Saatvik Green Energy Q1 FY26 earnings call: Saatvik Green Energy Limited's order book stood at over 4 gigawatts as of June 30th

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

Order book stood at over 4 gigawatts as of June 30th. The company expects an additional 4% to 5% EBITDA for the cell part from that kind of capacity. The company began operations in 2016 with 125 megawatt capacity and had about 3.8 gigawatt of installed capacity as of June 2025. Revenue from operation was approximately INR 916 crores, registering 272% year-on-year growth in Q1 FY26. There are about 70 gigawatt to 100 gigawatt of pent-up demand that is tendered and is going to get installed in the coming period.

The numbers management gave

Results

  • Revenue from operation was approximately INR 916 crores, registering 272% year-on-year growth in Q1 FY26.
    Show source
    Some of the numbers which I would like to mention here is revenue from operation is stood at INR 916 crores approximately, registering with 272% year-on-year growth.
  • EBITDA was INR 181 crores, up 346% year-on-year, and its EBITDA margin was 19.8% compared to 16.5% in Q1 FY25, in Q1 FY26.
    Show source
    EBITDA came in INR 181 crores, up 346% year -on-year, translating into an EBITDA margin of 19.8% compared to 16.5% in Q1 FY25.
  • The company had capacity utilisation of 81.47% and production of 685 megawatts in Q1 FY26.
    Show source
    During the quarter, we had high-capacity utilisation of 81.47%, and a strong production of 685 megawatts.
  • Return on equity was 26% and return on capital employed was 24%, non-annualised, in Q1 FY26.
    Show source
    On the balance sheet front, return on equity stood at 26% and return on capital employed at 24%, non -annualised, indicating efficient capital utilisation.
  • The company has consistently had capacity utilisation over 80%.
    Show source
    And our capacity utilization has been over 80% consistently.
  • Realization per megawatt is around INR2 per watt, per watt peak.
    Show source
    Prashant Mathur: The realization per megawatt is around INR2 per watt, per watt peak.
Show 9 more statements

Money and capital

  • INR 900 crore initial public offering had an overall subscription of 6.93 times.
    Show source
    Our INR 900 crore s initial public offering received an encouraging response from the market with overall subscription of 6 .93 times.
  • Debt-equity ratio improved to 1.28 from 1.36 in FY25.
    Show source
    Debt-equity ratio we have improved to 1.28 from 1.36 in FY25.
  • The company is investing about INR1,850 crores for the first phase of 4 gigawatt of module and 2.4 gigawatt of cell capacity in Odisha.
    Show source
    So, for the first phase of 4 gigawatt of module and 2.4 gigawatt of cell, the total capex is INR1,850 crores.
  • The company plans to invest about INR1,300 crores in FY26 and FY27, in the ratio of maybe 60% in FY26 and 40% in FY27.
    Show source
    Abani Jha: So, see, if you -- so we are going to invest about INR1,300 crores in two different financial years, in FY26 and FY27, in the ratio of maybe 60% this year and 40% next year.
  • The company has secured debt from a leading government bank to fund 75% of the cell project cost; 25% will be funded through equity.
    Show source
    So, to fund that 60%, we have secured the debt from the leading government bank which will fund us 75% of the project cost and 25% of the project will be funded through equity and we have enough equity capital, equity available in our balance sheet and we are also generating profit.
  • The company will maintain its debt-equity ratio between 1.2 to 1.3, including debt it is going to take on the capex.
    Show source
    We will maintain the debt equity ratio between 1.2 to 1.3.
  • The company will primarily use the proceeds from its initial public offering to fund its upcoming greenfield manufacturing project in Odisha.
    Show source
    The proceeds from the IPO will primarily be used to fund our upcoming greenfield manufacturing project in Odisha.
  • The company will use a portion of its initial public offering funds to repay debt in one of its subsidiaries.
    Show source
    A portion of the funds will also be utilised to repay debt in one of our subsidiaries, further strengthening our balance sheet and enhancing financial flexibility.
  • The company says internal accruals will be more than sufficient to fund its cell production and cell capacity.
    Show source
    So, those internal accruals will be more than sufficient to fund our cell production, cell capacity.

What it expects ahead

What management expects

  • The company expects an additional 4% to 5% EBITDA for the cell part from that kind of capacity.
    Show source
    And that is -- so what we are expecting additional -- for that kind of capacity, additional 4% to 5% EBITDA would come for the cell part.
  • The company feels there will be some extension into the timelines for shifting to domestic cell until there is a 40 gigawatt-50 gigawatt type of cell up and running.
    Show source
    So, we feel that there will be some extension into those timelines.
  • The shift towards domestic cell will happen somewhere around 2027-28.
    Show source
    That will happen somewhere around 2027-28.
  • The company is targeting to do close to 4000 pumps-5000 pumps this year, which will be around INR50 crores-INR80 crores kind of revenue.
    Show source
    So, this year we are targeting to do close to 4000 pumps-5000 pumps, which will be around INR50 crores-INR80 crores kind of revenue.
  • Target is to do about 4000 pumps-5000 pumps this year and about 15000 pumps next year.
    Show source
    Next year our target is to do about 15000 pumps.
  • The company will be adding more orders as it adds more capacity. Replaced by a later filing.
    Show source
    As we are adding more capacity, we will be adding more orders.
Show 4 more statements

Orders

  • Order book stood at over 4 gigawatts as of June 30th.
    Show source
    Our order book as of June 30th stands at over 4 gigawatts.
  • Spot orders and retail distributor orders, which are not included in Saatvik Green Energy Limited's order book, account for about 25% to 30% of its monthly sales.
    Show source
    Apart from that, there are spot orders as well as retail distributor orders, which you receive and these are in small quantities, but a large number of these orders are there every month and these get executed, which is also about 25% to 30% of our monthly sales.
  • The company has got 1,500 pumps from Maharashtra, MEDA, Odisha and Madhya Pradesh.
    Show source
    Now we have got 1,500 pumps.
  • Order book is always full, and it has customers in utilities, C&I, retail, open access and pumps.
    Show source
    We ensure that our order book is Saatvik Green Energy Limited October 10, 2025 Page 13 of 19 always full and we have our set of customers in every different segment, be it utilities, C&I, retail, you have open access, pumps.

What it is building and selling

Projects and capacity

  • The company began operations in 2016 with 125 megawatt capacity and had about 3.8 gigawatt of installed capacity as of June 2025.
    Show source
    We began operations back in 2016 with a modest 125 megawatt capacity and since then have grown rapidly to reach about 3.8 gigawatt of installed capacity as of June 2025.
  • The company operates three module manufacturing facilities in Ambala, Haryana, spread over 724,000 square feet.
    Show source
    Talking about our manufacturing footprint, we currently operate three state-of-the-art module manufacturing facilities in Ambala, Haryana, spread over 724,000 square feet.
  • The company is expanding with an Odisha facility for 4.8 gigawatt of cell capacity and 4 gigawatt of module capacity, expected to be commissioned by quarter 3 FY27 and FY26, respectively.
    Show source
    Beyond this, we are expanding our capabilities further with a fully integrated cell and module manufacturing facility in Odisha, 4.8 gigawatt for cells and 4 gigawatt for modules, expected to be commissioned by quarter 3 FY27 and FY26, respectively.
  • The company was adding one more gigawatt of capacity because of high demand, which was the reason its order book was over 4 gigawatts.
    Show source
    But since our capacity was 3.8 gigawatts, we are adding one more gigawatt because of high demand and that is the reason why we have the order book today is over 4 gigawatts.
  • The company is targeting end of second quarter for its 2.4 gigawatt cell capacity.
    Show source
    So, we are targeting end of second quarter for Saatvik Green Energy Limited October 10, 2025 Page 7 of 19 our 2.4 gigawatt cell.
  • Brownfield module capacity can start commercialized production in maybe 2-3 months and run at full, at least 80% capacity, in a total 5 to 6 months.
    Show source
    And it is faster also because you can start commercialized production from it in maybe in 2-3 months, and then you kind of optimize it and in a total 5 to 6 months, you can run it at full, at least 80% capacity.
Show 24 more statements

Projects and capacity

  • The company initially got 51 acre land in a solar manufacturing park being built in Narmadapuram near Bhopal, Madhya Pradesh, and is trying to increase it to at least 200 acres; it has asked for 300 acres.
    Show source
    And additionally, we have taken land in Madhya Pradesh also, there is a solar manufacturing park which is being built in Narmadapuram near Bhopal, where we have initially have got 51 acre land, but we are trying to increase it to at least 200 acres, 300 acres is what we've asked.
  • The company says that even if it gets 200 acres in Narmadapuram, it will be able to build 8 gigawatt of integrated ingot wafer cell module kind of a facility there.
    Show source
    But even if we get 200 acres, we will be able to build 8 gigawatt of integrated ingot wafer cell module kind of a facility there.
  • It takes about 18 to 20, rather 30 months to commission a project from awarding till the end.
    Show source
    Apart from that, there is -- it takes about 18 to 20, rather 30 months to commission a project from awarding till the end.
  • Even if demand starts from 2026, it takes about two years to commission a project.
    Show source
    So, even if the demand starts from 2026, it takes about two years to commission.
  • Capacities increased by 2 gigawatt, one in January and the other in March.
    Show source
    So, our capacities have gone by 2 gigawatt.
  • Available capacity effectively will be about 3.6 to 3.7 gigawatt this year.
    Show source
    So, this year, our available capacity effectively will be about 3.6 to 3.7 gigawatt.
  • Effective available capacity will end up being about 3.8 gigawatt in Q3.
    Show source
    So, our effective available capacity will end up being about 3.8 gigawatt.
  • The company took Tata Steel SEZ land in Gopalpur, Odisha, rather than government land, for its project; the land is close to Gopalpur port, Vizag and Paradip port, within 200 km distance.
    Show source
    The other thing is Odisha per se did not pose any problem but what happened is what we have done is instead of taking a government land, we have taken a Tata Steel SEZ land in Gopalpur, Odisha and the benefit is maybe we paid a little higher on the land price but firstly it is very close to the Gopalpur port , which is being taken by Adani and they are developing it as a future deep sea port.
  • The company added one gigawatt of capacity in quarter two FY26.
    Show source
    We have added one gigawatt of capacity in quarter two FY26.
  • Odisha project is on time, and civil construction work is already going on.
    Show source
    So, the civil construction work is already going on.
  • The company has already completed equipment ordering for its Odisha project and is well on track.
    Show source
    The equipment ordering has already been done and we are well on track on that.
  • The company is considering setting up backward integration of ingot wafer matching its cell capacities in Odisha.
    Show source
    One is setting up backward integration of the ingot wafer matching our cell capacities in Odisha.
  • The company gets electricity and water at the developed Tata Steel SEZ, and future CTP access will also be given.
    Show source
    We get electricity, water which is very important and future CTP access will also be given.
  • Tata Steel SEZ site is on Calcutta -Chennai highway, and a multi-utility corridor is being built there.
    Show source
    There is a multi-utility corridor also that is being built.

Demand and pricing

  • There are about 70 gigawatt to 100 gigawatt of pent-up demand that is tendered and is going to get installed in the coming period.
    Show source
    And then, there are about 70 gigawatt to 100 gigawatt of pent -up demand also that has been -- that is tendered and it is going to get installed in the coming period.
  • The company does not see an overcapacity situation in the coming at least few years, because many old technologies will become offline.
    Show source
    So, considering that lot of old technologies will become offline, we don't see overcapacity kind of situation in the coming at least few years.
  • The company said the green hydrogen and green ammonia play will start, with an execution timeline of three years, of which one year and so had passed.
    Show source
    Along with that, the green hydrogen and green ammonia play will also start because their execution timeline was three years, and already one year and so has passed.
  • The company has diversified its customer base regionally and by segment, which supports demand when demand fluctuates across a year or month.
    Show source
    So, we have been focused on our diversification in terms of our customer base, be it regional, be it segment-wise and that gives us on the demand side.

Segments

  • The company has supplied more than 2.5 gigawatt of high-efficiency modules.
    Show source
    Saatvik Green Energy Limited October 10, 2025 Page 3 of 19 Over this period, we have supplied more than 2.5 gigawatt of high -efficiency modules, a strong validation of our quality, execution, and customer trust.
  • The company operates across the renewable energy value chain through module manufacturing, EPC, and O&M services.
    Show source
    We operate across the renewable energy value chain, combining module manufacturing, EPC, and O&M services, which gives us a clear competitive advantage and helps us deliver end -to-end solar solutions.
  • Product portfolio includes Mono PERC and N-TOPCon modules in Monofacial and Bifacial configurations.
    Show source
    Coming to our products, our diverse portfolio includes advanced Mono PERC and N-TOPCon modules available in both Monofacial and Bifacial configurations.
  • The company is also doing EPC and its own pumps.
    Show source
    So, we have our foothold, we are also doing EPC, we are doing our own pumps also.

Deals and partners

  • The company is getting its technology from SC China, which has done similar projects for its peers.
    Show source
    So, we are getting our technology from SC China and SC China has done similar projects for our peers also.
  • The company chose partners with experience delivering in India, including SC China, which has done projects for its large peers, and Membrane in India, which has done DIA, ETP and ZLD for them.
    Show source
    So, we have gone in with the partners , who have delivered like SC China has done it for our peers, large peers and also Membrane in India, who has done it for DIA, ETP, ZLD for them.

Everything else said on the call

Other

  • Share of the referenced but unidentified measure will be 80% in the current quarter.
    Show source
    Abani Jha: It will be -- in the current quarter, it will be 80%, to be precise.
  • The company held its maiden earnings call after listing on the stock exchanges.
    Show source
    It is a real pleasure to welcome you all to Saatvik Green Energy Limited maiden earnings call after a listing on the stock exchanges.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Surender Singh: Good morning and congratulations on these excellent orders, for your excellent results. My question is that do you have any revenue guidance for FY '26?

    Answer, prashant mathur

    Prashant Mathur: Thank you, Mr. Singh, for the question. For the revenue guidelines, we cannot really give the guidance. But what we can say is that we have continuously focused on high -capacity utilization, which is also reflecting in our results in the past, as well as in the current year as well. And our capacity utilization has been over 80% consistently. And that means we have -- capacity utilization helps us to have better costs, because then your overheads are distributed well in your costs. Capacity utilization also means that we have a strong order book, and we have been good at executing our orders. So, with the kind of capacity utilization which we have been targeting and matching for the last two years, and we feel that we should be able to have a high -capacity utilization in this year as well.

    Answer, prashant mathur

    And that should reflect in our numbers. So, if you see last year, our capacity available was about 1.7 gigawatts. This year, our capacity available will be close to about 3.6, 3.7 gigawatts. That is the best we can give the guidance.

  2. Question

    Surender Singh: Thank you for the explanation. That makes sense. My second question would be that as you have planned for your capacities, do you also have plans to have the order books by financial year '26? If yes, then what is the number? And also, if you can share, what is the current order book at the end of month of September?

    Answer, prashant mathur

    Prashant Mathur: We can give the order book at the end of June, which is 4 gigawatts plus. And as I said in my remarks earlier also, that our order book does not comprise of the spot orders and distributor orders, because these orders also are significant, but they come and go on , you know, rather not even monthly, weekly basis, you have those orders coming and going. So, our order book reflects the capacities which we have. As we are adding capacities, so as along with the capacities, our order book will also grow, we will be filling that as we come close to commissioning off over Odisha plant as well.

  3. Question

    Surender Singh: Okay. See, my concern is, do you anticipate that demand will slow down in one year's time because of overcapacity?

    Answer, prashant mathur

    Prashant Mathur: So, overcapacity, on the face of it, it may look like an overcapacity, but what we know is that lot of the capacity, firstly, if you see industry standard, the capacity utilization is not even 40%. So, capacity on ALMM may look high, but actual capacity utilization is very low. That is one point. Saatvik Green Energy Limited October 10, 2025 Page 6 of 19 The other point is that there has been tectonic technology change that has happened in the last one year, and many old technologies like Multi, Mono, and Mono PERC will become obsolete in the next one year, or Mono and Multi would, you know, they might be in ALMM because ALMM is for three years. They may become obsolete, or they are already obsolete, but they are visible there. So, considering that lot of old technologies will become offline, we don't see overcapacity kind of situation in the coming at least few years. Along with that, the green hydrogen and green ammonia play will also start because their execution timeline was three years, and already one year and so has passed.

    Answer, prashant mathur

    So, their commissioning timelines are also getting closer. So, we feel that that also will be powered from solar, and that additional volume will also start adding up in the coming period. So, we feel that the demand should keep rising, and because you have alternate demand also adding up to the already prevalent demand. And along with that, battery storage is also adding up to that demand. So, all that is adding, the backward demand is ultimately coming to solar only.

  4. Question

    Kunal Shah: Sorry? Status for equipment ordering.

    Answer, prashant mathur

    Prashant Mathur: Okay. So, our Odisha project is well on time. So, the civil construction work is already going on. We should start our PEB erection very soon, probably by end of this month. And module and cell capacities should come around the same time, but module takes little less time to optimize and commercialize. So, that should start giving revenue from April of 2026. But installation should happen in the last quarter of this financial year.

    Answer, prashant mathur

    But it takes three, four months to really stabilize and get this fully commercialized. So, that's why we are saying April 26 is when it should start producing. And full production should take another three months. So, second quarter onwards we will get full production of that 4 gigawatt module. Along with this, cell capacities are also coming, but cell takes little more time to optimize because this is more complex process and gases and chemicals and lot of -- so efficiencies are a big and that stabilization takes little more time. So, we are targeting end of second quarter for Saatvik Green Energy Limited October 10, 2025 Page 7 of 19 our 2.4 gigawatt cell. The equipment ordering has already been done and we are well on track on that.

  5. Question

    Kunal Shah: Understood. Sir, just to clarify, are you saying that the cell line would be stabilized by the end of the second quarter or would be commissioned by the end of the second quarter?

    Answer, prashant mathur

    Prashant Mathur: Stabilized by the end of second quarter.

  6. Question

    Kunal Shah: Understood. So, sir, any guidance on the utilization then for the second half of F27, basically from a cell production perspective?

    Answer, prashant mathur

    Prashant Mathur: So, out of this 2.4 gigawatt, we feel that for the entire year, 1 gigawatt will be available because the second half of the year only we will be able to get the revenue out of it. And cell is a continuous process. So, around 800 megawatt to 1 gigawatt is the kind of output we are expecting for the financial year.

  7. Question

    Kunal Shah: Understood. So, this is very helpful. So, secondly I wanted to understand the thought process of the promoters on sideways integration, let's say, in terms of entering into manufacturing of inverters or BESS. So, like how from a 3 or 5 year perspective, how should one expect this company to evolve from a longer term perspective? That would be helpful?

    Answer, prashant mathur

    Prashant Mathur: So, what we are building is we are building an integrated renewable energy manufacturing as well as a service providing company. So, we are backward integrating into cell manufacturing. We also have plans to get into wafer and ingot value chain. So, entire value chain from ingot to module is what we are targeting. We are already doing EPC, we are doing solar pumps. Solar pumps also, last year we have incubated it and we did about 100 pumps last year. This year we should do about 4,000 to 5,000 pumps.

    Answer, prashant mathur

    So, the kind of growth which will be seen from less than INR2 crores revenue last year to about INR50 crores revenue this year and that is also a division which has a potential of becoming a separate business unit. So, that is also happening. We are also getting into ancillaries. Yesterday we have launched our inverters. So, we have made forayed into our inverter business with residential as well as small commercial industrial inverters and also ancillaries as I said we are looking at getting into encapsulated manufacturing and also into other. So, all in all we are building -- we are also doing BESS projects and ultimately the target is to get into battery storage products also. So, all in all we are building entire integrated forward, backward and sideways energy company, renewable energy company especially.

  8. Question

    Deepak Poddar: Yes. Thank you very much sir for this opportunity and many congratulations for a great set of numbers. So, just wanted to understand first up on the recently Ambala 1 gigawatt, what was the capex involved there?

    Answer, abani jha

    Abani Jha: So, see I am the CFO of the company. So, what I can tell you is that the average cost of commissioning a gigawatt plant in module will cost around INR75 crores to INR100 crores of rupees depending on land cost. That much I can tell you so our capital expenditure will also be in the range.

  9. Question

    Deepak Poddar: Okay. So, 1 gigawatt would be around INR75 to INR100 crores. So, what about the Odisha ? I mean we have got their module as well as cell. So, what is the total capex involved there?

    Answer, abani jha

    Abani Jha: So, we are investing about INR1,850 crores which includes 4 gigawatt of module and 2.4 gigawatt of cell. So, our objective as we have put in our various offer documents to the regulators that we will be building 4.8 gigawatt of cell capacity. The first phase will have 2.4 gigawatt and another phase will have another 2.4 gigawatt. So, for the first phase of 4 gigawatt of module and 2.4 gigawatt of cell, the total capex is INR1,850 crores.

  10. Question

    Deepak Poddar: And individually the module would be costing around 4 gigawatt would be some INR300 crores to INR400 crores as per your what per gigawatt?

    Answer, abani jha

    Abani Jha: So, there it will be INR550 crores. It will take kind of what I have given you earlier number is because we already have the base there. So, it is kind of Brownfield expansion. Here in this location in Odisha we said Greenfield expansion. So, the capex is bit more because you have to create the infrastructure also.

Show 13 more questions
  1. Question

    Deepak Poddar: Okay. That is pretty clear. And in terms of realization, I mean, I was reading your press release. So, you mentioned that the module prices has bottomed out and it kind of you expect it to stabilize going forward. So, what sort of realization we are seeing right now per megawatt?

    Answer, prashant mathur

    Prashant Mathur: The realization per megawatt is around INR2 per watt, per watt peak. Saatvik Green Energy Limited October 10, 2025 Page 9 of 19 Deepak Poddar: So, per megawatt if you can share that would be very helpful?

    Answer, prashant mathur

    Prashant Mathur: Per megawatt will be 20 lakh.

  2. Question

    Deepak Poddar: Okay. Understood. And you mentioned right now about BESS plan. Can you elaborate more on what sort of capacity and capex that is involved there and by when we are coming through with those BESS project?

    Answer, prashant mathur

    Prashant Mathur: What I meant was we are doing EPC projects which is a BESS standalone project. So, we have taken a project in Bihar and we are also bidding for other EPC projects. We have plans to get into manufacturing also for batteries, but that is still on the white board stage. So, we don't have a number to give on that.

  3. Question

    Deepak Poddar: Okay. So, that is on white board. Okay. I got it. And just final couple of things from my side. Now, this solar cell capacity will be, everything will be internally utilized. I mean, would that be a fair understanding because you will have 8.8 gigawatt of module capacity there?

    Answer, prashant mathur

    Prashant Mathur: Yes, that would depend on the market dynamics, depending on where we get the best value and the best demand. But in a hypothetical situation, obviously, this will be internally digested. But it would depend on what kind of orders we are booked with and we can sell also some of the cells depending on the market situation.

  4. Question

    Deepak Poddar: And what sort of margin benefit it can bring? I mean, what sort of differential it would have versus, I mean, externally sourcing versus internally manufacturing?

    Answer, prashant mathur

    Prashant Mathur: So, domestic cell tenders and demand is totally different where the prices also are very different. And that is -- so what we are expecting additional -- for that kind of capacity, additional 4% to 5% EBITDA would come for the cell part.

  5. Question

    Kartik Sharma: Yes, I just wanted to understand whether the CUFs differ from a brownfield projec t and from a greenfield project?

    Answer, prashant mathur

    Prashant Mathur: No, the CUF does not really differ, but what happens is, like, our brownfield project, what we, we had additional space available in our shed and we were able to quickly up and run the additional module capacity. So, the additional benefit is that you don't have much capex requirement because there is no land required, there is no building required, you have the infrastructure, utilities all available. And it is faster also because you can start commercialized production from it in maybe in 2-3 months, and then you kind of optimize it and in a total 5 to 6 months, you can run it at full, at least 80% capacity.

  6. Question

    Kartik Sharma: In a greenfield project? In a brownfield project?

    Answer, prashant mathur

    Prashant Mathur: In a greenfield project, you have land, you have to do all the approvals, you have utilities, you have to have the civil work, you have foundation, shed, everything. And then it's a longer gestation cycle, but everything brownfield is at one point of time greenfield. So, that's the difference.

  7. Question

    Kartik Sharma: And sir, one more last question from my end. When you say you had plans for ingot wafer till module, so an entire integrated facility, so are there any capacities that you are focusing for the ingot wafer and where that might be?

    Answer, prashant mathur

    Prashant Mathur: So, it's also under consideration right now. So, there are two directions which we are thinking of. One is setting up backward integration of the ingot wafer matching our cell capacities in Odisha. And additionally, we have taken land in Madhya Pradesh also, there is a solar manufacturing park which is being built in Narmadapuram near Bhopal, where we have initially have got 51 acre land, but we are trying to increase it to at least 200 acres, 300 acres is what we've asked. But even if we get 200 acres, we will be able to build 8 gigawatt of integrated ingot wafer cell module kind of a facility there.

  8. Question

    So, the demand for Mono PERC and monocrystalline, is it already gone o r is there a stage where there is demand for these?

    Answer, prashant mathur

    Prashant Mathur: Sorry, your voice is not clear, but I kind o f understand your question. Yes, so what happens is, it's like you have the iPhone 17 gets launched and then iPhone 16. Firstly, the demand also goes down and then the price also kind of is down because of the lower demand. The same is happening for Mono PERC as well as for the older technologies. So, we still have projects which demand for 540 -550 watt panels, but the kind of margins you see in TOPCon versus the kind of margins you see in Mono PERC, because ultimately, even if the developer compromises on the wattage of the panel, they want to compensate for an entire system cost. Because when you have a 625-watt panel versus a 550-watt panel, you have higher system cost because the structure, inverter, cable, everything is additional, 10 %, 15%. You have higher land requirement with a lesser wattage.

    Answer, prashant mathur

    So, the margins are really tight and so that is there on Mono PERC. But also, in TOPCon also, you have generations. So, like M10, M10R today, G12R. So, in a year or so, the Mono PERC or the Mono is already obsolete, Mono PERC, the margins become very less. It shrinks and it does not really become sustainable to hold on to those kind of margins because the customer ultimately wa nts a higher efficient product. So, that is what I mean.

  9. Question

    Sarang Koglekar: Understood. Also, on the FY '27, now that ALCM is also coming in, you said that your facility cell capacity will come from September and most of the players have faced delays in stabilization because of the complex process. So, if there is maybe 1 or 2 month delay, let's say it goes to November. So, is it the case that you lose the business between June and October, those 4, 5 months because there is a very limited cell capacity?

    Answer, prashant mathur

    Prashant Mathur: So, ALMM was expected to come in 2019. Eventually, it came in 2024 because the government has to do a balancing act of not sacrificing the energy demand shifting from renewable to non -renewable. So, they would want the installations to keep happening for the solar projects. And also, in parallel, want the ecosystem also getting built. So, the balancing act is being done wherein every quarter they ask us for the kind of module capacities we have, what is the Saatvik Green Energy Limited October 10, 2025 Page 12 of 19 utilization of our capacities, how much cell capacities we are putting in, what is the timeline and based on that, the demand for domestic cell tenders are getting built up. So, the government has shown a commitment to create the entire manufacturing ecosystem in India by way of ALCM, but there are not enough cell capacities which have really got commissioned because there was a technology change also happening from Monofab to TOPCon. So, now, like us, others are also setting up cell manufacturing.

    Answer, prashant mathur

    And so, until there is a 40 gigawatt-50 gigawatt type of cell up and running, it is difficult to do the entire shift towards domestic cell. So, we feel that there will be some extension into those timelines. Apart from that, there is -- it takes about 18 to 20, rather 30 months to commission a project from awarding till the end. So, even if the demand starts from 2026, it takes about two years to commission. And then, there are about 70 gigawatt to 100 gigawatt of pent -up demand also that has been -- that is tendered and it is going to get installed in the coming period. So, there is enough demand to continue and shift towards domestic cell. That will happen somewhere around 2027-28.

  10. Question

    Sarang Koglekar: Understood. And so, my last question is on the capacity, the ALMM capacity when you see it is more than 100 gigawatt. So, do you have any estimate of how much of that is TOPCon? And secondly, you said 40% is the industry capacity utili zation and yours is I think 80%, you said. So, what exactly are you doing? Because when I speak with the listed peers, everyone gives a number around 60%. So, like what is it that you are doing differently?

    Answer, prashant mathur

    Prashant Mathur: So, industry capacity utili zation is low because there are some players who are -- because ALMM is a three -year -- so, you list in ALMM and then you are there for three years. So, not every manufacturer is similar. So, a manufacturer may have issues with cash flow, order booking, they may be running only last quarter of the year, they may not be focused. So, there are various -- they don't have the bank limits available, they don't have the team available, they might not be industry focused. And there could be many factors why a manufacturer may not be utili zing their capacities fully. But overall average if you see, somebody would be at 0% also, some might be at 10% and then you would have people like us at 80%. Now, comparing us with the others who have 60%, the way we are doing it differently is firstly, we consider ourselves as a sales -driven organization.

    Answer, prashant mathur

    We ensure that our order book is Saatvik Green Energy Limited October 10, 2025 Page 13 of 19 always full and we have our set of customers in every different segment, be it utilities, C&I, retail, you have open access, pumps. So, we have our foothold, we are also doing EPC, we are doing our own pumps also. So, kind of it questions also if there is a demand up and down in a year, in a month. So, we have been focused on our diversification in terms of our customer base, be it regional, be it segment-wise and that gives us on the demand side. On the supply side, since we have a strong purchasing power now, so we have a better supplier base, we have good working capital limits. So, we have executed for the last 10 years, we have been in business. So, we have a good kind of performance credentials also in the market.

  11. Question

    Chirag Jain: Good morning, sir, and congrats on good quality performance. My first question was, so I was trying to understand effective installed capacity of our total installed capacity. So, based on disclosures, it appears that our effective operational capacity is currently below 50% of total installed capacity. So, I was trying to understand what is the gap like ? Is it related to any operating hours or technical limitations? And additionally, what do we expect, like, do we expect to maintain this same effective utilisation capacity going forward? Because then it would cap the top -line growth and also elongate our execution timelines.

    Answer, prashant mathur

    Prashant Mathur: Okay. So, our capacities have gone by 2 gigawatt. And one was in January and the other was in March. So, it takes a few months to kind of optimise and get to a full optimum utilisation level. So, this year, our available capacity effectively will be about 3.6 to 3.7 gigawatt. Our 1 Saatvik Green Energy Limited October 10, 2025 Page 14 of 19 gigawatt has recently got installed. We should start getting revenue for that in October, November.

    Answer, prashant mathur

    Prashant Mathur: Yeah, in the Q3. So, our effective available capacity will end up being about 3.8 gigawatt. So, we should be able to clock around 3.5 gigawatt kind of output in this year.

  12. Question

    Chirag Jain: Yes.

    Answer, abani jha

    Abani Jha: So, see, if you -- so we are going to invest about INR1,300 crores in two different financial years, in FY26 and FY27, in the ratio of maybe 60% this year and 40% next year. So, to fund that 60%, we have secured the debt from the leading government bank which will fund us 75% of the project cost and 25% of the project will be funded through equity and we have enough equity capital, equity available in our balance sheet and we are also generating profit. So, those internal accruals will be more than sufficient to fund our cell production, cell capacity.

  13. Question

    Chirag Jain: Okay. Thank you so much.

    Answer, abani jha

    Abani Jha: It will be in the range of 8.9 to 9. Jainam: Okay. And what is the peak level of debt that the company wants to, that the company is comfortable at? Currently, I think it's 1.28 x, right? So, after this capex that we are going to do and I'm assuming going forward as well for wafers, maybe that's a little out. But what's that comfortable level of debt that you want to ensure that beyond that the company doesn't go?

    Answer, abani jha

    Abani Jha: No. So, we will maintain the debt equity ratio in our current level only. So, it will be about even including the debt we are going to take on the capex. We will maintain the debt equity ratio between 1.2 to 1.3. Jainam: Okay. I also wanted to understand that in terms of your customers, if you could give a better idea, who are your customers? What would be your concentration? And in terms of mix, as you said, that …., C&I and there would be also probably some system integrators within PM- KUSUM and PM Surya Ghar that you would be supplying to.

    Answer, abani jha

    Abani Jha: It will be -- in the current quarter, it will be 80%, to be precise. Jainam: Okay. Okay. Saatvik Green Energy Limited October 10, 2025 Page 16 of 19 Abani Jha: So, that is a large area.

    Answer, prashant mathur

    Now we have got 1,500 pumps. We also got from MEDA, we have got it from Odisha, we have got from Madhya Pradesh. So, this year we are targeting to do close to 4000 pumps-5000 pumps, which will be around INR50 crores-INR80 crores kind of revenue. But what happens is it's like EPC, you have to build your credentials one after another. So, initially you will get small, then you will get little bigger. And then in 3 -4 years, then you become a large -- that becomes a large chunk of your business also. Jainam: So, you are fairly confident about the opportunity over there, probably in 3-4 years you can… Saatvik Green Energy Limited October 10, 2025 Page 17 of 19 Prashant Mathur: Yes.

    Answer, prashant mathur

    Prashant Mathur: This year our target is to do about 4000 pumps-5000 pumps. Next year our target is to do about 15000 pumps. And then scale upon that. SO, t hat is the kind of scalability , we see in that business as well. Jainam: Yes, and in Suryaghar, what is the strategy with inverters? And are we also one of the players participating in PM Surya ghar? And between the two, which one do you find to be a bigger and better opportunity, Surya and Kusum?

    Answer, prashant mathur

    Prashant Mathur: So, firstly on the vendor side, let me talk about that. There were two options, one is the European option with Chinese make and the other is the Chinese option with Chinese make. Saatvik Green Energy Limited October 10, 2025 Page 18 of 19 So, the only difference is that the technology is either European or European with Chinese. So, ultimately all equipments currently are getting made in China only and even we had an option with Centro Thermo also but ultimately China is only the one , who is making equipment otherwise it is difficult to even compete. So, we are getting our technology from SC China and SC China has done similar projects for our peers also. So, they have the learning curve and for us the speed of execution of the project is very important. So, we have gone in with the partners , who have delivered like SC China has done it for our peers, large peers and also Membrane in India, who has done it for DIA, ETP, ZLD for them.

    Answer, prashant mathur

    So, we have gone in with people, who have done it in Indian conditions. The other thing is Odisha per se did not pose any problem but what happened is what we have done is instead of taking a government land, we have taken a Tata Steel SEZ land in Gopalpur, Odisha and the benefit is maybe we paid a little higher on the land price but firstly it is very close to the Gopalpur port , which is being taken by Adani and they are developing it as a future deep sea port. It is also very close to Vizag as well as Paradip port within 200 km distance. So , we get access to the port. In Tata Steel SEZ , it is a developed SEZ. We get a land there on the main spine road. We get electricity, water which is very important and future CTP access will also be given.

    Answer, prashant mathur

    There is a multi-utility corridor also that is being built. We are on Calcutta -Chennai highway and this Tata Steel SEZ. So , what happens is when you take a large chunk of land like W aaree did, about 600 acres they took in Dhenkanal. The government gave them land and promises but ultimately , we are delivering the electricity, water and there were challenges because such a large chunk of land was in a very remote area and they struggled to get things done. So, we learned lessons from that and we took it in the SEZ. So that is how we have addressed a potential delay in our project by doing it.

    Answer, prashant mathur

    Prashant Mathur: Thank you, Abaniji. Thank you, everyone. Q1 FY '26 has been a very strong year -- a strong start for the year. Reflecting Saatvik's continued momentum in scaling operations and strengthening our profitability. Our focus remains on expanding capacity and driving operational excellence and deepening our presence. We see sustained demand for high efficiency solar modules supported by India's Saatvik Green Energy Limited October 10, 2025 Page 19 of 19 clean energy goals and global transition to renewables. With our integrated model and committed team we are confident of delivering consistent growth and value to all our stakeholders.

Questions about this call

When was the Saatvik Green Energy Q1 FY26 earnings call transcript filed?
Saatvik Green Energy filed the transcript with the exchange on 14 Oct 2025. This page is built from that transcript.
What does this page list?
57 statements from the transcript across 9 topics, 36 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 23 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
Saatvik Green Energy Q1 FY26 concall: Saatvik Green Energy Limited's order book stood at over 4 gigawatts as of June 30th · DalalOS