Earnings call

Lloyds Metals And Energy Q2 FY26 earnings call

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

The company has a 3 million tons contract from NTPC; the coal has already been taken out and operations will start immediately in this financial year. Lloyds Metals does not foresee market movements of more than 2% to 3% up or down in the next 6 months to 9 months. Lloyds Metals and Energy Limited's 4 million ton pellet plant began commercial production at the end of Q1 and has been ramped up. Lloyds Metals and Energy Limited's total income was INR 25,754 million in Q2 FY '26, up 75% year-on-year, driven by higher iron-ore dispatches, commencement of pellet sales and improved logistics through the slurry pipeline. Indian domestic prices were at a premium of around 35% to 45% over international prices, with a 61% grade priced at around $100 in January and Lloyds Metals selling at a higher price ex people's factories.

The numbers management gave

Results

  • Lloyds Metals and Energy Limited's total income was INR 25,754 million in Q2 FY '26, up 75% year-on-year, driven by higher iron-ore dispatches, commencement of pellet sales and improved logistics through the slurry pipeline.
    Show source
    Our total income for quarter 2 FY '26 stood at INR 25,754 million, up 75% year-on -year, driven by higher iron-ore dispatches, the commencement of pellet sales and improved logistics through the slurry pipeline.
  • Lloyds Metals and Energy Limited's total income was INR49,838 million in H1 FY '26, higher by 28% year-on-year.
    Show source
    For H1 FY '26, total income came in at INR49,838 million, higher by 28% year-on -year.
  • Lloyds Metals and Energy Limited's EBITDA was INR 8,693 million in Q2 FY '26, up 95% year-on-year, with margins at 33.75%, expanding by 348 basis points.
    Show source
    EBITDA for the quarter was INR 8,693 million, up 95% year-on- year with margins at 33.75% expanding by 348 basis points.
  • Lloyds Metals and Energy Limited's EBITDA was INR 16,778 million in H1 FY '26, with margins at 33.66%, an improvement of 363 basis points.
    Show source
    For the half year, EBITDA stood at INR 16,778 million with margins at 33.66% reflecting an improvement of 363 basis points.
  • Lloyds Metals and Energy Limited's profit after tax was INR6,056 million in Q2 FY '26 and INR 12,402 million in H1 FY '26, both up 22% year-on-year.
    Show source
    Profit after tax came in at INR6,056 million for the quarter and INR 12,402 million for the half year, both up 22% year-on- year.
  • Lloyds Metals and Energy Limited's iron production was 3.42 million tons in Q2 FY '26, while sales were 2.5 million tons, up 77% and 10% year-on-year, respectively.
    Show source
    In iron production for quarter 2 FY '26 stood at 3.42 million tons , while sales were 2.5 million tons up 77% and 10% year-on -year.
Show 24 more statements

Results

  • Lloyds Metals and Energy Limited's iron realization averaged INR 5,571 per ton in Q2 FY '26, stable sequentially.
    Show source
    Realization averaged INR 5,571 per ton stable sequentially.
  • Lloyds Metals and Energy Limited's iron EBITDA per ton improved to INR1,781 in Q2 FY '26, up 7% year-on-year.
    Show source
    EBITDA per ton improved to INR1,781, up 7% year-on -year.
  • Lloyds Metals and Energy Limited's pellet production was 0.78 million tons in Q2 FY '26, with realization at INR 9,916 per ton and EBITDA per ton at INR5,039.
    Show source
    In quarter 2 FY '26 pellet production stood at 0.78 million tons , with realization at INR 9,916 per ton and EBITDA per ton at INR5,039.
  • Lloyds Metals and Energy Limited's DRI volumes were 88,200 tons in Q2 FY '26, up 4% year-on-year.
    Show source
    In the DRI and Power segment, DRI volumes stood at 88,200 tons , up 4% year-on -year.
  • Lloyds Metals and Energy Limited's power volumes were stable and lower fuel costs helped maintain operating profitability in Q2 FY '26, while DRI realizations were muted due to market softness.
    Show source
    Though realizations were muted due to market softness, power volumes were stable and lower, fuel cost -- and lower fuel costs helped maintain operating profitability.
  • Thriveni Earthmovers and Infra Private Limited delivered a steady performance on a consolidated basis in Q2 FY '26.
    Show source
    On a consolidated basis, Thriveni Earthmovers and Infra Private Limited delivered a steady performance.
  • DRI EBITDA per ton was INR3,879 in H1FY26.
    Show source
    Riyaz Shaikh: The EBITDA per ton for DRI in this quarter has been -- H1 has been INR3,879.
  • The company saved around INR 600 per ton due to the slurry pipeline.
    Show source
    Around INR600 has been the saving due to the slurry pipeline.
  • The company has started the IPS benefit and identified INR 94 crore in Q2FY26.
    Show source
    In this quarter, we've got INR 94 crore, that has been identified.
  • Lloyds Metals and Energy Limited booked the costs of the 1.2 million ton BHQ mined, and the material is lying in stock.
    Show source
    Rajesh Gupta: The costs have been booked and --- lying-in stock .
  • Lloyds Metals and Energy Limited's trading volume this quarter was around 2 lakh tons of iron ore pellets.
    Show source
    Rajesh Gupta: So this quarter, the trading was around 2 lakh tons , but of iron ore -- pellet, sorry..
  • Lloyds Metals and Energy Limited's captive transfer by the slurry pipeline saves INR600 for the company and INR 1,000 for many other players; its operating cost is around INR 300 to INR 400 lesser, and its destination-to-destination selling price is around INR 200, INR300 higher than anybody else.
    Show source
    Number two, captive transfer by the slurry pipeline, saving of INR600 for us and INR 1,000 for many other players.
  • Lloyds Metals and Energy Limited's fuel cost is INR 9.5.
    Show source
    Our fuel cost is INR 9.5.
  • Lloyds Metals and Energy Limited's margins in H1 this year were better by around 400 basis points than in H1 last year, mainly because costs remain the same during the rainy season, especially in the Thriveni segment, when output is lower.
    Show source
    Riyaz Shaikh: INR2,400 crores in this half year.
  • Lloyds Metals and Energy Limited's pellet business is contributing robust EBITDA per metric ton, driven by captive ores, slurry pipeline efficiency, industry-leading conversion costing and strong realizations due to strong quality parameters.
    Show source
    The pellet plant -- pellet business is already contributing robust EBITDA per metric ton driven by captive ores, slurry pipeline efficiency and industry-leading costing -- conversion costing and conversion and strong realizations due to the strong quality parameters.
  • Lloyds Metals and Energy Limited reported its highest ever quarter at half-year revenue in Q2 & H1FY26.
    Show source
    To reiterate, the company has reported its highest ever quarter at half year revenue.
  • Lloyds Metals and Energy Limited's slurry pipeline and captive ore supply have ensured cost efficiency and strong margins for the pellet business from the start.
    Show source
    The slurry pipeline and captive ore supply has ensured cost efficiency and strong margins right from the start.
  • Lloyds Metals' EBITDA margin in the first half declined in percentage and absolute terms because of costs incurred to scale up production, mobilize and deploy manpower and equipment at sites for LMEL and in Odisha; the company expects to maintain its margin as volumes rise in the next half and both quarters.
    Show source
    And due to that, our EBITDA margin in terms of percentage or in terms of absolute numbers have gone down in this first half.

Money and capital

  • Lloyds Metals and Energy Limited spent INR 24,117 million during the first half of FY '26, with work progressing simultaneously across all active projects.
    Show source
    We have spent INR 24,117 million during the first half of FY '26 with work progressing simultaneously across all active projects.
  • The consolidated INR 7,900 crores figure includes Lloyds Metals And Energy Limited; Thriveni's figure was around INR 5,000 crores, and its INR 5,600 crores has become around INR 6,000 crores on account of the scaling up of operations.
    Show source
    I don't -- when we had INR5,600 crores, which is now around INR 6,000 crores, which is on account of the scaling up of the operations.
  • Thriveni has a cash balance of INR 400 crores.
    Show source
    We have to go on for the equipment and - - plus we also have a cash balance of INR 400 crores.
  • Thriveni's net cash would be INR 5,600 crores.
    Show source
    So the net cash would be always INR 5,600 crores.
  • Lloyds Metals and Energy Limited plans to raise INR9,500 crores through an NCD issue over the next 6 months from now and has got sanctioned around INR 800 crores of working capital.
    Show source
    Riyaz Shaikh: INR9,500 crores of an NCD issue.
  • Lloyds Metals and Energy Limited is planning mostly lease debt and aims for a debt to EBITDA of 1, though it may be higher at times and will always trail the next year EBITDA.
    Show source
    So we're planning aiming for a debt to EBITDA of 1, that's what our aim is, though it would be higher sometimes and it will be always a trailing the next year EBITDA.

What it expects ahead

What management expects

  • Lloyds Metals does not foresee market movements of more than 2% to 3% up or down in the next 6 months to 9 months.
    Show source
    Riyaz Shaikh: I don't foresee anything more than 2%, 3% market up or down in the next 6 months to 9 months.
  • The company expects iron ore dispatches from the mine of a minimum of 20 million to 21 million tons this year; the maximum it can do in iron ore this year is around 22 million tons, with some ore used internally for pellet and DRI production and the balance sold, and it expects to have no stock to a large extent.
    Show source
    We would do a minimum of 20 million, 21 million tons of dispatches from the mine.
  • The company expects INR4,500 crores to INR 5,000 crores in this year, and around INR 6,000 crores to INR 6,500 crores in the next 2 years.
    Show source
    Riyaz Shaikh: We should be doing around INR 5,000 -- of INR4,500 crores to INR 5,000 crores in this year.
  • Lloyds Metals and Energy Limited gave FY '27 or '28 revenue guidance of around INR 7,800 crores to INR 8,000 crores of top line.
    Show source
    Rajesh Gupta: FY -- revenue guidance of around INR 7,800 crores to INR 8,000 crores of top line.
  • For the next year, Lloyds Metals and Energy Limited expects pellet self-consumption of around 8 million tons, give or take 0.5 million tons, and around 1 million tons to 1.2 million tons to be used for DRI.
    Show source
    Rajesh Gupta: For the next year, the total market -- the self consumption would be around 8 million tons for the pellet plant give or take 0.5 million tons and around -- out of that 8 million ton , 1 million ton or 800,000 tons will be used internally and around 200,000 tons for the DRI, so around 1 point -- 1 million ton , 1.2 million tons will be used for DRI and 8 million ton for pellet.
  • Lloyds Metals and Energy Limited expects around 18 million tons of iron ore to be open market supply.
    Show source
    Rajesh Gupta: The rest will be open, iron ore, which is, say, around 20 -- sorry, 18 million tons .
Show 14 more statements

What management expects

  • Lloyds Metals and Energy Limited's mining plan indicates further BHQ production over the next 12 to 15 months before the BHQ plant comes online; exact figures will be known as mining progresses.
    Show source
    Yes, the mining plan indicates that.
  • Lloyds Metals and Energy Limited expects BHQ output of 10 million tons from input of 30 million tons.
    Show source
    Rajesh Gupta: Output of 10 million tons, input of 30 million tons .
  • Lloyds Metals and Energy Limited expects its debt to be around INR 8,000 crores, while Thriveni loans and short-term loans will be repaid.
    Show source
    So it would be somewhere -- it should be around INR 6,000 crores -- with the NCD is a big amount, so it should be around INR 8,000 crores.
  • Thriveni's EBITDA is expected to be INR2,000 crores, based on INR8,000 crores and around 30%, 35% of opex EBITDA, given the vagaries in this year.
    Show source
    So I think INR2,000 crores is the right figure that we can look at given the vagaries in this year.
  • Lloyds Metals and Energy Limited expects annual IPS benefits of around INR 1,000 a ton for the pellet and around INR 1,200 for the DRI's additional capacity, totaling around INR 350 crores to INR 400 crores.
    Show source
    So around INR 350 crores to INR 400 crores.
  • Lloyds Metals and Energy Limited is going to further reduce its conversion cost by going green in the fuel by LNG this month, maybe early next month; 25%, 35% of its power would be green in the next 6 months, and the two factors together would save another INR 100, INR150 per ton.
    Show source
    And all put together, we would save another INR 100, INR150 per ton from these 2 factors alone.
  • Given today's market, Lloyds Metals and Energy Limited expects its margins over the next 3 months to be a little better or the same.
    Show source
    Rajesh Gupta: Given today's market, at least next to 3 months, I would say a little better or the same.
  • Lloyds Metals and Energy Limited does not see its margins going below INR 4,000 because even at the export level they are INR 4,000.
    Show source
    Riyaz Shaikh: I don't see it going below INR 4,000 because even at the export level it's INR 4,000.
  • Lloyds Metals and Energy Limited expects to make up lost revenue in the coming months, and mining operations have normalized post monsoon.
    Show source
    However, I want to highlight that lost revenue will be made up in the coming months, and mining operations are now normalized post monsoon.
  • For H2, Lloyds Metals and Energy Limited expects the full benefit of the slurry pipeline, higher and stabilized pellet output, DRI ramp-up, post-monsoon mining stabilization and systematic execution of projects already in motion.
    Show source
    As we look forward to H2, the drivers are firmly in place, full benefit of the slurry pipeline, higher and stabilized pellet output, DRI ramp -up, post monsoon mining stabilization and systematic execution of all the projects already in motion.
  • Lloyds Metals expects all additional EC and the ramp-up in Surjagarh mines and other mines to happen in the second half of this year and is confident of reaching those numbers.
    Show source
    Rajesh Gupta: And all this additional EC and the ramp-up in Surjagarh mines as well as the other mines, will all happen in the second half of this year.
  • Lloyds Metals and Energy Limited hopes to cross the steel industry's tough cycle by the time its steel plant starts, so that it is in full swing on the steel schedule when the cycle turns.
    Show source
    The steel industry is going through a tough cycle at the moment, and we hope to cross this by the time our steel plant starts so that when we are on the other side of a steel cycle, we are in full swing on the steel schedule as well.
  • The IPS benefit keeps increasing as Lloyds Metals and Energy Limited adds on the new products. Replaced by a later filing.
    Show source
    Rajesh Gupta: It keeps on increasing as we add on the new products.

Orders

  • The company has a 3 million tons contract from NTPC; the coal has already been taken out and operations will start immediately in this financial year.
    Show source
    And in -- on the coal side, there is a -- we have got a contract from NTPC, it's 3 million tons .

What it is building and selling

Projects and capacity

  • Lloyds Metals and Energy Limited's 4 million ton pellet plant began commercial production at the end of Q1 and has been ramped up.
    Show source
    The pellet plant has been ramped up, the first pellet plan of 4 million ton s, which began commercial production just at the end of Q1.
  • Lloyds Metals and Energy Limited's pellet plant produced more than 350,000 tons in October, crossing 100% of capacity.
    Show source
    In October, we have crossed 100% of capacity with a production of 350,000 tons, a little bit more than that.
  • Lloyds Metals and Energy Limited commissioned one DRI plant toward the end of Q2 FY '26, expanding its DRI operations.
    Show source
    The next project that we have just commissioned is one of the DRI, which has expanded our DRI operations this quarter, just towards the end of this quarter.
  • Lloyds Metals and Energy Limited's pellet plant number two is in advanced stages, and its 1.2 million tons wire rod plant is part of the projects being advanced.
    Show source
    Page 2of 15 Lloyds Metals and Energy Limited November 13, 202 5 Pellet plant number two is already in advanced stages, 1.2 million tons of wire rod plant.
  • Surjagarh mine is gearing up for full capacity from 10 to 26 million tons.
    Show source
    Surjagarh mine is also gearing up for full capacity from 10 to 26 million tons .
  • Lloyds Metals and Energy Limited's key mines have a 5-star rating, and the company is continuously converting and inducting electric and LNG hybrid mining equipment.
    Show source
    The 5-star rating at all the key mines, continuous conversion and induction of electric and LNG hybrid mining equipment.
Show 26 more statements

Projects and capacity

  • Lloyds Metals and Energy Limited's newly commissioned pellet plant at Konsari achieved full utilization within 4 months of commencement.
    Show source
    The newly commissioned pellet plant at Konsari has been ramping up well and has achieved full utilization within 4 months of commencement.
  • Lloyds Metals and Energy Limited commissioned its DRI expansion in Ghugus in Q2 FY '26, and the plant is ramping up.
    Show source
    We have commissioned our DRI expansion in Ghugus in this quarter, and the plant is ramping up well as we speak.
  • Lloyds Metals will start work on its integrated 3 million ton steel plant in mid- to end '27; the land is under acquisition, and the company is restudying the composition with a detailed project study by a big Chinese consultant. The planned product mix includes flat products, value-added flat products, value-added structural steel, and color-coated products in terms of value-added HR coils and flat products. Lloyds Metals expects to commission its 1.2 million wire rod plant at Chandrapur in the next year.
    Show source
    Riyaz Shaikh: It is a half 50-50 product mix.
  • Third pellet plant is expected around '28, '29, around the time the third phase of the beneficiation plant is commissioned.
    Show source
    Rajesh Gupta: Third pellet plant will be '28, '29 around the time that the third phase of the beneficiation plant is commissioned.
  • Surjagarh operations' capacity has increased from 10 million to 26 million, and together with the other stated changes this is expected to increase production this year.
    Show source
    And the major impact would be the Surjagarh operations where earlier the capacity was 10 million, now we have got that capacity to increase to 26 million.
  • Lloyds Metals and Energy Limited expects to transport around 25,000 tons to 28,000 tons by pipeline next year and around 60,000 tons by truck to the siding and the rest of the market.
    Show source
    Rajesh Gupta: On the land, the land will be used, it's around 10 kilometer from our Konsari factory.
  • Lloyds Metals and Energy Limited's land is around 10 kilometer from its Konsari factory and will be used partly for housing and as a switchyard station for the MSEDCL support system.
    Show source
    We'll also be using it as a switchyard station for the MSEDCL support system.
  • Lloyds Metals and Energy Limited expects the first BHQ plant unit in the last quarter of next year; the plant has three units of 15 million ton input, with modules of 5 million tons each, and the company plans one module per month for the first six modules starting in the last quarter of next year, followed by the last module based on the steel plant.
    Show source
    And starting next -- last quarter of next year, we would be doing one, one module every month -- for the first 6 modules.
  • Lloyds Metals and Energy Limited is waiting for final clearance for the land for its BHQ beneficiation plant, has identified the technology and is doing detailed engineering; the schedule is plus/minus 6 months from the original schedule.
    Show source
    So with all of that, I think it's -- it's from the original schedule, we are plus/minus 6 months.
  • Slurry pipeline is completed for 85 kilometres.
    Show source
    Seamless and reliable evacuation, and we've already seen the advantages in this monsoon, structural cost reduction, lower carbon footprint and most importantly, efficient movement that safeguards our margins even in volatile pricing environment.
  • Lloyds Metals and Energy Limited's DRI plant has started.
    Show source
    DRI plant has started.
  • Lloyds Metals and Energy Limited has started planning and procurement for BHQ beneficiation.
    Show source
    The BHQ beneficiation planning and procurement has started.
  • Lloyds Metals and Energy Limited's land acquisition final stage is still ongoing.
    Show source
    And while land acquisition final state is still going on.
  • The company expects an increase in mining operations in Odisha this year and proposes to start two new projects, Indrani Patnaik mines and MGM Mines.
    Show source
    Rajesh Gupta: In the last year -- this year, we are expecting some increase in our mining operations in Odisha and two new projects which we are proposing to start is one is Indrani Patnaik mines and another is MGM Mines.
  • Lloyds Metals and Energy Limited has no update on Madhya Pradesh mining; it remains under study.
    Show source
    Regarding Madhya Pradesh mining, there is no update at the moment.

Demand and pricing

  • Indian domestic prices were at a premium of around 35% to 45% over international prices, with a 61% grade priced at around $100 in January and Lloyds Metals selling at a higher price ex people's factories.
    Show source
    Riyaz Shaikh: International price versus domestic price, I think we are trading at a premium of around 35% to 45% roughly, yes, not at a discount to the international price.
  • Lloyds Metals said the secondary steel market was suffering, international coal prices had reached their bottom after a reduction, and pricing could recover over the next 2 to 3 months, especially next quarter, although the current quarter remained subdued.
    Show source
    I think over the next 2, 3 months, the pricing will come back, especially I think the next quarter.
  • Lloyds Metals said further reductions in international prices had not affected Indian pricing, while pellet prices had moved up and down more because of a weak steel market and steel cycle.
    Show source
    So I don't think that the further reduction has had any effect on the Indian pricing.
  • Lloyds Metals and Energy Limited is looking at pellet markets in southern India and exports to Europe, other Far East markets and the Middle East; most current exports go to China.
    Show source
    Right now, most of our exports are going to China, but we are looking at other areas in Far East, Middle East as well as Europe.
  • Lloyds Metals and Energy Limited says its conversion costs and captive mining make it the lowest-cost producer.
    Show source
    Like I said earlier, our cost of conversion, our captive mining, etcetera, makes us the lowest -cost producer.

Segments

  • The EC of Lloyds Metals and Energy Limited's clients in iron ore products has gone up by 35% to 40%.
    Show source
    The EC of our clients in iron ore products has gone up by 35% to 40%.
  • The EC at NTPC mines has gone up by around 20%.
    Show source
    NTPC mines, the EC has gone up by around 20%.

Deals and partners

  • Lloyds Metals and Energy Limited serves all customers in the Chandrapur area with iron ore, and supplies around 70% to 75% of non-captive consumption among Raipur iron ore pellet producers.
    Show source
    We are 100% serving our customers in the Chandrapur area, 100% -- not 100%, but out of the non-capital consumption in Raipur, most of the iron ore pellet producers are using from us around 70%, 75%.
  • Around 35% to 40% of Lloyds Metals and Energy Limited's iron ore quantity goes to JSW and JSPL; it supplies 100% of their requirement and supplies Sunflag, with this profile remaining more or less constant for the last 6 to 8 months.
    Show source
    A lot of the quantity around 40% -- 35%, 40% is going to JSW and JSPL, 100% of our product is going -- of their requirement is being fed by us to them and to Sunflag, which is more or less remained constant for the last 6, 8 months, so it's quite steady.
  • Lloyds Metals and Energy Limited's pellet supply in its captive area of Chandrapur and Telangana is more or less 100%.
    Show source
    On the pellet front, we are, again, in our captive area of Chandrapur and Telangana is more or less 100%.
  • Lloyds Metals and Energy Limited supplies pellets to RINL and Bhilai and exports around 60,000 tons to 70,000 tons per month.
    Show source
    We are feeding to Bhilai, also export around 70,000 tons , 60,000 tons per month we are exporting.

Everything else said on the call

Group structure

  • Thriveni's accounts were consolidated for the first time in Q2 FY '26.
    Show source
    This was the first quarter where the accounts have been consolidated.
  • INR 6,000 crores, including the RPS (redeemable preference shares) issued to the promoters for taking over those accounts, came from Thriveni's consolidation.
    Show source
    So INR 6,000 crores -- including the RPS, the redeemable preference shares issued to the promoters for taking over of those accounts.
  • Bharat Wire Ropes CCPS investment was purely financial, with no strategic direction attached; the company is looking at around 18% to 20% and conversion within 18 months.
    Show source
    We are looki ng at around something around 18% to 20%.
  • Thriveni Earthmovers and Infra Private Limited is Lloyds Metals and Energy Limited's subsidiary, engaged in MDO and its related services.
    Show source
    Thriveni is our subsidiary, which is engaged in MDO and its related services.

People and governance

  • Lloyds Metals and Energy Limited reported nearly 32,000 people under its hat across its operations.
    Show source
    I want to appreciate all our teams at the mines, pellet plants, logistics unit and corporate officers who manage our large -scale operations with nearly 32,000 people now under our hat.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Siddharth Gadekar: Good evening, everyone, and thank you for joining us today. We at Equirus are pleased to host Lloyds Metals and Energy's Q 2 FY '26 Earnings Call. We have with us today Mr. Rajesh Gupta, Managing Director; Mr. Riyaz Shaikh, CFO; and S.K. Naredi, Director Finance of Thriveni. Now I would like to invite Mr. Rajesh Gupta to initiate the proceedings for the results call.

    Answer, rajesh gupta

    Rajesh Gupta: Good afternoon, everyone. A warm welcome to all of you, and I sincerely thank Siddharth ji and the Equirus team for hosting this call and for their continued support. Let me begin with the big picture headline before we go deeper. This has been a half year where operational commissioning of the pellet plant has taken center stage. DRI plant has started. The value-added products have further strengthened their profile, and our project pipeline has moved forward as predicted with the planning. Across the board, the business continues to demonstrate resilience and direction.

    Answer, rajesh gupta

    Let's begin with the projects. The slurry pipeline of 85 kilometers has been one of our biggest enablers this year. And I want to emphasize what the slurry pipeline means. Seamless and reliable evacuation, and we've already seen the advantages in this monsoon, structural cost reduction, lower carbon footprint and most importantly, efficient movement that safeguards our margins even in volatile pricing environment. This truly market turning point on how to operate and scale. The pellet plant has been ramped up, the first pellet plan of 4 million ton s, which began commercial production just at the end of Q1. And in the fourth month of full operation.

    Answer, rajesh gupta

    In October, we have crossed 100% of capacity with a production of 350,000 tons, a little bit more than that. The pellet plant -- pellet business is already contributing robust EBITDA per metric ton driven by captive ores, slurry pipeline efficiency and industry-leading costing -- conversion costing and conversion and strong realizations due to the strong quality parameters. This value-added mix has now become a core driver of our profitability. The next project that we have just commissioned is one of the DRI, which has expanded our DRI operations this quarter, just towards the end of this quarter. This strengthens the integrated pathway we are building from mines to pellet to DRI and eventually steel. With regards to other projects, we continue to move forward with all our other major projects with a very disciplined approach. Page 2of 15 Lloyds Metals and Energy Limited November 13, 202 5 Pellet plant number two is already in advanced stages, 1.2 million tons of wire rod plant.

    Answer, rajesh gupta

    The groundwork is progressing extremely systematically. The BHQ beneficiation planning and procurement has started. And while land acquisition final state is still going on. Our overall capex plan remains well -structured and each project is aligned to long-term value creation, not short-term capacity addition. Let me touch base on Thriveni as well. This was the first quarter where the accounts have been consolidated. The EC of our clients in iron ore products has gone up by 35% to 40%.

    Answer, rajesh gupta

    NTPC mines, the EC has gone up by around 20%. Surjagarh mine is also gearing up for full capacity from 10 to 26 million tons . Operational and capex gearing up is done for these plants. Given our large-scale mining footprint, rain-related interruptions do have an effect on quarterly numbers. However, I want to highlight that lost revenue will be made up in the coming months, and mining operations are now normalized post monsoon. This confidence comes from the capability and depth our teams have built over years of operating in challenging area. Our Thriveni underlying operations remained very strong and on track.

    Answer, rajesh gupta

    These -- there are multiple positives worth highlighting. The 5-star rating at all the key mines, continuous conversion and induction of electric and LNG hybrid mining equipment. All of this enforces our reason of acquisition of this integrated value proposition of the Lloyds Thriveni platform. Our policy and our philosophy for all these projects remains the same, plan meticulously, execute swiftly, execute efficiently and build for the next 30 years, not for the 3 quarters. I want to appreciate all our teams at the mines, pellet plants, logistics unit and corporate officers who manage our large -scale operations with nearly 32,000 people now under our hat. The ability to maintain momentum, innovate on site and push forward despite external challenges, one of our biggest strength. As we look forward to H2, the drivers are firmly in place, full benefit of the slurry pipeline, higher and stabilized pellet output, DRI ramp -up, post monsoon mining stabilization and systematic execution of all the projects already in motion.

    Answer, riyaz shaikh

    Riyaz Shaikh: Thank you, Rajeshji, for the strategic overview. Good evening, everyone. Let me take you through our consolidated financial and operational performance for the second quarter and first half of FY '26, followed by updates on key projects and strategic developments. This quarter has been another strong step forward for Lloyds Metals. We continue to build momentum across all business, translating operational execution into record financial performance. Page 3of 15 Lloyds Metals and Energy Limited November 13, 202 5 Starting with the stand-alone numbers. To reiterate, the company has reported its highest ever quarter at half year revenue.

    Answer, riyaz shaikh

    Our total income for quarter 2 FY '26 stood at INR 25,754 million, up 75% year-on -year, driven by higher iron-ore dispatches, the commencement of pellet sales and improved logistics through the slurry pipeline. For H1 FY '26, total income came in at INR49,838 million, higher by 28% year-on -year. EBITDA for the quarter was INR 8,693 million, up 95% year-on- year with margins at 33.75% expanding by 348 basis points. For the half year, EBITDA stood at INR 16,778 million with margins at 33.66% reflecting an improvement of 363 basis points. Profit after tax came in at INR6,056 million for the quarter and INR 12,402 million for the half year, both up 22% year-on- year. These results highlight the growing strength of our integrated operations and the benefit of higher value-added contribution from pellets. As mentioned by Rajeshji, we are getting more and more close towards creating a resilient business, which has minimum to least impact on account of steel cycle volatility.

    Answer, riyaz shaikh

    Our margin improvement is both year-on-year and quarter -on- quarter is a validation of our approach. Having said that now, moving to the segment performance. In iron production for quarter 2 FY '26 stood at 3.42 million tons , while sales were 2.5 million tons up 77% and 10% year-on -year. Realization averaged INR 5,571 per ton stable sequentially. EBITDA per ton improved to INR1,781, up 7% year-on -year. These numbers have to be viewed in perspective that despite quarter 2 being the traditionally challenging quarter for mining, due to monsoon, we were able to report such robust growth in production and dispatches. The newly commissioned pellet plant at Konsari has been ramping up well and has achieved full utilization within 4 months of commencement.

    Answer, riyaz shaikh

    This is quite a significant milestone for us. In quarter 2 FY '26 pellet production stood at 0.78 million tons , with realization at INR 9,916 per ton and EBITDA per ton at INR5,039. The slurry pipeline and captive ore supply has ensured cost efficiency and strong margins right from the start. In the DRI and Power segment, DRI volumes stood at 88,200 tons , up 4% year-on -year. Though realizations were muted due to market softness, power volumes were stable and lower, fuel cost -- and lower fuel costs helped maintain operating profitability. On capital expenditure, our focus remains on disciplined execution. We have commissioned our DRI expansion in Ghugus in this quarter, and the plant is ramping up well as we speak.

    Answer, riyaz shaikh

    We have spent INR 24,117 million during the first half of FY '26 with work progressing simultaneously across all active projects. Let me also touch upon the Thriveni as well. Thriveni is our subsidiary, which is engaged in MDO and its related services. On a consolidated basis, Thriveni Earthmovers and Infra Private Limited delivered a steady performance. Quarter 2 of the financial year is always a challenging quarter given the monsoon period. This year, monsoon was extended across India, which affected volume to a large extent. However, the team has been quite upbeat for remainder of the year.

  2. Question

    Vikash Singh: Noted. Sir, since we are selling more on the West Coast and international prices are on a declining trend, just wanted to understand your views. Do you see further downside this to the pricing? Or what is the discounts domestic prices are trading at versus the international imported landed price?

    Answer, riyaz shaikh

    Riyaz Shaikh: International price versus domestic price, I think we are trading at a premium of around 35% to 45% roughly, yes, not at a discount to the international price. International price currently, say, January is around $100 for a 61% grade, we are selling at a higher price ex people's factories. So there is a premium.

  3. Question

    Vikash Singh: So there...

    Answer, riyaz shaikh

    Riyaz Shaikh: Sorry, there's a discount which is -- I'm sorry, there is a discount which is slightly lesser. It's a steady thing. And I think India is quite deviated from the international pricing in that way. So I don't think that the further reduction has had any effect on the Indian pricing. The pellet prices has come up and come down more because of the steel market, steel cycle being a little weak.

  4. Question

    Vikash Singh: Noted. So you don't foresee much of the risk going ahead?

    Answer, riyaz shaikh

    Riyaz Shaikh: I don't foresee anything more than 2%, 3% market up or down in the next 6 months to 9 months. Page 5of 15 Lloyds Metals and Energy Limited November 13, 202 5 Vikash Singh: Noted.

  5. Question

    Vikash Singh: Noted. And, sir, just lastly...

    Answer, rajesh gupta

    Rajesh Gupta: And all this additional EC and the ramp-up in Surjagarh mines as well as the other mines, will all happen in the second half of this year. So we are very confident to getting reaching those numbers.

  6. Question

    Vikash Singh: Noted. Sir, just lastly on our upcoming integrated 3 million ton steel plant. So sir, since you are talking about starting the project as soon as first quarter '27, could you give us the product mix which we are thinking of producing there?

    Answer, riyaz shaikh

    Riyaz Shaikh: It is a half 50-50 product mix. HR would be 50...

  7. Question

    Divy Agarwal: Sure, sir. And secondly, sir, on the Thriveni part. So in the last quarter, it was mentioned that the EBITDA margin should be around 33%, while the numbers reported were around 16%. So just wanted to know what are the -- what is because of this divergence?

    Answer, riyaz shaikh

    And ultimately, it has impacted on our profitability margin percentage also. But next quarter -- next half as well as for both the quarters and next half since the volumes are going to be high, ultimately, overall, we'll be able to maintain. And as everybody is aware that since we had to scale up the production to gear up the equipments and all those things, mobilization and all these things, we need to keep on deploying our manpower and equipments at the various sites for LMEL as well as in Odisha other places. So all these things we have incurred costs. And due to that, our EBITDA margin in terms of percentage or in terms of absolute numbers have gone down in this first half.

  8. Question

    Divy Agarwal: Right. And lastly, on the DRI part, so the realization has been low since like 2, 3 quarters. So what's the realization right now? And are you seeing any signs of improvement there?

    Answer, rajesh gupta

    Rajesh Gupta: DRI in the secondary steel market, both are suffering quite a lot right now. And the only rainbow that you're seeing is a little reduction in coal price, which has reached its bottom, international coal. I think over the next 2, 3 months, the pricing will come back, especially I think the next quarter. This quarter, I'm still seeing a very subdued market.

    Answer, riyaz shaikh

    Riyaz Shaikh: The EBITDA per ton for DRI in this quarter has been -- H1 has been INR3,879.

  9. Question

    Hardik Gori: Yes, slurry benefit per ton basis.

    Answer, riyaz shaikh

    Riyaz Shaikh: See, as we've been stating, we saved around INR 600 per ton on the slurry pipeline. Around INR600 has been the saving due to the slurry pipeline.

    Answer, riyaz shaikh

    Riyaz Shaikh: Yes, it's actually coming from Thriveni's consolidation. So INR 6,000 crores -- including the RPS, the redeemable preference shares issued to the promoters for taking over of those accounts.

  10. Question

    Ritesh Bhagwati: Sure, sir. I'll do that.

    Answer, rajesh gupta

    Rajesh Gupta: The maximum that we can do in iron ore this year is around 22 million tons . We would do a minimum of 20 million, 21 million tons of dispatches from the mine. Part of that will be used internally for the pellet and the DRI, the balance will be sold. We will not be having any stock to a large extent. What was the second part of your question?

Show 17 more questions
  1. Question

    Vinit Thakur: What would be your timing for the third pellet plant?

    Answer, rajesh gupta

    Rajesh Gupta: Third pellet plant will be '28, '29 around the time that the third phase of the beneficiation plant is commissioned.

  2. Question

    Vinit Thakur: Okay, sir. Noted. And has the IPS benefit been recognized? And what is the total planned capacity of your pellet plants that you're expecting?

    Answer, riyaz shaikh

    Riyaz Shaikh: Total capacity for my pellet plants would be 12 million tons , floating taking all 3 in those lines. And IPS, yes, we've already started. In this quarter, we've got INR 94 crore, that has been identified.

    Answer, riyaz shaikh

    Riyaz Shaikh: It's a console number, that INR 7,900 crores is a consol number with Lloyds metals also in it. So as in Lloyds -- as in for Thriveni, the number was around INR 5,000 crores. I don't -- when we had INR5,600 crores, which is now around INR 6,000 crores, which is on account of the scaling up of the operations. So that's a continuous business. We have to go on for the equipment and - - plus we also have a cash balance of INR 400 crores. So the net cash would be always INR 5,600 crores. Page 9of 15 Lloyds Metals and Energy Limited November 13, 202 5 Bhavik Shah: Okay.

  3. Question

    So, we have taken around INR 6,000 crores from Thriveni as debt, right?

    Answer, riyaz shaikh

    Riyaz Shaikh: INR2,400 crores in this half year.

  4. Question

    Bhavik Shah: Okay. So, what is the guidance for the remaining year?

    Answer, riyaz shaikh

    Riyaz Shaikh: We should be doing around INR 5,000 -- of INR4,500 crores to INR 5,000 crores in this year. And the next 2 years also should be around INR 6,000 crores, INR 6,500 crores.

  5. Question

    Siddharth Gadekar: Sir, my first question is on the Bharat Wire Ropes acquisition where we have acquired some CCPS. Can you just share the rationale behind that? And how do we see that conversion happening over the next 2, 3 years?

    Answer, riyaz shaikh

    Riyaz Shaikh: See it was purely a financial investment. There is no strategic direction attached to this transaction. It is -- this company's position as an industry with a long-term potential. For the risk-reward standpoint, the opportunity was compelling. We are looki ng at around something around 18% to 20%. And within 18 months is what's supposed to be converted. So that is what we are looking at.

  6. Question

    Siddharth Gadekar: Okay. Sir, second question is on the Thriveni operations. When we had done the acquisition we had given a road map where our mining expansion would go up to almost 123 million, 124 million tons once LMEL also ramps up. Where do we stand on that? And over the last 12 months, have we acquired any new projects? Can you give some more color that how should we see '27 and '28 incrementally going ahead?

    Answer, rajesh gupta

    Rajesh Gupta: In the last year -- this year, we are expecting some increase in our mining operations in Odisha and two new projects which we are proposing to start is one is Indrani Patnaik mines and another is MGM Mines. These are the 2 mines which we propose to increase in Odisha. And in -- on the coal side, there is a -- we have got a contract from NTPC, it's 3 million tons . So that we are also -- now the coal has been already taken out and it will start immediately in this financial year. And the major impact would be the Surjagarh operations where earlier the capacity was 10 million, now we have got that capacity to increase to 26 million. So these 2, 3 things taken together is going to increase the production this year.

  7. Question

    Siddharth Gadekar: FY '27 or '28?

    Answer, rajesh gupta

    Rajesh Gupta: FY -- revenue guidance of around INR 7,800 crores to INR 8,000 crores of top line. Tons and cubic meter, I'll just work out and I'll share those things during this...

  8. Question

    Tanmay Choudhary: Yes. I'm asking like can you give me the ballpark number for the captive consumption over the open market side for the pellet and DRI side for the full year?

    Answer, rajesh gupta

    Rajesh Gupta: For the next year, the total market -- the self consumption would be around 8 million tons for the pellet plant give or take 0.5 million tons and around -- out of that 8 million ton , 1 million ton or 800,000 tons will be used internally and around 200,000 tons for the DRI, so around 1 point -- 1 million ton , 1.2 million tons will be used for DRI and 8 million ton for pellet.

  9. Question

    Tanmay Choudhary: And for the open market iron ore?

    Answer, rajesh gupta

    Rajesh Gupta: The rest will be open, iron ore, which is, say, around 20 -- sorry, 18 million tons .

  10. Question

    Tanmay Choudhary: Okay. And sir, in the second half of the financial year, we're targeting for around 12 million to 14 million tons of -- so can you just throw some light of the evacuation plan and the customer concentration profile for the supply of it?

    Answer, rajesh gupta

    Rajesh Gupta: The customer profile for the iron ore has remains the same. We are 100% serving our customers in the Chandrapur area, 100% -- not 100%, but out of the non-capital consumption in Raipur, most of the iron ore pellet producers are using from us around 70%, 75%. A lot of the quantity around 40% -- 35%, 40% is going to JSW and JSPL, 100% of our product is going -- of their requirement is being fed by us to them and to Sunflag, which is more or less remained constant for the last 6, 8 months, so it's quite steady. On the pellet front, we are, again, in our captive area of Chandrapur and Telangana is more or less 100%. We are feeding to RINL. We are feeding to Bhilai, also export around 70,000 tons , 60,000 tons per month we are exporting. So by and large, that is the route we are looking at other markets also.

  11. Question

    Tanmay Choudhary: Understood, sir. And sir, like what would be your framework for the evacuation like? How much you are targeting per day of evacuation through transport and through rail and through pipeline? Page 11of 15 Lloyds Metals and Energy Limited November 13, 202 5 Rajesh Gupta: Look, by pipeline next year would be around 25,000 tons to 28,000 tons and around 60,000 tons by truck to the siding and to the rest of the market.

    Answer, rajesh gupta

    Rajesh Gupta: On the land, the land will be used, it's around 10 kilometer from our Konsari factory. It will be used for 2, 3 purposes, including partly housing, which already exist on the land. We'll also be using it as a switchyard station for the MSEDCL support system. Regarding Madhya Pradesh mining, there is no update at the moment. It is still under study and things like that.

  12. Question

    Siddharth Gadekar: Sir, just a couple of more questions. So first, on the 1.2 million ton BHQ that you have mined, have you already booked these costs in the quarter? And going ahead, will we see some more BHQ mining done before the BHQ plant comes online?

    Answer, rajesh gupta

    Rajesh Gupta: The costs have been booked and --- lying-in stock .

  13. Question

    Siddharth Gadekar: And over the next 12, 15 months before the BHQ plant comes online, will we see more production on the BHQ side also?

    Answer, rajesh gupta

    Rajesh Gupta: Yes. Yes, the mining plan indicates that. The exact figures, we would know as the mining progresses.

  14. Question

    Siddharth Gadekar: Okay. Sir, secondly, on the BHQ plant, when do we expect the first plant to get commissioned and about the ramp-up also how should we think about that?

    Answer, rajesh gupta

    Rajesh Gupta: Next year, last quarter should be the first unit. There are -- basically there are 3 units of 15 million ton input, each of these 3 units are -- have seen module of 5 million. So basically, we have million 9 models of 5 million tons each. And starting next -- last quarter of next year, we would be doing one, one module every month -- for the first 6 modules. And then based on that, along with the steel plant, we'll be doing the last module.

  15. Question

    Siddharth Gadekar: Sir, broadly by FY '28, we should have around 15 million coming from BHQ?

    Answer, rajesh gupta

    Rajesh Gupta: Output of 10 million tons, input of 30 million tons .

  16. Question

    Siddharth Gadekar: Okay. Got it. Sir, secondly, on the pellets, incrementally with our second pellet plant coming in also next year, how should we think about the customer profile moving? Page 12of 15 Lloyds Metals and Energy Limited November 13, 202 5 Rajesh Gupta: Customer profile is increasing.

    Answer, rajesh gupta

    We are looking, like I said, at more markets towards the south of India and also more exports with CBAM and all that, we are looking to also export into Europe and things like that. So we're looking at various options and -- we have done the overall working. And at this moment, it's too early to divulge that in the public. But we're very confident of the marketing strategy of that. Like I said earlier, our cost of conversion, our captive mining, etcetera, makes us the lowest -cost producer. Our market strength in India is there, and we hope to capture that also in the international market. Right now, most of our exports are going to China, but we are looking at other areas in Far East, Middle East as well as Europe.

  17. Question

    Siddharth Gadekar: Did we have any trading volumes also from our associated companies on the pellet side?

    Answer, rajesh gupta

    Rajesh Gupta: So this quarter, the trading was around 2 lakh tons , but of iron ore -- pellet, sorry..

Questions about this call

When was the Lloyds Metals And Energy Q2 FY26 earnings call transcript filed?
Lloyds Metals And Energy filed the transcript with the exchange on 18 Nov 2025. This page is built from that transcript.
What does this page list?
87 statements from the transcript across 10 topics, 69 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 27 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
Lloyds Metals And Energy Q2 FY26 concall: what the company said · DalalOS