900 crores from the toll segment.
    Show source
    And for FY28, we are expecting INR 1,200 crores, for EPC INR 300 crores and INR900 crores for toll segment.
  • The company says break-even for wayside amenities is expected in the ballpark of 5 to 8 years in a 30-year time period, and 3 to 5 years, perhaps 7 years, in a 20-year period.
    Show source
    And the other thing break-even will be also subjective, but we are looking in the ballpark of 5 to 8 years in a 30-year time period, and let's say 3 to 5 years, maybe 7 years in a 20-year period.
  • The company expects to execute INR 200 crores of the INR 600 crores in FY27, equal to 33.33% of that amount; it says 100% of the toll segment order book is executed within a year.
    Show source
    And out of INR 600 crores, we are just expecting to execute INR 200 crores, so this is 33.33%.
  • The company is evaluating adjacent infrastructure opportunities, including wayside amenities and renewable energy-linked EPC opportunities such as EV charging infrastructure; some of the EV charging projects have already been executed and commissioned under the AICTSL PSU.
    Show source
    Renewable energy-linked EPC opportunities, such as EV charging infrastructure, out of which some of the projects are already executed and commissioned under the AICTSL PSU.
  • The company says that even if traffic reduces in the short term, it will not have a very big impact on the company under MLFF.
    Show source
    So the thing is, even if the traffic reduces on a short-term basis, this will not have a very big impact on us in MLFF.
Show 12 more statements

What management expects

  • The company says it has been studying MLFF and is actively looking for good and better opportunities in the MLFF segment.
    Show source
    So MLFF, we are already been working on it, we've been studying, and we are actively looking for good and better opportunities in the MLFF segment.
  • The company says it does not have to mitigate the impact of MLFF because it does not see MLFF as an issue.
    Show source
    So, to your question, we don't have to mitigate this because we don't see this as an issue.
  • The company has been actively bidding for controlled access corridors for wayside amenities and says visibility for these opportunities will be seen in the near future.
    Show source
    We have been actively bidding for some, and in the near future, you will be seeing the visibility for that.
  • The company says it will disclose the revenue it is eyeing for wayside amenities once it gets into the projects, and that any number at present would be unjustified.
    Show source
    So, it is very subjective at the moment, and once we actually get into this, we will be able to disclose or comfortably say what kind of revenue are we eyeing.
  • The company says the upper Northeast may become one of its largest contributors in the near future.
    Show source
    And I think we don't know, I mean, in the near future, it may come up as one of the largest contributors.
  • The company says MLFF tolling reduces risk, operates more on a PPP basis, and allows the operator a government-provided period to break even and make a profit after putting up the infrastructure. Replaced by a later filing.
    Show source
    So, I put up the infrastructure, government gives me a time period to, come and break even and make my profit.
  • The company says MLFF has much less risk and much longer tenure, and that the company will be well-positioned in the coming future. Replaced by a later filing.
    Show source
    We see this on the positive side that we have much less risk, much longer tenure, and then we will be well-positioned in the coming future for that.
  • The company says wayside amenities are an interesting opportunity and that it is well-positioned as the government moves toward PPP for tolling. Replaced by a later filing.
    Show source
    And if you look at this from the PPP perspective, like again for tolling also government is moving towards PPP, we are well- positioned for that.

Orders

  • The company closed FY26 with an order book of over INR 1,000 crores, debt-to-equity at 0.45x, and return on equity at 18.4%.
    Show source
    We closed the year with the highest -ever order book of over INR 1,000 crores.
  • The company secured the Kaza Fee Plaza project in Andhra Pradesh during FY26 with a contract value of about INR328.8 crores, the largest Tollway collection contract in the company's history.
    Show source
    Page 2 of 13 Highway Infrastructure Limited June 02, 2026 During FY26, we strengthened this vertical, including securing the Kaza Fee Plaza project in Andhra Pradesh with a contract value of about INR328.8 crores, the largest Tollway collection contract in the company's history.
  • Executable pipeline as of March 2026 comprised INR 591.3 crores of balance EPC works and INR 526.1 crores of Tollway Collection balance value.
    Show source
    As of March 2026, our executable pipeline comprised of INR 591.3 crores of balance EPC works and INR 526.1 crores of Tollway Collection balance value, providing a solid foundation for revenue visibility in the coming periods.
  • The company closed FY26 with a record order book of INR 1,143 crores.
    Show source
    We closed this year with a record order book of INR 1,143 crores, which provides strong execution visibility ahead.

What it is building and selling

Projects and capacity

  • The company has been scoping one wayside amenities site of about 3 acres and another of about 30 acres, in different parts of India; one is positioned as a transport logistic center and the other as a pilgrimage center.
    Show source
    One is positioned as a transport logistic center and one is positioned as a pilgrimage center.

Demand and pricing

  • The company says Andhra Pradesh, Rajasthan, Gujarat, the Delhi-NCR region and Uttar Pradesh have been helpful for its growth, and the upper Northeast is posing a very big opportunity as development there takes shape.
    Show source
    Even so, upcoming areas such as the upper Northeast where for the past 50 years the development has now taken up and is taking shape, tha t is also posing as a very big opportunity.
  • The company says MLFF reduces operator risk and competition because many tolling operators are not capable of operating on a PPP basis. Replaced by a later filing.
    Show source
    So MLFF is a good coming, it is reducing the operator's risk also, and it is com ing on a PPP basis, so again that reduces the competition because a lot of tolling operator s are not capable of PPP basis.

Segments

  • The company has a presence across 11 states and 1 Union Territory, and is deepening its footprint in Gujarat, Rajasthan, Andhra Pradesh, and the wider Northeast.
    Show source
    We now have a presence across 11 states and 1 Union Territory, and we continue to deepen our footprint in markets such as Gujarat, Rajasthan, Andhra Pradesh, and the wider Northeast.
  • The government is looking at wayside amenities as a regular station model, with long-term contracts of 5-year, 20-year or 30-year terms.
    Show source
    The government is looking at the wayside amenities, as a regular station model, and these are long-term contracts, 5-year contracts, 20-year contracts, 30-year contracts.
  • EPC margins are 13% to 14%, its Toll segment margin is 7%, and its Real Estate margins are approximately 50%.
    Show source
    Saurabh Mittal: EPC margins are 13% to 14%, Toll segment is 7%, and in Real Estate, we work at approximately 50% margins.
Show 3 more statements

Segments

  • The company operates across three business verticals: Tollway collection, EPC infrastructure, and Real Estate.
    Show source
    We operate across three business verticals: Tollway collection, EPC infrastructure, and Real Estate.
  • The company says it is tolling pan-India and has started looking into the Northeast as roads are being developed there.
    Show source
    As opposed to us, we are tolling pan-India.
  • The company is focused on EPC in Madhya Pradesh and is also moving out of the state.
    Show source
    In terms of EPC, we are more focused in Madhya Pradesh till now.

Risks, rules and outside factors

Risks and disputes

  • The company withdrew the Venkatapalam Fee Plaza opportunity in Andhra Pradesh, resulting in a penalty of INR 26.33 lakh, and handed over the Katiyara Fee Plaza in Bihar after concluding that the contract was not commercially attractive and not in the interest of the company.
    Show source
    We withdrew the Venkatapalam Fee Plaza opportunity in Andhra Pradesh, which resulted in a penalty of INR 26.33 lakh, and we also handed over the Katiyara Fee Plaza in Bihar after concluding that the contract was not commercially attractive and not in the interest of the company.

Outside factors

  • The company says industry traffic grows year-on-year by 5% to 7%, and by even 10% on some economic corridors.
    Show source
    As in terms if you see the industry trends, the traffic grows on a long -term basis on year-on-year, the traffic growth is there, 5% to 7%, even 10% on some economic corridors.

Everything else said on the call

What management stressed

  • The company says it will not go below a GP of 13% to 14% for EPC projects, while industry participants might go below 10%.
    Show source
    So, we are only focused and we are only looking at projects which we see are viable, feasible And also, within the lines of our general understanding that we will not go below a GP of let's say 13% to 14% as opposed to the industry where people might go below 10% also.
  • The company has developed most of its Tollways technology in-house, giving it greater control and leverage for geographic expansion.
    Show source
    And the best part is that for at least for Tollways, most of the technology that we have developed is in-house.
  • The company says its experience as Tollway operators gives it detailed data on which corridors work, traffic counts, road problems, and the preferences of people using those roads, positioning it for wayside amenities.
    Show source
    We have all that data, so we are well-positioned for wayside amenities.
  • The company is actively reviewing its processes and how to leverage its software to reduce manpower and leakages at site and improve efficiency, and says this will be its main focus ongoingly.
    Show source
    Like we said, with the current time we've got, we have been actively reviewing our processes, reviewing how can we leverage the software that we've made to reduce the manpower at site, reduce the leakages at site, and overall improve the efficiency.
  • The company says it has no language barrier or social barrier and is spread across India, generating much larger opportunities. Replaced by a later filing.
    Show source
    We have no language barrier, we have no social barrier and so we are very much spread all across India, which generates much larger opportunities for us.
  • The company says it is more technology-focused and relies on processes and technology-backed processes that have very low account on error. Replaced by a later filing.
    Show source
    We are more reliant on our processes and technology-backed processes, which are very less account on error on that front.
Show 2 more statements

What management stressed

  • The company says it focuses not only on increasing its order book but also on the margins and timely execution of orders, which it says helps it maintain a good rapport with clients. Replaced by a later filing.
    Show source
    So over there, we are not very much focused in we want to increase our order book, but we are also more focused on what orders we get in, what are our margins and can we execute them timely, in a timely manner so we have a good rapport with our clients.
  • The company says it is technology-focused and is leveraging technology at the forefront of its operations. Replaced by a later filing.
    Show source
    At the same time, in Highway, like I said and I've always been saying, we are a technology - focused company.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Sir, I wanted to understand if you could give some details or maybe throw some light on what differentiates HIL in winning certain contracts, maybe while bidding for EPC and other Toll projects? What is that differentiating factor?

    Answer, riddharth jain

    Riddharth Jain: I think for Tollways, I would like to start that I've also mentioned in a lot of previous talks that we are very clear that we will not concentrate our Tollways in any one particular region. And regions matter a lot and having said that a lot of Toll players in India, they are very much concentrated in their particular area. In terms, some people like or are more capable in doing Tolls in the further South. Could be language barrier, could be a comfort zone situation, could be deployment of manpower. As opposed to us, we are tolling pan-India. We have also started to look now that the roads are being developed in the further Northeast. We are also starting to look into that particular region, which is a much more difficult approach as opposed to the central part of India.

    Answer, riddharth jain

    And so again, we are very much confident on how to deploy our systems. Our systems are very much set. We have no language barrier, we have no social barrier and so we are very much spread all across India, which generates much larger opportunities for us. And at the same time, people see us as a much larger player which is not concentrated in one particular region for Tollways. I think that gives us a very big edge over any other Toll players. Other than that, I think how we can do this is that we are more technology-focused. We are more reliant on our processes and technology-backed processes, which are very less account on error on that front.

    Answer, riddharth jain

    So I think most of our revenue monitoring and discipline comes from these technology-backed processes. And the best part is that for at least for Tollways, most of the technology that we have developed is in-house. So we have much larger control as opposed to any of the other Tollway collection players which might not be looking at this business from this angle, which also gives us again the leverage of geographic expansion. In terms of EPC, we are more focused in Madhya Pradesh till now. While having said that, we are also moving out of the state. I am sure you are already aware that in EPC, the margins become very low because of the bidding pattern. So, we are only focused and we are only looking at projects which we see are viable, feasible And also, within the lines of our general understanding that we will not go below a GP of let's say 13% to 14% as opposed to the industry where people might go below 10% also.

    Answer, riddharth jain

    So over there, we are not very much focused in we want to increase our order book, but we are also more focused on what orders we get in, what are our margins and can we execute them timely, in a timely manner so we have a good rapport with our clients. I think that puts us ahead of others in terms of EPC. Rohan Sarda: Okay. Understood, sir. Sir, my second question is on the MLFF scheme. As the government is increasing its focus on implementing MLFF tolling across national highways, I wanted to Page 6 of 13 Highway Infrastructure Limited June 02, 2026 understand what would be the potential impact that we foresee on the Toll collection business and what are the plans we have to mitigate it?

    Answer, riddharth jain

    Riddharth Jain: I think first of all, what the government is trying to do is absolutely correct and long time coming now. We have been expecting this to come for multiple years now because given that our agenda is to improve connectivity and increase speed, why do people have to stop at tolls for paying the toll, right. Even for 10-20 seconds. So long time coming, we have been monitoring it. What MLFF is doing is actually it is reducing the risk. It is more on a PPP basis. So, I put up the infrastructure, government gives me a time period to, come and break even and make my profit.

    Answer, riddharth jain

    So the thing is, even if the traffic reduces on a short-term basis, this will not have a very big impact on us in MLFF. As in terms if you see the industry trends, the traffic grows on a long -term basis on year-on-year, the traffic growth is there, 5% to 7%, even 10% on some economic corridors. So MLFF is a good coming, it is reducing the operator's risk also, and it is com ing on a PPP basis, so again that reduces the competition because a lot of tolling operator s are not capable of PPP basis. At the same time, in Highway, like I said and I've always been saying, we are a technology - focused company. Whatever we are doing, we are leveraging technology a t the forefront. So MLFF, we are already been working on it, we've been studying, and we are actively looking for good and better opportunities in the MLFF segment. So, to your question, we don't have to mitigate this because we don't see this as an issue.

    Answer, riddharth jain

    We see this on the positive side that we have much less risk, much longer tenure, and then we will be well-positioned in the coming future for that.

  2. Question

    Nachiket Kale: Okay. Yes, so my first question is more around the order book. I think we are around INR 600 crores roughly. So, can you explain how this turns into the revenue recognition for upcoming FY27 and maybe for FY28 also?

    Answer, saurabh mittal

    Saurabh Mittal: In FY27, we are expecting INR 200 crores from EPC and INR 700 crores from Toll. So we are expecting as the total INR 900 crores in FY26-27. And for FY28, we are expecting INR 1,200 crores, for EPC INR 300 crores and INR900 crores for toll segment. Page 7 of 13 Highway Infrastructure Limited June 02, 2026 Nachiket Kale: This will convert into top line, right?

  3. Question

    Nachiket Kale: Yes.

    Answer, riddharth jain

    Riddharth Jain: Yes. Wayside, I think earlier also we've talked very extensively about commercial leasing and logistic-related leasing for the company. And this is very much adjacent to what we are saying. So –you can look at it in this perspective, government gives you land, you develop in whatever form, I mean, they obviously want some certain mandatory amenities such as washroom and food and other allied fuel systems and other allied amenities. And then they give you also some extra land so that you can develop other things which you think can be monetized over time. And the best part is what the company is looking at is we are looking at controlled access corridors. We have been actively bidding for some, and in the near future, you will be seeing the visibility for that.

    Answer, riddharth jain

    We have been actively bidding, and we've been bidding on controlled access corridors, so the thing is competition is near to zero. I mean, the competition will be for the other wayside amenities that the government has allocated on the same particular road, but the government has also made sure that the distance between two amenities is about 80 kilometres. So that a traveller, a commuter, when if he stops at the first one, he may not have the need to stop at the second one and so forth. And it's also subjective about the kind of commuter, the kind of route, the area, what kind of amenities that you've built up and all that stuff. So I think this is coming up as a very interesting opportunity for us. And if you look at this from the PPP perspective, like again for tolling also government is moving towards PPP, we are well- positioned for that. The government is looking at the wayside amenities, as a regular station model, and these are long-term contracts, 5-year contracts, 20-year contracts, 30-year contracts.

    Answer, riddharth jain

    Yes, so I think once we get into this, we will see a lot of change in the terms of how we work, what is our aim, and overall segment as Tollway operators, we have extensive understanding of what corridors are working, why are they working, what is the traffic count, and, what are the problems on that road, what could work, what could not work, to the point of detail of what kind of people are Page 8 of 13 Highway Infrastructure Limited June 02, 2026 coming in. Even to the part that what kind of language do they prefer, what kind of food preferences do they have. We have all that data, so we are well-positioned for wayside amenities.

  4. Question

    Nachiket Kale: Okay. But just one small follow-up on this, like what are the economics on this? Like how much would be the cash outgo from our pockets and what could be the break -even time or level for this?

    Answer, riddharth jain

    Riddharth Jain: I think cash outflow I cannot really say at the moment, but in terms of break-even, because it is again, why I cannot say is it is very subjective. Some sites are 3 acres, some sites could be 30- 31 acres, different locations. And the other thing break-even will be also subjective, but we are looking in the ballpark of 5 to 8 years in a 30-year time period, and let's say 3 to 5 years, maybe 7 years in a 20-year period.

  5. Question

    Nachiket Kale: Got it. Okay. But like we will not, our balance sheet can support this capex or we will we need to raise more debt or equity for this?

    Answer, riddharth jain

    Riddharth Jain: The balance sheet will be able to support, and when and where in time the management will take decisions on how to proceed with it. Because again, you have to understand this is a very long- term contract. Things might change in the future. So, it is very subjective, but at the moment, we see that the balance sheet is supportive.

  6. Question

    Nachiket Kale: Okay, great to know. Just one more on the balance sheet front. The receivables have gone up a little. So, could you explain the reasoning, and can we expect, like, this is the base performance, or this is just one-off?

    Answer, saurabh mittal

    Saurabh Mittal: The total receivables is approximately INR 65 crores in 2026, out of which we have billed INR 27 crores in March, which is realizable in the next three months. So, there is no big difference, no very big variance.

  7. Question

    Anoop Agarwal: Approximately 20% to 25%. Vishnu: Okay. And secondly, I wanted to ask that, so I think we are quite comfortable when it comes to our debt-equity ratio at around 0.45x or something. So, we do have funds available. So, as you also said in one of your questions asked by a previous participant that your deployment in EPC would be very calibrated. So, any new verticals that we would be trying to enter, if you can throw some light on that?

    Answer, riddharth jain

    Riddharth Jain: I like I said, wayside and renewable energy sectors are the two forefronts, the two fronts that we are actually actively working. Wayside, like I said, we have already been bidding. And in terms of EVs, we have actively commissioned two projects of EV charging stations in Indore, and we are actively looking for more scoping out. This might take some time, but like we said, we will selectively keep everything in mind, keep our margins in mind, then only we will enter the business because like we said, EPC is a long- term value creation and getting into something will have to be monitored in that perspective. Vishnu: Okay, thanks. And I think one of the previous participants asked, if you can just throw some light on what could be the revenue guidance for FY27? I skipped that number actually.

    Answer, saurabh mittal

    Saurabh Mittal: In FY27, forecasting is INR 950 crores, out of which EPC would be INR 300 crores approximately and toll would be INR 650 crores. Vishnu: INR 650. Okay. And any levers for margin improvement from the current 8% of sorts that we registered this year?

    Answer, riddharth jain

    Riddharth Jain: I think we are constantly working on that. Like we said, with the current time we've got, we have been actively reviewing our processes, reviewing how can we leverage the software that we've made to reduce the manpower at site, reduce the leakages at site, and overall improve the efficiency. But I cannot comment on a number, but we are actively working on that. And like I said in my speech also, this will be our main focus ongoingly. Vishnu: Okay. So, if you're not comfortable with quoting the number, but we can easily assume that it would be higher than the current level in FY27, right? I mean, the levers will kick in for FY27, right?

    Answer, riddharth jain

    Riddharth Jain: I think it is important to mention that this is an ongoing process. We cannot assure that everything is going to come in within a one year. We have to have a longer-term perspective on Page 10 of 13 Highway Infrastructure Limited June 02, 2026 this. So, like we have a longer-term perspective on this, it's a continuous process, so we hope for the best. Vishnu: Sure. I think that's it. Okay.

    Answer, riddharth jain

    So that's it from my side. If I have any questions, I'll come back in the queue. Thank you so much.

  8. Question

    Deepak Kumar: Thank you for the opportunity. Sir, I have one question on the wayside amenities revenue. So previous participant, I think one of the participants asked about this. So, I just want the range of what would be the range of revenue expected from wayside amenities?

    Answer, riddharth jain

    Riddharth Jain: It's actually very subjective because some, like I said, one of the sites that we've been looking or scoping was about 3 acres. The other site was about 30 acres. Both on different parts of India. One is positioned as a transport logistic center and one is positioned as a pilgrimage center. So, it is very subjective at the moment, and once we actually get into this, we will be able to disclose or comfortably say what kind of revenue are we eyeing. Any number right now would be unjustified.

  9. Question

    Deepak Kumar: Okay, understood. So, sir, my second question would be, in the opening remarks, you have mentioned like we want to explore the new opportunities in ropeway projects. So what is the strategic rationale behind this entering this new segment? Or is it like a broader strategy of diversifying from the Tolls?

    Answer, riddharth jain

    Riddharth Jain: So like I mentioned, you have to see it at this perspective. Like wayside is for roads, government is also going to develop other commercial activities around ropeways. So ropeway is like the road and the other commercial activities for ropeway is like the wayside for these roads, right. For like for pilgrimage sites and others like they are making ropeway at multiple pilgrimage sites all over India. And where there is a lot of commute, a lot of people flowing in at different times of the year, obviously they will want commercial activity to go on, which is food, beverages, hotel leasing, so on and so forth, which is very much like wayside. So I think this is a parallel thing. This is very much related, but just the location is different, but the purpose is same.

  10. Question

    Pratik Shah: Yes.

    Answer, riddharth jain

    Riddharth Jain: I think it's very much available in the results. Yes, as an overall, you can see in the toll segment. If you want an answer, you can mail it to us through EY, and we'll be happy to get on a one-on- one call to answer any such specific questions.

Show 4 more questions
  1. Question

    Bharat Sharma: Hello. Thanks for the opportunity. So, congratulations on a decent set of numbers. So, I have a couple of questions. So, the company now operates across 11 states and one Union Territory. So which geographies offer the strongest opportunity for growth over the next couple of years?

    Answer, riddharth jain

    Riddharth Jain: Thank you, Mr. Sharma, for the question. I think opportunities are coming from all parts of India right now. We have been very fortunate to have Andhra Pradesh on our side, Rajasthan on our side, even so Gujarat on our side, and Delhi-NCR region is performing very good. Uttar Pradesh has been very fruitful for us. Going forward, we cannot pinpoint one particular state. As you see, every state is outperforming at the moment, and that is how we see. Even so, upcoming areas such as the upper Northeast where for the past 50 years the development has now taken up and is taking shape, tha t is also posing as a very big opportunity.

    Answer, riddharth jain

    And I think we don't know, I mean, in the near future, it may come up as one of the largest contributors. So, any one state specific no, but I think I've mentioned some which have been helpful for our growth.

  2. Question

    Bharat Sharma: Okay, got it. Another one, so can you provide a comparison of margin between EPC projects and the Toll collection contracts?

    Answer, saurabh mittal

    Saurabh Mittal: EPC margins are 13% to 14%, Toll segment is 7%, and in Real Estate, we work at approximately 50% margins.

  3. Question

    Sir, what percentage of FY26 order book addition is expected to convert into revenue during FY27? Am I audible?

    Answer, saurabh mittal

    Saurabh Mittal: In toll segment, it's 100% because the toll order book is executed within a year. And out of INR 600 crores, we are just expecting to execute INR 200 crores, so this is 33.33%.

  4. Question

    Isha Shah: Okay, sir. Thank you so much.

    Answer, riddharth jain

    Riddharth Jain: Thank you, everyone. Thank you so much for all of your questions. Thank you so much for being present and listening extensively to what we want to say. And alongside, thank you so much for supporting the company and all of the well-wishers. The company has been constantly trying to live up to and increase the standards of the company, how we work. And I would like to again mention that we are not only chasing the order book, but we are also looking at what the margins are going to be. We are also looking at the profitability.

    Answer, riddharth jain

    And so hopefully in the near future, you will be seeing all of these things in the numbers. At the same time, we are also looking at expansion into relevant segments that we are very much confident we will be able to execute. And again, the visibility will be seen in the numbers. Thank you so much for joining. Thank you, everybody.

Questions about this call

When was the Highway Infrastructure Q4 FY26 earnings call transcript filed?
Highway Infrastructure filed the transcript with the exchange on 5 Jun 2026. This page is built from that transcript.
What does this page list?
43 statements from the transcript across 10 topics, 19 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 14 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
Highway Infrastructure Q4 FY26 concall: Highway Infrastructure Limited closed FY26 with an order book of over INR 1,000 crores, debt-to-equity at 0.45x, and return on equity at 18.4% · DalalOS