Skip to content

Earnings call

Pace Digitek Q3 FY26 earnings call: Almost 80% of Pace Digitek Limited's capacity is already backed by orders

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

Almost 80% of Pace Digitek Limited's capacity is already backed by orders. Effective production capacity for the next financial year will be about 7.5 GWh, and it is confident it can use that capacity because its order book is strong. The company expects its expanded facility to be operational by September and to produce an additional 2.5 GWh from October to March, over and above its existing 5 GWh capacity. The equity IRR for some solar projects is about 12% to 12.5%. The company is comparable with Chinese suppliers at $72 when manufacturing in India, competing with China on a like-to-like basis.

The numbers management gave

Results

  • The equity IRR for some solar projects is about 12% to 12.5%.
    Show source
    For all the solar projects also the calculation is done on the equity IRR and the equity IRR for solar is in some cases about 12% to 12.5%.
  • The approximately $5 duty difference on a $70 product could go into Pace Digitek Limited’s profit.
    Show source
    This difference of about $5 on $70 product could go into our profit.
  • The company says its backward integration helps optimize cost.
    Show source
    Thankfully for us because we are the backward integrators, it helps us to optimize the Page 9 of 19 Pace Digitek Limited February 09, 2026 cost.

Money and capital

  • The company has secured equity for its three projects through IPO and internal accruals and is working to raise money for future projects at the TransGreenX Energy platform level rather than the SPV level.
    Show source
    For future equity for all these three projects, we have already secured equity through IPO and internal accruals, but for the future projects, we are already working on raising money at a platform level, that is at a TGX level rather than a SPV level.

What it expects ahead

What management expects

  • Effective production capacity for the next financial year will be about 7.5 GWh, and it is confident it can use that capacity because its order book is strong.
    Show source
    Our manufacturing target for the next financial year is 7.5 GWh.
  • The company plans to grow its asset-owned business into an annuity business by 2030.
    Show source
    By 2030, we have some good plans to grow that business into an annuity business.
  • The company hopes to become a 10-GWh company by September of this year.
    Show source
    We would like to be a 10-GWh company hopefully by September of this year.
  • The company estimates that prices would stabilize at least from April onwards.
    Show source
    We are estimating prices would stabilize at least from April onwards.
  • The company does not expect the impact to be major on its Build-Own-Operate, manufacturing and EPC projects within the group. Replaced by a later filing.
    Show source
    Keeping this in mind, the Build-Own-Operate as well as manufacturing and the EPC projects within the group, we do feel that the impact will not be seen majorly.

Orders

  • Almost 80% of Pace Digitek Limited's capacity is already backed by orders.
    Show source
    We are confident of achieving this business, because almost 80% of capacity is already backed by orders.
Show 7 more statements

Orders

  • Around 40% of the BESS order book potentially by March 2026, including EPC and asset-owned business, will be executable in FY27 and FY28.
    Show source
    Execution will be about 40% of it.
  • The company was declared L1 in some tenders, which it expects may be converted into orders in the next two months or so, taking orders to around 6 GWh.
    Show source
    That would take us to around 6 GWh.
  • At the beginning of the next financial year, Pace Digitek Limited's capacity will be 5 GWh and its orders will be 6 GWh.
    Show source
    At the beginning of the next financial year, our capacity will be 5 GWh and orders will be 6 GWh.
  • The company has orders for more than 4.0 to 4.3 gigawatt and expects orders to cross beyond 6 to 7 gigawatt by the end of this financial year and to cross the 10 gigawatt hour number by the time the third facility is ready; it says this will suffice for the full capacity of its construction.
    Show source
    Venugopal Rao Maddisetty: Yes, we have over 4 GWh order in hand.
  • L&T has given Pace Digitek Limited an order that the company is executing in Q4.
    Show source
    Some people have already given orders to us, like L&T has given order to us, which we are executing in this Q4.
  • Advait Greenergy has given Pace Digitek Limited an order.
    Show source
    Then Advait Greenergy has given another order.
  • The company expects some more orders soon. Replaced by a later filing.
    Show source
    There are some more orders are expected soon.

What it is building and selling

Projects and capacity

  • The company expects its expanded facility to be operational by September and to produce an additional 2.5 GWh from October to March, over and above its existing 5 GWh capacity.
    Show source
    The expanded facility is expected to be operational by September and, from October to March, we will be able to produce additional 2.5 GWh over and above the existing 5 GWh capacity.
  • Long-term projects have execution timelines of 12-18 months.
    Show source
    Good thing is that these are the long -term projects with execution timelines of 12-18 months.
  • The company is looking to expand capacity from 5 GWh to 10 GWh by September 2026.
    Show source
    So, naturally, we are sitting on a good order position and that is why we are looking at expanding this 5 to 10 GWh by September 2026.
  • Expanded capacity will be available for half a year, giving effective additional production of about 2.5 GWh.
    Show source
    Since the expanded capacity will be available only for half a year, the effective additional production would be about 2.5 GWh.
  • Netting the internal profit from project cost would bring the project IRR to around 19-20%.
    Show source
    One way is that margin you have netted out from the project cost , so IRR would be far better around 19-20%.
  • The company is adding another 5 GWh of capacity to maintain its lead.
    Show source
    That is where we are adding another 5 GWh.
Show 19 more statements

Projects and capacity

  • The company was the only company with cell-to-container production capacity at the time of the call; one or two unnamed companies may be ready in the next 8 to 12 months.
    Show source
    So, people are bringing the packs and then doing it as of now, but cell to container, I would say strongly that we are the people currently having this capacity.
  • The company is planning its expansion well in advance. Replaced by a later filing.
    Show source
    So, we are planning for the expansion well in advance.

Demand and pricing

  • The company is comparable with Chinese suppliers at $72 when manufacturing in India, competing with China on a like-to-like basis.
    Show source
    Number two, is that we are comparable for the $72 when we manufacture in India, we are competing with Chinese on a like -to-like basis.
  • The company says competitors will take about 1.5 years, at least one year and above, to build capacity in India.
    Show source
    Yes, many people are thinking of doing it, but in my opinion, this will take about 1.5 years, at least one year and above to basically get some capacity built in India.
  • Of the five projects Pace Digitek Limited won, three were bid before heavy competition started.
    Show source
    Out of five projects we have won, three projects we have bid before the heavy competition started.
  • The company recently won two projects in different applications from DISCOM-level BESS projects, where competition was not so much.
    Show source
    We have chosen some different applications where the competition was not so much.
  • There are four projects where bidding was aggressive, but people are now realizing the execution issues.
    Show source
    There are four projects where there was aggressively bid, but people are now realizing those issues.
  • The company is bidding at higher levels for future projects because prices are increasing.
    Show source
    And for the future projects, since the prices are increasing, we are also bidding at higher level.
  • The company says it is comparable with China prices on an apple-to-apple basis, and that duty benefits, local support and spare parts are helping it compete.
    Show source
    I can confidently say that we are comparable with China prices on apple-to-apple basis.

Segments

  • In Pace Digitek Limited’s standalone BESS model, the company deploys battery systems and collects money monthly for 12 years.
    Show source
    One is the standalone BESS business we call where only battery systems we deploy and we collect the money on a monthly basis for 12 years.
  • Solar plus BESS model has PPAs of 25 years.
    Show source
    The second model is that it is called solar plus BESS, where PPAs are of 25 years.
  • The company buys only battery cells, which are manufactured in China.
    Show source
    We buy only the cells.
  • The company procures cells, converts them into containers and supplies them as a product.
    Show source
    We procure cells and we convert into container and then supply as a product.
  • The company is the largest BESS manufacturer from cell to container.
    Show source
    Venugopal Rao Maddisetty: Yes, today we are the largest BESS manufacturer from cell to container.
  • The company says its technical product requires services after installation. Replaced by a later filing.
    Show source
    This product being technical, it cannot be just that we install and no need for any services.

Deals and partners

  • The company normally books with suppliers by paying advances when it receives orders.
    Show source
    Venugopal Rao Maddisetty: Yes, whenever we receive the orders, we normally book with our suppliers by paying some advances.
  • The company has won three projects for asset-owned businesses under the Build-Own-Operate model, and PPAs have been signed.
    Show source
    For asset-owned businesses under Build-Own-Operate model, we have won, three projects and PPAs have been signed.
  • The company buys battery cells from four partners, all of whom are top-rated companies in China.
    Show source
    We buy from four partners , all of whom are top- rated companies in China.
  • The company offers local support and spare parts to customers, while imported products from China do not have support available in India.
    Show source
    These are long-term projects, whereas if they import from China, they only get a product, but then there is no support available in India.

Risks, rules and outside factors

Outside factors

  • A finished container from China costs about $72.
    Show source
    Whereas the finished container today is about $72 from China.

Rules and policy

  • Some tenders specify a minimum 20% local content.
    Show source
    In some tenders, the local content is being written properly such as a minimum 20% local content.
  • The import duty on battery cells is 5%.
    Show source
    Now the import duty is 5% on the battery cells .
  • At a cell cost of $40, the import duty at 5% is $2.
    Show source
    For example, if the cell cost is $40, we pay import duty of 5% which is $2 as a duty.
  • At a 10% duty, the duty on the finished container from China would be $7.2.
    Show source
    On that, let's say 10% they do is $7.2.
  • The duty difference between the battery cell and finished product is $5.
    Show source
    The duty difference itself is $5.
Show 1 more statement

Rules and policy

  • The government removed duties on capital equipment required for manufacturing BESS systems. Replaced by a later filing.
    Show source
    They have removed the capital equipment, the duties on the capital equipment required for manufacturing BESS system.

Everything else said on the call

Group structure

  • The company expects its 93% subsidiary Lineage Power to become a 100% subsidiary by the next financial year.
    Show source
    We are in the process and we expect it to be taken care by the next financial year.
  • Pace Renewable Energies Private Limited (PREPL), the SPV for one of the projects, is 93% held, and Pace Digitek Limited is at the final stages of converting it to 100%.
    Show source
    There, we are at the final stages to convert it to 100%.
  • The company owns about 80% of its subsidiary Lineage Power.
    Show source
    Pace Digitek Limited is a listed entity and it has a subsidiary of Lineage Power, in which we own about 80%.
  • TransGreenX Energy is 100% owned by Pace Digitek Limited, and Pace Digitek Limited will hive off some portion at a later date when it needs money for the equity portion, based on business needs.
    Show source
    As of now, it is 100% owned by Pace Digitek, that is a listed company.
  • The company formed TransGreenX Energy Private Limited as a wholly owned subsidiary and is moving its asset-owned businesses under it.
    Show source
    Now, what we are doing is since this business is growing and we are increasing this portfolio, we have formed a new entity called TransGreenX Energy Private Limited, which is a wholly owned subsidiary of Pace Digitek and moving all these assets under that.
  • TransGreenX Energy will own Pace Digitek Limited’s assets under SPVs.
    Show source
    TGX will own all these assets under SPVs.
Show 4 more statements

Group structure

  • The company is in the process of moving assets under the TransGreenX Energy platform, and future asset-owned businesses will be under that platform.
    Show source
    We are in the process of moving the assets under this platform and the future businesses of asset owned will be under this platform.
  • The company will de-merge TransGreenX Energy at an appropriate time once it creates some value in the platform.
    Show source
    We will be doing that at an appropriate time once we create some value in this platform.
  • A de-merger of TransGreenX Energy is possible at some point to get the full benefits of the business. Replaced by a later filing.
    Show source
    At some point of time, de-merger also is possible to get the full benefits on this business.

Other

  • Built-Own-Operate asset creation may not reflect on the balance sheet but will be sitting in the asset.
    Show source
    Venugopal Rao Maddisetty: That may not reflect on the balance sheet, but that will be sitting in the asset.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Anuj Kapil: And sir, you have mentioned that you are expanding to 10 GWh. What is the utilization threshold is needed for reaching optimal ROCE? And also let me know if there are any execution bottlenecks in achieving that kind of expansion?

    Answer, venugopal maddisetty

    Venugopal Rao Maddisetty: For this 10 GWh expansion, we already have visibility for the next year. After we close March production, the open order or the order that will carry forward to the next financial year starting April 2026, is about 6 GWh is already there as of today. We believe that in few months, we would be able to bring in some more business because the demand is quite huge. The expanded facility is expected to be operational by September and, from October to March, we will be able to produce additional 2.5 GWh over and above the existing 5 GWh capacity. So, what is our target? Our manufacturing target for the next financial year is 7.5 GWh. We are confident of achieving this business, because almost 80% of capacity is already backed by orders.

    Answer, venugopal maddisetty

    Good thing is that these are the long -term projects with execution timelines of 12-18 months. So, we are planning for the expansion well in advance.

  2. Question

    Rajavendhan P: FY 27, as we estimated, we are estimating about Rs. 3,200 crores of consolidated top line from this order book and beyond this, the asset-owned projects under the Built-Own-Operate model also will get executed. We estimate that this Capex built-up asset creation for this BOO model will touch about another Rs. 2,200 crores for the next financial year.

    Answer, venugopal maddisetty

    Venugopal Rao Maddisetty: That may not reflect on the balance sheet, but that will be sitting in the asset.

  3. Question

    Paras Chheda: No, my question was, out of this Rs. 10,000 crores potentially by March 2026, for BESS order book, what proportion will be executable in FY27 and FY28?

    Answer, venugopal maddisetty

    Venugopal Rao Maddisetty: Around 40%. This includes both EPC plus asset-owned business put together . Execution will be about 40% of it.

  4. Question

    Rohan Baranwal: My question was on the side of tender prices. In Q2, we had a commentary on aggressive bidding from the side of competitors. Have you seen any improvement or any returning to the tender prices? Are competitors still bidding at those aggressive levels? Or have prices stabilized?

    Answer, venugopal maddisetty

    Venugopal Rao Maddisetty: Yes, what you say is partly right. There was a very aggression in the last three months. But whatever the orders that we have won, they are in a better situation . Out of five projects we have won, three projects we have bid before the heavy competition started. That is one advantage we have. In the other two projects which we have won recently, there the advantage is that the different applications, not like the DISCOM level BESS projects. We have chosen some different applications where the competition was not so much.

    Answer, venugopal maddisetty

    Now, talking about this competition . It is obvious that in any new sector when the demand starts increasing, generally the people think that there are huge margins available in the business, Page 8 of 19 Pace Digitek Limited February 09, 2026 people start to bidding aggressively. I am hoping that the correction will happen soon because they are not able to execute on the ground whoever has won. Once they realize the difficulties involved in executing these new sectoral projects, I am hoping that they may not be bidding further. We are estimating prices would stabilize at least from April onwards. There are four projects where there was aggressively bid, but people are now realizing those issues.

  5. Question

    Rohan Baranwal: Follow-up is, do we see any benefit coming from government side like imposing the duties on to localize the in-house manufacturing on the BESS side?

    Answer, venugopal maddisetty

    Venugopal Rao Maddisetty: Yes, there are a couple of things from this budget. They have removed the capital equipment, the duties on the capital equipment required for manufacturing BESS system. That is one advantage they have given. In some tenders, the local content is being written properly such as a minimum 20% local content. We do believe that government should come forward for some more benefits, similar to what happened in solar. Similar lines, government is working but we hope that it should come soon.

  6. Question

    Rohan Baranwal: My second question is about capacity expansion. As we are doubling our capacity from 5 GWh to 10 GWh and our current order pipeline is close to 4.3 GWh. How confident are we to expand it to 10 GWh? And are we banking on exports as well like markets like Saudi Arabia or Kenya or any other countries?

    Answer, venugopal maddisetty

    Venugopal Rao Maddisetty: Yes, we have over 4 GWh order in hand. As we mentioned, in some tenders we are already declared as L1, which would be converted into orders soon, maybe in the next two months or so. That would take us to around 6 GWh. At the beginning of the next financial year, our capacity will be 5 GWh and orders will be 6 GWh. So, naturally, we are sitting on a good order position and that is why we are looking at expanding this 5 to 10 GWh by September 2026. Since the expanded capacity will be available only for half a year, the effective additional production would be about 2.5 GWh. Therefore, our effective production capacity for the next financial year will be ~7.5 GWh effectively and we are confident to utilize that capacity because our order book is strong.

    Answer, venugopal maddisetty

    Venugopal Rao Maddisetty: Yes, whenever we receive the orders, we normally book with our suppliers by paying some advances. This will not impact our project IRR, as we have ensured that we are well within that range. Thankfully for us because we are the backward integrators, it helps us to optimize the Page 9 of 19 Pace Digitek Limited February 09, 2026 cost. And for the future projects, since the prices are increasing, we are also bidding at higher level. Keeping this in mind, the Build-Own-Operate as well as manufacturing and the EPC projects within the group, we do feel that the impact will not be seen majorly. Also, from next financial year we are now trying to focus on at least some portion of our production goes to the export to Africa and Middle East. These are the two markets we are aggressively exploring and that would take care of the prices are better than India prices, which should take care of our bottom lines.

    Answer, venugopal maddisetty

    Kapil: Another question is with regards to the Lineage Power. We currently holds 93% and there were some plans to make it a 100% subsidiary. Any steps taken to complete this by March or first quarter of next year? Rajavendhan P : Yes, you are right that Lineage Power is 93% subsidiary. We are in the process and we expect it to be taken care by the next financial year. There is a company called Pace Renewable Energies Private Limited (PREPL), which is the SPV for one of the projects, which is having 93%. There, we are at the final stages to convert it to 100%.

    Answer, venugopal maddisetty

    That process would be completed by end of March, post which we will take up for Lineage Power. Kapil: Last question is with regards to the leakage that is happening between your standalone financials and the consolidated financials. I assume this is because of the profit that you are earning on your own BOO projects, which is getting eliminated in the consolidation. Now this problem will multifold as and when your BOO capacity gets significantly higher. What is the thought process? Are you thinking of creating two parallel companies and then de-merging them so that you don't have to eliminate the profit in the consolidation out there?

  7. Question

    Amol Kankariya: It is a very thin margin. As the interest rates go down, only then, probably, this would be more profitable or the IRR can increase later.

    Answer, venugopal maddisetty

    Venugopal Rao Maddisetty: No, normally we calculate on the equity IRR because the debt portion is reduced on a monthly basis in terms of the interest and the principal that we pay back. For all the solar projects also the calculation is done on the equity IRR and the equity IRR for solar is in some cases about 12% to 12.5%.

  8. Question

    Amol Kankariya: Okay, but then there will be O&M costs also later on in the project.

    Answer, venugopal maddisetty

    Venugopal Rao Maddisetty: That is being taken care on the financials already. So, from the income, we remove those, the interest burden and the loan and the repayment, everything is taken care and then we calculate the equity IRR.

  9. Question

    Chintan Mehta: We do 100% everything in-house or a 50% of the component in-house and multiply by the product margin, correct? Or how much percentage we will be doing in-house?

    Answer, venugopal maddisetty

    Venugopal Rao Maddisetty: Around 60% of the project in terms of products will be produced in our factory. The balance goes towards the services and the third -party items, like, we call it as the BOS, balance of system, which is in turn with some transformers, panels and the cables, which we are not manufacturing. Around 60% would be the product in any project we produce in our factory.

  10. Question

    Chintan Mehta: Then our overall IRR then would be much higher?

    Answer, venugopal maddisetty

    Venugopal Rao Maddisetty: Yes. If you netted off this, it will be much better. Like there are two ways of looking at it. One way is that margin you have netted out from the project cost , so IRR would be far better around 19-20%. Other way is to take this as an internal profit for the other two organizations, which unfortunately we are not able to show on the balance sheet because those SPVs are owned by us. The right way of looking at it is that the project cost will come down by netting off the internal profit and therefore IRR is far better.

Show 5 more questions
  1. Question

    Chintan Mehta: Can you please explain if the SPVs owned by promoter or how the structure is? Page 12 of 19 Pace Digitek Limited February 09, 2026 Venugopal Rao Maddisetty: Yes, let me explain, sir.

    Answer, venugopal maddisetty

    I think it is in the interest of all our investors, we would like to explain this little more in detail. Pace Digitek Limited is a listed entity and it has a subsidiary of Lineage Power, in which we own about 80%. For asset-owned businesses under Build-Own-Operate model, we have won, three projects and PPAs have been signed. These SPVs were earlier under PDL, that is PACE Digitek Limited, as 100% owned. Now, what we are doing is since this business is growing and we are increasing this portfolio, we have formed a new entity called TransGreenX Energy Private Limited, which is a wholly owned subsidiary of Pace Digitek and moving all these assets under that. By 2030, we have some good plans to grow that business into an annuity business. There are two categories.

    Answer, venugopal maddisetty

    One is the standalone BESS business we call where only battery systems we deploy and we collect the money on a monthly basis for 12 years. The second model is that it is called solar plus BESS, where PPAs are of 25 years. What we are trying to do is, by using TransGreenX Energy, which we call it as TGX . TGX will own all these assets under SPVs. We will be growing this business independently. As of now, it is 100% owned by Pace Digitek, that is a listed company. For future equity for all these three projects, we have already secured equity through IPO and internal accruals, but for the future projects, we are already working on raising money at a platform level, that is at a TGX level rather than a SPV level.

    Answer, venugopal maddisetty

    This will give us better leverage on the funds deployed, and any excess funds can be used for new projects and similar opportunities. So, keeping that in mind, TGX has been formed. We are in the process of moving the assets under this platform and the future businesses of asset owned will be under this platform. As of right now, it is 100% owned by Pace Digitek and at a later date, when we need money for the equity portion, we will be hiving off some portion based on the business needs.

  2. Question

    Chintan Mehta: Thank you so much, sir, for explaining that bit. Just the last question from my side. Is it possible after one point, we need to de-merge this entity into a separate company so that our debt and equity cost of fund would become lower?

    Answer, venugopal maddisetty

    Venugopal Rao Maddisetty: Absolutely. We will be doing that at an appropriate time once we create some value in this platform. There are some positive vibes coming up from the market on this because in solar also, if you have seen, these kinds of platforms are very famous and we are working in that direction. At some point of time, de-merger also is possible to get the full benefits on this business. But as I mentioned, we are in the process of creating this platform. We have already structured it and then we are executing all these projects under this platform. There will be Pace Digitek, Lineage Power and TransGreenX Energy.

    Answer, venugopal maddisetty

    These are the two subsidiaries of Pace Digitek and we will try to take appropriate decisions in the interest of the company.

  3. Question

    Chintan Mehta: Just wanted to know about import part of the BESS, how much import is cheaper compared to our, or it is neck to neck from the Chinese or Korean batteries. Even at container level or this is Page 13 of 19 Pace Digitek Limited February 09, 2026 only at the BESS level, just any blended you have, any number that 20% cheaper or something kind of.

    Answer, venugopal maddisetty

    Venugopal Rao Maddisetty: Yes. Okay. This is also an interesting question, sir. Again, in the interest of all our investors, we would like to elaborate a little more. For us, the input is the cell. We buy only the cells. Naturally, the cells are manufactured in China.

    Answer, venugopal maddisetty

    We buy from four partners , all of whom are top- rated companies in China. Now the import duty is 5% on the battery cells . We procure cells and we convert into container and then supply as a product. Number one. For example, if the cell cost is $40, we pay import duty of 5% which is $2 as a duty. Whereas the finished container today is about $72 from China. On that, let's say 10% they do is $7.2.

    Answer, venugopal maddisetty

    The duty difference itself is $5. That is the first point I would like you to note. There is a difference in duty just from a cell to the finished product and that is significant. This difference of about $5 on $70 product could go into our profit. Number two, is that we are comparable for the $72 when we manufacture in India, we are competing with Chinese on a like -to-like basis. The other indirect benefits for our customers that we are offering is that the local manufacturing will have local support, spare parts. These are long-term projects, whereas if they import from China, they only get a product, but then there is no support available in India.

    Answer, venugopal maddisetty

    In the long-term projects like this, something goes wrong, it is a binary - battery system is working or not working. If it is not working and if minimum 95% availability required under the contract is not maintained, then the penalties will kick in. There is always mixed reaction as of now in the market that should we import from China or should we look at local. We are working with our customers and people are inclined to buy from us. There are positive developments we are working on where they are visiting our plant and they are trying to view. Some people have already given orders to us, like L&T has given order to us, which we are executing in this Q4. Then Advait Greenergy has given another order.

    Answer, venugopal maddisetty

    There are some more orders are expected soon. I can confidently say that we are comparable with China prices on apple-to-apple basis. The duty benefits are helping us. Number three, the local support and spare parts, all that also indirect benefits that China doesn't have. This product being technical, it cannot be just that we install and no need for any services. These are the three indirect benefits and the two direct benefits by which we are confident that we can do well to supply to our other customers as well.

  4. Question

    Sourav Khara: Sir, what is the BESS industry size in terms of volume and value?

    Answer, venugopal maddisetty

    Venugopal Rao Maddisetty: By 2030, that is the government document says it is 236 GWh is required for the country. Based on this renewable energy integration of 500 GWh, the estimation is that BESS requirement is 236 GWh by 2030.

  5. Question

    Rajavendhan P: Out of this 236 GWh, the country has already, with all DISCOMs put together, they have issued the tenders of about 60 to 40 GWh, out of which about 25 plus GWh is already awarded. And out of which we are proud to say that we have 3.3GWh of developer projects plus the 1 GWh of EPC project.

    Answer, venugopal maddisetty

    Venugopal Rao Maddisetty: Yes, today we are the largest BESS manufacturer from cell to container. That is proven and it is in the market already. Yes, many people are thinking of doing it, but in my opinion, this will take about 1.5 years, at least one year and above to basically get some capacity built in India. We do want more capacity being built because there is a lot of demand coming up. At the same time, from our own company point of view, we would like to maintain the lead that we have taken. Being the front runner, we want to maintain this lead even going forward. That is where we are adding another 5 GWh.

    Answer, venugopal maddisetty

    We would like to be a 10-GWh company hopefully by September of this year. With that capacity, we will certainly be ahead of the curve, and then we take the decisions appropriately, like as we mentioned that we have already started the further backward integration of container manufacturing which others are not at all even doing t hat today. We will keep taking these kinds of decisions at an appropriate time to maintain this lead. The demand looks very good. So, there is a scope for many such companies to get into. However, we would l ike to maintain this lead for some more time. Tej: If you could help me understand what will be the current installed production capacity from cell to pack in India?

    Answer, venugopal maddisetty

    Venugopal Rao Maddisetty: That is other than us, there is no production capacity from cell to pack or cell to container as of now. Some people are doing pack to container because the cell to pack is a critical thing. So, people are bringing the packs and then doing it as of now, but cell to container, I would say strongly that we are the people currently having this capacity. But there may be something coming up some, I don't want to name them, in the next 8 to 12 months, one or two companies are going to be ready.

Questions about this call

When was the Pace Digitek Q3 FY26 earnings call transcript filed?
Pace Digitek filed the transcript with the exchange on 16 Feb 2026. This page is built from that transcript.
What does this page list?
59 statements from the transcript across 12 topics, 31 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 15 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
Pace Digitek Q3 FY26 concall: Almost 80% of Pace Digitek Limited's capacity is already backed by orders · DalalOS