Earnings call
Mtar Technologies Q1 FY26 earnings call: MTAR Technologies Limited delivered approximately INR25 crores in aerospace and defence orders during Q1 FY '26
By DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person.
Transcript filed .
MTAR Technologies Limited delivered approximately INR25 crores in aerospace and defence orders during Q1 FY '26. MTAR Technologies Limited anticipates sequential improvements quarter-on-quarter, particularly in the second half of FY '26, and expects stronger revenue growth in H2, driven by operating leverage and scaling up production for new products developed in Clean Energy and Aerospace sectors over the past few years. MTAR Technologies Limited is setting up a new dedicated facility to meet demand from India's strategic push to increase nuclear power capacity to 100 gigawatts by 2047; the facility will expand capacity and enhance delivery capabilities in the civil nuclear vertical. MTAR Technologies Limited registered approximately INR5.4 crores in civil nuclear sector revenues during Q1 FY '26. Each hot box generates 65 kilowatts, and its output could go up to 75 as the technology changes.
The numbers management gave
Results
- MTAR Technologies Limited registered approximately INR5.4 crores in civil nuclear sector revenues during Q1 FY '26.
Show source
In civil nuclear sector, we registered revenues of approximately INR5.4 crores during Q1.
- MTAR Technologies Limited registered INR21 crores in products and other verticals revenues in Q1 FY '26 and expects 20% growth in this segment for FY '26.
Show source
Finally, in the products and other verticals, we registered revenues of INR21 crores in this quarter and expect a 20% growth in this segment for FY '26.
- MTAR Technologies Limited reported revenue from operations of INR156.6 crores in Q1 FY '26 compared with INR128.3 crores in Q1 FY '25, a 22.1% year-on-year increase.
Show source
Page 4 of 17 MTAR Technologies Limited August 06, 2025 Building Nation with Exceptional Engineering So the revenue from operations stood at INR156.6 crores in Q1 FY '26 compared to INR128.3 crores in Q1 FY '25, a 22.1% year-on-year increase.
- MTAR Technologies Limited reported EBITDA of INR28.4 crores in Q1 FY '26 compared with INR16.6 crores in Q1 FY '25, a 70.9% year-on-year increase.
Show source
EBITDA was reported at INR28.4 crores in Q1 FY '26 up from INR16.6 crores in Q1 FY '25, a robust 70.9% year-on-year increase.
- MTAR Technologies Limited reported profit before tax of INR114.8 crores in Q1 FY '26 compared with INR6.2 crores in Q1 FY '25, reflecting 138.7% year-on-year growth.
Show source
Profit before tax stood at INR114.8 crores as against INR6.2 crores in Q1 FY '25, reflecting a 138.7% year-on-year growth.
- MTAR Technologies Limited's working capital days increased to 267 days from 229 days in the previous quarter, mainly because of lower revenue realization from some customers amid the ongoing conflict in that region; the company received almost $2.5 million in the first week of the end of the quarter.
Show source
In case of working capital days, it has increased to 267 days from 229 days in the previous quarter.
Show 9 more statements
Results
- MTAR Technologies Limited’s working capital days were 267 days, up from 229, because it could not receive almost $2 million worth of receivables from some customers in the Israeli area due to the ongoing war, while some other customers paid in the first week of July; including those payments, working capital days were the same as the last quarter.
Show source
Gunneswara Rao: 267 days.
- Bloom's average run rate was INR100 crores per quarter or INR110 crores per quarter in that range.
Show source
Srinivas Reddy: We have done an average run rate of, let's say, INR100 crores per quarter or INR110 crores in that range, which I can go up through -- as I mentioned earlier, the question asked me what was asked earlier.
- MTAR Technologies Limited’s gross margin was higher because substantial work on long operating cycle civil nuclear power, FMBC and FT systems was reflected as a change in inventory, and some clean energy products were manufactured for subsequent quarters; production exceeded sales during the last quarter.
Show source
So that is reflecting the higher gross margin.
- Bloom Energy's product requirement for Mtar Technologies Limited was slightly less than supposed in the quarter, but is expected to catch up in subsequent quarters; Mtar Technologies Limited is also adding products for export in subsequent quarters.
Show source
Srinivas Reddy: Not exactly a degrowth because the kind of product requirement that they had for this quarter was slightly less than what it's supposed to be, but it's going to catch up in subsequent quarters.
- Bloom Energy had enough inventory of one of Mtar Technologies Limited's products, ASPs, and asked Mtar Technologies Limited to ship more in subsequent quarters; Mtar Technologies Limited is also adding ball screws and valves for export to defence organizations and expects to achieve that growth by year-end.
Show source
It's because of one of the products like ASPs, there were enough inventory levels in Bloom and they've asked us to ship a lot more in the subsequent quarters.
- MTAR Technologies Limited said WIP increased because a lot of work is done in the form of WIP in the first quarter and will be dispatched in the subsequent quarter.
Show source
That is the reason for increase in WIP.
Money and capital
- MTAR Technologies Limited is spending around INR70 crores on capex for the oil and gas sector in FY '26; total capex will be around INR100-plus crores in FY '26, including sustenance capex and other equipment, while sustenance capex for next year is around INR25 crores to INR30 crores.
Show source
It will be around INR100-plus crores for this financial year.
- MTAR Technologies Limited plans to fund this with maybe 70% from debt and 30% from internal accruals; its existing debt is around INR120 crores, which it is repaying within 2 to 3 years, and this will be funded by term loans.
Show source
Gunneswara Rao: See, we are going to take some debt also, maybe 70% is from the debt and 30% internal accruals we'll do.
- Working capital days were 222 days as of December and are projected to be around 225 days by the end of this financial year; the company aims to reduce them to 175 days in the long run, perhaps from FY '27 onward, while 200 days is required because of various projects and projected 30% increased revenue in FY '26.
Show source
However, we are targeting to reduce our working capital days to 200 days by end of this financial year.
What it expects ahead
What management expects
- MTAR Technologies Limited anticipates sequential improvements quarter-on-quarter, particularly in the second half of FY '26, and expects stronger revenue growth in H2, driven by operating leverage and scaling up production for new products developed in Clean Energy and Aerospace sectors over the past few years.
Show source
As communicated in the previous quarter, we anticipate sequential improvements quarter-on- quarter basis, particularly in the second half of the year.
- MTAR Technologies Limited anticipates civil nuclear division orders close to about INR1,000 crores during FY '26, coming in over the next 3 to 6 months.
Show source
And as I mentioned earlier, during the current financial year, we are anticipating orders close to about INR1,000 crores coming in from the nuclear division over the next 3 to 6 months.
- MTAR Technologies Limited anticipates delivering orders worth around INR60 crores in the civil nuclear sector in FY '26.
Show source
We anticipate delivering orders worth around INR60 crores in this sector in FY '26 underscoring our ongoing commitment to supporting the nuclear power industry with highly specialized products for the core of the reactor.
- MTAR Technologies Limited expects the civil nuclear segment to grow exponentially year-on-year from FY '27 onwards, based on the orders it expects to receive during FY '26.
Show source
And this segment is going to grow exponentially year-on-year basis from FY '27 onwards based on the kind of orders that we are expecting to come in during the current financial year.
- MTAR Technologies Limited expects nuclear orders of close to INR1,000 crores to come in this quarter and next quarter, within the next 3 to 6 months; these orders are not part of its execution plan for this current financial year and must be executed on a fast-track basis within 3 years.
Show source
We expect to receive approximately INR1,000 crores in the next 3 to 6 months.
- MTAR Technologies Limited generated around INR45 crores in aerospace revenue last year and is targeting almost INR100 crores to INR120 crores by the end of this financial year, with growth driven by repeat business from existing customers and increased production capacity at the separate unit commissioned last year in Pashamylaram in Hyderabad.
Show source
This year, we are targeting almost INR100 crores to INR120 crores of revenue by end of this financial year.
Show 36 more statements
What management expects
- Srinivas Reddy said Bloom would probably look at doing the complete assembly over the next 2 years.
Show source
So I would see over the next 2 years, probably they would look at doing the complete assembly.
- Bloom gave MTAR Technologies Limited a forecast 25% higher than what it is doing this year, just after tariffs were announced.
Show source
So first answer to your question of order inflow is, see, basically, the forecast from Bloom has been given just after the tariffs were announced, they've given 25% higher numbers than what we are doing this year.
- Bloom’s order inflow for MTAR Technologies Limited is about 25% or more higher than the current year.
Show source
So we are -- so the order inflow is much higher compared to the current year by about 25% or more.
- MTAR Technologies Limited conservatively says growth will be 15%, 20%, but expects a lot more because its wallet share is increasing across various segments it works on with Bloom.
Show source
And when we talk about the growth, yes, we say conservatively 15%, 20%, but we always say that, but we are expecting a lot more because of our increase in wallet share in various segments what we are working with Bloom.
- MTAR Technologies Limited expects exponential growth in its nuclear division moving forward in the next 3 years.
Show source
That's why we see a lot of exponential growth in nuclear division moving forward in the next 3 years.
- The company expects orders for all other reactor-refurbishment projects within 3 to 6 months, based on the L1 category.
Show source
And the information I have is maximum the outlay of time to get the orders in place for refurbishment of reactors based on the L1 category, we are expecting within 3 to 6 months time for all other refurbishing reactors.
- The Chairman of ISRO announced that semi-cryo engines will most probably start being used by FY '27.
Show source
Now semi-cryo, Renu, is basically, if you have heard about this, the Chairman of ISRO has announced that most probably by FY '27, they will launch -- start using the semi-cryo engines.
- MTAR Technologies Limited is targeting aerospace revenue of more than INR100 crores to INR120 crores compared to INR45 crores in the last year, and needs to order raw material in minimum batch sizes.
Show source
And the RM also because of the aerospace revenue, which we are targeting more than INR100 crores to INR120 crores compared to INR45 crores in the last year.
- MTAR Technologies Limited may see increased WIP as it expects a lot more orders in the nuclear sector, with work and dispatch taking 2 to 3 years; WIP may increase in absolute terms while days may come down because of higher revenue projections.
Show source
In absolute terms, WIP may increase, but days may come down because of the higher revenue projections.
- MTAR Technologies Limited is looking at close to INR140 crores to INR150 crores of revenues from Bloom per quarter next year.
Show source
So next year, we're looking at about close to INR140 crores to INR150 crores of revenues coming from Bloom per quarter.
- MTAR Technologies Limited said the Fluence program may reflect in FY '27 after Proto 2 is completed and the product is finalized.
Show source
So what we are looking at is once that is done, then we'll be able to talk about the agreement, the future and things like that, probably it can reflect in FY '27.
- The forecast for Bloom might tax about INR130 crores, INR140 crores or INR150 crores per quarter.
Show source
So the way the kind of forecast is given probably might tax about INR130 crores, INR140 crores, INR150 crores per quarter.
- MTAR Technologies Limited expects FY '26 revenue growth of 25% and EBITDA margins of 21%, plus or minus 100 basis points.
Show source
We remain committed very clearly to our FY '26 guidance of 25% revenue growth and an EBITDA margin of 21%, plus/minus 100 basis points.
- MTAR Technologies Limited looks forward to clean energy growth of 15% to 20%, including fuel cells, hydropower, battery storage systems and others.
Show source
Looking ahead, we anticipate a robust growth of 15% to 20% in FY '26 across clean energy sector, including fuel cells, hydropower, battery storage systems and others.
- MTAR Technologies Limited anticipates 80% growth from the aerospace and defense sector in FY '26.
Show source
We expect revenue growth of approximately 80% from this segment in FY '26.
- Bloom gave MTAR Technologies Limited its highest forecast for next fiscal year after the tariffs announcement.
Show source
The idea is that obviously, post tariffs announcement also, we got the highest forecast from Bloom for next fiscal year.
- The company expects subsequent reactors including Mahi Banswara to come in subsequently.
Show source
So we have to ensure that and ensure that we grow in that manner and then we get subsequent reactors as well like Mahi Banswara and other reactors coming in subsequently, right?
- The company expects to know its L1 status for reactor-refurbishment projects probably in September or October.
Show source
So we're expecting at least the L1 status will know probably in the month of September or October.
- Bloom Energy might look at a complete assembly system in India to serve various countries, including Europe and Asian countries.
Show source
And the ultimate goal, I think, is, as I said many years back or even a couple of years back is that they might look at complete assembly system back in India to cater to various other countries back from India to Europe to Asian countries, etcetera.
- The company expects further orders for Vikas engines during this fiscal year.
Show source
And apart from that, the regular business is going on without any hindrance, the further orders for the Vikas engines are also expected during this fiscal year.
- The company expects a large number of Vikas engines during this fiscal year.
Show source
Large number of Vikas engines are expected during this fiscal year.
- The company expects cryo engine orders.
Show source
Other than that, even the cryo engine orders are expected.
- The company has developed electrolyzer products but is waiting with Bloom to get the electrolyzer order book going; electrolyzer activity needs the right infrastructure in India and internationally and is going to take time.
Show source
We have developed it, but we are just waiting with our partners, Bloom to get the order book going on electrolyzers.
- MTAR Technologies Limited said WIP may increase in absolute terms, but WIP days will come down.
Show source
But on the days front, it will come down.
- MTAR Technologies Limited expects add-on revenues in the oil and gas sector in a big way in the next financial year.
Show source
So that will be the add-on revenues coming in for the next financial year in the oil and gas sector in a big way.
- The company is confident of achieving that kind of growth moving forward. Replaced by a later filing.
Show source
So that's why we are pretty confident to have that kind of growth moving forward.
Orders
- MTAR Technologies Limited delivered approximately INR25 crores in aerospace and defence orders during Q1 FY '26.
Show source
We continue to maintain strong traction in the aerospace and defence vertical, delivering approximately INR25 crores in orders during the Q1.
- MTAR Technologies Limited has submitted quotes for upcoming projects in Kaiga-5 and -6 and refurbishment reactors for Madhya Pradesh, Rajasthan and Chennai projects.
Show source
The company has submitted various quotes for the upcoming projects in Kaiga-5 and -6 and refurbishment reactors for Madhya Pradesh, Rajasthan and Chennai projects.
- MTAR Technologies Limited is working on refurbishment reactors in Tarapur, Madhya Pradesh, Rajasthan and Chennai; tenders have been floated, it has quoted, and the orders must be executed in 24 months.
Show source
So these are all orders which have to be executed in 24 months.
- The company has quoted for about 80% of reactor-refurbishment tenders, with 1 or 2 tenders pending and expected within the next 1 week.
Show source
And as far as refurbishment of reactors are concerned, we have quoted for at least about 80% of the tenders, only 1 or 2 tenders are pending, which are coming in within the next 1 week.
- The company hopes to win the electromechanical actuator systems project for space in which it participated for ISRO; the business could be close to INR60 crores to INR70 crores from EMA.
Show source
So mostly, we are hoping that we would get that project, which is substantial, which will be close to about INR60 crores to INR70 crores of business coming in only from EMA.
- MTAR Technologies Limited sees an opportunity involving almost 5 reactors going under refurbishment at one time, but could not quantify the numbers because the tenders are live.
Show source
It's almost like we're looking at 5 reactors going under refurbishment, which is happening at one time.
- MTAR Technologies Limited expects orders for Kaiga 5 & 6, recently awarded through an LOA to Megha Engineering, probably by the end of March or beginning of next quarter, worth at least INR500 crores to INR600 crores.
Show source
And hopefully, by end of August or September, we should be able to freeze the Kaiga 5 and 6 orders, what we're expecting in this quarter.
- MTAR Technologies Limited anticipates increased order inflows in the coming quarters in civil nuclear power and aerospace and defence, which are expected to further strengthen its order book substantially.
Show source
We anticipate, as I mentioned earlier, increased order inflows in the coming quarters in civil nuclear power and as well as in aerospace and defence sectors, which are expected to further strengthen our order book substantially.
- MTAR Technologies Limited is participating in the tendering process for various programs for Government of India. Replaced by a later filing.
Show source
The company is actively strengthening its defence portfolio and is currently participating in tendering process for various prestigious programs for Government of India.
- MTAR Technologies Limited’s customers are increasing its order book step by step, following satisfaction with its first articles, production, batch quantities and quality; the company expects the same momentum moving forward. Replaced by a later filing.
Show source
So the way we have proven our first articles and the production, what we have created, the batch quantities and the production, the quality what we have maintained, they're extremely happy with us, and they are increasing the order book step by step with MTAR, and that's why you see the numbers growing year-on-year basis.
What it is building and selling
Projects and capacity
- MTAR Technologies Limited is setting up a new dedicated facility to meet demand from India's strategic push to increase nuclear power capacity to 100 gigawatts by 2047; the facility will expand capacity and enhance delivery capabilities in the civil nuclear vertical.
Show source
So to meet this demand, we are setting up a new dedicated facility, which will significantly expand our capacity and enhance delivery capabilities in this vertical.
- Kaiga-5 and -6 are two new 700-megawatt reactors.
Show source
It's a new reactor, 700-megawatt reactors, 2 of them.
- The company has enough capacity to execute an INR1,000 crores order book in 3 years, although it needs to address bottlenecks including raw-material storage as projects move forward from FY '27, '28, '29.
Show source
But the only thing is if you look at the quantum of orders we are receiving, like if you have to execute, let's say, INR1,000 crores order book in 3 years, which has never happened in the past, we have enough capacities.
- The company is creating a small facility next to Unit 3 to support the nuclear division and execute time-bound projects, including Kaiga 5 and 6 and reactor refurbishments in Madhya Pradesh, Rajasthan, Chennai and Tarapur, within 3 years' time.
Show source
So we are creating a small facility next to our Unit 3, if you are aware, which is close by where it handles the nuclear division to have a support system in terms of addressing these orders and ensuring that these are executed within the time frame because Kaiga 5 and 6 is a time-bound project and also the refurbishment reactors in Madhya Pradesh, Rajasthan, Chennai and Tarapur are all time bound projects.
- The company hopes to complete Proto 2 this quarter; after the final design is frozen, it will discuss the future with Fluence, with a long-term agreement depending on Fluence.
Show source
We can't just assume that right now, but we are still working on the Proto 2, which hopefully, this quarter, we should be able to complete it.
- MTAR Technologies Limited is creating a dedicated facility in the SEZ to support its oil and gas vertical.
Show source
And we are venturing -- we are creating a dedicated facility in the SEZ to support this vertical.
Show 28 more statements
Projects and capacity
- The company is setting up a dedicated facility for civil nuclear power near its existing units; the facility will be small and address bottlenecks.
Show source
For a civil nuclear power, we have -- we are also setting up a dedicated facility near our existing units here, but that will be not so big facility.
- The company is working to complete semi-cryo engine hardware dispatch this year, and is addressing design issues in one assembly with ISRO; it hopes to resolve them in this quarter and launch the semi-cryo program successfully this year.
Show source
We are working day in and day out to meet and complete the semi-cryo engine hardware dispatch this year.
- Weatherford asked MTAR Technologies Limited how much capacity it could spare within existing units; MTAR Technologies Limited is building a separate facility for Weatherford near the airport, expected to be commissioned by June of next year.
Show source
They have asked us in the recent meetings how much capacity that we can spare within the existing units because we are building a separate facility for them near the airport, which will get commissioned by June of next year.
Demand and pricing
- MTAR Technologies Limited said the tariff difference will not make any difference to Bloom or MTAR Technologies Limited.
Show source
So I don't want to go into specifics, but the difference in tariff will not make any difference as far as Bloom or MTAR is concerned.
- Srinivas Reddy said foreign players entering India's nuclear sector would benefit Mtar Technologies Limited and would not be competition.
Show source
So we can only benefit from that, and it's nothing like competition out there.
Segments
- Each hot box generates 65 kilowatts, and its output could go up to 75 as the technology changes.
Show source
So each of the hot box generates 65 kilowatts.
- MTAR Technologies Limited exported to various countries, mainly Europe and Israel.
Show source
Page 2 of 17 MTAR Technologies Limited August 06, 2025 Building Nation with Exceptional Engineering And we are also diversified into various other countries in our exports mainly to Europe and Israel.
- The company is looking at pressurized water reactors in India, while foreign players are involved in light water reactors and will subcontract many requirements to qualified Indian companies.
Show source
And the foreign players are like light water reactors, and they will also subcontract a lot of their requirements back for the Indian companies which are qualified to do that.
- MTAR Technologies Limited wants to venture into the Oil & Gas sector. Replaced by a later filing.
Show source
And also, I just wanted to tell you, we wanted to venture into the Oil & Gas sector.
- MTAR Technologies Limited said it is one of the leaders in the nuclear division. Replaced by a later filing.
Show source
And these are all the requirements that they need, and we are one of the leaders in that division.
Deals and partners
- MTAR Technologies Limited is in advanced discussions with multiple customers in clean energy, aerospace and defence sectors to establish long-term contracts, and recently entered a long-term agreement with Weatherford over the next 5 years, with the first year following successful execution of first article products.
Show source
Additionally, the company is actively engaged in advanced discussions with multiple customers in clean energy, aerospace and defence sectors to establish long-term contracts and we have notably entered recently into a long-term agreement with Weatherford over the next 5 years, being the first year following the successful execution of first article products.
- The company has given 16 packages to MEIL for Kaiga 5 and 6, and final negotiations are going on to finalize them.
Show source
Srinivas Reddy: Kaiga 5 and 6 already, as we speak, the discussions are going on, as all of you are aware, it's given to MEIL, so we have given 16 packages to them.
- Wallet share with Bloom Energy has been increasing over the last 3 months to 6 months in hot box, enclosures and other products, as Bloom increases the work done in India step by step.
Show source
Srinivas Reddy: So we are seeing the wallet share increase not only in the hot box segment, but also in the enclosures and other products that we are doing right now over the last 3 months to 6 months.
- MTAR Technologies Limited has worked with NPCIL for almost 40 years in its nuclear division, and its nuclear products and assemblies have already been developed.
Show source
We have been working with NPCIL for almost 40 years now with the nuclear division.
- MTAR Technologies Limited is doing design and development for Fluence and is doing Proto 2; after it is completed, discussions will take place to finalize the final product Fluence wants to launch.
Show source
We are doing design and development for them and we are doing the Proto 2 right now.
- MTAR Technologies Limited said the Weatherford facility will be a full-fledged program for the next 10 years.
Show source
So that will be a full-fledged program for the next 10 years for Weatherford.
- MTAR Technologies Limited said all its customers assured it they would ensure stability across supply chain partners, especially MTAR as a participant in the high-technology segment.
Show source
We have been assured by all our customers that they will be ensuring stability across all the supply chain partners especially MTAR being involved in the high-technology segment.
- Bloom Energy provided MTAR Technologies Limited its highest-ever forecast for execution of its boxes in the upcoming fiscal year after the tariffs announcement.
Show source
And additionally, our customer, Bloom Energy has provided a very high -- highest ever forecast for the execution of our boxes in the upcoming fiscal year post the tariffs announcement.
- Bloom Energy announced plans to deploy its fuel cell technology at select Oracle Cloud infrastructure data centers in the U.S.
Show source
Most recently, it announced plans to deploy its fuel cell technology at select Oracle Cloud infrastructure data centers in the U.S. The median data center size is projected to grow by nearly 115% from approximately 175 megawatts today to around 375 megawatts over the next decade, presenting substantial growth opportunities for fuel cell adoption.
- MTAR Technologies Limited has already signed a long-term contract with Weatherford in the oil and gas sector.
Show source
We have already signed a long-term contract in oil and gas sector for the Weatherford.
- MTAR Technologies Limited works with U.S. customers, Israeli customers and European customers, primarily for civil aircraft, and also works on defence projects for these customers.
Show source
So basically, if you look at our projects what we are doing, we are working with the U.S. customers, we're working with Israeli customers, European customers, basically for the civil aircraft primarily.
- MTAR Technologies Limited has long-term contracts with IAI and with Weatherford for oil-free work, as well as with GKN and other companies.
Show source
And obviously, it's -- all these are on a long-term contract basis, either we have with IAI or oil-free with Weatherford or with any other company like GKN, different companies that we are working with.
- Bloom authorized MTAR Technologies Limited to proceed with sourcing raw materials and bottom for this and sent an official communication.
Show source
They've already given us the authorization to go ahead with the sourcing of raw materials and bottom for this.
- MTAR Technologies Limited said it is far ahead of its Taiwanese competitor in innovation, products for Bloom and capacity, and has a major wallet share in hot boxes with Bloom compared with other competitors.
Show source
And obviously, we have a major wallet share in terms of hot boxes with Bloom compared to the other competitors.
- MTAR Technologies Limited has almost completed various Weatherford assemblies in prototype, and Weatherford is looking for batch and volume production.
Show source
And now they're looking for the batch and volume production.
- MTAR Technologies Limited is looking at other oil and gas companies for the same facility with a different kind of machinery setup.
Show source
And also, we are looking at other oil and gas companies as well within the same facility with different kind of machinery setup.
- Bloom is increasing MTAR Technologies Limited’s wallet share step by step across various assemblies MTAR is doing for Bloom. Replaced by a later filing.
Show source
And then apart from that, they're also increasing step by step the wallet share for MTAR at various assemblies, what we are doing for them.
- MTAR Technologies Limited is continuously working with Bloom on improving the technology of hot boxes. Replaced by a later filing.
Show source
So it all depends on how we move forward step by step in terms of improving the technology and which we are continuously working with Bloom as we speak.
Risks, rules and outside factors
Outside factors
- MTAR Technologies Limited said tariff-related uncertainties persist with respect to the U.S. market, but it remains confident in sustaining export momentum, underpinned by cost competitiveness and engineering depth achieved through indigenization of key components.
Show source
While tariff-related uncertainties persist with respect to the U.S. market, we remain confident in sustaining our export momentum.
- MTAR Technologies Limited said its cost competitiveness and engineering expertise provide an advantage over Southeast Asian counterparts amid global uncertainties such as tariffs.
Show source
As highlighted earlier, our cost competitiveness and engineering expertise continue to provide us with a distinct advantage over our Southeast Asian counterparts amidst heightened global uncertainties such as tariffs.
Everything else said on the call
What management stressed
- MTAR Technologies Limited is focusing on timely collection of receivables and trying to reduce raw material days by inwarding raw material just in time. Replaced by a later filing.
Show source
We are trying to inward only just in time in case of raw material.
Other
- The median data center size is projected to grow by nearly 115%, from approximately 175 megawatts today to around 375 megawatts over the next decade.
Show source
Most recently, it announced plans to deploy its fuel cell technology at select Oracle Cloud infrastructure data centers in the U.S. The median data center size is projected to grow by nearly 115% from approximately 175 megawatts today to around 375 megawatts over the next decade, presenting substantial growth opportunities for fuel cell adoption.
- The company said margins for Fluence assemblies are probably similar margins. Replaced by a later filing.
Show source
Srinivas Reddy: The margins are probably the similar margins.
What the company said on its earnings call, taken from its own transcript. Not advice.
Questions and answers
Question
Vipraw Srivastava: There's two questions. First of all, on the financial side. So what's the net working capital days you're expecting by the end of this year? And what's the capex guidance for FY '26? Page 5 of 17 MTAR Technologies Limited August 06, 2025 Building Nation with Exceptional Engineering Gunneswara Rao: Yes.
Answer, exceptional rao
So regarding capex, for oil and gas sector, we are spending around INR70 crores of capex for this year. Other than that, there is some sustenance capex and a few other equipments which we are buying for this financial year. It will be around INR100-plus crores for this financial year. And as far as the next year concerned, only around INR25 crores to INR30 crores is there as per the like sustenance capex. But we will see as and when any new customers come, we will see at that point of time.
Answer, gunneswara rao
Gunneswara Rao: 267 days. Now it was up from 229 to 267. This is the main reason is some of the customers in Israeli area because of the ongoing war, we could not receive almost $2 million worth of receivables. And some other customers also paid in the first week of July. So if we take into account, it will be as -- it is same as the last quarter. However, we are targeting to reduce our working capital days to 200 days by end of this financial year.
Question
Vipraw Srivastava: Secondly, sir, on Bloom as you mentioned that they have been winning a lot of orders in U.S. So the Indian data center space is also evolving in a huge way. So any plans for Bloom to come to India or they will be currently focused only on U.S. market?
Answer, srinivas reddy
Srinivas Reddy: No. The issue -- it's not about plan to come to India. The idea is that obviously, post tariffs announcement also, we got the highest forecast from Bloom for next fiscal year. That is a very good sign, right? And then apart from that, they're also increasing step by step the wallet share for MTAR at various assemblies, what we are doing for them. So I would see over the next 2 years, probably they would look at doing the complete assembly. I'm just hoping that they will strategy-wise also for them for catering to the Asian markets and Indian markets or the European markets, they could probably look at the situation of directly shipping the products from here back to these countries and taking the products to U.S. for the U.S. market. So that's, I think, the strategy that they're trying to adopt.
Answer, srinivas reddy
That's why our wallet share is also increasing step by step over the last 2 quarters in what we are doing with Bloom. Vipraw Srivastava: Right, sir. And sir, lastly, on the aerospace and defence, that is doing very well in Europe because of the ongoing conflict in that region. I mean the increased traction that you are seeing is it a function of the conflict in that region or the structural reason why these companies are tying up with.Inaudible:17:17 Srinivas Reddy: No, it's not entirely because of the conflict.
Answer, srinivas reddy
So we don't -- obviously, none of us want any conflict anywhere in the world, right? So basically, if you look at our projects what we are doing, we are working with the U.S. customers, we're working with Israeli customers, European customers, basically for the civil aircraft primarily. And then the defence side also, we are working with various projects for all these customers. Page 6 of 17 MTAR Technologies Limited August 06, 2025 Building Nation with Exceptional Engineering And it's all based on the needs what they have. And obviously, it's -- all these are on a long-term contract basis, either we have with IAI or oil-free with Weatherford or with any other company like GKN, different companies that we are working with. So the way we have proven our first articles and the production, what we have created, the batch quantities and the production, the quality what we have maintained, they're extremely happy with us, and they are increasing the order book step by step with MTAR, and that's why you see the numbers growing year-on-year basis. And we're expecting the same momentum moving forward as well.
Answer, srinivas reddy
Srinivas Reddy: Okay. So first answer to your question of order inflow is, see, basically, the forecast from Bloom has been given just after the tariffs were announced, they've given 25% higher numbers than what we are doing this year. So technically, the orders is just they'll follow automatically. So whether it will happen in this quarter or next quarter, they will release those orders. So that's not an issue at all. They've already given us the authorization to go ahead with the sourcing of raw materials and bottom for this. For this, and they have sent an official communication as well.
Answer, srinivas reddy
So we are -- so the order inflow is much higher compared to the current year by about 25% or more. And when we talk about the growth, yes, we say conservatively 15%, 20%, but we always say that, but we are expecting a lot more because of our increase in wallet share in various segments what we are working with Bloom. And it's going to go higher and higher, as explained earlier to Vipraw as well.
Question
Piyush Sevaldasani: My next question is on the -- can you please help us understand where is the order stock because it's been quite a time we are still using large orders in the nuclear?
Answer, srinivas reddy
Srinivas Reddy: So look, basically, now it's in very advanced stage. We can expect the orders some coming in this quarter, some by next quarter. That's why the CFO mentioned within the next 3 to 6 months. These orders of close to INR1,000 crores are not part of our execution plan for this current financial year. That's why we see a lot of exponential growth in nuclear division moving forward in the next 3 years. And all these orders have to be executed on a fast-track basis within 3 years. The reason is one is Kaiga-5 and -6 is on a fast track basis.
Answer, srinivas reddy
It's a new reactor, 700-megawatt reactors, 2 of them. And the rest of them are the refurbishment reactors that we are working with reactors in Tarapur, Madhya Pradesh, Rajasthan and Chennai. All these are coming -- are in the pipeline. Page 7 of 17 MTAR Technologies Limited August 06, 2025 Building Nation with Exceptional Engineering Tenders have been floated. We have quoted for that. So these are all orders which have to be executed in 24 months. So there is enough on our plate once these orders kick in for the next 3 years.
Answer, srinivas reddy
And also further 4 reactors are going to come in 700 megawatts in Mahi Banswara in Rajasthan. Those tenders are expected -- that's not part of this INR1,000 crores what I was talking about. That is something new which we have come to know recently. And that will kick in probably in second half of this year, the tender should be quoted for that as well where that's being worked upon right now.
Question
Piyush Sevaldasani: Sure, sir. Sir, my last question is on the gross margin. So we saw an improvement in the gross margin despite material change in the revenue mix. Can you help us understand like which segments have better gross margin because despite clean energy having much higher revenue mix, gross margins have improved?
Answer, gunneswara rao
Gunneswara Rao: Yes. The gross margin, the main reason is we are working on the various long operating cycle projects like civil nuclear power, we have FMBC and FT systems. Substantial work has been done on those jobs. That is the reason a lot of work is in the form of change in inventory. So that is reflecting the higher gross margin. And also some of the clean energy products we manufactured for the subsequent quarters. So it means our production is more than the sales during the last quarter despite having good numbers, and we have produced a lot of work in the other areas also.
Answer, gunneswara rao
That is the reason gross margins were higher.
Answer, gunneswara rao
Gunneswara Rao: See, we are going to take some debt also, maybe 70% is from the debt and 30% internal accruals we'll do. And already, our existing debt is around INR120 crores around that number. So we are repaying the existing debt within 2 to 3 years of time. This will be funded by the term loans.
Question
Renu Baid: And secondly, I'm not sure I just want to clarify, did you mention that for the nuclear products, given the demand which is there, we are planning a dedicated facility for nuclear or was it only for oil and gas? Just trying to clarify on that again… Gunneswara Rao: No. Oil and gas, we are setting up a new dedicated facility in SEZ.
Answer, gunneswara rao
For a civil nuclear power, we have -- we are also setting up a dedicated facility near our existing units here, but that will be not so big facility. It will be a small facility wherever we have a bottlenecks are there, we are addressing through that new facility.
Question
Renu Baid: Okay. Right. Because the current utilization for nuclear facilities would anyway be running pretty low currently? Page 8 of 17 MTAR Technologies Limited August 06, 2025 Building Nation with Exceptional Engineering Gunneswara Rao: Yes.
Answer, srinivas reddy
Srinivas Reddy: No, no, we have enough capacities. But the only thing is if you look at the quantum of orders we are receiving, like if you have to execute, let's say, INR1,000 crores order book in 3 years, which has never happened in the past, we have enough capacities. But as CFO has mentioned, we'll have certain bottlenecks here and there, which we need to address them and including storage of raw material and stuff like that because we're handling a number of projects now moving forward from FY '27, '28, '29. So we are creating a small facility next to our Unit 3, if you are aware, which is close by where it handles the nuclear division to have a support system in terms of addressing these orders and ensuring that these are executed within the time frame because Kaiga 5 and 6 is a time-bound project and also the refurbishment reactors in Madhya Pradesh, Rajasthan, Chennai and Tarapur are all time bound projects. So we have to ensure that and ensure that we grow in that manner and then we get subsequent reactors as well like Mahi Banswara and other reactors coming in subsequently, right? So we need to create the support system to ensure that we execute these projects in 3 years' time.
Question
Renu Baid: And just a little bit more on the nuclear segment, while you did mention briefly in terms of these orders to come through in the next 3 to 6 months, can you share a bit more granular updates in terms of where is Kaiga 5 and 6 stuck? It was expected long back. And similarly, where are we in terms of project award for the refurbishment projects across the 3 states that you mentioned?
Answer, srinivas reddy
Srinivas Reddy: Kaiga 5 and 6 already, as we speak, the discussions are going on, as all of you are aware, it's given to MEIL, so we have given 16 packages to them. Right now, the final negotiations are going on with the company to finalize it. And hopefully, by end of August or September, we should be able to freeze the Kaiga 5 and 6 orders, what we're expecting in this quarter. And as far as refurbishment of reactors are concerned, we have quoted for at least about 80% of the tenders, only 1 or 2 tenders are pending, which are coming in within the next 1 week. And the information I have is maximum the outlay of time to get the orders in place for refurbishment of reactors based on the L1 category, we are expecting within 3 to 6 months time for all other refurbishing reactors.
Question
Renu Baid: Are we already have -- is MTAR already announced L1 on these refurbishment projects or...
Answer, srinivas reddy
Srinivas Reddy: Not yet. We are more or less highly qualified to do these projects, especially the refurbishment of reactors. And so basically, we are expecting -- we are pretty confident of bagging the maximum number of orders. And the announcement should be done, I think, by September, October, by the time they do the evaluation and price bid and all that, price bid opening and all that. So we're expecting at least the L1 status will know probably in the month of September or October. Renu Baid: Got it. Secondly, when we look at the Bloom Energy portfolio and they have guided pretty strong volumes.
Answer, srinivas reddy
Srinivas Reddy: So we are seeing the wallet share increase not only in the hot box segment, but also in the enclosures and other products that we are doing right now over the last 3 months to 6 months. So that's going on step by step, they're increasing it to ensure that most of the work is done back here. And the ultimate goal, I think, is, as I said many years back or even a couple of years back is that they might look at complete assembly system back in India to cater to various other countries back from India to Europe to Asian countries, etcetera. So that's how the wallet share has been increasing step by step over the years.
Question
Renu Baid: Right. And last question, if I can. You're probably missing some of your comments around space segment. So how has been the business there? Are any projects in pipeline? We had some issues with the semi-cryo engine. So where is that? And the SSLV program where we were investing to have our own independent products, where are we on the product development side?
Answer, srinivas reddy
Srinivas Reddy: See, there are a couple of things here. One is we have been more realistic in our approach, keeping the company as -- taking the future of the company as the most important factor. First is on the space side, it's a stable kind of a business that we are doing. And in fact, we are adding -- we are hoping that we would back the electromechanical actuator systems for the space, which we have participated for ISRO, which we have not done earlier. For the first time they have done it. So mostly, we are hoping that we would get that project, which is substantial, which will be close to about INR60 crores to INR70 crores of business coming in only from EMA. And apart from that, the regular business is going on without any hindrance, the further orders for the Vikas engines are also expected during this fiscal year.
Answer, srinivas reddy
Large number of Vikas engines are expected during this fiscal year. Other than that, even the cryo engine orders are expected. Now semi-cryo, Renu, is basically, if you have heard about this, the Chairman of ISRO has announced that most probably by FY '27, they will launch -- start using the semi-cryo engines. We are working day in and day out to meet and complete the semi-cryo engine hardware dispatch this year. There has been certain design issues in one of the assemblies, which we are working on. Hopefully, in this quarter, we'll resolve it along with ISRO. And once that is done, we're all set to launch the semi-cryo program successfully this year.
Question
We are in the technology area. And as I mentioned in my speech as well, based on what we have developed over the years and the cost competitiveness and the kind of technology we have developed, we have no such indication and Bloom also announced a very aggressive forecast for next year post the tariff announcement. So we are just focusing on what we are doing right now in terms of developmental activities, and I don't see that's going to be any factor as far as MTAR is concerned. Balasubramanian: Expected in next 3 to 6 months, is basically into like pressurized heavy water reactors or small modular reactors?
Answer, srinivas reddy
Srinivas Reddy: These are all pressurized heavy water reactors, PHWRs. Balasubramanian: Okay, sir. And sir, secondly, on the battery storage side, I think Proto 2 delivery when we can expect and when we can do mass production agreements and what kind of revenue potential expected on the Fluence side? And Fluence is shifting to full part assemblies, it is any additional capex required for this assemblies and how will compare between Fluence and hot boxes in terms of margin?
Answer, srinivas reddy
Srinivas Reddy: The margins are probably the similar margins. We can't just assume that right now, but we are still working on the Proto 2, which hopefully, this quarter, we should be able to complete it. And once that is done and the final design and all that is frozen, then we move on to discussing about the future with Fluence. So it's a little premature right now for me to comment on that. But we are in a stage where we have done Proto 1, we are working on Proto 2 and then we move on. We talk about the long- term agreement or whatever. So it depends on Fluence, how he wants to take it up in the future.
Answer, srinivas reddy
Srinivas Reddy: As I said earlier, electrolyzer is going to take time. We need the right infrastructure for that not only here, but also internationally as well. We have developed it, but we are just waiting with our partners, Bloom to get the order book going on electrolyzers. Internationally, it has to have the right kind of infrastructure for that. Once that happens, then we'll definitely let you know about that.
Show 11 more questions
Question
Meet Jain: So any particular reason for a degrowth this quarter? Any delay or any one-off?
Answer, srinivas reddy
Srinivas Reddy: Not exactly a degrowth because the kind of product requirement that they had for this quarter was slightly less than what it's supposed to be, but it's going to catch up in subsequent quarters. And also, we are adding some more products which will be exported during the subsequent quarters as well. So that's why we are pretty confident to have that kind of growth moving forward.
Question
Meet Jain: Okay. So seeing the current geopolitical scenario, can we assume that this is the -- can be a reason for a decline or the low requirement for this kind of product in this quarter?
Answer, srinivas reddy
Srinivas Reddy: No, absolutely not. It is not because of that. It's because of one of the products like ASPs, there were enough inventory levels in Bloom and they've asked us to ship a lot more in the subsequent quarters. And plus we're adding a lot of other products where we're exporting in ball screws and as well as in valves within for the defence organizations as well. So it will catch up and we'll achieve that growth by end of the year.
Question
Meet Jain: Okay. Apart from the working capital side, we talk about the receivables, how it has increased. I would also like to know the inventory. So we see the inventory days both in the RM and WIP has seen a sequential increase. So is it a seasonal kind of phenomenon or there are certain inventories in hand? Can you throw some light on that as well?
Answer, gunneswara rao
Gunneswara Rao: Yes. The reason is, as I told you, there are a lot of -- the work is done in the form of WIP in the first quarter. That is the reason for increase in WIP. It will be dispatched in the subsequent quarter. And the RM also because of the aerospace revenue, which we are targeting more than INR100 crores to INR120 crores compared to INR45 crores in the last year. So we need to order in a minimum batch sizes. So eventually, it will come down.
Answer, gunneswara rao
But however, our target is 200 days we are targeting by end of this year.
Question
Meet Jain: So for 200 days target, we need to decrease our receivable days and days by a significant amount. So...
Answer, gunneswara rao
Gunneswara Rao: No, , we have -- there are credit terms agreed with customers there. We are focusing on timely collection as far as receivables are concerned. And we are trying to reduce raw material days as much as possible. We are trying to inward only just in time in case of raw material. In the case of WIP, for example, since we are expecting a lot more orders in the nuclear sector, we have to do a lot of work and dispatch in 2 to 3 years of time. So the WIP may increase, but the revenues also proportionately will increase. In absolute terms, WIP may increase, but days may come down because of the higher revenue projections.
Answer, gunneswara rao
So receivables, we are trying our best and raw material, we will -- we are trying to reduce as much as possible. And the WIP in absolute terms, it may increase. But on the days front, it will come down.
Answer, srinivas reddy
Srinivas Reddy: No, what all we are supplying to the nuclear division all have been done by MTAR for a number of years. So there's nothing to develop this. We have been working with NPCIL for almost 40 years now with the nuclear division. So they all developed products and assemblies that we have done in the past. And these are all the requirements that they need, and we are one of the leaders in that division. So there's nothing to develop there. We have already developed all these… Keyur Kumar Vidalia: Okay.
Answer, srinivas reddy
Srinivas Reddy: I can't quantify the numbers because the tenders are on live right now, but it's a great opportunity. It's almost like we're looking at 5 reactors going under refurbishment, which is happening at one time. So that's a sizable opportunity that we are looking at.
Question
Dhavan Shah: Is there any metric to understand this 750 terawatt hours of demand, would generate how many hot boxes demand incrementally for Bloom and what...
Answer, srinivas reddy
Srinivas Reddy: No, it all depends on the technology, how it moves from a year-on-year basis, right? So it's not necessarily that the hot box today can generate 65 kilowatts. Tomorrow, it can go up to 75 as well. So each of the hot box generates 65 kilowatts. So it all depends on how we move forward step by step in terms of improving the technology and which we are continuously working with Bloom as we speak.
Question
Dhavan Shah: Understood, sir. And I think your competitor is from Taiwan, wherein the tariff is roughly 20- odd percent versus our tariff is 25%. So if you can share what is the cost differentiation between us and them? You said that we are lower than them. So if you can help us to understand in terms of the percentage, how much is that?
Answer, srinivas reddy
Srinivas Reddy: I don't know what exactly the -- I'm not aware of what prices the Taiwanese supplier is supplying. But as far as -- one thing is as far as the innovation and various products that we are doing for Bloom, we are far ahead of them. And secondly, as far as the capacities that are concerned, we are far ahead of them. And obviously, we have a major wallet share in terms of hot boxes with Bloom compared to the other competitors. So I don't want to go into specifics, but the difference in tariff will not make any difference as far as Bloom or MTAR is concerned. That should not be a matter at all.
Question
Dhavan Shah: Understood. And sir, if I look at the last 3, 4 quarters, I think the clean energy from Bloom is doing roughly INR100-odd crores of business every quarter for us. So when do we see this INR100 crores can go up to INR150 crores, INR200 crores per quarter? If you can help us to understand that stuff?
Answer, srinivas reddy
Srinivas Reddy: So as I said earlier, you asked the right question as well. So next year, we're looking at about close to INR140 crores to INR150 crores of revenues coming from Bloom per quarter.
Question
Dhavan Shah: Run rate would more or less the same INR100 crores per quarter?
Answer, srinivas reddy
Srinivas Reddy: The run rate for next year is much, much higher.
Question
Dhavan Shah: Understood, sir. And if you can help us to understand this new product development for Fluence, you mentioned in the presentation that the Proto 1 is already completed. Proto 2 delivery was also expected to be delivered in the first quarter '26. So I believe that, that might also have been completed. So how do you see that kind of the business from Fluence, the incremental opportunity per year? And from -- by when can we see that in the numbers? And secondly, about the Weatherford also, if you can help us understand the execution is also completed over there. So what could be the opportunity from that business also?
Answer, srinivas reddy
Srinivas Reddy: See, the first step is in Fluence. What is important is we need to complete -- it's a completely new design. We are doing design and development for them and we are doing the Proto 2 right now. Once that is completed, then a lot of discussions will happen in terms of finalizing the final product what they want to launch. And that will take some time. So what we are looking at is once that is done, then we'll be able to talk about the agreement, the future and things like that, probably it can reflect in FY '27. Hopefully, let's see how it goes, but we have to wait and watch for that.
Answer, srinivas reddy
But we are going in the right direction as far as Fluence is concerned, let's see how it goes. And Weatherford, we are already in advanced stage. In fact, we have almost completed the various assemblies in prototype. And now they're looking for the batch and volume production. They have asked us in the recent meetings how much capacity that we can spare within the existing units because we are building a separate facility for them near the airport, which will get commissioned by June of next year. So that will be a full-fledged program for the next 10 years for Weatherford. And also, we are looking at other oil and gas companies as well within the same facility with different kind of machinery setup.
Answer, srinivas reddy
So it's going in a very positive way. So that will be the add-on revenues coming in for the next financial year in the oil and gas sector in a big way.
Question
Nikhil Agrawal: Okay. So can you help us with the revenue contribution from Bloom for the last 2 years and the next 2 years that is expected? Is that possible?
Answer, srinivas reddy
Srinivas Reddy: We have done an average run rate of, let's say, INR100 crores per quarter or INR110 crores in that range, which I can go up through -- as I mentioned earlier, the question asked me what was asked earlier. So the way the kind of forecast is given probably might tax about INR130 crores, INR140 crores, INR150 crores per quarter.
Question
Vipraw Srivastava: Okay, sir. Got it, sir. And sir, last question, sir, from my end. So obviously, in this budget, last budget, there was a change in the nuclear act wherein. Now foreign players can also come and invest in the country. So from a long-term perspective, do you see this having any implication in the nuclear sector with foreign players coming in, you will be running to collaborate with them or will there be a competition to you? Any thoughts on that?
Answer, srinivas reddy
Srinivas Reddy: There's nothing like competition to us. See, we are looking at pressurized water reactors in India. And the foreign players are like light water reactors, and they will also subcontract a lot of their requirements back for the Indian companies which are qualified to do that. So we can only benefit from that, and it's nothing like competition out there.
Questions about this call
- When was the Mtar Technologies Q1 FY26 earnings call transcript filed?
- Mtar Technologies filed the transcript with the exchange on 13 Aug 2025. This page is built from that transcript.
- What does this page list?
- 96 statements from the transcript across 11 topics, 46 of them with a figure. Each statement is shown with the transcript sentence it came from.
- Are the analysts' questions included?
- Yes. 21 questions and management's answers are listed in the order they were asked, as the transcript prints them.
- Who wrote this page?
- DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.