Transcript filed .
Lloyds Metals and Energy Limited expected iron ore volume to remain strong in quarter 4 FY '26 and aimed to exit FY '26 with 20-plus million tons volume on ore; pellet operation would continue at optimal utilization. Lloyds Metals and Energy Limited's second pellet plant is now commissioned in Q2 FY27 and its 1.2 million ton wire rod mill by Q4 FY27. Lloyds Metals and Energy Limited crossed INR11,000 crores in consolidated revenue in Q3 & 9MFY26. In India, iron ore growth is around 5%-6% and steel growth is around 8%-9%; over 5 years, the CAGR is 5%-6% for iron ore and around 9%-10% for steel, contributing to a continuing shrinkage of extra supply and reduced exports of low-grade iron ore or pellets. Lloyds Metals and Energy Limited said BHQ royalty would come down from around INR1,200 to around INR200, and processing the ore would involve power, its biggest cost.
The numbers management gave
Results
- Lloyds Metals and Energy Limited crossed INR11,000 crores in consolidated revenue in Q3 & 9MFY26.
Show source
Let me start with the headline numbers before we go to the operative narrative, where we have got the highest -- INR11,000 crores we have crossed in consolidated revenue, which is a very, very significant milestone for us.
- Lloyds Metals and Energy Limited's standalone total income in Quarter 3 FY26 was about INR3,875 crores, up 129% year-on-year.
Show source
Quarter 3 FY26 standalone, the total income came in at about INR3,875 crores, up 129% year- on-year.
- Lloyds Metals and Energy Limited's standalone PAT in Quarter 3 FY26 was INR889 crores, up 128% year-on-year.
Show source
PAT stood at INR889 crores, up 128% year-on -year.
- Lloyds Metals and Energy Limited's standalone total income for 9-month FY26 was INR8,859 crores, up 59% year-on-year.
Show source
For the 9 -month FY26 standalone, the total income was INR8,859 crores, up 59% year-on -year.
- Lloyds Metals and Energy Limited's standalone EBITDA for 9-month FY26 was INR2,994 crores, a 74% year-on-year growth.
Show source
EBITDA came in at INR2,994 crores, a 74% year-on - year growth.
- Lloyds Metals and Energy Limited's standalone PAT for 9-month FY26 was INR2,129 crores, up 71% year-on-year.
Show source
PAT was INR2,129 crores, up 71% year-on-year.
Show 30 more statements
Results
- Lloyds Metals and Energy Limited's EBITDA margin in Quarter 3 FY26 was about 34%.
Show source
Quarter 3 EBITDA margin was about 34%.
- Lloyds Metals and Energy Limited's EBITDA margin for 9 months FY26 stood at roughly 33.8%, almost 280 basis points higher year-on-year; the improvement came from a higher share of value-added products, especially pellets, the slurry pipeline benefit flowing into the P&L, and better utilization across mining, pellet, and DRI operations.
Show source
9 months EBITDA margin stood at roughly 33.8%, which is almost 280 basis points higher year-on-year.
- Lloyds Metals and Energy Limited's Iron Ore production was 5.49 million tons in Quarter 3 and 12.87 million tons for 9-month FY26.
Show source
Operational highlights: On the operational sides, Iron Ore production was 5.49 million tons in Quarter 3 and 12.87 million tons for 9-month FY26.
- Lloyds Metals and Energy Limited's dispatches were 4.1 million tons in Quarter 3 and 10.1 million tons for 9 months FY26.
Show source
Dispatches were largely in line, which is 4.1 million tons in Quarter 3 and 10.1 million tons for the 9 months.
- Lloyds Metals and Energy Limited's EBITDA stood at INR1,825 per ton in Quarter 3 and INR1,951 per ton for 9 months FY26.
Show source
EBITDA stood at INR1,825 per ton in Quarter 3 and INR1,951 per ton for 9 months FY '26.
- Lloyds Metals and Energy Limited's pellets production was 1.14 million tons in quarter 3 and 1.95 million tons in 9 months FY26.
Show source
Pellets production was 1.14 million tons in quarter 3 and 1.95 million tons in 9 months FY '26.
- Lloyds Metals and Energy Limited's pellet realization in quarter 3 was about INR10,289 per ton and EBITDA per ton was roughly INR4,535, supported by captive iron ore, slurry-based evacuation and strong domestic demand.
Show source
Realization in quarter 3 was about INR10,289 per ton and whereas EBITDA per ton was roughly INR4,535, supported by captive iron ore, slurry- based evacuation and strong demand -- domestic demand.
- Lloyds Metals and Energy Limited's DRI volumes were around 0.12 million tons in quarter 3 and 0.29 million tons for 9 months FY26.
Show source
DRI volumes were around 0.12 million tons in quarter 3 and 0.29 million tons for the 9 months.
- Lloyds Metals and Energy Limited recorded monthly coal production of 17.7 lakh tons in December, and its in-pit crushing and conveying system had handled close to 15 lakh tons, significantly improving efficiency.
Show source
December saw a record monthly coal production of 17.7 lakh tons and the in-pit crushing and conveying system commissioned earlier has already handled close to 15 lakh tons, significantly improving the efficiency.
- Lloyds Metals and Energy Limited's January iron ore volume was around 2.4 million tons to 2.5 million tons, and the company said it would achieve the 20 million ton-21 million ton target for the year.
Show source
Rajesh Gupta: The volume in this year -- in this month, that is January, is around 2.4 million tons -- 2.5 million tons, which crosses the 26 million ton overall, and definitely will achieve the 20 million-21 million ton target for the year.
- Lloyds Metals and Energy Limited was transporting around 70%-60% more ore by truck than the overall requirement.
Show source
And right now we are producing around -- transporting by truck around 70%-60% more than the overall requirement.
- Lloyds Metals and Energy Limited's revenue and margin increased, with a 280 basis point margin increase attributed to factors discussed by Riyaz and a cost control system.
Show source
Operational efficiencies are looked at every level, and you can see that in the increase in the revenue, in the margin also, 280 basis point is a factor of whatever Riyaz said plus a cost control system also.
- Lloyds Metals and Energy Limited scaled up from around INR500 crores to INR10,000 crores, or in this year maybe INR13,000 crores, over 4 years.
Show source
We scaled up from around INR500 crores to INR10,000 crores or in this year maybe INR13,000 crores over 4 years.
- IPS benefits in Q3 & 9MFY26 have been around INR130 crores this year, drawn since the pellet plant began production.
Show source
Rajesh Gupta: IPS benefits, we have been drawing the benefits from day 1 of the pellet plant production and this year has been around INR130 crores.
- Pellet average realization fell from around INR11,000 in quarter 2 to INR10,000 in quarter 3, reducing margins.
Show source
Riyaz Shaikh: The pellet prices in quarter 2 was around INR11,000, is what we had got in average realization and it has come down to INR10,000 in quarter 3.
- Pellet realization is around INR4,500 and EBITDA is around INR4,500 crores per ton, attributed to the market-friendly nature and its costing and logistics cost.
Show source
So that's why our realization in pellet is around INR4,500 a nd the EBITDA is around INR4,500 crores per ton because of the market-friendly nature as well as our costing and logistics cost.
- 5.39 million tons of dispatches from the mines includes internal transfers.
Show source
Riyaz Shaikh: That that also includes the internal transfers.
- Lloyds Metals & Energy Limited's EBITDA for Q3FY26 was 137% higher YoY.
Show source
EBITDA was INR1,317 crores, which is a 137% year-on -year increase.
- Lloyds Metals & Energy Ltd. reported PAT of 3,895 million (₹) in Q3 & 9MFY26.
Show source
The second plant would be come by June, the second slurry pipeline -- the pipeline would be ready to take the second pellet plant input, so 9 million ton would move out of that.
- Lloyds Metals and Energy Limited's margins in H1 this year were better by around 400 basis points than in H1 last year, mainly because costs remain the same during the rainy season, especially in the Thriveni segment, when output is lower.
Show source
Rajesh Gupta: The premium that we would get on this output of product if I were to sell all the ore would be around INR1,400 a ton also.
- Lloyds Metals and Energy Limited's Iron Ore dispatches have grown meaningfully, supported by the slurry pipeline.
Show source
Coming to operational performance, Iron Ore dispatches have grown meaningfully, supported by the slurry pipeline which is working very well.
- Lloyds Metals and Energy Limited's pellet plants achieved optimal utilization within three-four months of commissioning and are now looking at debottlenecking them.
Show source
Pellet plants we have achieved within three-four months of commissioning optimal utilization and are now looking at debottlenecking it.
- Pellet pricing is lower because it has added more export to the mix as volumes have picked up.
Show source
Rajesh Gupta: The pricing is lower because we have added more export to the mix.
- Lloyds Metals and Energy Limited's DRI plants and power plants are operating at optimized levels and contributing steadily in a very difficult environment of DRI. Replaced by a later filing.
Show source
Our DRI plants, both of which are commissioned, and the power plants are operating at optimized levels and contributing steadily in a very difficult environment of DRI.
Money and capital
- Lloyds Metals and Energy Limited expects to receive around INR900 crores from outstanding warrants, with the amount pending and expected to come up around 15th or 18th March.
Show source
I'll give you, I have got the number, but the value around INR900 crores is pending, which would be coming up in the month of March.
- Consolidated net debt was around INR7,100 crores as on 31st December.
Show source
Riyaz Shaikh: As on 31st December, if I would say, the console debt, net debt was around INR7,100 crores.
- The company expects its debt this year to be not more than around INR7,100 crores.
Show source
This year, we should be not more than that.
- The company expects peak debt in FY '28 to be around INR10,500 crores, INR10,600 crores on a consolidated basis.
Show source
When we reach the peak debt, we should be -- on a console basis, should be around INR10,500 crores, INR10,600 crores.
- Capex outlay is around INR14,000 crores from this year and the next year, with around INR6,000 crores intended to be funded from debt and the balance from internal accruals.
Show source
But yes, the capex outlay is around INR14,000 crores from this year and the next year.
- Lloyds Metals and Energy Limited is planning mostly lease debt and aims for a debt to EBITDA of 1, though it may be higher at times and will always trail the next year EBITDA.
Show source
So we are always targeting at 1 is to 1 debt to EBITDA and that is what we are working on.
What it expects ahead
What management expects
- Lloyds Metals and Energy Limited expected iron ore volume to remain strong in quarter 4 FY '26 and aimed to exit FY '26 with 20-plus million tons volume on ore; pellet operation would continue at optimal utilization.
Show source
We aim to exit FY '26 with 20-plus million tons volume on ore.
- Lloyds Metals and Energy Limited expected Odisha volumes to grow by nearly 40% year-on-year in FY '27, driven by faster statutory clearances, improved infrastructure and focused execution at site.
Show source
And overall, Odisha volumes are expected to grow by nearly 40% year-on-year in FY '27.
- Geomysore India Private Limited's gold mine had a targeted EBITDA contribution of around INR60 crores in FY '27, with potential upside as exploration progresses.
Show source
This asset provides long-term visibility with a targeted EBITDA of --- contribution of around INR60 crores in FY '27 and we see potential upside as exploration progresses.
- Lloyds Metals and Energy Limited's integrated operation was expected to reach around 30,000 tons per annum, which may take 2-3 years to achieve.
Show source
At the end of the day, it would be an integrated operation of around 30,000 tons per annum, which may take 2-3 years to achieve.
- Lloyds Metals and Energy Limited expected to achieve 10,000 tons of operations in financial year '27 at a fairly integrated mix of ore.
Show source
We believe that in the next year, financial year '27, 10,000 tons of operations would be achieved at a fairly integrated mix of ore.
- Lloyds Metals and Energy Limited was very confident of achieving 21 million tons and had given guidance of 20 to 22 million tons for the year.
Show source
That's why we have given a confident -- a guidance of 20 to 22 million tons for the year.
Show 10 more statements
What management expects
- Lloyds Metals and Energy Limited said current copper price is around $11,000 -- $11,500, $12,000, with a Congo transport-cost premium, and anticipated margins of approximately 30%, 32% on copper cathode; this gives INR500 crores, INR700 crores that it is talking about next year.
Show source
And the margins that we anticipate are approximately 30%, 32%.
- Thriveni's iron ore non-Lloyd metal outlook is for around a 40% increase in FY '27.
Show source
The Thriveni outlook is around 40% increase in iron ore non- Lloyd metal.
- The gold mine is expected to contribute around INR60 crores EBITDA in FY '27.
Show source
Around 60%, 70% increase in the Lloyd metal because of the BHQ increase, 15% in NTPC, that is both the Pakri Barwadih mines, around INR60 crores EBITDA they have come up directly with the EBITDA figure expected for the gold mine.
- Goldmines output is 0.3 million tons in FY '27.
Show source
Management: Goldmines is 0.3 million tons.
- The company expects some reduction in volumes in Indonesia and in the barytes operations in FY '27.
Show source
There will be some reduction in volumes in Indonesia and in the barytes operations.
- The company expects top line growth of around 15% to 20% and bottom line growth of around 35% in FY '27.
Show source
Overall, a top line growth of around 15% to 20% and a bottom line growth of around 35%, right?
- Lloyds Metals and Energy Limited expects Iron Ore volumes to grow in Q4 as well as FY27 in line with the EC.
Show source
Iron Ore volumes are expected in line with the EC to grow in Q4 as well as FY27, and value addition plans continue, and FY27 will mark our formal entry into steelmaking.
- FY27 will mark Lloyds Metals and Energy Limited's formal entry into steelmaking.
Show source
Iron Ore volumes are expected in line with the EC to grow in Q4 as well as FY27, and value addition plans continue, and FY27 will mark our formal entry into steelmaking.
- Gold and Copper from the Katanga area are also included in the expected figure Rajesh Gupta referred to.
Show source
Add to that Gold and Copper of the Katanga area .
- Lloyds Metals and Energy Limited expects market buoyancy to continue, supported by infrastructure, steel demand, and economic growth in the country. Replaced by a later filing.
Show source
We expect the buoyancy of the market to continue, supported by infrastructure, steel demand, and of course the economic growth in the country.
What it is building and selling
Projects and capacity
- Lloyds Metals and Energy Limited's second pellet plant is now commissioned in Q2 FY27 and its 1.2 million ton wire rod mill by Q4 FY27.
Show source
The second pellet plant is now commissioned in Q2 FY27 and the 1.2 million ton wire rod mill by Q4 FY27.
- Lloyds Metals and Energy Limited will increase the capacities of both pellet plants to 10 million tons from earlier 8 million tons.
Show source
While operation -- operating our pellet plant, we have seen opportunity to unlock talent -- latent capacity, and optimizing similarly for pellet plant number two, we will increase the capacities of both these plants to 10 million tons from earlier 8 million tons.
- Lloyds Metals and Energy Limited's DRI expansion was commissioned during quarter 3 and operations are now stabilizing.
Show source
DRI expansion was commissioned during quarter 3 and operations are now stabilizing.
- Lloyds Metals and Energy Limited's standalone capex during 9 months FY '26 was about INR4,236 crores, largely towards pellet plant 2 DRI expansion, the 1.2 million ton steel plant at Chandrapur and the first module of the beneficiation plant; capex execution was on track and within approved budgets.
Show source
The standalone c apex during 9 months FY '26 was about INR4,236 crores.
- Lloyds Metals and Energy Limited commenced MDO and exploration activities at Geomysore India Private Limited from January 26.
Show source
We have commenced MDO and exploration activities at Geomysore India Private Limited from January 26.
- Lloyds Metals and Energy Limited had 16 mining leases over 100 square kilometers, and exploration was going on; the company had found copper at good depths, with copper grades of 1.5% to 2% and 0.8%, as well as oxides.
Show source
18 leases over 100 square kilometers -- sorry, 16 leases over 100 square kilometers.
Show 17 more statements
Projects and capacity
- The Cathode plant's direct output was 10,000 to 12,000 tons, and its ore could come from Lloyds Metals and Energy Limited's own mines, where ore had already started accumulating, as well as from bought out mines.
Show source
And the 10,000 to 12,000 tons is a direct output of the plant that we are talking.
- For Lloyds Metals and Energy Limited's BHQ plant, land procurement was under control, engineering and ordering were complete, and equipment had been ordered; the company was hopeful of commissioning the plant by December '27 or so.
Show source
And we are hopeful of getting it commissioned by December '27 or so.
- Lloyds Metals and Energy Limited was moving around 4.5 million tons of ore on an annualized basis by pipeline and expected to be able to move 9 million tons by April.
Show source
Right now we are moving around on an annualized basis around 4.5 million tons of ore by the pipeline.
- Lloyds Metals and Energy Limited increased the planned capacity of the second slurry pipeline connecting the mines to the Chandrapur plant in Ghugus from 5 million tons to 16 million tons, to cover 26 million tons of dispatches through slurry pipeline; the total project cost is envisaged at around INR8,000 crores in phases, with the first phase up to Chandrapur costing around INR2,000 crores - INR2,500 crores.
Show source
Now what we have now doing is we would be -- we have increased the capacity of that, we will be now making it a 16 million tons slurry pipeline so that we cover the entire 26 million tons of dispatches through slurry pipeline.
- Slurry pipeline is completed for 85 kilometres.
Show source
Our first 85km pipeline is running smoothly and has led us to plan our Second Slurry Pipeline from Hedri to Chandrapur.
- Lloyds Metals and Energy Limited is increasing the mine by 250%.
Show source
The key change is the introduction of a stockyard at Chandrapur to move beneficiated ore also through the pipeline route.
- PB North West, a Lloyds Metals and Energy Limited coal block, commenced production and dispatches, and the company expected the project to scale meaningfully over the next few quarters.
Show source
PB North West, our another coal block has also commenced production and dispatches and we expect this project to scale meaningfully over the next few quarters.
- Lloyds Metals and Energy Limited's future steel plant in Gadchiroli is being looked at internally and has nothing to do with the Tata MoU; any Tata MoU setup together would be for a different plant.
Show source
Rajesh Gupta: Our future steel plant in Gadchiroli is being looked at internally, nothing to do with the Tata MoU.
Demand and pricing
- In India, iron ore growth is around 5%-6% and steel growth is around 8%-9%; over 5 years, the CAGR is 5%-6% for iron ore and around 9%-10% for steel, contributing to a continuing shrinkage of extra supply and reduced exports of low-grade iron ore or pellets.
Show source
So, there has been a continuous shrinkage of the supply, extra supply and therefore exports Page 11 of 18 Lloyds Metals and Energy Limited February 04, 2026 either in the form of low-grade iron ore or in the form of pellets have reduced .
- Over the next 5 years, around one-third of the capacity which is premium-free will go into auction, adding a higher cost mechanism for the industry.
Show source
Number two, as we go forward, over the next 5 years, around one-third of the capacity which is premium-free will go into auction over the next 5 years and that will add to the, not the lesser supply, but definitely to a higher cost mechanism for the industry.
- Pellet prices have gone up, putting pressure on DRI pricing and EBITDA.
Show source
Therefore, pricing is showing that there's a pressure on that, right, EBITDA on DRI pricing.
Segments
- Lloyds Metals and Energy Limited said BHQ royalty would come down from around INR1,200 to around INR200, and processing the ore would involve power, its biggest cost.
Show source
Royalty would be around from 1,200 would come down to around INR 200 rupees.
- Lloyds Metals and Energy Limited was rationalizing lower-margin operations in Indonesia and redeploying its equipment to higher return opportunities.
Show source
Internationally, we are rationalizing lower-margin operations in Indonesia and redeploying our equipment to higher return opportunities.
Deals and partners
- Lloyds Metals and Energy Limited signed a non-binding MOU with Tata for multiple collaboration to strengthen the ecosystem in Gadchiroli area and the eastern belt of India.
Show source
We have signed a non-binding MOU with Tata for mul tiple collaboration, to strengthen the ecosystem in Gadchiroli area, in the eastern coast -- eastern belt of India, and of course we have also signed the shareholder agreement for BRPL pellet plant along with the conversion pellet agreement which gives us a steady cash flow in BRPL.
- Lloyds Metals and Energy Limited signed the shareholder agreement for BRPL pellet plant along with the conversion pellet agreement, which gives it a steady cash flow in BRPL.
Show source
We have signed a non-binding MOU with Tata for mul tiple collaboration, to strengthen the ecosystem in Gadchiroli area, in the eastern coast -- eastern belt of India, and of course we have also signed the shareholder agreement for BRPL pellet plant along with the conversion pellet agreement which gives us a steady cash flow in BRPL.
- The MoU with Tata has two parts: the BRPL SHA and BRPL ownership and conversion contract, which was executed, and future exploration of opportunities in the Eastern area and Gadchiroli, including potential MDO contracting, use of Paradip land, and possible joint bids or opportunities to get ore at relatively better pricing and better commercials; the Gadchiroli opportunities would not be from the existing mine.
Show source
One is the BRPL SHA and the BRPL ownership and conversion contract, which is executed.
- Mining would be done by Thriveni, through a subsidiary of Thriveni in that area.
Show source
Rajesh Gupta: Mining would be by Thriveni, by a subsidiary of Thriveni in that area, yes.
Risks, rules and outside factors
Rules and policy
- In Gadchiroli, Lloyds Metals and Energy Limited's environmental clearance increased from 10 million tons to 55 million tons, including BHQ.
Show source
Page 5 of 18 Lloyds Metals and Energy Limited February 04, 2026 In Gadchiroli, which many of you are familiar with, the environmental clearance has been increased from 10 million tons to 55 million tons, including BHQ.
- Lloyds Metals and Energy Limited expects BHQ beneficiation to receive support on the royalty front because beneficiation of ore has been accepted by the government as an important aspect of the national policy of steel.
Show source
The BHQ beneficiation or beneficiation of ore in general has been accepted by the government as a very, very important aspect of the national policy of steel, and that therefore we expect lot of support on the royalty front from that.
Everything else said on the call
What management stressed
- Lloyds Metals and Energy Limited said its team at the site could take care of the technicality of the leaching process and the cathode process.
Show source
The technicality of the leaching process and the cathode process is not a very -- is not a super technical or a super new invention, and that can be taken care of by the team that we have ensured already on the job at the site as we speak.
Group structure
- The existing promoters set up the copper plant, but it was not running; they lost the bandwidth to run it, and Lloyds Metals and Energy Limited came in.
Show source
They lost the bandwidth to run it, and that's where we come in.
People and governance
- One of Lloyds Metals and Energy Limited's Promoter Directors would be involved full-time in Congo.
Show source
Number two, as far as Congo particularly is concerned, one of the Promoter Directors would be involved full-time there.
Other
- At PB West, Lloyds Metals and Energy Limited achieved a 5-star rating from the Ministry of Coal, ranking number one among more than 380 opencast mines in the country.
Show source
At PB West, we achieved the highest distinction of a 5-star rating from the Ministry of Coal, ranking number one among more than 380 opencast mines in the country.
What the company said on its earnings call, taken from its own transcript. Not advice.
Questions and answers
Question
Parthiv Jhonsa: Thank you, Ikra. Good evening, everyone, and thank you for joining us today. We at Anand Rathi are pleased to host Lloyds Metal and Energy Limited Q3 and 9 Months FY '26 Earnings Conference Call. We have with us today from the management, Mr. Rajesh Gupta sir, Managing Director; Mr. Riyaz Shaikh, CFO; and Mr. Chintan Mehta, CIO. Without further ado, I would now like to invite Mr. Rajesh Gupta sir to initiate the proceedings for the call, which would then be followed by question-and- answer session. Thank you, and over to you, sir Rajesh Gupta: Good evening, everyone, and a warm welcome to all the participants.
Answer, rajesh gupta
Thank you, Parthiv and Anand Rathi for hosting this call. We truly appreciate the interest and time from all our investors, analysts and stakeholders. Let me start with the headline numbers before we go to the operative narrative, where we have got the highest -- INR11,000 crores we have crossed in consolidated revenue, which is a very, very significant milestone for us. And as you might have seen the presentation, the EBITDA and the PAT match that. I would like to express that this current top line -- current bottom line was our top line around 2 to 3 years back, and we hope to achieve the same in the future as well. I will take a small deviation from my usual remarks today on the ferrous side and start with copper. Copper, as we know, is a new gold for the new age economy.
Answer, rajesh gupta
Projects of this nature require not just capital, but deep operational leadership, which we already have with Mr. Surya as well as other core colleagues from other parts of the operations. Now let me come back to the pellet operations. Execution continues at a breathtaking pace. Multiple projects are progressing simultaneously, and most importantly, on schedule. The second pellet plant is now commissioned in Q2 FY27 and the 1.2 million ton wire rod mill by Q4 FY27. While operation -- operating our pellet plant, we have seen opportunity to unlock talent -- latent capacity, and optimizing similarly for pellet plant number two, we will increase the capacities of both these plants to 10 million tons from earlier 8 million tons. These projects will improve our value-added mix and enhance margin stability.
Answer, rajesh gupta
Logistics remains one of our most criti cal pillars of cost leadership. Our first 85km pipeline is running smoothly and has led us to plan our Second Slurry Pipeline from Hedri to Chandrapur. The key change is the introduction of a stockyard at Chandrapur to move beneficiated ore also through the pipeline route. This will give us advantage for direct access to railways near Chandrapur, and also obviously of saving of INR850 for the sale material and around further INR250, that is around INR1,250 for the material that would be used for the pellet plant in Chandrapur. We are by this removing the inefficiency of the mine by -- which doesn't have a rail head. Details of this plan are covered in the presentation. Coming to operational performance, Iron Ore dispatches have grown meaningfully, supported by the slurry pipeline which is working very well.
Answer, rajesh gupta
Very strong operational discipline and strong execution. Pellet plants we have achieved within three-four months of commissioning optimal utilization and are now looking at debottlenecking it. Our DRI plants, both of which are commissioned, and the power plants are operating at optimized levels and contributing steadily in a very difficult environment of DRI. On the demand side, both Iron Ore and pellets have witnessed strong demand in the domestic as well as international market, and product has been very, very well accepted. We expect the buoyancy of the market to continue, supported by infrastructure, steel demand, and of course the economic growth in the country. Let me spend a few moments of time on the MOU with Tata Steel. We have signed a non-binding MOU with Tata for mul tiple collaboration, to strengthen the ecosystem in Gadchiroli area, in the eastern coast -- eastern belt of India, and of course we have also signed the shareholder agreement for BRPL pellet plant along with the conversion pellet agreement which gives us a steady cash flow in BRPL.
Answer, rajesh gupta
To summarize, we remain very buoyant on our ferrous operations. Iron Ore volumes are expected in line with the EC to grow in Q4 as well as FY27, and value addition plans continue, and FY27 will mark our formal entry into steelmaking. And lastly but not the least, Copper will Page 3 of 18 Lloyds Metals and Energy Limited February 04, 2026 act as a strong growth engine over the medium term. Now I hand over the call to Riyaz ji and Naredi ji, who will take you through the detailed figures.
Answer, riyaz shaikh
In fact, Quarter 3 and 9-month FY26 are the best we have seen so far in terms of revenue, profitability, and margins. Quarter 3 FY26 standalone, the total income came in at about INR3,875 crores, up 129% year- on-year. EBITDA was INR1,317 crores, which is a 137% year-on -year increase. PAT stood at INR889 crores, up 128% year-on -year. For the 9 -month FY26 standalone, the total income was INR8,859 crores, up 59% year-on -year. EBITDA came in at INR2,994 crores, a 74% year-on - year growth. PAT was INR2,129 crores, up 71% year-on-year.
Answer, riyaz shaikh
With regards to the margins, margins have remained very healthy and stable. Quarter 3 EBITDA margin was about 34%. 9 months EBITDA margin stood at roughly 33.8%, which is almost 280 basis points higher year-on-year. This improvement is not one -off; it's st ructural and is coming from higher share of value-added products, specially pellets, benefit of the slurry pipeline which has started flowing into the P&L, better utilization across mining, pellet, and DRI operations. Operational highlights: On the operational sides, Iron Ore production was 5.49 million tons in Quarter 3 and 12.87 million tons for 9-month FY26. Dispatches were largely in line, which is 4.1 million tons in Quarter 3 and 10.1 million tons for the 9 months. EBITDA stood at INR1,825 per ton in Quarter 3 and INR1,951 per ton for 9 months FY '26.
Answer, riyaz shaikh
Pellets have been a key positive this year. Pellets production was 1.14 million tons in quarter 3 and 1.95 million tons in 9 months FY '26. What's encouraging is that this run rate was achieved within just 3 to 4 months of commissioning. Realization in quarter 3 was about INR10,289 per ton and whereas EBITDA per ton was roughly INR4,535, supported by captive iron ore, slurry- based evacuation and strong demand -- domestic demand. DRI volumes were around 0.12 million tons in quarter 3 and 0.29 million tons for the 9 months. DRI expansion was commissioned during quarter 3 and operations are now stabilizing. Value- added mix: Value-added products are now forming a meaningful part of our revenue mix.
Answer, riyaz shaikh
For 9 months FY '26, value-added products accounted for roughly 35% of standalone revenues. This mix shift is central to improving margin stability, reducing volatility and enhancing overall return metrics. Now coming to the c apex update on a standalone basis. Let me quickly touch upon capex. The standalone c apex during 9 months FY '26 was about INR4,236 crores. This Page 4 of 18 Lloyds Metals and Energy Limited February 04, 2026 was largely towards pellet plant 2 DRI expansion, the 1.2 million ton steel plant at Chandrapur, the first module of the beneficiation plant. Importantly, capex execution is on track and within approved budgets.
Answer, riyaz shaikh
Touching upon the balance sheet and cash flow. Despite the high level of capex, the balance sheet remains comfortable. Strong EBITDA generation has supported internal accrual-led funding and controlled leverage. Working capital continues to be well managed, helped by faster dispatch cycles and healthy demand conditions. Looking ahead, the outlook looking ahead, iron ore volume should remain strong in quarter 4 FY '26. We aim to exit FY '26 with 20-plus million tons volume on ore. Pellet operation will continue to run at optimal utilization.
Answer, riyaz shaikh
Operationally, our coal mining operations continue to perform exceptionally well. At PB West, we achieved the highest distinction of a 5-star rating from the Ministry of Coal, ranking number one among more than 380 opencast mines in the country. December saw a record monthly coal production of 17.7 lakh tons and the in-pit crushing and conveying system commissioned earlier has already handled close to 15 lakh tons, significantly improving the efficiency. PB North West, our another coal block has also commenced production and dispatches and we expect this project to scale meaningfully over the next few quarters. Odisha remains a key growth driver for us. Several mines have seen capacity enhancements. And overall, Odisha volumes are expected to grow by nearly 40% year-on-year in FY '27.
Answer, riyaz shaikh
This scale-up is being driven by faster statutory clearances, improved infrastructure and focused execution at site. Page 5 of 18 Lloyds Metals and Energy Limited February 04, 2026 In Gadchiroli, which many of you are familiar with, the environmental clearance has been increased from 10 million tons to 55 million tons, including BHQ. Alongside scale, we continue to push sustainability-led initiatives such as electrification of mining equipment and LNG hybrid deployment, which are helping us optimize costs while reducing our carbon footprint. We have commenced MDO and exploration activities at Geomysore India Private Limited from January 26. This is a gold mine. This asset provides long-term visibility with a targeted EBITDA of --- contribution of around INR60 crores in FY '27 and we see potential upside as exploration progresses. Internationally, we are rationalizing lower-margin operations in Indonesia and redeploying our equipment to higher return opportunities.
Question
Amit Dixit: Yes. Hi, good evening everyone and thanks for the opportunity. Congratulations for a very good set of numbers. A couple of questions from my side. The first one is on the MoU that we have with Tata Steel. So just wanted to understand the various facets of this MoU. While you have explained in your prepared remarks, Tata Steel also held a concall in which they explained a few things? But just wondering that in mining, when we are so strong in this region, why do we need someone else? I mean it might be Tata Steel, of course, no doubt they are experts. But what expertise we are actually looking to get from Tata Steel and is there something that goes beyond mining, let us say, into
Answer, rajesh gupta
Rajesh Gupta: The MoU with Tata has two parts. One is the BRPL SHA and the BRPL ownership and conversion contract, which is executed. The second future exploration of opportunities, there are two areas that we are looking at. One is the E astern area of the country where, for example, Tata may have some assets where we can act as a contractor as an MDO contractor maybe or where they may need a pipeline to a certain area where we have some expertise, which Tata has not yet developed or maybe we have some land in Paradip, which we can try to utilize in a better way. A lot of opportunities are being looked at in the Eastern belt. In the Gadchiroli area, we are looking at whether we can bid jointly or opportunities come up with government trending system where we can get ore at a relatively better pricing, better commercials. This would not be from the existing mine.
Question
Okay, great. The second question is essentially on the copper. So, I mean, it is indicated in the presentation that there are certain mines also associated with it. First of all, Congo is not exactly the best place to work, and then, you know, mining, I know several companies who have failed because of various reasons? So what is it that we see in Congo, and are these mines yet operational, or at what stage of exploration they are? You have indicated some numbers, but these numbers seem to be more for the processing side. Just wanted to understand the backward integration part of it, a little bit more. And if you can also mention the grade of copper that you expect over there?
Answer, rajesh gupta
The mining leases that we have are 16 or 18 leases, I'm forgetting the number right now, 18. 18 leases over 100 square kilometers -- sorry, 16 leases over 100 square kilometers. Exploration is going on. We have already found copper at good depths. 1.5% to 2% copper is also available, 0.8% is also available, oxides are available. And the 10,000 to 12,000 tons is a direct output of the plant that we are talking. We can, for that, for the Cathode plant, the leaching and Cathode plant, we could take the ore from our own mines which we have already started accumulating, as well as from bought out mines.
Answer, rajesh gupta
At the end of the day, it would be an integrated operation of around 30,000 tons per annum, which may take 2-3 years to achieve. We believe that in the next year, financial year '27, 10,000 tons of operations would be achieved at a fairly integrated mix of ore.
Question
Amit Dixit: Great sir. Just if I can squeeze one more. Just wanted to get the status of BHQ plant?
Answer, rajesh gupta
Rajesh Gupta: BHQ plant, the land is under -- land procurement is under control and the engineering is complete, the ordering is complete. We have ordered the equipment from the best possible companies in the world to take care of any exigencies because it's a newer technology in India, so we're not, you know, taking any chances on the technology part of it. We have worked with the Chinese and now with the -- with FLSmidth also. And we are hopeful of getting it commissioned by December '27 or so.
Question
Jashandeep Chadha: Hello, hi. Thank you for the opportunity, and congratulations sir on a great set of numbers. Sir, my first set of questions are around iron ore. Firstly on your guidance, FY26 guidance is close to 20 to 22 million ton. If I assume that you will be doing 3 million ton of pellets also, that is close to 4.5-5 million ton of iron ore . 10 million tons of iron ore you have still done, which means close to 6 to 8 million tons of volumes you are forecasting for fourth quarter of FY26? Lloyds has not done -- you know, anytime such volumes in one quarter. Just wanted to understand what is the confidence behind giving such guidance and what are the challenges that the company can fa
Answer, rajesh gupta
Rajesh Gupta: The volume in this year -- in this month, that is January, is around 2.4 million tons -- 2.5 million tons, which crosses the 26 million ton overall, and definitely will achieve the 20 million-21 million ton target for the year. We have to appreciate one thing that at the moment we have to - - the problem is not in the marketing of it, the problem is not in the mining of it. The area that we are right now focusing on solving the problems are on the logistics side. Right now we are moving around on an annualized basis around 4.5 million tons of ore by the pipeline. And come by April we will be able to do 9 million tons. The second plant would be come by June, the second slurry pipeline -- the pipeline would be ready to take the second pellet plant input, so 9 million ton would move out of that. And right now we are producing around -- transporting by truck around 70%-60% more than the overall requirement.
Answer, rajesh gupta
It is a tough job. We are very confident of achieving 21. That's why we have given a confident -- a guidance of 20 to 22 million tons for the year. We believe that quarter guidances and directions are lesser -- quarter guidances are lesser important for a company of our nature, and our overall direction of decadal growth or at least 3-year growth is what we are -- what we are -- what I am focusing on. Operational efficiencies are looked at every level, and you can see that in the increase in the revenue, in the margin also, 280 basis point is a factor of whatever Riyaz said plus a cost control system also. So everything has been factored in when we have made the guidance.
Question
Jashandeep Chadha: I mean it's part of my question only. I have asked you that one only?
Answer, riyaz shaikh
Riyaz Shaikh: On the slurry pipeline. On the slurry pipeline, as you as you might be knowing, we had planned for another 5 million tons of slurry pipeline connecting our -- the mines to the Chandrapur plant in -- Ghugus plant in Chandrapur. Now what we have now doing is we would be -- we have increased the capacity of that, we will be now making it a 16 million tons slurry pipeline so that we cover the entire 26 million tons of dispatches through slurry pipeline. So it will be one will be -- one is existing which is there as a 10 million tons, this is a second slurry pipeline which will be a 16 million tons slurry pipeline which will be taking us more to the markets as well as to the -- to our Chandrapur plant. And the total cost for this we also in fact have a second phase on it, the slurry pipeline which will be connecting to more of the markets as well as the ports. So the total cost envisaged is around INR8,000 crores on this particular project, but we will be doing it on phase wise. So the first phase of up to Chandrapur will be around INR2,000 crores - - INR2,500 crores.
Question
Prateek Singh: Hi, thanks for the opportunity, and congrats on a good set of numbers. The first question, Gupta ji, largely on BHQ project. Given the fact that bulk of our volumes going ahead would be coming from BHQ. How confident are we in maintaining the fact that the cost of production of BHQ would be similar to our current cost of production, given that we'll have to mine more material, there will be beneficiation cost also? I understand that we save a bit on royalty, but do you think there is any risk of operating cost overrun in BHQ going ahead? Page 9 of 18 Lloyds Metals and Energy Limited February 04, 2026 Rajesh Gupta: BHQ, the royalty saving, based on the existing proposals of the
Answer, rajesh gupta
Please also factor in that the grade of ore from 62-64 would become 66%-67%, and that gets a very high premium. So the cost of ore versus the selling price or the usability of ore becomes much better. The BHQ beneficiation or beneficiation of ore in general has been accepted by the government as a very, very important aspect of the national policy of steel, and that therefore we expect lot of support on the royalty front from that. Does that answer your question?
Question
Prateek Singh: Yes, so just going into a bit more detail here , sir. So royalty, if our current realizations are let's say 6,000, and royalty all in, let's say, 20%, so 1,200 odd royalty, and even if royalty on BHQ is let's say zero, so INR1,200 per ton of saving plus let's say some premium because of higher grade...
Answer, rajesh gupta
Rajesh Gupta: Royalty is not zero. Royalty would be around from 1,200 would come down to around INR 200 rupees. And processing of the ore would involve some power, which is the biggest cost. We are working on getting greening our power also as well as other operations, and that's where that's what I said we are using the best technology to ensure that the systems are very, very strong and uptimes and efficiency of the plant is the best.
Question
Prateek Singh: Okay, understood, sir.
Answer, rajesh gupta
Rajesh Gupta: The premium that we would get on this output of product if I were to sell all the ore would be around INR1,400 a ton also. You have to also factor that in.
Question
Vikas Singh: Thank you for the opportunity. Sir, my first question pertains to our copper mine, as you stated that it was an operational mine. So just wanted to understand had the existing promoters was facing any difficulty in terms of producing and ramping up of the mine, and that's why we were got the chance to get some stake there? And secondly, on the management bandwidth, we are doing too many things simultaneously. So just wanted to understand the management bandwidth in terms of managing and looking after the timely completion of all these projects. How should we look at it? Page 10 of 18 Lloyds Metals and Energy Limited February 04, 2026 Rajesh Gupta: Number one, on the existing pro
Answer, rajesh gupta
They had got this mine as an opportunity, mine and the copper plant has been set up by them as well. The copper plant is running -- is set up, but not running. They lost the bandwidth to run it, and that's where we come in. We have Mr. Prabhakaran and the erstwhile Thriveni had been looking at DRC for a long period, and that's how the opportunity comes to us of investing in that. There have been no problems. Again I repeat, there are around 70-80 plants including Glencore and Ivanhoe and the best companies in the world running copper mines there and copper operations. So that's not a worry that we are -- we foresee in a very serious way.
Answer, rajesh gupta
In terms of operational bandwidth, we have scaled up -- first let me give you a little bit of history. We scaled up from around INR500 crores to INR10,000 crores or in this year maybe INR13,000 crores over 4 years. We have proved to the market, we have proved to ourselves, we have proved to our team, and our team has proved to us that we can take care of growth in a sustainable, sensible, economical, and business-like manner. And we continue to do that. Number one. Number two, as far as Congo particularly is concerned, one of the Promoter Directors would be involved full-time there. Apart from a very, very professional team who has been involved in mining operations, and we have hired experts on copper side also -- on the copper manufacturing side also.
Answer, rajesh gupta
The technicality of the leaching process and the cathode process is not a very -- is not a super technical or a super new invention, and that can be taken care of by the team that we have ensured already on the job at the site as we speak. I think that should -- we are confident of sustaining this growth in a very sensible way.
Show 12 more questions
Question
Vedant Sarda: Thank you for the opportunity and congratulations on the great set of numbers. Sir, my question is, we are hearing that government is taking various measures to ensure availability of iron ore, like they have to bring our iron ore, iron product sizes at par with international markets. So we can complete and export our iron goods. So, can you comment on the pricing outlook going forward and how to look at this?
Answer, rajesh gupta
Rajesh Gupta: See, if you look at iron ore in India, the growth is around 5%-6%, the steel growth is around 8%- 9% even now. If you look at 5 years CAGR, it is 5%-6% for iron ore and around 9%-10% for steel. So, there has been a continuous shrinkage of the supply, extra supply and therefore exports Page 11 of 18 Lloyds Metals and Energy Limited February 04, 2026 either in the form of low-grade iron ore or in the form of pellets have reduced . So, the overall supply-demand gap is very, very favourable in supply of iron ore, number one. Number two, as we go forward, over the next 5 years, around one-third of the capacity which is premium-free will go into auction over the next 5 years and that will add to the, not the lesser supply, but definitely to a higher cost mechanism for the industry. So, we are pretty confident of our commercial part of selling iron ore and over a period, our value-added business will be quite a lot and we can therefore be well equalized in both iron ore as well as value- added products like pellets or steel as well in the future.
Question
Harsh Shah: Good afternoon, sir and our heartiest appreciation for excellent execution over the last 3 years. Sir, my first question is on the MoU with Tata Steel, given that it could end up being quite an extensive agreement eventually. So will it in any way affect or change our plans for the integrated steel plant, which would be our INR16,000 crores capex plan?
Answer, rajesh gupta
Rajesh Gupta: Our future steel plant in Gadchiroli is being looked at internally, nothing to do with the Tata MoU. Any Tata MoU -- any Tata setup together would be for a different plant than that.
Question
Harsh Shah: Outstanding warrants as of today.
Answer, rajesh gupta
Rajesh Gupta: We should be getting around INR900 crores from it. I'll give you, I have got the number, but the value around INR900 crores is pending, which would be coming up in the month of March. That is something - the time between 15th or 18th March that will happen. So we should be getting it.
Question
Harsh Shah: Okay. And sir, on the copper part, the 10,000 metric ton capacity which we have, what would be the average realization and EBITDA margin on those?
Answer, rajesh gupta
Rajesh Gupta: This is copper cathode. So the current copper price is around $11,000 -- $11,500, $12,000. And normally, there is a premium to Congo because of the transport cost. So the -- that's the approximate range. And the margins that we anticipate are approximately 30%, 32%. So that gives that INR500 crores, INR700 crores that we're talking about next year.
Question
Harsh Shah: Okay. And since we have 50% stake in this JV and this is relating to this? So are we the MDO partner here or mining will be done by someone else?
Answer, rajesh gupta
Rajesh Gupta: Mining would be by Thriveni, by a subsidiary of Thriveni in that area, yes. Page 12 of 18 Lloyds Metals and Energy Limited February 04, 2026 Harsh Shah: Okay, sure.
Question
Hardik Gori: Hello, sir. Thank you for the opportunity and congratulations on a great set of numbers. Firstly, on the growth outlook for our MDO business in FY '27? And secondly, what was the IPS benefit for Q3?
Answer, rajesh gupta
Rajesh Gupta: IPS benefits, we have been drawing the benefits from day 1 of the pellet plant production and this year has been around INR130 crores. The Thriveni outlook is around 40% increase in iron ore non- Lloyd metal. Around 60%, 70% increase in the Lloyd metal because of the BHQ increase, 15% in NTPC, that is both the Pakri Barwadih mines, around INR60 crores EBITDA they have come up directly with the EBITDA figure expected for the gold mine. Management: Goldmines is 0.3 million tons.
Answer, rajesh gupta
Rajesh Gupta: 0.3 million tons output and that would be the profitability. There will be some reduction in volumes in Indonesia and in the barytes operations. Overall, a top line growth of around 15% to 20% and a bottom line growth of around 35%, right?
Question
Vinit Thakur: Sir, I would like to know what would be the expected debt console figure for the year and what would be our peak debt?
Answer, riyaz shaikh
Riyaz Shaikh: As on 31st December, if I would say, the console debt, net debt was around INR7,100 crores. This year, we should be not more than that. And FY '28 is when I would say the peak debt. When we reach the peak debt, we should be -- on a console basis, should be around INR10,500 crores, INR10,600 crores. So we are always targeting at 1 is to 1 debt to EBITDA and that is what we are working on.
Question
Shubham Harne: The EBITDA per pellets?
Answer, rajesh gupta
Rajesh Gupta: If you look at the pellet prices, the pellet pricing has gone up. Therefore, pricing is showing that there's a pressure on that, right, EBITDA on DRI pricing. So basically, it's a -- it was a cycle. The cycle has crossed the hump.
Answer, riyaz shaikh
Riyaz Shaikh: The pellet prices in quarter 2 was around INR11,000, is what we had got in average realization and it has come down to INR10,000 in quarter 3. That is why the margins have been reduced.
Answer, rajesh gupta
Rajesh Gupta: The pricing is lower because we have added more export to the mix. As the volume has picked up, we have had to add some volume of export. The EBITDA is still very strong and much stronger than the rest of the industry put together.
Question
Tanmay Choudhary: Sir, given Lloyd's ongoing c apex pipeline, so can you just outline the expected funding mix and cash outflows over next 2 years and also the scheduled debt repayments and principal payment providing not declareing any dividend?
Answer, riyaz shaikh
Riyaz Shaikh: The debt schedule and all, we can give it to you separately. I won't be able to do that. But yes, the capex outlay is around INR14,000 crores from this year and the next year. We would be around -- we intend to do around INR6,000 crores from debt and then the balance should be from the internal accruals. That is where we are working on.
Question
Tanmay Choudhary: Okay. And sir, just last one question. In PPT, we have mentioned the realization of pellet increases because of the geographical location. So can you just throw some light on it?
Answer, rajesh gupta
Rajesh Gupta: Geographically -- I mean, I cannot relate directly to the PPT question, but geographically our location is such that we can market to -- we have been very strong in marketing to the South as well as the Chandrapur area itself. So that's why our realization in pellet is around INR4,500 a nd the EBITDA is around INR4,500 crores per ton because of the market-friendly nature as well as our costing and logistics cost. So I think that's where -- does that answer your question? Or is there something specific?
Question
Rushabh Dhruv: Yes. So my question is regarding iron ore sales volume. So for this quarter we just did around 4.1 million tons, right? Then why is this PPT also showing 5.39 million tons? What's the difference here?
Answer, riyaz shaikh
Riyaz Shaikh: That that also includes the internal transfers. That's how it was. That is the dispatches from the mines.
Question
Parthiv Jhonsa: Absolutely, absolutely. Yes. Okay. And sir is it possible to repeat that number that 40% increase in iron ore and everything? I think I missed a couple of them actually. For next year?
Answer, rajesh gupta
Rajesh Gupta: The internal -- sorry, the external iron ore figure is around 40% increase in '27, FY '27. The external coal, that is NTPC contract is around 15% growth, correct me if I'm wrong Mr. Naredi. There would be a reduction of around 65% in the barytes operations. There would be reduction of around 25% in the Indonesian operations. Add to that Gold and Copper of the Katanga area . With that we expect that figure that Mr. Naredi just gave us.
Questions about this call
- When was the Lloyds Metals And Energy Q3 FY26 earnings call transcript filed?
- Lloyds Metals And Energy filed the transcript with the exchange on 9 Feb 2026. This page is built from that transcript.
- What does this page list?
- 81 statements from the transcript across 12 topics, 61 of them with a figure. Each statement is shown with the transcript sentence it came from.
- Are the analysts' questions included?
- Yes. 22 questions and management's answers are listed in the order they were asked, as the transcript prints them.
- Who wrote this page?
- DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.