Earnings call
Tejas Networks Q3 FY25 earnings call: Tejas Networks' closing backlog was INR2,681 crores
By DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person.
Transcript filed .
Tejas Networks' closing backlog was INR2,681 crores. The company said most BharatNet Phase 3 tender results had been announced and some orders had started to be placed; system integrators were expected to start engaging with OEMs for product supplies over this quarter and early next quarter. Tejas Networks' net revenues were INR2,642 crores in Q3 FY '25, a significant growth over FY '24. Tejas Networks' radios were developed over 5 different bands from 700 Megahertz to 2.6 Gigahertz and include both single band and dual band offerings. Tejas Networks' closing borrowing position was around INR3,157 crores and cash was INR643 crores.
The numbers management gave
Results
- Tejas Networks' net revenues were INR2,642 crores in Q3 FY '25, a significant growth over FY '24.
Show source
Our Q3 net revenues were INR2,642 crores, which is a sign ificant growth over FY '24.
- Tejas Networks' PAT was INR166 crores and its order book was INR2,681 crores at the end of Q3 FY '25.
Show source
The Q3 PAT was INR166 crores and the order book at the end of the Q3 was INR2,681 crores.
- The company completed RAN supplies for 27,000 plus sites in Q3 FY '25, bringing total sites delivered to 86,000 plus for BSNL's 4G /5G network.
Show source
In terms of the highlights for the quarter, some of the significant events that happened are the following: For the wireless business, we have completed RAN supplies for 27,000 plus sites in this quarter, leading to a total of 86,000 plus sites delivered till date in BSNL's 4G /5G network.
- Tejas Networks' revenue was INR2,497 crores and other operating revenue, mainly the PLI incentive, was about INR145 crores in Q3FY '25; total revenue from operations was INR2,642 crores, roughly 4.7x of the previous year.
Show source
So total revenue from operations is INR2,642 crores, which is roughly about 4.7x of the previous year.
- Tejas Networks' EBIT was INR260 crores, PBT was INR211 crores and PAT was INR166 crores in Q3FY’25.
Show source
Q3FY’25 EBIT was INR260 crores, PBT of INR211 crores and PAT of INR166 crores.
- Tejas Networks' profitability was lower than the previous quarter mainly due to a change in product mix, provisions for old inventory and higher depreciation for certain R&D equipment in Q3FY '25.
Show source
The margins or profitability are a bit lower than the previous quarter, and that's mainly on account of change in product mix.
Show 14 more statements
Results
- Tejas Networks' inventory was INR3,127 crores, down marginally over the previous quarter in Q3FY '25.
Show source
Moving on to the next page, our inventory levels stand at INR3,127 crores, come down marginally over the previous quarter.
- The company collected about INR2,000 crores during the quarter.
Show source
We've collected about INR2,000 crores during this quarter.
- India government business was 3% of Tejas Networks' revenue for 9M, with a year-over-year decline of 40%.
Show source
So in terms of revenue mix, in the India government business has been 3% of our revenue, and there has been a year-over-year decline of 40%.
- Tejas Networks' high inventory was mainly due to ongoing project execution and procurement of high lead time items for future projects.
Show source
Inventory continues to be high mainly due to the ongoing project execution and also certain procurement for high lead time items that we do on an ongoing basis for future projects.
- The company said its India government business is tender-driven and lumpy, with seasonal revenue variations based on project-cycle timing.
Show source
So there are seasonal variations of revenue based on where we are in a project cycle, and this is a reflection of that.
- Tejas Networks' BSNL project margins were slightly lower than typical wireline business margins because it was the company's first wireless project.
Show source
And the other point related to your BSNL project as again, mentioned this in the past, given that this is a first wireless project, margins were slightly lower than what you would see, let's say, in typical wireline business.
- India business was the dominant part of Tejas Networks' revenue. Replaced by a later filing.
Show source
India business has been the dominant part of our revenue.
Money and capital
- Tejas Networks' closing borrowing position was around INR3,157 crores and cash was INR643 crores.
Show source
Closing borrowing position was around INR3,157 crores and cash of INR643 crores.
- The company received the PLI incentives for FY '23 in FY '24, and typically receives payment in the subsequent year.
Show source
Sumit Dhingra: We received the PLI incentives for FY '23 in FY '24.
- The company expects to receive this year the PLI incentive amount recognized as revenue in FY '24.
Show source
So what you would see in recognized as revenue in FY '24 is what we would expect to receive this year.
- The company has submitted documentation for the FY '24 PLI incentive; the process is underway with the nodal agency and ministry, and Tejas Networks is hopeful of receiving the incentive soon.
Show source
So we are hopeful of getting the incentive for FY '24 soon.
- The company expects to receive the corresponding FY '25 PLI incentives in the next fiscal.
Show source
And then for FY '25, the corresponding incentives are something that we would expect to get in the next fiscal.
- Tejas Networks' trade receivables are gross of customer advances, which are in current liabilities; as milestones occur, receivables will get adjusted against those advances.
Show source
So as and when the milestones occur - the receivables will get adjusted against those advances, that are there in the current liabilities.
- Tejas Networks' borrowings were mainly for working capital purposes.
Show source
Borrowings are mainly for working capital purposes.
What it expects ahead
What management expects
- The company said most BharatNet Phase 3 tender results had been announced and some orders had started to be placed; system integrators were expected to start engaging with OEMs for product supplies over this quarter and early next quarter.
Show source
And over this quarter and early next quarter, we expect this to happen.
- The company expects large tender-driven opportunities such as the BSNL expansion network, 5G, Power and BharatNet to convert in Q4 of FY’25 and Q1 of FY '26 and contribute to its business for FY '26.
Show source
Some of the large tender-driven opportunities such as the BSNL expansion network, 5G, Power, BharatNet etc., are all live opportunities, which are maturing as we speak, and we expect them to convert in Q4 of FY’25 and Q1 of FY '26.
- Tejas Networks' 400 gig and 800 gigabits per channel technology is to evolve to 1.2 terabits per channel in this calendar year.
Show source
So the state-of-the- art of 400 gig and 800 gigabits per channel has to evolve to 1.2 terabits per channel, and that's going to come out in this calendar year.
- The company is planning to close a significant opportunity related to expansion of BSNL's 4G network and 5G upgrade in this quarter and next.
Show source
This is also something that is going to be one of the significant opportunities that we are planning to close in this quarter and next.
- BSNL is planning to build its stand-alone 5G network in 3.5 gigahertz band, which is an opportunity for Tejas Networks.
Show source
The other one is, if you are aware, BSNL is also planning on building their stand-alone 5G network in 3.5 gigahertz band.
- For each of the five opportunities discussed, including BharatNet Phase 3, Tejas Networks' equipment opportunity ranges from a few hundred crores to several thousand crores; the amount that turns into business for Tejas Networks depends on how much it wins.
Show source
And for the wireline, the BharatNet Phase 3, I think that's been in the news and you're aware of i t, and we have an opportunity for these projects.
Show 23 more statements
What management expects
- The company is lining up an opportunity as utility and rail operators upgrade their nationwide WDM backbones from 100 gig to 400 gig and above.
Show source
So as they upgrade it from 100 gig to 400 gig and above, this is another major opportunity that we are lining up for.
- The company expects its pipeline deals to contribute significantly to its FY '26 business.
Show source
So these are some of the key deals in the pipeline that will go into adding to our backlog that we have and we expect to contribute significantly to our FY '26 business.
- The company expects expansion of BSNL's 4G network and an upgrade of the network to 5G, as BSNL still has to extend coverage across the country wherever its plans require.
Show source
So there will be expansion of this 4G network and upgrade of this network to 5G as well.
- The company has separate opportunities for 5G in the n78, 3.5 gigahertz bands.
Show source
And there are separate opportunities for 5G in the n78, 3.5 gigahertz bands.
- The company expects live POCs with operators in India to result in some success in terms of additional orders and deployment, probably in this quarter or in Q1FY’26.
Show source
So as I mentioned that live POCs are going on for operators in India, and we think probably in this quarter or in Q1FY’26, we should be able to see some success in that in terms of additional orders and additional deployment.
- The company expects conversion of opportunities including BSNL 4G network expansion, 5G, Kavach and BharatNet in Q4 and Q1FY’26, with a significant part expected to be executed in FY '26.
Show source
So yes, most of these opportunities that we're talking about -- whether it's BSNL 4G network expansion, 5G or the Kavach or BharatNet, we expect to see conversion in these in Q4 and Q1FY’26 and a significant part of that should be executed in FY '26.
- The company said its international business was still a small share of overall business and business conversion into revenue had longer cycles.
Show source
There is a slow and steady increase in the business traction that we see, but we see longer cycles of business conversion into revenue.
- The company expected significant investment in expansion of the WDM backbone for the utilities segment, but the large tender opportunity had got delayed.
Show source
Then the expansion of WDM backbone for the utilities segment, we expect significant in vestment to happen over here but the large tender opportunity over there ha s got delayed.
- The company expects margins to improve over the next few quarters as its international business picks up and it widens its order book.
Show source
As we go along, as our international business picks up, as we're able to widen our order book, we expect margins to improve over the next few quarters.
- The company expects very large deals for the utility segment for the power and rail segment, where operators are investing in nationwide WDM backbones to address their telco business; much of the backbone has been built using Tejas Networks equipment.
Show source
We're also expecting very large deals for the utility segment for the power and rail segment where they are significantly investing in growing their nationwide WDM backbones to address their telco business.
- Tejas Networks' international wireless engagements will take longer to convert because they require some customization.
Show source
So those will take a little longer to really convert because that will require some amount of customization as well.
- For Tejas Networks, the supply cycle after vendor selection is at least a year, or a multiyear cycle for a major project deployment.
Show source
It's at least a year, if not a multiyear cycle or it's a major project deployment Page 12 of 15 Tejas Networks Limited January 23, 2025 that happens because the operators also invest a lot in going through the testing process in selecting a particular vendor.
- The company is working with local partners to address the US BEAD and Rip and Replace programs and is working with its sales team and partners to win part of the BEAD business, which is being invested in phases.
Show source
And a lot of the investment is happening in phases, and we are working actively with our sales team as well as partners over there to win a part of this business.
- Tejas Networks' opportunity cycle from the start of investment to closure usually takes a long time. Replaced by a later filing.
Show source
That's the reason why from the start of investment of a particular opportunity cycle to closure , it usually takes a long time.
- If Tejas Networks is successful in most of these opportunities, they could lead to a significant bump or refilling of its order book. Replaced by a later filing.
Show source
So if we are successful in most of these opportunities, it could lead to a significant bump or refilling of our order book.
Orders
- Tejas Networks' closing backlog was INR2,681 crores.
Show source
Our closing backlog was INR2,681 crores.
- The company had anticipated a larger backlog driven by opportunities including BSNL's 4G network expansion and 5G upgrade, BSNL's 5G SA network build out for 5G bands, the Indian Railways collision avoidance system, private 5G for a large enterprise in India, and 5G radio band customization for tier 1 international operators.
Show source
And we had anticipated a larger back log over here driven by some of the Page 4 of 15 Tejas Networks Limited January 23, 2025 large opportunities that we were targeting, one of them was the expansion of BSNL's 4G network and 5G upgrade, BSNL's 5G SA network build out.
- The major components Tejas Networks is banking on in its order book are projects for the expansion of BSNL's 4G network and 5G upgrade.
Show source
But the major components that we are banking on in our order book are the projects that we talked about for the expansion of BSNL's 4G network and 5G upgrade.
- The company expects the initial 1 lakh site order from BSNL to be executed in this financial year.
Show source
I think this initial 1 lakh site order should get executed in this financial year.
- The company completed the POC and received initial purchase orders for a network modernization win in the US.
Show source
We also successfully completed the POC and received the initial purchase orders for a network modernization win in the US.
- The company started receiving orders for the larger deployment of its network modernization solution in the US after a successful POC and first office application in the network.
Show source
And based on that, we have started receiving the orders for the larger deployment into the network.
- The company received major orders from an existing customer in Asia for expansion of the mobile backhaul network, for packet transport and WDM equipment.
Show source
From our existing customer in Asia, we received, again, major orders for the expansion of the mobile backhaul network, and this has been for, again, our packet transport and WDM equipment.
- The company does not show its run rate business from private operators under long-term contracts in its backlog order book.
Show source
We don't show that in our backlog order book.
What it is building and selling
Demand and pricing
- The company says Rip and Replace typically happens when customers and operators expand their networks in those regions, with equipment replacement and network expansion occurring alongside the expansion.
Show source
It typically happens when customers and operators expand their network in those regions.
- The company is targeting network modernization as another significant opportunity in North America, alongside BEAD and other optical transport opportunities.
Show source
Besides BEAD and Rip and Replace, another significant opportunity that we are targeting in North America is network modernization .
- Tejas Networks’ dense circuit emulation solution is seeing a lot of traction in North American markets. Replaced by a later filing.
Show source
Our dense circuit emulation solution is seeing a lot of Page 14 of 15 Tejas Networks Limited January 23, 2025 traction in these markets .
Segments
- Tejas Networks' radios were developed over 5 different bands from 700 Megahertz to 2.6 Gigahertz and include both single band and dual band offerings.
Show source
So these are radios developed over 5 different bands from 700 Megahertz to 2.6 Gigahertz and include both single band and dual band offerings.
- The company has a few ongoing POCs with domestic operators for 4G and 5G products; the POC cycles may take time because of additional functionality development, additional KPI parameters and product evolution during the POC cycle.
Show source
Since they are new products, the se POC cycles will usually take time because they may need additional functionality development, additional KPI parameters requiring a product evolution during the POC cycle.
- The company is building advanced non-terrestrial communication capabilities in its 5G RAN equipment by leveraging technology from Saankhya Labs.
Show source
And by leveraging a lot of the technology that we have from Sa ankhya Labs in satellite communications, we are building advanced non-terrestrial communication capabilities in our 5G RAN equipment.
Show 33 more statements
Segments
- The company is evolving its gigabit GPON to 10 gigabit and 50 gigabit PON standards.
Show source
We're evolving our gigabit GPON to 10 gigabit and 50 gigabit PON standards.
- The company is upgrading its converged broadband products to support LTE for fixed wireless application and 5G, and upgrading GPON to XGS-PON and higher speeds.
Show source
We're evolving it to support 5G, and we are upgrading our GPON to XGS-PON and higher speeds.
- Tejas Networks' equipment can deliver multiple services using one piece of equipment and one management software, generating operational savings in training costs and power; its cost of goods advantage may be 20%-25%.
Show source
Page 10 of 15 Tejas Networks Limited January 23, 2025 Being able to deliver multiple services from a single equipment with a single management software gives them a lot of operational savings in terms of their own traini ng costs, power etc. So you may get a cost of goods advantage of maybe 20%-25% to that extent, but you get a larger benefit in terms of the opex also in terms of running a converged or integrated equipment .
- The company sees interest in country-specific band customization for its high-power radios for mobility and fixed wireless access applications.
Show source
And we've seen a lot of interest in our high-power radios, and we see Page 2 of 15 Tejas Networks Limited January 23, 2025 interest in doing country- specific band customization for these radios for both mobility as well as fixed wireless access applications.
- The company is investing in additional technologies and protocols for its PON equipment to support enterprise and mobile backhaul applications.
Show source
And that requires building additional technologies and protocols for our PON equipment, which we are investing in.
- The company expanded its sales teams in North America and LatAm regions.
Show source
We expanded our sales teams in North America and LatAm regions, which is a special focus area for us, and we are seeing quite a good success that we can build on.
- The company has localized in India many key product inputs, including enclosures, accessories, cables, connectors, mechanical items and passive components.
Show source
But a lot of the key ingredients in terms of enclosures, accessories, cables, connectors, mechanical items, Passive components, a lot of that has been localized in India .
- The company localizes its manufacturing and assembly process in India, including PCB assembly, system assembly and testing.
Show source
In addition the entire manufacturing and assembly process including the PCB assembly as well as system assembly and testing are localized.
- The company integrated backhaul functionality into its RAN equipment, giving operators significant savings in network deployment cost.
Show source
And we have implemented a very unique architecture where we integrated the entire backhaul functionality in our RAN equipment thereby giving the operator significant savings in terms of his network deployment cost.
- Tejas Networks' converged baseband unit can take additional modules for broadband services to enterprises and homes, allowing an operator to reach more customers in an area at very incremental cost.
Show source
So given a footprint in a particular area, say under a tower, by adding these modules, the operator with a very incremental cost can actually reach out to many more customers in that area by delivering broadband services.
- Tejas Networks' architecture gives operators a cost advantage through the total cost of ownership and cost of the solution, rather than cheaper components for a specific function.
Show source
So while the technology still remains 4G or 5G from a radio perspective, but the total cost of ownership, the total cost of the solution for building the network and the other applications that come along with it gives our implementation and architecture, a unique cost advantage for the operator.
- The company says North American telecom networks built over many years using voice-optimized TDM technology require circuit emulation over packet networks to modernize the network core while gradually transitioning older networks to modern interfaces, because endpoint connectivity cannot easily be replaced.
Show source
So they require a special technology called circuit emulation over packet networks for being able to modernize the heart of the network and slowly transition their older networks to more modern interfaces.
Deals and partners
- The company started major engagements with multiple international operators for its high-power 5G radios in Q3.
Show source
Apart from this, in Q3, we had started major engagements with multiple international operators for our high-power 5G radios.
- The company signed a 3 -year contract with Vodafone Idea to supply equipment for its pan-India 4G and 5G mobile backhaul network.
Show source
For the wireline business, one of the highlights has been signing a 3 -year contract with Vodafone Idea for supplying equipment for their pan-India 4G and 5G mobile backhaul network.
- Tejas Networks' India business was dominated by 4G shipments for the BSNL network to TCS, the final system integrator.
Show source
But again, I would like to mention as in the past that this is dominated by the 4G shipments for the BSNL network to TCS, who are the final system integrator.
- The company has a 3-year contract for supply under the Vodafone-Idea deal.
Show source
The Vodafone-Idea deal is an example, where it's a 3-year contract for supply.
- The company completed successful testing of 5G for Railway's Kavach, the collision avoidance system, after a successful POC for its 4G products; the company is waiting for the tender to come out and bid.
Show source
And that testing has also been done successfully.
- The company completed a POC for a private 5G application and is in commercial discussions.
Show source
Page 7 of 15 Tejas Networks Limited January 23, 2025 This is also a deal where we have completed the POC and we are in commercial discussions.
- The company is in advanced technical discussions with a few tier 1 international operators, and customization of the products will require some R&D work.
Show source
That's a little longer sales cycle because we are currently in advanced technical discussions and there will be some amount of R&D work required for the customization of these products.
- BSNL reported that 65,000 of the sites supplied by Tejas Networks were operational and live.
Show source
But BSNL themselves have reported, if you see yesterday or day before that 65,000 of these sites are operational and live.
- Field installation of BSNL sites was a little more than 65,000.
Show source
Field installation is a little more than 65,000 but 65,000 are actually live and radiating and actually serving customers.
- The company added 1 or 2 partners in every region, based on geographical territories.
Show source
In every region, we've added 1 or 2 partners based on their geographical territories.
- Tejas Networks' Vodafone Idea contract covers equipment supplies in a set of states and circles, network building across multiple states, deployment and commissioning, network management software, and making the equipment live and connected to Vodafone Idea's mobile 4G and 5G networks; Tejas Networks is paid as it makes supplies.
Show source
And the contract includes supply and deployment and commissioning of the equipment, including supply of network management software and making the equipment live and connecting it to their mobile 4G, 5G networks and getting the traffic running.
- Tejas Networks' Vodafone Idea contract followed extensive lab and field testing and qualification, mainly of its packet transport and optical DWDM equipment; supplies have started and deployment is happening.
Show source
So we have already started the supplies and the deployment is happening as we speak.
- The company was selected as a broadband equipment supplier for state -led BharatNet Last Mile Connectivity in Tamil Nadu, mainly for its FTTX equipment based on GPON technology.
Show source
We have been selected as a broadband equipment supplier for state -led BharatNet Last Mile Connectivity in Tamil Nadu.
- Vodafone Idea and a few other private operators in India were part of Tejas Networks' private business.
Show source
The other parts of the private business also has been Vodafone Idea and a few other private operators in India .
- The company talked about FTTH and network modernization deals with multiple operators in Middle East, Africa and the Americas, and Metro network expansion for private operators in India for mobile backhaul and enterprise services.
Show source
And then we talked about FTTH and network modernization deal with multiple operators in Middle East, Africa and the Americas and the Metro network expansion for priva te operators in India for mobile backhaul and enterprise services.
- The company expanded its partner networks in Europe, Asia and ANZ regions.
Show source
We have also expanded our partner networks in Europe, Asia and ANZ regions as we build our business in this region incrementally.
- The company has ongoing engagement with international customers and discussions about customizing its wireless equipment for their countries' specific bands.
Show source
And there's a lot of discussions which are going on in terms of how do we customize it for their specific bands, which are there in th eir countries, right?
- Tejas Networks' sales partners provide local-language support for customer dealings and business at remote locations, in-country presence, customer relationships, and sales, supplies, deployment and support.
Show source
So those are the people we work with in terms of partnering, in terms of sales and supplies and deployment and support.
- Tejas Networks' customer deal process includes lab testing, initial technical engagement and presentations, product testing, possible remote demonstrations and customer lab testing, field deployment to assess performance, and commercial discussions before an agreement.
Show source
So that's how a deal progress.
- Tejas Networks' contract with Vodafone Idea is an independent contract directly with Tejas Networks.
Show source
Arnob Roy: No, this is an independent contract with us directly.
- The company works with sales partners who have local operations, telecom-network expertise, regional supply expertise, technology knowledge, customer relationships and experience building networks with these technologies. Replaced by a later filing.
Show source
So they are people who are set up over there who have the expertise of building telecom networks, who have the expertise of supplying in that region.
Risks, rules and outside factors
Outside factors
- Imported active electronic components, especially semiconductor chips, account for between 40% and 65% of Tejas Networks' active electronics, varying by product.
Show source
The amount of it can vary between 40% to 65%, in terms of the active electronics that gets imported especially for the semiconductor chips.
Rules and policy
- The company conducts testing for global certifications in India, where certification labs such as TUV and UL exist.
Show source
And that testing happens actually in India because all those global certification labs like TUV, UL actually exist in India.
- The company said tariffs were an open question, that nothing had been announced, and that speculation would continue until something came up.
Show source
Now as far as tariffs and all are concerned, it's still an open question.
Everything else said on the call
What management stressed
- The company will continue to invest in R&D and build its products, while optimizing and controlling overall spending. Replaced by a later filing.
Show source
While we would always look at optimizing and controlling the overall spend in general, but at an absolute level the investments in R&D will continue.
People and governance
- Arnob Roy was elected Chairman of TEPC, the Telecom Export Promotion Council, for '25 to '27, succeeding NG Subramaniam.
Show source
I have been elected as the Chairman of TEPC, the Telecom Export Promotion Council for '25 to '27 and succeeding NG Subramaniam, our Chairman, who was the past Chairman of TEPC.
- Compared with the last financial year, Tejas Networks grew its teams in international regions by more than 50%.
Show source
Arnob Roy: Well, with respect to last financial year, we have grown our teams by more than 50% in those regions.
- The company added at least 6 -7 people in the US and LatAm, including system architects, senior sales and marketing people, and account executives.
Show source
In the US and LatAm, we've added at least 6 -7 people, both in terms of system architects, senior sales, marketing people as well as account executives.
- Sanjay Malik, former India Country Head of Nokia, joined Tejas Networks' management team as EVP, Chief Strategy and Business Officer.
Show source
From a corporate update point of view, as you've seen from our press release, Sanjay Malik, who was former India Country Head of Nokia has joined the management team as EVP, Chief Strategy and Business Officer.
Other
- Tejas Networks' proof of concept (POC) was conducted across many sites in Chandigarh for more than a year.
Show source
POC was done across many sites in Chandigarh for more than a year.
What the company said on its earnings call, taken from its own transcript. Not advice.
Questions and answers
Question
My first question is for Sumit sir. Sumit sir, if you can just hel p me understand on the gross margin front, while you've highlighted what are the levers that have impacted the margin this quarter. But if you can just help me understand what was the change in mix like in the wireless piece? My assumption is that when you say mix change, it would be the increase in the wireless equipment sale that would have happened this quarter. So if -- and most of it would be coming from BSNL. And given the fact that BSNL would be at the fag end of execution, should our gross margins be much better going forward? That's question number one. The second question is on -- if you could help us with an update
Answer, sumit dhingra
Sumit Dhingra: So I'll take the first question on gross margin. And so basically, like I think we've mentioned also in our earlier conference calls, while it’s difficult to comment specifically on project-by-project, but what it means by changing product mix is that even as part of one project, there could be various types of products, different configurations that we ship . And depending on the product -- depending on the margins of the products that get shipped within a particular quarter, whether it be one project or across multiple projects, that would drive the margin movements up or down. And the other point related to your BSNL project as again, mentioned this in the past, given that this is a first wireless project, margins were slightly lower than what you would see, let's say, in typical wireline business. As we go along, as our international business picks up, as we're able to widen our order book, we expect margins to improve over the next few quarters. On your second question about the business pipeline, I think I'll request Arnob to comment Arnob Roy: Yes, yes.
Answer, arnob roy
So -- our business pipeline has 2 portions. One is, of course, the run rate business from existing customers, which have long- term contracts. The Vodafone-Idea deal is an example, where it's a 3-year contract for supply. So with most of the private operators, I mean that's what we have, and that's not there in our order book, right? We don't show that in our backlog order book. But the major components that we are banking on in our order book are the projects that we talked about for the expansion of BSNL's 4G network and 5G upgrade. And as we speak, there is a lot of movement and progress happening over there.
Answer, arnob roy
This is also something that is going to be one of the significant opportunities that we are planning to close in this quarter and next. The other one is, if you are aware, BSNL is also planning on building their stand-alone 5G network in 3.5 gigahertz band. So that's another area where we have a very strong opportunity. And the third one was the Railway's Kavach, the collision avoidance system. We did a successful POC over there for our 4G products, and we also wanted to try out 5G. And that testing has also been done successfully. We are waiting for the tender to come out and bid over there.
Answer, arnob roy
Then I talked about private 5G application. Page 7 of 15 Tejas Networks Limited January 23, 2025 This is also a deal where we have completed the POC and we are in commercial discussions. The other one, we're talking about is the engagement with a few tier 1 international operators. That's a little longer sales cycle because we are currently in advanced technical discussions and there will be some amount of R&D work required for the customization of these products. And for the wireline, the BharatNet Phase 3, I think that's been in the news and you're aware of i t, and we have an opportunity for these projects. We're also expecting very large deals for the utility segment for the power and rail segment where they are significantly investing in growing their nationwide WDM backbones to address their telco business. And a lot of that has been built using our equipment.
Answer, arnob roy
So as they upgrade it from 100 gig to 400 gig and above, this is another major opportunity that we are lining up for. And the others, of course, the run rate, the Metro network expansion and similar opportunities. So that will happen consistently quarter - over-quarter over the year. So these are some of the key deals in the pipeline that will go into adding to our backlog that we have and we expect to contribute significantly to our FY '26 business. T he first question was about headcount. So as of today, we are upwards of 23 50 people, and more than 60% of them are in R&D, that is part of our engineering team.
Question
Vimal Gohil: And sir, one last question. On the BSNL deal, given the fact that our initial dea l that we had with BSNL was for 1 lakh towers for their 4G equipment. We have already completed 86,000. Would it be fair to assume that next quarter, we'll see this execution being complete for the 4G part and post which in FY '26, we should see the 5G par t ramping up. Is my understanding correct?
Answer, arnob roy
Arnob Roy: That's correct. I think this initial 1 lakh site order should get executed in this financial year. So what we expect to see is, again, an expansion of this 4G network because I think there is still some way to go for them to get coverage across the country wherever their plans are. So there will be expansion of this 4G network and upgrade of this network to 5G as well. And there are separate opportunities for 5G in the n78, 3.5 gigahertz bands. So there are multiple opportunities. One is the 4G expansion itself.
Answer, arnob roy
Arnob Roy: Yes. As you can see, we only report what we supply, which is more than 86,000 sites. But BSNL themselves have reported, if you see yesterday or day before that 65,000 of these sites are operational and live. Field installation is a little more than 65,000 but 65,000 are actually live and radiating and actually serving customers. So as far as we are concerned, I think BSNL is quite happy with the performance and quite happy with the customer acquisitions that they are doing. So yes, I would say it has been quite successful as far as we are concerned, both in terms of the equipment supplies as well as the ir performance in the network. Page 8 of 15 Tejas Networks Limited January 23, 2025 Ritesh Poladia: So the product doesn't need much of tweaking.
Question
In terms of also feet traffic, it's working as per the parameter...
Answer, arnob roy
Arnob Roy: Yes, yes, yes absolutely. I t hink performance has been tested extensively during the POC that happened before we got awarded the contract. There was almost a year -long POC that happened where every aspect of our equipment's performance got compared with the state -of-the-art that has been deployed in the country. So only after that, we got awarded the contract. So I think there is no concern on that front at all.
Question
Ritesh Poladia: POC performance and real performance is same.
Answer, arnob roy
Arnob Roy: Absolutely. And by the way, I mean, just to let you know, POC was not just a small-scale lab test. POC was done across many sites in Chandigarh for more than a year. It was built across the Chandigarh City, across many sites and testing has happened extensively over these sites. So with that kind of rigorous field testing, it’s not surprising that the real-world performance and POC performance are at par.
Question
Ritesh Poladia: Second question on R&D spend. I think roughly company is spending about INR600-odd crores on R&D. Now if the company doesn't win substantial contract in next few months, so there is a possibility of revenue decline. So in that scenario, do you think in FY '26, the R&D spend can be curtailed? Or will you still maintain your R&D as whatever are your plans?
Answer, sumit dhingra
Sumit Dhingra: So I think without commenting on the revenue visibility and outlook, from an overall long-term investment perspective, I think we'll continue to build our products, continue to invest in R&D. As I mentioned in earlier conversations as well, it's an important part of what we do in terms of the industry that we operate in and our overall plans that we continue to build on the products. While we would always look at optimizing and controlling the overall spend in general, but at an absolute level the investments in R&D will continue.
Question
Ritesh Poladia: Then lastly, sir, what would be your import content in the materials? Or now is the domestic sourcing is higher?
Answer, arnob roy
Arnob Roy: Yes. So we have localized a lot of the components that go into our products, especially in our 4G, 5G radio. But having said that, I think most of the electronics -- active electronic components are imported and it varies from product to product. The amount of it can vary between 40% to 65%, in terms of the active electronics that gets imported especially for the semiconductor chips. But a lot of the key ingredients in terms of enclosures, accessories, cables, connectors, mechanical items, Passive components, a lot of that has been localized in India . In addition the entire manufacturing and assembly process including the PCB assembly as well as system assembly and testing are localized. So a significant part of the entire manufactur ing operations are actually done in India.
Question
So how do we ensure that we win the orders from these kind of customers and the order does not go to the foreign players like Cisco, Ericsson and Nokia. Also, what kind of cost advantage do we really have? Because these players also have Indian R&D and manufacturing setup, right? So what is the cost advantage we have? And what can be the reason for maybe not winning an order and maybe Nokia, Cisco, Ericsson winning it? Like I want to have some granular insights on it, sir.
Answer, arnob roy
Arnob Roy: Yes. So the same equipment from different vendors are not identical. Each vendor builds their product with their unique thinking in terms of the network applications they want to optimize it for and want to serve well. So what usually happens is that based on the applications a particular architecture wins. For example, as we've spoken before, if you compare our equipment with other wireless equipment, it is differentiated by the kind of technology integration that we have done in terms of combining the baseband unit with the transport or backhaul functionality. So in a typical RAN equipment, an operator would need to have the radio, the baseband unit and a separate backhaul unit in terms of a router or some other transport equipment at the tower to really backhaul the mobile traffic. And we have implemented a very unique architecture where we integrated the entire backhaul functionality in our RAN equipment thereby giving the operator significant savings in terms of his network deployment cost.
Answer, arnob roy
Similarly, our baseband unit is also a converged network product where you can also plug in additional modules, which can do broadband services for enterprises and homes. So given a footprint in a particular area, say under a tower, by adding these modules, the operator with a very incremental cost can actually reach out to many more customers in that area by delivering broadband services. So while the technology still remains 4G or 5G from a radio perspective, but the total cost of ownership, the total cost of the solution for building the network and the other applications that come along with it gives our implementation and architecture, a unique cost advantage for the operator. So the cost advantage is not in terms of using a cheaper component than my competitor for a specific functionality. It is in the novel architecture of the product, how we have designed it and what kinds of applications it serves more cost-effectively. So I just gave an example of that. And so similarly, we have many other such examples even for our wireline products.
Answer, arnob roy
So I hope I've been able to answer this question. And that when actually operators value that kind of cost optimization that we get in the network, that's the key reason that we win.
Question
Rishab Gang: So what kind of lifetime value, right, maybe a customer saves, right, because of all this integration and all? Like can you give some more granular insights on that, like some numbers or some percentage?
Answer, arnob roy
Arnob Roy: Well, it depends on the application. The integration of radio with transport is one kind of optimization, the access to transport, that's another kind of optimization. And so the cost savings are not only in terms of the cost of the equipment, but also in terms of the operational expenses. Page 10 of 15 Tejas Networks Limited January 23, 2025 Being able to deliver multiple services from a single equipment with a single management software gives them a lot of operational savings in terms of their own traini ng costs, power etc. So you may get a cost of goods advantage of maybe 20%-25% to that extent, but you get a larger benefit in terms of the opex also in terms of running a converged or integrated equipment . So it's like it really varies, and these are just kind of indicative of where the benefit really comes from.
Question
Rishab Gang: Very helpful. what would need to happen, right, for us to win India wireless orders, right? So I wanted to understand what is the status of ongoing POCs, right? When do you think the outcome of these POCs will come through? Also, if such POCs are happening for international orders, what do you think about that?
Answer, arnob roy
Arnob Roy: Yes. So as I mentioned that live POCs are going on for operators in India, and we think probably in this quarter or in Q1FY’26, we should be able to see some success in that in terms of additional orders and additional deployment. For international customers, we have a lot of ongoing engagement. Obviously, our success in BSNL has given us a lot of visibility globally. And people see our equipment and see our architecture and the efficiency of our product, and they are very interested. And there's a lot of discussions which are going on in terms of how do we customize it for their specific bands, which are there in th eir countries, right? So that's what is going on.
Answer, arnob roy
So those will take a little longer to really convert because that will require some amount of customization as well. But that's the kind of engagement that is happening in the international market for our w ireless equipment.
Question
Rishab Gang: Just one last question from my side. On the international front, right, we have said that we are expanding teams in North America and LatAm region and partner networks in Europe, Asia, ANZ. Can you give some numbers, right, or some insights on how we have performed -- how we have expanded versus last year, right, or maybe 2 quarters before. Some numbers on headcount in the sales team outside India or partner networks outside India like that?
Answer, arnob roy
Arnob Roy: Well, with respect to last financial year, we have grown our teams by more than 50% in those regions. In the US and LatAm, we've added at least 6 -7 people, both in terms of system architects, senior sales, marketing people as well as account executives. That's a significant incr ease in headcount. In every region, we've added 1 or 2 partners based on their geographical territories. So that's roughly an example or quantification of how we have invested in terms of sales.
Show 7 more questions
Question
Rishab Gang: And how does this partnership work? Like do they -- how do they help you in getting the orders? Just if you can give some insight on that?
Answer, arnob roy
Arnob Roy: So the sales partners, basically, they are people who have operations local to the region. And there are many countries where the business is done in the local language, right? So they are people who are set up over there who have the expertise of building telecom networks, who have the expertise of supplying in that region. They understand the technology well. They have the customer relationships. They have the experience of building networks using these technologies. We have countrywide Page 11 of 15 Tejas Networks Limited January 23, 2025 presence in those countries, whether Indonesia, Malaysia, maybe in the Middle East and all, where we need on the ground presence and country presence for building networks because that's how our equipment is deployed.
Answer, arnob roy
So we need that we need local language support for dealing with the customers as well as for handling business at remote locations within the country. So those are the nature of the partners who are there, people with significant in -country presence, significant local language support and significant customer relationships in those regions. So those are the people we work with in terms of partnering, in terms of sales and supplies and deployment and support.
Answer, arnob roy
Arnob Roy: Yes. So in terms of regulatory environment , there are really no issues. I think the only regulatory thing we need to meet is the performance of the equipment because these are advanced equipment, and they have to meet the global or country -specific standards in terms of their performance, safety, radiation etc., certified by agencies such as TUV and UL. And we have to have our equipment certified against those standards before we ship to those markets. And when we design our equipment, before we take it to production, we make sure that we have tested for those standards in various markets. Many of them are very, very similar. A few of them may have one-off extra features but we make sure that the equipment are upfront designed to meet those regulatory requirements and we get the necessary certifications before we ship the equipment to these countries .
Answer, arnob roy
And that testing happens actually in India because all those global certification labs like TUV, UL actually exist in India. So that's as far as regulatory compliance is concerned for global standards. Now as far as tariffs and all are concerned, it's still an open question. We really do not know. I mean nothing has been announced, so nothing has come up. So until that time it comes up, it's all pure speculation on this front. In terms of lead time it's very similar for customers everywhere.
Answer, arnob roy
There is a process of lab testing, there is an initial technical engagement, we make presentations, go through extensive technical discussions on what is the value that we're providing to the customers. We then enter into a cycle of product testing. Sometimes they do remote demo followed by testing in their labs. The customer actually deploys our equipment in their network in the field to see its performance, so this stage often takes some time. And after that we engage in commercial discussions and get into an agreement. So that's how a deal progress. That's the reason why from the start of investment of a particular opportunity cycle to closure , it usually takes a long time.
Answer, arnob roy
But when you are selected, and if your performance is okay, the supply cycle is also a long one. It's at least a year, if not a multiyear cycle or it's a major project deployment Page 12 of 15 Tejas Networks Limited January 23, 2025 that happens because the operators also invest a lot in going through the testing process in selecting a particular vendor.
Question
Advait Lath: Got it, sir. And just a follow-on question. This has to do with our Vodafone and Idea -- Vodafone Idea deal. So just wanted to ask what are the terms of the agreement, if you can share some detail on that?
Answer, arnob roy
Arnob Roy: Yes, yes. It's a very standard agreement like we have with any other private operator, which is to do with supplies of our equipment in a few set of states for a set of circles. So we are building the entire network for the state across multiple states. And the contract includes supply and deployment and commissioning of the equipment, including supply of network management software and making the equipment live and connecting it to their mobile 4G, 5G networks and getting the traffic running. So there's the entire scope of the equipment and we are getting paid as we do the supplies.
Question
Advait Lath: Got it. And this will be in tandem with TCS or this would be an independent contract?
Answer, arnob roy
Arnob Roy: No, this is an independent contract with us directly.
Answer, sumit dhingra
Sumit Dhingra: We received the PLI incentives for FY '23 in FY '24. And typically, the payment happens in the subsequent year. So what you would see in recognized as revenue in FY '24 is what we would expect to receive this year. The process for that is on. We've submitted documentation. There is back and forth with the nodal agency and thereafter with the ministry. So we are hopeful of getting the incentive for FY '24 soon.
Answer, sumit dhingra
And then for FY '25, the corresponding incentives are something that we would expect to get in the next fiscal.
Question
Sunny Gosar: Got it. That's quite helpful. In the earlier part of the call, you alluded to a few opportunities like the Kavach program, the 5G -- private 5G application, the BharatNet Phase 3 project. Will you -- like if you could give some color on the quantum of some of these opportunities, some ballpark numbers or some indicative color on how large some of these opportunities could be? And like on an annual basis, how much revenue opportunity that could lead to over the next few years?
Answer, arnob roy
Arnob Roy: These are very significant 5 projects. For the BharatNet Phase 3 project the overall budget has been public information for some time. And I think in all of them, the equipment opportunities for us ranges from a few hundred crores to several thousand crores as well. There's a wide range and a lot of it, but each of them is a fairly significant sized opportunity. And what it will turn out to be for us depends on how much of each of those opportunities we win. But each of them is of a very significant size.
Question
Sunny Gosar: Got it. And in terms of the conversion of these opportunities or proof of concepts into actual orders and then eventually into revenue, can you like give some kind of indicative time lines or which of Page 13 of 15 Tejas Networks Limited January 23, 2025 the projects are more closer to conversion as compared to some of the others? So some indicative color because the order backlog now is about INR2,600 crores and most of it is related to BSNL, which would me an that post Q4, assuming that no new orders come in, there could be a temporary dive in terms of the revenue. So how should we look at this in terms of continuity of revenue and the future outlook in that sense?
Answer, arnob roy
Arnob Roy: Yes, yes. So first of all, back log right now, a lot of the BSNL backlog rundown -- order book rundown has happened. And a good part of the backlog is also the non-BSNL business. But having said that, you're correct in the sense that it is still significantly small compared to what we had at the beginning of the year. So yes, most of these opportunities that we're talking about -- whether it's BSNL 4G network expansion, 5G or the Kavach or BharatNet, we expect to see conversion in these in Q4 and Q1FY’26 and a significant part of that should be executed in FY '26. So if we are successful in most of these opportunities, it could lead to a significant bump or refilling of our order book.
Question
Sunny Gosar: Got it. And one last question.
Answer, arnob roy
Arnob Roy: I would also like to make it the last question of this session, if you don't mind. I think we're running out of time. So please let's take this last question.
Question
Sunny Gosar: So one last question from my side. Basically, the BEAD program in US, which is like a multibillion-dollar government program and also the Rip and Replace initiative that the US government has announced. So are we likely to be beneficiaries of those programs? And what kind of opportunity do we see in the North American market?
Answer, arnob roy
Arnob Roy: Yes, both of those programs we are trying to address with our local partners. BEAD is about the expansion of broadband rollout in the rural areas of US where there is a significant amount of investment. And a lot of the investment is happening in phases, and we are working actively with our sales team as well as partners over there to win a part of this business. The same holds for Rip and Replace. Rip and Replace, doesn't really imply that there is some equipment to be replaced. It typically happens when customers and operators expand their network in those regions. And along with that, the replacement of equipment and expansion of the network also happens.
Answer, arnob roy
Besides BEAD and Rip and Replace, another significant opportunity that we are targeting in North America is network modernization . Most telecom networks in North America have been built over many, many years using old TDM technology which were optimized for voice. And as they modernize the network to a more modern packet-based infrastructure, they cannot really replace all of their endpoint connectivity so easily. So they require a special technology called circuit emulation over packet networks for being able to modernize the heart of the network and slowly transition their older networks to more modern interfaces. And that is something that we are able to address with our products, along with BEAD and other optical transport opportunities. Our dense circuit emulation solution is seeing a lot of Page 14 of 15 Tejas Networks Limited January 23, 2025 traction in these markets . Sunny Go sar: Got it.
Answer, arnob roy
That's quite helpful. And thanks for the detailed answers on all my questions.
Answer, arnob roy
Arnob Roy: So with that, I would like to thank everyone for joining the call . Thank you for your questions and hope we've been able to provide a good insight on our business and look forward to talking to you all again the next quarter. Thank you very much.
Questions about this call
- When was the Tejas Networks Q3 FY25 earnings call transcript filed?
- Tejas Networks filed the transcript with the exchange on 28 Jan 2025. This page is built from that transcript.
- What does this page list?
- 97 statements from the transcript across 12 topics, 51 of them with a figure. Each statement is shown with the transcript sentence it came from.
- Are the analysts' questions included?
- Yes. 17 questions and management's answers are listed in the order they were asked, as the transcript prints them.
- Who wrote this page?
- DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.