Sterling and Wilson Renewable Energy Q1 FY26 earnings call: Sterling and Wilson Renewable Energy Limited’s bid pipeline exceeded 30 gigawatts, including over 26 gigawatt for India

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

Bid pipeline exceeded 30 gigawatts, including over 26 gigawatt for India. The company expects the majority of its domestic pipeline to be awarded before December '25. Khavda 1 had almost been sorted, with about 100-megawatt module supply still pending. The company won only 1 order from NTPC in Q1 FY '26, for turnkey EPC solutions with modules but not BESS or other schemes. India had only 205 megawatt of battery capacity added as of the call, while around 3 gigawatt of battery storage pipeline clarity had emerged.

The numbers management gave

Results

  • The company won only 1 order from NTPC in Q1 FY '26, for turnkey EPC solutions with modules but not BESS or other schemes.
    Show source
    On the execution side, our teams have been making good progress and commissioned over 1 gigawatt of projects in Q1 alone.
  • Top line grew around 93% year-on-year to INR1,762 crores in Q1 FY '26.
    Show source
    In terms of execution, our scale-up plans continue to remain on track and the improved top line of Q1, which has grown 93% year-on-year is reflective of the same.
  • Revenue declined sequentially in Q1 FY '26 because Q1 is usually slower than Q4.
    Show source
    Sequential decline in revenue is attributable to seasonality impact, since Q1 is usually slower than Q4.
  • Projects bordering Pakistan in Gujarat and Rajasthan were evacuated from the last week of April through almost all of May and then remobilized, losing productivity for 40, 45 days and impacting Q1 FY '26 revenue generation.
    Show source
    Our majority of the projects were in Rajasthan and Gujarat and those were disrupted for around 40, 45 days.
  • Domestic EPC, international EPC and O&M segments all contributed to its performance in Q1 FY '26.
    Show source
    All 3 segments, Page 4 of 17 Sterling and Wilson Renewable Energy Limited July 18, 2025 domestic EPC, international EPC and O&M contributed to the strong performance in quarter 1.
  • Consolidated gross margin was approximately 11.7% in Q1 FY '26, compared with 10.1% in FY '25; softening of some key input costs helped the gross margin in Q1 FY '26.
    Show source
    With respect to our gross margins, our consol Q1 gross margin was approximately 11.7%, while our FY '25 gross margin was 10.1%.
Show 21 more statements

Results

  • Domestic EPC gross margin was 10.8% in Q1 FY '26, above its target range of 10%.
    Show source
    Looking at it segment-wise, our domestic EPC gross margin was 10.8%, and that's above our target range of 10%, while our international EPC gross margin was approximately 12.3% and more reflective of the steady-state margin profile of that segment.
  • O&M margin was 23% in Q1 FY '26, reflecting the segment’s recurring margin profile.
    Show source
    Our O&M margin trended back to now 23%, which is, again reflective of a recurring margin profile of that segment.
  • Operational EBITDA was INR123 crores, with a 7% operational EBITDA margin, in Q1 FY '26, compared with approximately INR25 crores in Q1 FY '25 and INR158 crores in Q4 FY '25.
    Show source
    Our operational EBITDA, which is operating revenue less recurring overheads, amounted to INR123 crores this quarter, that 7% operational EBITDA margin compared to approximately INR25 crores we have seen in quarter 1 FY '25.
  • Recurring overhead was INR83 in Q1 FY '26, compared with INR77 crores in Q1 FY '25 and INR105 crores in Q4 FY '25.
    Show source
    Our recurring overhead has been steady at INR83 in Q1 compared to INR77 crores in Q1 FY '25 and INR105 crores last quarter.
  • Reported EBITDA was INR102 crores, with a 5.8% EBITDA margin, in Q1 FY '26, up 175% year-on-year compared with INR37 crores in Q1 FY '25 and close to INR116 crores in Q4 FY '25.
    Show source
    Reported Q1 EBITDA was INR102 crores at a 5.8% EBITDA margin and up 175% year-on-year compared to INR37 crores in Q1 FY '25.
  • Reported PAT was INR39 crores in Q1 FY '26, compared with INR5 crores in the same period last year and INR55 crores in the prior quarter.
    Show source
    Reported Q1 PAT was INR39 crores compared to INR5 crores for same period last year and INR55 crores in the prior quarter.
  • Higher stand-alone profitability in SWREL as well as in South Africa and Spain projects resulted in higher tax expense for Sterling and Wilson Renewable Energy Limited in Q1 FY '26.
    Show source
    The tax expense has been high during the current quarter due to higher stand-alone profitability in SWREL as well as in South Africa and Spain projects.
  • Development projects shifted from last quarter to quarter 1, with a few possibly going to quarter 2.
    Show source
    So this is the reason basically mostly that the development projects have been shifted, in fact, from last quarter to quarter 1, maybe a few of them will go to quarter 2.
  • The company renegotiated module prices after securing a cushion in the project schedule, using the prevailing market price to increase its bottom line in Q1 FY '26.
    Show source
    That was our business strategy and that has supported us to increase the bottom line.
  • The company had around INR330 crores of receivables outstanding for more than 6 months, out of total receivables of around INR1,500 crore; the claim under note 7A is not indemnifiable, and an adverse order could affect P&L but not cash flow because the cash is already out.
    Show source
    It's around INR330 crores, out of total receivables of around INR1,500 crore.
  • Delays on account of customer input were not going to impact Sterling and Wilson Renewable Energy Limited's project finances.
    Show source
    So in any case, on our project finances because of delays on account of the customer input is not going to impact us.
  • International projects in South Africa, Spain and Italy are profitable, while subsidiaries in the U.S., Australia and Dubai with no projects incur losses from overheads.
    Show source
    Ajit Singh: So in international, whatever projects we are doing, those all are in profits, in South Africa, Spain and Italy, all are making profits.
  • Legacy projects had losses because of legal expenses and overheads in projects in Dubai, Australia and the U.S.
    Show source
    Ajit Singh: Legacy projects, they have losses because of -- primarily because of the legal expenses and certain overheads we have in those projects, like, as I said, in Dubai, Australia, U.S. Moderator: Thank you.

Money and capital

  • The company impaired around INR21 crores of receivables on a conservative basis for one of its international projects in Q1 FY '26, making other expenses higher.
    Show source
    Our net debt has increased by around INR205 crores during the current quarter.
  • The company took an INR200 crores disbursement from Bank of Maharashtra last quarter and used that amount in Q1 FY '26.
    Show source
    Because last quarter, we've taken disbursement from Bank of Maharashtra for INR200 crores, and that amount was utilized in the first quarter.
  • The company obtained fresh sanctions from 3 new banks for around INR900 crores and received surety bonds of around INR200 crores.
    Show source
    We have also made progress on our banking limits front and have obtained fresh sanctions from 3 new banks for around INR900 crores, plus surety bonds of around INR200 crores we have got.
  • The company received new bank sanctions of around INR900 crores in Q1 FY '26 after its rating was upgraded to BBB+, and expects to get additional lines of around INR1,500 crores this year.
    Show source
    Over and above, we are also speaking to our existing consortium members, as well as few new banks, and we are hopeful to get additional around INR1,500 crores lines in this year.
  • The company received a two-notch rating upgrade to BBB+ for its working capital facilities and term loan.
    Show source
    A key development that I would like to highlight is a two-notch rating upgrade to BBB+ that we have received for our working capital facilities and term loan.
  • The company received favorable indications from existing consortium banks and a few new banks for its request for additional credit lines.
    Show source
    We have also received favorable indications from our existing consortium banks as well as few new other banks for a request for additional credit lines.
  • Improved credit rating has helped it obtain reduced LC and BG charges going forward, with significant progress made with some consortium members.
    Show source
    Our improved credit rating has also helped us in getting our LC and BG charges reduced going forward, and we have made significant progress in that direction with some of the consortium members.
  • The company has inducted three insurance companies and is using surety bonds as a replacement for its EMD and performance guarantee requirements.
    Show source
    Over and above, we also got surety bonds from insurance companies, 3 insurance companies we have inducted and now using surety bonds also -- as the replacement of our EMD and performance guarantee requirement.

What it expects ahead

What management expects

  • The company expects the majority of its domestic pipeline to be awarded before December '25.
    Show source
    We expect the majority of this domestic pipeline to be awarded before December '25.
  • The company expects large opportunities from projects pushed to quarter 2 and quarter 3 and is sure it is well placed to follow the guidance it gave investors.
    Show source
    So from our side, although the Q1 has been a little lumpy, but we are sure that with all the push to quarter 2 and quarter 3, there would be large opportunities, and we are well placed to follow the guidance that we have given to the investors.
  • The company said it would grow order booking by 20% year on year, doing better than in the last financial years.
    Show source
    So for sure, I mean, what was achieved during last financial years, we will be doing better than the last ones at the rate of, say, 20% growth on the order booking.
  • The company could capture around 400, 500 megawatt of hours of battery space in this financial year going forward, from a 3 gigawatt opportunity.
    Show source
    Thakur: As of now, I mean, let's say, in 3 gigawatt, if you are able to grab around 400, 500 megawatt of hours, that would be the combination of our total battery space in this financial year going forward.
  • Battery business in this financial year could be miniscule, around 500-megawatt hour; the company said the percentage was difficult to say at this stage.
    Show source
    But going forward, in this particular financial year, could we -- percentage-wise difficult to say at this stage, but could be miniscule, let's say, 500-megawatt hour kind of thing.
  • The company expected 20% revenue streams throughout the country going forward from battery solutions under the new scheme.
    Show source
    Page 10 of 17 Sterling and Wilson Renewable Energy Limited July 18, 2025 So with this, you can expect that now going onwards, 20% revenue streams would be throughout the country.
Show 26 more statements

What management expects

  • The company expected most tenders to come under the battery scheme in quarter 2 and quarter 3, although tenders had not yet started coming out.
    Show source
    And then tenders have not started coming out, but I'm expecting that the quarter 2, quarter 3, most of the tenders will come on this scheme.
  • It would be reasonable to assume that at least 10% of revenue streams would come from battery and other storage solutions.
    Show source
    And therefore, I mean, it would be reasonable to assume that at least 10% revenue streams would be coming from the battery and the other storage solutions.
  • Operational EBITDA was around 7% for the quarter, and its overall EBITDA was around 5.8%; management expects to maintain the same overall EBITDA range going forward.
    Show source
    And overall EBITDA was around 5.8%, and we expect to maintain the same range going forward.
  • The company expects revenue growth of 20% year-on-year and order booking growth of around 20% from last year to this year; it expects next quarter's revenue to be similar or a little better, but slightly cyclical because of productivity loss during the monsoon season.
    Show source
    On the order guidelines that you have asked for, so I've already told that I mean, you should be expecting, let's say, 20% over and above the last financial year, right.
  • Legal expenses will be around INR40 crores per year.
    Show source
    Ajit Singh: Yes, it will be around INR40 crores per year.
  • BoS revenue could be around INR30 lakhs to INR40 lakhs per megawatt hour.
    Show source
    And on the second question, basically, on the BoS side, so let's say, the BoS revenue could be around INR30 lakhs to INR40 lakhs per megawatt hour kind of thing, right?
  • The company targets $250 million to $300 million of orders this financial year, primarily split between European and African markets; the Nigeria project is on but delayed by procedural matters and would require financial closures and NTP before proceeding.
    Show source
    So in our business model, if you see for this year, financial year, our target is to get around $250 million to $300 million orders, primarily in European and the African markets, it is split between these 2.
  • The company expects a meaningful pickup in O&M segment revenues from second half of FY '26, as EPC projects nearing completion in the next few quarters will feed a pipeline of new O&M projects.
    Show source
    As we commission our large stream of EPC projects, which are nearing completion, it will feed our O&M portfolio and should aid a meaningful pickup in revenues in this segment from second half of FY '26.
  • The company was discussing large hybrid orders with a few private clients; the expected orders would include solar, wind and battery storage.
    Show source
    I don't want to name those clients at this stage, but then yes, there are a few large-sized orders which are expected.
  • Reliance was still planning projects in the Kutch regions and other areas.
    Show source
    Other than these projects, then they are still planning for the Kutch regions and other areas.
  • The company said battery share would increase going forward to avoid intermittencies of solar renewables and other renewables.
    Show source
    So the share will increase.
  • The company expects new orders from international locations and is bidding in some geographies and in active discussions.
    Show source
    Ajit Singh: So in terms of order book, we are expecting new orders from international locations also.
  • The company does not expect any substantial write-off in receivables because most legacy receivables are indemnified and current receivables are booked.
    Show source
    And we don't expect any substantial write-off in terms of any receivables, because most of the receivables are indemnified (legacy ones) and current receivables, these are all booked.
  • The company will not receive revenue from the Nigeria project this year.
    Show source
    So the revenue for this year will not come from this project.
  • Most tenders were expected to be with the BoS schemes this year because of the ALMM requirements. Replaced by a later filing.
    Show source
    This year, the trend could be reversed because of the ALMM requirements, most of the tenders are expected with the BoS schemes.

Orders

  • Bid pipeline exceeded 30 gigawatts, including over 26 gigawatt for India.
    Show source
    This push out has resulted in our bid pipeline growing significantly, and now exceeds 30 gigawatts, including over 26 gigawatt pipeline for India alone.
  • The company was declared L1 for turnkey orders for a 290-megawatt projects in Gujarat worth approximately INR813 crores from a leading PSU.
    Show source
    We started this fiscal year by bagging our first turnkey orders when we were declared L1 for a 290-megawatt projects in Gujarat worth approximately INR813 crores from a leading PSU.
  • Unexecuted order book was approximately INR8,348 crores as of June 2025 and is expected to improve with a pickup in domestic and international order inflows.
    Show source
    Our unexecuted order book was approximately INR8,348 crores as of June 2025 and is expected to improve going forward with a pickup in domestic and international order inflows.
  • Over 88% of Sterling and Wilson Renewable Energy Limited’s order book comprised domestic Indian projects, while its international UOV comprised primarily 2 projects each in Europe and South Africa.
    Show source
    Over 88% Page 2 of 17 Sterling and Wilson Renewable Energy Limited July 18, 2025 of this order book comprises domestic Indian projects while the international UOV comprises primarily 2 projects each in Europe and South Africa.
  • Quarter 2 pipeline seems very strong.
    Show source
    But quarter 2 pipeline seems to be very, very strong.
  • First order won in Q1 FY '26 included modules.
    Show source
    And out of that, we have won, the first one that we have won, right, in the first quarter, this is with modules.
  • The company has been focusing on select PV and BESS projects in Africa and Europe, where its international pipeline appears very promising.
    Show source
    Our international pipeline also appears very promising, and we have been focusing on select PV and BESS projects in Africa and Europe.
  • EPC business has lumpy order inflows, and project closure timelines could vary depending on finalization of contractual terms and land and transmission availability issues.
    Show source
    Our EPC business is lumpy in terms of order inflow, and time lines for achieving projects closures could vary depending on a host of factors, including finalizations of contractual terms, land and transmission availability related issues.
  • The company is increasingly seeing attractive international EPC opportunities, primarily in Africa and Europe.
    Show source
    On the international EPC side, we are increasingly seeing attractive opportunities opening up primarily in Africa and Europe.
  • The company is seeing a good number of European BESS projects to complement the renewable spurt in the market.
    Show source
    We are also seeing a good number of European BESS projects to complement the renewable spurt seen in the market.
  • Existing order book has no DCR components; its orders are for international sale and the module side, and the orders are not affected by the DCR deadline.
    Show source
    And otherwise, you can say in 9 months' time, if everybody decides to go for the international these things - but the best part is that in our existing order book as of now, we don't have anything which is DCR components.

What it is building and selling

Projects and capacity

  • Khavda 1 had almost been sorted, with about 100-megawatt module supply still pending.
    Show source
    Thakur: So basically, out of 2 projects, one project Khavda 1 has almost been sorted, hardly 100- megawatt module supply is still pending.
  • Khavda 2 had received around 200-megawatt of modules, with the remaining supply underway; module supply had been delayed and the monsoon was still impacting the project.
    Show source
    And around 200-megawatt kind of modules have been supplied and rest is underway.
  • The expected EPC cost for battery projects is between INR2.5 crores to INR4 crores per megawatt.
    Show source
    Thakur: So the battery price is constantly evolving, but the EPC cost on this, you should be expecting between INR2.5 crores to INR4 crores per megawatt.
  • The company was doing one of the largest solar projects for one of its clients. Replaced by a later filing.
    Show source
    As of now, for us, we are better placed because we are doing one of the largest projects for one of the clients in the solar.

Demand and pricing

  • India had only 205 megawatt of battery capacity added as of the call, while around 3 gigawatt of battery storage pipeline clarity had emerged.
    Show source
    But in the pipeline seems to be, as I told in my -- the opening speech also, so around 3 gigawatt clarity has come out, right, so various options and other things.
  • Infrastructure players entered solar EPC in a spurt this quarter, and some entrants take 1 or 2 projects, are unable to execute, and exit.
    Show source
    This quarter, you have seen a spurt of a lot of infrastructure players coming for the solar EPC and all.
Show 12 more statements

Demand and pricing

  • The company expects future bids for battery projects from both PSUs and IPPs; large-sized orders gaining traction are currently coming from IPPs, while NTPC and other PSUs are discussing long-term plans for scaling up battery storage.
    Show source
    But the traction will happen in both the sectors, PSU and IPPs.
  • People are looking at the solar EPC market as very attractive. Replaced by a later filing.
    Show source
    But yes, people are looking for this as a very attractive market.
  • Competition in solar EPC will be there for some time, in C.K. Thakur’s opinion. Replaced by a later filing.
    Show source
    So this competition is still -- in my opinion, will be there for some time.

Segments

  • O&M portfolio stood at 9.3 gigawatt as of June 2025.
    Show source
    Our current portfolio stands at 9.3 gigawatt as of June 2025.
  • Battery energy storage system projects have the same margin as solar projects and take 15% to 20% less time because they involve less complexity and civil work.
    Show source
    So you can say, 15% to 20% less time lines and same margin.
  • The company will continue to target BESS projects and select hybrid wind EPC projects in addition to its solar EPC pipeline.
    Show source
    Over and above the solar EPC pipeline we will continue to target BESS projects and select hybrid wind EPC projects as well.
  • The company is targeting strategic third-party O&M contracts in India and overseas that can be accretive to its existing portfolio.
    Show source
    In addition to our organic O&M portfolio growth, we are also targeting strategic third-party O&M contracts, which can be accretive to our existing portfolio, both in India and overseas.
  • Developers will take the modules in their scope and provide Sterling and Wilson Renewable Energy Limited with the free issue items, a trend the company was expecting because of uncertainty on the ALMM II decisions.
    Show source
    So, they will take the module in their scope and give us the free issue items.
  • The company will do only BoS in battery projects.
    Show source
    Ajit Singh: So we will do only BoS in battery projects.
  • Battery projects in the domestic market are mostly BoS, while outside India they could include battery supply; Sterling and Wilson Renewable Energy Limited has done a few small projects in Mali and Nigeria along with battery supply.
    Show source
    So in the domestic market, you see mostly the BoS, but outside, it could be with battery.
  • The company may offer a turnkey solution for projects with batteries after careful evaluation.
    Show source
    Now even if it is with battery, we'll carefully evaluate and we can go with a turnkey solution.

Deals and partners

  • The company was doing 1 pilot project for Reliance, combining various technologies.
    Show source
    So basically, all of you are aware that we are doing 1 pilot project for them and that is the combination of various technologies and all.

Risks, rules and outside factors

Risks and disputes

  • The company had given NTPC a notice for time extensions and a claim because of the delays.
    Show source
    But then because of all such delays, we have given very strong notice for time extensions and the claim to NTPC.
  • A battery project Sterling and Wilson Renewable Energy Limited was doing last year had gone under the legal route with SECI and was not stalled.
    Show source
    Last year, there was hardly anything. one of the projects which we were doing, unfortunately, it has gone under the legal route with SECI and all.
  • Legal expenses will continue for at least some time because most legal cases are continuing.
    Show source
    In terms of legal expenses, because still most of the legal cases are continuing, the legal expenses also will continue at least for some time period.

Outside factors

  • Connectivity issues, including large substations in Rajasthan and Gujarat planned by March 2025 that were pushed towards '25, '26, were another reason projects were pushed into quarter 1 and quarter 2.
    Show source
    The other reasons for the projects being pushed to quarter 1 and quarter 2 is basically some of the connectivity’s issues, so connectivity’s which were all planned by March 2025 have been pushed towards '25, '26, particularly in Rajasthan and Gujarat - some of the large size substations and all.
  • The company benefited in Q1 FY '26 from lower module prices on portions of modules supplied during the quarter, as tariff-related market availability and demand issues lowered module prices.
    Show source
    And some of the modules that -- the portions of modules that were supplied during this quarter that has given us advantage.
  • The company has around 1 to 2 months between order placement and its understanding of the project, which has supported renegotiating for better module pricing.
    Show source
    So that has supported us to renegotiate better and get the pricing.
Show 9 more statements

Outside factors

  • Developers applied for relief on project timelines, contributing to project delays for Sterling and Wilson Renewable Energy Limited.
    Show source
    So all of the developers have applied for the relief on the time lines for the projects.
  • The company said it was protected from module price inflation because the order had already been placed.
    Show source
    So we were, in any case, protected.
  • The time between Sterling and Wilson Renewable Energy Limited receiving an order and placing an order for modules has helped it negotiate better terms.
    Show source
    Ajit Singh: So there has been a difference between we getting the order and placing order for modules - that also help us in better negotiation of terms.
  • Battery cost for solar plants was more or less comparable to solar cost, and slightly higher. Replaced by a later filing.
    Show source
    So let's say, if you have INR100 revenue, so for sure, then the battery cost of the solar plants and this, I mean, more or less being comparable, slightly higher from the solar and all.

Rules and policy

  • Approval to extend ISTS waivers had not been given as of Q1 FY '26, while industries, particularly in C&I sectors, expected an extension to preserve the tariff advantage committed in their pricing.
    Show source
    Other is that the ISTS waivers, people are seeking approval for extension, which has not been given as of now.
  • The ISTS waivers had not been announced as of Q1 FY '26, impacting the overall growth of the industries.
    Show source
    So the ISTS waivers, of course, not announced as of now, but this is impacting the overall growth of the industries.
  • Under the new Government of India scheme, new tenders would require 20% of solar plant capacity to be supported with battery installation.
    Show source
    So under this scheme, every single tender which will come out, that will be, I mean, demanding the battery installation of 20%.
  • The deadline for the DCR is 1st June 2026; in 9 months' time, the market has a 26, 27 gigawatt opportunity, and 27 megawatts have to be added, with an extension of timelines needed.
    Show source
    And I mean, now in 9 months' time, out of the 26, 27 gigawatt opportunity that you are seeing in the market, right.
  • ALMM II requirements for the cell and uncertainty about how domestic solar modules could be produced and at what price were among the reasons project orders were pushed from previous quarters to Q1 and possibly Q2.
    Show source
    So primarily the order has been pushed from the last few quarters to Q1, to maybe Q2 also, mainly because of few reasons, one prominently could be the ALMM II requirements for the cell and industry just watching to see that how the domestic solar modules could be produced and what price and all.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Kunal Shah: So just a couple of things. So one, on the muted order inflow bit, could you just help -- I mean you did touch upon it, but was it more to do with the overall tendering activity being soft? Or are you still letting go off orders due to aggressive competitive intensity? And related to that, how do you see now for the full year order inflow shaping up? Like, do we maintain the previous guidance? Page 5 of 17 Sterling and Wilson Renewable Energy Limited July 18, 2025 C.K.

    Answer, c.k thakur

    Thakur: Yes. So primarily the order has been pushed from the last few quarters to Q1, to maybe Q2 also, mainly because of few reasons, one prominently could be the ALMM II requirements for the cell and industry just watching to see that how the domestic solar modules could be produced and what price and all. So all of the developers have applied for the relief on the time lines for the projects. That is one of the reasons. The other reasons for the projects being pushed to quarter 1 and quarter 2 is basically some of the connectivity’s issues, so connectivity’s which were all planned by March 2025 have been pushed towards '25, '26, particularly in Rajasthan and Gujarat - some of the large size substations and all. So from our side, although the Q1 has been a little lumpy, but we are sure that with all the push to quarter 2 and quarter 3, there would be large opportunities, and we are well placed to follow the guidance that we have given to the investors.

  2. Question

    Kunal Shah: Understood. Just wanted to confirm, you mentioned about relaxation on ALCM time line, right? What we are sort of trying...

    Answer, c.k thakur

    So this is the reason basically mostly that the development projects have been shifted, in fact, from last quarter to quarter 1, maybe a few of them will go to quarter 2. But quarter 2 pipeline seems to be very, very strong.

  3. Question

    Kunal Shah: Understood. And one last thing on the banking limits, like over the last 12-odd months, there has been like a slew of ratings upgrade consistently, but the commensurate increase in limits -- actual available limits from the banks has been like very slow. So how do you think of LCs opening up over the next 3 to 4 months? Like could you just help with the current positioning? And how do you see the non-fund-based limits opening up? Page 6 of 17 Sterling and Wilson Renewable Energy Limited July 18, 2025 Ajit Singh: So this year, we have seen quite good progress this quarter, rating got upgraded now to BBB+ and that has helped us in achieving new sanctions for around INR900 crores fr

    Answer, ajit singh

    Over and above, we are also speaking to our existing consortium members, as well as few new banks, and we are hopeful to get additional around INR1,500 crores lines in this year.

  4. Question

    Kunal Shah: So you're saying INR900 crores plus INR1,500 crores is the total number, right, that we are looking at? .

    Answer, ajit singh

    Ajit Singh: Right. Over and above, we also got surety bonds from insurance companies, 3 insurance companies we have inducted and now using surety bonds also -- as the replacement of our EMD and performance guarantee requirement.

  5. Question

    Kunal Shah: Understood. And just one last bit on the bookkeeping, like you mentioned about softening of input costs in your presentation for the reason for improvement in gross margin. Now could you just touch upon here, like what are these costs, I mean, in that sense?

    Answer, c.k thakur

    C.K. Thakur: Yes. So what Ajit had mentioned about the input cost is basically a few of the orders that you had was with the turnkey solutions, right, so including the modules and all. So, because of the tariff war and all those things, U.S. imposing and others. So there was a good amount of the modules available in the market, right? So because of the overall requirements -- demand issues, so the module prices have gone down. And some of the modules that -- the portions of modules that were supplied during this quarter that has given us advantage.

  6. Question

    Kunal Shah: Sir, just -- sorry for one of this follow-up, but it should not benefit or the margin should not be upwards or downwards, right, because of the back-to-back billing. So could you just help here because irrespective of module pricing going up or down, because we are doing back-to-back billing to hedge ourselves, why should it even be advantageous?

    Answer, c.k thakur

    C.K. Thakur: So basically, when we have got the project, it was ex-price of module suppose, right. And we have seen that we had cushion in the project schedule. And going forward, then we renegotiated the price of the modules. And the price that was fixed, I mean, have gone under change to take advantage of the existing market price. That was our business strategy and that has supported us to increase the bottom line.

  7. Question

    Kunal Shah: But sir, this strategy can work the other way around as well, right, in case if there is any inflationary bet on the modules. So just wanted to understand.

    Answer, c.k thakur

    C.K. Thakur: No, but then the order was not stopped. The order was already, I mean, placed. So we were, in any case, protected.

  8. Question

    Kunal Shah: That's it from my side. This is very helpful. Sorry, sorry, go ahead. Page 7 of 17 Sterling and Wilson Renewable Energy Limited July 18, 2025 C.K.

    Answer, c.k thakur

    Thakur: Yes. So you have around 1 to 2 months' time between the order placement and all this kind of understanding. So that has supported us to renegotiate better and get the pricing.

    Answer, ajit singh

    Ajit Singh: So there has been a difference between we getting the order and placing order for modules - that also help us in better negotiation of terms.

    Answer, c.k thakur

    C.K. Thakur: Yes. So last call, if you can recall, so we are giving guidance to the market that we will be growing at 15% to 20% on a year-on- year basis. So for sure, I mean, what was achieved during last financial years, we will be doing better than the last ones at the rate of, say, 20% growth on the order booking.

  9. Question

    Akshay Mane: Okay. Okay. And another thing, see there was this news regarding the ISTS waiver getting expired now. Is there any further update on extension of the same or if there is any clarity on that policy, which will actually hamper further round of bidding or any of that sort?

    Answer, c.k thakur

    C.K. Thakur: Firstly, also I think this is one of the reasons, apart from the ALMM II that I spoke. So connectivity is also an issue. So, one, that the infrastructure readiness is getting delayed. Other is that the ISTS waivers, people are seeking approval for extension, which has not been given as of now. But then the industries, particularly in C&I sectors, they are expecting that this to come, right, so that they can get the -- I mean, the advantage on to the tariff that they have committed in terms of pricing and all. So yes, you are right.

    Answer, c.k thakur

    So the ISTS waivers, of course, not announced as of now, but this is impacting the overall growth of the industries.

  10. Question

    Akshay Mane: Okay. Okay. And just lastly, any update on the couple of projects? I mean I think there was this NTPC project where we were facing delays because of module supplies. So, I believe that would have been sorted currently?

    Answer, c.k thakur

    C.K. Thakur: So basically, out of 2 projects, one project Khavda 1 has almost been sorted, hardly 100- megawatt module supply is still pending. But Khavda 2, yes, it is not sorted because we thought Page 8 of 17 Sterling and Wilson Renewable Energy Limited July 18, 2025 of the project getting commissioned by June, July, but the module supply has been delayed. And around 200-megawatt kind of modules have been supplied and rest is underway. The monsoon is still impacting. So the project would be further going on. But then because of all such delays, we have given very strong notice for time extensions and the claim to NTPC.

    Answer, c.k thakur

    So in any case, on our project finances because of delays on account of the customer input is not going to impact us.

    Answer, c.k thakur

    C.K. Thakur: Percentage-wise, see 2 things. One, that until last financial years, some of the orders, which were placed to an EPC player that has been canceled, those were with the modules and that have come up now for the finalizations. And out of that, we have won, the first one that we have won, right, in the first quarter, this is with modules. So in the last financial year, if you see percentage- wise, it could be around 25% to 30%, right? This year, the trend could be reversed because of the ALMM requirements, most of the tenders are expected with the BoS schemes. Puneet: Understood.

    Answer, c.k thakur

    C.K. Thakur: No. I mean it will be the responsibility of the developers. So, they will take the module in their scope and give us the free issue items. So that's the trend we are expecting, because of the uncertainty on the ALMM II decisions and all. Puneet: Secondly, if you can also comment a bit more on the color of your order inflow for this quarter. Was there any battery projects and who are the key customers for you in this quarter?

    Answer, c.k thakur

    C.K. Thakur: I mean trend is reversing. So now people are going under FDRE schemes or to remove the intermittency of the renewable energy nature. People are going more for the hybrid. So that's the trend we've seen. Of course, as of today, if you see in the country, we have only 205 megawatt battery capacity, which we added. But in the pipeline seems to be, as I told in my -- the opening speech also, so around 3 gigawatt clarity has come out, right, so various options and other things.

    Answer, c.k thakur

    For us, I mean, for sure, we are discussing with a few private clients, which are of the large size of the hybrid orders. That will I mean, the solar, that will include the wind and the battery storage. I don't want to name those clients at this stage, but then yes, there are a few large-sized orders which are expected. Puneet: But in Q1, none of those are there. It's fair to assume that?

    Answer, c.k thakur

    Thakur: Yes. So basically, all of you are aware that we are doing 1 pilot project for them and that is the combination of various technologies and all. The project is doing well. Other than these projects, then they are still planning for the Kutch regions and other areas. So I mean, frankly speaking, the opportunities are not reflected in the market. But as and when it comes. I mean, all of you will come to know that.

    Answer, c.k thakur

    C.K. Thakur: If you see the total -- I mean, the plan for the financial year -- the coming financial year, the next 9 months, 3 gigawatts out of the total 26 gigawatt opportunity in India, 3 gigawatt battery storage visibility is there. So, I mean, out of 26 gigawatt kind of batteries, so I understand this is around 15%, right. But as I have told in the previous answer, that the trend is reversing now under the FDRE schemes and the hybrid projects installation schemes and all. So going forward, the battery share has to improve to avoid the intermittencies of the renewables -- the solar renewables and the others. So the share will increase. As of now, for us, we are better placed because we are doing one of the largest projects for one of the clients in the solar.

Show 12 more questions
  1. Question

    Anuj Jain: So sir, what is the revenue percentage contribution from this space as of now?

    Answer, c.k thakur

    C.K. Thakur: As of now, I mean, let's say, in 3 gigawatt, if you are able to grab around 400, 500 megawatt of hours, that would be the combination of our total battery space in this financial year going forward. Last year, there was hardly anything. one of the projects which we were doing, unfortunately, it has gone under the legal route with SECI and all. So that project is not stalled basically. But going forward, in this particular financial year, could we -- percentage-wise difficult to say at this stage, but could be miniscule, let's say, 500-megawatt hour kind of thing.

  2. Question

    Anuj Jain: And second question, sir, I mean like you have...

    Answer, c.k thakur

    C.K. Thakur: So what I say the interesting point here is that under the new scheme of the Government of India, now for all the new tenders, 20% capacity of the solar plants have to be supported with the battery, right. But this traction has started showing just now. So under this scheme, every single tender which will come out, that will be, I mean, demanding the battery installation of 20%. So let's say, if you have INR100 revenue, so for sure, then the battery cost of the solar plants and this, I mean, more or less being comparable, slightly higher from the solar and all. Page 10 of 17 Sterling and Wilson Renewable Energy Limited July 18, 2025 So with this, you can expect that now going onwards, 20% revenue streams would be throughout the country. The industrial scenario would be like this.

    Answer, c.k thakur

    But I mean, this traction is to be seen. This is the policy. And then tenders have not started coming out, but I'm expecting that the quarter 2, quarter 3, most of the tenders will come on this scheme. And therefore, I mean, it would be reasonable to assume that at least 10% revenue streams would be coming from the battery and the other storage solutions.

  3. Question

    Anuj Jain: Got it, sir. Got it. And my second question is like we have increased gross margin in this particular quarter and our EBITDA margins are hovering in the range of 5-odd percent. So, from the perspective of next 2 to 3 years or 4 years, what is the -- I mean, guidance which you can give for the EBITDA margins and gross margins? I mean, definitely, it should be a range -- kind of range where we want to be. I mean what are the expected levels of EBITDA margin where we want to go?

    Answer, ajit singh

    Ajit Singh: Yes. So our operational EBITDA, if you see it's around 7% for the quarter. And overall EBITDA was around 5.8%, and we expect to maintain the same range going forward.

  4. Question

    Anuj Jain: Okay. Okay. So that is our comfortable range.

    Answer, c.k thakur

    C.K. Thakur: No. So the management -- I mean, the shareholding patterns is on the public domain, right? And Mr. Khurshed Daruvala is well involved into the company, as the Chairman of the company. So as far as the management controls and other things are there, it is with the professionals under the guidance of Chairman, Mr. Daruvala. On the order guidelines that you have asked for, so I've already told that I mean, you should be expecting, let's say, 20% over and above the last financial year, right. So, we are well placed.

  5. Question

    Faisal Hawa: So sir, one more question is that with the overseas orders now coming down and a large part of the central office expenses were coming from legal expenses, do you feel that these expenses now could go down a lot because that is what is causing our EBITDA margin to go down because of these large legal expenses? And also, do we expect any kind of large write-offs in this year on the debtor front?

    Answer, ajit singh

    Ajit Singh: So in terms of order book, we are expecting new orders from international locations also. We are bidding in some of the geographies and are in active discussions. So that will come. In terms of legal expenses, because still most of the legal cases are continuing, the legal expenses also will continue at least for some time period.

  6. Question

    Faisal Hawa: So for 2 more financial years?

    Answer, ajit singh

    Ajit Singh: Yes, it will be around INR40 crores per year.

  7. Question

    Faisal Hawa: So in 2 years from today, maybe these expenses will come down to 0?

    Answer, ajit singh

    Ajit Singh: Right. And we don't expect any substantial write-off in terms of any receivables, because most of the receivables are indemnified (legacy ones) and current receivables, these are all booked.

  8. Question

    Faisal Hawa: Okay. And sir, is the competitive intensity in the EPC players going down? Or is it still very high?

    Answer, c.k thakur

    C.K. Thakur: No. So the competitive spree, of course, is going high sometimes, I can say. This quarter, you have seen a spurt of a lot of infrastructure players coming for the solar EPC and all. I'm not sure how long and how best they can be continuing on, but then yes, it is cyclic. So sometimes you see that, I mean, there are only a few, but suddenly, you find so many people coming in, they take 1 or 2 projects, not able to execute, again they will exit. So this kind of situation is there. But yes, people are looking for this as a very attractive market.

    Answer, c.k thakur

    So this competition is still -- in my opinion, will be there for some time.

    Answer, c.k thakur

    C.K. Thakur: No. So that's what I was just speaking. So as of now, the deadline for the DCR is is 1st June 2026, right. And I mean, now in 9 months' time, out of the 26, 27 gigawatt opportunity that you are seeing in the market, right. I mean people are just waiting. I mean, this 27 megawatts have to be added, there has to be extension of the time lines. So that is one particular point.

    Answer, c.k thakur

    And otherwise, you can say in 9 months' time, if everybody decides to go for the international these things - but the best part is that in our existing order book as of now, we don't have anything which is DCR components. Everything is basically the international sale and the module side. So, we don't have the -- in the UOV and the orders that we are getting, it is not affected because of this. Page 12 of 17 Sterling and Wilson Renewable Energy Limited July 18, 2025 Moderator: We take the next question from the line of Nitin Gosar from BOI Mutual Fund.

    Answer, c.k thakur

    C.K. Thakur: So the battery price is constantly evolving, but the EPC cost on this, you should be expecting between INR2.5 crores to INR4 crores per megawatt.

  9. Question

    Nitin Gosar: Okay. And there is pure EPC or this will also include the component, I mean, the battery itself?

    Answer, ajit singh

    Ajit Singh: So we will do only BoS in battery projects.

    Answer, c.k thakur

    C.K. Thakur: So basically trend is that the battery is being supplied by them from PSUs. Outside India, basically battery, it comes with the battery supply. So we have to tie up. So we did a few small projects in Mali, Nigeria, which were along with the battery and all. So it is both basically. So in the domestic market, you see mostly the BoS, but outside, it could be with battery.

    Answer, c.k thakur

    Now even if it is with battery, we'll carefully evaluate and we can go with a turnkey solution. So I mean that's fine.

  10. Question

    Himanshu Dugar: Sir, currently, what is the more than 6 months receivables outstanding, if you could share that number?

    Answer, c.k thakur

    So any -- going forward, whatever bids will be coming, that will be both the PSU and IPP. As of now, the large-sized few orders which are getting traction in the market is basically coming from IPPs, which is visible. But for PSU side, if you see, I mean, NTPC and all, they are discussing on the long-term basis because they have to go forward with massive scaling up of the battery and storage and all. But no such one tender was there for the small project that has also been canceled because of some reasons. But the traction will happen in both the sectors, PSU and IPPs. Coming to your another questions of how difficult it would be to integrate in the existing facilities? It all depends on the land and level.

  11. Question

    Chirag Shah: Yes, sir.

    Answer, c.k thakur

    C.K. Thakur: Margin would be same as the solar projects. And in terms of time lines, it will be lesser than the solar projects because the complexity involved here is less, the civil works requirement is less. So you can say, 15% to 20% less time lines and same margin.

    Answer, c.k thakur

    C.K. Thakur: Yes. So first, I'll answer your first question. So on the revenue guidance, as I've already told that I it's a 20% growth year-on-year. So from last year to this year, it will be around 20% on the order booking side also in the same region. For the next quarter's revenue, we could have been expecting similar or a little better, but because of the productivity loss during the monsoon season and all, so it would be slightly cyclic, right? And on the second question, basically, on the BoS side, so let's say, the BoS revenue could be around INR30 lakhs to INR40 lakhs per megawatt hour kind of thing, right?

  12. Question

    Vedant Sarda: Okay. So sir, quarter-on-quarter, we should not see in this revenue?

    Answer, c.k thakur

    C.K. Thakur: Yes. So in our business model, if you see for this year, financial year, our target is to get around $250 million to $300 million orders, primarily in European and the African markets, it is split between these 2. On the Nigeria side, it is a procedural delay. Unfortunately, it is taking longer time. But yes, the project is on. And as you have rightly told that even if it comes, it will take some time, right, financial closures and the NTP and all.

Questions about this call

When was the Sterling and Wilson Renewable Energy Q1 FY26 earnings call transcript filed?
Sterling and Wilson Renewable Energy filed the transcript with the exchange on 24 Jul 2025. This page is built from that transcript.
What does this page list?
92 statements from the transcript across 11 topics, 52 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 22 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
Sterling and Wilson Renewable Energy Q1 FY26 concall: Sterling and Wilson Renewable Energy Limited’s bid pipeline exceeded 30 gigawatts, including over 26 gigawatt for India · DalalOS