Earnings call
Pace Digitek Q4 FY26 earnings call: Pace Digitek's executable order book was Rs.11,338 crores, comprising Rs. 8,854 crores in the Energy sector and Rs. 2,484 crores in the Telecom & ICT side
By DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person.
Transcript filed .
Executable order book was Rs.11,338 crores, comprising Rs. 8,854 crores in the Energy sector and Rs. 2,484 crores in the Telecom & ICT side. The company maintains revenue guidance for FY27 at Rs.3,200 to Rs.3,400 crores and for FY28 at Rs. 4,000 crores to Rs. 4,200 crores, supported by its diversified order book in telecom and energy, with energy being a major contributor. The company operationalized a 2.5 GWh BESS manufacturing plant last year, with ~ 80% utilization during the year, and delivered 178 BESS containers. Consolidated revenue from operations for Q4 FY26 was Rs.1,097 crores compared to Rs. 683 crores in Q4 FY25, representing 60.5% year-on-year growth, primarily driven by project execution. The company is focused on the infrastructure segment of the government’s Kavach project for the Railway sector, providing network infrastructure solutions; it has bid for a couple of projects and will continue bidding for further projects, with Railway divisions floating projects ranging from Rs.100 to Rs. 250 crores.
The numbers management gave
Results
- Consolidated revenue from operations for Q4 FY26 was Rs.1,097 crores compared to Rs. 683 crores in Q4 FY25, representing 60.5% year-on-year growth, primarily driven by project execution.
Show source
Our consolidated revenue from operations for the Q4 FY26 stood at Rs.1,097 crores compared to Rs. 683 crores in Q4 FY25, representing a 60.5% year-on-year growth.
- The company reported revenue from operations of Rs. 2,641 crores for the full year FY26 compared to Rs.2,439 crores of the last year, an 8.3% year-on-year increase.
Show source
For the full year FY26, we have reported revenue from operations of Rs. 2,641 crores compared to Rs.2,439 crores of the last year, which indicates a year-on-year increase of 8.3%.
- Gross profit for Q4 FY2026 was Rs.249 crores compared to Rs.130 crores in Q4 FY2025, with the increase primarily driven by increased turnover.
Show source
Page 5 of 22 Pace Digitek Limited May 26, 2026 Coming to profitability, the gross profit for Q4 FY2026 stood at Rs.249 crores compared to Rs.130 crores in Q4 FY2025.
- Employee expenses for FY2026 were Rs. 96 crores compared to Rs. 67 crores in the previous year, mainly driven by business diversification from telecom to energy, deployment across a couple of projects, and commencement of a BESS manufacturing plant.
Show source
Employee expenses for the full year were Rs. 96 crores for FY2026 compared to Rs. 67 crores in the previous year.
- EBITDA for Q4 FY2026 was Rs.163 crores compared to Rs.76 crores in Q4 FY2025, with the increase significantly impacted by increased revenue.
Show source
At the EBITDA level, the Q4 number was Rs.163 crores compared to Rs.76 crores Q4 FY2025.
- EBITDA for the full year was Rs.455 crores compared to Rs.482 crores in the previous year; EBITDA margins dipped because revenue composition changed from a telecom-focused business to a mix of telecom and energy businesses.
Show source
For the full year, the EBITDA stood at Rs.455 crores compared to Rs.482 crores in the previous year.
Show 28 more statements
Results
- Full year finance cost was Rs. 60 crores compared to Rs.115 crores in the previous year, reflecting reduced borrowings and borrowing cost post the IPO and treasury optimization.
Show source
Full year finance cost was Rs. 60 crores compared to Rs.115 crores in the previous year.
- PBT for FY2026 was Rs.430 crores, compared with Rs. 384 crores in the previous year.
Show source
PBT for FY2026 stood at Rs.430 crores as against Rs. 384 crores in the previous year.
- PAT for FY2026 was Rs. 307 crores, compared with Rs. 279 crores in the previous financial year, a YoY growth of 10.1%.
Show source
PAT for FY2026 stood at Rs. 307 crores compared to Rs. 279 crores of the previous financial year, indicating a YoY growth of 10.1%.
- PAT margin increased to 11.4% in FY2026 from 11.3% in FY2025.
Show source
PAT margin increased to 11.4% from 11.3% in FY2025.
- Return on equity for FY2026 was 13.6% and return on capital employed was 14.3%; the return ratios moderated during the year primarily because of capital deployed towards long-term energy assets, manufacturing expansion and execution of energy projects.
Show source
Return on equity for the FY2026 stood at 13.6% and return on capital employed stood at 14.3%.
- Inventory stood at Rs.540 crores as on 31st March 2026; it increased inventory to mitigate raw material cost, specifically lithium-ion cell prices, and exchange rate effects, and the inventory will be used in the current quarter for consumption, benefiting Q1 FY2027 by reducing cost compared to prevailing commodity prices.
Show source
First, on the inventory side, our inventory stood at Rs.540 crores as on 31st March 2026.
- Trade receivables stood at Rs. 2,442 crores in FY2026.
Show source
Second, trade receivables stood at Rs. 2,442 crores.
- Current container realization is about $82 to $84 per kWh, while cell costs are currently elevated in the range of $48 to $50 per kWh; cell costs account for ~ 60% of overall BESS system value.
Show source
M. Venugopal Rao: The current container realization is about $82 to $84 per kWh, while cell costs are currently elevated levels in the range of $48 to $50 per kWh.
- The company expects overall pricing and operating efficiencies to improve by approximately 4% to 5% through in-house container fabrication.
Show source
In addition to that, we expect overall pricing and operating efficiencies to improve by approximately 4% to 5% through in-house container fabrication.
- The company reclassified a portion of trade receivables from current to non-current because receivables related to a BSNL telecom project with a five-year payment schedule are recoverable over a longer period; the non-current portion is about Rs. 295 crores.
Show source
You can see about Rs. 295 crores in the non-current portion.
- The company regrouped FY2025 comparative trade receivables into current and non-current categories, presenting two line items of about Rs. 295 crores and Rs. 1,271 crores to ensure comparability with the FY2026 presentation.
Show source
So, it is about Rs. 295 crores plus Rs. 1,271 crores.
- FY2026 sales were concentrated in Q4, when it recorded sales of Rs. 1,097 crores; project receivables normally come over a span of 90 to 120 days after revenue is booked.
Show source
In Q4, we have recorded sales of Rs. 1,097 crores.
- The company said a significant portion of its Q4 sales is reflected in receivables because project receivables normally come over a span of 90 to 120 days.
Show source
Therefore, a significant portion of the Q4 sales is reflected in receivables.
- Net of debtors and creditors is about Rs. 650 crores with a 90-day cycle.
Show source
If you see the numbers, the net of debtors and creditors is about Rs. 650 crores with a 90 -day cycle, so that is the relevant metric to consider.
- The company collected about Rs. 300 crores relating to Q4 sales between April and May, and receivables are expected to ease further by September 2026.
Show source
Between April and May, we have collected Rs. 300 crores and receivables are expected to ease further by September 2026.
- Cash flow from operations in the financial year was impacted by inventory build-up and increased receivables; the company expects this to ease out and normalize by September 2026 because significantly higher sales in Q4 FY2026 resulted in higher receivables.
Show source
Rajavendhan P: The cash flow from operations in this financial year was impacted by inventory built up plus increase in receivables.
- Reported top line is always net of all inter-company transactions.
Show source
Rajavendhan P: Yes, the top line that we report is always net of all the inter-company transactions.
- For the current MSEDCL project, Pace Digitek follows the dealer-lessor model under Ind AS standards and classifies the project under lease accounting, recognizing revenue and the related receivable.
Show source
Under this model, the project has been classified under lease accounting, where revenue and Page 13 of 22 Pace Digitek Limited May 26, 2026 the related receivable are recognized.
- Revenue from solar plus BESS projects is generated from the sale of energy, so project capex will not be counted as revenue.
Show source
Solar plus BESS projects are different because revenue is generated from the sale of energy.
Money and capital
- Total equity increased to Rs. 2,252 crores during FY2026, supported by IPO proceeds and increased reserves and surpluses.
Show source
Page 6 of 22 Pace Digitek Limited May 26, 2026 Moving to the balance sheet, the total equity has increased to Rs. 2,252 crores during FY2026, supported by IPO proceeds and increased reserves and surpluses.
- Total debt as on 31st March 2026 was Rs. 961 crores, compared with Rs.161 crores of the previous year; the increase reflects investment towards BESS manufacturing expansion, energy asset creation and execution scaling up for energy projects.
Show source
The total debt as on 31st March 2026 stood at Rs. 961 crores compared to Rs.161 crores of the previous year.
- Debt-to-equity ratio is about 0.43x in FY2026.
Show source
The debt-to-equity ratio is at about 0.43x.
- Cash and bank balances stood about Rs.769 crores in FY2026.
Show source
Cash and bank balances stood about Rs.769 crores.
- Net debt-to-equity ratio stood at 0.09x in FY2026.
Show source
The net debt- to-equity ratio stood at 0.09x.
- The company has about Rs. 900 crores of milestone-based outstanding telecom project receivables yet to be billed, which will be billed over the next 3-5 years based on project milestones and the related billing schedule.
Show source
Rajavendhan P: The milestone-based outstanding which is yet to be billed is about Rs. 900 crores, which will be billed over a period of next 3-5 years' time based on project milestones and the related billing schedule.
- The company will bill around Rs.150 to Rs.175 crores each year over the next five years under milestone-based billing for its telecom project.
Show source
We have a milestone-based billing under which every year, over the next five years, we will bill around Rs.150 to Rs.175 crores.
- Of Pace Digitek’s four BOO projects, the first three are funded through IPO funds or internal accruals, and the fourth project is being funded through external resources.
Show source
The fourth project is being funded through external resources.
- Additional EPC margin attracts additional tax.
Show source
Yes, the additional margin does attract additional tax.
What it expects ahead
What management expects
- The company maintains revenue guidance for FY27 at Rs.3,200 to Rs.3,400 crores and for FY28 at Rs. 4,000 crores to Rs. 4,200 crores, supported by its diversified order book in telecom and energy, with energy being a major contributor.
Show source
Based on the current execution visibility and order book, we maintain our revenue guidance for FY27 at Rs.3,200 Page 7 of 22 Pace Digitek Limited May 26, 2026 to Rs.3,400 crores and for FY28 at Rs. 4,000 crores to Rs. 4,200 crores.
- The company expects PAT margins in a range of 10% to 11% for FY2027, considering energy’s significant contribution to the top line.
Show source
Considering the fact that energy is going to play a significant role to the top line in FY2027 we are expecting PAT margins in a range of 10% to 11% for next year.
- The company said its PAT margin of 11.4% and EBITDA margin of 17.2% may reduce slightly as the contribution of energy orders to overall revenue mix increases.
Show source
The margins you are referring to, whether the PAT margin of 11.4% or the EBITDA margin of 17.2%, may reduce slightly as the contribution of energy orders to the overall revenue mix increases.
- For this and the next financial year, Pace Digitek Limited expects the majority of BESS manufacturing to go to BOO projects and 50% to 60% to be allocated to the direct product business or EPC business; this is how it arrived at its Rs. 4,000 crores guidance for FY28.
Show source
That is how we have arrived at this guidance of Rs. 4,000 crores for FY28.
- 5.32 GWh comprises BOO plus EPC; BOO accounts for about 2.72 GWh, and the first project from MSEDCL is expected to generate revenue of about Rs. 1,000 crores in the current financial year.
Show source
For BOO it is about 2.72 GWh, out of which the first project form MSEDCL is expected to generate revenue of about Rs. 1,000 crores in the current financial year.
- The company is trying to maintain a PAT margin of around 10% for the BOO segment as an overall business.
Show source
Rajavendhan P: At the PAT level for the BOO segment, as an overall business, we are trying to maintain PAT margin of around 10%.
Show 19 more statements
What management expects
- The company expects approximately 300 to 500 MWh of orders for FY27 and FY28, starting from FY27.
Show source
For FY27 and FY28, we expect approximately 300 to 500 MWh of orders, starting from FY27.
- The company says achieving 300 to 500 MWh of orders in FY27 appears achievable.
Show source
Achieving 300 to 500 MWh of orders in FY27 appears achievable.
- The company may grow by a further 20% to 25% over FY27 levels in FY28.
Show source
In FY28, we may grow by a further 20% to 25% over FY27 levels.
- The company expects operational efficiencies to improve over the medium term through manufacturing scaling up, localization initiatives, backward integration, improved supply chain efficiencies, and increased contribution from product-led revenues.
Show source
However, over the medium term, we expect operational efficiencies to improve through: 1. manufacturing scaling up; 2. localization initiatives as our MD explained; 3. backward integration which we are already doing; 4. improved supply chain efficiencies; and 5. increased contribution from product-led revenues.
- The company does not expect much impact for at least one quarter because it has stocked material at earlier prices, and its inventory position provides some protection against the recent increase in cell prices.
Show source
However, at least for one quarter, we do not expect much impact because we already stocked material at earlier prices.
- The company is not stepping into further BOO projects unless it has external investment in place and currently has no plan for further projects; for FY27 and FY28, it wants to concentrate more on selling BESS product business to the outside market.
Show source
With this, we are not stepping into further BOO projects unless we have some external investment in place.
- For the financial year, Pace Digitek Limited is focused on distributing its top line more evenly quarter-on-quarter instead of concentrating it in Q4; the prior financial year's order book started execution in Q3, resulting in a significant portion of sales being recognized in Q4, while the company expects this to normalize during the current year as it began the year with an order book and commenced execution on a few projects in the quarter.
Show source
Last financial year, what has happened is that the order book available with us started execution in Q3, which resulted in a significant portion of sales being recognized in Q4.
- The company expects other projects to use a fixed asset accounting model rather than a lease accounting model.
Show source
We expect that the other projects will have a fixed asset accounting model rather than the lease accounting model.
- The company has identified two to three potential projects and its teams are actively working on them.
Show source
We have already identified two to three potential projects, and the teams are actively working on them.
- The company is confident that its projected growth and topline targets will be achieved, based on its order book and execution visibility.
Show source
So, we are confident that with the order book and execution visibility we have, the growth and topline targets we have projected will be achieved .
- The company considers its numbers conservative, but says it is quite possible it will achieve or exceed them. Replaced by a later filing.
Show source
If we put everything together, numbers are a bit conservative, but it is quite possible that we will achieve this or even exceed it.
Orders
- Executable order book was Rs.11,338 crores, comprising Rs. 8,854 crores in the Energy sector and Rs. 2,484 crores in the Telecom & ICT side.
Show source
We have a diversified executable order book of Rs.11,338 crores, comprising Rs. 8,854 crores in the Energy sector and Rs. 2,484 crores is form the Telecom & ICT side .
- Open order book as we speak is around 6 GWh.
Show source
The open order book as we speak, is around 6 GWh .
- Total overall order book stands at 5.32 GWh, of which 2.72 GWh is for BOO; two of the four BOO projects are solar plus BESS energy-selling projects, while MSEDCL and KPTCL projects follow a lease model.
Show source
M. Venugopal Rao: Total overall order book stands at 5.32 GWh and out of that, 2.72 GWh is for the BOO.
- Energy order book stands at Rs. 8,854 crores and includes both BOO and EPC projects.
Show source
Rajavendhan P: The energy order book stands at Rs. 8,854 crores and it includes both BOO and EPC projects.
- L&T, Pace Digitek Limited's first customer other than its own internal consumption, was previously buying from China and awarded Pace Digitek Limited an order of 250 MWh in January after completing its evaluation and validation process.
Show source
They have awarded us an order of 250 MWh in January after completing their evaluation and validation process.
- Executable Telecom & ICT order book stood at ₹2,484 crore as on May 25, 2026.
Show source
Coming to order book, the total executable order book as on May 25, 2026 stood at about Rs.11,338 crores, consisting of energy at Rs. 8,854 crores and telecom & ICT at Rs. 2,484 crores.
- The company secured further orders from BSNL and Railways in the last quarter.
Show source
In addition to our earlier orders, we have secured further orders from BSNL and Railways in the last quarter.
- The company secured an order from RailTel for Railway Kavach and digital infrastructure projects.
Show source
We have also secured an order from RailTel for Railway Kavach and digital infrastructure projects.
What it is building and selling
Projects and capacity
- The company operationalized a 2.5 GWh BESS manufacturing plant last year, with ~ 80% utilization during the year, and delivered 178 BESS containers.
Show source
On the manufacturing side, we have operationalized 2.5 GWh BESS manufacturing plant last year with ~ 80% utilization during the year and delivered 178 BESS containers.
- The overall cost of the MSEDCL project in Maharashtra is about Rs.1.3 crores to Rs.1.35 crores per MWh, including a GST portion of about Rs. 0.2 crores; excluding GST, the net cost is about Rs. 1.2 crores per MWh, including VGF of about Rs. 27 lakhs per MWh from the government.
Show source
The overall cost of the project is about Rs.1.3 crores to Rs.1.35 crores per MWh.
- After adjusting for VGF support, the net cost per MWh reduces from Rs. 1.2 crores to Rs. 93 lakhs, net of GST and VGF funding; this cost mostly consists of the battery storage system as a material cost.
Show source
After adjusting for the VGF support, the net cost reduces from Rs. 1.2 crores to Rs. 93 lakhs.
- For a project of about 1,500 MWh, revenue will be based on 750 MW, and the government pays Rs. 2,19,000 per MW per month.
Show source
In terms of MW capacity, the government pays us Rs. 2,19,000 per MW per month.
- The company expects to operate at 75% to 80% utilization rather than 100%; BOO and other EPC projects currently account for 5.32 GWh to be executed.
Show source
Further BOO and other EPC projects currently account for 5.32 GWh Page 16 of 22 Pace Digitek Limited May 26, 2026 which are to be executed.
- The company is looking to expand capacity from 5 GWh to 10 GWh by September 2026.
Show source
By October, we will be at 10-GWh.
Show 17 more statements
Projects and capacity
- Manufacturing capacity commissioning was delayed by two months because of shipment delays arising from the conflict in West Asia, which disrupted shipping lines and affected equipment movement; the equipment has arrived and is under installation, and the line will be operational by July this year and commence production of BESS containers from July.
Show source
As we mentioned earlier, it will be operational by July this year.
- The company almost lost one month due to shipment delays; the equipment is in its factory and under installation, will be commissioned within June itself and become operational from July.
Show source
It will be commissioned within June itself and become operational from July.
- The company is not delaying projects at this moment because it has some stock.
Show source
We are not delaying projects at this moment because we have some stock .
- For Pace Digitek Limited's BOO projects, standalone BESS execution takes approximately one and a half years, while solar plus BESS projects take two to three years.
Show source
Page 18 of 22 Pace Digitek Limited May 26, 2026 In terms of the BOO projects, if it is a standalone BESS, execution timeline is approximately one and a half years and if it is a solar plus BESS project, it can range between two to three years.
- First project was commissioned in September last year and its products have been working in the field for more than a year.
Show source
For example, our first project was commissioned in September last year, so that also serves as a credential that our products have been working in the field for more than a year.
- Cell manufacturing is very much on the cards, and it will be coming up soon with an announcement. Replaced by a later filing.
Show source
Point number three, cell manufacturing is very much on the cards.
Demand and pricing
- The addressable market in Africa is primarily grid-scale BESS, and unstable grids and low power availability in most African countries create an opportunity for green energy coupled with BESS.
Show source
Therefore, there is a big opportunity in terms of green energy coupled with BESS.
- Government business requires bidding and winning as L1, while private customers consider manufacturing capabilities, field operations, support availability in India, and technical knowledge and know-how.
Show source
Yes, in the government business you have to bid and win as L1.
Segments
- The company is focused on the infrastructure segment of the government’s Kavach project for the Railway sector, providing network infrastructure solutions; it has bid for a couple of projects and will continue bidding for further projects, with Railway divisions floating projects ranging from Rs.100 to Rs. 250 crores.
Show source
Till now, we have bid for a couple of projects and we will continue bidding for further projects.
- The company transitioned from a telecom infrastructure execution company into an integrated infrastructure platform across telecom and energy infrastructure and Battery Energy Storage Systems (BESS).
Show source
We have transitioned from a telecom infrastructure execution company into an integrated infrastructure platform across telecom and energy infrastructure and Battery Energy Storage Systems (BESS).
- The company maintains creditors with extended usance periods based on the projects it executes and customer milestone schedules; most customers are government-based customers with milestone-based payment mechanisms.
Show source
We also operate on a B2B model wherein most of our customers are government-based customers with milestone-based payment mechanisms.
- The company participates in Kavach tenders for specific corridors, such as Mumbai to Ahmedabad or Chennai to Bangalore, drawing on its telecom-segment expertise in tower infrastructure and optical fiber deployment.
Show source
We are participating in these tenders because we are in the telecom segment and have expertise in tower infrastructure and optical fiber deployment.
- Data centers, particularly AI data centers seeking round-the-clock green energy, are a focus area for Pace Digitek Limited; its teams are understanding their power configurations and requirements and developing solutions for the segment.
Show source
Yes, data center s are focus area for us because most data centers, particularly AI data centers are looking for green energy on a round the clock (RTC) basis.
- The company does not have subcontractors involved in project execution.
Show source
We do not have a subcontractors involved in the project execution.
- The company has built a Network Operating Center to monitor its plants remotely; the entire operation is managed online, with no manual intervention.
Show source
Page 21 of 22 Pace Digitek Limited May 26, 2026 We have built a Network Operating Center and we are monitoring our plants remotely.
Deals and partners
- The company has not yet found a suitable partner for large-scale BESS container manufacturing and is developing one or two potential partners; at present, most containers are imported.
Show source
While some limited-scale manufacturing exists, we have not yet found a suitable partner for large-scale BESS container manufacturing.
- NEC, a group originally from Japan with a strong power-infrastructure presence in Africa, signed an exclusive agreement with Pace Digitek Limited for some regions in Africa after almost six months of deliberations.
Show source
After almost six months of deliberations, they have signed an exclusive agreement with us for some regions in Africa.
Risks, rules and outside factors
Risks and disputes
- The company may evaluate available force majeure provisions if required; if the situation continues, there could be some impact on project timelines because the government has issued guidelines under which projects can be extended by two to four months due to this war.
Show source
We may evaluate the available force majeure provisions, if required.
Outside factors
- Rates increased by almost 20% from 1st April due to regulatory changes; inventory built up as of 31st March has reduced consumption cost for the current quarter, and the company expects prices to start easing from the next quarter onwards.
Show source
The rates have increased by almost 20%.
- The company built up inventory as a strategic measure for Q1 consumption, considering increases in commodity prices and foreign exchange rates.
Show source
First, the inventory has been built up as a strategic measure considering the increase in commodity prices and foreign exchange rates.
Rules and policy
- State government policies in Maharashtra, Gujarat and Rajasthan stipulate that BESS must be set up wherever there are 50 MW and above solar installations.
Show source
Keeping in mind the various state government policies in states such as Maharashtra, Gujarat and Rajasthan, which have launched their BESS policies recently and stipulate that wherever you have 50 MW and above solar installations, you need to set up BESS on a mandatory basis.
Everything else said on the call
What management stressed
- The company is more focused on the industrial sector than EV charging infrastructure, which is not a focus area at this point in time.
Show source
Therefore, EV charging infrastructure is not a focus area for us at this point in time.
- FY2026 was a landmark year for Pace Digitek, with a successful IPO listing that created a strong platform for the next phase of scale and long-term growth. Replaced by a later filing.
Show source
FY2026 was a landmark year with successful IPO listing, creating a strong platform for next phase of scale and long -term growth.
Group structure
- Pace Digitek Limited, as the parent company, will undertake EPC execution for its subsidiary SPV; the project IRR at the SPV level is about 12% to 13%, and there will also be an EPC margin.
Show source
Pace Digitek as the parent company will undertake the EPC execution of the project for the subsidiary which is the SPV.
- Lineage Power, Pace Digitek’s subsidiary, manufactures BESS products for sale to Pace Digitek or the external market.
Show source
What happens is that Lineage Power manufactures BESS products which either sell its products to Page 12 of 22 Pace Digitek Limited May 26, 2026 parent company which is Pace Digitek or to the external market.
- The company adopts the pricing principle that an independent third-party contractor would charge the SPV for EPC work on the same project.
Show source
Accordingly, whatever price a third party would charge to SPV, same pricing principle is adopted here as well.
Other
- The company said that 70% of INR3,400 is around INR2,100 crores, INR2,200 crores, and 9% of that would be INR200 crores.
Show source
We have around 200 engineers who are supporting field operations.
Show 2 more statements
Other
- Standalone BESS projects typically qualify for lease accounting, whereas solar plus BESS projects are generally accounted for under the fixed asset accounting model; treatment differs by project depending on the customer agreement structure.
Show source
In terms of accounting, standalone BESS projects typically qualify for lease accounting, whereas solar plus BESS projects are generally accounted for under the fixed asset accounting model.
- The FY2025 receivable amount was regrouped between current and non-current.
Show source
The amount has been regrouped between current and non-current.
What the company said on its earnings call, taken from its own transcript. Not advice.
Questions and answers
Question
Sahil Jinesh Seth: Hi, congratulations on the great set of numbers. My first question would be, our manufacturing capacity commissioning date has been postponed by almost a quarter across all our facilities. Is there any bottleneck we are facing in terms of commissioning?
Answer, m rao
M. Venugopal Rao: Hi, good morning. Yes, it has been delayed by two months, not a full quarter. The primary reason was delay in shipments arising from the conflict in West Asia. Shipping lines were disrupted which affected movement of equipment. The equipment has now arrived and it is under installation. As we mentioned earlier, it will be operational by July this year. From July, this line will also commence production of BESS containers.
Question
Sahil Jinesh Seth: From which country are we importing the manufacturing equipment from?
Answer, m rao
M. Venugopal Rao: Yes and I know your point is that problem is on the other side, so why was the impact felt in the eastern part of the world ? Basically, these liners, when they work, let's say they don't just operate only between China to India. To give an example, an aircraft may fly from Bangalore to Hyderabad, then from Hyderabad to Delhi and from Delhi to Jammu before returning. If there is a disruption at any point in the supply chain, it impacts entire supply chain and the freight network. We almost lost one month due to delays in shipment. But now the problem is over, the equipment is already in our factory and under Page 8 of 22 Pace Digitek Limited May 26, 2026 installation. It will be commissioned within June itself and become operational from July.
Answer, m rao
M. Venugopal Rao: As you know, we are already in a leading position in cell to pack and pack to container manufacturing in India. Point number one, we would like to maintain this lead by building further capacity as I mentioned from 2.5 GWh to 5 GWh and from 5 GWh to 10 GWh. This capacity expansion happening within next four to five months. By October, we will be at 10-GWh. That is a big capacity compared to what other people are planning now and we will have our capacity already built up by September, whereas others may take some more time . Point number two, it is not just the manufacturing, it is a complete chain including field operations, execution capabilities and business visibility. The open order book as we speak, is around 6 GWh .
Answer, m rao
Our products are being deployed in the field and they are already working. This itself is a significant learning curve of almost one and a half years for us and everybody has to go through this learning curv e. We will have to maintain that lead and we are already working towards that. Point number three, cell manufacturing is very much on the cards. We will be coming up soon with an announcement.
Question
Sahil Jinesh Seth: Okay. On the recent China rebate reversal policy which has already decreased from 9% to 6% and set to expire in the next year . What is our current cell cost we are facing and what change are we expecting and how much of would be pass on to our realization on the container side? If you can give us in terms of dollar per kilowatt hour or any number.
Answer, rajavendhan p
Rajavendhan P: As we mentioned earlier, as part of strategic initiative we have stocked cells at the older prices. Yes, you are right, from 1st April the rates have increased due to regulatory changes. The rates have increased by almost 20%. The inventory built up as of 31st March has helped us during the current quarter, by reducing the consumption cost for this quarter. But subsequently, we expect prices to moderate and moreover what we have done for all our bidding is that we have kept some contingency factors for all these rate Page 9 of 22 Pace Digitek Limited May 26, 2026 increase scenarios, which will take care of our margin protection. We expect that prices will start easing from the next quarter onwards. So that's our expectation.
Question
Sahil Jinesh Seth: Sir, can you provide your current realization per container and what would be the cell cost out of it?
Answer, m rao
M. Venugopal Rao: The current container realization is about $82 to $84 per kWh, while cell costs are currently elevated levels in the range of $48 to $50 per kWh. Therefore, cell costs account for ~ 60% of overall BESS system value. We hope commodity prices will come down because we believe that these prices are not sustainable. However, at least for one quarter, we do not expect much impact because we already stocked material at earlier prices. This inventory position provides some protection against the recent increase in cell prices. Many industry participants are evaluating project timelines in the current environment until there is greater clarity on input costs and supply chain conditions. We are not delaying projects at this moment because we have some stock .
Answer, m rao
However, if this situation continues there could be some impact on project timelines because the government has also issued a guidelines under which projects can be extended by two to four months due to this war. We may evaluate the available force majeure provisions, if required.
Question
Sahil Jinesh Seth: Got it sir. Last question, what savings are you seeing due to in-house container fabrication plant?
Answer, m rao
M. Venugopal Rao: There are two reasons for this in-house container manufacturing. One, the logistical challenges are quite significant. I'll tell you one example. First of all, in India the container manufacturing is not there as of now . While some limited-scale manufacturing exists, we have not yet found a suitable partner for large-scale BESS container manufacturing. We are developing one or two potential partners, but that process is taking time. Therefore, at present, most containers are imported .
Answer, m rao
The cost of the container includes almost 30% of overheads cost incurred to bring it to India by sea freight and along with risks relating to handling and transit damages. It is more of logistics advantage in addition to the cost . If we manufacture Page 10 of 22 Pace Digitek Limited May 26, 2026 within our factory, we will be able to use it for our own consumption, that convenience is very high. In addition to that, we expect overall pricing and operating efficiencies to improve by approximately 4% to 5% through in-house container fabrication.
Question
Sanket Sadh: Thank you for the opportunity and congratulations on a good set of numbers. My first question is, our EBITDA margins in the energy segment are slightly lower than EBITDA margins from telecom. And in the previous call, you had given an estimate of PAT margin becoming around 11% in FY27. In your view, would those margin projections remain intact or are you expecting some dip in margin in FY27 given our order book is mostly in energy?
Answer, rajavendhan p
Rajavendhan P: Yes. Your observation is right. Energy EBITDA margins are lower than telecom. Across our current order book, the EBITDA margins are comparatively lower than the telecom business. With this backdrop, execution of energy orders will increase in FY27. The margins you are referring to, whether the PAT margin of 11.4% or the EBITDA margin of 17.2%, may reduce slightly as the contribution of energy orders to the overall revenue mix increases. Considering the fact that energy is going to play a significant role to the top line in FY2027 we are expecting PAT margins in a range of 10% to 11% for next year.
Question
Sanket Sadh: Okay. And, regarding the receivables which I noticed on the balance sheet which was just posted last night, so in the FY26 result, it says that the receivables are Rs. 1,565 crores. However, when we look at the annual report or the RHP filed by the company last year, the receivables are Rs.1,843 crores. It's almost a Rs.300 crores difference in receivables. If you could just shed some light on why the difference has occurred.
Answer, rajavendhan p
Rajavendhan P: Yes, I think you need to see the complete balance sheet. There is one more line item where a portion of the receivables has been reclassified as non-current. Considering the fact that one of the telecom projects from BSNL has a five-year payment schedule the related receivables are recoverable over a longer period, and therefore we have classified that portion as non-current. Accordingly, a part of the trade receivables has been moved from current to non-current receivables. You can see about Rs. 295 crores in the non-current portion. Page 11 of 22 Pace Digitek Limited May 26, 2026 Sanket Sadh: I added the non-current as well as the current portion receivable in the FY2026 result balance sheet and I believe in the RHP and annual report, there's only one line item and that is only in current.
Question
Despite that, there's still a difference. If you're able to give an answer or maybe I can email you later for this question .
Answer, rajavendhan p
Rajavendhan P: Ok, let me explain. As I stated, we have regrouped a portion of receivables into non-current receivables not only for FY2026 but also for the comparative FY2025 numbers. So, it is about Rs. 295 crores plus Rs. 1,271 crores. These are two line items of the trade receivables shown for FY2025 in the balance sheet as comparative figures. Accordingly, the receivables have been presented under separate current and non-current categories to ensure comparability with the FY2026 presentation.
Question
Sanket Sadh: My last question is, as you continue to grow in BESS, are you going to continue in the Build-Own-Operate projects via debt funding only? Or are you going to raise through any warrants or a fresh round as internal accruals do not look sufficient enough to continue funding this expansion?
Answer, rajavendhan p
Rajavendhan P: As we stated in our opening remarks, the strategy for FY27 and FY28 is to increase the product business. So wherein the product business in terms of BESS is what we are trying for the external customers. In line with this strategy, out of the four BOO projects we have, the first three are already funded either through the IPO funds or the internal accruals. The fourth project is being funded through external resources. With this, we are not stepping into further BOO projects unless we have some external investment in place. Currently we don't have that plan, so the FY27 -FY28 we want to concentrate more on the product business in terms of selling it to the outside market.
Question
Shreeya Kamble: Hi Sir, I wanted to ask as it was mentioned about the changes in accounting policies that were going to happen in Lineage Power, your subsidiary . Are they being changed keeping in mind the changes in Ind AS?
Answer, rajavendhan p
Rajavendhan P: Lineage Power is a manufacturing entity and it is manufacturing BESS. We don't have any accounting policy change in the Lineage Power. What happens is that Lineage Power manufactures BESS products which either sell its products to Page 12 of 22 Pace Digitek Limited May 26, 2026 parent company which is Pace Digitek or to the external market. That's the only difference, otherwise there is no major change in accounting policy.
Show 14 more questions
Question
Shreeya Kamble: Also, the revenue guidance that you've given of Rs.3,200 to Rs. 3,400 crores for FY27, is it a net of intra-company transactions?
Answer, rajavendhan p
Rajavendhan P: Yes, the top line that we report is always net of all the inter-company transactions.
Question
Deepak Poddar: Okay. And how are we accounting for it because this BOO project are being executed through subsidiaries, right? How are we accounting this, can you just briefly explain?
Answer, rajavendhan p
Rajavendhan P: Yes, it is based on the project structure. For the current MSEDCL project we are executing, we follow the dealer-lessor model as per Ind AS standards. Under this model, the project has been classified under lease accounting, where revenue and Page 13 of 22 Pace Digitek Limited May 26, 2026 the related receivable are recognized. Therefore, it differs from project to project based on its structure.
Question
Kaushal Sharma: My question on your working capital side . In FY2026, working capital seems to be stretched out because of the receivables significantly increased . Our revenue from operations increased 8.3% YoY but receivable has grown 56% YoY. And same side the payable has also grown 77% YoY. What is the reason of increasing the working capital or the receivable side?
Answer, rajavendhan p
Rajavendhan P: Yes sir. There are two points to note as I explained . First, the inventory has been built up as a strategic measure considering the increase in commodity prices and foreign exchange rates. We have specifically built up this inventory for Q1 consumption. Second, on the receivables side, in FY2026 the sales were concentrated in Q4 . In Q4, we have recorded sales of Rs. 1,097 crores. Normally, for projects where revenue is booked, the receivable comes over a span of 90 to 120 days.
Answer, rajavendhan p
Therefore, a significant portion of the Q4 sales is reflected in receivables. Another point is that creditor have also increased . What we normally do is try to match the debtors and creditors. If you see the numbers, the net of debtors and creditors is about Rs. 650 crores with a 90 -day cycle, so that is the relevant metric to consider. What we normally do is maintain creditors with extended usance periods based on the projects we execute and the customer milestone schedules. We also operate on a B2B model wherein most of our customers are government-based customers with milestone-based payment mechanisms. These factors account for the increase in receivables.
Answer, rajavendhan p
Further, as on today, we have already collected about Rs. 300 crores relating to Q4 sales. Between April and May, we have collected Rs. 300 crores and receivables are expected to ease further by September 2026. Page 14 of 22 Pace Digitek Limited May 26, 2026 Kaushal Sharma: Got it sir.
Question
And my question is on your BOO model, where we are having 50% BOO projects. Could you please explain the unit economics taking the Telangana projects into consideration, what is overall capex net of VGF and the debt-equity mix, IRR, EBITDA per MW hour and other unit economics, so that I could understand the BOO model?
Answer, rajavendhan p
Rajavendhan P: Sure. I'll take a live example of the MSEDCL project in Maharashtra. The overall cost of the project is about Rs.1.3 crores to Rs.1.35 crores per MWh. This includes a GST portion of about Rs. 0.2 crores. Excluding the GST component, the net cost is about Rs. 1.2 crores per MWh. This Rs. 1.2 crores again includes the VGF. In other words, a part of the project cost is offset through VGF from the government of about Rs. 27 lakhs per MWh.
Answer, rajavendhan p
After adjusting for the VGF support, the net cost reduces from Rs. 1.2 crores to Rs. 93 lakhs. Rs.93 lakhs is the net cost per MWh, net of GST and VGF funding. This Rs.93 lakhs per MW hour mostly consists of the battery storage system as a material cost. The government pays us in terms of rupees per MW, not MWh. For example, if this is a project for about 1,500 MWh, the revenue will be based on 750 MW. In terms of MW capacity, the government pays us Rs. 2,19,000 per MW per month.
Question
Paras Chheda: Okay. What is the split between billed receivables and milestone -based receivables?
Answer, rajavendhan p
Rajavendhan P: The milestone-based outstanding which is yet to be billed is about Rs. 900 crores, which will be billed over a period of next 3-5 years' time based on project milestones and the related billing schedule. Page 15 of 22 Pace Digitek Limited May 26, 2026 Paras Chheda: Okay, understood so under the BOO project you mean to say?
Answer, rajavendhan p
Rajavendhan P: No, this is for the telecom project. We have a milestone-based billing under which every year, over the next five years, we will bill around Rs.150 to Rs.175 crores.
Question
Paras Chheda: Understood sir. When do we expect the cash flow from operations to turn positive?
Answer, rajavendhan p
Rajavendhan P: The cash flow from operations in this financial year was impacted by inventory built up plus increase in receivables. We expect this to ease out by September 2026 because, as I explained significantly higher sales were recorded in Q4 FY2026, which resulted in higher receivables. We expect this to normalize by September 2026. For this financial year, we are focused on ensuring the top line is more evenly distributed quarter-on-quarter instead of being concentrated in Q4. Last financial year, what has happened is that the order book available with us started execution in Q3, which resulted in a significant portion of sales being recognized in Q4. This is expected to normalize during the current year because at the beginning of the year we have an order book under which we have already commenced execution for a few projects in this quarter.
Answer, rajavendhan p
Rajavendhan P: Your observation is correct. Mostly, we will not operate at 100% utilization but at 75% to 80%. Further BOO and other EPC projects currently account for 5.32 GWh Page 16 of 22 Pace Digitek Limited May 26, 2026 which are to be executed. Accordingly, the revenue realization would be different from project to project. We expect that the other projects will have a fixed asset accounting model rather than the lease accounting model. For this and the next financial year, majority of the BESS manufacturing will go to these BOO projects and 50% to 60% is expected to be allocated to the direct product business or the EPC business. That is how we have arrived at this guidance of Rs. 4,000 crores for FY28.
Answer, rajavendhan p
This would change based on the composition of orders that we execute. Bhagwat: Okay. In the presentation it's mentioned 2.72 GWh, but you mentioned 6 GWh. M. Venugopal Rao: Total overall order book stands at 5.32 GWh and out of that, 2.72 GWh is for the BOO. Out of these four BOO projects, two of them are the solar plus BESS where it is energy selling business, whereas the projects we are executing like MSEDCL and KPTCL follow a lease model. Solar plus BESS projects are different because revenue is generated from the sale of energy. Therefore, project capex will not be counted as revenue.
Answer, rajavendhan p
If we put everything together, numbers are a bit conservative, but it is quite possible that we will achieve this or even exceed it. Bhagwat: Okay. For FY27, I think the previous comment was Rs. 800 crores top line and next year another Rs. 1,000 crores, is that what I have listened? So, on PAT level what the contribution it would be from the BOO segment for these two years?
Answer, rajavendhan p
Rajavendhan P: The 5.32 GWh that I referred to comprises BOO plus EPC. For BOO it is about 2.72 GWh, out of which the first project form MSEDCL is expected to generate revenue of about Rs. 1,000 crores in the current financial year. Bhagwat: Okay. And at the PAT level if you could comment on what it contributes for the BOO segment?
Answer, rajavendhan p
Rajavendhan P: At the PAT level for the BOO segment, as an overall business, we are trying to maintain PAT margin of around 10%.
Question
So, congratulations for the great set of numbers. In the initial remark, you have mentioned regarding Kavach project solutions. Can you throw more light on it?
Answer, rajavendhan p
Rajavendhan P: Yes sir. These projects come under our Telecom & ICT vertical. Kavach project is a government initiative for the Railway sector. There are two different areas of this Kavach project; one is the core signaling equipment; second is the infrastructure for the Kavach. We are focused on the infrastructure segment of the Kavach project, where we provide network infrastructure solutions. Till now, we have bid for a couple of projects and we will continue bidding for further projects. Various Railway divisions are coming up with these projects in smaller project sizes ranging between Rs.100 and Rs. 250 crores.
Answer, rajavendhan p
The tenders are floated for specific corridors, for example Mumbai to Ahmedabad or Chennai to Bangalore. We are participating in these tenders because we are in the telecom segment and have expertise in tower infrastructure and optical fiber deployment.
Question
Praveen Sahay: Hi, thank you for giving me an opportunity. My first question is related to your order book related to energy. Can you give the timeline and second, the revenue recognition for different segments like solar plus BESS, standalone BESS and solar EPC?
Answer, rajavendhan p
Rajavendhan P: The energy order book stands at Rs. 8,854 crores and it includes both BOO and EPC projects. For standalone BESS EPC projects, the execution timeline is approx. 1.5 to 2 years, whereas for solar plus BESS mix project, it would range between 1.5 to 2.5 years. Page 18 of 22 Pace Digitek Limited May 26, 2026 In terms of the BOO projects, if it is a standalone BESS, execution timeline is approximately one and a half years and if it is a solar plus BESS project, it can range between two to three years. In terms of accounting, standalone BESS projects typically qualify for lease accounting, whereas solar plus BESS projects are generally accounted for under the fixed asset accounting model. The accounting treatment differs from project to project depending on the structure of the agreement with the customer.
Question
Praveen Sahay: Okay. Second question is just a clarification regarding the earlier discussion related to the receivable of FY2025. As per the Q4 and full year FY2026 filing, there is a difference. Even after considering both current and non-current receivables together, there is still a gap of Rs. 399 crores. Can you give a clarification where this amount accounted for in FY2025?
Answer, rajavendhan p
Rajavendhan P: I am not seeing any difference. The amount has been regrouped between current and non-current. If you can email it across to me separately, I can clarify this.
Question
Aaditya Sharma: Hello sir, first of all congratulations for the excellent set of numbers. My question is that your BESS business is going well. Apart from this, does the company plan to expand into other areas like data center, EV charging?
Answer, m rao
M. Venugopal Rao: Hi, good afternoon. Yes, data center s are focus area for us because most data centers, particularly AI data centers are looking for green energy on a round the clock (RTC) basis. Our teams are currently working on understanding their power configurations and requirements, and we are developing solutions for this segment. As for charging stations, since this is primarily a retail-oriented market, we are more focused on the industrial sector. Therefore, EV charging infrastructure is not a focus area for us at this point in time.
Question
Yash Jain: Congratulations on a good set of numbers. Sir, I just had two quick questions. First, regarding the NEC XON partnership that Pace Digitek has, which provides Pace Digitek exclusive OEM access across African markets. Can you share the Page 19 of 22 Pace Digitek Limited May 26, 2026 addressable BESS demand across these African markets and what revenue contribution do you expect from this channel in FY27 and FY28, if any?
Answer, m rao
M. Venugopal Rao: Yes, the NEC is group originally from Japan and they have a very good setup in Africa and they have strong in-roads in terms of power infrastructure. After almost six months of deliberations, they have signed an exclusive agreement with us for some regions in Africa. They already hav e some projects for which they are trying to find a financial closure. Once that happens, the order should come. In Africa, addressable market is primarily in grid-scale BESS. The grid is also very unstable in most African countries and the power availability is very low. Therefore, there is a big opportunity in terms of green energy coupled with BESS.
Answer, m rao
For FY27 and FY28, we expect approximately 300 to 500 MWh of orders, starting from FY27. We have already identified two to three potential projects, and the teams are actively working on them. Achieving 300 to 500 MWh of orders in FY27 appears achievable. In FY28, we may grow by a further 20% to 25% over FY27 levels.
Question
Kartik Mittal: Congratulations on the great set of numbers. My first question on BOO projects at the SPV level, where you mentioned project level IRRs are 12% to 13%. I wanted to know what is the transaction structuring where holding company provides EPC services and books EPC profits and then the subsidiary company books the BOO revenues. Is there any other profit pool or value capture mechanism at the holding company level as well?
Answer, rajavendhan p
Rajavendhan P: Yes, you are right. Pace Digitek as the parent company will undertake the EPC execution of the project for the subsidiary which is the SPV. At the SPV level, the project IRR is about 12% to 13%. There will also be a margin for the EPC. What we are trying to say is that, on an arm's length basis, if the same project were being executed by another SPV developer, the EPC contract would typically be awarded to an independent third-party contractor. Accordingly, whatever price a third party would charge to SPV, same pricing principle is adopted here as well. Page 20 of 22 Pace Digitek Limited May 26, 2026 The strength of the company lies in backward integration of project execution.
Answer, rajavendhan p
We do not have a subcontractors involved in the project execution.
Question
Kartik Mittal: Good, but doesn't it account for extra taxation on the profits you're booking within the consolidated entity?
Answer, rajavendhan p
Rajavendhan P: Sir, this is required on an arm's length basis. As I mentioned earlier, if the EPC work for a similar project were awarded to an independent contractor, the SPV would incur a comparable EPC cost. Therefore, the same arm's length pricing principle is followed in our case as well. Only because we have the capabilities, we are doing this at the parent company level. Yes, the additional margin does attract additional tax. These are standard market practices.
Question
Kartik Mittal: Yes, good. Just one more question. You said that currently we have a first-mover advantage in the BESS market, but other players are also ramping up their capacities. One year from now, what will be our right to win projects? Is it L1 bidding or large-scale execution capability or something else?
Answer, m rao
M. Venugopal Rao: The BESS business is a complete ecosystem and not just manufacturing. If somebody puts up a plant, it does not mean that they will automatically get the business. There are two sets of customers we have; one is the government business. Yes, in the government business you have to bid and win as L1. That is one route to market. However, in the private business, customers look at manufacturing capabilities, field operations, support availability in India, and technical knowledge and know-how. All of these factors are important.
Questions about this call
- When was the Pace Digitek Q4 FY26 earnings call transcript filed?
- Pace Digitek filed the transcript with the exchange on 3 Jun 2026. This page is built from that transcript.
- What does this page list?
- 94 statements from the transcript across 14 topics, 55 of them with a figure. Each statement is shown with the transcript sentence it came from.
- Are the analysts' questions included?
- Yes. 24 questions and management's answers are listed in the order they were asked, as the transcript prints them.
- Who wrote this page?
- DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.