Afcons's balance order book for Jal Jeevan Mission-related projects is around INR1,300 crores, including INR530 crores in UP, around INR500-odd crores in MP and around INR300-odd crores in Rajasthan; Afcons said it foresees no problem in MP and no challenge in Rajasthan. Afcons expects its full-year EBITDA margin to be better than its general guidance of around 11%, having achieved a 13.3% EBITDA margin in nine months, although an unspecified event could derail this. The company has completed around 30% physical progress in the Bullet Train project. Afcons's EBITDA was INR424 crores, with an EBITDA margin of 14% in Q3 FY ‘26, compared with 13.5% in the previous quarter; the EBITDA calculation excluded the one-time labor code-related provision. Afcons's gross debt was INR3,634 crores and net debt was INR2,779 crores.
The numbers management gave
Results
- Afcons's EBITDA was INR424 crores, with an EBITDA margin of 14% in Q3 FY ‘26, compared with 13.5% in the previous quarter; the EBITDA calculation excluded the one-time labor code-related provision.
Show source
In the quarterly number for the Q3 FY ‘26, we have done INR424 crores, and in this quarter, the EBITDA margin works out to 14%, as against 13.5% in the previous quarter.
- Afcons recorded an exceptional labor code-related provision of INR76.51 crores during Q3 FY ‘26.
Show source
The exceptional item on account of labor code is around INR77 crores, INR76.51 crores to be very specific, during this quarter.
- Afcons's profit before tax was INR456 crores, or 4.8% of the top line, for the nine-month period, after providing for INR76.5 crores of labor code provision; the prior year's figure was INR526 crores, or 5.5% of the top line.
Show source
When it comes to profit before tax for the nine-month period, we have done INR456 crores, and this number is after providing for this INR76.5 crores of labor code provision.
- Afcons's labor code-related exceptional provision was around 80 basis points for the nine-month period.
Show source
When we look at this nine-monthly number of 4.8%, the exceptional item provision works out to around 80 basis points for the nine-month period.
- Afcons recorded INR211 crores in other operating income for the nine-month period; this includes recurring and integral items such as arbitration interest, foreign currency exchange gain and miscellaneous incomes.
Show source
For the nine-month period, this amount was INR211 crores in other operating income.
- Afcons completed close to INR200 crores in nine months. Replaced by a later filing.
Show source
Ramesh Jha: In nine months, we have done close to INR200 crores.
Show 3 more statements
Results
- Afcons said it has received some upside from an arbitration award. Replaced by a later filing.
Show source
And third, we have got some award because of arbitration award, and because of that also, there is some upside.
Money and capital
- Afcons's gross debt was INR3,634 crores and net debt was INR2,779 crores.
Show source
So the debt number, gross debt number is INR3,634 crores is the gross number, and INR2,779 is the net debt number.
- Afcons said interest-bearing advances had generally been around 20%-25% over the last three-four years, but were at an elevated level at the time of the call.
Show source
So generally the way we have seen last three-four years, the number is around say 20%-25% the interest-bearing.
What it expects ahead
What management expects
- Afcons expects its full-year EBITDA margin to be better than its general guidance of around 11%, having achieved a 13.3% EBITDA margin in nine months, although an unspecified event could derail this.
Show source
Since we have already achieved 13.3% EBITDA margin in nine months, our full-year EBITDA should be better than what generally the guidance we give of around 11%.
- Afcons said an EBITDA margin of around 11% will be sustainable, noting that it had largely been around 10% plus over the last 10-12 years and 11% plus in recent time, with some years around 9.5%.
Show source
So that is where on a consistent basis we are talking about that 11% EBITDA margin is something which will be there, and if you see last 10-12 years, we are largely there -- some years maybe around say 9.5% -- but largely we are around say 10% plus and in recent time 11% plus.
- Afcons is targeting order booking of around INR20,000 crores next year.
Show source
Hitesh Singh: Yes, that's the target, that around INR20,000 crores next year also will be targeting for order booking.
- If the TBM moves to the next year, Afcons expects capex of around INR1,000-INR1,100 crores, rather than a direct addition of INR700 crores plus INR700 crores, because equipment will be freed from projects that are completing and Afcons needs to rationalize.
Show source
It will be -- it will be say around say -- if this TBM moves to the next year, maybe around INR1,000-INR1,100 crores kind of capex will be there.
Orders
- Afcons's balance order book for Jal Jeevan Mission-related projects is around INR1,300 crores, including INR530 crores in UP, around INR500-odd crores in MP and around INR300-odd crores in Rajasthan; Afcons said it foresees no problem in MP and no challenge in Rajasthan.
Show source
Ramesh Jha: Mohit, just to add, the total Jal Jeevan Mission-related project is around INR1,300 crores balance order book.
- Afcons said it has in excess of INR11,000 crores of international orders at L1.
Show source
Ramesh Jha: So see we have already in excess of INR11,000 crores of international order which is L1.
Show 2 more statements
Orders
- Afcons's total L1 position was INR11,300 crores, after removing the Maharashtra job because it was going for rebid.
Show source
Ramesh Jha: L1 position total is INR11,300 crores.
- Afcons's current bid pipeline, extending to the next two years, was close to INR3.8 trillion: around 35% was in urban infrastructure, around 30% in hydro and underground, close to 20% in marine and industrial business, and around 15% in surface transport; around one-third was overseas and two-third domestic.
Show source
It is well spread across all the segments, all the four key segments where we are actively participating.
What it is building and selling
Projects and capacity
- The company has completed around 30% physical progress in the Bullet Train project.
Show source
But in terms of percentage, we can tell you that we have completed around 30% in the project, the physical progress, and accordingly revenue and cost has been booked.
What the company said on its earnings call, taken from its own transcript. Not advice.
Questions and answers
Question
I would also like to extend a warm welcome to all our investors, analysts, and participants. We value your continued interest in Afcons and appreciate the engagement you bring to this discussion. As Mr. Subramanian outlined, the third quarter reflected some execution and sectoral headwinds which moderated our performance. Despite our best efforts to mitigate these challenges, some impacts persisted, largely due to timing-related factors rather than any internal structural issues. We remain focused on restoring the growth momentum over the coming quarters. Let me briefly touch upon the operating environment and how we see it evolving. In India, the government has reiterated its long-term comm
Answer, ramesh jha
Ramesh Jha: Thank you, sir. Good morning, everyone. Before talking on the numbers, let me reiterate what usually I do it on every quarter, and this becomes more relevant this quarter, that the quarterly number varies. Company is into business of construction, the margin in a quarter varies based on the nature, type, and quantum of work executed. So quarterly results may vary in different quarters and may not be indicative of annual result or trend. Now coming specific to the numbers. For the nine months ended, we have done a top line of INR9,545 crores against last year nine-month top line of INR9,635 crores, which is a kind of, it has come down by 0.9%.
Answer, ramesh jha
In Q3, we have achieved a top line of INR3,025 crores versus INR3,332 crores in previous year Q3. So there is a marginal degrowth in nine months as well as Q3 as well. Now this kind of top line movement is a manifestation of stressed payment across the projects, and few specific projects where certification and payments are slow. Jobs where we were declared L1 quite some time back are still not awarded. Some recently bagged jobs have not picked up in a manner we were expecting, and also few fast-track projects are moving at the normal pace. Now moving on to the margins. As far as EBITDA is concerned, for the nine-month period, we have done INR1,269 crores, which works out to 13.3% of the top line, which has improved from the previous year number of INR1,247 wherein we had done 12.9%.
Answer, ramesh jha
So the EBITDA in terms of percentage has gone up. In the quarterly number for the Q3 FY ‘26, we have done INR424 crores, and in this quarter, the EBITDA margin works out to 14%, as against 13.5% in the previous quarter. When we are talking about the EBITDA number, of course, we have not included this one-time exceptional provision on the accounts of labor code-related provision. The exceptional item on account of labor code is around INR77 crores, INR76.51 crores to be very specific, during this quarter. When it comes to profit before tax for the nine-month period, we have done INR456 crores, and this number is after providing for this INR76.5 crores of labor code provision. This works out to around 4.8%, as compared to last year's INR526, which was Page 5 of 18 Afcons Infrastructure Limited February 11, 2026 5.5%. When we look at this nine-monthly number of 4.8%, the exceptional item provision works out to around 80 basis points for the nine-month period.
Answer, ramesh jha
On Q3, the number of profit before tax is INR123 crores, against INR200 crores of profit before tax in the Q3 FY ‘25. Profit after tax for the nine-month period is INR339 crores, as against INR376 crores in the previous year nine months. And during the quarter, the profit after tax is INR97 crores, which is 3.2%, as against INR149 crores done last year. Now I'll just like to explain on the EBITDA. In our EBITDA calculation, we consider BG commission as part of our operating expenditure. So EBITDA what we are talking about is after removal of BG commission as operating expenditure. This quarter, because of labor code-related provision, there is a one-time impact which of course we have not factored in the EBITDA calculation, we have factored that in profit before tax and profit after tax.
Answer, ramesh jha
Other income. In our calculation, we include other income as part of other operating revenue. Here we have explained earlier also that our other income is something which is part of operating revenue, like arbitration interest, foreign currency exchange gain, and miscellaneous incomes are recurring and very integral to our business. Hence, this needs to be considered as part of other operating income. For the nine-month period, this amount was INR211 crores in other operating income. Since we have already achieved 13.3% EBITDA margin in nine months, our full-year EBITDA should be better than what generally the guidance we give of around 11%. But at the same time, there could be some event which may derail, but I am not saying there is any specific project, but I am generally saying that every year we are giving guidance of around 11%.
Answer, ramesh jha
We have already done better, and we have got all projects which are doing fairly well. So annual numbers should be better than whatever we give generally, the annual guidance. For the nine months, it is around 13.3%. In terms of profits, the profit for the period is similar to that of the last year after adjusting for the labor code-related one-off exceptional item. Of course, this factors some upside on account of arbitration award and also because of margin improvement in few projects. Also, in some projects, we could save on some of the material cost and other operational improvements, and that has improved the margin on an overall basis. Specific to finance cost increase, we have improved our average borrowing cost in the nine months FY ‘26 as compared to what we had achieved last year nine months, but in the nine months, the average borrowing has gone up.
Answer, ramesh jha
And that is because of working capital blockage, because we are not seeing the payments very smooth in this nine-month period. So despite improving the average cost of borrowing (interest on bank borrowing), the overall interest cost on the bank borrowing has gone up. Also, the interest-bearing advances for the period ending December 2025 has almost doubled to around 40% in the overall advance from customers, as compared to last year when we were around say 20%-22% in the overall borrowing -- in the overall advances -- the interest-bearing advance this time was around 39%-40%. Page 6 of 18 Afcons Infrastructure Limited February 11, 2026 Because of this, interest on customer advance has also increased, making the overall interest cost to go up. We expect the situation to improve once our L1 orders materialize, because large part of the international orders where the advances are interest-free. We have provided for accelerated depreciation in this quarter as well. Of the total INR354 crores of depreciation, more than 1% of the cost component in the depreciation is towards accelerated depreciation.
Answer, ramesh jha
So our profit numbers are after accounting for the accelerated depreciation. In terms of ROCE, ROCE in nine months is around 14%, 13.4% to be very precise after considering the exceptional item. We'll look at these numbers on an annual basis because that will make more sense. As far as net working capital goes, the net working capital continues to remain at elevated levels. There is some moderate improvement in payment from January onwards, but the stuck payments are not moving, and that is where the challenge lies. We are expecting some improved collection in this quarter. Realization of few stuck receivables and also the collection of good advances should improve the situation definitely from where we are today.
Answer, ramesh jha
Debt, the debt number has remained in the similar range that of September and stands at INR3,633 crores on the gross basis and INR2,779 crores on net basis. On net basis, the debt- equity is around 0.5 times of the net worth. In terms of liquidity, the company is in a very comfortable situation because we are maintaining very healthy balance of cash and bank balance, and we have got large amount of bank limits which is unused. On behalf of Afcons Infrastructure Limited, I thank everyone for attending this call. Now I request the moderator to open the floor for question and answer. Thank you.
Question
Paramasivan Srinivasan: There, that was opened -- that was awarded nearly two years back. This bid was invited sometime in Jan 2025 -- bid was submitted rather in Jan 2025, bid was opened. This was awarded much earlier, sometime in March or before that 2024. So that part of the job is going on. This part of the job is something which they are going for rebid, as we know.
Answer, ramesh jha
Ramesh Jha: I'll answer on the margins. Good morning, Aditya. On the margin front, see we have -- I'll break this into three parts. One, we have already talked about that any project we submit bid, we always look at a threshold of margin, and that margin will always be there in the project, unless something goes upside down and then only otherwise, we'll maintain that kind of margin. So that is one. Two, we have also talked about that in projects there are some risk and contingencies provisions are there, and our endeavor is always to save on those risk and contingencies, improve on some methods, designs, and then improve the margin. So that is second aspect.
Answer, ramesh jha
And third, we have got some award because of arbitration award, and because of that also, there is some upside. So that is where on a consistent basis we are talking about that 11% EBITDA margin is something which will be there, and if you see last 10-12 years, we are largely there -- some years maybe around say 9.5% -- but largely we are around say 10% plus and in recent time 11% plus. So that is something which is sustainable. Balance is dependent upon, how we are able to save on those risk and contingencies, and if some arbitration award comes, that also kind of takes it up. Page 8 of 18 Afcons Infrastructure Limited February 11, 2026 Aditya: Understood, sir. And should we start assuming that instead of 11%, we can generate higher margins going forward as well, or this appears to be a bit of an aberration because of maybe some arbitration awards that we had and some projects nearing completion?
Answer, ramesh jha
Ramesh Jha: So the margin what we are seeing today is not from -- 11% is something which definitely will be there, and the kind of margin we are seeing today is not because of purely arbitration award because, arbitration upside is a small fraction of that. The remaining part is towards the improvements we have done in the project. Some projects we have -- we are completing before time. Some projects we are improving designs and methods, and we are saving on some of the cost. We are saving on some material procurement and other aspects. So that is where this improvement is happening. Definitely the margin will be, northwards of 11%, but at the moment, what we'll request that, let's keep it at 11% plus.
Question
Paramasivan Srinivasan: On Jal Jeevan Mission projects, our major problem is with respect to our UP. In UP, balance pending order is roughly around INR500 crores -- sorry, roughly around INR500 crores. Existing outstanding from the client is INR405 crores. So while there had been meetings held at the Chief Minister's level and all as early as in October, not much traction had taken place in terms of cash flows. So we are still awaiting a cash flow coming through for us. Page 9 of 18 Afcons Infrastructure Limited February 11, 2026 In the meantime, we have whatever business call we need to take with respect to the project we have taken by way of slowing down and probably pruning down our estab
Answer, ramesh jha
Ramesh Jha: Mohit, just to add, the total Jal Jeevan Mission-related project is around INR1,300 crores balance order book. As sir has explained, that UP is INR530 crores and that's the biggest chunk. Another say INR500-odd crores is in MP where we are not foreseeing any problem. The bills are -- we are doing the work, we are submitting bills, and we are getting paid as well. In Rajasthan, we have started the third job. There around say INR300-odd crores is there in Rajasthan. And since it is at the very initial stage, we don't foresee any challenge in Rajasthan.
Answer, ramesh jha
So all together around INR1,300 crores. UP is something which we need to see. And in UP also, from January onwards, they have started releasing payment. We have received close to INR15 crores in the month of January. We need to see -- they have promised that they'll release payment, we need to see how it pans out.
Question
Ashish Shah: Yes, thank you for the opportunity. Sir, my first question on -- I mean you did mention that there would have been some impact of favorable arbitration also during this quarter as far as the margins is concerned. As I read from the notes to account, there is INR165 crores of revenue which has been taken to the P&L on account of the Chenab Bridge arbitration award. So could you tell that whether this INR165 crores directly flows to the EBITDA and down or there is a cost element also attached to it? So what could be the EBITDA impact of this INR165 crores? That's my first question, sir.
Answer, ramesh jha
Ramesh Jha: No, it's not the full amount is having an EBITDA impact. There is a cost element also in that.
Question
Ashish Shah: Okay. Sir, any range you could share, what's the EBITDA impact of INR165 crores?
Answer, ramesh jha
Ramesh Jha: So exact number at the moment we don't have, but the EBITDA impact would be, of this amount, it could be around say 23%-24%.
Question
Ashish Shah: 23 to 24% of INR165. Okay. All right. The same note also mentions there is another INR115 crores that we are still carrying on this particular project. So what happens? I mean the arbitration has given us the INR243 total amount and INR115 still remains. So what happens to this amount, sir? Does this have to be impaired or we continue to go for another round of arbitration for this INR115? Page 10 of 18 Afcons Infrastructure Limited February 11, 2026 Ramesh Jha: No, so see this arbitration are for on various accounts, and one of the -- one of the case has been settled and we have got the award.
Answer, ramesh jha
The case pertaining to INR115 crores will come in the due course of time.
Question
Ashish Shah: Alright. And sir, lastly in terms of the execution constraints that we talked about. Now I get an impression that the UP order book is just about INR530-odd crores out of the total about INR30,000-odd crores order book that we have. Of course, the TBM issues still continues, but beyond UP, what -- can you highlight any specific project segment where things have been slow? So the Bullet Train is something that we understand. The UP is -- seems like a relatively small amount in the overall scheme of things in terms of at least the backlog. Page 11 of 18 Afcons Infrastructure Limited February 11, 2026 Hitesh Singh: Hi, Ashish.
Answer, hitesh singh
The specific projects it will be very difficult to explain, but there are certain domestic projects where we were anticipating that the progress will be fast-tracked, and that is what we have taken in our plans. But due to various reasons, the progress has not been as fast-track as we have anticipated, and that is why this delay has happened. These are largely domestic projects.
Question
Paramasivan Srinivasan: Yes, very much. It should normalize as it looks.
Answer, hitesh singh
Hitesh Singh: That's what it looks like, the situation will normalize because there are certain scope changes, there are certain approvals which were pending, which we have received and will receive in due course of time, and we expect the pace to catch up very soon.
Question
Shravan Shah: Hi, sir. Couple of questions just continuing the previous questions. So the bond, the French one, so correct me if I'm wrong: what I understand is this Meridian French has already filed for the bankruptcy. So when we are saying that we are confident to get back this INR194-odd crores, can you -- can you explain how that is possible?
Answer, ramesh jha
Ramesh Jha: So just to add, see this project what we are doing, Meridian is the parent entity, but the project we are doing is for SAG, which is a Gabonese entity. And this project is on a BOT basis in Gabon, and this is for Government of Gabon. So once they start tolling, from that toll revenue, they'll make the payment. So our recourse is on the Gabonese entity, not the Meridian entity, the French entity. The contract was under French law, that's why the reason the matter has gone to French court, otherwise this is with SAG. Shravan Shah: Got it. Couple of more questions.
Answer, ramesh jha
So now when we are saying that we are looking at a INR20,000 crores order inflow for FY ‘26, so INR3,700 crores including this Uganda one we have already won and now the all the Maharashtra is one can say is cancelled. So Croatia, so can you help me understand this Croatia, the entire INR11,300 crores though you said that the road can spill to the April also, so are we in INR20,000 crores considering the entire INR11,300 crores to be LOA by March?
Question
Shravan Shah: Okay, so my thought or my -- I was trying to understand whether this, the balance INR16,000 is entirely how much would be the fresh -- the new one that we are looking at, not the converting of the L1 to LOA Croatia?
Answer, hitesh singh
Hitesh Singh: Yes, so in the only the Croatia rail project is what we have factored in, which is around INR6,700 crores, rest all are in the new projects which are in the tendering phase. We in the -- no other L1 we have taken in account in this INR16,300 crores.
Show 17 more questions
Question
Shravan Shah: Okay. And in terms of the going forward also, this kind of a run rate INR20,000 crores is broadly that we look at on a maybe in FY ‘27, ‘28 also. That's the way one can look at?
Answer, hitesh singh
Hitesh Singh: Yes, that's the target, that around INR20,000 crores next year also will be targeting for order booking.
Question
Shravan Shah: Okay, got it. Understood that. And couple of balance sheet items if you can share, in terms of the and the gross debt and net debt you have mentioned, but I missed that part, if you can spell it again? And maybe debtor, inventory, creditors, mobilization, retention, unbilled, if you can share, would be help to understand how the working capital is moving.
Answer, ramesh jha
Ramesh Jha: Working capital, at the moment I don't have the balance sheet numbers, the full breakup, but I can give you the debt number. So the debt number, gross debt number is INR3,634 crores is the gross number, and INR2,779 is the net debt number. And broadly the balance sheet parameters are similar to the September number, and it is already there in the presentation.
Question
Shravan Shah: Okay, okay, okay, got it. And the capex, till now nine months, how much we have done? And we were looking at INR1,100-odd crores, so what's the number for full year? And maybe for next year also if you can specify? Page 13 of 18 Afcons Infrastructure Limited February 11, 2026 Ramesh Jha: So on the capex front, for this financial year, as you have rightly said, we had planned INR1,100 crores.
Answer, ramesh jha
And in that INR1,100 crores, the tunnel boring machine related to this high-speed rail project is around INR700 crores. Balance INR400 crores is something which we are going to do. And this TBM is something which is contingent upon, movement from China. If the approval comes, then we'll end up somewhere around say INR1,100 crores for this financial year. If that doesn't happen, then maybe we'll end up around INR400 crores.
Question
Shravan Shah: Okay. And till now nine months, how much we have already done?
Answer, ramesh jha
Ramesh Jha: In nine months, we have done close to INR200 crores.
Question
Shravan Shah: Okay, because in H1, I think it was INR230-odd crores, so nothing has been done?
Answer, ramesh jha
Ramesh Jha: Similar number is there. So usually what happens that in capex, it's not that it will be, proportionate every month. These are large value equipment, and the movement happens and that's how it gets accounted.
Question
Shravan Shah: Okay. And so, if this INR700 crores TBM, let's say, moves to the next year, so next year this INR700 and plus maybe another INR700 or INR1,400-INR1,500 crores kind of a capex one can look at?
Answer, ramesh jha
Ramesh Jha: We need to see, because many of the projects, the way we were looking at, at the beginning of FY ‘26, some of the projects were ongoing and then we were expecting that new projects will come. The way things are looking now, some projects, the existing projects will be completing. So large part of the equipment will get free from the existing project. So it will not be a direct, math of INR700 plus INR700. We need to rationalize. It will be -- it will be say around say -- if this TBM moves to the next year, maybe around INR1,000-INR1,100 crores kind of capex will be there.
Question
Shravan Shah: And last, out of current existing order book INR32,500 and maybe plus this INR1,000 crores Uganda, let's assume no further inflow comes, how much of that in terms of the revenue one can look at in FY ‘27 out of this INR33,000-INR34,000-odd crores?
Answer, ramesh jha
Ramesh Jha: We'll come back on this number maybe next quarter, because it's too early because we have to do that detailed planning.
Question
Shravan Shah: But broadly three year is a is a execution, that's the way one can look at, or it could be three and a half year?
Answer, ramesh jha
Ramesh Jha: Two and a half year is our average execution period, that's what we have always conveyed.
Question
Paramasivan Srinivasan: Vadhvan Port is something which has gone for security clearance for all the bidders. Usually in many government contracts, they take only the winning bidder for the security clearance. Here they have mentioned that all the bidders will go for security clearance. So the one they're still awaiting the security clearance, once security clearance comes, bid could be opened. Balasubramanian: Okay, sir. Sir, I think our interest-bearing advances has been increased to 20% to 40%. So that leads to higher interest cost. Once -- once we get international orders, how this mix will change?
Answer, ramesh jha
Ramesh Jha: So see we have already in excess of INR11,000 crores of international order which is L1. And even some of the domestic projects also we get interest-free advance. So generally the way we have seen last three-four years, the number is around say 20%-25% the interest-bearing. But at the moment, it is at a bit elevated level. It will be difficult to put in any number, the percentage, but you can take a guidance that in past it used to be around 20%-25%. Balasubramanian: Okay, sir. Thank you.
Question
Vaibhav Shah: Yes. Sir, what would be our total L1 position as of now?
Answer, ramesh jha
Ramesh Jha: L1 position total is INR11,300 crores. And we have -- we have in this L1 position, we have removed the Maharashtra job because what, the internal this thing we have is these are going for rebid.
Question
Vaibhav Shah: Okay. And sir, what would be our current bid pipeline, and if you could quantify it across key verticals? Page 15 of 18 Afcons Infrastructure Limited February 11, 2026 Hitesh Singh: Yes, our current bid pipeline, which extends to next two years, is close to INR3.8 trillion.
Answer, hitesh singh
It is well spread across all the segments, all the four key segments where we are actively participating. The large chunk, around 35%, lies in the urban infrastructure space, which takes care of metro, bridges, elevated corridors and those kind of things. Around 30% is in the hydro and underground, which includes water, road tunnels, those kind of work. Close to 20% is in marine and industrial business, and around 15% will be in surface transport, which is our road business and railways business. And in terms of domestic and overseas, around one-third will be overseas and two-third is domestic.
Question
Mudit Bhandari: Hi, sir. My question is upon the execution. Now if we look at order book and exclude all JJM and other projects that you talk about, even then we have very good visibility. And you said there are some pending clearances or approvals and change in scope. So can you quantify what amount of these projects are which are pending clearance or undergoing changes?
Answer, hitesh singh
Hitesh Singh: Mudit, it's very difficult to quantify the projects, but these are some of the projects which are in the initial stage of execution, and that is why the teething issues. Generally, these kind of issue happens and they get resolved quickly, but in certain projects, it has taken more time. That is the one aspect. And the other part is there certain projects we expected the pace of turnaround will be much, much quicker, which has not happened. Page 16 of 18 Afcons Infrastructure Limited February 11, 2026 So these are the mixed of two things, but very difficult to quantify in numbers in what exactly the number is, I mean quantum of projects which is going through is. But as we have mentioned earlier also, most of the teething issues has been resolved, and we expect this quarter to see the benefit of that.
Question
Mudit Bhandari: Got it, sir. Any color you can give upon which segment of these projects will be?
Answer, hitesh singh
Hitesh Singh: I mean, again, it is spread across largely three segments, the urban infrastructure business, marine business, and also in the in the hydro and underground business.
Question
Mudit Bhandari: Okay, got it. So we are expecting that all these approvals or majorly of these approvals will receive within this Q4?
Answer, hitesh singh
Hitesh Singh: Better said, that it stretched more than planned, so they have -- they have already come through.
Question
Mudit Bhandari: So you're saying all the approvals have already came.
Answer, hitesh singh
Hitesh Singh: Some of them -- most of them have come through.
Question
Bhavin Modi: So just one question. In terms of the Bullet Train project, sir, how much work we have executed, and that have we recognized in the revenue?
Answer, ramesh jha
Ramesh Jha: So again, project-specific numbers, we would not like to put across here. But in terms of percentage, we can tell you that we have completed around 30% in the project, the physical progress, and accordingly revenue and cost has been booked.
Question
Bhavin Modi: Okay. So sir, we have not yet billed to the client, right? So this will be standing as unbilled revenue.
Answer, ramesh jha
Ramesh Jha: No, no, no. So what we are saying is we have completed 30% in the project. Accordingly cost have been booked, accordingly revenue has been booked. And we have -- the billing happens as per the payment milestones, so we have -- largely it will be done. The billing has been done.
Questions about this call
- When was the Afcons Infrastructure Q3 FY26 earnings call transcript filed?
- Afcons Infrastructure filed the transcript with the exchange on 16 Feb 2026. This page is built from that transcript.
- What does this page list?
- 18 statements from the transcript across 5 topics, 15 of them with a figure. Each statement is shown with the transcript sentence it came from.
- Are the analysts' questions included?
- Yes. 27 questions and management's answers are listed in the order they were asked, as the transcript prints them.
- Who wrote this page?
- DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.