Earnings call

Oil India Q3 FY25 earnings call: Oil India Limited has a target of 4 MMT and intends to scale up production even beyond 4 MMT

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

The company has a target of 4 MMT and intends to scale up production even beyond 4 MMT. Expansion plan had progressed to about 73% physical progress until 31st December '24. Crude oil production was 0.868 MMT in the quarter ended 31st December 2024, up 1.4 percentage from 0.856 MMT in the quarter ended 31st December 2023. Capex incurred was about INR23,000 crores until December, of which about INR 12,000 crores was by way of debt financing. The company has tied up with national and international oil companies and obtained 3 blocks in the Indian subcontinent to advance its exploration, development and production targets.

The numbers management gave

Results

  • Crude oil production was 0.868 MMT in the quarter ended 31st December 2024, up 1.4 percentage from 0.856 MMT in the quarter ended 31st December 2023.
    Show source
    Now coming to the standalone results and the beginning with the production front, the company has continued to improve its crude oil production, which is higher by 1.4 percentage in quarter ended 31st December 2024 as 0.868 MMT vis-a -vis 0.856 MMT in quarter ended 31st December 2023.
  • Natural gas production was 2.446 BCM in the 9 months ended 31st December 2024, up 2.90 percentage from 2.377 BCM in the 9 months ended 31st December 2023.
    Show source
    Natural gas production during 9 months ended 31st December 2024 is at 2.446 BCM, increased by 2.90 percentage over production during 9 months ended 31st December 2023, which was Page 2of 19 Oil India Limited February 08, 202 5 2.377 BCM.
  • Natural gas production was 0.829 BCM for the quarter ended 31st December 2024, up 0.85 percentage from 0.822 BCM for the quarter ended 31st December 2023.
    Show source
    Natural gas production for quarter ended 31st December 2024 is marginally higher by 0.85 percentage at 0.829 BCM vis-a -vis 0.822 BCM for quarter ended 31st December 2023.
  • Average crude oil price valuation was $ 73.82/ barrel for Q3 financial year 2025 vis-a-vis $84.14 per barrel for financial year '24; it decreased by 12.27% for 9 months ended 31st December 2024.
    Show source
    On the financial side, average crude oil price valuation for Q3 financial year 2025 is $ 73.82/ barrel vis-a -vis $84.14 per barrel for financial year '24, which decreased by 12.27% for 9 months ended 31st December 2024.
  • Average crude oil realization was $ 79.35 per barrel for 9 months ended 31st December 2024, down 4.27% from $82.89 per barrel for 9 months ended 31st December 2023.
    Show source
    Average crude oil realization is $ 79.35 per barrel vis-a -vis $82.89 per barrel for 9 months ended 31st December 2023, which has decreased by 4.27%.
  • Average natural gas price remained unchanged at $ 6.5 per MMBTU in Q3 financial year 2025.
    Show source
    Average natural gas price for Q3 financial year 2025 has remained unchanged at $ 6.5 per MMBTU.
Show 16 more statements

Results

  • Turnover for 9 months ended 31st December 2024 was INR16,598.28 crores compared to INR 16,673.06 crores for 9 months ended 31st December 2023; it increased by 1.38%, mainly due to higher crude oil and natural gas sales in 9 months of financial year 2025 compared to 9 months of financial year 2024.
    Show source
    The turnover for 9 months ended 31st December 2024 has increased by 1.38 % to INR16,598.28 crores compared to INR 16,673.06 crores for 9 months ended 31st December 2023, which is mainly due to higher crude oil and natural gas sales in 9 months of financial year 2025 compared to 9 months of financial year 2024.
  • EBITDA margin was 4 2.76% in Q3 financial year 2025 vis-a-vis 41.34% for Q3 of Financial Year 2024.
    Show source
    EBITDA margin for Q3 financial year 2025 has increased to 4 2.76% vis-a -vis 41.34% for Q3 of Financial Year 2024.
  • Profit after tax was INR 1,221.80 crores in Q3 financial year 2025 vis-a-vis INR1,584.28 crores for Q3 of financial year 2024.
    Show source
    Profit after tax for Q3 financial year 2025 is INR 1,221.80 crores vis-a -vis INR1,584.28 crores for Q3 of financial year 2024.
  • Profit after tax for 9 months ended 31st December 2024 increased by 28.38% to INR 4,522.71 crores vis-a-vis INR3,523.02 crores for 9 months ended 31st December 2023.
    Show source
    The profit after tax for 9 months ended 31st December 2024 has increased by 28.38% to INR 4,522.71 crores vis-a -vis INR3,523.02 crores for 9 months ended 31st December 2023.
  • Earnings per share was INR 27.80 per share for 9 months ended 31st December 2024 vis-a-vis INR21.66 per share for 9 months ended 31st December 2023.
    Show source
    The earnings per share for 9 months ended 31st December 2024 is INR 27.80 per share vis-a -vis INR21.66 per share for 9 months ended 31st December 2023.
  • Numaligarh Refinery's profit after tax was INR 385.36 crores during quarter 3 of financial year 2025 vis-a-vis INR858.72 crores during Q3 of Financial year 2024.
    Show source
    Profit after tax of NRL during quarter 3 of financial year 2025 is INR 385.36 crores vis-a -vis INR858.72 crores during Q3 of Financial year 2024.
  • Numaligarh Refinery's profit after tax for 9 months ended 31st December 2024 was INR 990.94 Crore compared to INR 1,516.66 crores for the corresponding period of last year.
    Show source
    And profit after tax for 9 months ended 31st December 2024 is INR 990.94 Crore compared to INR 1,516.66 crores for the corresponding period of last year.
  • NRL's gross refining margin was $ 2.10 per barrel during quarter 3 of financial year '25 vis-a-vis $12.72 per barrel during quarter 3 financial year 24; its gross refining margin for the 9 months ended 31st December '24 was $3.61 per barrel vis-a-vis $13.12 per barrel for the corresponding period last year.
    Show source
    NRL's gross refining margin during the quarter 3 of financial year '25 is $ 2.10 per barrel vis-a -vis $12.72 per barrel during quarter 3 financial year 24, and gross refining margin for the 9 months ended 31st December '24 is $3.61 per barrel vis-a -vis $13.12 per barrel for the corresponding period last year.
  • NRL's EBITDA was INR 656.70 crores for quarter 3 financial year '25 vis-a-vis INR1,218.19 crores for Q3 financial year '24; EBITDA for the 9 months ended 31st December '24 was INR1,789.21 crores vis-a-vis INR2,297.57 crores for the 9 months ended 31st December 2023.
    Show source
    NRL's EBITDA for the quarter 3 financial year '25 is INR 656.70 crores vis-a -vis INR1,218.19 crores for the Q3 financial year '24, while EBITDA for the 9 months ended 31st December '24 is INR1,789.21 crores vis-a -vis INR2,297.57 crores for the 9 months ended 31st December 2023.
  • Oil group's consolidated turnover was INR26,575.93 crores for the 9 months ended 31st December 2024 vis-a-vis INR26,137.84 crores for 9 months ended 31st December 2023.
    Show source
    Our consolidated results, the Oil group's turnover for the 9 months ended 31st December 2024 is INR26,575.93 crores vis-a -vis INR26,137.84 crores for 9 months ended 31st December 2023.
  • Oil group's consolidated profit after tax was INR5,542.66 crores for the 9 months ended 31st December 2024 vis-a-vis INR4,647.51 crores for the 9 months ended 31st December 2023.
    Show source
    And consolidated profit after tax for the 9 months ended 31st December 2024 is INR5,542.66 crores vis-a -vis INR4,647.51 crores for the 9 months ended 31st December 2023.
  • Seismic costs were about INR 535 crores for the 9 months.
    Show source
    Rupam Barua: It is about INR 535 crores for the 9 months, I'm talking about the 9 months.
  • Seismic costs were about INR210 crores for the quarter.
    Show source
    And for the quarter, it is about INR 200 crores -- INR210 crores.

Money and capital

  • Capex incurred was about INR23,000 crores until December, of which about INR 12,000 crores was by way of debt financing.
    Show source
    And as regards the capex incurred is already about INR23,000 crores until December, out of which about INR 12,000 crores by way of debt financing.
  • Board recommended an interim dividend of ₹7 per fully paid equity share based on the financial results.
    Show source
    The Board of Directors of the company has recommended an interim dividend of INR 7 per fully paid equity share.
  • Total interim dividend declared by Q3 FY25 was ₹10 per equity share.
    Show source
    With this total, interim dividend declared by the company till third quarter is INR 10 per Page 3of 19 Oil India Limited February 08, 202 5 equity share.

What it expects ahead

What management expects

  • The company has a target of 4 MMT and intends to scale up production even beyond 4 MMT.
    Show source
    Trailukya Borgohain: Yes, the 4 MMT is the target.
  • The company is hopeful that its activities in Barekuri, Sesabil, Kumchai and five other areas will help it reach 4 MMT.
    Show source
    And with this, we are hopeful that we'll be able to reach 4 MMT.
  • The company wants to reach a target of 4 million metric tons by the next fiscal year or next to next fiscal year.
    Show source
    Apart from the fundamental target of 4 million metric tons that we want to receive by the next fiscal year or next to next fiscal year, which our Director Operations commented.
  • The company expects to scale up its production once the IGGL is commissioned.
    Show source
    Management: But our expectation is that once the IGGL is commissioned, we'll scale up our production.
  • The current situation does not prompt Oil India Limited to scale up production; when IGGL happens and the companies awarded blocks complete their back-end work, integration of their network will help Oil India Limited send gas to all parts of the country and all major parts of Assam.
    Show source
    The current situation doesn't quite prompt us to scale up our production, the moment the IGGL happens and the CGD -- I mean, blocks that have already been awarded and those companies are all doing their back-end work, so this integration of their network will help us to send gas to all parts of the country and all major parts of Assam.

What it is building and selling

Projects and capacity

  • Expansion plan had progressed to about 73% physical progress until 31st December '24.
    Show source
    Rupam Barua: Regarding the physical progress of the expansion plan, it has already progressed up to about 70% -- 73% until 31st December '24.
  • The company added two areas, Barekuri and Sesabil, to its drilling focus, bringing the number of areas taken up to 7.
    Show source
    This time, we have added 2 more areas, so 7 areas we had taken up.
  • The company is going to drill around 15 more wells in Barekuri in coming days.
    Show source
    Specifically, in Barekuri, we are going to drill around 15 more wells in coming days.
  • The company is drilling around 15 more wells in Barekuri and planning another 3 or 4 wells in Sesabil, which will ramp up production from those areas.
    Show source
    And in Sesabil, we are planning for another 3, 4 wells.
  • The company has increased its exploration acreage by six to sevenfold over the past 4 or 5 years.
    Show source
    So what we have been doing over the past is, over the past 4, 5 years, we have increased our exploration acreage by six to sevenfold.
  • The company has taken a step to acquire around 40,000 square kilometers of acreage as an operator in the Mahanadi and KG basins; the acreage is yet to be notified by the Government of India, and Oil India Limited says it is the lead bidder.
    Show source
    But since the release of this no-go zone areas, Oil India Limited has taken a very aggressive and very calculated step in acquiring around 40,000 square kilometers of acreage just as an operator, which is yet to be notified by the Government of India, but we know that we are the lead bidder, and these basins are Mahanadi, KG.
Show 17 more statements

Projects and capacity

  • The company is storing gas underground in a reservoir while producing liquids, so its liquid production does not go down; it has started putting gas into storage at the Naharkatia-257 well.
    Show source
    Page 13of 19 Oil India Limited February 08, 202 5 And in one area, in a well called Naharkatia-257, we have already started putting the gas at the storage.
  • The Numaligarh-Siliguri pipeline capacity will go up from 1.7 MTA to 5 MTA as it is augmented.
    Show source
    That also is being augmented so that this capacity will go up from 1.7 MTA to 5 MTA.
  • Mechanical completion will be by December 2025; commissioning will take some time, after which production will be augmented through a step-by-step process.
    Show source
    There will be some commissioning exercise that will be there, so it will take some time.
  • Kumchai line is completed.
    Show source
    Trailukya Borgohain: Actually, Kumchai line is completed.
  • Sesabil is a new discovery, and Oil India Limited is planning to drill a number of wells there.
    Show source
    So these are new -- Sesabil is a new discovery, and we are planning to drill a number of wells.
  • The company is planning to put two rigs together in Kumchai to ramp up production there.
    Show source
    So like Kumchai , we are planning to put -- I think most probably, we'll be able to put 2 rigs together at the same time, so that Kumchai production will also ramp up.
  • The company is targeting areas outside the Northeast and may proceed directly to drilling in some high prospective areas where seismic data is already available.
    Show source
    And we'll directly go for drilling in some high prospective areas.
  • The company has acquired and locked prospective acreage in Cambay, where it had not previously been present.
    Show source
    And the most important thing is that we have, for the first time, put our foot on to the land of Gujarat in Cambay where we were nowhere present.
  • The company is looking at underground gas storage because shutting down gas wells due to seasonal fluctuations and other reasons results in lost associated oil or condensate.
    Show source
    This time, what we have done is that, we are looking at underground gas storage.

Deals and partners

  • The company has tied up with national and international oil companies and obtained 3 blocks in the Indian subcontinent to advance its exploration, development and production targets.
    Show source
    Apart from this, we have also extended our collaboration and outreach because you know that exploration is an inherent uncertainties in terms of exploring, exploiting of hydrocarbon resources, which we have tied up with national and international oil companies for collaborating and have got 3 blocks in the Indian subcontinent to forward our exploration, development and production targets.
  • Assam power generation company, called APGCL, takes Oil India Limited's gas for its Namrup Thermal Power plant and Lakwa Thermal Power plant.
    Show source
    The APGCL is taking our gas for two of their plants, one is Namrup Thermal Power plant and Lakwa Thermal Power plant.
  • NEEPCO is a customer of Oil India Limited's gas.
    Show source
    Then there is NEEPCO.
  • Gas goes to BVFCL and APL for fertilizer.
    Show source
    And as far as fertilizer is concerned, it goes BVFCL and APL.
  • Some of Oil India Limited's gas goes to tea gardens and some small power plants.
    Show source
    So then tea gardens, some of them goes to the tea gardens and some small power plants.
  • The company is discussing supplying gas through these networks to tea gardens in middle and lower Assam, whose tea gardens were not taking gas; tea gardens in upper Assam generally take its gas.
    Show source
    Now there is the discussion going on to supply the gas to them also, for these networks.
  • The company has applied to the government to increase the amount of gas allocated to its customers, and the application has gone to the ministry for consideration.
    Show source
    So that application has already gone to the ministry and ministry is looking at it.
  • The company has been extending its outreach to various international oil and gas companies for physical collaborations, technology and knowledge partnerships, and participating interest. Replaced by a later filing.
    Show source
    Management: What we are basically doing is that because refinery expansion is a progressive thing.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Sabri Hazarika: Yes. Thanks. Good morning, everyone. On behalf of Emkay Global Financial Services, I welcome you all to the Q3 FY '25 Earnings Conference Call of Oil India Limited. We have with us the senior management of the company, led by Mr. Abhijit Majumder , who has recently taken over as Director Finance. We also have Trailukya Borgohain, who's Director (Operations) and we have Mr. Rupam Barua, Executive Director, Finance and Accounts; Mr. Ranjan Goswami, Executive Director of Business Development; and Mr. Dharam Singh Manral, Chief General Manager, Exploration and Development. So today's session would be a brief on the results by the management, and that will be followed by the quest

    Answer, abhijit majumder

    Abhijit Majumder: Good morning, all the participants who have joined us for this investor and analyst con-call. So I am Abhijit Majumder , Director Finance, Oil India Limited. With me, I have my team represented by the senior executives from the operations department, from business development, from finance. So may I now request our ED Finance to make the opening remarks.

    Answer, rupam barua

    Rupam Barua: Good morning, dear friends. At the outset, I would like to thank Emkay Global Financial Services Limited for organizing today's analyst call. I am Rupam Barua, ED Finance and Accounts of Oil India. The company's financial results of Q3 financial year '25 were published on February 7, 2025. I'll briefly give some highlights about the performance of the company in both fiscal and financial terms. Now coming to the standalone results and the beginning with the production front, the company has continued to improve its crude oil production, which is higher by 1.4 percentage in quarter ended 31st December 2024 as 0.868 MMT vis-a -vis 0.856 MMT in quarter ended 31st December 2023. Crude oil production has increased by 4.1% in 9 months ended 31st December 2024 at 2.614 MMT vis-a -vis 2.511 MMT in the 9 months ended 31st December 2023.

    Answer, rupam barua

    Natural gas production during 9 months ended 31st December 2024 is at 2.446 BCM, increased by 2.90 percentage over production during 9 months ended 31st December 2023, which was Page 2of 19 Oil India Limited February 08, 202 5 2.377 BCM. Natural gas production for quarter ended 31st December 2024 is marginally higher by 0.85 percentage at 0.829 BCM vis-a -vis 0.822 BCM for quarter ended 31st December 2023. On the financial side, average crude oil price valuation for Q3 financial year 2025 is $ 73.82/ barrel vis-a -vis $84.14 per barrel for financial year '24, which decreased by 12.27% for 9 months ended 31st December 2024. Average crude oil realization is $ 79.35 per barrel vis-a -vis $82.89 per barrel for 9 months ended 31st December 2023, which has decreased by 4.27%. Average natural gas price for Q3 financial year 2025 has remained unchanged at $ 6.5 per MMBTU. The turnover for 9 months ended 31st December 2024 has increased by 1.38 % to INR16,598.28 crores compared to INR 16,673.06 crores for 9 months ended 31st December 2023, which is mainly due to higher crude oil and natural gas sales in 9 months of financial year 2025 compared to 9 months of financial year 2024. EBITDA margin for Q3 financial year 2025 has increased to 4 2.76% vis-a -vis 41.34% for Q3 of Financial Year 2024.

    Answer, rupam barua

    Profit after tax for Q3 financial year 2025 is INR 1,221.80 crores vis-a -vis INR1,584.28 crores for Q3 of financial year 2024. The profit after tax for 9 months ended 31st December 2024 has increased by 28.38% to INR 4,522.71 crores vis-a -vis INR3,523.02 crores for 9 months ended 31st December 2023. The earnings per share for 9 months ended 31st December 2024 is INR 27.80 per share vis-a -vis INR21.66 per share for 9 months ended 31st December 2023. I'm just giving you the financial performance of Numaligarh Refinery also. Profit after tax of NRL during quarter 3 of financial year 2025 is INR 385.36 crores vis-a -vis INR858.72 crores during Q3 of Financial year 2024. And profit after tax for 9 months ended 31st December 2024 is INR 990.94 Crore compared to INR 1,516.66 crores for the corresponding period of last year. NRL's gross refining margin during the quarter 3 of financial year '25 is $ 2.10 per barrel vis-a -vis $12.72 per barrel during quarter 3 financial year 24, and gross refining margin for the 9 months ended 31st December '24 is $3.61 per barrel vis-a -vis $13.12 per barrel for the corresponding period last year.

    Answer, rupam barua

    NRL's EBITDA for the quarter 3 financial year '25 is INR 656.70 crores vis-a -vis INR1,218.19 crores for the Q3 financial year '24, while EBITDA for the 9 months ended 31st December '24 is INR1,789.21 crores vis-a -vis INR2,297.57 crores for the 9 months ended 31st December 2023. Our consolidated results, the Oil group's turnover for the 9 months ended 31st December 2024 is INR26,575.93 crores vis-a -vis INR26,137.84 crores for 9 months ended 31st December 2023. And consolidated profit after tax for the 9 months ended 31st December 2024 is INR5,542.66 crores vis-a -vis INR4,647.51 crores for the 9 months ended 31st December 2023. The Board of Directors of the company has recommended an interim dividend of INR 7 per fully paid equity share. With this total, interim dividend declared by the company till third quarter is INR 10 per Page 3of 19 Oil India Limited February 08, 202 5 equity share. With this, my opening remarks on the performance is over, and we are now open to question-and -answer session.

    Answer, rupam barua

    Rupam Barua: Regarding the physical progress of the expansion plan, it has already progressed up to about 70% -- 73% until 31st December '24.

  2. Question

    Probal Sen: 73%, okay, that's physical completion, right?

    Answer, rupam barua

    Rupam Barua: Yes, physical completion I'm talking about. And as regards the capex incurred is already about INR23,000 crores until December, out of which about INR 12,000 crores by way of debt financing.

  3. Question

    Probal Sen: Very clear. Sir, last question if I may squeeze in?

    Answer, abhijit majumder

    Abhijit Majumder: Addressing your query on the drop in GRM, if I can just step in, what has happened is, across the board, you would see that GRMs have fallen. According to my understanding, except for NRL, none of the other companies are ahead of NRL so far as GRM is concerned. So that also has to be taken into account while you look at the bigger picture. That much I just wanted to underline.

  4. Question

    Probal Sen: This is for oil, sir?

    Answer, abhijit majumder

    Abhijit Majumder: That is the outlook for oil.

  5. Question

    Vivekanand S: I meant annual, sir. Management: Sir, actually, our major customers are basically some fertilizer companies, some power companies. Management: We have NEEPCO is there, we have APGCL, tea gardens.

    Answer, trailukya borgohain

    Trailukya Borgohain: So out of that, the major customers, to name a few, one is Assam power generation company is there, which is called APGCL. Then there is NEEPCO. The APGCL is taking our gas for two of their plants, one is Namrup Thermal Power plant and Lakwa Thermal Power plant. Then it goes to BVFCL. And as far as fertilizer is concerned, it goes BVFCL and APL. So then tea gardens, some of them goes to the tea gardens and some small power plants. Management: But our expectation is that once the IGGL is commissioned, we'll scale up our production.

    Answer, trailukya borgohain

    We have plenty of gas there. The current situation doesn't quite prompt us to scale up our production, the moment the IGGL happens and the CGD -- I mean, blocks that have already been awarded and those companies are all doing their back-end work, so this integration of their network will help us to send gas to all parts of the country and all major parts of Assam. Trailukya Borgohain: And already recently, one thing has developed for tea gardens. Generally, the tea gardens in upper Assam take the gas. The tea gardens in the middle part of Assam and lower part, they were not taking. Now there is the discussion going on to supply the gas to them also, for these networks.

  6. Question

    Vivekanand S: Sir, how big are tea gardens?

    Answer, trailukya borgohain

    Trailukya Borgohain: Another part of the answer is mentioned the previous question.

  7. Question

    Gagan Dixit: Sir, final question is, when it is expected to be completed?

    Answer, trailukya borgohain

    Trailukya Borgohain: Actually, Kumchai line is completed.

  8. Question

    Kartik Kohli: Could you let me know the seismic costs for the quarter?

    Answer, rupam barua

    Rupam Barua: It is about INR 535 crores for the 9 months, I'm talking about the 9 months. And for the quarter, it is about INR 200 crores -- INR210 crores.

  9. Question

    Nitin Tiwari: Sir, just to get clarity on the questions which were asked earlier as well. If you can just lay out the road map for reaching the 4 MMT and 5 BCM that you spoke about. So I'm lot very clear on your FY '26 production guidance. So one, if you can help with that first? And then what is the time line we are looking at for 4 MMT and 5 BCM? Page 11of 19 Oil India Limited February 08, 202 5 Secondly, what are the infrastructure requirements that are pending for ramping up of our gas production because there were a couple of pipelines mentioned when you gave out the details. So I'm not very clear on which pipelines are like under construction and which are pending authorization. You me

    Answer, trailukya borgohain

    Trailukya Borgohain: Yes, the 4 MMT is the target. Initially, we had the plan for -- specific five areas we targeted to give maximum impetus on drilling, new drill. So these were like, I don't know the names of the areas. This time, we have added 2 more areas, so 7 areas we had taken up. So one of the areas, there was a little bit of supply, a little bit of production as expected, but all other areas, like we have added this time the Barekuri, specifically we have added Barekuri and also Sesabil, two more areas. So these are new -- Sesabil is a new discovery, and we are planning to drill a number of wells. Specifically, in Barekuri, we are going to drill around 15 more wells in coming days.

    Answer, trailukya borgohain

    And in Sesabil, we are planning for another 3, 4 wells. So the production will ramp up from these areas. And at the same time, we are working on the other five areas. So like Kumchai , we are planning to put -- I think most probably, we'll be able to put 2 rigs together at the same time, so that Kumchai production will also ramp up. So these are some of the activities we are picking up. And with this, we are hopeful that we'll be able to reach 4 MMT. And what is happening Rajasthan, we are planning from 700 now...

  10. Question

    Nitin Tiwari: Sir, time line for 4 MMT? When are we going to see the 4 MMT production? '27?

    Answer, trailukya borgohain

    Trailukya Borgohain: As of now, it will be '27 -- '26, '27. Management: We are almost at 3.6. So it won't take us much to reach that level. These are some of the medium term activities that we have taken up. Apart from that, the announcement of the ninth round of OALP bidding, we were holding around 55% of exploration acreages. After the announcement, we are yet to receive the letter of award from DGH. Our acreage will go up to more than 1 lakh square kilometers.

    Answer, trailukya borgohain

    So this shows our intent to scale up our production and go even beyond 4 MMT. 4 MMT is the target for...

    Answer, trailukya borgohain

    Trailukya Borgohain: So what is happening is that this time, we are targeting areas outside of Northeast also. So some prospective area, we have already earmarked and most probably we are -- if we get those areas. We may not go for seismic because seismic is already available in those areas. And we'll directly go for drilling in some high prospective areas. So this is one action we are taking up. Management: Just for the sake of an opportunity, I would just like to summarize it. That in order to augment our oil and gas production, what all initiatives we have been taking.

    Answer, trailukya borgohain

    Apart from the fundamental target of 4 million metric tons that we want to receive by the next fiscal year or next to next fiscal year, which our Director Operations commented. See what happens is that we are primarily an upstream company with, of course, our presence in midstream, downstream. Page 12of 19 Oil India Limited February 08, 202 5 And even in alternative and in renewable energies, and even going into the mineral resources as well now. But to fuel all these initiatives, we need to have our bottom line fixed. So what we have been doing over the past is, over the past 4, 5 years, we have increased our exploration acreage by six to sevenfold. So what does this essentially mean? This essentially means that if we don't explore, we don't identify.

    Answer, trailukya borgohain

    If we don't identify, we don't harness -- evaluate. If we want to evaluate, we don't exploit or harness hydrocarbons. And we do not develop them. So exploration is our forte. We'll keep on exploring, exploring and exploring because this is only what is going to lead to reserve accretion. And as I already mentioned in one of the previous questions that this is bound to lead to reserve accretion and more results for us in the future. Which will translate into better production of oil and gas.

    Answer, trailukya borgohain

    And then what I mean to say is that, what happened is that the Government of India has decided to release around 1 million square kilometers of area in the no-go zone areas in the east and western offshore of the Indian subcontinent. These are very promising areas, which for the last 10 to 15 years, the government did not – we have certain statutory problems, defense installations that these were not in place. But since the release of this no-go zone areas, Oil India Limited has taken a very aggressive and very calculated step in acquiring around 40,000 square kilometers of acreage just as an operator, which is yet to be notified by the Government of India, but we know that we are the lead bidder, and these basins are Mahanadi, KG. And the most important thing is that we have, for the first time, put our foot on to the land of Gujarat in Cambay where we were nowhere present. So this is another milestone that we have acquired and locked, which is prospective. Apart from this, we have also extended our collaboration and outreach because you know that exploration is an inherent uncertainties in terms of exploring, exploiting of hydrocarbon resources, which we have tied up with national and international oil companies for collaborating and have got 3 blocks in the Indian subcontinent to forward our exploration, development and production targets.

    Answer, trailukya borgohain

    Management: For the gas, we are doing some of the areas where like in terms of allocation of gas, we have already applied to the government that we need to allocate the increase amount of gas that needs to be given to the customers because allocation is not done by us. So that is one part because that already we have applied. From our side, we have applied that this much of gas we are going to give it to the customers. So that application has already gone to the ministry and ministry is looking at it. The other point I would like to raise here or tell you here is that sometimes because of the seasonal fluctuation and many other reasons, the gas wells needs to be shut down. So what we are doing this time is that when we shut down the gas, we lose the associated oil that comes up or condensate whatever that comes up, it is a loss to us. This time, what we have done is that, we are looking at underground gas storage.

    Answer, trailukya borgohain

    When we produce the gas, this underground gas will be stored in the reservoir, while we take the liquid at the same time. So my liquid production doesn't go down. So this is what is already we are doing. Page 13of 19 Oil India Limited February 08, 202 5 And in one area, in a well called Naharkatia-257, we have already started putting the gas at the storage. So if there is any demand/supply issue, then we can immediately put it in the – dry gas into the reservoir. But at the same time, we can produce the oil. These are some of the steps we have taken.

Show 2 more questions
  1. Question

    Nitin Tiwari: Two questions are allowed, right? So this is the second question I'm asking. Sir, as you mentioned that you have acquired quite bit of acreage in the recent licensing. So like when you see you entered into a technical collaboration with a global major, are you also evaluating something like that? Can we expect some announcements on that end, sir? That is the second question from my side. Management: Yes, of course. We have been extending our outreach to various international oil and gas companies, both, not just in terms of physical coexistence or physical collaborations. But what we are looking is at technology, knowledge partnership and even PI, means participating interest.

    Answer, trailukya borgohain

    Trailukya Borgohain: Yes. After implementation of all the 11 compressors we are bringing, I think it will further go down, maybe close to 1.5. Management: Not just monetizing the gas. This is also our green effort that there shouldn't be any escape of emissions into the environment. So it is a double kind of whammy for us. It will help us generate more revenue and at the same time, solving the environmental cause. Mayank: And sir, the second question was more in terms of NRL.

    Answer, trailukya borgohain

    Trailukya Borgohain: More than 72%, 73% completion and physical progress -- 78%, sorry, 78% physical progress has been done. And the project cost already spent is about INR 23,000 crores, and it is still expected to be completed by December '25. Mayank: So all the major equipment and everything is all in place and I suppose the last pipeline was going on so you can start mechanical completion in December '25?

    Answer, trailukya borgohain

    Trailukya Borgohain: Majority of the units have already been physically completed by about more than 90%. Mayank: Okay. Sir, when do you start the commercial operations? Like is it somewhere March '26 or... Management: It means that as soon as the new refinery with new capacity gets completed, it is not that overnight it will pick up to 100%. It will gradually pick up to 100%. Maybe the first year, it will run at about 50% to 60%, then going forward to say 75%, then 75% to 100% will be equipped in the third year, expected.

    Answer, trailukya borgohain

    Management: What we are basically doing is that because refinery expansion is a progressive thing. It will happen over a period of time. However, at the other end, once it picks up so that the associated facilities are all in place, so what we are doing is we are almost at the completion stage of the Numaligarh-Siliguri pipeline. That also is being augmented so that this capacity will go up from 1.7 MTA to 5 MTA. So things are happening simultaneously.

    Answer, trailukya borgohain

    Trailukya Borgohain: This is what Director Finance telling is that it's a product pipeline. Like once we bring the crude, at the same time, we need to have the product going out. So if we cannot deliver the product, so in this case, our product pipeline is around 90% we are complete. And by April it will -- by April of this year, 2025, it will complete -- before completion of the Paradip-Numaligarh crude oil pipeline. That is this outlook. Mayank: So sir, is it fair to say that everything will be ready by December '25 or whatever logistical requirements are there and then you can kind of ramp up from December '25 or you ramp up from April -- March '26? Management: We are completing -- mechanical completion will be by December 2025.

    Answer, trailukya borgohain

    There will be some commissioning exercise that will be there, so it will take some time. After that, it started like what he already said is that accordingly, this will start produce -- like the production will be getting augmented. It will be a step by step process. Page 16of 19 Oil India Limited February 08, 202 5 Mayank: And sir, for mechanical completion, you don't need any shutdowns or anything of that of the existing refinery units, correct? That should be all normal... Management: Existing, we will be commissioning. Exercise will be done, then accordingly, this will be getting augmented.

  2. Question

    Sabri Hazarika: Got it, sir. Thank you so much for this conference call, and I hope it is quite informative and insightful for participants. Sir, we will end the call. And before doing so, any closing comments from your side?

    Answer, abhijit majumder

    Abhijit Majumder: So it's a pleasure having you all with us for this interactive session con-call. So I extend my sincere thanks to all those who participated in the con-call, and wish you all the very best.

Questions about this call

When was the Oil India Q3 FY25 earnings call transcript filed?
Oil India filed the transcript with the exchange on 12 Feb 2025. This page is built from that transcript.
What does this page list?
50 statements from the transcript across 5 topics, 34 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 12 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
Oil India Q3 FY25 concall: Oil India Limited has a target of 4 MMT and intends to scale up production even beyond 4 MMT · DalalOS