Skip to content

Earnings call

NCC Q1 FY27 earnings call

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

Order book stood at INR 81,214 crores as of 30th June ' 26, and the company booked new orders worth INR 3,889 crores during the quarter, mainly from its Buildings and Water & Railways divisions; the order book provided a book-to-bill of about 3.5 x. Guidance for FY '27 is order inflow of INR 22,000 crores to INR 25,000 crores, revenue growth of 8% to 10%, and EBITDA margin of 8.5% to 9%. The widely reported site is about 20, 30 kilometers from NCC Limited’s actual site, and NCC Limited said there was no great impact as such. The company reported turnover of INR 5,842 crores on a consol basis in the 1st Quarter of FY '27, compared with INR 5,208 crores in the corresponding quarter of the previous year, registering growth of 12%. Standalone debt at the beginning of Q1 FY '27 was INR 2,251 crores and net debt after cash and cash equivalents was INR 1,667 crores; at the end of Q1 FY '27, debt was INR 2,410 crores and net debt was INR 2,008 crores. At the end of the corresponding quarter of the previous year, debt was INR 1,852 crores and net debt was INR 1,497 crores.

The numbers management gave

Results

  • The company reported turnover of INR 5,842 crores on a consol basis in the 1st Quarter of FY '27, compared with INR 5,208 crores in the corresponding quarter of the previous year, registering growth of 12%.
    Show source
    In the 1st Quarter of FY '27, the company has reported a turnover of INR 5,842 crores on a consol basis as against INR 5,208 crores in the corresponding quarter of the previous year, registering a growth of 12%.
  • EBITDA margin was 9.4% on a consol basis in the 1st Quarter of FY '27, compared with 8.8% in the corresponding quarter of the previous year.
    Show source
    The EBITDA margin for the quarter stands at 9.4% on a consol basis as against 8.8% in the corresponding quarter of the previous year.
  • Standalone turnover in Q1 FY '27 was INR 4,912 crores, its highest Q1 turnover in the company’s history.
    Show source
    Before I start my presentation, it is my pleasure to announce that the turnover in Q1 of FY '27 , which is INR 4,912 crores, is the highest Q1 turnover reported in the history of NCC.
  • Consolidated turnover in Q1 FY '27 was INR 5,842 crores, its highest turnover in the company’s history.
    Show source
    And as far as the consolidated turnover is concerned, we have reported INR 5,842 crores.
  • Earlier highest standalone turnover was INR 4,747 crores in Q1 of FY ' 25, and its earlier highest consolidated turnover was INR 5,558 crores in Q1 of FY ' 25.
    Show source
    The earlier highest turnover was in standalone INR 4,747 crores, which was reported in Q1 of FY ' 25, at consol, INR 5,558 crores in Q1 of FY ' 25.
  • Standalone turnover in Q1 FY '27 was INR 4,952 crores, compared with INR 4,430 crores in the corresponding quarter of the previous year, an increase of 12%.
    Show source
    Coming to the revenue: At the standalone level, we have reported a turnover of INR 4,952 crores in Q1 FY '27 against the turnover of INR 4,430 crores in the corresponding quarter of the previous year, thereby an increase of 12% reported.
Show 36 more statements

Results

  • Consolidated turnover in Q1 FY '27 was INR 5,842 crores, compared with INR 5,208 crores in the corresponding quarter of the previous year, an increase of 12%.
    Show source
    Consolidated turnover: Turnover reported in Q1 FY '27 is INR 5,842 crores as against the turnover of INR 5,208 crores in the corresponding quarter of the previous year, thereby an increase of 12%.
  • Standalone EBITDA in Q1 FY '27 was INR 442.45 crores, or 9.01%, compared with INR 394.82 crores, or 9.02%, in the corresponding quarter of the previous year.
    Show source
    Coming to the profitability: At standalone level, we achieved EBITDA of 9.01%, which is INR 442.45 crores, as against 9.02%, which is INR 394.82 crores for the corresponding quarter of the previous year.
  • Standalone PBT before exceptional items in Q1 FY '27 was INR 232.51 crores, or 5.12%, and PAT was INR 187.31 crores, or 3.8%; in the corresponding quarter of the previous year, PBT was INR 240.69 crores, or 5.43%, and PAT was INR 189.99 crores, or 4.29%.
    Show source
    The PBT we achieved is 5.12% before exceptional items, which is INR 232.51 crores, and PAT of 3.8%, which is INR 187.31 crores in the current quarter, as against PBT of 5.43%, which is INR 240.69 crores, and PAT of 4.29%, which is INR 189.99 crores in the corresponding quarter of the previous year.
  • Consolidated EBITDA in Q1 FY '27 was INR 545.12 crores, or 9.38%, and PBT before exceptional items was INR 311.64 crores, or 5.33%; PAT was INR 216.40 crores, or 3.7%. In the corresponding quarter of the previous year, EBITDA was INR 456.12 crores, or 8.81%, PBT was INR 268.36 crores, or 5.15%, and PAT was INR 192.14 crores, or 3.69%.
    Show source
    This is before exceptional items, and PAT of INR 216.40 crores, which is 3.7% in the current quarter, as against EBITDA of 8.81%, which is INR 456.12 crores, PBT of 5.15%, which is INR 268.36 crores, and PAT of 3.69%, which is INR 192.14 crores in the corresponding quarter of the previous year.
  • Working capital, excluding cash and margin money deposits, stood at INR 5,334 crores, 27% of turnover and 95 days, at the end of Q1 FY '27.
    Show source
    Coming to the working capital: Excluding cash and margin money deposits: At the end of Q1 FY '27 , we stand at INR 5,334 crores, which is 27% of the turnover.
  • Working capital at the beginning of this year was INR 4,887 crores, 28% of turnover and 97 days.
    Show source
    At the beginning of this year, we were standing at INR 4,887 crores, which is 28%, and working capital days was 97 days.
  • Outstanding trade receivables at the end of Q1 decreased from INR 3,336 crores to INR 3,055 crores, and trade receivables days decreased from 73 days to 68 days in the current quarter; the number of days was 77 days in the corresponding quarter of the previous year.
    Show source
    Let’s get into the trade receivables: Outstanding at the end of Q1 has decreased from INR 3,336 crores to INR 3,055 crores, and the number of days also decreased from 73 days to 68 days in the current quarter.
  • Unbilled revenue increased from INR 6,675 crores, or 38% of revenue, to INR 7,414 crores, which represented 38% of revenue on an annualized basis in Q1 FY '27; unbilled revenue was INR 6,442 crores, or 37%, in the corresponding period of the previous year.
    Show source
    This also represents 38% of the revenue on annualized basis in Q1 FY '27 and INR 6,442 crores in the corresponding period of the previous year, which is 37%.
  • Retention money stood at INR 2,396 crores at the end of Q1 FY '27, compared with INR 2,256 crores at the beginning of the quarter.
    Show source
    Retention money: Page 5 of 22 NCC Limited August 07, 2026 This stands at INR 2,396 crores at the end of this quarter as against INR 2,256 crores at the beginning of this quarter.
  • Mobilization advances stood at INR 3,163 crores as on 30th June 2026, compared with INR 3,386 crores as on March ' 26.
    Show source
    Coming to the mobilization advances: These advances stand at INR 3,163 crores as on 30th June 2026 as against INR 3,386 crores as on March ' 26.
  • Of NCC Limited’s mobilization advances, 60% were interest-bearing, with an average interest rate of 9.1%; the interest-bearing share decreased from 64% to 60% in the quarter.
    Show source
    Of these mobilization advances, 60% are interest-bearing, and the average interest rate comes to 9.1%.
  • Inventory stood at INR 1,815 crores, compared with INR 1,787 crores at the end of March.
    Show source
    Inventory: We are standing at INR 1,815 crores as against INR 1,787 crores at the end of March.
  • The company collected about INR 110 crores in the 1st Quarter against the UP projects under JJM.
    Show source
    Sanjay Pusarla: In the 1st Quarter, we have collected about INR 110 crores.
  • The company collected INR 610 crores during the 1st Quarter against the overall JJM projects, including surface water and groundwater.
    Show source
    The amount collected during the 1st Quarter against this is INR 610 crores.
  • Of NCC Limited's INR 7,414 crores of unbilled revenue, about INR 780 crores to INR 800 crores had been certified in the first week of July, reducing unbilled revenue to that extent; milestone-based contracts are the reason for a little increase in unbilled revenue, which NCC Limited expects to smoothen over the next quarters as billing for BSNL and BharatNet starts and the unbilled revenue converts to revenue.
    Show source
    Sanjay Pusarla: Obviously, this unbilled revenue also, out of the INR 7,414 crores, about INR 780 crores to INR 800 crores, that have been certified in first week of July.
  • The company reported standalone basic and diluted EPS of 2.98 in the first quarter of Financial Year 2026-27, compared with 3.03 in the corresponding quarter of the previous year.
    Show source
    EPS stands at INR 2.98 at the end of Q1 FY '27 as against INR 3.03 at the end of Q1 FY '26, that is corresponding quarter of the previous year.
  • Unbilled revenue is already treated as revenue; when unbilled revenue converts into certification, unbilled revenue comes down and certified revenue goes up, without changing revenue numbers.
    Show source
    Sanjay Pusarla: No. Because unbilled revenue is already treated as revenue.

Money and capital

  • Standalone debt at the beginning of Q1 FY '27 was INR 2,251 crores and net debt after cash and cash equivalents was INR 1,667 crores; at the end of Q1 FY '27, debt was INR 2,410 crores and net debt was INR 2,008 crores. At the end of the corresponding quarter of the previous year, debt was INR 1,852 crores and net debt was INR 1,497 crores.
    Show source
    At the end of Q1 FY '27 , the debt stands at INR 2,410 crores and net debt of INR 2,008 crores.
  • Standalone debt increased by INR 159 crores in Q1 FY '27, and its debt-equity ratio was 0.31 at the end of Q1 FY '27, compared with 0.30 at the end of March ' 26 and 0.24 in the corresponding quarter of the previous year.
    Show source
    The debt-equity ratio stands at 0.31 at the end of Q1 FY '27 as against 0.30 at the end of March ' 26, and corresponding quarter of the previous year, it was 0.24.
  • Consolidated debt at the beginning of Q1 FY '27 was INR 3,457 crores and net debt after cash and cash equivalents was INR 2,815 crores; at the end of Q1 FY '27, debt was INR 4,020 crores and net debt was INR 3,513 crores. At the end of the 1st Quarter of the previous year, debt was INR 1,986 crores and net debt was INR 1,574 crores.
    Show source
    At the end of Q1 FY '27 , it stands at INR 4,020 crores, and net debt at INR 3,513 crores.
  • Cash and cash equivalents were INR 402 crores at the end of June ' 26, compared with INR 585 crores at the end of March '26.
    Show source
    Cash and cash equivalents: We are at INR 402 crores at the end of June ' 26 as against INR 585 crores at the end of March '26.
  • Margin money deposits and others were INR 633 crores at the end of Q1, compared with INR 631 crores at the end of March.
    Show source
    Margin money deposits and others: We were at INR 633 crores at the end of Q1 as against INR 631 crores at the end of March.
  • The company incurred CAPEX of INR 170 crores in Q1, against budgeted CAPEX of INR 500 crores.
    Show source
    So coming to the CAPEX: We have incurred CAPEX of INR 170 crores in Q1 against the budgeted CAPEX of INR 500 crores.
  • Investment was INR 867 crores, the same amount as at the end of March.
    Show source
    Investment: We are at INR 867 crores.
  • Loans to group companies were INR 290 crores at the end of June, compared with INR 295 crores at the end of March.
    Show source
    Loans to group companies: We were at INR 290 crores as at the end of June as against INR 295 crores at the end of March.
  • Trade payables were INR 7,071 crores as at the end of June 2026.
    Show source
    For the trade payables, it was INR 7,071 crores as at the end of June 2026.
  • Outstanding for the UP water projects under JJM was INR 1,043 crores as of June 26.
    Show source
    Sanjay Pusarla: The outstanding for the JJM as of June 26 is INR 1,043 crores for the UP water projects.
  • The company received about INR 413 crores from JJM in July.
    Show source
    And i n the month of July also, we have got a good money of about INR 413 crores from the JJM.
  • The company has no pending equity requirement from its side for the smart meter project; it had invested about INR 460 crore as of the end of March, and the required investment had been completed with no further equity requirement at the moment.
    Show source
    We have invested about INR 460 crore as of the end of March.
  • The company took about INR 400 crores, INR 370 crores of debt on the smart meters in the 1st Quarter of FY '27.
    Show source
    About INR 400 crores, INR 370 crores we have taken debt on the smart meters.
  • The company raised about INR 160 crore, INR 170 crores of loans for CAPEX requirements at the HoldCo level in the 1st Quarter of FY '27.
    Show source
    So, about INR 160 crore, INR 170 crores.
  • Loan drawn for its smart meter projects from June ' 25 was about INR 1,350 crores.
    Show source
    From June ' 25, if you ask me, the loan which we have drawn for our smart meter projects is about INR 1,350 crores.
  • Smart meter debt at the end of June ' 26 was INR 1,461 crores out of INR 4,019 crores cumulatively.
    Show source
    But if you ask me cumulatively, the debt of smart meters at the end of June ' 26 is INR 1,461 crores out of the INR 4,019.
  • INR 1,461 crores of NCC Limited’s INR 3,500 crores net debt was smart meter debt.
    Show source
    Neerad Sharma: Out of 35, 1,461 is smart meter .
  • Receivable for the old AP Capital City projects was about INR 142 crores at the end of March '26; NCC Limited expects the entire amount to be realized in this quarter or very early next quarter.
    Show source
    In the AP Capital City, old projects, the Capital City old projects, okay, which was there at the end of March ' 26, is about INR 142 crores.
  • The company said contracts are coming on PPP mode, HAM mode or annuity mode, and its debt profile will change depending on the type of contract it wins.
    Show source
    So, g iven the type of contract we are going to win, depending on that, the debt profile also will be changing.

What it expects ahead

What management expects

  • Guidance for FY '27 is order inflow of INR 22,000 crores to INR 25,000 crores, revenue growth of 8% to 10%, and EBITDA margin of 8.5% to 9%.
    Show source
    I repeat, INR 22,000 crores to INR 25,000 crores; revenue growth of 8% to 10% and EBITDA margin in the range of 8.5% to 9%.
  • CAPEX guidance remains INR 500 crores.
    Show source
    Guidance remains the same for the CAPEX , INR 500 crores, whatever we have given.
  • Prospective pipeline of projects was about INR 2.5 lakh crore as of 1st Quarter.
    Show source
    The prospective pipeline of projects is about INR 2.5 lakh crore as of 1st Quarter.
  • The company said orders worth about INR 3,889 crore received in the current quarter may start producing turnover from the third quarter onwards because initial mobilization time is required.
    Show source
    They will start producing the turnover maybe from the third quarter onwards because initial mobilization time is required.
  • The company expects the CAPEX part of its smart meter projects in Maharashtra or Bihar to be completed by March '27, after which O&M revenue will accrue to the organization consistently and on a regular basis.
    Show source
    We are expecting that all the smart meter projects, either at Maharashtra or Bihar, will be completed by March ' 27.
  • The company said that for every one lakh meters coming into operation, it will generate about INR 1 crore in O&M revenue.
    Show source
    But g enerally, what happens is that for every one lakh meters that we are coming into operation, we will be generating about INR 1 crore for the O&M. For every one lakh of meters coming into operation, we will be generating INR 1 crore for revenue as O&M revenue.
Show 30 more statements

What management expects

  • The company was looking at an IRR of 18% for the smart meter project and expects to maintain that in the project.
    Show source
    And we expect that we will be maintaining that in the project.
  • The company hopes to receive the balance receivables from the Telangana government relating to Mission Bhagiratha as per the schedule, at the rate of 15% every month.
    Show source
    I mean, we hope to get paid as per the schedule.
  • The company expects the flow of money and release of payment from JJM to continue and, with that expectation, expects to complete substantially the JJM projects in the current year.
    Show source
    And w ith that expectation, we are expecting to complete substantially the JJM projects in the current year.
  • The company will substantially close the JJM projects in its pipeline in the current year, provided the money flow continues like this.
    Show source
    Sanjay Pusarla: Substantially, we will close, provided the money flow also continues like this.
  • The company expects prices to stabilize in the second quarter and hopes there will not be much impact if prices stabilize.
    Show source
    And i n the second quarter, we are expecting the prices to stabilize.
  • The company expects its unbilled revenue to smoothen over the next two quarters.
    Show source
    Over the next two quarters, it should smoothen.
  • The company expects prices on the BharatNet project to get smoothened over a period of time; while prices may not result in a loss, they will result in a lesser profit, and prices can have ups and downs.
    Show source
    We are expecting that the prices will get smoothened over a period of time.
  • The company said progress on the Ken-Betwa project may slow a little if there are rains, but would be good if there are no rains.
    Show source
    Probably if rains are there, there will be a little slowdown in the progress, but if the rains are not there, the progress will be good.
  • The company expects the TBM to start functioning, with depreciation possibly increasing from the third quarter.
    Show source
    Once it starts functioning, probably, maybe from the third quarter, the depreciation also will go up.
  • The company will start recognizing depreciation of the TBM in the third quarter.
    Show source
    We will start recognizing the depreciation of the TBM.
  • The company will maintain the same percentage of interest cost if payments are coming; if corrections come in the coming months, the interest cost may get sorted.
    Show source
    Given the situation, if the payments are coming, we will be maintaining the same kind of percentage of interest cost.
  • For BharatNet, some packages have not yet been opened, the client will decide which to award and when, and the award is expected to take some time.
    Show source
    Sanjay Pusarla: 6,500 is the balance order to be executed for BharatNet project.
  • The company is in regular touch with the client on the BharatNet project and is hopeful of some kind of resolution in the next few quarters. Replaced by a later filing.
    Show source
    So, as I brought to your attention, we are in regular touch with the client, and we are hopeful of some kind of resolution in the next few quarters.
  • The company said execution was moving smoothly and making good progress, but the environment remained uncertain and it was difficult to say with certainty how fund allocation would be in future quarters. Replaced by a later filing.
    Show source
    And it is very difficult to say for a certainty that this is how the future quarters how would the fund allocation.
  • The company said it is slowly entering into private-sector projects and is likely to see some increase in its entry into private projects. Replaced by a later filing.
    Show source
    Slowly we are venturing into it, and likely that we will see some kind of our entry into the private projects also, increase in the entry of private projects also.

Orders

  • Order book stood at INR 81,214 crores as of 30th June ' 26, and the company booked new orders worth INR 3,889 crores during the quarter, mainly from its Buildings and Water & Railways divisions; the order book provided a book-to-bill of about 3.5 x.
    Show source
    As of 30th June ' 26, our order book stands at INR 81,214 crores.
  • Total order inflow, including projects bagged in the month of July, stood at INR 4,542 crores.
    Show source
    If we take into account the projects bagged in the month of July, the total order inflow stands at INR 4,542 crores.
  • Buildings division order book stood at INR 22,357 crores, about 28% of the total order book, at the end of the 1st Quarter of FY '27.
    Show source
    The broad components of this order book as of the end of the 1st Quarter is the Buildings division stands at INR 22,357 crores, which is about 28% of the total order book.
  • Transportation division order book stood at INR 16,344 crores, about 20% of its order book, at the end of the 1st Quarter of FY '27.
    Show source
    The Transportation division has an order book of INR 16,344 crores, which is about 20% of our order book.
  • Electrical T&D order book stood at INR 13,312 crores, about 16% of the order book, at the end of the 1st Quarter of FY '27.
    Show source
    The Electrical T&D stands at INR 13,312 crores, which is about 16% of the order book.
  • Mining division order book stood at INR 13,400 crores, representing 16% of the total order book, at the end of the 1st Quarter of FY '27.
    Show source
    The Mining division stands at INR 13,400 crores, representing 16% of the total order book.
  • Water & Railways division order book stood at INR 10,994 crores, about 14% of the order book, at the end of the 1st Quarter of FY '27.
    Show source
    The Water & Railways division holds INR 10,994 crores, which is about 14% of the order book.
  • Irrigation division order book stood at INR 4,806 crores, about 6% of the order book, at the end of the 1st Quarter of FY '27.
    Show source
    The Irrigation division has INR 4,806 crores, which is about 6% of the order book.
  • Order book stood at INR 81,214 crores as at the end of June 30th, 2026, comprising INR 71,312 crores standalone and INR 9,902 crores from subsidiaries; the order book at the beginning of the year was INR 83,004 crores, and orders received during the quarter were INR 3,889 crores.
    Show source
    The order book contains standalone of INR 71,312 crores and from the subsidiaries, INR 9,902 crores.
  • Overall JJM projects, including surface water and groundwater, had UBR of INR 2,771 crores.
    Show source
    If you ask me overall JJM projects, the overall JJM projects, including the surface water and the groundwater, the total is INR 2,771 crores is the UBR .
  • Order book as of the end of June 26th included INR 3,524 crores of groundwater and INR 2,358 crores of surface water, for a total order book of INR 5,881 crores; it had no O&M component.
    Show source
    And as far as the order book is concerned, we have complete orders like for surface water and the groundwater, INR 5,881 crores as at the end of June 26.
  • Order book comprised about 14% central government orders, about 19% state government orders, about 60% orders from PSUs and state government entities, about 5% from ADB, AIIB and banks, and about 4% from private clients.
    Show source
    The central government orders constitute about 14%, and state government orders constitute about 19%.
  • INR 81,000 crore order book consists of orders spanning 2 years to 5 years, with a mining order spanning almost 7 years and some other orders spanning 2 years or 3 to 4 years; all these orders are in executable mode.
    Show source
    Page 18 of 22 NCC Limited August 07, 2026 But one thing what we can say is that all these INR 81,000 crores of orders are in executable mode.
  • The company generally removes slow-moving or non-moving orders from its order book and does not consider them in the order book.
    Show source
    Sanjay Pusarla: Generally, in our order book, what we do is that if there is any slow-moving order or maybe a non-moving order, we don’t consider them.
  • BharatNet project is a fixed price contract.
    Show source
    Sanjay Pusarla: Yes, it is a fixed price contract.

What it is building and selling

Projects and capacity

  • The widely reported site is about 20, 30 kilometers from NCC Limited’s actual site, and NCC Limited said there was no great impact as such.
    Show source
    So, there is no great impact as such.
  • Ken-Betwa project has a total order value of INR 3,390 crore, of which about INR 116.35 crore has been executed; the project is completely mobilized at the site and all equipment has been received.
    Show source
    As far as the Ken-Betwa is concerned, the total order value is INR 3,390 crore s, and so far we have executed about INR 116.35 crore.
  • The company has mobilized its resources, including the people and contractors required, to complete the project by March '27.
    Show source
    We have our resources, and we geared up, and to execute that, whatever number of people are required, contractors are required, we have mobilized ourselves to ensure that we complete the project by March ' 27.
  • The company has installed about 45% of the total meters required to be installed under the smart meter projects.
    Show source
    Sanjay Pusarla: So, we have so far installed about 45% of the total meters that are required to be installed.
  • The company said that 7 to 8 million meters are expected to be installed under the smart meter projects.
    Show source
    Sanjay Pusarla: And if you ask me, we have done… Neerad Sharma: 7 to 8 million.
  • The company expects to install approximately 7 million to 8 million meters under its three smart meter projects; two projects are in Maharashtra in SPVs and one is in Bihar in NCC Limited’s parent company’s name, and about 45% of the total number has been achieved.
    Show source
    Neerad Sharma: No, 7 million to 8 million is the approximately total number of meters that we are expected to install in all these three smart meter projects.
Show 3 more statements

Projects and capacity

  • The company is doing other infrastructure works on the BharatNet project that do not involve OFC and will continue doing OFC work.
    Show source
    But at the moment, what we are doing, we are doing other infrastructure works which are not involving the OFC.
  • The company said that unless the issues around prices and availability of cables are sorted out, it would be very difficult to timely complete the total BharatNet project.
    Show source
    Unless these issues are sorted out, it would be very difficult to timely complete the total BharatNet project.

Deals and partners

  • The company is in regular touch with the authorities and concerned departments about BharatNet prices, and NCC Limited is hopeful of some kind of resolution in the near future after stakeholders raised the issue with the client.
    Show source
    All stakeholders have raised this issue with the client, and we are hopeful of some kind of resolution in the near future.

Risks, rules and outside factors

Outside factors

  • The company has price escalation clauses in almost 81% of its contracts, which partially compensate for price increases through price variation clauses.
    Show source
    Sanjay Pusarla: We have almost like 81% of the contracts, we have the price escalation.
  • Performance depends on clients providing funds on time, giving all approvals and making all ROWs possible.
    Show source
    The second critical element is the ability of the clients to provide the funds, make the funds available on time, give all the approvals, make all the ROWs possible.
  • The company was not seeing any price increase in regular commodities such as steel and cement.
    Show source
    Sanjay Pusarla: As far as the commodity prices are concerned, like regular commodities, steel, cement, we are not seeing any price increase.
  • The company was seeing a little price increase in commodities linked to petroleum products, aluminum and copper.
    Show source
    But t he commodities which are related to the linked to the petroleum products and aluminum and copper, we are looking at little price increase.
  • The company was seeing a price increase in OFC cable used in its BharatNet projects.
    Show source
    And also the OFC cable which we are using in our BharatNet projects, there also we seeing there is a price increase.

Everything else said on the call

Group structure

  • Quantum Technology is the holding company for the smart meter projects under two SPVs, RAY and Marathwada.
    Show source
    Quantum Technology is a holding company for these two smart meters.

Other

  • Vizag Urban status was INR 271 crores at the end of June ' 26, compared with INR 291 crores at the end of March ' 26.
    Show source
    Coming to the Vizag Urban status: Vizag Urban status as at the end of June ' 26 is INR 271 crores as against INR 291 crores at the end of March ' 26.
  • The entire amount is supposed to come by December '26.
    Show source
    Sanjay Pusarla: Yes, supposed to come, the entire amount by December ' 26.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Vaibhav Shah: Thank you, Atharva. On behalf of JM Financial, I welcome everybody to 1 Q FY '27 Earnings Conference Call of NCC Limited. We have from the management today, Sri R. S. Raju – Director of Projects; Sri Sanjay Pusarla – Executive Vice President, Finance And Accounts; and Sri Neerad Sharma – Head, Strategy & Investor Relations. Now I hand over the call to the Management for the opening remarks, post which we can begin with the Q&A session. Over to you, sir.

    Answer, neerad sharma

    During the last quarter, the operating environment remained broadly stable and execution across our project portfolio gathered pace. Project progress across the sector continues to be influenced by fund allocation, client approvals, land availability, utility shifting, and billing milestones. And our teams have remained focused on mitigating these through disciplined project execution and close engagement with our clients. Our underlying business fundamentals remain robust, supported by a diversified order book across seven business divisions and an established and proven project management framework. As of 30th June ' 26, our order book stands at INR 81,214 crores. During the quarter, we have booked new orders worth INR 3,889 crores, mainly from our Buildings and Water & Railways divisions. This order book provides us a book-to -bill of about 3.5 x, giving healthy multi-year revenue visibility.

    Answer, neerad sharma

    If we take into account the projects bagged in the month of July, the total order inflow stands at INR 4,542 crores. In the 1st Quarter of FY '27, the company has reported a turnover of INR 5,842 crores on a consol basis as against INR 5,208 crores in the corresponding quarter of the previous year, registering a growth of 12%. On a standalone basis, the number is same, about 12% growth over the last quarter of the previous year. The EBITDA margin for the quarter stands at 9.4% on a consol basis as against 8.8% in the corresponding quarter of the previous year. I am pleased to share our guidance for FY '27 with you. The order inflow for this financial year is a band INR 22,000 crores to INR25,000 crores. I repeat, INR 22,000 crores to INR 25,000 crores; revenue growth of 8% to 10% and EBITDA margin in the range of 8.5% to 9%.

    Answer, neerad sharma

    The broad components of this order book as of the end of the 1st Quarter is the Buildings division stands at INR 22,357 crores, which is about 28% of the total order book. The Transportation division has an order book of INR 16,344 crores, which is about 20% of our order book. The Electrical T&D stands at INR 13,312 crores, which is about 16% of the order book. The Mining division stands at INR 13,400 crores, representing 16% of the total order book. The Water & Railways division holds INR 10,994 crores, which is about 14% of the order book. The Irrigation division has INR 4,806 crores, which is about 6% of the order book. Now I hand over to my colleague – Mr. Sanjay Pusarla, with a request to share the detailed financial performance of the company for the last quarter.

    Answer, sanjay pusarla

    This is Sanjay Pusarla – CFO from NCC Limited. Good morning, ladies and gentlemen. I am pleased to announce the financial results for Q1 FY '27 at NCC Limited. Before I start my presentation, it is my pleasure to announce that the turnover in Q1 of FY '27 , which is INR 4,912 crores, is the highest Q1 turnover reported in the history of NCC. And as far as the consolidated turnover is concerned, we have reported INR 5,842 crores. This is also the highest turnover of NCC history. The earlier highest turnover was in standalone INR 4,747 crores, which was reported in Q1 of FY ' 25, at consol, INR 5,558 crores in Q1 of FY ' 25.

    Answer, sanjay pusarla

    Now I will take you to my presentation. My announcement will be in the order of order book, revenue, profitability, debt movement, and some of the important balance sheet items. Coming to the order book: Our order book stands at INR 81,214 crores as at the end of June 30th, 2026. You are aware the order book at the beginning of the year stands at INR 83,004 crores, and orders received during this quarter is INR 3,889 crores. The order book contains standalone of INR 71,312 crores and from the subsidiaries, INR 9,902 crores. Coming to the revenue: At the standalone level, we have reported a turnover of INR 4,952 crores in Q1 FY '27 against the turnover of INR 4,430 crores in the corresponding quarter of the previous year, thereby an increase of 12% reported. Consolidated turnover: Turnover reported in Q1 FY '27 is INR 5,842 crores as against the turnover of INR 5,208 crores in the corresponding quarter of the previous year, thereby an increase of 12%.

    Answer, sanjay pusarla

    Coming to the profitability: At standalone level, we achieved EBITDA of 9.01%, which is INR 442.45 crores, as against 9.02%, which is INR 394.82 crores for the corresponding quarter of the previous year. The PBT we achieved is 5.12% before exceptional items, which is INR 232.51 crores, and PAT of 3.8%, which is INR 187.31 crores in the current quarter, as against PBT of 5.43%, which is INR 240.69 crores, and PAT of 4.29%, which is INR 189.99 crores in the corresponding quarter of the previous year. At consolidated level: Page 4 of 22 NCC Limited August 07, 2026 We achieved EBITDA of INR 545.12 crores, which is 9.38%, and PBT of INR 311.64 crores, which is 5.33%. This is before exceptional items, and PAT of INR 216.40 crores, which is 3.7% in the current quarter, as against EBITDA of 8.81%, which is INR 456.12 crores, PBT of 5.15%, which is INR 268.36 crores, and PAT of 3.69%, which is INR 192.14 crores in the corresponding quarter of the previous year. We will move to the debt: At the standalone level, the debt at the beginning of the quarter stood at INR 2,251 crores, and net debt after cash and cash equivalents, INR 1,667 crores. At the end of Q1 FY '27 , the debt stands at INR 2,410 crores and net debt of INR 2,008 crores. At the end of Quarter 1 FY ' 26, that is the previous year corresponding quarter, it is INR 1,852 crores and net debt of INR 1,497 crores.

    Answer, sanjay pusarla

    This shows an increase in debt by INR 159 crores in Q1 FY '27 . The debt-equity ratio stands at 0.31 at the end of Q1 FY '27 as against 0.30 at the end of March ' 26, and corresponding quarter of the previous year, it was 0.24. At the consolidated level, the debt stands at the beginning of the quarter is INR 3,457 crores, and net debt after cash and cash equivalents is INR 2,815 crores. At the end of Q1 FY '27 , it stands at INR 4,020 crores, and net debt at INR 3,513 crores. And t he same at the end of the 1st Quarter of the previous year, INR 1,986 crores is the debt, and net debt is INR 1,574 crores. Coming to the working capital: Excluding cash and margin money deposits: At the end of Q1 FY '27 , we stand at INR 5,334 crores, which is 27% of the turnover. In terms of working capital days, it is 95 days.

    Answer, sanjay pusarla

    At the beginning of this year, we were standing at INR 4,887 crores, which is 28%, and working capital days was 97 days. Let’s get into the trade receivables: Outstanding at the end of Q1 has decreased from INR 3,336 crores to INR 3,055 crores, and the number of days also decreased from 73 days to 68 days in the current quarter. 77 days is the number in the corresponding quarter of the previous year. Unbilled revenue: This has increased from INR 6,675 crores, which is 38% of the revenue, to INR 7,414 crores. This also represents 38% of the revenue on annualized basis in Q1 FY '27 and INR 6,442 crores in the corresponding period of the previous year, which is 37%. Retention money: Page 5 of 22 NCC Limited August 07, 2026 This stands at INR 2,396 crores at the end of this quarter as against INR 2,256 crores at the beginning of this quarter. Coming to the mobilization advances: These advances stand at INR 3,163 crores as on 30th June 2026 as against INR 3,386 crores as on March ' 26.

    Answer, sanjay pusarla

    Of these mobilization advances, 60% are interest-bearing, and the average interest rate comes to 9.1%. Interest-bearing advances decreased from 64% to 60% in this quarter. Cash and cash equivalents: We are at INR 402 crores at the end of June ' 26 as against INR 585 crores at the end of March '26. Margin money deposits and others: We were at INR 633 crores at the end of Q1 as against INR 631 crores at the end of March. So coming to the CAPEX: We have incurred CAPEX of INR 170 crores in Q1 against the budgeted CAPEX of INR 500 crores. EPS stands at INR 2.98 at the end of Q1 FY '27 as against INR 3.03 at the end of Q1 FY '26, that is corresponding quarter of the previous year. Inventory: We are standing at INR 1,815 crores as against INR 1,787 crores at the end of March.

    Answer, sanjay pusarla

    Investment: We are at INR 867 crores. The same is the number at the end of March. Loans to group companies: We were at INR 290 crores as at the end of June as against INR 295 crores at the end of March. Coming to the Vizag Urban status: Vizag Urban status as at the end of June ' 26 is INR 271 crores as against INR 291 crores at the end of March ' 26. With this, I conclude my presentation on the financial numbers. I do it back to Mr. Neerad . Thank you.

  2. Question

    Shravan Shah: But internally, are we kind of saying there is a possibility that this number, particularly on the growth front, given the order book that we have, or maybe you can give us some color in terms of the entire INR 81,000 crore kind of order book is under execution or maybe how much still is yet to kind of pick up in execution. To get a sense that what is the probability that this number, particularly on the growth front, revenue front, can inch up to maybe a 15% plus kind of a number.

    Answer, neerad sharma

    Neerad Sharma: Yes. Let me answer this question little differently, Mr. Shaw . There are two critical elements to our performance. The first critical element is our ability to execute the projects. So, t here is not an iota of change in our capability, our ability to execute the projects. So, t his is something that is very much in place. The second critical element is the ability of the clients to provide the funds, make the funds available on time, give all the approvals, make all the ROWs possible.

  3. Question

    First, I have seen in the annual report, there is one subsidiary, NCC Quantum Technologies Private Limited, where there is a INR 256 crore equity investment is there, which was INR 70 crore in FY ' 25. Can you help us what is this and what this subsidiary is likely to do?

    Answer, sanjay pusarla

    Sanjay Pusarla: Quantum Technology is the holding company for the smart meters. You are aware that we are executing two smart meter projects under two SPVs. One is RAY and one is for Marathwada. Quantum Technology is a holding company for these two smart meters.

  4. Question

    Shravan Shah: And lastly, in terms of the trade payable is how much as on June and then the CAPEX INR 500 crore for this year, that number guidance remains the same?

    Answer, sanjay pusarla

    Sanjay Pusarla: Yes. Guidance remains the same for the CAPEX , INR 500 crores, whatever we have given. For the trade payables, it was INR 7,071 crores as at the end of June 2026.

  5. Question

    Aditya Sahu: I had a few queries. Firstly, on the JJM front, if you could, help with how much would be the collection that we would have received in Q1, and what is the outstanding as of now?

    Answer, sanjay pusarla

    Sanjay Pusarla: The outstanding for the JJM as of June 26 is INR 1,043 crores for the UP water projects. Okay?

  6. Question

    Aditya Sahu: Quarter, yes sir.

    Answer, sanjay pusarla

    Sanjay Pusarla: In the 1st Quarter, we have collected about INR 110 crores. This is corresponding to the UP projects. If you ask me overall JJM projects, the overall JJM projects, including the surface water and the groundwater, the total is INR 2,771 crores is the UBR . The amount collected during the 1st Quarter against this is INR 610 crores.

  7. Question

    Aditya Sahu: INR 610 crores.

    Answer, sanjay pusarla

    And i n the month of July also, we have got a good money of about INR 413 crores from the JJM. We are expecting that this flow of money, release of payment should continue. And w ith that expectation, we are expecting to complete substantially the JJM projects in the current year.

  8. Question

    Aditya Sahu: So, by the current year, we are expecting to close the JJM projects that are in your pipeline.

    Answer, sanjay pusarla

    Sanjay Pusarla: Substantially, we will close, provided the money flow also continues like this.

  9. Question

    Aditya Sahu: Obviously, sir. Just on the two more questions on JJM that I had was, what would be the pending order book for the JJM and the balance sheet exposure? If you can provide those two numbers for JJM part.

    Answer, sanjay pusarla

    Sanjay Pusarla: We have given you already the amount receivable, that is INR 2,771 crores. And as far as the order book is concerned, we have complete orders like for surface water and the groundwater, INR 5,881 crores as at the end of June 26.

  10. Question

    Aditya Sahu: The bid pipeline, I was looking for what sort of pipeline are we looking at?

    Answer, neerad sharma

    Neerad Sharma: In the 1st Quarter , we have shared this number, Mr. Sahu. The prospective pipeline of projects is about INR 2.5 lakh crore as of 1st Quarter.

Show 18 more questions
  1. Question

    Aditya Sahu: I’m just trying to understand on the commodity prices, because I think commodity prices have increased. So, any impact, if you would have seen, towards the payments and the execution? What is your view on that front because of this increase in the commodity prices?

    Answer, sanjay pusarla

    Sanjay Pusarla: As far as the commodity prices are concerned, like regular commodities, steel, cement, we are not seeing any price increase. But t he commodities which are related to the linked to the petroleum products and aluminum and copper, we are looking at little price increase. And also the OFC cable which we are using in our BharatNet projects, there also we seeing there is a price increase. Page 9 of 22 NCC Limited August 07, 2026 But in the 1st Quarter, whatever material we have used, that is from the turnover what is there in our hand. And i n the second quarter, we are expecting the prices to stabilize. If the prices are stabilizing, I hope that impact will not be there, not much of impact will be there .

  2. Question

    Aditya Sahu: Sir, this is connected to that only. Just one thing. So, t he price increase that you are seeing, how much are you able to pass on? That is all from my end.

    Answer, sanjay pusarla

    Sanjay Pusarla: We have almost like 81% of the contracts, we have the price escalation. So, w hatever price increase is coming, it gets partially compensated with the price variation clauses that are existing in our contracts.

  3. Question

    Parvez Qazi: Two questions from my side. First, in the smart meter projects, what is the pending equity from our side?

    Answer, sanjay pusarla

    Sanjay Pusarla: There is no pending equity from our side. Whatever money need to be invested in the smart meter project, that has been completed. We have invested about INR 460 crore as of the end of March. No further equity requirement is there at the moment.

  4. Question

    Vishal Periwal: I have two questions. First, in terms of order book breakup, can you provide this into state, private, and central? And second is, in order book that we have, are there any slow-moving order or have you received the mobilization advance for all of them? Any color that can be provided will be helpful.

    Answer, sanjay pusarla

    Sanjay Pusarla: Generally, in our order book, what we do is that if there is any slow-moving order or maybe a non-moving order, we don’t consider them. We generally remove it from that. And w hat is the other question?

  5. Question

    Vishal Periwal: The breakup of the state government, central government, and private.

    Answer, sanjay pusarla

    Sanjay Pusarla: I will just give it. The central government orders constitute about 14%, and state government orders constitute about 19%. PSUs and state government entities, they were about 60%. And ADB, AIIB, and banks, it is about 5%. And f rom the private clients, we started taking the orders, which constitute about 4%.

  6. Question

    Vaibhav Shah: The entire amount?

    Answer, sanjay pusarla

    Sanjay Pusarla: Yes, supposed to come, the entire amount by December ' 26.

  7. Question

    Vaibhav Shah: And sir, lastly, what would be the AP Capital City receivables right now?

    Answer, sanjay pusarla

    Sanjay Pusarla: Yes. In the AP Capital City, old projects, the Capital City old projects, okay, which was there at the end of March ' 26, is about INR 142 crores. So, we are expecting that the entire money to be realized in this quarter or very early next quarter.

  8. Question

    The amount has kept ballooning year- over-year, and it is growing faster than your revenue rate. Is it that the flow of unbilled revenue to revenues is slower than what you would ideally like it to be?

    Answer, sanjay pusarla

    Sanjay Pusarla: Obviously, this unbilled revenue also, out of the INR 7,414 crores, about INR 780 crores to INR 800 crores, that have been certified in first week of July. So t hat has come down to that extent. And given the contracts nowadays, the contracts are based on the milestones. That is the reason there is a little bit of increase in the unbilled revenue. But we are expecting that unbilled revenue should get smoothened over the next quarters because the BSNL billing also will start. Where we are executing for BharatNet, the billing also will start. It will get converted from unbilled revenue to revenue.

    Answer, sanjay pusarla

    This is what we are expecting. Over the next two quarters, it should smoothen.

  9. Question

    Abhishek Maheshwari: So, just a follow-up. With next two quarters, the revenues might be a little lumpy in terms of growth. It will not be consistent because a lot of unbilled revenues you have, as and when milestones keep getting hit, the revenues will keep getting recognized. Am I correct in assuming that?

    Answer, sanjay pusarla

    Sanjay Pusarla: No. Because unbilled revenue is already treated as revenue. Wherever the unbilled revenue converts into certification, what will happen? Unbilled revenue will come down; your certified revenue will go up. So, i t will not change the revenue numbers.

  10. Question

    Krish Bhatia: My first question was on the Ken-Betwa project. There have been protests around land acquisition, compensation and rehabilitation, and there were reports of work at the Daudhan Dam site being disrupted. So, g iven that NCC is executing that package, can you update us on the current execution status? And h ave these issues affected site availability, execution, or do you see any risk to project timeline?

    Answer, neerad sharma

    Neerad Sharma: Yes, Mr. Bhatia, as I shared with you, we are making reasonably good progress. And t his site that has been widely reported in the media is about 20, 30 kilometers from our actual site. So, there is no great impact as such. And this is an issue between the local administration and the agitating population, and we hope the issue is slowly getting resolved.

  11. Question

    Parikshit Kandpal: Sir, my first question is on the debt numbers. So, if I see the Y -o-Y, your debt was INR 1,500 crores standalone net debt, and consolidated net debt was INR 1,600 crore. Now in Q1, it has gone up to INR 2,000 crores and INR 3,500 crores. So, a substantial jump in consolidated debt. Can you please explain that what is the increase? Where is the increase?

    Answer, sanjay pusarla

    Sanjay Pusarla: The increase is mainly on account of fresh debt we have taken in the smart meters. About INR 400 crores, INR 370 crores we have taken debt on the smart meters. So, t he reason for increase is only that. And also we are taking some equipment at the HoldCo level. That CAPEX requirements are there. So, about INR 160 crore, INR 170 crores. For CAPEX requirement also we have raised some of the loans.

  12. Question

    Parikshit Kandpal: Yes. June ' 25.

    Answer, sanjay pusarla

    Sanjay Pusarla: Yes. From June ' 25, if you ask me, the loan which we have drawn for our smart meter projects is about INR 1,350 crores.

  13. Question

    Parikshit Kandpal: So, it is a project loan. Basically, if I have to calculate, out of the INR 3,500 crore of total net debt in the consol level, approximately INR 1,350 comes from the smart meter. Page 14 of 22 NCC Limited August 07, 2026 Sanjay Pusarla: For cumulatively, if you ask me, it is coming to INR 1,461.

    Answer, sanjay pusarla

    Because w e were talking about from June '25. But if you ask me cumulatively, the debt of smart meters at the end of June ' 26 is INR 1,461 crores out of the INR 4,019.

  14. Question

    Parikshit Kandpal: 1,460 is the part of INR 3,500 crores of net debt, right? So, the consolidated debt of INR 3,500 crores, so then you split that net debt of INR 3,500 crores into standalone and consolidated.

    Answer, neerad sharma

    Neerad Sharma: Out of 35, 1,461 is smart meter .

  15. Question

    Parikshit Kandpal: So, the BharatNet order, what is the total residual order book? Since the optical fiber prices have gone up significantly, is it a pass-through for us, whether we make margins on this project or there will be losses at the current prices?

    Answer, sanjay pusarla

    Sanjay Pusarla: So, what we are expecting is that with the current prices, even we are taking up with concerned authorities at the client level, at the ministry level also. We are asking them to look into that to ensure that the supply also domestically, it is available at fairly reasonable prices. But at the moment, what we are doing, we are doing other infrastructure works which are not involving the OFC. OFC also will be doing it continuously.

    Answer, neerad sharma

    Neerad Sharma: The prices might change also. Parikshit ji, it is a long duration project. So, it is not that the price which is prevailing in the market will continue for eternity. This might undergo some change. And we are in regular touch with the authorities, the concerned departments. Not we only. All stakeholders have raised this issue with the client, and we are hopeful of some kind of resolution in the near future.

  16. Question

    Parikshit Kandpal: What is the pending order book, sir? And i s it a fixed price contract on the optical fiber side?

    Answer, sanjay pusarla

    Sanjay Pusarla: 6,500 is the balance order to be executed for BharatNet project.

  17. Question

    Parikshit Kandpal: And is it a fixed price contract? I mean, especially the optical fiber part.

    Answer, sanjay pusarla

    Sanjay Pusarla: Yes, it is a fixed price contract.

  18. Question

    Parikshit Kandpal: And if the current prices prevail, and if we have to execute, then there will be a loss on this, right? Page 15 of 22 NCC Limited August 07, 2026 Sanjay Pusarla: It may not be resulting into a loss, but it will result into a lesser profit.

    Answer, sanjay pusarla

    But w hat actually Mr. Neerad explained to you, the prices will not be continued forever like this. There can be ups and downs in the prices. We are expecting that the prices will get smoothened over a period of time.

    Answer, neerad sharma

    Neerad Sharma: It is a long gestation project, Mr. Kandpal. So, as I said, and it is not only about NCC, there are other bidders, and the whole future of the BharatNet project depends on how these prices, not only the price. We unduly always focus on the price and do not look at the availability part of the cables. Unless these issues are sorted out, it would be very difficult to timely complete the total BharatNet project. So, as I brought to your attention, we are in regular touch with the client, and we are hopeful of some kind of resolution in the next few quarters.

Questions about this call

When was the NCC Q1 FY27 earnings call transcript filed?
NCC filed the transcript with the exchange on 11 Aug 2026. This page is built from that transcript.
What does this page list?
95 statements from the transcript across 9 topics, 70 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 28 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
NCC Q1 FY27 concall: what the company said · DalalOS