Rail Vikas Nigam Q1 FY26 earnings call: Rail Vikas Nigam Limited won roughly Rs. 1,000 crores of orders in Quarter 1 FY '26, and its order book was roughly Rs. 1,01,000 crores

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

The company won roughly Rs. 1,000 crores of orders in Quarter 1 FY '26, and its order book was roughly Rs. 1,01,000 crores. The company said that at the end of Financial Year ‘25 it had indicated revenue growth in the range of 10% odd. The company hopes the first Vande Bharat prototype will be seen in June 26, after which regular production will start. The company said turnover from railways was down almost 25%, while turnover from bidding had increased by 3 times, and overall performance was minus 3.42% as of 1st quarter.

The numbers management gave

Results

  • The company said turnover from railways was down almost 25%, while turnover from bidding had increased by 3 times, and overall performance was minus 3.42% as of 1st quarter.
    Show source
    So, I am sure that because overall, now it is minus 3.42% as of 1st quarter.
  • Gross margin dipped by roughly 13.57% in Quarter 1 FY '26, mainly because income from MoR decreased while income from projects from bidding increased by 67%.
    Show source
    M. P. Singh: Actually, when you see the gross margin, there is a slight dip in the gross margin by roughly 13.57%.
  • Net margin decreased in Quarter 1 FY '26 because losses recognized on some onerous contracts were accounted for.
    Show source
    And net margin decreased, there is a reason for that because some of the onerous contracts where some loss has been recognized, they have been accounted for.
  • The company accounted for roughly Rs. 20 crores of BharatNet pre-bid expenses and Rs. 40 crores due to onerous cost in Quarter 1 FY '26; the combined Rs. 60 crores decreased PBT and ultimately PAT.
    Show source
    So, this Rs. 60 crores has gone into, which has decreased our PBT, and which ultimately resulted in decrease in PAT.
  • The company booked a one-time expenditure for pre-bid consultancy work on a BharatNet bidding survey as indirect expenditure.
    Show source
    This is a one-time expenditure which has been booked in expenditure, indirect expenditure.
  • The company said it was already ahead in revenue compared to last year and was making up the difference with projects taken on bidding.
    Show source
    As of today, we are already ahead in revenue compared to the last year.
Show 2 more statements

Results

  • Traffic had improved in Rail Vikas Nigam Limited's other JVs. Replaced by a later filing.
    Show source
    And in other JVs also, the traffic has improved.

Money and capital

  • The company was hopeful that it would get dividends from its JVs this year; SPRCL had already given a dividend, and two SPVs had given a dividend this year.
    Show source
    SPRCL has already given a dividend.

What it expects ahead

What management expects

  • The company said that at the end of Financial Year ‘25 it had indicated revenue growth in the range of 10% odd.
    Show source
    And in terms of our revenue profile earlier, at the end of Financial Year ‘25, we were hinting that we can clock a revenue growth of in the range of 10% odd.
  • The company expected revenue to match last year's revenue cumulatively by the 2nd quarter.
    Show source
    It is already the reshoots are visible and in this quarter, we expect to cover the substantial ground and we hope that our revenue will match last year's revenue to the 2nd quarter cumulatively.
  • The company has already ordered spare components for 10 Vande Bharat sets and expects revenue from at least 6-8 Vande Bharat trains in Financial Year ‘26-27.
    Show source
    So, immediately, the production will start, and I am quite sure in Financial Year ‘26-27, we can expect revenue of at least 6-8 Vande Bharat trains.
  • The company expects to bid almost Rs. 30,000-Rs. 35,000 crores of projects this year only overseas and hopes to increase its order book at a strike rate of around 15%-20%.
    Show source
    We are expecting to bid almost Rs. 30,000-Rs. 35,000 crores of projects this year only overseas.
  • The company said turnover from railways will continuously slide, but increased turnover from bidding projects will compensate for it.
    Show source
    But it will be compensated by increase in the turnover from bidding project.
  • The company anticipated that there may be losses at the end of the project and said it had change-of-scope items requiring sanction from the plan; after sanction, the picture would improve.
    Show source
    Chandan Kumar Verma: We anticipate that there may be some losses at the end of the project, but in due course, we are doing the value addition.
Show 19 more statements

What management expects

  • The company said margins in bidding projects would improve once work started in full swing and change-of-scope claims were sanctioned and settled.
    Show source
    Once these claims will be settled, the margins will improve.
  • The company hopes to gain business from the nuclear sector, citing the Government of India's focus on nuclear power.
    Show source
    That is an upcoming sector and with the Government of India's focus on nuclear power in a big way, we hope to gain certain business from that sector also.
  • The company hopes to continue its momentum in solar projects, citing its success in a JV in Uzbekistan and Saudi Arabia, and is bidding on solar in Armenia.
    Show source
    And in Armenia, we are bidding on solar.
  • The company said it had gone beyond last year as of today and expected turnover to exceed last year's level. Replaced by a later filing.
    Show source
    This turnover will be not only able to match last year, it will increase it also.
  • The company said it would exceed last year's revenue. Replaced by a later filing.
    Show source
    We will be exceeding the last year's revenue.
  • The company was hopeful that improving traffic would result in more dividends from its JVs. Replaced by a later filing.
    Show source
    So, we are hopeful that with the improvement in traffic, more dividends will come to-- M. P. Singh: Traffic will increase and their liabilities will also go down the cost of the capital which they have taken a loan for Rajesh Agarwal: And sir, Vande project is in schedule now?

Orders

  • The company won roughly Rs. 1,000 crores of orders in Quarter 1 FY '26, and its order book was roughly Rs. 1,01,000 crores.
    Show source
    So, roughly, the order book of RVNL is Rs. 1,01,000 crores, which is unlimited.
  • The company had around 96 organized contracts in Quarter 1 FY '26.
    Show source
    The total orders won in this quarter is roughly of value of Rs. 1,000 crores and total contracts which are now organized, one stands at around 96 contracts.
  • Residual value of contracts won through open bidding was around Rs. 60,500 crores, and its legacy railway projects were around Rs. 41,000 crores.
    Show source
    The residual value of the contracts which we have won through open bidding is around Page 2 of 9 Rail Vikas Nigam Limited August 12, 2025 Rs. 60,500 crores and coupled with our orders, which are our legacy railway projects, that is around Rs. 41,000 crores.
  • The company had around Rs. 26,000 crores of orders from civil engineering contracts in railways, highways and metros, around Rs. 10,900 crores of electrical orders, and around Rs. 14,700 crores of signalling and telecom orders.
    Show source
    Orders which are from the electrical is around Rs. 10,900 crores and orders from signalling and telecom is of value total is around Rs. 14,700 crores.
  • Civil engineering orders included around Rs. 10,000 crores in metro, around Rs. 9,000 crores in highways, and around Rs. 7,000 crores in civil engineering including traditional railways and irrigation.
    Show source
    The highway sector is around Rs. 9,000 crores and the civil engineering sector, which includes traditional railways, irrigation etc., is around Rs. 7,000 crores.
  • Electrical orders included overhead electrification, 2 x 25 conversion in railways, RDSS, a distribution system of the state transports, and transmission lines.
    Show source
    Then RDSS that is a distribution system of the state transports is a major component and the transmission line also comprises of a major segment.
  • The company had a Vande Bharat manufacturing order with capital cost of Rs. 8,640 crores, representing RVNL’s share in the JV.
    Show source
    And we have got a significant order of Vande Bharat manufacturing also, of which the capital cost is Rs. 8,640 crores.
  • The two Vande Bharat prototypes will form part of the 120 train sets Rail Vikas Nigam Limited is going to deliver.
    Show source
    Pradeep Gaur: And even these two prototypes will become part of that 120 train sets what we are going to deliver.
  • There are no tenders currently in the pipeline because tenders for aluminum purchases could not be finalized; the 200 train sets are presently in the pipeline.
    Show source
    So, I think presently these 200 train sets is what it is in the pipeline.
  • The contract covers 200 train sets, which ICF and RCF will produce at their railway production unit and continue producing.
    Show source
    M. P. Singh: 200 train sets by contract and ICF and RCF will be producing their railway production unit.
  • The other bidder, the BHEL and Titagarh Wagons consortium, was awarded 80 train sets and will produce them at its manufacturing facility at rates matching Rail Vikas Nigam Limited’s train set rates.
    Show source
    M. P. Singh: No, 80 train set is awarded to the other bidder, consortium that is BHEL and Titagarh Wagons.
  • The company bid around Rs. 10,000 crores in the present year and has another Rs. 6,000 crores in pipeline.
    Show source
    Pradeep Gaur: Let me add, we have already bid in the present year itself around Rs. 10,000 crores, we have bid.
  • Order book was spread across various sectors. Replaced by a later filing.
    Show source
    M. P. Singh: Our order book is spread out on various sectors.

What it is building and selling

Projects and capacity

  • The company hopes the first Vande Bharat prototype will be seen in June 26, after which regular production will start.
    Show source
    And we hope to see the first prototype in June 26.
  • The Vande Bharat project was delayed by 10 months due to configuration, and railways increased the time by 10 months.
    Show source
    Pradeep Gaur: Actually, background, you must be aware of it because the configuration and all that, which has led to 10 months delay.
  • The company expects the first Vande Bharat prototype to roll out by next June, with revenue starting then; under the contract, 90% of the train set cost will be given on production of the prototype and the remaining 10% after its successful trial balance.
    Show source
    As per the contract condition, 90% of the cost of the train set will be given on production of prototype and after its successful trial balance, 10% will also be released as revenue.
  • The company expects regular production of Vande Bharat train sets to start in Financial Year ‘26-27, once trials are successful and the prototype is cleared for regular production.
    Show source
    So, in the next financial year, that is Financial Year ‘26-27, along with the prototype, we expect to see the regular production of the train sets also.
  • The Vande Bharat trial normally takes 60 days; the trains use ICF design, with sleeper coaches instead of the existing chair cars, and Rail Vikas Nigam Limited expects the trial to proceed without much issue because it is ICF design.
    Show source
    Pradeep Gaur: I will just add to what Mr. M. P. Singh has mentioned that this trial normally takes 60 days.
  • The original target for the first Vande Bharat prototype to roll out was September 25; a 10-month delay moved it to June 26, and Rail Vikas Nigam Limited expects things to start in Financial Year ‘26-27.
    Show source
    So, that is why it is now June 26 and definitely in the Financial Year ‘26-27 itself, things will start in right turn.
Show 8 more statements

Projects and capacity

  • The MoU and JV partnership will be almost 800 megawatts.
    Show source
    Pradeep Gaur: That will be almost 800 megawatts.
  • The BHEL and Titagarh Wagons consortium will manufacture its train sets in ICF, while Rail Vikas Nigam Limited will manufacture its train sets in Latur.
    Show source
    Pradeep Gaur: But they will be manufacturing their train sets in ICF only.
  • The company is pursuing solar projects in Romania.
    Show source
    In Romania, we are going for some solar projects.
  • Cost was bid based on working the cost, and most of the supply chain is established and already supplying to ICF; the work uses ICF design and the same supply chain, with one or two overseas supply issues about sanctions that have been overcome.
    Show source
    Because in this, it is ICF design, we are ordering to the same supply chain, except for one or two things where it is abroad, one or two issues were there about sanctions, etc., but those have also been overcome.

Deals and partners

  • The company has entered into MoUs with two companies and hopes to compete in Indian Railways projects to maintain electrical engines at two workshops.
    Show source
    So, we have already formed MoU with the two companies and we hope to compete in those projects.
  • The company is entering into an MoU with Rosatom in the nuclear sector and has given a proposal to the Ministry of Railways.
    Show source
    Simultaneously, in the nuclear sector also with the Rosatom, we are entering into MoU and we have given a proposal to the Ministry of Railways also.
  • The company completed a solar project in Uzbekistan with Jackson and has an ongoing solar project in Saudi Arabia with Jackson.
    Show source
    With the Jackson, with whom we had a project completed in Uzbekistan and an ongoing project in Saudi Arabia.
  • MoU and JV partnership will be expanded to Europe. Replaced by a later filing.
    Show source
    So, this MoU and JV partnership, we are expanding it further to go to Europe now.

Everything else said on the call

What management stressed

  • Getting good orders abroad is one of Rail Vikas Nigam Limited's main areas of focus. Replaced by a later filing.
    Show source
    Because this is one of the main areas of focus, which we are really going all out to get some good orders abroad.

Other

  • Krishnapatnam had its own profit for the first time this year.
    Show source
    Basically, Krishnapatnam, this year they have their own profit for the first time.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Rajesh Agarwal: And you feel from 2nd quarter, the revenue mix will start improving?

    Answer, m singh

    M. P. Singh: Yes, we are quite hopeful, second quarter. It is already the reshoots are visible and in this quarter, we expect to cover the substantial ground and we hope that our revenue will match last year's revenue to the 2nd quarter cumulatively.

    Answer, pradeep gaur

    Pradeep Gaur: No. We are already ahead now. As of today, we are already ahead in revenue compared to the last year. So, definitely we are making it up by projects taken on bidding. So, revenue-wise, absolutely no issue. We will be exceeding the last year's revenue.

  2. Question

    Rajesh Agarwal: And margins, sir?

    Answer, pradeep gaur

    Pradeep Gaur: Margins, there is a slight dip in the margins. That is based on, I will request Mr. Chandan Verma to stay on this.

    Answer, chandan verma

    Chandan Kumar Verma: Actually, in bidding projects, booking has just started. Most of the projects, we have just started executing the work. So, no doubt, it is very early to say that, but margins will improve once the work will start in full swing and change of scope, there are too many claims are there to be sanctioned from the plan. Once these claims will be settled, the margins will improve.

  3. Question

    Rajesh Agarwal: Understood. Thank you, sir. And sir, for JV, when the profitability from the JVs will come? Other railway JVs? Kutch railway and all?

    Answer, chandan verma

    Chandan Kumar Verma: Yes, Kutch railway. Basically, Krishnapatnam, this year they have their own profit for the first time. And in other JVs also, the traffic has improved. So, we are hopeful that this year will get dividends. SPRCL has already given a dividend. Even two SPVs have given a dividend this year. So, we are hopeful that with the improvement in traffic, more dividends will come to-- M. P. Singh: Traffic will increase and their liabilities will also go down the cost of the capital which they have taken a loan for Rajesh Agarwal: And sir, Vande project is in schedule now?

  4. Question

    Rajesh Agarwal: Vande Bharat. Page 5 of 9 Rail Vikas Nigam Limited August 12, 2025 M. P. Singh: Yes, all the roadblocks have been cleared and now it is in advance designing stage and production has started in Latur factory.

    Answer, m singh

    And we hope to see the first prototype in June 26. And after that, the regular production will start.

    Answer, pradeep gaur

    Pradeep Gaur: Actually, background, you must be aware of it because the configuration and all that, which has led to 10 months delay. And railways have increased the time also by 10 months.

  5. Question

    Rajesh Agarwal: Understood, sir. Thank you.

    Answer, vishal periwal

    Vishal Periwal: Yes, sir. Thanks for the opportunity again. Sir, on Vande Bharat, I think you did mention June 26 is first prototype. So, how exactly things work after that? When we start recognizing revenue, how much time it takes from a prototype to actually commercially rolling out? So, can you give some background of this?

    Answer, m singh

    M. P. Singh: Yes, first, as we expect the first prototype to roll out by next June, so revenue will also start flowing out. As per the contract condition, 90% of the cost of the train set will be given on production of prototype and after its successful trial balance, 10% will also be released as revenue. And once the trials are successful and proving trials are held and the prototype is cleared for regular production, the regular production will start. So, in the next financial year, that is Financial Year ‘26-27, along with the prototype, we expect to see the regular production of the train sets also.

    Answer, pradeep gaur

    Pradeep Gaur: I will just add to what Mr. M. P. Singh has mentioned that this trial normally takes 60 days. And the positive part is we are following only ICF design, because this is basically the design whatever already trains are running, except difference is the existing trains are chair cars and this will be sleeper coaches. So, there is a slight change in configuration, but by and large, the same ICF design is being followed. So, we expect this trial should not take much issues because it is again ICF design. And as soon as these trials are over, I must give comfort that we have already ordered for spare components and all for 10 sets immediately. So, immediately, the production will start, and I am quite sure in Financial Year ‘26-27, we can expect revenue of at least 6-8 Vande Bharat trains.

    Answer, pradeep gaur

    Pradeep Gaur: And even these two prototypes will become part of that 120 train sets what we are going to deliver.

    Answer, pradeep gaur

    Pradeep Gaur: So, we are geared up for that. So, once it is just, our original target for September 25 to roll out the first prototype. But unfortunately, these 10 months got us this one and delayed the whole thing. So, that is why it is now June 26 and definitely in the Financial Year ‘26-27 itself, things will start in right turn.

    Answer, vishal periwal

    Vishal Periwal: Got it, sir. And I think earlier we used to hear that, like, this 120 train sets and plus couple of peers also got 80-odd train sets, these 200 train sets, this pie is almost like 500-1000 odd train sets. So, anything that are more orders are coming or anything that can be shared as of now for Vande Bharat?

    Answer, pradeep gaur

    Pradeep Gaur: I do not think any tenders are now, as of now, in the pipeline. It is because there were some tenders about aluminum purchases and all that, but that could not be finalized. So, I think presently these 200 train sets is what it is in the pipeline.

    Answer, m singh

    M. P. Singh: 200 train sets by contract and ICF and RCF will be producing their railway production unit. They will be continuing to produce the train sets.

    Answer, vishal periwal

    Vishal Periwal: And then, so we have this ICF, we are mapped to ICF. So, for the 80 train set, the peers are mapped to other coach factories?

    Answer, m singh

    M. P. Singh: No, 80 train set is awarded to the other bidder, consortium that is BHEL and Titagarh Wagons. So, they will be in contract matching to our basically train set rates. So, they will be producing 80 train sets in their manufacturing facility.

    Answer, pradeep gaur

    Pradeep Gaur: But they will be manufacturing their train sets in ICF only. Like, we are going to do it in Latur, they will manufacture it in ICF. Vishal Periwal: Got it. And then, sir, any developments that is happening for a couple of JVs that we have formed, any business traction that are we seeing anything, or as of now, they are still at MoU stage and more like a prelim discussion that usually happens before any business pickups. So, it is at that stage only, is that fair to say, or any updates that can be provided?

    Answer, m singh

    M. P. Singh: So, we have entered into couple of MoUs and we are seeing good potential coming from it, like in maintenance of the rolling stock and engines. Indian Railways has come up with some of the bids also for maintenance of the electrical engines at two workshops. So, we have already formed MoU with the two companies and we hope to compete in those projects. Simultaneously, in the nuclear sector also with the Rosatom, we are entering into MoU and we have given a proposal to the Ministry of Railways also. That is an upcoming sector and with the Government of India's focus on nuclear power in a big way, we hope to gain certain business from that sector also. And in the solar sector also, with our success in JV in Uzbekistan and Saudi Arabia, we hope to continue with the momentum in the solar projects also. And in Armenia, we are bidding on solar.

    Answer, m singh

    With the Jackson, with whom we had a project completed in Uzbekistan and an ongoing project in Saudi Arabia. In Romania, we are going for some solar projects.

    Answer, pradeep gaur

    Pradeep Gaur: That will be almost 800 megawatts. So, this MoU and JV partnership, we are expanding it further to go to Europe now.

    Answer, vishal periwal

    Vishal Periwal: Maybe one last question from my side, sir. As of now, what is the international order book pie in our 1 lakh crores order book?

    Answer, pradeep gaur

    Pradeep Gaur: Let me add, we have already bid in the present year itself around Rs. 10,000 crores, we have bid. And another Rs. 6,000 crores is in pipeline. We are expecting to bid almost Rs. 30,000-Rs. 35,000 crores of projects this year only overseas. So, even if the strike rate is around 15%-20%, we hope that this order book will increase now. Because this is one of the main areas of focus, which we are really going all out to get some good orders abroad.

    Answer, vishal periwal

    Vishal Periwal: Got it. And like a couple of procurements and everything that has been done for Vande Bharat, it is still some time to actually physically or commercially roll out. So, as of now, what sort of margin that you are seeing that one can make in Vande Bharat? Maybe single-digit, high single- digit, low double-digit or anything?

    Answer, pradeep gaur

    Pradeep Gaur: The cost has been bid based on working the cost. And what I will add that most of the supply chain is established supply chain, which we are already supplying to ICF. So, mostly, we have gone by the same order. So, I think there is nothing extraordinary happening as of now. So, I think it is going in the direction at which we had planned. Because in this, it is ICF design, we are ordering to the same supply chain, except for one or two things where it is abroad, one or two issues were there about sanctions, etc., but those have also been overcome.

    Answer, pradeep gaur

    Pradeep Gaur: Nothing extraordinary, neither on positive side nor on negative side. Page 8 of 9 Rail Vikas Nigam Limited August 12, 2025 Vishal Periwal: Sure, sir.

Questions about this call

When was the Rail Vikas Nigam Q1 FY26 earnings call transcript filed?
Rail Vikas Nigam filed the transcript with the exchange on 14 Aug 2025. This page is built from that transcript.
What does this page list?
49 statements from the transcript across 8 topics, 27 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 5 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
Rail Vikas Nigam Q1 FY26 concall: Rail Vikas Nigam Limited won roughly Rs. 1,000 crores of orders in Quarter 1 FY '26, and its order book was roughly Rs. 1,01,000 crores · DalalOS