RVNL is targeting work orders of around INR 25,000 crore during the year, in addition to the existing order book; approximately INR 7,132 crore had already been received during H1 FY27. RVNL expects top-line revenue to grow by around 10%, while the bottom line is projected to increase by approximately 8-10%, reflecting continued business momentum and a positive growth outlook. Kinet Railway Solutions Ltd is the manufacturing platform for RVNL's 120-train, ₹14,400 Cr Vande Bharat sleeper coach programme, in partnership. RVNL's consolidated PAT rose by about 59% over the preceding quarter in Q2 FY 2026-27. RVNL's consolidated total liquidity increased to INR 10,181 crore as on September 30, 2026, from INR 9835.36 crore as on March 31, 2026; cash and cash equivalents rose to INR 691 crore from INR 556 crore.

The numbers management gave

Results

  • RVNL's consolidated PAT rose by about 59% over the preceding quarter in Q2 FY 2026-27.
    Show source
    Q2 of FY27 has delivered a strong sequential improvement in profitability for RVNL, with consolidated PAT rising by about 59% over the preceding quarter and healthy growth in half-year profitability.
  • RVNL's consolidated revenue from operations stood at INR 4,700 crore in Q2 FY 2026-27, 8.79% higher than Q1 FY27, reflecting steady execution momentum and improved project activity during the quarter.
    Show source
    On a consolidated basis, revenue from operations stood at INR 4,700 crore, higher by 8.79% over Q1 FY27, reflecting steady execution momentum and improved project activity during the quarter.
  • RVNL's consolidated revenue from operations stood at INR 9,022 crore for the half year in Q2 FY 2026-27.
    Show source
    For the half year, consolidated revenue from operations stood at INR 9,022 crore.
  • RVNL's standalone turnover stood at INR 4,663.27 crore in Q2 FY 2026-27, a change of 5.5% YoY.
    Show source
    On a standalone basis, turnover for the quarter stood at INR 4,663.27 crore, a change of 5.5% YoY.
  • RVNL's consolidated PBT increased to INR 325 crore from INR 223 crore in Q1 FY27, a growth of 45.59%, while consolidated PAT rose to INR 253.7 crore from INR 159.52 crore, a sequential growth of 59.04%, in Q2 FY 2026-27.
    Show source
    Consolidated PBT increased to INR 325 crore from INR 223 crore in Q1 FY27, a growth of 45.59%, while consolidated PAT rose to INR 253.7 crore from INR 159.52 crore, a sequential growth of 59.04%.
  • RVNL's consolidated PAT was INR 253.7 crore in Q2 FY 2026-27, 10.06% higher than INR 230.52 crore in Q2 FY26.
    Show source
    On a YoY basis, consolidated PAT was higher by 10.06% over INR 230.52 crore in Q2 FY26.
Show 15 more statements

Results

  • RVNL's consolidated earnings per share improved to INR 1.20 from INR 0.76 in the preceding quarter in Q2 FY 2026-27.
    Show source
    Consolidated earnings per share improved to INR 1.20 from INR 0.76 in the preceding quarter.
  • RVNL's consolidated EBITDA stood at INR 294 crore with an EBITDA margin of 6.26%, compared with INR 190.78 crore and 4.4% in Q1, in Q2 FY 2026-27.
    Show source
    Consolidated EBITDA stood at INR 294 crore with an EBITDA margin of 6.26% as compared to INR 190.78 crore and 4.4% in Q1.
  • RVNL's standalone PAT stood at INR 214 crore in Q2 FY 2026-27, 9.46% higher YoY than INR 196 crore in Q2 FY26 and 37.94% higher than INR 155.62 crore in Q1FY27.
    Show source
    Standalone performance followed a similar trend; standalone PAT stood at INR 214 crore, higher by 9.46% YoY over INR 196 crore in Q2 FY26, and by 37.94% over INR 155.62 crore in Q1FY27.
  • RVNL's standalone EBITDA stood at INR 230 crore with an EBITDA margin of 4.94%, compared with INR 171 crore and 3.99% in Q1 FY27, in Q2 FY 2026-27.
    Show source
    Standalone EBITDA stood at INR 230 crore with an EBITDA margin of 4.94% as compared to INR 171 crore and 3.99% in Q1 FY27.
  • RVNL's consolidated PAT stood at INR 413 crore for the half-year ended September 30, 2026, compared with INR 364 crore in H1 FY26, a growth of 13.25%; consolidated PBT increased by 6.43% to INR 548 crore from INR 515.8 crore.
    Show source
    For the half-year ended September 30, 2026, consolidated PAT stood at INR 413 crore as against INR 364 crore in H1 FY26, registering growth of 13.25% while consolidated PBT increased by 6.43% to INR 548 crore from INR 515.8 crore.
  • RVNL's consolidated total comprehensive income rose by 19.28% to INR 417.53 crore in Q2 FY 2026-27.
    Show source
    Consolidated total comprehensive income rose by 19.28% to INR 417.53 crore.
  • RVNL's standalone H1 PAT stood at INR 370 crore, 14.29% higher than INR 323.96 crore in H1 FY26.
    Show source
    On a standalone basis, H1 PAT stood at INR 370 crore, higher by 14.29% over INR 323.96 crore in H1 FY26.
  • RVNL's consolidated cash flow from operating activities was positive at INR 589 crore in H1 FY27, compared with negative INR 1,250 crore in H1 FY26.
    Show source
    3 Rail Vikas Nigam Limited Q2 FY 2026-27 Conference Call 17.11.2026 Consolidated cash flow from operating activities stood at a positive INR 589 crore in H1 FY27, compared with a negative INR 1,250 crore in H1 FY26.
  • Building works contributed 33.53% of RVNL's total revenue from operations during H1 FY27, an increase of 11% from the previous year.
    Show source
    Building works contributed 33.53% to total revenue from operations during H1 FY27, showing an increase of 11% from the previous year.
  • RVNL subsidiaries contributed INR 56.11 crore to consolidated revenue and INR 6.36 crore to PAT during H1 FY26-27; RVNL's share of profit from joint ventures and associates was INR 36.59 crore.
    Show source
    During H1 FY26-27, our subsidiaries contributed INR 56.11 crore to consolidated revenue and INR 6.36 crore to PAT, while the company’s share of profit from joint ventures and associates stood at INR 36.59 crore.
  • Dividend income received by RVNL from JVs and subsidiaries stood at INR 21.34 crore during H1, contributing positively to RVNL's consolidated profitability.
    Show source
    Additionally, dividend income received from JVs and subsidiaries stood at INR 21.34 crore during H1, which contributed positively to the company’s consolidated profitability.
  • H1 results were up by almost 9% QoQ.
    Show source
    Saleem Ahmad So, if you see our H1 results, we are up by almost 9% QoQ.
  • RVNL was down by 0.11% because of a project closure in KSA.
    Show source
    Saleem Ahmad No. Definitely, we are down by only 0.11%, and this was because of a project closure in KSA.
  • Q2 progress was slightly held back by the monsoon season.
    Show source
    Saleem Ahmad As you can see, Q2 was slightly held back because of the monsoon season.

Money and capital

  • RVNL's consolidated total liquidity increased to INR 10,181 crore as on September 30, 2026, from INR 9835.36 crore as on March 31, 2026; cash and cash equivalents rose to INR 691 crore from INR 556 crore.
    Show source
    Our financial foundation has strengthened further with consolidated total liquidity increasing to INR 10,181 crore as on September 30, 2026 from INR 9835.36 crore as on March 31, 2026, and cash and cash equivalents rising to INR 691 crore from INR 556 crore.

What it expects ahead

What management expects

  • RVNL expects top-line revenue to grow by around 10%, while the bottom line is projected to increase by approximately 8-10%, reflecting continued business momentum and a positive growth outlook.
    Show source
    Further, the company expects its top-line revenue to grow by around 10%, while the bottom line is projected to increase by approximately 8-10%, reflecting continued business momentum and a positive growth outlook.
  • The company is maintaining 9-10% growth and hopes to improve in Q3 and Q4, when maximum execution takes place; Q2 was held back by the monsoon and the geopolitical situation and its effects.
    Show source
    So, we are maintaining 9-10%, and we are hoping to improve in Q3 and Q4.
  • The company is targeting around 10-15% growth in its top line this year and expects an around 10% increase in its bottom line.
    Show source
    Saleem Ahmad No. As I emphasized in my speech also, this year we are targeting growth of around 10-15% in our top line, and similarly, in the bottom line, we are expecting an increase of around 10%.
  • The company is targeting a 6-7% margin and is hopeful of achieving it.
    Show source
    We are targeting 6-7% margin, and we are hopeful to achieve that.
  • RVNL expects to achieve its target of a 10% increase in operational revenue in Q3 and Q4.
    Show source
    But overall, if you see, our operational revenue is increasing on a standalone basis also, and we are hopeful that in Q3 and Q4, we'll definitely perform better and achieve our target of 10% increase.
  • RVNL expects total revenue of around INR 13,000 crore in the last two quarters of FY 2026-27.
    Show source
    Saleem Ahmad In total, we will do around the same INR 13,000 crore.
Show 27 more statements

What management expects

  • RVNL is targeting total revenue of INR 22,000 crore.
    Show source
    Our total target is INR 22,000 crore, which we are targeting.
  • RVNL expects revenue of around INR 22,500-23,000 crore, based on the prior year's trend in which the first two quarters contributed around 40% of annual revenue and Q3 and Q4 contributed the remaining 60%.
    Show source
    So, if we maintain that, then we'll reach around -- as the CMD has said, it will be around INR 22,500-23,000 crore.
  • RVNL is hopeful of being awarded railway works of almost INR 4,000 crore this month.
    Show source
    This month, we are hopeful of being awarded works of almost INR 4,000 crore.
  • Another NMDC work of INR 2,500 crore is expected to be awarded in another two months.
    Show source
    Then 11 Rail Vikas Nigam Limited Q2 FY 2026-27 Conference Call 17.11.2026 another work of INR 2,500 crore from NMDC will be awarded in another two months.
  • RVNL expects good revenue and profit margins this year from the BharatNet project, with work progressing at a good pace across various locations.
    Show source
    RVNL has made significant progress in project execution with work now progressing at a good pace across various locations, and we are expecting good revenue and profit margins this year.
  • RVNL said the delay in its Vande Bharat project is only for the first prototype and is hopeful it will maintain the timelines given for the entire contract once the prototype is delivered and fully tested.
    Show source
    Definitely, there's a delay, but I think this delay is only for the first prototype.
  • The company is bidding for railway and highway works and is hopeful of getting a lot of work from them.
    Show source
    And as I pointed out in the speech also, there are a lot of avenues available because a lot of railway and highway works are coming up where we are bidding, and we are hopeful of getting a lot of work from there.
  • The company has just been prequalified for orders in Serbia and Israel, which will definitely not materialize this year and may be received next year.
    Show source
    And in Serbia and Israel, we have just been prequalified, so these orders will definitely not materialize this year.
  • RVNL expects to get some good orders soon from its international market bidding. Replaced by a later filing.
    Show source
    We are bidding aggressively in the international market and expect to get some good orders soon.
  • The company expects good works out of bidding in the coming quarters. Replaced by a later filing.
    Show source
    So, we are expecting good works out of bidding in the coming quarters.
  • The company expects good progress in the other quarters. Replaced by a later filing.
    Show source
    But in the other quarters, we expect good progress, which you will hopefully see.
  • The company expects much better results in Q3 and Q4. Replaced by a later filing.
    Show source
    But in Q3 and Q4, you will definitely see much better results.
  • The company expects to do much better in the next quarter. Replaced by a later filing.
    Show source
    In the next quarter, we will do much better.
  • The company is following other orders in the pipeline and is sure it will get some this year. Replaced by a later filing.
    Show source
    But this year, among the other orders that we are following and that are in the pipeline, we are sure we will definitely get some.

Orders

  • RVNL is targeting work orders of around INR 25,000 crore during the year, in addition to the existing order book; approximately INR 7,132 crore had already been received during H1 FY27.
    Show source
    The company 2 Rail Vikas Nigam Limited Q2 FY 2026-27 Conference Call 17.11.2026 is targeting work orders of around INR 25,000 crore during the year, in addition to the existing order book, out of which approximately INR 7,132 crore has already been received during H1 FY27.
  • RVNL's order inflow stood at INR 7,132 crore during the half-year ended September 2026.
    Show source
    During the half-year ended September 2026, the order inflow stood at INR 7,132 crore.
  • RVNL's total order book stood at INR 90,099 crore as on September 30, 2026, primarily driven by railways at INR 56,816 crore, signaling and telecommunication at INR 12,224 crore, building works at INR 6,504 crore, metros at INR 5,346 crore, power and transmission at INR 3,876 crore, ports, roads, and highways at INR 3,534 crore, hydro and irrigation projects at INR 1,237 crore, and other works at INR 562 crore.
    Show source
    As on September 30, 2026, the company's total order book stood at an impressive INR 90,099 crore.
  • RVNL is the lowest bidder (L1) for a grant project in Sierra Leone worth around INR 220 crore.
    Show source
    We are also the lowest bidder (L1) for a work in Sierra Leone, which is a grant project of around INR 220 crore.
  • Order bucket includes an almost INR 3,800 crore PMC contract on nomination basis from NMDC.
    Show source
    The bucket includes a PMC contract on nomination basis of almost INR 3,800 crore from NMDC.
  • Total order inflow is INR 7,500 crore.
    Show source
    And the total order inflow is INR 7,500 crore.
  • Order mix is almost 55:45, with 41% from PMC nomination and 59% competitive.
    Show source
    So it is almost 55:45; 41% is from PMC nomination and and 59% is competitive from.
  • The company is winning almost 7-10% of contracts through bidding.
    Show source
    We are winning almost 7-10% of the contracts.
  • The company received almost INR 7,600 crore of orders in H1.
    Show source
    Saleem Ahmad No. Till now, we have received orders of almost INR 7,600 crore in H1.
  • Order target is around INR 20,000- 25,000 crore.
    Show source
    And our target is around INR 20,000- 25,000 crore.
  • The company is hoping to get a small order of around INR 220 crore in Sierra Leone, where it is the L1, and is focusing on the African market.
    Show source
    And as I earlier briefed, we are hoping to get a small order of around INR 220 crore in Sierra Leone, where we are the L1, and we are focusing on the African market.
  • Orders of almost INR 3,000 crore have been issued for NMDC works, and work is starting on the ground.
    Show source
    Saleem Ahmad In addition, NMDC works are picking up, for which orders of almost INR 3,000 crore have been issued.
  • New railway and multi-sector infrastructure work awarded to RVNL, steady execution leading to revenue recognition, and its disciplined, margin-focused, selective bidding strategy supported growth and movement in RVNL's order book.
    Show source
    The growth and movement in the order book was supported by new railway and multi-sector infrastructure work awarded to RVNL, steady execution leading to revenue recognition and our disciplined, margin-focused, selective bidding strategy.

What it is building and selling

Projects and capacity

  • The first prototype train set for RVNL's Vande Bharat sleeper train set project is targeted for launch in Q1 of '27.
    Show source
    The first prototype train set is targeted for launch in Q1 of '27.
  • RVNL's Rishikesh-Karnaprayag Rail Project in Uttarakhand is being developed at a cost of INR 37,119 crore.
    Show source
    Our Rishikesh-Karnaprayag Rail Project, a project of national importance in Uttarakhand, is being developed at a cost of INR 37,119 crore.
  • RVNL's 125-kilometer Rishikesh-Karnaprayag Rail Project has achieved 79% overall progress, with around 97% of tunnel excavation completed.
    Show source
    The 125-kilometer project has achieved 79% overall progress with around 97% tunnel excavation completed.
  • RVNL's Rishikesh-Karnaprayag Rail Project is targeted for completion by December 2029; it will improve access to the Himalayan region, support the Char Dham pilgrimage corridor, strengthen border connectivity, boost tourism and local economies, and reduce travel time in the region.
    Show source
    Targeted for completion by December 2029, the project will improve access to the Himalayan region, support the Char Dham pilgrimage corridor, strengthen border connectivity, boost tourism and local economies, and significantly reduce travel time in the region.
  • The company will deliver the first prototype between March and June '27.
    Show source
    Saleem Ahmad We'll deliver it between March and June '27.
  • Kinet Railway Solutions Ltd is the manufacturing platform for RVNL's 120-train, ₹14,400 Cr Vande Bharat sleeper coach programme, in partnership.
    Show source
    The Vande Bharat sleeper train set, an INR 14,400 crore project with 35-year maintenance arrangements, is being executed by Kinet Railway, an SPV of RVNL.
Show 11 more statements

Projects and capacity

  • RVNL's works are ongoing in the Maldives, Saudi Arabia, and Rwanda; RVNL is focused on securing more work in Ghana and other African countries.
    Show source
    I would like to inform stakeholders that, in international markets, our works are presently ongoing in the Maldives, Saudi Arabia, and Rwanda.
  • Initial approval issues with the concerned department for RVNL's Vande Bharat project have been resolved.
    Show source
    There were some teething troubles initially, and the issue was regarding the approvals from the concerned department, and those issues have been resolved.
  • Manufacturing of RVNL's Vande Bharat project is in progress at its Latur factory in Marathwada; RVNL is hopeful it will deliver the first prototype in the first quarter or, at the latest, by the second quarter.
    Show source
    Manufacturing is now in progress at our Latur factory in Marathwada, and we are hopeful that either in the first quarter or, at the latest, by the second quarter, we will be able to deliver the first prototype.
  • The company is part of multimodal logistics parks in Chennai and Bangalore and is infusing some equity with other stakeholders.
    Show source
    We are infusing some equity with other stakeholders.

Deals and partners

  • RVNL has started work on the NMDC contract, whose total value is INR 6,504 crore; INR 3,869 crore was received during H1 FY27.
    Show source
    The total value of contract is INR 6,504 crore, of which INR 3,869 crore has been received during H1 FY27.
  • The BharatNet project, awarded to RVNL by Bharat Sanchar Nigam Limited, is an INR 13,236 crore initiative to provide high-speed broadband connectivity in rural and remote areas through 82,607 kilometers of OSP infrastructure under the DBOM model.
    Show source
    The BharatNet project, awarded by Bharat Sanchar Nigam Limited, is an INR 13,236 crore initiative to provide high-speed broadband connectivity in rural and remote areas through 82,607 kilometers of OSP infrastructure under the DBOM model.
  • The Israel Metro has eight packages, each about INR 20,000 crore; Rail Vikas Nigam Limited's part would be around INR 10,000 crore if it gets the order, and it is proceeding with its partner.
    Show source
    So our part will be around INR 10,000 crore if we get that order.
  • The Serbia order is INR 12,000 crore, and Rail Vikas Nigam Limited is pursuing it with its joint venture.
    Show source
    And Serbia is INR 12,000 crore.
  • RVNL has qualified in Serbia and for the Israel Metro.
    Show source
    Only today, we received a communication that we have qualified in Serbia, and we have also qualified for the Israel Metro.
  • RVNL is executing the Vande Bharat project with its Russian partners, who are experienced in rolling stock production or manufacturing.
    Show source
    Saleem Ahmad Abhishek, Vande Bharat is quite a complex and new project for RVNL, and we are executing this project with our Russian partners.
  • The company has been shortlisted in Serbia and Israel and is pitching for other work that it cannot disclose right now.
    Show source
    7 Rail Vikas Nigam Limited Q2 FY 2026-27 Conference Call 17.11.2026 As I told you, we have been shortlisted in Serbia and Israel, and we are pitching for others, which I cannot disclose right now, to get good works.

Everything else said on the call

What management stressed

  • The company is focused on the international market. Replaced by a later filing.
    Show source
    Our focus is also on the international market.
  • The company is focused on getting projects in logistics-related areas including railways, highways and waterways. Replaced by a later filing.
    Show source
    So, we are focused on getting projects in these areas.

Group structure

  • The company is searching for more orders in Saudi Arabia and Uzbekistan, where work has been completed, and is not closing down its JVs there.
    Show source
    In fact, where the work has been completed in Saudi Arabia or Uzbekistan, we are searching for more orders, and we are not closing down the JVs there.
  • The company is on the path to opening new JVs in new geographies such as Serbia or Romania.
    Show source
    In fact, we are on the path to opening new JVs in new geographies such as Serbia or Romania.
  • The company decided to close its Kyrgyzstan JV because there was no clarity on further orders from Kyrgyzstan.
    Show source
    Kyrgyzstan is a non-starter, so we have decided to close it down because there was no clarity on further orders from Kyrgyzstan.
  • The company will open more offices and subsidiaries in countries as required. Replaced by a later filing.
    Show source
    So whenever need arises, we will open more offices and subsidiaries in those countries as per the requirement.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Vivek Nayak Sir, in the past, we had a lot of international projects in ports, harbors, etc. What is the status there? Why are we not moving ahead with them? Thank you.

    Answer, saleem ahmad

    Saleem Ahmad Vivek, thank you for asking the question. I would like to inform stakeholders that, in international markets, our works are presently ongoing in the Maldives, Saudi Arabia, and Rwanda. We are focused on securing more work in Ghana and other African countries. We are bidding aggressively in the international market and expect to get some good orders soon. Recently, we have also been shortlisted in Serbia. Only today, we received a communication that we have qualified in Serbia, and we have also qualified for the Israel Metro. We are also the lowest bidder (L1) for a work in Sierra Leone, which is a grant project of around INR 220 crore.

    Answer, saleem ahmad

    So, basically, our focus remains on the international market. Works are in the pipeline, and we expect to get a few orders soon. Thank you.

  2. Question

    Abhishek Leekha Yes. Hi, sir. Thank you for the opportunity. Could you give me an update on the readiness of the Vande Bharat project, because it's already been delayed quite a number of times? And now the prototype timeline is given as December '26. 5 Rail Vikas Nigam Limited Q2 FY 2026-27 Conference Call 17.11.2026 How should we take it from here?

    Answer, conference call

    And how confident are you that this will be the final deadline, with no more slippages from here on? This is my first question, and then I'll take the next one.

    Answer, saleem ahmad

    Saleem Ahmad Abhishek, Vande Bharat is quite a complex and new project for RVNL, and we are executing this project with our Russian partners. They are quite experienced in the production or manufacturing of rolling stock. There were some teething troubles initially, and the issue was regarding the approvals from the concerned department, and those issues have been resolved. Manufacturing is now in progress at our Latur factory in Marathwada, and we are hopeful that either in the first quarter or, at the latest, by the second quarter, we will be able to deliver the first prototype. Definitely, there's a delay, but I think this delay is only for the first prototype. Once it is delivered and fully tested, we are hopeful that we'll maintain the timelines given for the entire contract. Thank you.

  3. Question

    Abhishek Leekha That means the December '26 deadline is maintained, and we'll deliver the first prototype, and that will get tested. Once it is tested, things will probably move on, correct?

    Answer, saleem ahmad

    Saleem Ahmad We'll deliver it between March and June '27.

  4. Question

    Abhishek Leekha You also mentioned the order win ratio in bidding. What is the order win percentage as of today? Because the majority of the orders are coming through nomination, not through bidding.

    Answer, saleem ahmad

    Saleem Ahmad I think it's a mix of both. The bucket includes a PMC contract on nomination basis of almost INR 3,800 crore from NMDC. And the total order inflow is INR 7,500 crore. So it is almost 55:45; 41% is from PMC nomination and and 59% is competitive from. We are bidding aggressively now. And a lot of bidding has been done by us. So, we are expecting good works out of bidding in the coming quarters.

  5. Question

    Abhishek Leekha 6 Rail Vikas Nigam Limited Q2 FY 2026-27 Conference Call 17.11.2026 Because we were at around INR 93,000 crore in Q1, and now we are at INR 90,000 crore, the execution in Q2 has not been fully replenished in the order book.

    Answer, conference call

    That was my concern regarding future orders and the win rate.

    Answer, saleem ahmad

    Saleem Ahmad As you can see, Q2 was slightly held back because of the monsoon season. But in the other quarters, we expect good progress, which you will hopefully see. And regarding the win rate on bidding projects, it is good. We are winning almost 7-10% of the contracts. The win ratio is more than 7-10%, which is not bad.

  6. Question

    Abhishek Leekha You mentioned that you are maintaining the 10% guidance on revenue and profitability. Q2 was a little slow, but profitability was okay. So, are we on track to deliver 10% overall growth rate in terms of revenue and profitability for the year?

    Answer, saleem ahmad

    Saleem Ahmad So, if you see our H1 results, we are up by almost 9% QoQ. H1 to H1, if you compare, we are up by almost 9%. So, we are maintaining 9-10%, and we are hoping to improve in Q3 and Q4. These are the quarters where maximum execution takes place. Q2 has been held back by the monsoon and by the geopolitical situation and its effects. But in Q3 and Q4, you will definitely see much better results.

  7. Question

    Abhishek Leekha And one last question: taking the cash position as of today, is it okay for a large balance sheet to have somewhere around INR 500-100 crore of cash? Is that enough liquidity? And what is our endeavor for how RVNL can grow exponentially from here on because India needs a lot of infrastructure players, and you being one of the dominant players, there can be a lot of depth. And over the last five years, we see that we have been maintaining a number of around INR 20,000-odd crore. We have not been able to increase significantly in terms of revenue. So what kind of effort or game plan is there so that next year we can grow at a much higher rate and sustain those growth rates in t

    Answer, saleem ahmad

    Saleem Ahmad No. As I emphasized in my speech also, this year we are targeting growth of around 10-15% in our top line, and similarly, in the bottom line, we are expecting an increase of around 10%. So we are hopeful to maintain it. And as I pointed out in the speech also, there are a lot of avenues available because a lot of railway and highway works are coming up where we are bidding, and we are hopeful of getting a lot of work from there. Our focus is also on the international market. 7 Rail Vikas Nigam Limited Q2 FY 2026-27 Conference Call 17.11.2026 As I told you, we have been shortlisted in Serbia and Israel, and we are pitching for others, which I cannot disclose right now, to get good works.

  8. Question

    Vishal Periwal And second, I think the margins this quarter have been very good. I think we have touched almost 5.6% in this quarter. So, is there any one-off? And how exactly do you see the margin trajectory moving on a full-year basis for us?

    Answer, saleem ahmad

    Saleem Ahmad It will definitely improve. We are targeting 6-7% margin, and we are hopeful to achieve that. In the next quarter, we will do much better.

  9. Question

    Vishal Periwal Perfect. Got it, sir. And another question, in terms of the PPT that you have shared. If you look at it, order inflow for us is yet to pick up, I mean, in terms of the first-half numbers. You briefly mentioned the two orders, Serbia and Israel. So is it fair to say that these will probably come through this year? And what could be the size of these orders for Serbia and the Israel one?

    Answer, saleem ahmad

    Saleem Ahmad No. Till now, we have received orders of almost INR 7,600 crore in H1. And our target is around INR 20,000- 25,000 crore. So we are sure that we'll get these orders soon. And in Serbia and Israel, we have just been prequalified, so these orders will definitely not materialize this year. Maybe we will get these orders next year. But this year, among the other orders that we are following and that are in the pipeline, we are sure we will definitely get some.

  10. Question

    Vishal Periwal And, sir, what is the size of these orders, Israel and Serbia separately? Can you guide?

    Answer, saleem ahmad

    Saleem Ahmad No. There are eight packages in the Israel Metro, and each package is about INR 20,000 crore. So we are going ahead with our partner. So our part will be around INR 10,000 crore if we get that order. And Serbia is INR 12,000 crore. We are going with our joint venture Vishal Periwal Sure. Got it, sir. I think that's all from my side.

    Answer, saleem ahmad

    And thank you, sir, for answering and giving your perspective on various aspects. Thank you.

Show 7 more questions
  1. Question

    Rushank Mody Thank you for the opportunity, sir. I just have a couple of questions. So firstly, we have closed down the South African subsidiary, and we are also winding up the Kyrgyz JV. So is the company stepping back from these markets? And if so, which countries are now in focus? 9 Rail Vikas Nigam Limited Q2 FY 2026-27 Conference Call 17.11.2026 Mr. Mritunjay Pratap Singh We are not closing down the international JVs.

    Answer, mritunjay pratap

    In fact, where the work has been completed in Saudi Arabia or Uzbekistan, we are searching for more orders, and we are not closing down the JVs there. In fact, we are on the path to opening new JVs in new geographies such as Serbia or Romania. We are bidding for projects. Kyrgyzstan is a non-starter, so we have decided to close it down because there was no clarity on further orders from Kyrgyzstan. The same applies to South Africa, because we were not progressing on the South Africa front, but, obviously, in other African countries, we are on the path of getting more projects. So, there will be openings in Ghana or Saleem Ahmad But till now, we have closed only two subsidiaries, which were in Kyrgyzstan and South Africa. Otherwise, all JVs or subsidiaries are in place.

    Answer, mritunjay pratap

    And as I earlier briefed, we are hoping to get a small order of around INR 220 crore in Sierra Leone, where we are the L1, and we are focusing on the African market. So whenever need arises, we will open more offices and subsidiaries in those countries as per the requirement. Thank you.

  2. Question

    Rushank Mody So one more question. How large could the defense and the strategic logistics opportunity be for our company compared to the existing business?

    Answer, mritunjay pratap

    Mr. Mritunjay Pratap Singh The logistics sector of the country is growing in every field, be it railways, roads or multimodal logistics parks, because we have an ambitious target to bring down logistics costs in the country. So the logistics sector is bound to grow, and it will spur many opportunities, not only in railways but also in associated sectors such as highways and even waterways. So, we are focused on getting projects in these areas.

    Answer, saleem ahmad

    Saleem Ahmad We are already part of multimodal logistics parks in Chennai and Bangalore. We are infusing some equity with other stakeholders. So, we are part of it.

  3. Question

    Abhishek Leekha 10 Rail Vikas Nigam Limited Q2 FY 2026-27 Conference Call 17.11.2026 Yeah.

    Answer, conference call

    Thank you for the opportunity. Sir, my question is, we did a revenue of INR 9,022 crore in this half year, and last year was INR 9,031 crore. The revenue has been somewhat down. Now, in order to achieve 10% growth on INR 20,412 crore, we will have to do at least INR 6,700 crore per quarter, against an average of INR 5,690 crore in the last two quarters of last year.

    Answer, saleem ahmad

    Saleem Ahmad No. Definitely, we are down by only 0.11%, and this was because of a project closure in KSA. So that is a marginal decrease. But overall, if you see, our operational revenue is increasing on a standalone basis also, and we are hopeful that in Q3 and Q4, we'll definitely perform better and achieve our target of 10% increase.

  4. Question

    Abhishek Leekha That means the average of the last two quarters of last year is around INR 5,690 crore. In order to maintain a 10% overall growth rate, will we do INR 6,700 crore per quarter?

    Answer, saleem ahmad

    Saleem Ahmad In total, we will do around the same INR 13,000 crore. Our total target is INR 22,000 crore, which we are targeting. So, we are hopeful to achieve it.

  5. Question

    Abhishek Leekha That means 10% growth comes to around INR 22,500 crore. So, that means you will approximately achieve that crore?

    Answer, mritunjay pratap

    Mr. Mritunjay Pratap Singh If we look at last year's trend also, the first two quarters contributed around 40% of annual revenue, and the balance 60% came in Q3 and Q4. So, if we maintain that, then we'll reach around -- as the CMD has said, it will be around INR 22,500-23,000 crore.

  6. Question

    Abhishek Leekha Yeah. Thank you so much.

    Answer, saleem ahmad

    Saleem Ahmad In addition, NMDC works are picking up, for which orders of almost INR 3,000 crore have been issued. LOAs have been issued, so work is starting on the ground. Similarly, other works from the railways are being awarded. This month, we are hopeful of being awarded works of almost INR 4,000 crore. Then 11 Rail Vikas Nigam Limited Q2 FY 2026-27 Conference Call 17.11.2026 another work of INR 2,500 crore from NMDC will be awarded in another two months.

    Answer, conference call

    So works of almost INR 10,000 crore are expected to be awarded in the next one or two months.

  7. Question

    Abhishek Leekha Yes. Last quarter, you mentioned that the company is exploring some defense opportunities.

    Answer, saleem ahmad

    Saleem Ahmad Yes. That is in the pipeline, so I cannot reveal the details. That process is going on, and we are hoping that some EOI will come in the market, and we'll be able to bid for that Abhishek Leekha Would that be within this financial year?

Questions about this call

When was the Rail Vikas Nigam Q2 FY27 earnings call transcript filed?
Rail Vikas Nigam filed the transcript with the exchange on 20 Nov 2026. This page is built from that transcript.
What does this page list?
77 statements from the transcript across 8 topics, 52 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 17 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
Rail Vikas Nigam Q2 FY27 concall: what the company said · DalalOS