Order intake in Q1 FY27 was over INR 34 billion, over INR 3,400 crores, comprising about INR 29.6 billion EPC and INR 4.7 billion O&M; international markets accounted for 77% of order intake and India 23%. The company expects working capital days to remain in the 100 days to 110 days range despite expected top-line growth over the next few years, while continuing to endeavor to reduce them. At VA Tech Wabag's Perur desalination project in Chennai, funded by JICA, 1 lakh cubic meters of concreting had been completed, the highest ever in its history on a single project. Consolidated revenue from operations was INR 887 crores, up 20.8% year-over-year, in Q1 FY27. The company had an average of about 30% of its revenues coming from Industrial up to 2024-25. Industrial represented 28% of VA Tech Wabag Limited's overall business, against a stated target of around 30%.

The numbers management gave

Results

  • Consolidated EBITDA was INR 116 crores, up 21.7% year-over-year, with an EBITDA margin of over 13% in Q1 FY27.
    Show source
    EBITDA stood at INR 116 crores, growing by 21.7% year-over-year with an EBITDA margin of over 13%.
  • Consolidated PAT was INR 90 crores, up almost 37% year-over-year, with a PAT margin of 10.2% in Q1 FY27.
    Show source
    PAT stood at INR 90 crores, registering a profitable growth of almost 37% year-over-year, with an improved PAT margin at 10.2%.
  • Stand-alone revenue from operations was INR 739 crores, up over 15% year-over-year, in Q1 FY27.
    Show source
    At the stand-alone level, revenue from operations stood at INR 739 crores, growing by over 15% year-over-year.
  • Stand-alone EBITDA increased by over 21% to INR 105 crores and stand-alone PAT increased by over 30% year-over-year to INR 79 crores in Q1 FY27.
    Show source
    Stand-alone EBITDA increased by over 21%, to INR 105 crores and stand-alone PAT increased by over 30% year-over-year to reach INR 79 crores for the quarter.
  • EPC contributed 82% of VA Tech Wabag's revenues and O&M contributed 18% in Q1 FY27.
    Show source
    EPC contributed 82% of the revenues while O&M contributed 18%.
  • Net working capital days were 108 days in Q1 FY27.
    Show source
    Net working capital days for the period stood at 108 days.
Show 10 more statements

Results

  • Return on Capital Employed (ROCE) was 19.6% and Return on Equity (ROE) was 16% in Q1 FY27.
    Show source
    We continue to focus on effective cash and debt management across the Group, along with delivering healthy returns on capital, with Return on Capital Employed (ROCE) at 19.6% and Return on Equity (ROE) at 16% for this quarter.
  • Working capital days moved from 130 days to 120 days to 110 days and were closer to 100 days over the last three years.
    Show source
    You can already see in the last three years how the working capital days have moved from 130 days to 120 days to 110 days and now we are closer to 100 days.
  • Operational level growth from last year to current year stayed above 13%, with forex gains treated as operational.
    Show source
    We have stayed above 13%.
  • Revenue grew 21% in Q1 FY27; management said growth is limited only by the pace of projects and that there is no bottleneck.
    Show source
    Skandaprasad S.: Amay, we have grown by 21% this quarter.
  • India-international mix was 48:52 in Q4 & FY26.
    Show source
    Geographically, 48% of the revenues came from India and 52% from overseas markets, emphasizing our growing global presence and geographical diversification, in line with our long-term strategy.
  • Consolidated revenue from operations was INR 887 crores, up 20.8% year-over-year, in Q1 FY27. Replaced by a later filing.

Money and capital

  • Net cash balance, excluding HAM, was INR 965 crores as of Q1 FY27, and the company remained net cash positive for the 14th consecutive quarter.
    Show source
    Importantly, we remained net cash positive for the 14th consecutive quarter, reinforcing the strength of our balance sheet and our disciplined approach to the growth.
  • Working capital is 3 to 3.5 months, which management said is not abnormal for a construction sector company targeting 15% to 20% growth.
    Show source
    On working capital, what I mentioned was if you are looking at growth 15% to 20%, especially being in a construction sector, having a 3 to 3.5- month kind of working capital is something that is not abnormal.
  • Working capital days have been sequentially coming down over the last 3 to 4 years as its international mix improves.
    Show source
    So you are also seeing over the last 3 to 4 years as our international mix continues to improve, our working capital days have also been sequentially coming down.
  • The company expects working-capital quality to improve with more international orders because payment patterns, payment timelines and contractual administration are better outside India than in India.
    Show source
    Yes, you are right, with more international orders, the working capital quality will certainly improve because the payment patterns, payment time lines, the contractual administration is much better outside India than in India.

What it expects ahead

What management expects

  • The company expects working capital days to remain in the 100 days to 110 days range despite expected top-line growth over the next few years, while continuing to endeavor to reduce them.
    Show source
    So, we are moving in the right direction, but I would say from an expectation perspective, if we are staying at 100 days to 110 days range, I think we are doing very well because as you know we are an asset-light organization, our only asset is working capital.
  • Execution timelines are 36 months in India and 24 to 30 months outside India.
    Show source
    Outside, you'll see more 24 to 30 months is what the timelines that we see.
  • The company expects these orders to be executed over the next 36 months.
    Show source
    But broadly, our expectation is that these orders would be executed over the next 36 months.
  • The company expects to selectively pick one or two high-technology orders over the next 12 to 18 months, and expects the number to be more meaningful over a three to five year period.
    Show source
    So I would say look at it more from a three to five year scale over the next 12 to 18 months, I say one or two orders selectively, we like to pick high technology.
  • The company is looking for 15% to 20% top line growth.
    Show source
    Skandaprasad S.: See we have already guided for a 15% to 20% growth, Shubham, and we are confident of meeting that.
  • The company is developing new industries through a special initiatives team and expects to produce meaningful results there in the next few quarters and years. Replaced by a later filing.
    Show source
    And you will see in the next few quarters and years that this will also get developed and we will also produce meaningful results there.
Show 13 more statements

Orders

  • Order intake in Q1 FY27 was over INR 34 billion, over INR 3,400 crores, comprising about INR 29.6 billion EPC and INR 4.7 billion O&M; international markets accounted for 77% of order intake and India 23%.
    Show source
    Page 3 of 25 VA TECH WABAG LIMITED August 13, 2026 Our order intake during Q1 was over INR 34 billion, over INR 3,400 crores, of which about INR 29.6 billion was EPC and INR 4.7 billion was O&M. International markets accounted for 77% of the order intake in this quarter and 23% came from India.
  • INR 19,400 crores order book consisted of effective orders in various phases of execution, with no slow-moving or non-moving orders. VA Tech Wabag's order book reached INR 194 billion, or INR 19,400 crores, almost $1.8 billion, in Q1 FY27, over four times its revenue base and providing visibility for execution over coming quarters and years.
    Show source
    So today, the INR 19,400 crores order book that we have, all the orders today are effective and are in various phases of execution.
  • Order backlog in Q1 FY27 was 66% EPC and 34% O&M and evenly balanced between India and international markets.
    Show source
    The backlog remains well -diversified with 66% EPC and 34% O&M and evenly balanced between India and international markets.
  • The company secured a 60 MIGD SWRO desalination plant from the Ministry of Electricity Water and Renewable Energy during Q1 FY27, its maiden project in Kuwait.
    Show source
    During the quarter, WABAG secured a landmark 60 MIGD SWRO desalination plant from the Ministry of Electricity Water and Renewable Energy.
  • The company follows projects worth between 2 to 3 billion across the Middle East, Africa and India at any point in time, roughly INR 20,000 crores to INR 25,000 crores, across stages from expression of interest to evaluation.
    Show source
    Roughly INR 20,000 crores, INR 25,000 crores.
  • Projects in VA Tech Wabag Limited's pipeline generally take 12 to 18 months to reach a tender and an award.
    Show source
    So, this is what we call as our pipeline because projects generally take 12 to 18 months to completely fructify and come to a tender and an award.
  • The company prudently removed INR 600 crores worth of framework orders from its order book; the orders had been signed and stamp duty paid but were awaiting effectiveness.
    Show source
    Today, we decided to prudently remove it.
  • EPC orders in international markets generally have an execution cycle of 24 to 30 months.
    Show source
    The EPC orders in the international markets are generally 24 to 30 months in terms of execution cycle.
  • EPC orders in India have an execution cycle of about 36 months or more, plus or minus a quarter depending on whether the project requires a permanent establishment, contract signing or completion of CPs.
    Show source
    In India, it's about 36 months or more of execution cycle, plus or minus a quarter depending on whether the project requires a permanent establishment, requires the contract signing, requires some CPs to be completed.
  • The company secured important order wins in the GCC, India and Europe in Q1 FY27, including entry into Kuwait and UAE, repeat orders in Bengaluru and Delhi, and another technologically advanced project in Europe.
    Show source
    We have entered Kuwait and UAE, strengthened our Indian portfolio with repeat orders in Bengaluru and Delhi and added another technologically advanced project in Europe.
  • The company has received an order from DJB in Mitraon for the Yamuna cleaning plan.
    Show source
    Skandaprasad S.: Yamuna, yes, we've already seen we have got one order from DJB in Mitraon.
  • INR 19,400 crores order book consisted of effective orders in various phases of execution, with no slow-moving or non-moving orders. Replaced by a later filing.
  • VA TECH WABAG LIMITED has O&M orders ranging from 5 to 20 years. Replaced by a later filing.

What it is building and selling

Projects and capacity

  • At VA Tech Wabag's Perur desalination project in Chennai, funded by JICA, 1 lakh cubic meters of concreting had been completed, the highest ever in its history on a single project.
    Show source
    At our flagship Perur desalination project in Chennai, funded by JICA, we crossed an important construction milestone with 1 lakh cubic meters of concreting completed, the highest ever in our history on a single project.
  • Kodungaiyur's refurbishment phase is a one-and-a-half-year phase alongside O&M, followed by full operation for 18.5 years, within a 20-year project.
    Show source
    And after that, it's a 20-year project, one and a half years of refurbishment phase along with O&M, followed by full operation for 18.5 year period.
  • Kutaisi project in Georgia, secured in Q4 last year, had started progressing.
    Show source
    In Europe, the team have already started to progress on the Kutaisi project in Georgia, which was secured in Q4 last year.
  • Ghaziabad project has been completed and is now in O&M.
    Show source
    For example, we have completed the Ghaziabad project.
  • Digha-Kankarbagh is completed and is in O&M.
    Show source
    So that is now into O&M. We have Digha-Kankarbagh, which is completed that is into O&M. Next year, we will see Perur.
  • Perur is expected to move into O&M next year.
    Show source
    So that is now into O&M. We have Digha-Kankarbagh, which is completed that is into O&M. Next year, we will see Perur.
Show 9 more statements

Projects and capacity

  • Kodungaiyur will go into refurbishment, while O&M will continue during the refurbishment phase.
    Show source
    Kodungaiyur will go into refurbishment now, but the O&M will continue even during the refurbishment phase.

Demand and pricing

  • The company expects water requirements for AI, data centers, solar, semiconductors and green hydrogen production to make water a mainstay in those industries, as a raw material or an important component for them to keep running.
    Show source
    But I'm sure over a period of three, five, seven years, this will become a meaningful part of the Industrial mix, especially with the kind of water requirement that is needed in these industries, you take AI, you take the kind of data center explosion that is there for cooling, ultrapure water for solar and semiconductors or any demineralized water for green hydrogen production, water is going to be the mainstay in these industries, whether as a raw material or as an important component for them to keep running.

Segments

  • The company had an average of about 30% of its revenues coming from Industrial up to 2024-25. Industrial represented 28% of VA Tech Wabag Limited's overall business, against a stated target of around 30%.
    Show source
    I remember up to 2024-25, we used to have an average of about 30% revenues coming from Industrial.
  • The company is expanding its addressable market beyond conventional water and wastewater treatment into desalination, reuse, resource recovery, Bio-CNG, digitalization and advanced industrial water applications.
    Show source
    Our strategy remains focused on building an asset-light technology-led water company while expanding our addressable market beyond conventional water and wastewater treatment into desalination, reuse, resource recovery, Bio-CNG, digitalization and advanced industrial water applications.
  • The company has a higher opportunity for EP orders internationally, especially on industrial contracts.
    Show source
    I think internationally, the opportunity to have EP orders is much higher, especially on industrial contracts, we tend to have EP.
  • The company has a mix of industrial clients in India and internationally. Replaced by a later filing.
    Show source
    So we have a good mix, both India and international in terms of the industrial clients.
  • The company has previously generated one-third of its revenues from EP. Replaced by a later filing.

Deals and partners

  • Kuwait desalination project is being delivered in partnership with HEISCO, a leading Kuwaiti engineering and construction company.
    Show source
    This project is being delivered in partnership with HEISCO, a leading Kuwaiti engineering and construction company.
  • The company has taken recent industrial orders from Reliance, GAIL in PATA, BPCL for its Bina refinery, and Aramco, as well as the Ras Tanura project in the Middle East.
    Show source
    Having said that, if you would see the last few orders where we have taken either from Reliance or from GAIL in PATA or from BPCL for their Bina refinery, the Ras Tanura project in the Middle East or the orders for Aramco that we did in the past.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Vaibhav Shah: Yes, thanks for the opportunity. Sir, firstly on the gross margins, we have seen some correction in the first quarter on a Y-o-Y basis. So, is it linked to some RM hike which we are facing, which has led to this fall? And second, on the other expenses, it seems to be on a higher end. Any one-offs or e-sales provisions over there?

    Answer, skandaprasad s

    Skandaprasad S.: Hi Vaibhav. Thank you. On the margins front, I think we have grown year-over-year when it comes to EBITDA. And of course, gross margin and contribution margin are usually a mix of the type of projects we have. So this will not be directly comparable. There may be cases where we have a mix of EP projects which are higher in the last year versus having more EPC projects in this year, number one. Number two, on the other expenses, as we told you last time as well that we continuously evolve our policies to see that with the increasing quality of our order book and the quality of orders that we take in, the policies become more stringent in terms of making provisions for delay or anticipated default.

    Answer, skandaprasad s

    I want to reiterate these are provisions. So based on the new policy that we have, there are provisions which are made. Nothing abnormal. These are standard provisions that are required by the accounting standards. And as the collections happen, there is an opportunity to reverse these as well.

  2. Question

    Vaibhav Shah: Okay. Sir, secondly, we have seen that there is a profit on associates of almost INR 5.5 crores in the first quarter. So from which subsidiary is it from where it is first and could it be recurring in nature in coming quarters?

    Answer, skandaprasad s

    Skandaprasad S.: See, these are the share of profit that you see is primarily from the HAM projects, which have now moved from the construction phase into the O&M phase. Since when you move from construction to O&M, there will be certain risk releases and things. As we move forward, when the O&Ms run, the profits that are accumulated in these projects, whatever is the share equivalent to our economic interest will be coming in here, may not be the exact number because, as I said, it also includes a part of the closure of the construction part.

  3. Question

    Vaibhav Shah: Okay, okay. And sir, any slow moving orders in the backlog? And what portion of the current backlog would be currently under execution? Page 7 of 25 VA TECH WABAG LIMITED August 13, 2026 Skandaprasad S.: See, we had two framework orders Vaibhav, if you recollect, and we have prudently removed both the framework orders, though they are confirmed orders signed waiting for effectiveness.

    Answer, skandaprasad s

    So today, the INR 19,400 crores order book that we have, all the orders today are effective and are in various phases of execution. Of course, the newer orders depending on the effective dates will start, but nothing as slow moving orders or non-moving orders today.

  4. Question

    Vaibhav Shah: And sir lastly on working capital, so from March '26 levels, how do you see it moving in the next couple of years? Will it be similar or we see some improvement on that front?

    Answer, skandaprasad s

    Skandaprasad S.: Yes, considering the growth that we are expecting over the next few years, we have always said that if we stay in the 100 days to 110 days range, despite the increased top line growth which will require some amount of investment, I think we are fairly doing well. But our endeavor will remain that this is further brought down. You can already see in the last three years how the working capital days have moved from 130 days to 120 days to 110 days and now we are closer to 100 days. So, we are moving in the right direction, but I would say from an expectation perspective, if we are staying at 100 days to 110 days range, I think we are doing very well because as you know we are an asset-light organization, our only asset is working capital. And if we do not even invest three months of working capital into the business, how do we even grow?

  5. Question

    Kishore Kumar: Yes. Thanks for the opportunity and good evening sir. Sir my first question is on the execution. So we almost received more than INR 6,000 crores orders in the last couple of quarters. How do you see the execution given the challenges in the Middle East? Because rest of the market contributes close to 50 percentage in the order backlog now. And I think we import a lot of equipments for the EPC business that we do in the Middle East. So how confident are we in the execution in the coming quarters? Do you see any challenges in terms of mobilization of labors or equipments or materials for the EPC?

    Answer, skandaprasad s

    Skandaprasad S.: Thank you, Kishore. See this is not the first time we have had an experience around managing the business in the midst of a geopolitical event. And I don't have to remind you on the multiple times it has happened in the past. This is not something that has happened in this quarter, even the current event has been progressing for more than two, three quarters now. And we have been able to manage the projects well. Page 8 of 25 VA TECH WABAG LIMITED August 13, 2026 I want to reiterate that the projects in the Middle East are far away from any of these strike zones. We don't do any of the sanctioned work.

    Answer, skandaprasad s

    All these projects are social in nature, they are water, sustainable, and hence these projects generally remain fairly insulated from any of these issues. So from a ground execution perspective over the last three quarters or more, even despite these events, our projects have been progressing well and this is what Rohan also mentioned during his opening remarks. Second, yes, all these events bring different kind of challenges, whether in terms of price, whether in terms of supply chain, whether in terms of on various space of activity. Which I think with our historical record you have seen we have been able to manage it well and I'm sure we will manage this also. Such events also have to be seen from the lens of a force majeure, because some of these events will create situations where it is not a normal situation. So we have written appropriate contractual letters to our customers and so the customers are also aware that any price increases, any time delays will be referred to them and we will arrive at an amicable solution. So in summary, projects are progressing well.

    Answer, skandaprasad s

    The new projects are also moving at the pace at which we believe they are good to move considering the backdrop that we have, and we don't have any material concerns at this point in time as far as our international revenues are concerned.

  6. Question

    Kishore Kumar: Got it sir, got it. The second question is a follow up to the previous participant's question on the margin. So, I know we actually operate in multiple countries and we have unbilled revenues or contractual assets in the balance sheet, and that actually results in the forex gain. But it's a significant portion in the bottom line in Q1. So if I adjust for it actually the bottom line actually has declined or the EBITDA. So as the gains in current quarter have been realized or it's more of an accounting entry that we did? Just wanted to understand this bit clear.

    Answer, skandaprasad s

    Skandaprasad S.: See Kishore, there are two types of gains. As you rightly sa id, there are transaction gains and there are translation gains. Translation is usually what happens through the translation reserve that doesn't get passed through the P&L, it only gets passed through the balance sheet. These are all gains that we have from transactions. And what we need to understand is we are increasingly going international and it is important to understand that these are the factors that we take into account even at the time of bidding. This is an important element of the whole bidding process. Second, I don't remember that in the last year first quarter somebody adjusted for the forex loss when there was one.

    Answer, skandaprasad s

    So I don't want that you also get surprised when we have a forex gain, because as we go increasingly international, you are going to see this more and more. And these are all absolutely transactional. You raise an invoice, you collect the money, you get forex gains. You book a cost, you pay the money, you get forex gains or loss. So these are part and parcel of the business and that is why we are very clear that forex gains or losses are part of our operational results. Page 9 of 25 VA TECH WABAG LIMITED August 13, 2026 Moderator: Thank you.

  7. Question

    Sudarshan Padmanabhan: Sure, sir. Sir, my second question is incrementally, we are receiving a lot more orders from the international business. So, if you can give us some color with respect to what is the execution time line vis-à-vis what it is with India or even the execution time lines and the contours vis-à- vis what we used to do, say, a year ago. So that would give us a little bit more insights towards the margins as well as the time lines of the execution.

    Answer, rohan mittal

    Rohan Mittal: When it comes to India or outside, it depends on the complexity of the order. But generally, the orders outside India are faster. These are more, I would say, more defined, the timelines. And you see a very good mix of consultants, clients, all pushing us to achieve the project to be faster because these are more funded projects where the water is sold on tariff basis. So, the faster you finish the project, the better it is for the developer and the EPC contractor. So our iota would Page 10 of 25 VA TECH WABAG LIMITED August 13, 2026 be to finish the project faster outside. Hence, you will see a more, I would say, not much, but maximum of six months faster, I think, the execution timelines outside India.

    Answer, rohan mittal

    Say, 36 months in India. Outside, you'll see more 24 to 30 months is what the timelines that we see.

  8. Question

    Dhananjay Mishra: Yes, thanks for the opportunity. You mentioned that we are going to focus more on Industrial segment. And in our order backlog, it is about 12% to 13% at present and it used to be more than 20% two to three years earlier. So, which area and which segment you are going to focus and geography-wise you can give some color on that?

    Answer, skandaprasad s

    Skandaprasad S.: See, Dhananjay, this cannot be seen at a point in time. It has to be seen over a period of time. I remember up to 2024-25, we used to have an average of about 30% revenues coming from Industrial. So these are also capex cycles and phases through which it goes. And obviously, water being a social subject will have the sizes coming from municipal. Having said that, if you would see the last few orders where we have taken either from Reliance or from GAIL in PATA or from BPCL for their Bina refinery, the Ras Tanura project in the Middle East or the orders for Aramco that we did in the past. So we have a good mix, both India and international in terms of the industrial clients.

    Answer, skandaprasad s

    Two parts to it. The first one is your traditional industrial market. The traditional industrial market, 90% of it would come from oil and gas plus upstream, downstream. And this has remained our core market, whether you talk about Aramco, whether you talk about PETRONAS, OMV, Dangote, and the like. Of course, 10% will come from other sectors, because the other sectors, compared to oil and gas, do not provide the kind of sizes that we look for in terms of economies of scale. The second part is the future energy solutions, which Rohan also mentioned in his opening remarks, data centers, solar, semiconductors, hydrogen. Here, we have repeated that these are decadal views that you have to take.

    Answer, skandaprasad s

    This is not something that over the next one or two years that will become a significant share of the Industrial segment. But I'm sure over a period of three, five, seven years, this will become a meaningful part of the Industrial mix, especially with the kind of water requirement that is needed in these industries, you take AI, you take the kind of data center explosion that is there for cooling, ultrapure water for solar and semiconductors or any demineralized water for green hydrogen production, water is going to be the mainstay in these industries, whether as a raw material or as an important component for them to keep running. So, we would say over a period of time, our objective will remain to take industrial order mix to be around 20% to 25%. That would be a good mix to have. And the new industries also we are developing through a special initiatives team. And you will see in the next few quarters and years that this will also get developed and we will also produce meaningful results there.

  9. Question

    Dhananjay Mishra: And secondly, sir, in Q1 order inflow, we have categorized niche of the orders like EPC, DB. So when we say DB, it is only the Engineering and Procurement part or Construction part is not Page 11 of 25 VA TECH WABAG LIMITED August 13, 2026 there and it could be high margin compared to EPC. Earlier we used to give this EPC backlog or EP backlog. So, how the ratio is currently now?

    Answer, skandaprasad s

    Skandaprasad S.: I don't have an immediate number on the EPC-EP backlog, but I would say today, with the kind of projects we have a higher EPC mix. The recent orders, of course, have a more tilt towards EP, if you talk about Ajman; Doha, again, is a high-technology project, along with O&M, it's a Design, Build, Operate. So, you are right, the Design, Build project will generally be better in margin because there is no construction. Construction for us is a pass-through. Our idea would remain that to see if we can have more design build orders. But of course, even when we take design build, operate orders, since construction is a pass-through, effectively, our margins are made only from design and build.

  10. Question

    Sailesh Raja: Yes, thanks for the opportunity, sir. Sir, we have seen single-digit 7% Y-o-Y growth in the O&M revenue for the quarter. So how do you see the O&M revenue growth for the remaining quarters as well as for the full year? By when we can achieve 20% of revenue? Also, can you update on this Kodungaiyur project, have you started refurbishment work?

    Answer, skandaprasad s

    Skandaprasad S.: Thank you, Sailesh. I think, yes, you are right. On the O&M, the growth has been about 7% Y- o-Y. O&M by structure will grow at this pace because projects have to be completed for it to move into the O&M phase. Through this year, you will see we will complete projects and those will move into the O&M phase. For example, we have completed the Ghaziabad project. So that is now into O&M. We have Digha-Kankarbagh, which is completed that is into O&M. Next year, we will see Perur. Kodungaiyur will go into refurbishment now, but the O&M will continue even during the refurbishment phase.

    Answer, skandaprasad s

    So, you will see the O&M growing. Look at it more from a two-, three- year angle rather than merely one year because there will be crests and troughs in the growth. Your question on what is happening at Kodungaiyur. Kodungaiyur, we have signed the agreement. We also have submitted the project report to the PE. PE is currently evaluating. While the PE is evaluating, we are, of course, still maintaining running the plant.

    Answer, skandaprasad s

    So, the refurbishment phase should start any time now. We are only waiting for the date to start. And after that, it's a 20-year project, one and a half years of refurbishment phase along with O&M, followed by full operation for 18.5 year period. So, anytime soon, we will start the refurbishment, Sailesh. Page 12 of 25 VA TECH WABAG LIMITED August 13, 2026 Sailesh Raja: Okay.

Show 14 more questions
  1. Question

    Sir, my second question, Saudi Arabia has been one of the biggest growth market for WABAG. So has there been any change in the tender pipeline or project award scheduling in Saudi Arabia? So what is the status of this IST project and also opportunity for us in the LTOM, sir?

    Answer, rohan mittal

    Rohan Mittal: Hi, I believe Saudi, I don't think the effect of the war has been so much and water being a critical part of the region, the dependency on desal on water reuse, which is what Hadda is going to do. The water is going to be used for agricultural and beautification reasons of the wastewater. So, I don't think there has been any slowdown. We are in touch with the client. So yes, we are seeing newer and newer projects. We are seeing Sharakat, which is one of the main customers for us, they were called SWPC before. They have announced that a series of projects that are going to come out.

    Answer, rohan mittal

    And also to reinsure their focus on water, 2027 has been announced as a Year of Water by Saudi. So it shows how much focus on water they have. I think that is imperative that they will not go down and slow down on any projects. We have more than half a dozen of inquiries that are actively, we are working on. So I don't see a slowdown in a bid pipeline. So and we are seeing a good mix. It's not just the government entities.

    Answer, rohan mittal

    We have also seen a lot of private entities coming out with tenders, which we are actively pursuing. So as far as the market, if you take the perspective of it, there is nothing that is slowing down. Either you take the execution or their seriousness or their intent to go for more water secure regions. So this is what I would say.

  2. Question

    Sailesh Raja: The status of LTOM sir?

    Answer, rohan mittal

    Rohan Mittal: See, the status of LTOM, it has not been published by NWC. They are going through the tender, the submittals. But meanwhile, we have had the next tenders that are out. And looking at Saudi, we are seeing a lot of other countries also going for it, which we are actively pursuing. So I think this is a good concept. We have done it in the past. We have done it in Turkey.

    Answer, rohan mittal

    We have done it in Agra and Ghaziabad. So I believe that this is the future, and I'm very happy to see that people are realizing this and making it where WABAG already has a first advantage of getting into these projects.

  3. Question

    Sailesh Raja: Okay sir. Thank you sir. All the best.

    Answer, rohan mittal

    Rohan Mittal: Yes. So, on the international, if you see the majority of Middle East and Africa, there is competition. But one thing that we have an advantage, I would say, is our extensive track record of being in the region. There are very few companies who have been four decades in the region Page 13 of 25 VA TECH WABAG LIMITED August 13, 2026 working internationally. We are also a well-reputed brand. So that recognition and advantage comes to us. We also have our IP rights, which we use for captive use.

    Answer, rohan mittal

    And that is something that we also have. And the best part is that we are in the underdeveloped countries like Turkey, Egypt, and India, that's where a majority of the workforce comes from, which gives us an overhead advantage over all the competition coming out from Spain, French or any of the European nations. So this is something that we have a tagline called European quality at Indian prices. I think that suits us and that says that how competitive we are. And a big part of doing so is that we have built 7,000 plants. We do a lot of value engineering. We have a lot of data that helps us to do a competitive bid.

  4. Question

    Krish Talot: On the domestic?

    Answer, skandaprasad s

    Skandaprasad S.: Yes. On the domestic front, I think we have seen traction now coming after many quarters of flood. You've seen over the last three, four quarters that it has opened up whether on the industrial side and now on the municipal side as well. So we are seeing traction. But purely because of the sizes and the number of countries outside India, the multilateral funding flow, the kind of need for water, the significant order flow continues to remain from outside India, and that is why we've also made our strategy in line and also focus our resources on the international markets. While India will remain a very strong part of WABAG base, this is our home country. We can't leave our water leadership here.

    Answer, skandaprasad s

    But we are seeing incrementally the sizes are much bigger outside India. I'm sure in a few years, India will also have larger projects when we will also see India growing at a similar pace as international markets.

  5. Question

    Mihir Vyas: Hi sir. Thank you for the opportunity. Sir, on our operational margins, they are down from 15.8% in Q1 FY26 to 8.9% in Q1 FY27 without taking into account forex gains and losses. Do we expect these margins to improve going ahead?

    Answer, skandaprasad s

    Skandaprasad S.: Mihir, we don't understand the vocab of margins, excluding forex, if we have more than 52% of the revenues coming from international geographies, the forex gains are going to be there. The accounting standards mandate this to be recorded in a separate line, but that does not mean these are non-operational gains. So for us, we have grown from last year to current year on operational level. We have stayed above 13%. So we want to reiterate that forex is completely operational. We don't have forex loans. We don't have foreign asset liabilities on which we trade.

    Answer, skandaprasad s

    All these are working capital. These are invoices raised, invoices booked, money is paid, money is received. So these are completely operational in nature. And you will see forex as an integral component with us going more and more global. So, I would request please consider looking at it, including forex, where you would see on year-on-year basis, we have grown.

  6. Question

    Shubham Borade: Hi. Thanks for taking my question and congratulations on good set of numbers. So I have a very simple question. We have a record order book of INR 194 billion. So how much on a conservative basis we can see execution in the next three quarters?

    Answer, skandaprasad s

    Skandaprasad S.: See we have already guided for a 15% to 20% growth, Shubham, and we are confident of meeting that. And I'm sure you know that our endeavor will always remain to be better than what we promised. So, I think enough said.

  7. Question

    I would like to know what is our current bid pipeline domestically and internationally? Hello?

    Answer, rohan mittal

    Skandaprasad S. : So at any point in time across regions, if you see between Middle East, Africa and India, we follow projects which are anywhere between 2 to 3 billion, right? Roughly INR 20,000 crores, INR 25,000 crores. This could be in all phases. It could be expression of interest, it could be early DPR, it could be a request for proposal, it could be a tender submission, it could be under evaluation. But that's the kind of order sizes that we follow at any point in time. So, this is what we call as our pipeline because projects generally take 12 to 18 months to completely fructify and come to a tender and an award. So, we start very early, work through the phase, selectively targeting projects which are a fit for what our organization is.

  8. Question

    Sriharsha Kj: I have just one question. This quarter the order backlog it does not contract of around INR 611 crores previous quarter. Any particular reason for this?

    Answer, skandaprasad s

    Skandaprasad S.: Mr. Sriharsha, you have seen that from the last quarter, we have removed INR 600 crores worth of framework orders. This was prudently removed and I did answer one of the earlier person’s who had asked this question. Though these orders were in our order book, signed, stamp duty paid, but we were waiting for effectiveness. Today, we decided to prudently remove it. And today, our INR 19,400 crores is all orders which are ready for execution, waiting for effective date or already under execution or O&M, which is waiting for EPC to be complete. So that's the reason why you would see that the difference of INR 600 crores on a mathematical calculation.

  9. Question

    Amay Sharda: Hi, sir. Thank you for the opportunity. Just had two basic questions. One was that we have guided a 15% to 20% kind of a revenue growth rate. But like is there some kind of a bottleneck that stops us from growing higher than 20%.

    Answer, skandaprasad s

    Skandaprasad S.: Amay, we have grown by 21% this quarter. So, I don't believe there is a bottleneck. It is only the pace of the projects. Our mantra has always been that we promise what we can, but we certainly do more than what we can. And you will see that we are always delivering on the higher side of our guidance, not on the lower side of our guidance. So, there is a bottleneck as such for our growth. With the kind of order book we have whether you or me like it or not, we have to deliver and the consequence of revenue growth will be there.

  10. Question

    Krish Salot: Thanks for taking again my question. I just wanted to understand from last year basis, what would be our EPC part of the construction, as you mentioned, this year, EPC was higher than EP. So if you can give some bifurcation on that. And as we are increasing our international projects, could we see a further improvement in our working capital days as well as you mentioned that there's around six months earlier commissioning in those projects?

    Answer, skandaprasad s

    Skandaprasad S.: I'll take the second question first, Krish. On working capital, what I mentioned was if you are looking at growth 15% to 20%, especially being in a construction sector, having a 3 to 3.5- month kind of working capital is something that is not abnormal. And that is what is our only growth and the only investment for the growth that is there. Yes, you are right, with more international orders, the working capital quality will certainly improve because the payment patterns, payment time lines, the contractual administration is much better outside India than in India. So you are also seeing over the last 3 to 4 years as our international mix continues to improve, our working capital days have also been sequentially coming down. I think your first question was on the mix of EP and EPC Internationally. I think internationally, the opportunity to have EP orders is much higher, especially on industrial contracts, we tend to have EP.

  11. Question

    And if you can just give some understanding on a full year basis, our orders will be more and on a multiyear basis as well, our orders will be more towards EP?

    Answer, skandaprasad s

    Skandaprasad S.: Krish, our endeavor will be to do EP projects, but that is not our bottleneck. It's not that we have a very strict policy that we will go only for EP projects. As I said, even in case of EPC projects because you have partners, you are practically offloading your construction risk. So, for us, it is an EP risk profile even if we go for EPC project. So, on a multiyear basis, our endeavor would be to at least do 10% to 20%, at least coming out of EP, if not more. In the past, we have even done one-third of our revenues from EP. But as I said, that is not our constraint to do projects.

  12. Question

    Manish Maheshwari: Second question is, Yamuna is a very, very profound and enormous opportunity, right? So any orders are we sort of expecting or envisaging this year, this financial year from Yamuna particularly Delhi?

    Answer, skandaprasad s

    Skandaprasad S.: Yamuna, yes, we've already seen we have got one order from DJB in Mitraon. And we are following the Yamuna cleaning plan. And obviously, having the relationship with DJB for many, many years and decades now, I think we have a good opportunity there. We are following it. We are following the tenders and also working on it. And you will see in the next few quarters as the orders of our size and our contract fit and something that fits our technology that we're Page 20 of 25 VA TECH WABAG LIMITED August 13, 2026 not in the race for orders today. Thankfully, we have sufficient order book.

  13. Question

    Manish Maheshwari: Great, sir. Thank you.

    Answer, skandaprasad s

    We have orders which are 5, 7, 10, 15, 20 years. So a very blind average on the backlog that we have would give us anywhere between 7 to 10 years of recurring revenues. On the EPC, Rohan did answer a question earlier. I'm not sure if you were there at that point in time. The EPC orders in the international markets are generally 24 to 30 months in terms of execution cycle. In India, it's about 36 months or more of execution cycle, plus or minus a quarter depending on whether the project requires a permanent establishment, requires the contract signing, requires some CPs to be completed. So that is the kind of cycle over which the revenues will pan out.

    Answer, skandaprasad s

    But broadly, our expectation is that these orders would be executed over the next 36 months. Arjavi: Okay. Thank you.

  14. Question

    K Rajesh: Congratulations on good set of numbers. I just had one question. So in the presentation, we highlighted the new avenues for growth, right, like solar PV, semiconductor, data centers and green hydros. So how do you visualize the order inflow in the coming like 12 to 18 months? Like how much? -- and congrats for the breakthrough order in this sector.

    Answer, skandaprasad s

    Solar, we have already been able to make the breakthrough. Next, there is semiconductor, data centers where cooling and Ultrapure Water will be required. And the very long-term part will be the green hydrogen. So I would say look at it more from a three to five year scale over the next 12 to 18 months, I say one or two orders selectively, we like to pick high technology. But over a three to five year period, this is expected to be a more meaningful number.

Questions about this call

When was the VA Tech Wabag Q1 FY27 earnings call transcript filed?
VA Tech Wabag filed the transcript with the exchange on 19 Aug 2026. This page is built from that transcript.
What does this page list?
50 statements from the transcript across 8 topics, 34 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 24 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
VA Tech Wabag Q1 FY27 concall: what the company said · DalalOS