NCC Q4 FY26 earnings call: NCC Limited's consolidated order book was INR 83,004 crores as of 31st March '26, about 16% higher than last year and the highest in the company's history

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

Consolidated order book was INR 83,004 crores as of 31st March '26, about 16% higher than last year and the highest in the company's history. The company decided not to give guidance for FY2 7 because there were too many variables and the environment was very uncertain; it may revisit this decision after the first quarter when it has more clarity. The overall TBM project value is about INR 6,000 crores, of which NCC Limited needs to execute INR 3,000 crores. Standalone turnover in Q4 FY2 6 was INR 5,382 crores, down 1% from INR5,445 crores in the corresponding quarter of the previous year. Debt at the beginning of the quarter was INR 2,980 crores and net debt after cash and cash equivalents was INR 2,830 crores; at the end of quarter 4 of FY26, debt was INR 2,251 crores and net debt was INR 1,667 crores.

The numbers management gave

Results

  • Standalone turnover in Q4 FY2 6 was INR 5,382 crores, down 1% from INR5,445 crores in the corresponding quarter of the previous year.
    Show source
    Turnover reported in Q4 FY2 6 is INR 5,382 crores, as against turnover of INR5,445 crores in the corresponding quarter of the previous year.
  • Standalone turnover for the full year was INR 17,669 crores, down 9% from INR 19,393 crores in the previous year.
    Show source
    For the full year, the turnover stands at INR 17,669 crores as against INR 19,393 crores of the previous year, a decline by 9%.
  • Consolidated turnover in Q4 was INR 6,251 crores, up 1% from INR 6,189 crores in the corresponding quarter of the previous year.
    Show source
    At consolidated level, the turnover is reported in Q4 at INR 6,251 crores as against INR 6,189 crores in the corresponding quarter of the previous year, which shows an increase by 1%.
  • Consolidated turnover for the full year was INR 20,944 crores, a decrease of 6% from INR 22,355 crores.
    Show source
    For the full year, the turnover is INR 20,944 crores as against INR 22,355 crores, which is a decrease of 6%.
  • Standalone EBITDA was 8.44% in Q4 FY26, compared with 9.21% in the corresponding quarter of the previous year.
    Show source
    At the stand-alone level, we achieved an EBITDA of 8.44% for Q4 FY26 as against 9.21% of the corresponding quarter of the previous year.
  • Standalone PBT before exceptional items was 5.2% and PAT was 3.77% in Q4 FY2 6, compared with PBT of 6.18% and PAT of 3.93% in quarter 4 of FY2 5.
    Show source
    PBT, we achieved 5.2% before exceptional items and PAT of 3.77% in the current quarter, that is Q4 FY2 6, as against PBT of 6.18% and PAT of 3.93% reported in the quarter 4 of FY2 5.
Show 51 more statements

Results

  • Consolidated EBITDA was 8.83%, PBT before exceptional items was 4.70%, and PAT was 3.3% in Q4 FY2 6, compared with EBITDA of 9.07%, PBT of 5.93%, and PAT of 4.1% in the corresponding quarter of the last year.
    Show source
    At consolidated level, we achieved EBITDA of 8.83% and PBT of 4.70% before exceptional items and PAT of 3.3% in the current quarter.
  • Working capital, excluding cash and margin money deposits, was INR 4,847 crores at the end of Q4 FY2 6, equal to 28% of turnover.
    Show source
    Working capital, excluding cash and margin money deposits at the end of Q4 FY2 6, it stands at INR 4,847 crores, which is 28% of the turnover.
  • Working capital was 97 days in Q4 FY2 6.
    Show source
    In terms of working capital days, it is 97 days.
  • Trade receivables outstanding at the end of Q4 decreased from INR 3,505 crores to INR3,336 crores; receivable days decreased from 87 days to 73 days in the current quarter, compared with 65 days in the corresponding quarter of the previous year.
    Show source
    The trade receivables outstanding at the end of Q4 has decreased from INR 3,505 crores to INR3,336 crores, and the number of days also has decreased from 87 days to 73 days in the current quarter and 65 days for the corresponding quarter of the previous year.
  • Unbilled revenue decreased from INR 7,129 crores, or 44%, to INR 6,675 crores, or 38%, in Q4 FY26; at the end of the previous year it was INR 5,937 crores, or 31%.
    Show source
    It has decreased from INR 7,129 crores, which is 44% to INR 6,675 crores, which is 38% in Q4 FY26.
  • Retention money was INR 2,253 crores in quarter 4 FY26, compared with INR 2,099 crores in Q3 FY26 and INR 8,870 crores at the end of March '25.
    Show source
    Retention money stands at INR 2,253 crores for quarter 4 FY26 as against INR 2,099 crores Q3 FY26.
  • Mobilization advances were INR 3,386 crores at the end of March 31, 2026, compared with INR3,162 crores at the end of December '25 and INR 2,098 crores at the end of March 2025; 64% of these advances were interest-bearing, at an average interest of 9.2%.
    Show source
    Mobilization advances are standing at INR 3,386 crores as at the end of March 31, 2026, as against INR3,162 crores at the end of December '25 and INR 2,098 crores at the end of March Page 3of 19 NCC Limited May 16, 2026 2025.
  • The interest-bearing share of NCC Limited's mobilization advances decreased from 67% to 64% during the current quarter.
    Show source
    Interest-bearing advances decreased from 67% to 64% during the current quarter.
  • EPS was INR 3.23 in Q4 FY2 6, compared with INR 3.4 in Q4 FY25, and INR 9.19 in FY26, compared with INR 12.12 in the previous year.
    Show source
    EPS stands at INR 3.23 at the end of Q4 FY2 6 as against INR 3.4 in Q4 FY25.
  • The company executed INR 1,730 crores of work in U.P. projects, covering groundwater and surface water, as on 31st March 2026.
    Show source
    The amount of work executed in U.P. projects is INR 1,730 crores for both groundwater and surface water.
  • The company made an impairment of INR21.3 crores as an exceptional item on its investment in Oman, where the project was completed and the claims to be received had been received.
    Show source
    Sanjay Pusarla: In the case of international projects, the impairment is done in the case of an investment at Oman, where the project is completed and whatever claims we have to receive, we have received, we have made an impairment of INR21.3 crores as an exceptional item.
  • Other income included interest income of INR 91 crores, dividend income and a buyback of INR97 crores, including dividends from its subsidiaries, Pachhwara Coal Mining and [inaudible] project; interest income mainly comprised income on margin money deposits.
    Show source
    Sanjay Pusarla: The other income includes interest income of INR 91 crores, dividend income and a buyback of INR97 crores that includes dividend from our subsidiaries, Pachhwara Coal Mining and also [inaudible 0:53:09] project.
  • Finance cost for FY26 was INR 645 crores, or 3.7%; it included INR 220 crores of interest on loans, INR 154 crores on mobilization advance, INR162 crores in commissions on BGs and LCs, and INR109 crores in interest, bank and processing charges. Net of interest income, finance cost was INR 554 crores, or 3.18%.
    Show source
    So total INR 645 crores.
  • Operational MDO coal mining project has revenue upwards of INR 2,000 crores and has achieved rated output of 15 MTPA.
    Show source
    It is already giving us revenue upwards of INR 2,000 crores.
  • BG charges were INR 162 crores, compared with INR 198 crores.
    Show source
    Sanjay Pusarla: BG charges is INR 162 crores, we said as against INR 198 crores.
  • Bank charges and BG charges together were about INR 300 crores in FY25.
    Show source
    Sanjay Pusarla: FY25, if you see both the charges together is about INR 300 crores.
  • The company has not seen any payment issues in transportation or buildings.
    Show source
    Sanjay Pusarla: Today, we have not seen any payment issues.
  • Consolidated interest cost increased because loans for the first smart meters are taken by SPVs and added to standalone figures on consolidation.
    Show source
    Sanjay Pusarla: Because of the smart meter loans.
  • The recently awarded second mining project will contribute to NCC Limited's revenue and profitability on a standalone basis.
    Show source
    This will contribute to the Page 17of 19 NCC Limited May 16, 2026 revenue and profitability of the -- on the stand-alone basis to the listed entity that is NCC Limited.
  • BG and LC charges reduced because it did not execute U.P. Jal Jeevan projects and did less water business, especially in the third and fourth quarters; the reduction was also reflected in the top line.
    Show source
    So that is the reason there is a reduction in the -- there appears to be a reduction in the BG and LC charges.
  • International outstanding was completely impaired. Replaced by a later filing.
    Show source
    With this, the international outstanding, whatever is there, that completely impaired.
  • The company said the payment cycle improved in Q4. Replaced by a later filing.
    Show source
    Sanjay Pusarla: In Q4, we have seen improvement in the payment cycle.
  • Charges softened a little. Replaced by a later filing.
    Show source
    And there is a little bit of softening of the charges also.

Money and capital

  • Debt at the beginning of the quarter was INR 2,980 crores and net debt after cash and cash equivalents was INR 2,830 crores; at the end of quarter 4 of FY26, debt was INR 2,251 crores and net debt was INR 1,667 crores.
    Show source
    At the end of quarter 4 of FY26, it stood at INR 2,251 crores and net debt at INR 1,667 crores.
  • Debt at the end of Q4 FY25 was INR 1,484 crores and net debt was INR 706 crores.
    Show source
    And at the end of Q4 FY25, the same is at INR 1,484 crores and net debt of INR 706 crores.
  • Debt decreased by INR729 crores in Q4 FY26.
    Show source
    There is a decrease of debt by INR729 crores in Q4 FY26.
  • Debt-to-equity ratio was 0.30x at the end of Q4 FY2 6, compared with 0.40 at the end of Q3 FY26 and 0.21 at the end of March '25.
    Show source
    The debt-to-equity ratio stands at 0.30x at the end of Q4 FY2 6 as against 0.40 at the end of Q3 FY26 and 0.21 at the end of March '25.
  • Cash and cash equivalents were INR 585 crores as on 31st March 2026, INR 150 crores as on 31/12/2025, and INR778 crores as on 31/03/2025.
    Show source
    Cash and cash equivalents, INR 585 crores as on 31st March 2026 and INR 150 crores as on 31/12/2025 and INR778 crores as on 31/03/2025.
  • The company incurred capex of INR344 crores in Q4 FY2 6 and INR 912 crores in the current year, including about INR320 crores of capital work in progress for TBM; the current-year capex was against a budget of INR1,050 crores, revised from INR 750 crores to INR1,050 crores in FY2 6.
    Show source
    Coming to the capex, we have incurred a capex of INR344 crores in Q4 FY2 6 and INR 912 crores we have incurred in the current year, which includes a capital work in progress for TBM about INR320 crores as against the budgeted capex of INR1,050 crores, which was revised earlier from INR 750 crores to INR1,050 crores in the year FY2 6.
  • Receivables from U.P. projects were INR3,015 crores, including groundwater, surface water, trade receivables and unbilled revenue, as on 31st March 2026.
    Show source
    As far as the receivables are concerned, the receivables have come down to INR3,015 crores, which includes groundwater, surface water, trade receivables and unbilled revenue.
  • JJM receivables across all states were INR 3,015 crores.
    Show source
    Sanjay Pusarla: This is what I have told you, it was INR 3,015 crores.
  • JJM debtors across all states were INR 695 crores.
    Show source
    Sanjay Pusarla: Only debtors, if you are asking me, it is only INR 695 crores.
  • The company collected about INR 1,000 crores in the current quarter.
    Show source
    About INR 1,000 crores we have collected in the current quarter.
  • The company received about INR1,000 crores in Q4 and about INR 400 crores, INR450 crores in the month of April for U.P. projects, and expects further payments in the coming months.
    Show source
    And as far as the U.P. is concerned, we have received about INR1,000 crores in the quarter 4, about INR 400 crores, INR450 crores in the month of April.
  • The company had loans to group companies of INR309 crores at the end of March '26.
    Show source
    And loans to the group companies is INR309 crores at the end of March '26.
  • The company will be collecting about INR 250 crores against the Vizag Urban outstanding of INR 291 crores.
    Show source
    Coming to the Vizag Urban status, I've already explained to you, we will be collecting about INR 250 crores and the outstanding is INR 291 crores.
  • The company has invested about INR 460 crores in the 2 SPVs for smart meters.
    Show source
    Sanjay Pusarla: In the smart meters, in the 2 SPVs, we have already invested about INR 460 crores.
  • The company has used about INR 130 crores, INR140 crores as working capital for its own project executed under the name of NCC Limited.
    Show source
    And in the case of our own project, which is executed under the name of NCC Limited, about INR 130 crores, INR140 crores, we have used as working capital.
  • The company has completed financial closure for its smart meter projects at a rate of 9.15% and has been using that facility to complete those projects.
    Show source
    As far as the projects which we have received on smart meters are concerned, we have done financial closure for those projects at a very competitive rate of 9.15%.
  • The company is nearing a 9% average interest rate.
    Show source
    And today, we are just nearing 9% average interest rate.
  • The company can raise purchase invoice discounting, trades and commercial paper at interest rates even below 8%.
    Show source
    Page 10of 19 NCC Limited May 16, 2026 And we have capabilities of raising good products in the market, which are like purchase invoice discounting, trades, commercial paper, which are at a very competitive rate of interest, which is even below 8%.
  • The company has never crossed 80% or 90% of its working capital facilities.
    Show source
    And we have enough bandwidth when we compare to the facilities, we have never crossed 80% or 90% of the working capital.
  • Regular capital expenditure is around INR 350 crores to INR 400 crores to replace equipment and buy new formworks and other items.
    Show source
    Sanjay Pusarla: So generally, what happens, our capex is around INR 350 crores to INR 400 crores on a regular basis because we need to replace the equipment, we need to buy the new formworks and other things.
  • INR900 crores of capital expenditure in the last year included about INR310 crores for a TBM being acquired for the GMLR project in Mumbai and about INR 150 crores to INR 160 crores for machinery purchased for the new mining project.
    Show source
    In the last year, INR900 crores, we have got 2 components.
  • The company projected capital expenditure of about INR 500 crores for the current year, including about INR 100 crores to INR150 crores for mining equipment acquired in phases because mining is capital-intensive.
    Show source
    And the current year, which we have projected about INR 500 crores, about INR 100 crores, INR150 crores we will be requiring for the mining because mining requires a huge capital- intensive project.
  • The company expects INR 100 crores to INR 150 crores of mining equipment and INR 350 crores or INR 400 crores for regular capital expenditure, refurbishment, replenishment or new equipment for its projects.
    Show source
    About INR 100 crores to INR 150 crores, we are expecting equipment for the mining and remaining INR 350 crores or INR 400 crores, which will be required for our regular capex , refurbishment, replenishment or the new equipment for all the projects which we are executing.
  • Net cash, net loans were INR 7,884 crores negative and INR2,118 crores positive in the two years discussed; the current-year position reflected about INR 1,100 crores of loans availed for smart meter projects from SBI and an about INR 500 crores increase in utilization of working capital.
    Show source
    In the current year, it is INR2,118 crores positive.
  • Margin money deposits were INR671 crores at the end of June '25 and INR639 crores at March '25.
    Show source
    It is standing at INR 631 crores as of the end of March '26, INR671 crores at the end of December '25 and INR650 crores -- INR654 crores at the end of March '25.
  • The company has fully invested the investment calls for both smart meter projects in the SPVs.
    Show source
    The -- what our investment calls were for both the projects in the SPVs, it has been fully invested.
  • The company has fund-based and non-fund-based working capital facilities tied up for its general contracting or EPC projects.
    Show source
    As far as other projects are concerned, which are in general nature and general contracting or EPC nature, we have facilities tied up, working capital facilities tied up both in terms of fund-based and non-fund -based.
  • The company has enough working capital limits to meet any kind of gaps that are going to come. Replaced by a later filing.
    Show source
    We have enough working capital limits also to meet any kind of gaps that are going to come.

What it expects ahead

What management expects

  • The company decided not to give guidance for FY2 7 because there were too many variables and the environment was very uncertain; it may revisit this decision after the first quarter when it has more clarity.
    Show source
    So we have decided not to give any guidance for FY2 7.
  • The company gave no guidance for its parameters, including order inflow, and said it may revisit the decision after the first quarter or so and provide guidance for '27 if there is clarity or a change in the environment.
    Show source
    Neerad Sharma: No guidance for all these parameters.
  • The company said it would revisit the subject of guidance after about 3, 4 months' time, when it has more clarity, rather than discuss a hypothetical number and revise it the next day.
    Show source
    So, as we have already shared with you that we will revisit this subject once we have some more clarity say that post about 3, 4 months' time, I mean, it is not really helpful to talk about any hypothetical number and tomorrow revise that number.
  • The company expects about INR 250 crores or INR291 crores, whatever is there, to come in the current year itself from Vizag Urban.
    Show source
    As far as the Vizag Urban is concerned, we are expecting about INR 250 crores in the current year.
  • The company will revisit the situation at the end of the first quarter and then give guidance, after watching the next 2 months.
    Show source
    At the end of the first quarter, we will revisit the situation and then give the guidance.
  • Execution remained normal during the past 45 days of the current year and was not being impacted, although the company did not know how supplies would shape up or what logistical constraints would arise.
    Show source
    But as of today, we are seeing in the past 45 days, the execution remains normal.
Show 25 more statements

What management expects

  • The coal mine has a rated capacity of 15 MTPA and achieved that capacity in FY2 3, '24; NCC Limited expects to maintain output at more or less the same level going forward.
    Show source
    So more or less, going forward, we should be able to maintain at the same level.
  • The company said its execution rate depends on developing circumstances, including prices going up, the dollar weakening and how the economy moves, and that it would be able to tell at the end of the quarter.
    Show source
    And we are seeing the prices going up, the dollar is weakening and how the economy is going to move.
  • TBM depreciation will start from the third quarter onwards, after TBM capitalization at the end of the second quarter.
    Show source
    So, third quarter onwards, we will get the depreciation of the TBM.
  • Standalone finance cost will remain as it is; finance cost for SPVs may increase a little bit when further disbursals are taken.
    Show source
    For SPVs, when we are taking the further disbursal, then it may increase a little bit.
  • Finance cost may go up if recent developments affect payment cycles; freely flowing payments would provide some relief.
    Show source
    If that impacts, this may go up.
  • Coal mining revenue and profitability are expected to remain in the same range as in the last two fiscal years, with some variation possible.
    Show source
    Neerad Sharma: In the same range, there could be some variation, but it could be in the -- it would be in the same range.
  • The company will be happy to return to Mr. Shah and share what is possible for FY27 if its view changes or it has more clarity. Replaced by a later filing.
    Show source
    So should there be any change in our view, should we have more clarity, we will be very happy to come back to you, Mr. Shah and share what we have, what is it that is really possible for FY27.
  • The company will continue to bid for projects depending on the projects coming up for bidding and the risk/reward equation. Replaced by a later filing.
    Show source
    We will continue to bid depending on the risk/reward equation.
  • The company is waiting for clarity, which it is hopeful will emerge in about the next few months; once it has more clarity, it would be happy to update investors about what it intends to do in the next few quarters. Replaced by a later filing.
    Show source
    We are waiting for some clarity to emerge, and we are hopeful that, that clarity should emerge in about next few months' time.

Orders

  • Consolidated order book was INR 83,004 crores as of 31st March '26, about 16% higher than last year and the highest in the company's history.
    Show source
    Our consolidated order book as of 31st March '26, stood at INR 83,004 crores, which is about 16% increase over the last year, and highest in the company's history.
  • The company received INR9,573 crores of fresh consolidated inflows in the fourth quarter and INR31,884 crores of consolidated inflows for the full year.
    Show source
    The fourth quarter contributed INR9,573 crores of fresh consolidated inflows and full year inflows totaled INR31,884 crores.
  • Order book provided multiyear revenue visibility, had a book-to-bill ratio of roughly 4x and was spread across seven verticals: buildings, transportation, mining, electrical, electrical T&D, water, and railways and irrigation.
    Show source
    This book -- this order book gives us multiyear revenue visibility and a book- to-bill ratio of roughly 4x, and it is spread across seven verticals, viz, buildings, transportation, mining, electrical, electrical T&D, water and railways and irrigation, which is what gives the portfolio its resilience.
  • U.P. JJM projects had outstanding order book of INR 3,619 crores for groundwater projects and INR2,562 crores for surface water projects, totaling INR 6,181 crores as on 31st March 2026.
    Show source
    That means INR 6,181 crores is the total order book pending as on 31st March 2026.
  • The company had reported about INR1,700 crores odd projects in month of April in FY2 7.
    Show source
    We have already reported about INR1,700 crores odd projects in month of April.
  • The company said that all orders included in its INR83,000 crores order book had the clearances and were fully available for execution.
    Show source
    Whatever orders are considered in this, they are all fully available for execution.
  • JJM projects, including groundwater and surface water, have an overall order book of INR26,000 crores, of which projects worth INR 20,142 crores have been executed, leaving a balance of INR 6,181 crores.
    Show source
    We have already executed projects up to INR 20,142 crores, leaving a balance of INR 6,181 crores.
  • Stand-alone order book for smart meters is INR 4,456 crores.
    Show source
    Sanjay Pusarla: And the order book in the stand-alone is INR 4,456 crores in the case of smart meters.
  • PCMPL for Pachhwara Coal Mining had an order book of INR4,800 crores, which NCC Limited generally looks ahead for 3 years as order book.
    Show source
    That was INR4,800 crores.
  • Private-line orders comprise about 5% of NCC Limited's entire order book.
    Show source
    Sanjay Pusarla: No, we have not seen any kind of pressure from the private lines because our private lines orders comprises about 4% to 5% -- yes about 5% in the entire order book.
  • Standalone order backlog is INR 72,259 crores, and a subsidiary company's order backlog is INR 10,745 crores.
    Show source
    Sanjay Pusarla: Standalone order backlog is INR 72,259 crores, and for a subsidiary company, it is INR 10,745 crores.
  • Order book included Buildings of INR 22,740 crores, Transportation of INR 15,320 crores, Water and Railways of INR10,400 crores, Electrical of INR 13,800 crores, Irrigation of INR4,950 crores and mining of INR 6,750 crores.
    Show source
    Sanjay Pusarla: Buildings, it is INR 22,740 crores.
  • Execution of the preapproval projects order has started, is going well, and had reached about INR430 crores till date.
    Show source
    And we have executed about INR430 crores till date.
  • The company recently bagged a mining project worth a little more than INR 6,000 crores and plans to commit capex to it.
    Show source
    Recently, we have bagged a big mining project, a little more than INR 6,000 crores.
  • Order book was Rs.71,568 cr.
    Show source
    Page 2of 19 NCC Limited May 16, 2026 The order book stands at INR 83,004 crores as of the end of 31st March '26, you are aware the order book at the beginning of the year stood at INR 71,568 crores and orders received in Q4 is INR9,573 crores and balance at the end of the year is say INR 83,004 crores.
  • The company includes state government, central government, central government agencies and PSUs in its definition of government.
    Show source
    Neerad Sharma: And government when we say government, means state government, central government, central government agencies, PSUs, all put together.

What it is building and selling

Projects and capacity

  • The company has one project in Qatar that is almost completed at the final stage, with probably INR20 crores, INR25 crores of work to execute in INR.
    Show source
    We have to probably execute a few -- maybe INR20 crores, INR25 crores of work in INR.
  • The overall TBM project value is about INR 6,000 crores, of which NCC Limited needs to execute INR 3,000 crores.
    Show source
    Sanjay Pusarla: The overall project value is about INR 6,000 crores.
  • The TBM project timeline is about 5 years.
    Show source
    Sanjay Pusarla: About 5 years' time -- 5 years' time.
  • The TBM machine, specifically designed for this project, is expected to start working in the next 2 months' time, and its total capex will be fully expensed in about 3 years' time.
    Show source
    The TBM machine is specifically designed for this project, and the total capex will fully expensed in about 3 years' time.
  • The company is constructing buildings, offices and central workshops across states where it has projects and a requirement for such workshops.
    Show source
    Sanjay Pusarla: So, there are buildings and offices and central workshops that are being constructed across all the states wherever we have the projects and wherever there is a requirement of having such Page 12of 19 NCC Limited May 16, 2026 workshops.

Risks, rules and outside factors

Risks and disputes

  • The company has made an investment in the Jubilee Hills Landmark project in Hyderabad, but the project is not being executed at the moment and its case is sub judice.
    Show source
    In addition to that, there is one project in Hyderabad, which is called a Jubilee Hills Landmark project, where we have done the investment and the project is not getting executed at the moment.
  • The company has a lot of similar arbitrations pending at different forums and will update as awards or cash are received.
    Show source
    Neerad Sharma: No, no. There would be a lot of similar kind of arbitrations pending at different forums.

Outside factors

  • About 74% of NCC Limited's contracts have escalation clauses, but the company is not sure whether price increases will be completely covered and says there may be some impact.
    Show source
    About 74% of the contracts, we have escalation clauses.
  • The company said rising costs in the economy might affect its clients' ability to take projects forward and make timely payments, and these situations are expected to play out in days to come.
    Show source
    Finally, this might also affect the ability of our clients to move -- take the projects forward, make timely payments.
  • The company has no international exposure at the moment.
    Show source
    Sanjay Pusarla: At the moment, we do not have any international exposure.
  • The company says logistics problems and fuel prices may cause some material availability issues; it is buying required materials just in time so execution pace and progress will not be hampered.
    Show source
    And second thing on that, availability of the materials because of the logistics problems and also the problems on account of the fuel prices and other things, there can be some availability issues in the case of materials.

Everything else said on the call

Group structure

  • Of NCC Limited's two mining projects, one is in an SPV and the other was directly awarded to the parent company, NCC Limited.
    Show source
    One is in the SPV, and one project has been directly awarded to the parent company, listed entity that is NCC Limited.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Vaibhav Shah: Yes. Thank you, Jitesh. On behalf of JM Financial, I welcome everybody to 4Q and FY2 6 Earnings Conference Call of NCC Limited. We have from the management today, Shri R.S. Raju, Director of Projects; Shri Sanjay Pusarla, Executive Vice President, Finance and Accounts; and Shri Neerad Sharma, Head Strategy and Investor Relations. Now I hand over the call to the management for their opening remarks, post which we can start with the Q&A session. Over to you, sir.

    Answer, neerad sharma

    Safe Harbor. Before we proceed, I would like to draw your attention to a brief disclaimer. Certain statements made during today's call may be forward-looking in nature and are subject to risks and uncertainties, actual results may differ materially from those expressed or implied. I encourage you to read the detailed statement on Page 2 of the investors' presentation. Order book, the foundation. Our consolidated order book as of 31st March '26, stood at INR 83,004 crores, which is about 16% increase over the last year, and highest in the company's history. The fourth quarter contributed INR9,573 crores of fresh consolidated inflows and full year inflows totaled INR31,884 crores.

    Answer, neerad sharma

    This book -- this order book gives us multiyear revenue visibility and a book- to-bill ratio of roughly 4x, and it is spread across seven verticals, viz, buildings, transportation, mining, electrical, electrical T&D, water and railways and irrigation, which is what gives the portfolio its resilience. Now I will hand over to my colleague, Mr. Sanjay Pusarla, he will share the details of the financial performance of the company. Post that, we will open for questions, any questions, any queries that you might have. Over to you, Mr. Pusarla. Sanjay Pusarla: Good morning, ladies and gentlemen. This is Sanjay Pusarla, Executive Vice President and CFO of NCC Limited. I am pleased to announce the financial results for Q4 FY2 6 of NCC Limited and also for the year ending 31st March 2026.

    Answer, neerad sharma

    My announcement basically covers order book revenue, profitability, debt movement and some of the important balance sheet items. Page 2of 19 NCC Limited May 16, 2026 The order book stands at INR 83,004 crores as of the end of 31st March '26, you are aware the order book at the beginning of the year stood at INR 71,568 crores and orders received in Q4 is INR9,573 crores and balance at the end of the year is say INR 83,004 crores. The revenue for the stand-alone. Turnover reported in Q4 FY2 6 is INR 5,382 crores, as against turnover of INR5,445 crores in the corresponding quarter of the previous year. It is decreased by 1%. For the full year, the turnover stands at INR 17,669 crores as against INR 19,393 crores of the previous year, a decline by 9%. At consolidated level, the turnover is reported in Q4 at INR 6,251 crores as against INR 6,189 crores in the corresponding quarter of the previous year, which shows an increase by 1%.

    Answer, neerad sharma

    For the full year, the turnover is INR 20,944 crores as against INR 22,355 crores, which is a decrease of 6%. Next on the profitability. At the stand-alone level, we achieved an EBITDA of 8.44% for Q4 FY26 as against 9.21% of the corresponding quarter of the previous year. PBT, we achieved 5.2% before exceptional items and PAT of 3.77% in the current quarter, that is Q4 FY2 6, as against PBT of 6.18% and PAT of 3.93% reported in the quarter 4 of FY2 5. At consolidated level, we achieved EBITDA of 8.83% and PBT of 4.70% before exceptional items and PAT of 3.3% in the current quarter. In the current quarter, that is Q4 FY2 6 as against EBITDA of 9.07% and PBT of 5.93% and PAT of 4.1% reported in the corresponding quarter of the last year. Then getting into the debt movement.

    Answer, neerad sharma

    The debt at the beginning of the quarter stood at INR 2,980 crores and net debt after cash and cash equivalents is INR 2,830 crores. At the end of quarter 4 of FY26, it stood at INR 2,251 crores and net debt at INR 1,667 crores. And at the end of Q4 FY25, the same is at INR 1,484 crores and net debt of INR 706 crores. There is a decrease of debt by INR729 crores in Q4 FY26. The debt-to-equity ratio stands at 0.30x at the end of Q4 FY2 6 as against 0.40 at the end of Q3 FY26 and 0.21 at the end of March '25. Getting into working capital. Working capital, excluding cash and margin money deposits at the end of Q4 FY2 6, it stands at INR 4,847 crores, which is 28% of the turnover.

    Answer, neerad sharma

    In terms of working capital days, it is 97 days. The trade receivables outstanding at the end of Q4 has decreased from INR 3,505 crores to INR3,336 crores, and the number of days also has decreased from 87 days to 73 days in the current quarter and 65 days for the corresponding quarter of the previous year. Unbilled revenue. It has decreased from INR 7,129 crores, which is 44% to INR 6,675 crores, which is 38% in Q4 FY26. And at the end of the previous year, it was INR 5,937 crores, which is 31%. Retention money stands at INR 2,253 crores for quarter 4 FY26 as against INR 2,099 crores Q3 FY26. And at the end of the March '25 that is the corresponding previous year, INR 8,870 crores.

    Answer, neerad sharma

    Coming to the mobilization advances. Mobilization advances are standing at INR 3,386 crores as at the end of March 31, 2026, as against INR3,162 crores at the end of December '25 and INR 2,098 crores at the end of March Page 3of 19 NCC Limited May 16, 2026 2025. Of these mobilized advances, 64% are interest-bearing and the average interest comes to 9.2%. Interest-bearing advances decreased from 67% to 64% during the current quarter. Cash and cash equivalents, INR 585 crores as on 31st March 2026 and INR 150 crores as on 31/12/2025 and INR778 crores as on 31/03/2025. Margin money deposits and others. It is standing at INR 631 crores as of the end of March '26, INR671 crores at the end of December '25 and INR650 crores -- INR654 crores at the end of March '25.

    Answer, neerad sharma

    Coming to the capex, we have incurred a capex of INR344 crores in Q4 FY2 6 and INR 912 crores we have incurred in the current year, which includes a capital work in progress for TBM about INR320 crores as against the budgeted capex of INR1,050 crores, which was revised earlier from INR 750 crores to INR1,050 crores in the year FY2 6. EPS stands at INR 3.23 at the end of Q4 FY2 6 as against INR 3.4 in Q4 FY25. And in FY26, it is INR 9.19 as against INR 12.12 in the previous year. With the end of -- with this, I'll be ending the announcement of the results. Thank you so much.

  2. Question

    Shravan Shah: A couple of questions. So first, we'll start with your broad guidance on revenue margin and order inflow for FY2 7. And also please specify this will be for stand-alone or at a consol level?

    Answer, neerad sharma

    Neerad Sharma: I mean there are too many variables in the equation as we speak. The whole environment is very uncertain. So we have decided not to give any guidance for FY2 7. However, we will revisit this decision, maybe when we will have -- we have some clarity after conclusion of the first quarter. If there is any guidance, we would be happy to come and share that with you.

  3. Question

    Shravan Shah: So for order inflow also, no guidance?

    Answer, neerad sharma

    Neerad Sharma: No guidance for all these parameters. But as I shared with you, because there are too many variables. It is very difficult really to look forward. You are already aware about the uncertain world that we are currently living in, but we will revisit this decision maybe, say, after first quarter or so. Should there be any clarity, should there be any change in the environment, we would be very pleased to revisit and come back to you with the guidance for '27.

  4. Question

    Shravan Shah: Sir, there just still -- I understand that we don't give, but still trying to get some sense. So obviously, the order book is at a historic high, and we must be knowing what kind of projects in which segments is going on and still 1.5 months is already there for this quarter also. So you -- we must be knowing a broad idea. I understand for last 2 quarters, we are not giving and again, we are not giving. So it is becoming a very, very difficult. So are we still of the opinion that still the working capital pressure, the payment issues and then whatever is happening at the world level obviously with the crisis. But at the India level, I understand the commodity prices, inflation

    Answer, neerad sharma

    Neerad Sharma: Yes, Mr. Shah. I really very much appreciate your concern. You talked about the cost element in the whole economy. Finally, this might also affect the ability of our clients to move -- take the projects forward, make timely payments. So, all these situations will finally are expected to play out in days to come. So, as we have already shared with you that we will revisit this subject once we have some more clarity say that post about 3, 4 months' time, I mean, it is not really helpful to talk about any hypothetical number and tomorrow revise that number. I hope you appreciate the spirit in which we have decided to share this information with you.

    Answer, neerad sharma

    So should there be any change in our view, should we have more clarity, we will be very happy to come back to you, Mr. Shah and share what we have, what is it that is really possible for FY27.

  5. Question

    Shravan Shah: Got it. Sir, on JJM front, so whatever the numbers if you can provide? So, both at total JJM and the U.P. So, the outstanding order book, the data both for U.P. and the total and how even post March and till now? What's the status there?

    Answer, sanjay pusarla

    Sanjay Pusarla: For U.P. project, JJM projects, the order book outstanding at the end of March '26 is INR 3,619 crores for all the groundwater. For the surface water projects, the outstanding order book is INR2,562 crores. That means INR 6,181 crores is the total order book pending as on 31st March 2026. The amount of work executed in U.P. projects is INR 1,730 crores for both groundwater and surface water. As far as the receivables are concerned, the receivables have come down to INR3,015 crores, which includes groundwater, surface water, trade receivables and unbilled revenue. That is coming to INR 3,015 crores.

  6. Question

    Shravan Shah: Okay. So, this is only U.P. -- and the total debtors is also from the JJM across all the states would be how much?

    Answer, sanjay pusarla

    Sanjay Pusarla: This is what I have told you, it was INR 3,015 crores.

    Answer, sanjay pusarla

    Sanjay Pusarla: Only debtors, if you are asking me, it is only INR 695 crores. Page 5of 19 NCC Limited May 16, 2026 Shravan Shah: Okay.

  7. Question

    So, the number, which was INR 1,700 crores as on December, now it is INR695 crores you're saying?

    Answer, sanjay pusarla

    Sanjay Pusarla: Correct. Correct. You are right. About INR 1,000 crores we have collected in the current quarter.

  8. Question

    Shravan Shah: Okay. Okay. And lastly, any more kind of a write-off impairment at the subsidiary level because last 2 years, I think we are slowly, slowly doing it. So -- and at the same time, the NCC Urban Infra, how much is outstanding and how much we will like to get repayment in FY2 7?

    Answer, sanjay pusarla

    Sanjay Pusarla: In the case of international projects, the impairment is done in the case of an investment at Oman, where the project is completed and whatever claims we have to receive, we have received, we have made an impairment of INR21.3 crores as an exceptional item. With this, the international outstanding, whatever is there, that completely impaired. That is one. As far as the Vizag Urban is concerned, we are expecting about INR 250 crores in the current year.

  9. Question

    Parikshit Kandpal: Okay, sure. So sir, in this environment, there are so many uncertainties. So are you bidding for orders? Or are you stop bidding for orders also?

    Answer, neerad sharma

    Neerad Sharma: No, no. We will continue to bid depending on the projects which are coming up for bidding. We will continue to bid depending on the risk/reward equation. In fact, we have already bagged a few projects in this financial year as well, that is FY2 7. We have already reported about INR1,700 crores odd projects in month of April. Parikshit Kandpal: So are we seeing any slowdown in our execution because we have INR 83,000 crores of order book. So I just wanted to check if we are -- the work is going on entirely on the books -- entire orders or there are still some orders where the work has not started. Has the clients asked us to slow down the work?

    Answer, sanjay pusarla

    Sanjay Pusarla: To add further, the order book of INR83,000 crores, whatever INR 80,000 -- INR83,000 crores. All the orders we have got the clearances, we'll be able to execute. There is absolutely no issue on account of any holdups or resigns or write-off bases. Whatever orders are considered in this, they are all fully available for execution.

  10. Question

    Parikshit Kandpal: No sir, I'm not asking guidance. I'm saying, are we able to maintain the current execution rate of INR5,300 crores, which we reported in this quarter? Or can it go down?

    Answer, sanjay pusarla

    Sanjay Pusarla: That also depends, we have still 1.5 months more because this situation is developing day by day. If you see that in the last -- beginning of the year and today, there is a lot of development that was happening. And we are seeing the prices going up, the dollar is weakening and how the economy is going to move. All these things will also have a bearing on the balance 15 days. So we'll be able to tell you at the end of the quarter, we have to wait, watch and see patiently.

Show 14 more questions
  1. Question

    Parikshit Kandpal: Yes. Okay. Just the last thing, sir, just one advice. I mean NCC is one of the oldest company in infra, which I have been covering more than 18 years now. And you have seen cycles. This is not the first time you have seen challenges or headwinds. You have GST, you have demonetizing. So many things have happened. We have never desisted away from even the AP crisis, which happened where a large part of the order book got and we have to lose it. But still we have guided. Page 7of 19 NCC Limited May 16, 2026 I don't know. I mean, when the size has become so big, so is this an advice, I mean, you should be considered, discussed with your Board. I mean you need to give the guida

    Answer, sanjay pusarla

    Sanjay Pusarla: In Q4, we have seen improvement in the payment cycle. Absolutely, that is correct. And as far as the U.P. is concerned, we have received about INR1,000 crores in the quarter 4, about INR 400 crores, INR450 crores in the month of April. And we are expecting further payments also in the coming months. So we are confident that the -- with the way the payments are being released, some more payments related to U.P. projects also will come. So this will improve the situation. And as far as others are concerned, now it is continued to be a good pay masters.

  2. Question

    Parvez Qazi: That's great to hear. Second, you gave the numbers about JJM projects in U.P. Would it be possible to get those numbers about our overall JJM order book, I mean, including orders that we might have in other cases also, what is the order book and what are the payment outstanding there?

    Answer, sanjay pusarla

    Sanjay Pusarla: The overall order book we have already covered, but I will give you for better clarity. The overall order book, what we have received for the JJM projects, including groundwater, surface water is INR26,000 crores. We have already executed projects up to INR 20,142 crores, leaving a balance of INR 6,181 crores. Is this clear?

  3. Question

    Parvez Qazi: Yes. Total exposure, investments plus loans and advances, whatever you might have done. Page 8of 19 NCC Limited May 16, 2026 Sanjay Pusarla: Yes, investment is INR 887 crores at the end of March '26.

    Answer, sanjay pusarla

    And loans to the group companies is INR309 crores at the end of March '26. Coming to the Vizag Urban status, I've already explained to you, we will be collecting about INR 250 crores and the outstanding is INR 291 crores.

  4. Question

    Parvez Qazi: Sure. And last question, some update on the smart meter projects, what is the kind of investment you've already done there?

    Answer, sanjay pusarla

    Sanjay Pusarla: In the smart meters, in the 2 SPVs, we have already invested about INR 460 crores. And in the case of our own project, which is executed under the name of NCC Limited, about INR 130 crores, INR140 crores, we have used as working capital. The total investment in SPV is about INR460 crores.

  5. Question

    Vaibhav Shah: Okay. Okay. Sir secondly, on smart meters, you have invested INR460 crores, any pending investment now remaining?

    Answer, sanjay pusarla

    Sanjay Pusarla: No, nothing is there. The -- what our investment calls were for both the projects in the SPVs, it has been fully invested.

  6. Question

    Vaibhav Shah: Okay.

    Answer, sanjay pusarla

    Sanjay Pusarla: And the order book in the stand-alone is INR 4,456 crores in the case of smart meters.

  7. Question

    Vaibhav Shah: Okay. And sir, lastly, in order inflow number, it was INR 9,573 crores for consol and INR 4,775 crores for stand-alone. So, what was the difference of roughly INR 4,800 crores in Q4?

    Answer, sanjay pusarla

    Sanjay Pusarla: PCMPL for Pachhwara Coal Mining. So, we generally take -- look ahead for 3 years as the order book. That was INR4,800 crores. Page 9of 19 NCC Limited May 16, 2026 Vaibhav Shah: So, we have added that order book for the mining portion?

  8. Question

    Sucrit D. Patil: My second question is to Mr. Sanjay is from a technical point of view, how is the company optimizing its capital structure to balance project financing requirements with debt sustainability, especially given the long-term decision period of infrastructure projects, could you elaborate on the framework being used for cash flow forecasting, interest rate risk management and working capital efficiencies to ensure liquidity while maintaining the profits?

    Answer, sanjay pusarla

    Sanjay Pusarla: In the case of the projects which we are executing, we do not have much long-term high -value high-ticket infrastructure projects, okay? The projects which we are executing basically of a contracting nature on EPC board. That is one. As far as the projects which we have received on smart meters are concerned, we have done financial closure for those projects at a very competitive rate of 9.15%. And we have been using that facility to complete those projects. As far as other projects are concerned, which are in general nature and general contracting or EPC nature, we have facilities tied up, working capital facilities tied up both in terms of fund-based and non-fund -based. Our interest rates are very competitive.

    Answer, sanjay pusarla

    And today, we are just nearing 9% average interest rate. Page 10of 19 NCC Limited May 16, 2026 And we have capabilities of raising good products in the market, which are like purchase invoice discounting, trades, commercial paper, which are at a very competitive rate of interest, which is even below 8%. And we have enough bandwidth when we compare to the facilities, we have never crossed 80% or 90% of the working capital. We have enough working capital limits also to meet any kind of gaps that are going to come. This is how we are managing our financing.

    Answer, sanjay pusarla

    Sanjay Pusarla: At the moment, we do not have any international exposure. We have only one project in Qatar, which is almost completed at the final stage. We have to probably execute a few -- maybe INR20 crores, INR25 crores of work in INR. Bhavin Modi: Okay. Understood. Sir, second question, again to dwell on the guidance part. Sir, like there can be two issues, right?

    Answer, sanjay pusarla

    Sanjay Pusarla: I think Mr. Neerad has already covered. We have the execution capabilities we have built up over the last 5 decades -- less than 5 decades we have built up. So, resource capabilities is not a constraint at all. Order book is not a constraint at all, given the uncertainties, which are prevailing today, we thought that we will just wait and give the guidance. We'll watch for this next 2 months. At the end of the first quarter, we will revisit the situation and then give the guidance.

  9. Question

    Bhavin Modi: Okay. Sir, I understand there's an uncertainty, but that can impact 2 things, right, either your execution or your margins. So, where you see -- I am not asking for the guidance, but where you see it's impacting the more or where the uncertainty lies? Is it the margin or is it the execution?

    Answer, sanjay pusarla

    Sanjay Pusarla: At the moment, what I can say is that we have all our contracts -- many of the contracts, we have escalation clauses. About 74% of the contracts, we have escalation clauses. But I'm not very sure whether the increase in the prices will completely get covered under the escalation clauses. There may be some impact. There is no doubt in that. And second thing on that, availability of the materials because of the logistics problems and also the problems on account of the fuel prices and other things, there can be some availability issues in the case of materials. But as of now, we are following a path of buying the material -- required materials just in time so that our execution pace and progress will not get hampered.

  10. Question

    Bhavin Modi: Understood. And just last question, sir. Almost 50% of our order book comes from the buildings and the transportation, leaving aside mining and water and irrigation. So just wanted to understand, sir, what is the share of private and the government client in the order book? Question being, are there any pressure coming from the private clients, any cancellation of orders or something like that, that you're seeing?

    Answer, sanjay pusarla

    Sanjay Pusarla: No, we have not seen any kind of pressure from the private lines because our private lines orders comprises about 4% to 5% -- yes about 5% in the entire order book. Page 11of 19 NCC Limited May 16, 2026 Bhavin Modi: So, 95% is from the government?

    Answer, neerad sharma

    Neerad Sharma: And government when we say government, means state government, central government, central government agencies, PSUs, all put together.

  11. Question

    Bhavin Modi: So, any payment -- in transportation or from the building side, any payment related issues? Or is it going fine?

    Answer, sanjay pusarla

    Sanjay Pusarla: Today, we have not seen any payment issues. Things are going fine.

    Answer, sanjay pusarla

    Sanjay Pusarla: So generally, what happens, our capex is around INR 350 crores to INR 400 crores on a regular basis because we need to replace the equipment, we need to buy the new formworks and other things. In the last year, INR900 crores, we have got 2 components. Basically, one is on the TBM, which we are acquiring for the GMLR project, which we are executing in Mumbai, about INR310 crores. About INR 150 crores, INR 160 crores, we have acquired -- we have purchased the machinery for the new mining project. So that was the composition of the last year. And the current year, which we have projected about INR 500 crores, about INR 100 crores, INR150 crores we will be requiring for the mining because mining requires a huge capital- intensive project. It requires in a phased manner acquisition of the equipment.

    Answer, sanjay pusarla

    About INR 100 crores to INR 150 crores, we are expecting equipment for the mining and remaining INR 350 crores or INR 400 crores, which will be required for our regular capex , refurbishment, replenishment or the new equipment for all the projects which we are executing.

  12. Question

    Saket Kapoor: Sir, for the TBM project, what would be the execution cycle and the size of the orders that we will be -- our endeavor will be to execute for the current year?

    Answer, sanjay pusarla

    Sanjay Pusarla: The overall project value is about INR 6,000 crores. And the part of execution, which we need to do is INR 3,000 crores.

  13. Question

    Saket Kapoor: Okay. And what are our timeline for the same, sir with respect to our clients, deliverables?

    Answer, sanjay pusarla

    Sanjay Pusarla: About 5 years' time -- 5 years' time.

  14. Question

    Saket Kapoor: Right. Sir, we have also seen some -- the status of investment property under construction. So, if you could dwell on the same, what is that pertaining to INR 110 crores or INR 105 crores?

    Answer, sanjay pusarla

    Sanjay Pusarla: So, there are buildings and offices and central workshops that are being constructed across all the states wherever we have the projects and wherever there is a requirement of having such Page 12of 19 NCC Limited May 16, 2026 workshops. In addition to that, there is one project in Hyderabad, which is called a Jubilee Hills Landmark project, where we have done the investment and the project is not getting executed at the moment. And the case is being heard, and it is sub judice to talk about that at this moment.

Questions about this call

When was the NCC Q4 FY26 earnings call transcript filed?
NCC filed the transcript with the exchange on 20 May 2026. This page is built from that transcript.
What does this page list?
100 statements from the transcript across 8 topics, 70 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 24 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
NCC Q4 FY26 concall: NCC Limited's consolidated order book was INR 83,004 crores as of 31st March '26, about 16% higher than last year and the highest in the company's history · DalalOS