Earnings call
Lloyds Metals And Energy Q3 FY25 earnings call
By DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person.
Transcript filed .
The company is fully mobilized to mine and dispatch 25 million tons, expecting the EC to be received in time by the end of the current quarter. Slurry pipeline is completed for 85 kilometres. Sponge iron division recorded its highest-ever production during the 9-month period at both plants in 9 months FY '25 and was operating at optimum capacity utilization. Beneficiated ore based pallet are around $45 to $50 premium for that grade. Lloyds Metals and Energy Limited's capex was INR 2,700 crores in the 9 months and around INR 4,400 crores in total till now.
The numbers management gave
Results
- Sponge iron division recorded its highest-ever production during the 9-month period at both plants in 9 months FY '25 and was operating at optimum capacity utilization.
Show source
Our sponge iron division recorded highest ever production during the 9-month period at both the plants and are operating at optimum capacity uti lization.
- Iron ore dispatches were 7.8 million tons in 9 months FY '25 and 2.4 million tons in Q3 FY '25.
Show source
In regard to our iron ore segment, the 9-month dispatches stood at 7.8 million tons and for Q3, it was 2.4 million tons.
- Revenue grew by 11% year-on-year in 9 months FY '25, supported by iron ore and sponge iron volumes.
Show source
Our revenue grew by 11% year-on -year, supported by robust iron ore and sponge iron volume.
- Iron ore realizations per ton improved by 8% year-on-year in quarter 3 FY '25 to INR 5,894 and by 10% year-on-year in 9 months FY '25 to INR5,718.
Show source
Realizations per ton improved by 8% year- on- year in quarter 3 FY '25 to INR 5,894 and by 10% year-on -year for 9 months FY '25 to INR5,718.
- Iron ore EBITDA per ton was INR 2,021 in quarter 3 FY '25, up 21% year-on-year, and INR 1,860 in 9 months FY '25, reflecting the same 21% growth.
Show source
Our EBITDA per ton for quarter 3 FY '25 was INR 2,021, marking a 21% year-on- year increase.
- The company recorded DRI segment volumes of 78,000 tons in quarter 3 FY '25 and 239,000 tons in 9 months FY '25.
Show source
In the DRI segment, we recorded 78,000 tons in quarter 3 FY '25 and 239,000 tons in 9 months FY '25.
Show 8 more statements
Results
- Captive iron ore supplies protected DRI margins and ensured stable profitability despite muted realizations in quarter 3 FY '25 and a fluctuating market.
Show source
While realizations were muted in quarter 3 FY '25, our captive iron ore supplies played a crucial role in protecting margins, ensuring stable profitability even in the fluctuating market.
- Power segment volumes were flat year-on-year in quarter 3 FY '25, while muted power prices in quarter 3 FY '25 affected EBITDA.
Show source
In the Power segment, volumes remained flat year-on- year and muted power prices in quarter 3 FY '25 had an impact on the EBITDA.
- Lloyds Metals and Energy Limited's raw material cost was 21% of sales in Q3 FY '24 and 8% in Q3 FY '25; the mismatch reflected lower sponge iron production, physical stock verification and a change in coal-consumption norms to reduce imported coal consumption.
Show source
So, there was some mismatch in that, so we had to provide for that, as well as there was a change in the consumption norms of coal, what we have done in this year to reduce the imported coal consumption.
- Lloyds Metals and Energy Limited received around INR70 crores as industrial promotion subsidy (IPS) in the last quarter, which contributed to the difference in DRI sales volumes.
Show source
Around INR70 crores is what we received in the form of IPS last quarter.
- Lloyds Metals and Energy Limited's closing inventory is 0.4 million tons in Q3 FY25.
Show source
Riyaz Shaikh: The closing inventory is 0.4 million tons .
- Lloyds Metals and Energy Limited reduced cost by using local coal when the sponge iron and steel industry market softened, while production came down slightly.
Show source
And by using local coal, cost has come down,and little production has come down because of that.
- Lloyds Metals' realization came down for the quarter; DRI is more linked to the secondary steel and scrap markets than to the iron ore market, and its raw material equation includes iron ore and coal.
Show source
Rajesh Gupta: So, our realization has come down for the quarter, not up.
Money and capital
- Lloyds Metals and Energy Limited's capex was INR 2,700 crores in the 9 months and around INR 4,400 crores in total till now.
Show source
Rajesh Gupta: In the 9 months, it is INR 2,700 crores, and we've done totally around INR 4,400 crores till now.
What it expects ahead
What management expects
- The company is fully mobilized to mine and dispatch 25 million tons, expecting the EC to be received in time by the end of the current quarter.
Show source
We are fully mobilized to mine and dispatch 25 million tons with the expectation that the EC shall be received in time by the end of this current quarter.
- Lloyds Metals hopes to be ready with mining from day 1 within the first 30 days after the EC and other legal formalities happen.
Show source
The day the EC happens, and the other legal formalities happen, we hope to be ready with the mining from day 1 within the first 30 days.
- In FY '28, Lloyds Metals' mix will be 10 million tons of DSO and 15 million tons of beneficiated ore; prior to that, it will step-by-step achieve 25 million tons total, with 25 million tons of DSO directly in the first year.
Show source
In the year FY '28, the mix would be 10 million tons of DSO and 15 million tons of beneficiated ore.
- By the third year, Lloyds Metals will go down to 10 million tons of DSO to preserve the ratio for the next 35 years.
Show source
So, by the third year, we'll go down to 10 million tons of DSO to preserve the ratio for the next 35 years.
- Lloyds Metals and Energy Limited will not sell 3 million tons of BHQ; maximum BHQ output will be 15 million tons, achieved in a stepped-up manner as BHQ capacities are added while DSO is reduced.
Show source
S Riyaz Shaikh: Maximum BHQ what we will be doing is 15 million tons of output.
- Lloyds Metals and Energy Limited expects to produce 25 million tons of iron ore in the next financial year, following the expected 25 million tons of EC.
Show source
So going forward, it should be 25 million tons of iron ore.
Show 7 more statements
What management expects
- Within the next 2 years, Lloyds Metals and Energy Limited expects to complete a 4 million ton pellet plant, reach around 7 lakh tons of DRI production and 1.2 million tons of wire rod plant capacity, and have an equivalent of 125 megawatts of power.
Show source
In the next 2 years, as I just mentioned, we should be done with the 4 million ton of pellet plant, we should be around 7 lakh tons of DRI production and 1.2 million tons of wire rod plant, that is steel plant and an equivalent of 125 megawatts of power along with it.
- Lloyds Metals and Energy Limited expects capex of around INR 5,000 crores by this year's end, with around INR6,000 crores to INR 6,500 crores of capex every year in the next 2 years to achieve its projects.
Show source
And going forward in the next 2 years, yes, we should be doing more than that at around INR6,000 crores to INR 6,500 crores every year of capex to achieve all these projects of ours.
- Lloyds Metals plans to sell around 10 million out of 25 million as iron ore or pellets, convert the balance into steel and sell around 4.5 million tons of steel, and sell the rest as semi-products; around 15 million tons will be sold as pellets or iron ore, mostly pellets.
Show source
Balance will be converted into steel and selling around 4.5 million tons of steel and rest will be semi-products, and around 15 million tons will be sold as pellets or iron ore, mostly pellets.
- Lloyds Metals can drive iron ore mining to a little more than 10 million tons if it gets it before March, on a pro rata basis, although that looks difficult.
Show source
But yes, we can drive a little bit more than 10 million tons.
- The company expects its investment in the Thriveni MDO business, on a fully consolidated basis, to result in meaningful earnings accretion over the years.
Show source
On fully consolidated, it is expected to result in meaningful earnings accretion Now I would like to hand over to Riyaz who will explain the financials in more detail.
- Lloyds Metals and Energy Limited's industrial promotion subsidy was a one-time payment for the prior period; it will apply for the DRI and new pellet plant projects and expects to start receiving subsidy after some time, but that income was not recognized in this quarter.
Show source
Now once the pellet plant starts, we will apply and get for the new projects, that is both the DRI and the new pellet plant, we will start getting after some time.
- Lloyds Metals and Energy Limited believes its overall mining cost is quite competitive; with Thriveni coming into its fold, the cost will be much lower because the MDO's profit would be consolidated in its books as well.
Show source
And with the advent of Thriveni coming into our fold, it will be much lower because the profit of the MDO would be consolidated in our books as well.
What it is building and selling
Projects and capacity
- Slurry pipeline is completed for 85 kilometres.
Show source
Execution has been one of our biggest strengths, having demonstrated this with the slurry pipeline, which is completed 85 kilometres , awaiting the pellet plant and the DRI plant completed last year in around 13, 14 months after the EC.
- The company completed its DRI plant last year in around 13, 14 months after the EC.
Show source
Execution has been one of our biggest strengths, having demonstrated this with the slurry pipeline, which is completed 85 kilometres , awaiting the pellet plant and the DRI plant completed last year in around 13, 14 months after the EC.
- 1.2-million-ton steel plant at Chandrapur has completed designing, its layouts are ready, orders for major equipment have been given, the EC has been applied for, and the land has been acquired.
Show source
The EC has been applied for, and the land has been acquired.
- BHQ beneficiation plant pilot plant has consistently delivered Fe content of 66% and beyond and a yield of 37% to 40% for the last 8 months, better than the original expectation.
Show source
For The BHQ beneficiation plant, and the pilot plant has been ready for the last 8 months and has consistently delivered Fe content of 66% and beyond and a yield of 37% to 40%, which is better than our original expectation.
- Rajesh Gupta described the 60-to-70-day timeline for Lloyds Metals And Energy Limited's EC process as the worst-case expectation.
Show source
Rajesh Gupta: Yes, our worst case expectation.
- Lloyds Metals has machinery in place through Thriveni for mining and excavation, and has done 1.8 million tons in a month at peak times.
Show source
And at peak times, we have done 1.8 million tons also in a month.
Show 25 more statements
Projects and capacity
- Lloyds Metals will not go in for beneficiation for roughly the first 1.5, 2 years and will use a current process of direct sales zone.
Show source
So, 2.2 million tons roughly, in the first 1.5, 2 years, we would be not going in for any beneficiation.
- Lloyds Metals considers 2 million tons of excavation and loading onto trucks not very difficult.
Show source
So that 2 million tons of excavation and loading onto trucks doesn't seem very difficult.
- Lloyds Metals has a pipeline of 10 million tons in place for evacuation.
Show source
Regarding the evacuation, like I mentioned earlier, our pipeline of 10 million tons is in place.
- By the time the grinding plant and pellet plant are ready, 5 million tons will be transported through the pipeline and pro rata 15 million, 20 million tons will be dispatched through the normal route.
Show source
By the time the grinding plant and the pellet plant is ready, the 5 million tons will be transported through that and pro rata 15 million, 20 million tons would be dispatched through the normal route.
- The reserves of DSO are 157 million, 160 million tons as per the Tata report certified by JORC, and Lloyds Metals has around 700 million tons of BHQ.
Show source
So, I don't know where you have observed the figure of 70 million tons , it's 157 million tons of DSO and around 700 million tons of BHQ.
- Viraj Steel has signed 3 or 4 MoUs envisaging 3 or 4 steel plants in Gadchiroli.
Show source
Not only one, I think other MoUs have also been signed by Viraj Steel, So 3 or 4 MoUs are there now envisaged for 3 or 4 steel plants in Gadchiroli.
- Lloyds Metals and Energy Limited's beneficiation plant technical phase for clearing the process route is final, its pilot plant is running and testing of its output is underway; required permissions and land have been applied for and are in place, and the first physical phase is expected to be completed in '27.
Show source
And physically, we feel '27 the first phase would be completed.
- Lloyds Metals and Energy Limited is developing its beneficiation plant in three modules of 15 million tons each; the first 15 million-ton module will be done by '27.
Show source
So, the first module of 15 million tons will be done in that time.
- Lloyds Metals and Energy Limited expects to place its biggest equipment orders in the next 10 days or so for BHQ, and has the big grinder and gyratory crusher in place, with the crusher due to be installed shortly.
Show source
I think we'll be in the position to order those equipment in the next 10 days or so, we'll be placing the biggest orders.
- BHQ beneficiation plant has completed primary engineering, equipment procurement is in progress, and land and other legal formalities are underway.
Show source
Primary engineering is complete, and the equipment procurement is currently in progress.
- Lloyds Metals would be starting off with its own pellet plant.
Show source
Riyaz Shaikh: We would be starting off with our own pellet plant.
- Lloyds Metals and Energy Limited's other two beneficiation plant modules will be developed in the next each financial year.
Show source
Riyaz Shaikh: Other 2 would be in the next each financial year.
- Lloyds Metals and Energy Limited's other beneficiation plant modules will be developed every financial year after that.
Show source
Rajesh Gupta: every financial year after that.
- Lloyds Metals and Energy Limited plans to work on the second BHQ plant, the second slurry pipeline and the pellet plant once the two pellet plants and the first BHQ plant are ready.
Show source
And so, once the two pellet plants are ready and the first BHQ plant is ready, then we'll work on the second BHQ plant and this pipeline and the pellet plant.
Demand and pricing
- Beneficiated ore based pallet are around $45 to $50 premium for that grade.
Show source
Beneficiated ore based pallet are around $45 to $50 premium for that grade.
- Lloyds Metals has not taken any price cut and does not see any price cut on the anvil; most of its material for this year of 10 million tons is sold.
Show source
So, we don't see any price cut on the anvil.
- Lloyds Metals said steel-sector demand was a little soft and there was oversupply, while demand was still growing 7%, 8% or 9%.
Show source
And ultimately, the supply and demand and the steel sector has been a little soft on the demand side.
- Rate parity for Lloyds Metals changes from time to time, location to location and product to product.
Show source
But having said that, rate parity changes from time to time, location to location and product to product.
- Lloyds Metals is already competitive in the Karnataka market and hopes to remain competitive later. Replaced by a later filing.
Show source
And since we are already competitive in that market, , we hope to be competitive later also.
Segments
- Lloyds Metals supplies its materials in literally all four corners of the country and hopes to continue doing so through rake, truck and pipeline logistics.
Show source
As such, today, we are supplying our materials in literally all four corners of the country.
- Lloyds Metals and Energy Limited has no plan to sell BHQ because there is no buyer for it; the only costs are mining cost and royalty.
Show source
Rajesh Gupta: No. Like I mentioned earlier, there is no buyer for BHQ, and we have no plan to sell any BHQ.
Deals and partners
- Lloyds Metals has tied up with Hinduja and Amplus, is about to sign final contracts with them, has been buying power from them, and is becoming a 26% equity holder in each of the two special subsidiaries for that power.
Show source
We've been buying power from them and also becoming an equity holder of 26% in those two special subsidies for that power.
- Some Lloyds Metals material is already going to various customers in Karnataka, and the company will continue supplying there irrespective of the taxation announced by the Karnataka government.
Show source
Rajesh Gupta: So currently, some of our material is already going to Karnataka to various customers and we'll continue doing so irrespective of the fact of the taxation announced by the Karnataka government.
- Lloyds Metals has tried to have an understanding of equity with Thriveni so that logistics income remains in-house.
Show source
So that all that income also remains in-house.
- Lloyds Metals supplies raw materials to Mandovi under an understanding and takes some pellets from Mandovi.
Show source
We are supplying raw materials, and we have an understanding with Mandovi for supplying iron ore to them and off taking some pellets from them.
Risks, rules and outside factors
Outside factors
- The six mines auctioned at a premium of around 110% of revenue would incur a cost of around INR4,000 multiplied by 1.1x above mine cost if selling at around INR4,000 average; Lloyds Metals and Energy Limited does not have to pay that premium.
Show source
So, if I'm selling at around INR4,000 average, their cost would be around INR 4,000 into 1.1x extra over and above mine, which I do not have to pay.
- The royalty for BHQ in Maharashtra is around INR 65, which Lloyds Metals and Energy Limited would pay in the worst-case scenario; the current royalty is less than INR 55 because BHQ is not recognized as iron ore by the country.
Show source
The royalty is around INR 65 for Maharashtra for this product, which is what we would be paying in the worst case scenario.
- The mining cost per ton of BHQ will be lower than the DSO iron ore cost, but beneficiation requires 2.5x–3x the material, making the ratio a little higher; BHQ grade is also higher.
Show source
Rajesh Gupta: It will be lesser per ton of BHQ, but when we beneficiated, we have to use 2.5x -3x of the material So, from that angle, the ratio will be a little higher, but the grade is also higher.
- Lloyds Metals and Energy Limited believes the overall cost ex mine or ex beneficiated plant would not be very different from the current DSO cost, given the lower royalty at INR 65; it is assessing whether INR 65 can be reduced, and says the grade has better quality with much lower silica and alumina.
Show source
We believe that the overall cost ex mine or ex beneficiated plant would not be very different from the current DSO cost given the lower royalty at INR 65.
- Lloyds Metals' landed cost of power is around INR 4.50-INR4.75 per unit, compared with an MSEDCL landed cost of around INR 8.50; the power is green.
Show source
Rajesh Gupta: So, the landed cost of this power is around INR 4.50- INR4.75 per unit.
- Operational efficiency and captive raw material source cushioned its sponge iron business against price fluctuations amid volatile market conditions.
Show source
While market conditions for sponge iron continue to be volatile, our operational efficiency and captive raw material source have provided a strong cushion against price fluctuations.
Show 2 more statements
Outside factors
- The taxation announced by the Karnataka government is a cost, not related to the selling price; the cost might go up, while the selling price would be ruled by the market.
Show source
And that taxation is actually a cost, not related to the selling price.
Rules and policy
- The public hearings are under the aegis of the state, and the regular formalities will be completed well in time. Replaced by a later filing.
Show source
And so all those regular formalities will be completed well in time.
Everything else said on the call
What management stressed
- Lloyds Metals is proud to have laid the foundation for Gadchiroli as the next steel city. Replaced by a later filing.
Show source
Like the Prime Minister and the CM has said that it is the next steel city, and we are proud to have laid the foundation to that city.
Group structure
- MDO business will come into the company from 1st April 2025, with the effects from that date subject to receipt of the NCLT order for the demerger.
Show source
So, all the effect would be coming in from 1st of April 2025 post the NCLT order is received.
- Lloyds Metals has taken over the MDO business; equity in BRPL and MRPL remains with Thriveni and does not come to Lloyds Metals.
Show source
The other businesses like equity in BRPL and in MRPL –remains with them and does not come to us at all..
Other
- The premium cost was in the range of 110%, approximately INR4,400 higher.
Show source
On the premium cost, I already mentioned that, and I think it's in the range of 110%, so that is around INR4,400 higher approximately.
What the company said on its earnings call, taken from its own transcript. Not advice.
Questions and answers
Question
Parthiv Jhonsa: So, in 60 to 70 days, you mean the EC should come in? Or it is another couple of months after that?
Answer, rajesh gupta
Rajesh Gupta: Yes, our worst case expectation.
Question
Parthiv Jhonsa: Okay. And sir, one place in the presentation you had mentioned that once the MDO business integration is completed, there'll be almost about, INR400 to INR 500 of cost saving in the iron ore side of the business. So, can you throw some light on it that when can this come and when can these savings play out? What is the timeline for the same?
Answer, riyaz shaikh
Riyaz Shaikh: See, the NCLT process is going on. The company has to first go on through the NCLT for the demerger. So, the business, as we have already mentioned that the MDO business will be coming in from 1st of April. So, all the effect would be coming in from 1st of April 2025 post the NCLT order is received. So, the entire business comes into this company from 1st April 2025. So, it will be for the next financial year.
Question
Parthiv Jhonsa: Okay. So basically, my question was will this benefit kick in from the day one itself? Page 4of 15 Lloyds Metals and Energy Limited January 29, 2025 Riyaz Shaikh: Yes.
Answer, riyaz shaikh
Since it will be under the same umbrella, it was a consolidated figure. So, it will be kicking in from the immediate basis, with the increased EC limits.
Answer, rajesh gupta
Rajesh Gupta: So, there are two aspects to the physical execution. One is the physical mining and excavation, and one is the evacuation. As far as the mining is concerned, we have machinery in place through Thriveni to do the mining. And at peak times, we have done 1.8 million tons also in a month. So, 2.2 million tons roughly, in the first 1.5, 2 years, we would be not going in for any beneficiation. It will be a current process of direct sales zone. So that 2 million tons of excavation and loading onto trucks doesn't seem very difficult.
Answer, rajesh gupta
Regarding the evacuation, like I mentioned earlier, our pipeline of 10 million tons is in place. By the time the grinding plant and the pellet plant is ready, the 5 million tons will be transported through that and pro rata 15 million, 20 million tons would be dispatched through the normal route. So, we would have, therefore, a big support of the pipeline in helping us in evacuation. And therefore, we see that there will be not major worries in achieving the evacuation either. The day the EC happens, and the other legal formalities happen, we hope to be ready with the mining from day 1 within the first 30 days.
Question
Vikash Singh: Understood. And sir, just one clarification. Until the beneficiation project comes in, we can actually go up to 25 million ton in the high- grade ore or we will cap our high- grade ore at a certain capacity and that 25 million ton , like you previously said, is a mix of 15 million- ton of low-grade beneficiated and 10 million ton of high grade, but then until that comes which is 27...
Answer, rajesh gupta
Rajesh Gupta: Yes. In the year FY '28, the mix would be 10 million tons of DSO and 15 million tons of beneficiated ore. Prior to that, step-by -step, we will be achieving 25 million tons total. So, in the first year, it will be 25 million tons of DSO directly.
Question
Vikash Singh: Understood. But then my second question comes that DSO reserves seems to be pretty limited. So once if we utilize that 15 million and 25 million tons, if I'm not correct, we will be left with only with 45 million, 50 million ton of DSO, which is not sufficient, more than 4 to 5 years of high-grade ore. So just wanted to understand about the -- how we should look at the mine life of DSO versus the low grade going forward?
Answer, rajesh gupta
Rajesh Gupta: The reserves of DSO are 157 million, 160 million tons as per the Tata report, which has been certified by JORC. So, I don't know where you have observed the figure of 70 million tons , it's 157 million tons of DSO and around 700 million tons of BHQ. So, by the third year, we'll go down to 10 million tons of DSO to preserve the ratio for the next 35 years. Page 5of 15 Lloyds Metals and Energy Limited January 29, 2025 Vikash Singh: Understood, sir.
Question
And sir, just one last question, basically, on this environmental clearance. Once we get the clearance, from state, we need only the consent to operate, right? There is not much formalities on the state level left?
Answer, rajesh gupta
Rajesh Gupta: Yes, I believe that's the only formality that's left . There are other formalities, obviously. Like I mentioned, the public hearings is under the aegis of the state. The state has always been very supportive and continues to be supportive. And so all those regular formalities will be completed well in time.
Question
Vikash Singh: Understood. And sir, just sorry to squeeze in one more question. In terms of parity, how do we stand versus Karnataka or Odisha material and imported material-wise? How the prices are ranging in Maharashtra or rather in Karnataka because recently, there's ordinance, Karnataka government is trying to pass a new mining bill. So, in case if Karnataka mining goes a little bit low, and we could supply there also since we are going to have a very large capacity, how does it sits including the logistic cost? Is that opportunity is also available with us?
Answer, rajesh gupta
Rajesh Gupta: So currently, some of our material is already going to Karnataka to various customers and we'll continue doing so irrespective of the fact of the taxation announced by the Karnataka government. And that taxation is actually a cost, not related to the selling price. So, the cost might go up, but the selling price would be ruled by the market. And since we are already competitive in that market, , we hope to be competitive later also. As such, today, we are supplying our materials in literally all four corners of the country. And we hope to continue doing so through various logistics, means like rake, truck and now pipeline as well.
Question
Vikash Singh: So basically, Karnataka material price versus M aharashtra material price ex of logistics, so what would be the gap?
Answer, rajesh gupta
Rajesh Gupta: So, there are some price differentiation between various destination ex the mine, there will be some differentiation. And those are commercial information, which I cannot easily pass on, but let me put it this way that, that's why we are doing a door-to -door delivery, which you might have seen in our presentation, and many places we are giving ex our siding where the customer takes care of the transport. And I mean, it's a logistic-oriented business. And that is part of the reason why we have tried to have an understanding of equity with Thriveni. So that all that income also remains in-house. But having said that, rate parity changes from time to time, location to location and product to product. Very difficult to define it as a precise figure.
Answer, rajesh gupta
Rajesh Gupta: what we have taken over is the MDO business. The other businesses like equity in BRPL and in MRPL –remains with them and does not come to us at all.. We are supplying raw materials, and we have an understanding with Mandovi for supplying iron ore to them and off taking some pellets from them.
Question
Rahul Agarwal: Okay, sir. So that partnership is going to continue...
Answer, riyaz shaikh
Riyaz Shaikh: We would be starting off with our own pellet plant. So, there is no question of trading does not allow that.
Question
Rahul Agarwal: All right. So, anybody I can contact in particular?
Answer, rajesh gupta
Rajesh Gupta: So, we're not fully privy to what the MoU is about. We know that in the past, they have signed a composite mining license with the Indian Government for one of the mines in Surjagarh. The exact details of what the MoU they have signed, we are not aware. Not only one, I think other MoUs have also been signed by Viraj Steel, So 3 or 4 MoUs are there now envisaged for 3 or 4 steel plants in Gadchiroli. Like the Prime Minister and the CM has said that it is the next steel city, and we are proud to have laid the foundation to that city. And with the iron ore reserves being very huge, I'm sure that a lot of steel companies will come, and the infrastructure overall would be developed in a better way once more companies come in. More taxes and royalties are received by the government, so they would invest more money in the district.
Show 23 more questions
Question
Divya Agarwal: Just a follow-up on that. Do you have a better cost structure as compared to those mines which these guys are having?
Answer, rajesh gupta
Rajesh Gupta: We would not be aware of their physical cost structure. But as far as I'm aware that the 6 mines have been auctioned at a premium of around 110% of the revenue. So, if I'm selling at around INR4,000 average, their cost would be around INR 4,000 into 1.1x extra over and above mine, which I do not have to pay.
Question
Divya Agarwal: Right. Right. Fair enough. Got it, sir. And secondly, on the gross margin front, sir, our overall sales volume if we've seen quarter 3 FY '25 is like slightly higher and the raw material cost as a percentage of sales was 21% in Q3 FY '24 versus it is 8% in Q3 FY '25. So, can you throw some light on that? Why is it so low in Q3 FY '25?
Answer, riyaz shaikh
Riyaz Shaikh: In the second quarter, there were 2, 3 factors because of which the cost structure was on a higher side. It was on the sponge iron front where production in this quarter has been lower. There was a physical verification of these stocks. So, there was some mismatch in that, so we had to provide for that, as well as there was a change in the consumption norms of coal, what we have done in this year to reduce the imported coal consumption. A ll these things have resulted in this mismatch in the numbers.
Question
Divya Agarwal: Okay. So, can we expect the similar range going forward?
Answer, rajesh gupta
Rajesh Gupta: AsI have mentioned earlier, we are always cognizant of the market. Once the market of the sponge iron and the steel industry gets a little softer, we instead of focusing on volume alone in the DRI sector, focus on cost as well. And by using local coal, cost has come down,and little production has come down because of that. And that's the advantage that we are seeing. Page 8of 15 Lloyds Metals and Energy Limited January 29, 2025 Divya Agarwal: Right.
Question
Divya Agarwal: No, the volume is down by 8%, but if you see the total DRI sales, it's down by 48%. And you said in the investor presentation, the...
Answer, riyaz shaikh
Riyaz Shaikh: In the last quarter, there was an industrial promotion subsidy, which we received. because of that, the -- if you see that the volumes -- the difference in the volume is coming in. Around INR70 crores is what we received in the form of IPS last quarter.
Question
Divya Agarwal: Yes. Got it. And on the IPS front, did we receive anything in this quarter?
Answer, rajesh gupta
Rajesh Gupta: That will continue now. sorry, this was a onetime. The IPS was one time for the prior period. Now once the pellet plant starts, we will apply and get for the new projects, that is both the DRI and the new pellet plant, we will start getting after some time. That income is not recognized in this quarter.
Question
Divya Agarwal: Sure, sir. And just last question. I n the last con call, you said we'll be selling around 3 million tons of BHQ, but are you planning to sell it in this financial or will it be in the next financial year?
Answer, rajesh gupta
Rajesh Gupta: No, we won't sell 3 million tons of BHQ. S Riyaz Shaikh: Maximum BHQ what we will be doing is 15 million tons of output. And that will be on a stepped- up manner. We start with DSO, and then we keep on reducing the DSO as and when the BHQ capacities get added.
Answer, rajesh gupta
Rajesh Gupta: For the beneficiation plant, before we come into the physical phases, we have the technical phases and the approval phases. The technical phase of clearing the process route is final and our pilot plant is up and running. And we are now in the phase of testing that output, number one. Number two, the permissions required, including getting the land, etcetera, are already in place -- I mean, are already applied for and in place. And physically, we feel '27 the first phase would be completed.
Question
Prince Choudhary: By '27, only first phase will be operational, right? Page 9of 15 Lloyds Metals and Energy Limited January 29, 2025 Riyaz Shaikh: We're doing it in 3 modules, it will be 15 million tons per module.
Answer, riyaz shaikh
So, the first module of 15 million tons will be done in that time.
Question
Prince Choudhary: Okay. And other 2 phases?
Answer, riyaz shaikh
Riyaz Shaikh: Other 2 would be in the next each financial year.
Answer, rajesh gupta
Rajesh Gupta: every financial year after that.
Question
Prince Choudhary: Okay. And what will be the royalty for that BHQ one?
Answer, rajesh gupta
Rajesh Gupta: So, the royalty currently is less than INR 55 as it is not recognized as iron ore by the country. The royalty is around INR 65 for Maharashtra for this product, which is what we would be paying in the worst case scenario.
Question
Prince Choudhary: Okay, like INR 65 per ton, right?
Answer, rajesh gupta
Rajesh Gupta: No. Like I mentioned earlier, there is no buyer for BHQ, and we have no plan to sell any BHQ. There are no other costs except the mining cost, obviously, and the royalty.
Question
Prince Choudhary: Okay. And the mining cost would be more than what we do for the DSO, iron ore, if I'm not wrong around then? Or it will be the same?
Answer, rajesh gupta
Rajesh Gupta: It will be lesser per ton of BHQ, but when we beneficiated, we have to use 2.5x -3x of the material So, from that angle, the ratio will be a little higher, but the grade is also higher.
Question
Parthiv Jhonsa: Yes, the capex for Q3 and 9 months, sir. Is it possible to get the number, you had said in the opening remarks?
Answer, rajesh gupta
Rajesh Gupta: In the 9 months, it is INR 2,700 crores, and we've done totally around INR 4,400 crores till now.
Question
Parthiv Jhonsa: Okay. Okay. Sir, also just one question to harp on the ex -mine cost when compared to, say, someone who is a merchant miner, right? Considering we have allotted mine. And what will be the cost differential there? For example, if someone is mining, considering the MDO cost and everything, what would be the cost differential with us compared to a merchant miner as on date?
Answer, rajesh gupta
Rajesh Gupta: I'm not privy to other miners in Gadchiroli. A, there are no mining going on right now. I'm not privy to the physical costs. On the premium cost, I already mentioned that, and I think it's in the range of 110%, so that is around INR4,400 higher approximately.
Question
Parthiv Jhonsa: No, I believe, sir, there are no other merchant miners mine. I just wanted to understand with miners, say, from Karnataka or Odisha if they are doing on MDO, what would be the cost differential just to get a comparison?
Answer, rajesh gupta
Rajesh Gupta: I think I don't track my competitors so closely. I think the easiest way to track it would be NMDC was a pure mining play or maybe Tata Steel. I'll have to have a look at that. We believe we are quite competitive in the overall mining cost. And with the advent of Thriveni coming into our fold, it will be much lower because the profit of the MDO would be consolidated in our books as well.
Question
Parthiv Jhonsa: No problem, sir, I'll get in touch with Chintan on this, absolutely fine. Sir, the last question is, is it possible to possible to give a heads-up on what will be the kind of a conversion cost there? Or it's too preliminary right now?
Answer, rajesh gupta
Rajesh Gupta: We have the cost with us. We believe that the overall cost ex mine or ex beneficiated plant would not be very different from the current DSO cost given the lower royalty at INR 65. We are trying to understand the laws a little bit more of whether INR 65 can be reduced or not. And so it would be in the same range, maybe a little bit plus/minus but the grade is better, the silica, alumina is much, much lesser. So, for the end user, there's a much, much bigger benefit. Whether we make Page 11of 15 Lloyds Metals and Energy Limited January 29, 2025 pellets or we sell steel or my consumers makes steel, it will be a much better benefit. Beneficiated ore based pallet are around $45 to $50 premium for that grade.
Question
Siddharth Gadekar: Okay. Sir, secondly, on our BHQ, have we started ordering the equipment? Or what is the status on that?
Answer, rajesh gupta
Rajesh Gupta: The engineering is all in full swing. Some of the very long-lead items, I think we have just ordered or about to order. Our teams have gone to Australia and to China to inspect new and better technologies also. I think we'll be in the position to order those equipment in the next 10 days or so, we'll be placing the biggest orders. We have got the big grinder in place, with the gyratory crusher, which would be getting installed shortly.
Question
Siddharth Gadekar: Okay. Sir, secondly, on the second slurry pipeline, when do we expect that to commission?
Answer, rajesh gupta
Rajesh Gupta: So, the way we have done our scheduling, which I mentioned to you earlier, is we are asking the cash flows to take care of that. And so, once the two pellet plants are ready and the first BHQ plant is ready, then we'll work on the second BHQ plant and this pipeline and the pellet plant.
Question
Siddharth Gadekar: Okay. Got it. But...
Answer, riyaz shaikh
Riyaz Shaikh: The closing inventory is 0.4 million tons . Page 12of 15 Lloyds Metals and Energy Limited January 29, 2025 Moderator: I think the line got disconnected.
Question
Dhananjai Bagrodia: So just a question is, how are we looking at capex over the next 3 years on a consolidated level across divisions? And how are we looking at this company over the next 3 to 5 years in terms business plan because we have now got the clearances, we are trying new opportunities, so how should one look at it?
Answer, riyaz shaikh
Riyaz Shaikh: Yes. See, as we've informed you that we should be getting into this 25 million tons of EC, and so we should be doing that much of production in the next financial year. So going forward, it should be 25 million tons of iron ore. In the next 2 years, as I just mentioned, we should be done with the 4 million ton of pellet plant, we should be around 7 lakh tons of DRI production and 1.2 million tons of wire rod plant, that is steel plant and an equivalent of 125 megawatts of power along with it. In terms of capex , we should be doing around INR 5,000 crores by this year's end. That has to be done around INR 4,400 crores, so we should be reaching around INR 5,000 crores by this year end. And going forward in the next 2 years, yes, we should be doing more than that at around INR6,000 crores to INR 6,500 crores every year of capex to achieve all these projects of ours.
Question
Dhananjai Bagrodia: Okay. And just to understand, is our vision to focus on which part of the chain going ahead? Obviously, the first leg, what you mentioned, but over longer term, this company wants to be known as a mining company, processing company. What about that? How are we looking at that?
Answer, rajesh gupta
Rajesh Gupta: So, our long-term vision is to be a cyclical -free steel industry. At the same -- how we will achieve that is, , by very, very low debt, if any, number one. Number two, we'll have a part of the iron ore that we mine will be sold as either iron ore or as pellets and part will be sold as steel. So out of 25 million, around 10 million will be sold. Balance will be converted into steel and selling around 4.5 million tons of steel and rest will be semi-products, and around 15 million tons will be sold as pellets or iron ore, mostly pellets.
Question
Kartik Khandelwal: Sir, a few quarters back, we showcased a desire to achieve a revenue of around INR 40,000 crores by FY '28 or '29. So, the recent acquisition of MDO business and the revenue will be earning from this, is it considered in the target itself? Or will it be over and above the desired revenue target of INR 40,000 crores by FY '28 or '29Rajesh Gupta: It'll be over and above.
Answer, rajesh gupta
Rajesh Gupta: Price cut. We haven't taken any price cut. Most of our material is sold for this year of 10 million tons. So, we don't see any price cut on the anvil. Aman: And sir, the realization for DRI has come off. W hat would be the reason for that? And can you explain what's the linkage with, let's say, iron ore realization in terms of what's the flow-through or linkage with iron ore?
Answer, rajesh gupta
Rajesh Gupta: So, our realization has come down for the quarter, not up. The DRI is more linked to the secondary steel market and the scrap market, lesser to the iron ore market. And also, as far as our raw material is concerned, we've got two raw materials, iron ore and coal. So, both of those are part of the equation that people have. And ultimately, the supply and demand and the steel sector has been a little soft on the demand side. I think oversupply is there. The demand is still 7%, 8%, 9% growth.
Question
Kishor Udasi: No, no, only mining. Iron ore mining. How much million tons ?
Answer, riyaz shaikh
Riyaz Shaikh: If we get it before March, on a pro rata basis, we can but that looks difficult. But yes, we can drive a little bit more than 10 million tons.
Question
Kishor Udasi: Okay. But right now, we are calculating only 10 million for this financial year?
Answer, rajesh gupta
Rajesh Gupta: We have tied up with 2 companies, Hinduja and Amplus. We are about to sign the final contracts with them. We've been buying power from them and also becoming an equity holder of 26% in those two special subsidies for that power. Vimogh Shah: Okay. And my second question is like, could you provide a detailed projection on how this cost reduction will translate into the pricing competitiveness in the market and enable a company to maintain its profitability?
Answer, rajesh gupta
Rajesh Gupta: So, the landed cost of this power is around INR 4.50- INR4.75 per unit. And the landing cost of MSEDCL cost is around INR 8.50, number one. Number two, and of course, this is green power, so that is also very important for us in our business strategy. So, with those two benefits, I think it's very easy to calculate the cost benefit to the product.
Questions about this call
- When was the Lloyds Metals And Energy Q3 FY25 earnings call transcript filed?
- Lloyds Metals And Energy filed the transcript with the exchange on 3 Feb 2025. This page is built from that transcript.
- What does this page list?
- 70 statements from the transcript across 12 topics, 47 of them with a figure. Each statement is shown with the transcript sentence it came from.
- Are the analysts' questions included?
- Yes. 33 questions and management's answers are listed in the order they were asked, as the transcript prints them.
- Who wrote this page?
- DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.