Earnings call

Premier Energies Q2 FY27 earnings call: Premier Energies won new cell and module orders totaling INR4,001 crores in Q2, taking its total order book to INR16,260 crores

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

The transcript names the quarter but not the year. The year is worked out from the date it was filed.

The company won new cell and module orders totaling INR4,001 crores in Q2, taking its total order book to INR16,260 crores. The company expects project commissioning progress to accelerate over the next six months, taking annual capacity addition to around 50 GW AC territory and surpassing last year’s numbers. The company commissioned its 7 GW TOPCon cell line; trial runs are underway and commercial production is expected to start later this month. Premier Energies’ consolidated revenue increased 38.2% Y-o-Y to INR2,656 crores in Q2. For the IPP segment, DCR module prices are going as low as about INR20.5 or even INR20 up to March 2027.

The numbers management gave

Results

  • Premier Energies’ consolidated revenue increased 38.2% Y-o-Y to INR2,656 crores in Q2.
    Show source
    The company has reported another sterling quarter with total revenue increasing by 38.2% Y-o-Y to INR2,656 crores on a consol basis.
  • Premier Energies’ EBITDA and PAT grew 17.8% and 30.8% Y-o-Y to INR760 crores and INR462 crores, respectively, in Q2.
    Show source
    EBITDA and PAT have grown by 17.8% and 30.8% Y-o-Y to INR760 crores and INR462 crores respectively.
  • Premier Energies’ solar manufacturing business had EBITDA and PAT margins of 29.3% and 17.9%, respectively, in Q2.
    Show source
    EBITDA and PAT margins in the solar manufacturing business came in at 29.3% and 17.9% respectively.
  • Transcon, Premier Energies’ subsidiary, reported revenue of INR122 crores and PAT of INR18 crores in Q2.
    Show source
    Transcon, our subsidiary, has reported another good quarter with revenue and PAT of INR122 crores and INR18 crores respectively.
  • Transcon, Premier Energies’ subsidiary, had EBITDA and PAT margins of 15% and 8%, respectively, in Q2.
    Show source
    EBITDA and PAT margins came in at 15% and 8%.
  • Premier Energies’ PAT margin moderated slightly because depreciation increased and other income decreased in Q2.
    Show source
    The PAT margin has moderated slightly because of increase in depreciation and reduction in other income.
Show 7 more statements

Results

  • Premier Energies’ non-DCR business has single-digit EBITDA margins.
    Show source
    When you talk of non-DCR business, it is, of course, in the single-digit kind of EBITDA margins.
  • Premier Energies’ operational cell plants delivered record capacity utilization in Q2. Replaced by a later filing.
    Show source
    Our operational cell plants delivered a record capacity utilization in the quarter, showcasing our all- round operational excellence.

Money and capital

  • The company expects capex of about INR700 crores over the next two quarters and around INR2,400 crores for the financial year; its cell and module expansion capex is largely complete, with marginal leftover payments for the Naidupeta cell plant, the battery and the aluminum plant, as well as open access captive projects.
    Show source
    I think on the whole, the capex for the next two quarters should be moderated, I would say, to about INR700 crores territory, which means the total capex for the financial year should be around INR2,400 crores.
  • Premier Energies’ inventory buildup is largely on the raw material side, with no major change in finished goods inventory.
    Show source
    The buildup is largely on the raw material side.
  • Premier Energies’ raw material inventory buildup is mainly due to ramp-up at Seetharampur and commissioning of the Naidupeta plant, ahead of an expected scale-up in cell and module operations.
    Show source
    The buildup is mainly because of two reasons.
  • The company has no QIP planned in the near future and says it has enough cash flow from operations to fund its announced capex plans.
    Show source
    There is no QIP planned in the near future.
  • The company has an A+ credit rating. Replaced by a later filing.
    Show source
    Our balance sheet strength, as reflected in low cost of capital and an A+ credit rating, is a key pillar of our business competitiveness.

What it expects ahead

What management expects

  • The company expects project commissioning progress to accelerate over the next six months, taking annual capacity addition to around 50 GW AC territory and surpassing last year’s numbers.
    Show source
    We expect project commissioning progress to accelerate over the next six months, taking the annual capacity addition to around 50 GW AC territory, surpassing last year's numbers.
  • The company expects realizations of around INR21.5 for the KUSUM C and C&I market, with prices at the bottom possibly INR21.
    Show source
    Then the next segment is the KUSUM C and the C&I market, where we expect realizations to be around INR21.5.
  • The company expects its transformers business to have a normalized margin of about 15% going forward; the previous quarter's higher margin resulted from variable increases in orders when steel and copper costs rose, while the company had hedged inventory.
    Show source
    But on a normal basis, we expect this to be a 15% margin business going forward.
  • The company says Surya Ghar 2.0 and KUSUM 2.0 would provide better margins in terms of realization, and is confident its current mix will improve if these schemes come in.
    Show source
    We are quite confident that if Surya Ghar 2.0, KUSUM 2.0 comes in, the mix what we have today will only get better.
  • The company says the timing is right to invest in the BESS business and expects to win BESS business from its IPP and C&I customers and qualify for 40% local content.
    Show source
    And we, having our reputation and the brand which we carry in the market with our customers and the history of 32 years which Premier has, we will be able to win BESS business from our IPP customers and C&I customers, and we will qualify for the 40% local content.
  • The company expects a major step-up in the company’s financial performance as new capacity ramps up over the next few quarters.
    Show source
    As new capacity ramp up over the next few quarters, we expect a major step up in financial performance of the company.
Show 11 more statements

What management expects

  • The company expects favorable government policy announcements and attractive overall demand-side macro conditions; the Green Energy Corridor scheme and BESS initiative with the VGF scheme have been seen in the last one or two months, while second versions of KUSUM and Surya Ghar Yojana are due for announcement over the next one or two months. The resulting tilt toward DCR modules is expected to help maintain and increase margins.
    Show source
    That should obviously tilt the business focus and the mix of product towards the DCR modules, and that will help us to maintain and increase our margins.
  • The company wants to grow in the semiconductor space, but says it is too early to commit to entering semiconductor wafers; it first wants to complete its already announced capex plans and execution timelines as committed before considering opportunities.
    Show source
    We as a company would want to grow in the semiconductor space.
  • The company has no firm plan for its next leg of growth or deployment of cash flows.
    Show source
    We do not have a firm plan now.
  • The company expects a significant step up in company performance over the next few quarters as the Naidupeta plant ramps up and Seetharampur volumes pick up because of increased cell production.
    Show source
    Next few quarters, we are expecting a significant step up in the performance of the company, with the Naidupeta plant ramping up, Seetharampur volumes also picking up because of the increased cell production.
  • The company expects transformer volumes to pick up quarter-on-quarter over the next two to three years.
    Show source
    Transformer volumes also will pick up quarter-on-quarter over the next two to three years.
  • The company expects the matter discussed to resolve latest by the March quarter. Replaced by a later filing.
    Show source
    Vinay Rustagi: I would say latest by March quarter, yes.
  • The company says the demand outlook is extremely positive with the Surya Ghar Yojana and KUSUM schemes around the corner and government initiatives underway. Replaced by a later filing.
    Show source
    The government is working on a number of initiatives, and with these new schemes, Surya Ghar Yojana and KUSUM around the corner, the demand outlook is extremely positive.

Orders

  • The company won new cell and module orders totaling INR4,001 crores in Q2, taking its total order book to INR16,260 crores.
    Show source
    A highlight of the quarter was new order wins totaling INR4,001 crores for cells and modules in a highly competitive market, taking our total order book to INR16,260 crores.
  • Premier Energies’ transformer business had a healthy order intake, reflecting higher capacities, taking the transformer company’s total order book to INR330 crores in Q2.
    Show source
    The transformer business also saw a healthy intake, reflecting higher capacities, taking the total order book in the transformer company to INR330 crores.
  • Retail accounts for about 35%-40% of Premier Energies’ order book.
    Show source
    But roughly, retail is about 35%-40%.
  • About 25%-30% of Premier Energies’ 16,000-odd crores order book is non-DCR.
    Show source
    Chiranjeev Saluja: In our 16,000-odd crores order book, about, as Vinay said, about 25%-30% is non-DCR.

What it is building and selling

Projects and capacity

  • The company commissioned its 7 GW TOPCon cell line; trial runs are underway and commercial production is expected to start later this month.
    Show source
    Trial runs are currently underway, and commercial production is expected to start later this month.
  • The company expects to operationalize its Battery Energy Storage System in Q2 2027.
    Show source
    On the Battery Energy Storage System, we expect to operationalize the Battery Energy Storage System in Q2 2027.
  • The company is working to localize container manufacturing and some fire suppression systems for its Battery Energy Storage System to achieve the 40% localization required by the government for various subsidy programs.
    Show source
    We are trying to localize some of the fire suppression systems inside it to achieve the 40% localization that is being asked by the government for the various subsidy programs.
  • The company has applied to the National Institute of Solar Energy for inspection of its 7 GW cell line at Naidupeta and its enrollment in the ALMM; it expects the inspection to happen anytime in the third week of November.
    Show source
    We are expecting the inspection to happen anytime in the third Page 3 of 19 Premier Energies Limited November 05, 2026 week of November.
  • The company is looking at about 12-18 months to finalize its U.S. factory location.
    Show source
    Chiranjeev Saluja: Yes, about 12-18 months is what we're looking at.
  • The company says it will comfortably achieve 40% value addition in its battery energy storage system through cell-to-pack, pack-to-container and software, with support from China to set up these lines; it has been cautious about announcing large investments in battery storage cell manufacturing because the issue is cell manufacturing, not equipment for cell-to-pack and pack-to-container lines.
    Show source
    To answer your question on the 40% value addition, we will comfortably achieve that with cell- to-pack, pack-to-container, and the software bit of the battery energy storage system.
Show 18 more statements

Projects and capacity

  • The company plans to manufacture its Battery Energy Storage System through cell-to-pack and pack-to-container processes at the manufacturing plant it is setting up.
    Show source
    So our plan is to do cell to pack and pack to container.
  • The company is at advanced stages to finalize its factory location in the U.S., already has a JV partner, and would set up cell manufacturing in the U.S.
    Show source
    If you talk of MIP, we are clear that Make in America is the answer, and hence we are at advanced stages to finalize our factory location in the U.S. We already have a JV partner, so we are progressing well on that side.

Demand and pricing

  • The prevailing retail-market price for a DCR module is INR23-INR24 per watt.
    Show source
    There, the price prevailing in the market is anywhere between INR23- INR24 per watt on a DCR module.
  • For the IPP segment, DCR module prices are going as low as about INR20.5 or even INR20 up to March 2027.
    Show source
    There, we see prices going to as low as about INR20.5 or even INR20, if you are talking about up to March 2027.
  • The average price for a DCR module is around INR21.5-INR22.
    Show source
    Now, when you average out all these prices, you get an average of around close to INR21.5-INR22 on the DCR module.
  • Cell prices range between $0.12-$0.14, with Mono PERC around $0.12-$0.125 and TOPCon at about $0.14, $0.145.
    Show source
    When you talk of cells, it is ranging between $0.12- $0.14, which is Mono PERC around $0.12- $0.125, and TOPCon at about $0.14, $0.145.
  • The company said aggressive pricing in non-DCR modules is offset by a price premium it can achieve with its high-quality BOM and highly automated manufacturing lines; it is looking at prices between INR12.75-INR13.
    Show source
    So there, we are looking at prices anywhere between INR12.75- INR13.
  • The company is looking at around INR20 pricing for IPP next year, but not for C&I; its mix of retail, KUSUM C, C&I and IPP results in better average realization, and demand at the retail level is quite strong.
    Show source
    So there, we are looking at around INR20 for IPP and not C&I. But then there is a mix.
  • The company says standalone pure-play module manufacturing will be difficult and backward integration is required; even if industry capacity reaches 100 GW, with average industry output of about 70 GW per annum, demand is still expected to be strong, with current demand almost about 50, 60 GW.
    Show source
    Your question on cell manufacturing, even if we reach 100 GW with an average industry output of about 70 GW per annum, we are still looking at demand being quite strong.
  • The company expects demand to mostly equal or surpass supply for another 12–18 months, given the growth rate it expects every year.
    Show source
    With the growth rate we are expecting every year, we see this demand to mostly equal or surpass the supply, at least for another 12- 18 months, whereas if cell manufacturing reaches about 100.
  • The company is accepting non-DCR orders at sub INR12, but says it is not doing so.
    Show source
    Chiranjeev Saluja: Sir, to answer your question, even in non-DCR business today, people are accepting orders at sub INR12, but we at Premier are not.
  • Premier Energies’ module pricing is INR12.75 and above.
    Show source
    We are at INR12.75 and above.
  • The company does not consider INR18 a benchmark for DCR module pricing.
    Show source
    I do not think the INR18 is a benchmark, which should be taken.
  • Premier Energies’ non-DCR pricing is generally upwards of 12.75.
    Show source
    In terms of pricing, generally, it is upwards of 12.75.
  • The company says its high-quality automated lines and experience allow it to command a premium. Replaced by a later filing.
    Show source
    We do command a premium because of the high-quality automated lines which we have and the experience which we hold.

Segments

  • The company says players with scale, financial bandwidth and execution skill to set up ingot-wafer manufacturing will be differentiated from other cell manufacturers. Replaced by a later filing.
    Show source
    We feel that players which are going to be at scale, who have the financial bandwidth and execution skill to set up ingot-wafer, that is backward integration, will be the ones which will be the difference between men and boys.

Deals and partners

  • The company has tied up to provide Indian-made EMS for its Battery Energy Storage System.
    Show source
    Also, on the software part also, we have tied up for providing Indian- made EMS for the Battery Energy Storage System.
  • Premier Energies’ partnership with RCT, a German company, is expected to provide access to European and U.S. markets for Battery Energy Storage solutions manufactured in India, RCT’s EMS solutions, product portfolio and customer base.
    Show source
    So it gives us both the product access to the product portfolio as well as their customer base that they're currently serving in these two markets.

Risks, rules and outside factors

Outside factors

  • Premier Energies’ raw material inventory position was inflated by extra buffers maintained because the war situation affected delivery timelines and congestion occurred at some ports; the company said this was temporary in nature.
    Show source
    We have basically also been maintaining some extra buffer on the raw material inventory, which has led to this slightly inflated position.
  • The company expects polysilicon and wafer prices to trend upward as an anti-involution policy is implemented to stabilize prices amid huge overcapacity in China; it expects battery cell prices to stabilize going forward.
    Show source
    We are seeing polysilicon prices, wafer prices on the upward trend because of that.
  • Recent policy announcements on bolstering transmission and storage capacity additions are expected to unlock the next cycle of growth for the solar sector. Replaced by a later filing.
    Show source
    Recent policy announcements on bolstering transmission and storage capacity additions are expected to unlock the next cycle of growth for the solar sector.
  • Commodity price inflation in the wake of the Middle East war has increased prices of key raw materials and delayed delivery timelines in the solar sector. Replaced by a later filing.
    Show source
    Commodity price inflation in wake of the Middle East war has hit the solar sector with material increases in prices of key raw materials and delay in delivery timelines.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Shubham Borade: Yes. Hi. Thank you for the opportunity, and congratulations on a good set of numbers. I have two questions. First being, where are we in battery manufacturing, and what we will be able to localize in the near term to achieve the 40% DCR requirement? Second would be, what is the status of our approval of new 7 GW capacity from MNRE, and has it stabilized?

    Answer, vinay rustagi

    Vinay Rustagi: Sorry, Shubham, we can't hear you. Can you please repeat the second question again?

    Answer, chiranjeev saluja

    Chiranjeev Saluja: Yes, the first question was clear. Just repeat the second question.

  2. Question

    Shubham Borade: Yes, sure. What is the status of our approval of new 7 GW capacity from MNRE, and has it stabilized? I hope I was audible.

    Answer, chiranjeev saluja

    Chiranjeev Saluja: Sure. Okay, I'll let Sudhir Reddy answer the first question on our battery manufacturing plans and localization plans, and the second question, I will take it after him.

    Answer, sudhir moola

    Sudhir. Sudhir Moola: Thank you. On the Battery Energy Storage System, we expect to operationalize the Battery Energy Storage System in Q2 2027. With respect to localization, we are working out on localizing the container manufacturing. We are trying to localize some of the fire suppression systems inside it to achieve the 40% localization that is being asked by the government for the various subsidy programs. Also, on the software part also, we have tied up for providing Indian- made EMS for the Battery Energy Storage System. So that's our plan on the Battery Energy Storage.

    Answer, chiranjeev saluja

    Chiranjeev Saluja: Yes. So our plan is to do cell to pack and pack to container. This is what the manufacturing plant, what we are setting up. On your second question on 7 GW cell line at Naidupeta, we have already made our application to the National Institute of Solar Energy for the inspection of our plant and to get it enrolled in the ALMM. We are expecting the inspection to happen anytime in the third Page 3 of 19 Premier Energies Limited November 05, 2026 week of November. The plant is, as we already said, is already commissioned, and trial runs are going on. I hope that answers your question.

  3. Question

    Shubham Borade: Yes, sir. Yes. Thank you. Just if I can squeeze in one more. What is the status of wafer and ingot manufacturing, and have you placed the orders for equipment, and what would be the total cost for the project? Thanks.

    Answer, sudhir moola

    Sudhir Moola: Yes. We have started working on the ingot-wafer plant. In fact, the land has been already procured quite some time back. Also, the license and permitting for that place, which is in Naidupeta, very next to our 7 GW plant, have been in position for that plant. Water allocation has been done. Electricity power approval also has been done, and we have laid the power lines to the plant in 169 acres. We hope to commission the Phase 1 by December 2027, and Phase 2, which is additional 5 GW, taking the total capacity about 10 GW, by June 2028, which is to more align with the ALMM- 3, and we will look for guidance from government on that if there is any timing changes.

  4. Question

    Apoorva Bahadur: Hi, sir. Thank you for the opportunity. Sir, on this battery manufacturing, I just wanted to double- click a little bit more, especially on our partnership with RCT. It would be very helpful if you can explain what would RCT bring to the table? Does the JV have access to its proprietary tech from Wärtsilä?

    Answer, chiranjeev saluja

    Chiranjeev Saluja: Sudhir will take this question.

    Answer, sudhir moola

    Sudhir Moola: Yes. I mean, just to give a background, RCT is a German company, and they have been in the Battery Energy Storage business for quite some time, and they have placed a lot of their Battery Energy Storage solutions both in Europe and in U.S. as well. So they have both CE and UL- certified products in their thing. That said, our partnership with RCT is going to give us this reach for us into those markets with the Battery Energy Storage solutions going to be manufactured in India. It also gives us access to some of their EMS solutions that they already have and have been using it for their European and U.S. customers as well. So it gives us both the product access to the product portfolio as well as their customer base that they're currently serving in these two markets. We hope to replicate some of their learnings from their already established products in the market into the Indian market.

  5. Question

    Apoorva Bahadur: Okay. Also, sir, the LFP cell imports for these plants, have we tied up for those? Which vendor and which geography? Who from China, basically? Page 4 of 19 Premier Energies Limited November 05, 2026 Chiranjeev Saluja: Yes.

    Answer, chiranjeev saluja

    Apoorva, we have been working with the tier 1 manufacturers of cell in China. We have not have a firm tie-up as on date. But as the plan progresses, we will enter into a firm supply arrangement.

  6. Question

    Apoorva Bahadur: Understood, sir. Very helpful. Secondly, also wanted to know your thoughts on the inventory buildup and sort of the depletion in cash conversion that we are seeing in over the last couple of months. How does it resolve? I understand that because we are building new capacity, so we would be needing some of the materials, but I think there's a buildup in finished goods inventory as well. Would love to know your thoughts on this.

    Answer, vinay rustagi

    Vinay Rustagi: Yes. Hi, Apoorva. This is Vinay here. The buildup is largely on the raw material side. There is no major change in the finished goods inventory. The buildup is mainly because of two reasons. One, of course, there is a ramp-up happening in Seetharampur and now with the Naidupeta plant also getting commissioned.

    Answer, vinay rustagi

    There is expected to be a big scale-up in operations of the company, both on the cell and the module side. In advance of this ramp-up, we have to have all the inventory position and the stocks kept up with the company. When you look at the inventory position and compare it with the historic revenue performance, the number seems artificially higher. The second thing which has happened in the quarter is that, particularly with the war situation, some of the delivery timelines have been impacted. Shipping lines, there is some congestion in some of the ports. We have basically also been maintaining some extra buffer on the raw material inventory, which has led to this slightly inflated position. I would say this is temporary in nature.

    Answer, vinay rustagi

    As these new plants stabilize, revenue starts coming into the numbers, you will see the numbers fall back to the normal scenario.

  7. Question

    Apoorva Bahadur: So we should expect this by March quarter, or do we expect a little bit more time for this?

    Answer, vinay rustagi

    Vinay Rustagi: I would say latest by March quarter, yes.

  8. Question

    Apoorva Bahadur: Okay. And lastly, sir, if you can also share the latest DCR ALMM-2 price trends. I believe that the C&I demand is also around the corner. It is around the corner.

    Answer, chiranjeev saluja

    Chiranjeev Saluja: Yes, Apoorva, I can take this question. In the DCR segment, we have got three markets which we address. One is the retail market where we have the highest selling point. There, the price prevailing in the market is anywhere between INR23- INR24 per watt on a DCR module. Then the next segment is the KUSUM C and the C&I market, where we expect realizations to be around INR21.5. At the bottom, maybe INR21. Then you have the IPP segment, which is now coming in, which is a large IPP.

    Answer, chiranjeev saluja

    There, we see prices going to as low as about INR20.5 or even INR20, if you are talking about up to March 2027. Now, when you average out all these prices, you get an average of around close to INR21.5-INR22 on the DCR module. When you talk of cells, it is ranging between $0.12- $0.14, which is Mono PERC around $0.12- $0.125, and TOPCon at about $0.14, $0.145. If you talk of non-DCR module, we are seeing a Page 5 of 19 Premier Energies Limited November 05, 2026 lot of aggressive pricing there. But as a company, with our high-quality BOM and highly automated manufacturing lines, we are able to get a price premium there. So there, we are looking at prices anywhere between INR12.75- INR13.

  9. Question

    Apoorva Bahadur: Thank you, sir. Just one more thing on this. I think on the DCR price, you said up till March 2027. So for these larger projects, maybe for C&I and IPP, the delivery timelines could be further beyond that. Is there a difference in pricing, say, for year-end C1 and C7?

    Answer, chiranjeev saluja

    Chiranjeev Saluja: Yes, so for the pricing for IPP, which I stated is all for next year, because IPP would not want modules immediately. Their planning is well in advance. So there, we are looking at around INR20 for IPP and not C&I. But then there is a mix. You have retail, you have KUSUM C, and you have C&I and IPP. So when you average out, we are getting a better realization. And the demand at the retail level is quite strong.

  10. Question

    Sumit Kishore: Good morning. Thanks for the opportunity. My first question is, it is still early days on China's proposed technology export controls, but do you see this, or how do you comment on the perceived risk of delay or deferment in implementation of ALMM for C&I and ALMM-3 later by June 2028?

    Answer, vinay rustagi

    Vinay Rustagi: Let me just step in. Yes. Hi, Sumit. I think on the China policy front, this is obviously a draft announcement right now. It is going through a consultation process, and we will know the final outcome, I would say, in the next three to four weeks. We kind of should reserve in terms of comments on what is going to really happen there. Obviously, we are anticipating some kind of controls, and we are kind of working with our technology and vendor partners as to finding the best way around some of these restrictions.

    Answer, vinay rustagi

    Bear in mind also that if you look at the Chinese machinery suppliers, for them, the domestic business is almost completely shut down, given that China is now trying to reduce capacity instead of increasing capacity. All the business for these machinery suppliers is basically coming from the export market, and India being the largest of these export markets. These machinery suppliers are working very closely with the government to try and get some relaxations in terms of the technologies, in terms of orders which have been placed already, and other possible areas. I think we are very hopeful that notwithstanding these restrictions, we will be able to find a way around. But like I said, let us wait for the final policy announcement before we can make any conclusive judgment on this.

    Answer, chiranjeev saluja

    Chiranjeev Saluja: Yes. Just to add what Vinay said, even the policy is not clear as of now, as it is talking about some high-end, high-technology, or new technology equipment. Luckily for Premier, we have imported those new-age and high-technology equipment for our Naidupeta cell line. So, we are Page 6 of 19 Premier Energies Limited November 05, 2026 at an advantageous situation where those machines are already in our manufacturing line, which have been kind of proposed for a ban. On cell line, we are fully covered. On ingot-wafer, we will be waiting to hear from the Chinese government after the November 15th, but we are quite hopeful that there would be a solution and that we would be able to get our equipment well on time.

Show 15 more questions
  1. Question

    Sumit Kishore: Sure. My second question is, you commented on realizations across DCR, non-DCR. Could you also sort of give some color on the EBITDA spread in Rupee per watt peak that you are making on cell module, and non-DCR module? How has that moved, say, on a quarter-on-quarter or year-on-year basis?

    Answer, vinay rustagi

    Vinay Rustagi: Yes, Sumit. Unfortunately, we do not give out the spread information on a product-by- product basis. But of course, we have given you indication of the prices. If you look at just the pricing, the cell and module pricing has been largely stable on the DCR side. Non-DCR pricing obviously has come down quite sharply.

  2. Question

    Sumit Kishore: Yes.

    Answer, vinay rustagi

    Vinay Rustagi: From about INR14+ , INR14, INR15 last year, to about INR12.5 right now. So, that has obviously impacted the NDCR margin. Equally, the BOM cost in terms of the cell remains largely stable, with the wafer pricing from China going up and down a little bit. But then the silver prices again have kind of softened after they went up about three to six months ago. Then we have seen some changes, recent increases in cost of commodities like aluminum, copper, polymer films, et cetera, which has impacted profitability again on the module assembly business. Beyond that, I cannot give you, unfortunately, any specific numbers.

  3. Question

    Kunal Shah: Understood, sir. This is very helpful. And sir, on the potential QIP also, could you just provide some clarity there, whether it's just an enabling resolution or we are actively looking there as well?

    Answer, chiranjeev saluja

    Chiranjeev Saluja: Yes, we have time and again stated this, that it was just an enabling resolution. We have enough cash flow from operations to fund our capex plans, which we have announced. There is no QIP planned in the near future.

  4. Question

    Praveen Sahay: Okay. Sir, last question related to the capex. Can you give the FY 2027, what would be the number we are looking for?

    Answer, vinay rustagi

    Vinay Rustagi: So, in the bulk of our capex for the cell and module expansion has already been completed. Now we are mainly looking at some marginal leftover payments for the Naidupeta cell plant, and then the battery and the aluminum plant. Plus we are undertaking open access captive projects. I think on the whole, the capex for the next two quarters should be moderated, I would say, to about INR700 crores territory, which means the total capex for the financial year should be around INR2,400 crores.

  5. Question

    Sahil Sheth: Okay, got it. Sir, my second question would be, on the U.S. side with the changing political scenario, how do you now see the outlook for the solar industry in India, and how are we assessing the opportunity? Are we looking in terms of export or setting up any manufacturing facility in U.S. itself?

    Answer, chiranjeev saluja

    Chiranjeev Saluja: See, there are two ways to look at it. One is with the changing environment there, it is a big, big positive for the renewable side. If you talk of MIP, we are clear that Make in America is the answer, and hence we are at advanced stages to finalize our factory location in the U.S. We already have a JV partner, so we are progressing well on that side. We would set up cell manufacturing as announced earlier in the U.S. Sahil Sheth: So sir, by when are we looking to finalize this? Is there any timeline you have in mind?

    Answer, chiranjeev saluja

    Chiranjeev Saluja: Yes, about 12-18 months is what we're looking at.

  6. Question

    Sahil Sheth: Okay, got it, sir. My last question would be, on the transformers business, in the previous quarter, we recorded margins of around 22%, while in the current quarter, it came down to 12%. What is the normalized level of margins we can expect going on in this business?

    Answer, chiranjeev saluja

    Chiranjeev Saluja: So yes, I think we have been clear on this, that the normalized margins on this business is about 15%. Last quarter, we had a higher number because the steel and the copper costs went up, so we got a variable increase in those orders, whereas we had enough inventory which we had hedged for. That gave us a little bit of an edge in terms of the margins. But on a normal basis, we expect this to be a 15% margin business going forward.

  7. Question

    Thanks for the opportunity. Sir, just two things. Given the mix, I think this quarter, a margin of around 28% is also a function of more modules, like you explained. Going forward, as the Naidupeta cell facility gets ramped up over next six months' time to 70%, you say, and demand obviously after December, C&I picking up in a big way because of the DCR regulation kicking in. And this BESS big thrust from the government side, IPP hopefully should also pick up. KUSUM, you're saying, reading some news around from the ministry, there's a final leg of finalization of KUSUM 2.0. Do you think, again, the mix will start favoring us from the blended margins point of view going forward? Number one, an

    Answer, vinay rustagi

    Vinay Rustagi: Okay. But Mayur, hi, this is Vinay here. On the government policy and the demand front, I think the government is completely seized of the matter in terms of trying to diversify the energy mix and grow the share of renewable energy. I think we are going to see a lot of initiatives that even in the last one or two months, we have seen a very large Green Energy Corridor scheme. Now you have seen the BESS initiative with the VGF scheme, and the KUSUM and Surya Ghar Yojana, the second version of both these schemes is also due for announcement, I would say, over the next one or two months. I think we do expect the overall macro for the demand side is very, very attractive, and we do expect a lot of favorable policy announcements from the government. That should obviously tilt the business focus and the mix of product towards the DCR modules, and that will help us to maintain and increase our margins.

    Answer, chiranjeev saluja

    Chiranjeev Saluja: Just to add what Vinay said, Mayur, that government is quite positive. If you look at the indications from them on Surya Ghar 2.0 and KUSUM 2.0, both these projects give us a better margin in terms of realization. We are quite confident that if Surya Ghar 2.0, KUSUM 2.0 comes in, the mix what we have today will only get better.

  8. Question

    Mayur Patel: Sure. Just one last thing, sir. Beyond next five years growth journey, does this SAS tie-up help us, say, going forward once we are fully operating at, including wafer ingot, everything is running steadily? After that, can we look at entering semiconductor wafers also, given your relationship and partnership with SAS? In future, I am not saying your next one.

    Answer, chiranjeev saluja

    Chiranjeev Saluja: Yes. That is on our wish list, but it is too early to say or commit anything there. We as a company would want to grow in the semiconductor space. When we would do this, with whom we would partner is something which we do not have an answer today. We first want to set our capex plans, which we already announced, the execution timelines, everything to be completed as per what we had committed, and we would be looking at various opportunities.

  9. Question

    Mayur Patel: Sure. Thank you so much. All the best to you and the team. Thank you.

    Answer, chiranjeev saluja

    Chiranjeev Saluja: Yes. So let me take this question, Amit. See, on Battery Energy Storage System, what we are doing is cell-to-pack and pack-to-container, and there is no problem with China in terms of supplying equipment for cell-to-pack and pack-to-container lines. It is more on the cell manufacturing on the BESS side, and that is the reason why we have been cautious in not announcing large investments into cell manufacturing on the battery energy storage side. To answer your question on the 40% value addition, we will comfortably achieve that with cell- to-pack, pack-to-container, and the software bit of the battery energy storage system. And there is enough support from China for setting up these lines. There is nothing which is banned on that front.

    Answer, chiranjeev saluja

    Page 15 of 19 Premier Energies Limited November 05, 2026 On prices in China and BESS companies and solar companies making a loss there, that is because of huge overcapacity, which we are aware of, and there is an anti-involution policy which is being implemented to try and stabilize prices. We are seeing polysilicon prices, wafer prices on the upward trend because of that. I think we would see that also, a stabilization on the battery cell side, I think, going forward. But as far as we are concerned, we feel that the time to invest in BESS business, what we are doing is the right time. And we, having our reputation and the brand which we carry in the market with our customers and the history of 32 years which Premier has, we will be able to win BESS business from our IPP customers and C&I customers, and we will qualify for the 40% local content. Amit: Sure. I'm sure.

    Answer, chiranjeev saluja

    Chiranjeev Saluja: Sure. Pure play module business, it's a very difficult time, right? I do see problems coming up on pure play module manufacturers in terms of standalone manufacturing for modules. That's going to be really, really difficult. Backward integration is required. Your question on cell manufacturing, even if we reach 100 GW with an average industry output of about 70 GW per annum, we are still looking at demand being quite strong. As we speak, the demand is almost about 50, 60 GW.

    Answer, chiranjeev saluja

    With the growth rate we are expecting every year, we see this demand to mostly equal or surpass the supply, at least for another 12- 18 months, whereas if cell manufacturing reaches about 100. Then again, between the cell manufacturers, you need to carve out manufacturers who have scale and who are getting into ingot-wafer. Somebody setting up a 1 or 2 GW cell line, competing with somebody who has got a large cell line five times the size, is going to be a different game. We feel that players which are going to be at scale, who have the financial bandwidth and execution skill to set up ingot-wafer, that is backward integration, will be the ones which will be the difference between men and boys. Page 16 of 19 Premier Energies Limited November 05, 2026 Amit: Okay, sir. Thank you and good luck to you.

  10. Question

    Amit Bhinde: Yes. My first question is on the mix that you have in retail, C&I, and utilities in the order book currently. Related to that, some of the developers are talking about them getting quotes for DCR module at close to around INR18, which has been set as a precedence by one of your competitors. How far are we in seeing the orders coming at INR18? I mean, at, let's say, a quarter or two down the line?

    Answer, chiranjeev saluja

    Chiranjeev Saluja: Sir, to answer your question, even in non-DCR business today, people are accepting orders at sub INR12, but we at Premier are not. We are at INR12.75 and above. We do command a premium because of the high-quality automated lines which we have and the experience which we hold. I do not think the INR18 is a benchmark, which should be taken. If somebody has quoted because of new lines or new business they are entering into, that would not be a benchmark for us.

  11. Question

    Amit Bhinde: Yes. If you can also help me with the mix that you have in terms of retail, C&I, and utilities scale in the order book currently.

    Answer, chiranjeev saluja

    Chiranjeev Saluja: Yes. As we said, with these Surya Ghar 2.0 and KUSUM 2.0 being announced, we see the mix may become better than what it is today, if not remain the same.

  12. Question

    Amit Bhinde: If you can help with some ballpark indicative numbers on that?

    Answer, chiranjeev saluja

    Chiranjeev Saluja: So, it is very difficult to give that number on a quarter-on-quarter basis. But roughly, retail is about 35%-40%.

  13. Question

    Amit Bhinde: Okay. Right. And one more question that I had is that, now whatever capex plan that you have, would get over in the next year. So, how should we look at the next leg of growth for Premier? One of the things that was discussed was on the semiconductor side. It was spoken in one of the questions. Any other areas of business where you would deploy your cash flows?

    Answer, chiranjeev saluja

    Chiranjeev Saluja: As I said, that is our wish list. We do not have a firm plan now. Once we have a firm plan, we will, of course, share with the markets.

  14. Question

    Bhaskar Chakraborty: Thank you very much. Can you give us some color on the non-DCR order book that you have? What the kind of margins, on what basis that you are realizing currently?

    Answer, chiranjeev saluja

    Chiranjeev Saluja: In our 16,000-odd crores order book, about, as Vinay said, about 25%-30% is non-DCR. When you talk of non-DCR business, it is, of course, in the single-digit kind of EBITDA margins. In terms of pricing, generally, it is upwards of 12.75.

  15. Question

    Bhaskar Chakraborty: Right. Yes. Sure. Thanks. Thanks very much, and all the best.

    Answer, vinay rustagi

    Vinay Rustagi: Thank you, everyone. Thank you for your time on the call. Overall, I think we discussed the whole range of demand, pricing, technology, and expansion initiative-related questions. I just have to say in the end that we are very pleased with another quarter of steady performance. The macro environment obviously has been challenging, but we've been able to kind of navigate that very successfully. Next few quarters, we are expecting a significant step up in the performance of the company, with the Naidupeta plant ramping up, Seetharampur volumes also picking up because of the increased cell production. Transformer volumes also will pick up quarter-on-quarter over the next two to three years.

    Answer, vinay rustagi

    Then, mid to longer term, I believe that the macro for the renewables is very, very compelling. The government is working on a number of initiatives, and with these new schemes, Surya Ghar Yojana and KUSUM around the corner, the demand outlook is extremely positive. We are very, very, I would say, encouraged by the growth prospects of the business, and look forward to working with you. Thank you so much.

Questions about this call

When was the Premier Energies Q2 FY27 earnings call transcript filed?
Premier Energies filed the transcript with the exchange on 11 Nov 2026. This page is built from that transcript.
What does this page list?
58 statements from the transcript across 9 topics, 23 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 25 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
Premier Energies Q2 FY27 concall: Premier Energies won new cell and module orders totaling INR4,001 crores in Q2, taking its total order book to INR16,260 crores · DalalOS