Cobalt capacity is expected to scale to approximately 20,000 tons in CHEMAF's 2 operating plants. Lloyds Metals and Energy Limited completed 2 pellet plants at Konsari, in Gadchiroli, reaching capacity of 8 million tons. Lloyds Metals and Energy Limited's revenue CAGR over the last 5 years was 109%. Lloyds Metals and Energy Limited maintained pricing parity with competition alongside a volume increase of 120% and the start of new products such as pellet. CHEMAF is a large operating copper cobalt platform in the Katanga copper belt with 50-plus permits.
The numbers management gave
Results
- Lloyds Metals and Energy Limited's revenue CAGR over the last 5 years was 109%.
Show source
In the last 5 years, our CAGR on revenue is up by 109%.
- Lloyds Metals and Energy Limited's PAT CAGR over the last 5 years was 139%.
Show source
And on PAT, the CAGR is a whopping 139%.
- Lloyds Metals and Energy Limited's iron ore volume scaled from 10 million to 22 million tons, a 120% growth in a single year.
Show source
On operations, our iron ore scaled from 10 million to 22 million tons, which is a 120% growth in a single year.
- Lloyds Metals and Energy Limited's pellet plant, commissioned at the fag end of Q2, reached 100% capacity utilization within 4 months and produced 3 million tons in 9 months.
Show source
The pellet plant commissioned at the fag end of Q2 reached 100% capacity utilization within just 4 months, 3 million tons in 9 months, a ramp-up that very few plants anywhere in the country have achieved.
- Lloyds Metals and Energy Limited's DRI volume scaled 56% year-on-year as the new kiln ramped up steadily alongside the pellet plant.
Show source
DRI volume scaled 56% year-on-year with the new kiln ramping up steadily as the pellet plant.
- Lloyds Metals and Energy Limited's EBITDA margin held steady at approximately 34% across the last 2 quarters, reflecting structural cost efficiency rather than one-off gains.
Show source
The EBITDA margin has held steady at approximately 34% across both the last 2 quarters, demonstrating structural cost efficiency and not one-off gains.
Show 48 more statements
Results
- Lloyds Metals and Energy Limited's return on capital employed stood at 56% ex CWIP for FY '26 and return on equity stood at 37%.
Show source
Return on capital employed stood at 56% ex CWIP for FY '26 and return on equity at 37%.
- Lloyds Metals and Energy Limited's total income in Q4FY26 was INR4,977 crores, up 310% year-on-year.
Show source
The total income came in at INR4,977 crores, registering a remarkable 310% year-on-year growth.
- Lloyds Metals and Energy Limited's EBITDA in Q4FY26 was INR1,679 crores, up 498% year-on-year.
Show source
EBITDA was INR1,679 crores, up 498% year-on-year, a near six-fold jump in absolute Page 4 of 19 Lloyds Metals and Energy Limited May 06, 2026 profitability.
- Lloyds Metals and Energy Limited's PAT in Q4FY26 was INR1,066 crores, up 368% year-on-year.
Show source
PAT stood at INR1,066 crores, up 368% year-on-year.
- Lloyds Metals and Energy Limited's EBITDA margin in Q4FY26 was 33.73%, an improvement of more than 1,000 basis points year-on-year.
Show source
EBITDA margin expanded to 33.73% in quarter 4, an improvement of more than 1,000 basis points year-on-year.
- Lloyds Metals and Energy Limited's total income in FY26 was approximately INR13,838 crores, up 104% year-on-year.
Show source
Total income for FY26 stood at approximately INR13,838 crores, up 104% year-on-year.
- Lloyds Metals and Energy Limited's EBITDA in FY26 was INR4,673 crores, up 133% year-on-year.
Show source
EBITDA came in at INR4,673 crores, growing 133% year-on-year.
- Lloyds Metals and Energy Limited's PAT in FY26 was INR3,194 crores, up 120% year-on-year.
Show source
PAT was INR3,194 crores, up 120% year-on-year.
- Lloyds Metals and Energy Limited's EBITDA margin in FY26 was 33.77%, up 418 basis points year-on-year.
Show source
EBITDA margin for the full year stood at 33.77%, up 418 basis points year-on-year.
- Lloyds Metals and Energy Limited's iron ore production in Q4FY26 was 9.09 million tons, up 529% year-on-year.
Show source
Iron Ore production for quarter 4 FY26 was 9.09 million tons, up 529% year-on-year.
- Lloyds Metals and Energy Limited's iron ore production in FY26 was 21.96 million tons, up 120% year-on-year.
Show source
For the full year, production stood at 21.96 million tons, up 120% year-on-year.
- Lloyds Metals and Energy Limited's iron ore sales volume in Q4FY26 was 6.16 million tons, up 271% year-on-year.
Show source
Iron Ore sales volume for quarter 4 FY26 was 6.16 million tons, up 271% year-on-year.
- Lloyds Metals and Energy Limited's iron ore sales in FY26 were 16.18 million tons, up 71% year-on-year.
Show source
For FY26, total sales were 16.18 million tons, up 71% year-on-year.
- Lloyds Metals and Energy Limited's iron ore realization per ton was INR5,848 in quarter 4 and INR5,806 for FY26.
Show source
Realization per ton stood at INR5,848 in quarter 4 and INR5,806 for the full year.
- Lloyds Metals and Energy Limited's iron ore EBITDA per ton was INR1,894 in quarter 4 and INR1,930 for FY26.
Show source
EBITDA per ton was INR1,894 in quarter 4 and INR1,930 for FY26, reflecting strong unit economics.
- Lloyds Metals and Energy Limited's pellet production in Q4FY26 was 1.08 million tons and in FY26 was 3.03 million tons.
Show source
Pellet production for quarter 4 FY26 was 1.08 million tons and for the full year was 3.03 million tons.
- Lloyds Metals and Energy Limited's pellet plant commenced commercial production at the fag end of quarter 2 FY26 and reached 100% capacity utilization within 4 months of commissioning.
Show source
Within 4 months of commissioning, it has already reached 100% capacity utilization, which is an exceptional execution outcome.
- Pellet realization per ton was INR9,590 and EBITDA per ton for pellets was INR4,040 in quarter 4 FY26; the EBITDA per ton was driven by captive iron ore, slurry pipeline-based evacuation and strong domestic demand.
Show source
Realization per ton for quarter 4 FY26 stood at INR9,590, supported by strong product quality and strategic geographic positioning.
- DRI sales volume was 188,000 tons in quarter 4 FY26, up 171% year-on-year, and DRI volumes were 480,000 tons for the full year, up 56% year-on-year.
Show source
For the operational highlights of DRI and Power, DRI sales volume for quarter 4 FY26 was 188,000 tons, up 171% year-on-year.
- DRI realization was INR27,306 per ton and EBITDA per ton was INR7,999 in quarter 4 FY26.
Show source
DRI realization stood at INR27,306 per ton in quarter 4 with EBITDA per ton of INR7,999 strong unit economics.
- Value-added products accounted for 32% of Lloyds Metals And Energy Limited’s FY26 stand-alone revenues, up from 20% in FY25; their share of EBIT contribution was 30%, up from 11% in FY25.
Show source
Value-added products now account for 32% of FY26 stand-alone revenues, up from 20% in FY25.
- Thriveni’s EBITDA was INR910 crores with margins of 36% in Q4 FY26, reflecting operating leverage as volumes scaled.
Show source
In Q4 FY26 specifically, EBITDA was INR910 crores with margins of 36%, reflecting exceptional operational -- operating leverage as volumes scaled.
- Thriveni’s cash PAT was INR1,196 crores and PAT margin was approximately 15% for the full year.
Show source
Cash PAT for the full year stood at INR1,196 crores with PAT margin of approximately 15%.
- At PB West, OB removal was 72.8 million BCM; coal production was 17.5 million tons and coal crushing and dispatch was 17.4 million tons.
Show source
A record yearly performance at PB West that OB removal has been at 72.8 million BCM.
- Electrical loading was 21.8 million BCM, up 80% year-on-year, and electric drilling was 1.5 lakh meters, up 45% year-on-year.
Show source
Electrical loading 21.8 million BCM that is up by 80% year-on-year.
- The first pellet plant achieved 3 million tons in its first 9 months of operation, within capacity.
Show source
The first plant -- the first 9 months of operation has achieved 3 million tons, which is within the capacity.
- Thriveni's receivables are 15 to 30 days.
Show source
Riyaz Shaikh: In Thriveni, receivables is 15 to 30 days.
- In coal, receivables are 15 days; the figure is similar in Lloyd Metals.
Show source
Riyaz Shaikh: Private miner owners, but in coal it is 15 days, Rajesh Gupta: So we have to -- and so it is similar in Lloyd Metals.
- Lloyds Metals and Energy Limited crossed INR11,000 crores in consolidated revenue in Q3 & 9MFY26.
Show source
Page 2 of 19 Lloyds Metals and Energy Limited May 06, 2026 Consolidated revenue crossed INR17,000 crores, fast approaching the $2 billion mark.
- Lloyds Metals and Energy Limited's monthly run rate remains upward of 2 million tons in Q2 & H1FY27.
Show source
Our monthly run rate in April 2026 is already at approximately 2 million tons, underpinning a strong start for -- to FY27.
- Lloyds Metals & Energy Ltd.'s power volumes were up by 48% in Q4FY26 YoY.
Show source
Power volumes were up 48% year-on-year in quarter 4 FY26.
- Pellet realization is around INR4,500 and EBITDA is around INR4,500 crores per ton, attributed to the market-friendly nature and its costing and logistics cost.
Show source
Coming for the capex update, the company has incurred capex of approximately INR13,500 crores during FY24 to FY26.
- Lloyds Metals and Energy Limited attributed its structural margin improvement to a higher revenue mix share of value-added products, especially pellets; benefits from the slurry pipeline flowing meaningfully into the P&L; better utilization across mining, pellets and DRI; and operating leverage as volumes scale significantly.
Show source
It is structural and is coming from higher share of value-added products, especially pellets in the revenue mix, benefits of the slurry pipeline, which has started flowing meaningfully into the P&L, better utilization across mining, pellets and DRI, operating leverage as volumes scale significantly.
Money and capital
- Lloyds Metals and Energy Limited invested INR13,500 crores in the last 4 years and said this investment will continue.
Show source
Going on with to the projects, we have invested heavily for the future, INR13,500 crores in the last 4 years, and this will continue.
- FY26 stand-alone capex was close to INR8,100.
Show source
FY26 stand-alone capex alone was close to INR8, 100, reflecting the significant investment phase we are currently in.
- Of Lloyds Metals And Energy Limited’s INR13,500 crores of capex, INR5,100 crores of assets had been capitalized, comprising mainly pellet plant 1, slurry pipeline and the DRI plant; INR1,850 crores was capital advances and the remainder was CWIP.
Show source
To give further color on capex of INR13,500 crores, we have capitalized INR5,100 crores of assets comprising mainly of pellet plant 1, slurry pipeline and the DRI plant.
- Stand-alone net debt was INR3,901 crores as on 31st March 2026.
Show source
Stand-alone net debt as on 31st March 2026 stands at INR3,901 crores, a manageable level given our EBITDA generation.
- Lloyds Metals and Energy Limited's total capex excluding the ISP for the Konsari unit is around INR28,000 crores, of which INR13,500- odd crores has been spent and INR14,500 crores remains to be spent over the next 2 years.
Show source
The total capex excluding the ISP for the Konsari unit is around INR28,000 crores is what we have of which we have already spent, as I mentioned earlier is INR13,500- odd crores.
- Lloyds Metals and Energy Limited plans to spend between INR10,000 crores to INR11,000 crores next year, including a large portion for the BHQ plant and the ISP at Chandrapur; the expected spend is around INR10,500 crores.
Show source
Next year, our plan is around between INR10,000 crores to INR11,000 crores is what we are planning to spend because that will include a lot of portion from the BHQ plant and the ISP at Chandrapur.
- Lloyds Metals and Energy Limited expects capex in '27, '28 to be INR12,500 crores plus, by which time it expects clarity on the larger steel plant at Konsari and copper; those expenditures will make the total a larger number.
Show source
And next year, it should be INR12,500 crores plus, yes, in '27, '28 by that time, we would be clear on the larger steel plant at Konsari and also the copper.
- Thriveni capex on a consolidated basis is expected to be around INR1,000 crores this current year.
Show source
Although, since you asked for consolidated, Thriveni capex would be around INR1,000 crores this year in the coming year -- this current year.
- On a consolidated basis, copper capex is expected to be near about USD200 million to USD260 million, which is near about INR2,000 crores; total capex is roughly INR15,000 crores.
Show source
So basically, on a console basis, copper will be as I mentioned earlier near about USD200 million to USD260 million.
- Lloyds Metals and Energy Limited expects capex of 15000 crores in 26-27.
Show source
Management: Console number 15000 crores for capex in this 26-27.
- Thriveni plans to reduce RPS; around INR700-odd crores was paid for RPS in April.
Show source
We have plans of reducing RPS as it was just paid around INR700-odd crores in this month of April for the RPS.
- INR2,100 crores of Thriveni's debt is RPS, of which INR700 crores is RPS.
Show source
So that INR2,100 crores in the debt is RPS of which INR700 crores is RPS.
- Thriveni's debt will reduce by INR2,000 crores over the next 3 years as RPS is repaid, and regular payments will also reduce it.
Show source
Over the next 3 years, the INR2,000 crores reduces the debt automatically comes down and the regular payments are also.
- The company has not planned any equity and does not intend to raise equity in the near future.
Show source
Equity as of now, we've not planned of anything and we don't -- in near future, so we don't intend on that.
- Any equity, if pursued, would be in the books of Thriveni if it goes for an IPO in that company at a later stage, not in this year.
Show source
Rajesh Gupta: Any equity would be if ever would be in the books of Thriveni if we go for an IPO in that company at a later stage, not in this year.
What it expects ahead
What management expects
- Cobalt capacity is expected to scale to approximately 20,000 tons in CHEMAF's 2 operating plants.
Show source
Cobalt capacity is expected to scale to approximately 20,000 tons in the 2 operating plants.
- Lloyds Metals and Energy Limited will achieve 100,000 tons of copper over the next 3 to 5 years from both CHEMAF and Surya.
Show source
Along with this, we will be achieving 100,000 tons of copper over the next 3 to 5 years from both CHEMAF and Surya.
- Lloyds Metals and Energy Limited's FY '27 guidance is iron ore production of 26 million tons, dispatches of 27 million tons, pellet of 7.75 million to 8 million tons, DRI at 825,000 tons, and wire rod mill production of around 150,000 tons as it formally enters steelmaking.
Show source
Our FY '27 guidance reflects the next change in our scale, iron ore production at 26 million tons, dispatches of 27 million tons, pellet of 7.75 million to 8 million tons, DRI at 825,000 tons and a formal entry into steelmaking with wire rod mill production at around 150,000 tons.
- Lloyds Metals and Energy Limited expects annual cost savings to surpass INR2,000 crores per annum by March '28 as logistics and sustainability initiatives mature.
Show source
We expect annual cost savings to surpass INR2,000 crores per annum as all logistics and sustainability initiatives are maturing by March '28.
- The company expects its value-added product share to improve further in FY27, with pellet plant 2 commissioned and the wire rod mill on track.
Show source
With pellet plant 2 now commissioned and the wire rod mill on track, this VAP share is expected to improve further in FY27.
- FY27 volume growth is expected to be more than 75%, including BHQ, underpinned by full-scale operations at Central Hill and completion of FY27 equipment mobilization as per schedule.
Show source
FY27 volume growth is expected to Page 6 of 19 Lloyds Metals and Energy Limited May 06, 2026 be more than 75%, including BHQ, underpinned by full-scale operations at Central Hill and completion of FY27 equipment mobilization as per schedule.
Show 16 more statements
What management expects
- Odisha operation volumes are expected to increase by 39% year-to-year to 34 million tons to 35 million tons in FY27.
Show source
Overall, the Odisha operation volumes are expected to increase by 39% year-to-year to 34 million tons to 35 million tons in FY27.
- Lloyds Metals and Energy Limited expects BHQ beneficiated ore to be 66%, 67%; it estimates a cost upside of around INR200, INR300, particularly with the government's revised notification on reduced royalties, and an upside of INR700, INR800 on selling price or usage level, including internal use, so EBITDA will go up once BHQ is commissioned.
Show source
So we think that the EBITDA will go up once the BHQ is commissioned.
- Lloyds Metals and Energy Limited expects the majority of copper investment to be made in FY27 and copper revenues and profitability to begin in FY28; the plants are near about 85% to 90% complete, and a large part of capex will be done this year to get them running as soon as possible.
Show source
So we should have the revenues and profitability from copper coming in from FY28 because as I said the plants are near about 85% to 90% complete.
- The company expects total savings of INR2,000 crores per year from 2028 onwards, including savings from the second pipeline once commissioned from Hedri to Ghugus via the Chandrapur stockyard, solar projects, green initiatives and other site initiatives.
Show source
So we have calculated a total of INR2,000 crores per year going forward from 2028 onwards.
- The company hopes to achieve 7.5 million to 8 million tons in the complete year across its two pellet plants.
Show source
And therefore, we hope to achieve 7.5 million to 8 million tons in this complete year.
- The company will consume around 9 million tons of iron ore internally this year for its pellet plant and DRI plant: around 8.8 million tons for the pellet plant and another 200,000 tons for the DRI plant.
Show source
So around 9 million tons will be consumed this year internally pellet plus DRI.
- Chemaf is expected to reach reasonably full commercial-scale production in July 2027, producing near about 8,000 tons of copper including the Surya mine; Chemaf itself will produce near about 6,000 to 5,500 tons per month.
Show source
Riyaz Shaikh: So as I answered earlier, I mean, July 2027, we should see reasonably full commercial scale production.
- Steel plant would be fully operational in FY28, with production of 1 million tons, which is 75%, 80% of capacity; its pellet plant would produce 8 million, 9 million tons, with DRI and pig iron also produced accordingly.
Show source
So we'll be having a production of 1 Page 17 of 19 Lloyds Metals and Energy Limited May 06, 2026 million tons which is 75%, 80% of the capacity.
- The company is rationalizing lower-margin operations in Indonesia and plans to redeploy equipment to higher return opportunities in Congo and PNG.
Show source
International, on Indonesia, we are rationalizing lower-margin operations and plan to redeploy equipment to higher return opportunities in Congo and PNG.
- The company is starting two new mining leases, and environmental-clearance enhancements at existing mining leases will lead to higher iron ore production than in the earlier year.
Show source
And due to that, the iron ore production is going to be higher as compared to the earlier year.
- The company is slightly slowing Indonesian operations due to lower margins; it is achieving contract volumes in Jharkhand operations and expects revenue quantity to increase more in iron ore than in coal.
Show source
So yes, we'll be increasing our revenues quantity in iron ore more as compared to coal.
- Iron ore expansion will be much more than its coal expansion.
Show source
So this is the reason that iron ore expansion will be much more as compared to coal.
- Lloyds Metals and Energy Limited expects revenue growth from higher iron ore production and says it will benefit from economies of scale.
Show source
Rajesh Gupta: No, no, revenue growth will be there, and we'll be getting the benefit of economies of scale.
- Lloyds Metals and Energy Limited expects revenue growth to be more or less in tandem with volume growth.
Show source
Rajesh Gupta: More or less, it will be the same.
- Lloyds Metals and Energy Limited expects top line growth to be more or less in tandem with volume growth, while bottom line growth will be faster because of economies of scale.
Show source
Bottom line will be faster because of economies of scale.
- The company said there is no increase in volume and that this is the maximized volume it has. Replaced by a later filing.
Show source
Rajesh Gupta: There is no increase in volume.
What it is building and selling
Projects and capacity
- Lloyds Metals and Energy Limited completed 2 pellet plants at Konsari, in Gadchiroli, reaching capacity of 8 million tons.
Show source
Konsari, in Gadchiroli, we have completed the 2 pellet plants reaching capacity of 8 million tons, making us the largest merchant pellet player by far.
- Lloyds Metals and Energy Limited completed its mine capacity increase at Hedri from 3 million to 55 million tons, with a sellable output of 26 million tons over the last 4 years.
Show source
In the mine at Hedri, we have completed our mine capacity increase from 3 million to 55 million tons with a sellable output of 26 million tons over the last 4 years.
- Lloyds Metals and Energy Limited's DRI capacity in Chandrapur doubled and its power capacity tripled to a stable 100 megawatts.
Show source
Meanwhile in Chandrapur, the DRI capacity doubled, our power capacity has tripled to a stable 100 megawatts, sorry, and it is stabilized.
- Lloyds Metals and Energy Limited's 1.2 million tonne wire rod steel plant in Chandrapur, comprising a blast furnace, arc furnace, coke oven and rolling mill, is well underway for commissioning for last quarter this year.
Show source
The steel plant that is a blast furnace, arc furnace, coke oven and rolling mill of 1.2 million tonne wire rod is well underway for commissioning for last quarter this year.
- Lloyds Metals and Energy Limited's third pellet plant engineering in Chandrapur is nearing completion, along with a 195-kilometer pipeline from Hedri to Ghugus via Chandrapur stockyard.
Show source
The engineering of this third pellet plant is also nearing complete in Chandrapur, along with a 195-kilometer pipeline from Hedri to Ghugus via Chandrapur stockyard.
- Lloyds Metals and Energy Limited's planned 195-kilometer pipeline from Hedri to Ghugus via Chandrapur stockyard will reduce logistics cost for most of its iron ore output by more than INR500 a ton and is in advanced planning stage.
Show source
This pipeline will reduce logistic cost for most of the iron ore output by us by more than INR500 a ton and is in advanced planning stage.
Show 33 more statements
Projects and capacity
- Thriveni's operations in Odisha and Jharkhand continued to grow, with 3 new mining operations starting.
Show source
Other than Surjagarh, the growth in Thriveni operations in Odisha and Jharkhand continue with 3 new mining operations starting.
- Lloyds Metals and Energy Limited successfully commissioned the Surya copper plant in 6 months.
Show source
I want to congratulate his team and him for successful commissioning of the Surya copper plant in 6 months.
- Lloyds Metals and Energy Limited has a defined pathway to expand capacity to 30,000 tons per annum at Surya mines.
Show source
We have defined pathway to expand capacity to 30,000 tons per annum at Surya mines.
- The company commissioned its second pellet plant in May 2026, taking total pellet capacity to 8 million tons per annum.
Show source
This takes our total pellet capacity to 8 million tons per annum and positions us strongly for FY27 volume growth.
- The environmental capacity at Surjagarh mines increased from 10 million tons per annum to 55 million tons per annum.
Show source
The environmental capacity at Surjagarh mines has been increased from 10 million tons per annum to 55 million tons per annum, a massive regulatory win that unlocks significant volume headroom.
- Gwalior Iron Ore mine production capacity increased from 7.4 million tons per annum to 9 million tons per annum.
Show source
Gwalior Iron Ore mine production has also been enhanced from 7.4 million tons per annum to 9 million tons per annum.
- Sarojini Pradhan mine capacity increased from 0.57 million tons to 4.9 million tons per annum.
Show source
Sarojini Pradhan mine has scaled up from 0.57 million tons to 4.9 million tons per annum.
- Operations at Dalpahar iron ore mines, a new mine, are expected to commence in Q1 of FY27, with an FY27 production target of 3 million tons.
Show source
Dalpahar iron ore mines, it’s a new mine and the operations are expected to commence in Q1 of FY27 with FY27 production target of 3 million tons.
- At Lasarda-Pacheri mines, a new mine, the MDPA has been signed and operations are to commence in Q1 FY27, with an FY27 production target of 1.5 million tons per annum.
Show source
Lasarda-Pacheri mines, again, a new mine, the MDPA has been signed and operations are to commence in Q1 FY27 with the FY27 production target of 1.5 million tons per annum.
- Sree Metaliks mine capacity increased from 1.5 million tons to 1.8 million tons.
Show source
Sree Metaliks mine capacity has been increased from 1.5 million tons to 1.8 million tons.
- IPCC was commissioned on 11th August '25 and handled 2.89 million tons.
Show source
IPCC commissioned on 11th August '25, handling 2.89 million tons.
- Lloyds Metals and Energy Limited expects to commission the first phase of its BHQ project by December 2027, with 30 million tons of input and around 12 million tons of output.
Show source
Rajesh Gupta: So our -- in my opening remarks, I mentioned that by December 2027, BHQ first phase of 30 million tons input and around 12 million tons output would be commissioned.
- Lloyds Metals and Energy Limited has mobilized construction equipment for its BHQ project, started crushing material, and will move material to and evacuate it from the site in this year; the material will be accumulated there over the next 2 years.
Show source
The crushing of the material has started, and we'll be pushing the material on to the site and getting it evacuated from the site in this year.
- Lloyds Metals and Energy Limited says total engineering for the BHQ project is more or less complete and 85%, 90% of the main ordering has been ordered with 5-star parties.
Show source
The main ordering of 85%, 90% has been ordered with 5-star parties.
- Once the second pipeline from Hedri to Ghugus via the Chandrapur stockyard is commissioned, transporting all 16 million tonnes of material by pipeline instead of trucks to railway sidings or customers would save INR500 to INR600 a ton.
Show source
Rajesh Gupta: I mentioned INR2,000 crores over the next -- once the second pipeline is commissioned from Hedri to Ghugus via the Chandrapur stockyard, all our 16 million tonnes of material, which is now being transported to the railway sidings or to various customers by truck, INR600 to, INR500 a ton would be saved, so that itself is INR1,000 crores plus whatever pipeline we're Page 13 of 19 Lloyds Metals and Energy Limited May 06, 2026 already doing right now plus our solar projects and other green initiatives plus various initiatives during all the sites.
- The company is studying and applying to the government for relevant permissions for pellet-plant debottlenecking, expects to get them by year-end by FY'27, and expects increased production next year.
Show source
We should get that by year-end by FY'27, so next year we will see an increased production in that.
- Target is 10 million tons of pellet capacity with the two plants; it gave no guidance on this.
Show source
Rajesh Gupta: No guidance on that, but yes, that is the target.
- The company is planning a Phase 2 slurry pipeline of 16 million tons, with the plants' entire capex to be completed within 2 years.
Show source
Riyaz Shaikh: The Phase 2 slurry pipeline is the 16 million tons what we are planning.
- The company evacuates product from the current pellet plant by truck or from a railway siding around 80 kilometers, 70 kilometers away.
Show source
This product is being evacuated either by truck or by -- from a railway siding, which is around 80 kilometers, 70 kilometers away.
- Slurry pipeline is completed for 85 kilometres.
Show source
And we also commissioned along with the 85-kilometer slurry pipeline, which is delivering now cost savings and operational stability.
- Lloyds Metals and Energy Limited's first train would be ready by June 2027.
Show source
All major machines are ordered on a key European supplier, and we are well in target of first phase readiness by December 2027.
- Lloyds Metals and Energy Limited's BHQ beneficiation project has delivered excellent pilot plant yields; major engineering contracts are completed and construction machinery is mobilized.
Show source
Pilot plants results have delivered excellent yields and major engineering contracts are completed, construction machine mobilized.
- Capex funded two pellet plants, TRI expansion, slurry pipeline and ongoing capex of the steel plant; execution was on track and within approved budgets.
Show source
Key projects funded into 2 pellet plants, TRI expansion, slurry pipeline and the ongoing capex of the steel plant.
- Lloyds Metals and Energy Limited said its pellet plant helped establish the final engineering for the BHQ project.
Show source
The pellet plant has helped us a lot in establishing the final engineering, and that is the status.
- The same pipeline commissioned around a year back is feeding both commissioned pellet plants at Lloyds Metals And Energy Limited.
Show source
The same pipeline is now feeding both the pellet plants that are commissioned.
- The company has a large expansion at Surjagarh. Replaced by a later filing.
Show source
And Surjagarh also, we have got a large expansion.
- The company is going to increase operations at Surjagarh. Replaced by a later filing.
Show source
So there also, we are going to increase it.
Demand and pricing
- Lloyds Metals and Energy Limited maintained pricing parity with competition alongside a volume increase of 120% and the start of new products such as pellet.
Show source
Pricing parity with competition is maintained along with the volume increase of 120% and new products like pellet started.
- Lloyds Metals and Energy Limited said higher pellet volumes required it to seek new markets, lowering pellet realizations because newer markets are farther away; some earlier tenders have not been re-established, and the company has been doing more exports.
Show source
Rajesh Gupta: As volumes have gone up in pellet, we have had to search new markets, and that is why the pellet realizations are a little lower because the newer markets are at a distance.
- Lloyds Metals and Energy Limited said iron ore pricing is more or less market-driven and is in line with the rest of the market and the steel market. Replaced by a later filing.
Show source
On the pricing of iron ore, it's more or less driven by the market.
Segments
- CHEMAF is a large operating copper cobalt platform in the Katanga copper belt with 50-plus permits.
Show source
CHEMAF is a large operating copper cobalt platform in the Katanga copper belt with 50-plus permits.
- Part of the pellet could also be consumed internally in the DRI plant. Replaced by a later filing.
Show source
Part of the pellet could also be consumed internally is the steel -- in the DRI plant.
Deals and partners
- MDO and exploration contract on Geomysore Gold Mining commenced in January '26 and has a targeted EBITDA contribution of approximately INR60 crores in FY27, with further upside as exploration progresses.
Show source
On Geomysore Gold Mining, our MDO and exploration contract commenced in Page 7 of 19 Lloyds Metals and Energy Limited May 06, 2026 January '26, we have a targeted EBITDA contribution of approximately INR60 crores in FY27, a meaningful new revenue stream with further upside as exploration progresses.
Everything else said on the call
Group structure
- The company owns 49% of Chemaf but has operational control because it runs the operations, so Chemaf is consolidated into Lloyds Metals And Energy Limited's books.
Show source
So that is why because of that reason, even though we are 49%, we have operational control and thus it gets consolidated into our books.
- Lloyds Metals & Energy Ltd. acquired a 49% stake in Chemaf Group, entering an operating copper–cobalt platform in the DRC.
Show source
In addition, we have acquired 49% in CHEMAF Group.
- The company has created a company for future actions in the country; no asset has been taken over, and it has only got rights, with nothing acquired.
Show source
We have got the rights only and nothing has been acquired and we, like I say, setting our foot into the area.
Other
- Lloyds Metals and Energy Limited crossed a market capitalization of INR1 lakh crores.
Show source
It fills me with immense pride to share that Lloyds had crossed the converted market cap of INR1 lakh crores, a milestone that we have seemed distant not long ago.
- Thriveni ranked number 1 among 383 open cast mines in India, according to the Ministry of Coal.
Show source
Thriveni ranked number 1 among 383 open cast mines in India by the Ministry of Coal, a reflection of operational excellence across the group.
What the company said on its earnings call, taken from its own transcript. Not advice.
Questions and answers
Question
Amit Dixit: Okay, okay, okay. The second question I have is on the Congo operations and congratulations for starting the copper operations over there. Just wondering what kind of incremental capex you expect to incur in both copper and cobalt project to reach the capacities that you have mentioned? Also on the related note, this geography is not the easiest one to work. So what specific steps you are taking to ensure that -- because you have started operations and I would say I don't recall any other company that has done that in such a small time. Management: Yes. So thanks again, Amit. Yes, definitely, it's a new territory, and that's why the new opportunities are coming out of it. And tha
Answer, rajesh gupta
Rajesh Gupta: In iron ore, we are starting 2 new mining leases. And for the other mining leases where we are already doing, we have got the environmental clearances enhancement. And due to that, the iron ore production is going to be higher as compared to the earlier year. And in respect of coal, as we stated, Indonesian operations, we are slightly slowing down due to lower margins. And Jharkhand operations, the contract volumes and all these things we are achieving. So yes, we'll be increasing our revenues quantity in iron ore more as compared to coal. And Surjagarh also, we have got a large expansion.
Answer, rajesh gupta
So there also, we are going to increase it. So this is the reason that iron ore expansion will be much more as compared to coal.
Question
Vikas Singh: Okay. Sir, just a follow-up question on this. In the remarks, somebody said that 37%, 39% higher iron ore production could be there. Would our revenue follow the similar model or the rates are different and revenue growth would be lower than that?
Answer, rajesh gupta
Rajesh Gupta: No, no, revenue growth will be there, and we'll be getting the benefit of economies of scale. So our revenues will be much, much better.
Question
Vikas Singh: So would that go in tandem with the volume assuming the same kind of rates we are getting across the board or the intensity would be lower than the volume growth? That's what I was asking effectively.
Answer, rajesh gupta
Rajesh Gupta: More or less, it will be the same.
Answer, riyaz shaikh
Riyaz Shaikh: Top line would be more or less the same. Bottom line will be faster because of economies of scale.
Question
Vikas Singh: Sir, pellet realization sequentially was down as per our own presentation, while the iron ore has been up sharply. So just wanted to understand...
Answer, rajesh gupta
Rajesh Gupta: As volumes have gone up in pellet, we have had to search new markets, and that is why the pellet realizations are a little lower because the newer markets are at a distance. Some tenders were there earlier, which we have not been able to re-establish again. And we've been doing a little bit more export. On the pricing of iron ore, it's more or less driven by the market. We are in line with the rest of the market and the steel market.
Question
Vikas Singh: Noted, sir. And sir, lastly, if you could give us some update on your BHQ project because next year, if I remember correctly, we wanted to do more of a low-grade beneficiation versus the high-grade sales.
Answer, rajesh gupta
Rajesh Gupta: So our -- in my opening remarks, I mentioned that by December 2027, BHQ first phase of 30 million tons input and around 12 million tons output would be commissioned. And the land is with us. The equipment has been mobilized -- the construction equipment has been mobilized. The crushing of the material has started, and we'll be pushing the material on to the site and getting it evacuated from the site in this year. And over the next 2 years, that material will be accumulated there. And as far as the project itself is concerned, we are going ahead with -- the total engineering is more or less complete. The main ordering of 85%, 90% has been ordered with 5-star parties.
Answer, rajesh gupta
The pellet plant has helped us a lot in establishing the final engineering, and that is the status.
Question
Vikas Singh: Since we are beneficiating and the mining ratio to output is lower, do we expect that once the BHQ picks up our overall blended EBITDA per ton on the iron ore side at least would settle on a lower scale?
Answer, rajesh gupta
Rajesh Gupta: We think it's on a higher scale because BHQ beneficiated ore will be 66%, 67%. The cost upside is around INR200, INR300, I think we explained in the last con-call and particularly with the revised notification of the government on reduced royalties. So the upside on the cost will be around INR200, INR300. The upside on the selling price or on the usage level, even if we do it internally, will be at INR700, INR800. So we think that the EBITDA will go up once the BHQ is commissioned.
Question
Vikas Singh: This is adjusted for the mining ratio you're talking about. Page 11 of 19 Lloyds Metals and Energy Limited May 06, 2026 Rajesh Gupta: Absolutely.
Answer, riyaz shaikh
Riyaz Shaikh: Thanks Jashandeep. The total capex excluding the ISP for the Konsari unit is around INR28,000 crores is what we have of which we have already spent, as I mentioned earlier is INR13,500- odd crores. So that remains with the INR14,500 crores to be spent over the next 2 years. Next year, our plan is around between INR10,000 crores to INR11,000 crores is what we are planning to spend because that will include a lot of portion from the BHQ plant and the ISP at Chandrapur. It should be around INR10,500 crores. And next year, it should be INR12,500 crores plus, yes, in '27, '28 by that time, we would be clear on the larger steel plant at Konsari and also the copper. So all those expenditures will be further included in this and should be a larger number.
Answer, rajesh gupta
Rajesh Gupta: FY27 also, there will be copper investments. Yes. Management: So actually, majority of the copper investment will get done in FY27. So we should have the revenues and profitability from copper coming in from FY28 because as I said the plants are near about 85% to 90% complete. So we want to get them running ASAP and that's why a large part of the capex will actually be done this year.
Answer, rajesh gupta
Rajesh Gupta: And to this we would have to add Thriveni capex. Although, since you asked for consolidated, Thriveni capex would be around INR1,000 crores this year in the coming year -- this current year.
Answer, riyaz shaikh
Riyaz Shaikh: No. That's on a standalone basis.
Answer, riyaz shaikh
Riyaz Shaikh: In terms of capex, you are asking? So basically, on a console basis, copper will be as I mentioned earlier near about USD200 million to USD260 million. So we can add near about INR2,000 crores for that. Page 12 of 19 Lloyds Metals and Energy Limited May 06, 2026 Rajesh Gupta: INR15,000 crores roughly.
Answer, rajesh gupta
Management: Console number 15000 crores for capex in this 26-27.
Answer, jashandeep chadha
Jashandeep Chadha: And any plan of deleverging Thriveni because most of the debt on the console book is from Thriveni. So any plan for the next 2 years to reduce the debt on Thriveni? And what is your target net debt to EBITDA that the management is internally working with?
Answer, riyaz shaikh
Riyaz Shaikh: Thriveni debt, yes, we are looking at. We have plans of reducing RPS as it was just paid around INR700-odd crores in this month of April for the RPS. So that INR2,100 crores in the debt is RPS of which INR700 crores is RPS. Over the next 3 years, the INR2,000 crores reduces the debt automatically comes down and the regular payments are also.
Answer, riyaz shaikh
Riyaz Shaikh: Yes, debt we would be raising. As we have mentioned, we should have a proper mix of debt. The debt should be around 1, 1.5x of the EBITDA, not more than that. That is what our numbers would be. Equity as of now, we've not planned of anything and we don't -- in near future, so we don't intend on that.
Answer, rajesh gupta
Rajesh Gupta: Any equity would be if ever would be in the books of Thriveni if we go for an IPO in that company at a later stage, not in this year.
Answer, jashandeep chadha
Jashandeep Chadha: Understood, sir. And sir, my last question will be largely towards the new government regulation, which came, which is now is fixing ASP for iron ore grade below 45% with the close to two-third of your reserves being in that category. While I understand benefication will be there and you will be selling, output will be higher grade. But just wanted to understand how does that regulation or how does the management look at that regulation, whether they will benefit in terms of royalty or whether there will be benefit in more offtakes happening of the lower grade? Just wanted to understand that?
Answer, rajesh gupta
Rajesh Gupta: So the royalty is paid on material going out of the mine and the lower grade of less than 45 or less than 35 would be going out of the mine and paying a royalty at the rate of 50% or 75%, respectively. So that would reduce our BHQ output cost to the BHQ plant. So it helps us in terms of reduction of cost.
Answer, rajesh gupta
Rajesh Gupta: I mentioned INR2,000 crores over the next -- once the second pipeline is commissioned from Hedri to Ghugus via the Chandrapur stockyard, all our 16 million tonnes of material, which is now being transported to the railway sidings or to various customers by truck, INR600 to, INR500 a ton would be saved, so that itself is INR1,000 crores plus whatever pipeline we're Page 13 of 19 Lloyds Metals and Energy Limited May 06, 2026 already doing right now plus our solar projects and other green initiatives plus various initiatives during all the sites. So we have calculated a total of INR2,000 crores per year going forward from 2028 onwards.
Answer, jashandeep chadha
Jashandeep Chadha: Understood, sir. Thank you so much for this and I will join back the queue.
Question
Ritesh Bhagwati: So basically, I want to understand our stake acquisition that we have done for Lloyds Panguna, which we will engage with Bougainville Copper Limited. So if you can just provide some clarity on the strategy road map, anticipated time line for securing mining rights?
Answer, rajesh gupta
Rajesh Gupta: No asset has been taken over. It's -- we have created a company for future actions in that country. It is a very active -- was a very active mine 40 years back with port built, roads built and the mine commissioned and well established, etcetera, with fairly rich copper and gold deposit, but it's still in the discussion stage. We have got the rights only and nothing has been acquired and we, like I say, setting our foot into the area. Page 14 of 19 Lloyds Metals and Energy Limited May 06, 2026 Ritesh Bhagwati: Okay.
Question
So just lastly, on our pellet plant. So like we have recently commissioned our second pellet plant as well. So what I want to understand is when do we expect both pellet plants together to reach the expanded capacity of 10 million tons per annum from our original 8 million tons per annum?
Answer, rajesh gupta
Rajesh Gupta: It's 8 million tons. 2 x 4, 8 million tons. The first plant -- the first 9 months of operation has achieved 3 million tons, which is within the capacity. We hope to repeat that in the second plant as well. And therefore, we hope to achieve 7.5 million to 8 million tons in this complete year.
Question
Parth Kotak: Hi, thanks for taking mine and congratulations for a good set of numbers. Sir, actually, I have a couple of questions. The first one is an extension to the previous participant's question. I understand that now since MDO is integrated with our operations, if you could just give a bit of colour on our receivable days and inventory days and payable days for the consolidated entity going ahead. And second, sir, if you could just on an accounting side, provide the number for IPS benefit this year, it would be really helpful?
Answer, rajesh gupta
Rajesh Gupta: On the IPS benefits, basically, it is right now around 1 year in accrual, 1 year post the claim to be made. The claim would be made in June. for the last year. So we would get the money in June 2027 for current year. We're trying to see how that can be expedited. For the consolidated receivables data, I think this question is a very interesting question. We don't have a clear cut answer on why exactly that movement is there. We'll come back very shortly on that.
Answer, riyaz shaikh
Riyaz Shaikh: In Thriveni, receivables is 15 to 30 days.
Answer, rajesh gupta
Rajesh Gupta: In Thriveni, the receivables are 15 to 30 days.
Answer, riyaz shaikh
Riyaz Shaikh: Private miner owners, but in coal it is 15 days, Rajesh Gupta: So we have to -- and so it is similar in Lloyd Metals.
Answer, rajesh gupta
We'll figure out exactly the reasoning behind it and come back. Page 15 of 19 Lloyds Metals and Energy Limited May 06, 2026 Moderator: Thank you.
Show 9 more questions
Question
Harsh Shah: Yes. Hi, good afternoon, sir. Sir in your slide you have given a guidance of 26 million tons for FY27 production of iron ore. Can you give us a split how much of this will be consumed internally for the downstream products, and what will be sold outside?
Answer, rajesh gupta
Rajesh Gupta: Around 8.85 million tons -- 8.8 million ton will be consumed internally for the pellet plant. And the DRI plant another 200,000 tons. So around 9 million tons will be consumed this year internally pellet plus DRI. Part of the pellet could also be consumed internally is the steel -- in the DRI plant.
Question
Siddharth Gadekar: So secondly, in terms of the ramp-up on Chemaf, how should one think about the ramp-up in this asset?
Answer, riyaz shaikh
Riyaz Shaikh: So as I answered earlier, I mean, July 2027, we should see reasonably full commercial scale production. So we should be producing near about 8,000 tons of copper, including the Surya mine. So only Chemaf itself, it will be near about 6,000 to 5,500 tons per month. Page 16 of 19 Lloyds Metals and Energy Limited May 06, 2026 Siddharth Gadekar: Sir, and the entire debt will get consolidated into our console balance sheet or how should one think about that?
Answer, riyaz shaikh
Riyaz Shaikh: Yes, that's right. So although we own 49%, but because we are having the operational control on the ground and we are the ones who are running the operations, which is typically for us as something which we like and control because effectively we need the operational controls to make the assets worth. So that is why because of that reason, even though we are 49%, we have operational control and thus it gets consolidated into our books.
Question
Siddharth Gadekar: Okay. Sir, lastly, on the standalone operations on the pellet, we have spoken about some debottlenecking that we were doing on the standalone operation. So when should we start seeing the benefit of that debottlenecking coming in?
Answer, rajesh gupta
Rajesh Gupta: We are studying and applying to the government for relevant permissions. We should get that by year-end by FY'27, so next year we will see an increased production in that.
Question
Siddharth Gadekar: So effectively, we can go to 10 million tons of pellet capacity with these two plants?
Answer, rajesh gupta
Rajesh Gupta: No guidance on that, but yes, that is the target.
Question
Netra Deshpande: So what would be Phase 2 cost of and the time line for the overall total project for the slurry pipeline, capacity of utilization and overall volume. total take up and ramping up.
Answer, riyaz shaikh
Riyaz Shaikh: The Phase 2 slurry pipeline is the 16 million tons what we are planning. This is -- the plants for the entire capex to be completed within 2 years, as we mentioned earlier also.
Question
Netra Deshpande: Okay. And my next question is about what would be the revenue growth in terms of volume of iron ore and value-added products for FY27 and FY28?
Answer, rajesh gupta
Rajesh Gupta: There is no increase in volume. This is the maximized volume that we have. FY27 we just discussed. FY28 our steel plant would be operational fully. So we'll be having a production of 1 Page 17 of 19 Lloyds Metals and Energy Limited May 06, 2026 million tons which is 75%, 80% of the capacity. Plus the pellet plant would be producing at 8 million, 9 million tons. So that will be the value added product range and relevantly DRI and pig iron etcetra would be also reproduced according to that.
Question
Netra Deshpande: Okay. Thank you. And sir one more which is what would be the intersegment segment in terms of captive iron ore that they are using because after the exhibition as we can see that inter- segment revenue have ramped up. It is somewhere around 4000 crores FY26. So what would be for Thriveni MDO intra-group dealing worth something for FY27 and if you can put some light because captive transfer of INR907 crores, which we can see the reflection in this?
Answer, rajesh gupta
Rajesh Gupta: I don't think we are ready with that exact figure that you're looking for. We'll come back shortly on that.
Question
Vedant Sarda: Thank you for the opportunity and congratulations on great results. Sir, we have guided 26 million ton of iron ore and double down on our pellet production and DRI production for FY'27. So can you broadly tell us the revenue growth and EBITDA growth for FY27 on the current realization of iron ore?
Answer, rajesh gupta
Rajesh Gupta: I think the figures are all with you. We leave it to the analysts to analyze and confirm the figures.
Question
Tanmay Chaudhary: Yes, sir. I'm asking on the evacuation plant to the pipeline and on the transport side, like for feeding our recently commenced pellet plant?
Answer, rajesh gupta
Rajesh Gupta: So the recently commissioned pellet plant is being fed by the pipeline that was commissioned around a year back. The same pipeline is now feeding both the pellet plants that are commissioned. This product is being evacuated either by truck or by -- from a railway siding, which is around 80 kilometers, 70 kilometers away. That's as far the evacuation for the current pellet plant and material into the pellet plant is concerned. Does it answer the question?
Questions about this call
- When was the Lloyds Metals And Energy Q4 FY26 earnings call transcript filed?
- Lloyds Metals And Energy filed the transcript with the exchange on 11 May 2026. This page is built from that transcript.
- What does this page list?
- 120 statements from the transcript across 9 topics, 97 of them with a figure. Each statement is shown with the transcript sentence it came from.
- Are the analysts' questions included?
- Yes. 19 questions and management's answers are listed in the order they were asked, as the transcript prints them.
- Who wrote this page?
- DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.