Garden Reach Shipbuilders & Engineers Q1 FY27 earnings call

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

Garden Reach Shipbuilders and Engineers Ltd.'s order book was ₹13,596 crore, comprising ₹13,296 crore from shipbuilding and the balance from its engineering and engine divisions. The company anticipates that employee cost could increase by a similar range of 15-20% in the next pay commission, which it says is normal in every pay commission, and has factored this into its future projections and calculations. The large P-17 Alpha ship had nearly 85% physical construction progress, and Garden Reach Shipbuilders and Engineers Ltd. intended to deliver it during the calendar year, by November. Garden Reach Shipbuilders and Engineers Ltd.'s total income was ₹1,914 crore in Q1 FY27, up 38% year-on-year compared with Q1 FY26; revenue from operations increased from ₹1,310 crore to ₹1,815 crore, up 39%. About 80,000 crores worth of RFPs are currently out of life, and about 60,000 more is likely to come out during the current year, making the opportunity volume around 1,40,000; the contenders for these 1,40,000 to 150,000 crores are about five to six shipyards.

The numbers management gave

Results

  • Garden Reach Shipbuilders and Engineers Ltd.'s total income was ₹1,914 crore in Q1 FY27, up 38% year-on-year compared with Q1 FY26; revenue from operations increased from ₹1,310 crore to ₹1,815 crore, up 39%.
    Show source
    Our total income stood at ₹1,914 crore, recording a year -on-year growth of 38% when compared to Q1 FY26 results and the revenue f rom operations has increased from ₹1,310 crore to ₹1,815 crore recording a growth of 39%.
  • Garden Reach Shipbuilders and Engineers Ltd.'s profit after tax increased 44% from ₹120 crore to ₹173 crore in Q1 FY27; earnings per share increased 44% from ₹10.49 to ₹15.09.
    Show source
    The profit after tax has moved up by 44% from ₹ 120 crore to ₹173 crore during this period and the earnings per share has increased by 44% from ₹10.49 to ₹ 15.09.
  • Garden Reach Shipbuilders and Engineers Ltd.'s financials had been on an upward trend for 17 consecutive quarters, and management hoped to maintain this in the coming quarters.
    Show source
    Yes, I would like to state that this is the 17th quarter on a trot that our financial s have been on an upward trend and hopefully we will be able to maintain this tempo in the coming quarters too.
  • Garden Reach Shipbuilders and Engineers Ltd. had delivered four of the eight Anti-Submarine Shallow Water Craft and planned to deliver the remaining four during the current financial year.
    Show source
    Four of the eight anti -submarine shallow water crafts have Page 4 of 18 already been delivered, and the balance of four ships shall be delivered during the current financial year.

What it expects ahead

What management expects

  • The company anticipates that employee cost could increase by a similar range of 15-20% in the next pay commission, which it says is normal in every pay commission, and has factored this into its future projections and calculations.
    Show source
    But our anticipation is that it could be of similar range 15-20% which is normal in every pay commission.
  • Garden Reach Shipbuilders and Engineers Ltd. planned to begin delivering the Next Generation Offshore Patrol Vessels in Q2 FY28 and deliver the last ship during Q2 FY29.
    Show source
    These ships shall be delivered commencing Q2 FY28, the first ship and the la st ship to be delivered during Q2 FY29.
  • The Next-Generation Corvette project contract had been delayed; Garden Reach Shipbuilders and Engineers Ltd. had expected it to be signed at the end of the last financial year or during the first quarter, but was confident it would be signed this quarter and saw no red flags with respect to contract conclusion.
    Show source
    We were expecting the contract to be signed either during the end of the last financial year or during the first quarter, but we are confident that the contract will be signed this quarter.
  • The next-generation destroyer project is in the Navy's prospective plan.
    Show source
    This is one of the projects which, as we are given to understand, this is in their prospective plan.
  • The next-generation destroyer has not yet gone for a DAC approval; after DAC approval, it would still take about a year-and-a-half to two for the RFP to be issued, and Garden Reach Shipbuilders & Engineers Limited does not expect the RFP to come out till FY29.
    Show source
    So, I do not expect, in my appreciation again, that I do not expect the RFP to come out for NGD till FY29, because currently we are in FY27.
  • Garden Reach Shipbuilders and Engineers Ltd. expected the contract signing for NGSP soon. Replaced by a later filing.
    Show source
    This is excluding the NGSP for which we are expecting the contract signing soon.
Show 34 more statements

Orders

  • Garden Reach Shipbuilders and Engineers Ltd.'s order book was ₹13,596 crore, comprising ₹13,296 crore from shipbuilding and the balance from its engineering and engine divisions.
    Show source
    Our current order book stands at ₹13,596 crore and this comprises mostly of shipbuilding orders with shipbuilding divisions contributing to ₹13,296 crore and the other two divisions, the engineering and the engine divisions, contribute to the balance of the order book.
  • Garden Reach Shipbuilders and Engineers Ltd.'s order book fell below ₹15,000 crore for the first time in the last 10 years, which management considered a reflection of an excellent execution rate.
    Show source
    I am happy to inform you that it is for the first time in the last 10 years that our order book has dropped below ₹15,000 crore and I consider it the reflect ion of an excellent execution rate.
  • Garden Reach Shipbuilders and Engineers Ltd.'s order book comprised 11 projects consisting of 44 marine platforms.
    Show source
    The current order book comprises 11 projects consisting of 44 marine platforms.
  • Garden Reach Shipbuilders and Engineers Ltd.'s 11 projects included nine warships for the Indian Navy: one P-17 Alpha advanced frigate, four Next-Generation Offshore Patrol Vessels, four Anti-Submarine Shallow Water Craft, two Coastal Research Vessels and one Acoustic Research ship.
    Show source
    These include nine warships for the Indian Navy, one P -17 Alpha advanced frigate, four N ext-Generation Offshore Patrol Vessels, four A nti-Submarine Shallow Water Craft, two Coastal Research Vessels, one Acoustic Research ship.
  • Garden Reach Shipbuilders and Engineers Ltd. was constructing a 1,000-meter-cubed trailing suction hopper Dredger for the Government of Bangladesh, 13 electric ferries for the Government of West Bengal, 12 multipurpose vessels for a German client, one green tug and four Platform Support Vessels.
    Show source
    In addition, we are also constructing a 1,000-meter-cubed trailing suction hopper Dredger for the Government of Ba ngladesh, 13 electric ferries for the G overnment of West Bengal, 12 multipurpose vessels for a German client, one green tug, and four platform support vessels for which we have recently received orders.
  • The order value for the Indian Navy's 120 fast interceptor crafts could be around 3,500 cores, and bid submission was due next month.
    Show source
    The order value could be to the tune of around 3,500 cores.
  • The order value for 22 interceptor boats, for which Garden Reach Shipbuilders and Engineers Ltd. had submitted bids, could be around ₹1,200 crore to ₹1,300 crore.
    Show source
    The order value could be to the tune of around ₹1,200 crore to ₹ 1,300 crore.
  • Six Next Generation Offshore Patrol Vessels for the Indian Coast Guard were valued at about ₹2,500 core.
    Show source
    Six Next Generation Offshore Patrol Vessels for the Indian Coast Guard, about ₹2,500 core.
  • Garden Reach Shipbuilders and Engineers Ltd. expected the RFP for the Indian Navy's 12-mine sounder measure vessel project to come out during the current calendar year; the project was expected to be split between two shipyards, eight and four, and its DAC AON value was ₹36,000 crore.
    Show source
    And the AON value as accorded by the DAC is ₹36,000 c rore.
  • Garden Reach Shipbuilders and Engineers Ltd. expected the RFP for four Landing Platform Dock vessels to come out during the calendar year, with an order value of around ₹35,000 crore.
    Show source
    The order value is to the tune of around ₹35,000 c rore.
  • About ₹80,000 crore worth of RFPs were live, and nearly ₹70,000 crore of RFPs were expected from the NCMB and LPD projects in the current calendar year.
    Show source
    Nearly ₹70,000 crore RFPs are expected from two of these projects, the NCMB and the LPD in the current calendar year.
  • About ₹1,50,000 crores worth of orders in the defense sector were expected in the near future, including about ₹80,000 from live RFPs and about Rs. 70,000 from RFPs expected to be or likely to be published during the calendar year.
    Show source
    So, in a nutshell, if you are taking the defense sector alone, about ₹1,50,000 c rores worth orders are expected in the near future.
  • Current total order book is ₹13,596.26 crore, including shipbuilding of ₹12,980 crore, ship repair of about ₹96 crore, naval vessel gun of ₹219 crore, bailey bridge of ₹158 crore, deck machinery of ₹58 crore and diesel engine plant of ₹82 crore.
    Show source
    The current total order book is ₹ 13,596.26 crore.
  • P 17 Alpha last ship order book is ₹4,519 crore.
    Show source
    P 17 Alpha , the last ship was ₹4,519 crore.
  • Anti-Submarine Swallow Water Craft order book is about ₹1,815 crore.
    Show source
    The Anti-Submarine Swallow Water Craft, about ₹1,815 crore.
  • Survey Vessel Large order book is about ₹225 crore.
    Show source
    225 crore.
  • Ocean Research Vessel order book is ₹740 crore.
    Show source
    The Ocean Research Vessel, ₹740 crore.
  • Acoustic Research ship order book is ₹450 crore.
    Show source
    The Acoustic Research ship, ₹450 crore.
  • Coastal Research Vessel order book is ₹258 crore.
    Show source
    The Coastal Research Vessel, ₹258 crore.
  • Ferry order book is ₹203 crore.
    Show source
    The ferry, ₹ 203 crore.
  • Multi Purpose Vessels and Dredger order book together is about ₹1,355 crore.
    Show source
    Multi Purpose Vessels and the Dredger put together about ₹1,355 crore.
  • About 74% of Garden Reach Shipbuilders & Engineers Limited's shipbuilding order book is from the four naval projects, while 25% is from the non-defence sector.
    Show source
    So, about 74% of the shipbuilding pie is from the four naval projects and the balance, 25% is coming from the non-defence sector.
  • Shipbuilding order book was 98% defence orders in an earlier period; the split has since changed, mostly because it has been executing research ship projects for various ministries and export orders.
    Show source
    There was a period when 98% of the shipbuilding order book was comprised of defence orders, but now the split, the breakup has been different, mostly because we have been executing the research ship projects for various ministries, and of course the export orders.
  • The company is doing a water metro project for the government of West Bengal; water metro projects could have an order value of around ₹200 to 300 crore per metro.
    Show source
    The order value could be to the tune of around ₹200 to 300 crore per metro.
  • If five states go for water metro projects, their order value could be around ₹1,500 crore.
    Show source
    If for five states, let us say, going for this, the order value could be to the tune of around ₹1,500 crore.
  • Water metro projects could range from 30 to 40 platforms.
    Show source
    And in terms of numbers, it could range from 30 to 40 platforms.
  • The company delivered the first P-17 Alpha ship to the Indian Navy on 31st of July this year, ahead of schedule; it was the largest weapon platform built by GRSE.
    Show source
    Coming to the status of these projects: The large ship of P -17 Alpha, again happy to inform you that the first two ships have been delivered ahead of schedule.
  • The company expects RFPs for the 120 Fast interceptor craft project for the Indian Navy, with an order value of around INR 3,500 crore, and the 31 Follow-On Water Jet FAC project for the Indian Navy, valued at about INR 3,500 crore, to come out in the next three months.
    Show source
    Again, here the order value could be to the tune of around ₹3,500 c rore.
  • The seven P-17 Bravo ships have recorded AoN, and Garden Reach Shipbuilders & Engineers Limited expects the RFP to come out in the next three months; the order value is likely around INR 70,000 crore.
    Show source
    And the much awaited P-17 Bravo, it's a high value project again.
  • Anti-Submarine Shallow Water Craft order is around ₹3,075 crores.
    Show source
    The NGOPV project, about ₹3,075 crore.
  • Garden Reach Shipbuilders and Engineers Ltd. received notification awards from Oil and Natural Gas Corporation (ONGC) to construct four Platform Support Vessels and from Syama Prasad Mookerjee Port, Kolkata, for a fully electric tug.
    Show source
    GRSE has also received a notification award for two projects, one from the Oil and Natural Gas Corporation ( ONGC) for construction of four P latform Support Vessels (PSV) and from the Syama Prasad Mookerjee Port , Kolkata for a fully electric tug.
  • Tenders based on demand aggregation by non-defense PSUs including GAIL, ONGC and BPCL were already out.
    Show source
    In addition, based on the demand aggregation of the non- defense PSUs, that is GAIL, ONGC, BPCL, and so on, a few tenders are already out.
  • The four MR tanker tender had already been published.
    Show source
    The four MR tanker tender has also already been published.
  • Tenders for six Very Large Gas Carriers (VLGC), six Aframax Vessels and container ships were expected to come soon.
    Show source
    Six Very Large Gas Carriers, VLGC, six Aframax Vessels, and another tender, high-value tender for container ships is expect ed to come soon.

What it is building and selling

Projects and capacity

  • The large P-17 Alpha ship had nearly 85% physical construction progress, and Garden Reach Shipbuilders and Engineers Ltd. intended to deliver it during the calendar year, by November.
    Show source
    By November, we should be able to deliver this ship.
  • Garden Reach Shipbuilders and Engineers Ltd.'s fifth Anti-Submarine Shallow Water Craft had almost 91% physical construction progress.
    Show source
    The fifth ship has achieved almost 91% physical progress of construction.
  • Garden Reach Shipbuilders and Engineers Ltd. had launched the first Next Generation Offshore Patrol Vessel and was launching the second on the 11th of this month; the third and fourth ships would be launched during the third and fourth quarters of the current financial year.
    Show source
    Coming to the third naval project: The next generation offshore petrol vessel, the first ship has already been launched, and the second ship is being launched on the 11th of this month, i.e. next week.
  • Garden Reach Shipbuilders and Engineers Ltd. had started physical construction on all three research vessel projects; the Ocean Research Vessel had about 20% physical progress.
    Show source
    Coming to the research vessel: All the three projects physical construction have been started and the O cean Research Vessel has touched a physical progress of about 20%.
  • Garden Reach Shipbuilders and Engineers Ltd.'s Acoustic Research ship had about 12% physical progress, and its Coastal Research Vessel had about 5%.
    Show source
    The Acoustic Research ship about 12% and the Coastal Research Vessel about 5%.
  • Garden Reach Shipbuilders and Engineers Ltd. intended to deliver two electric ferries for the Government of West Bengal in September and October, with the remaining ships of the project due by April 2027.
    Show source
    The ferry project for the Government of West Bengal is progressing smoothly, and we intend delivering two of these platforms in September and October and balance ships of the project shall be delivered by April 2027.
Show 21 more statements

Projects and capacity

  • Garden Reach Shipbuilders and Engineers Ltd.'s Dredger project for the Government of Bangladesh had about 70% physical construction progress.
    Show source
    The Dredger pr oject for the Government of Bangladesh is progressing smoothly and we are currently at about 70% physical progress of construction.
  • Garden Reach Shipbuilders and Engineers Ltd.'s 12-ship multipurpose vessel project for a German client had begun construction on five ships; construction of the balance would follow the contractual schedule.
    Show source
    We have already commenced construction of five of these ships and the balance shall follow as per the contractual schedule.
  • Garden Reach Shipbuilders and Engineers Ltd. expected ongoing modernization within its premises to increase capacity to concurrent construction of 32 platforms by the end of the calendar year, and considered that capacity inadequate for demand in defense and non-defense segments.
    Show source
    With ongoing modernization within our geographical premises, we expect this to be increased to concurrent construction of 32 platforms by the end of the calendar year, and we feel this capacity would be inadequate to meet the huge demand that exists both in the defense and non-defense segments.
  • Garden Reach Shipbuilders and Engineers Ltd. was setting up a shipyard at Raichak, West Bengal, expected necessary approvals during the current calendar year, and planned to begin infrastructure build-up from 2027; the project was expected to take three to five years to become fully operational.
    Show source
    In addition, we are setting up a shipyard in West Bengal, Raichak, which is closer to the sea, and we expect the necessary approvals to be accorded during the current calendar year , and we will commence the infrastructure build up from 2027.
  • The company expects to infuse about ₹200 crore in the two facilities taken over from Syama Prasad Mookerjee Port, and expects to complete their revitalization within 18 months.
    Show source
    And there the capital infusion is expected to be just about ₹200 crore and this will be completed within a year and half (18 months).
  • The company expects capital infusion of approximately ₹2,200 crore for a full-fledged shipyard in West Bengal; the DPR is in its final stages and setting up the greenfield facility would take three to five years.
    Show source
    We expect the capital infusion to the tune ₹2,200 crore of which DPR is in its final stages.
  • The company would infuse around ₹2,000 crore in its West project, for which the DPR is complete and environmental clearance has been obtained.
    Show source
    The capital infusion would be to the tune of again around ₹2,000 crore.
  • The company intends its two new facilities to remove riverine constraints and length and displacement restrictions, enabling capacity to build 43 platforms, including 11 large-vessel platform types such as Aframax and VLGC.
    Show source
    So, we intend, with the creation of these two facilities, the capacity constraint will be completely obliterated, and we will have the capability to build 43 platforms, and the 11 platforms, 11 types of platforms, that means from 32 to 43 platforms, there will be large vessels of Aframax and VLGC type.
  • The sixth, seventh and eighth ships in Garden Reach Shipbuilders & Engineers Limited's Anti-Submarine Shallow Water Craft project have construction progress ranging from 65% to 70%, and the company will complete the project by end of next year.
    Show source
    The seventh and eighth, around 65 to 70%.
  • Current shipbuilding capacity is for construction of 28 platforms.
    Show source
    Coming to our expansion plan, as I have reiterated during the earlier conversations with the analysts and investors, our current shipbuilding capacity is for concurrent construction of 28 platforms.
  • Garden Reach Shipbuilders and Engineers Ltd. planned to lay the Coastal Research Vessel's keel during September.
    Show source
    The Coastal Research Vessel, the keel of this vessel shall be laid during September, which is an important project milestone.
  • Garden Reach Shipbuilders and Engineers Ltd. decided to pursue brownfield and greenfield expansion on the western and eastern seaboards.
    Show source
    So, it is with this intent that we have decided to go in for both Brownfield and Greenfield expansion, both on the western and eastern seaboards.
  • Garden Reach Shipbuilders and Engineers Ltd. took two more premises on a long-term lease basis from Syama Prasad Mookerjee Port, and expansion and revitalization work on the two facilities had commenced.
    Show source
    In addition to this, we have taken two more premises on a long-term lease basis from Syama Prasad Mookerjee Port, and the expansion and revitalization project for these two facilities have already commenced.
  • Garden Reach Shipbuilders and Engineers Ltd. was setting up a full-fledged total ship solution facility on the western seaboard encompassing shipbuilding, green ship recycling and ship repairs.
    Show source
    Similarly, on the western seaboard, we are sett ing up a full -fledged total ship solution facility.
  • Garden Reach Shipbuilders and Engineers Ltd. intended to proceed with its western seaboard facility on a PPP model, expected necessary approvals during the calendar year and planned to commence the project next year.
    Show source
    We intend to proceed on a PPP model, and we again expect the necessary approvals to be obtained during the calendar year, and the project will commence next year.
  • Proposed total ship solution facility would combine shipbuilding, green ship recycling and ship repair capability under a single roof.
    Show source
    This will be a total ship solution facility , as I mentioned during my opening remarks, comprised of shipbuilding, green ship recycling, and ship repair capability under a single roof.
  • Garden Reach Shipbuilders and Engineers Ltd. is undertaking brownfield and greenfield capacity expansion initiatives to strengthen shipbuilding capabilities and support future growth. Replaced by a later filing.
    Show source
    The Co mpany is undertaking both brownfield and greenfield capacity expansion initiatives to strengthen our shipbuilding capabilities, support future growth and enhance our ability to execute larger and more complex projects.

Demand and pricing

  • About 80,000 crores worth of RFPs are currently out of life, and about 60,000 more is likely to come out during the current year, making the opportunity volume around 1,40,000; the contenders for these 1,40,000 to 150,000 crores are about five to six shipyards.
    Show source
    Now, keeping the NGD apart, as I mentioned during my introductory remarks, there are enough opportunities, as I stated, about 80,000 crores worth RFPs are currently out of life, and about 60,000 more is likely to come out during the current year.

Segments

  • INS Dunagiri, INS Sanshodhak and INS Agrai, built by Garden Reach Shipbuilders and Engineers Ltd., were commissioned into the Indian Navy at Kolkata on 21 June 2026 by Prime Minister Narendra Modi.
    Show source
    GRSE built three ships INS Dunagiri that is the second P17A Alpha stealth frigate, INS Sanshodhak, the last of the four-Survey Vessel Large and INS Agrai, the fourth ship of the eight -ship Anti-Submarine Shallow Water Craft project, were commissioned into the Indian Navy by the Honorable Prime Minister of India Sri Narendra Modi at Kolkata on 21 June 2026.
  • Garden Reach Shipbuilders and Engineers Ltd. was the only Indian shipyard then executing projects to construct specialized research vessels.
    Show source
    These orders for research ships, again , I am happy to inform you that we are the only Indian shipyard currently executing projects for construction of specialized research vessels.
  • Garden Reach Shipbuilders and Engineers Ltd. had four shipyards in West Bengal, three dedicated to shipbuilding and one to ship repair.
    Show source
    In West Bengal, we already have four Page 6 of 18 shipyards, three dedicated for shipbuilding and one for ship repair.

Everything else said on the call

People and governance

  • Garden Reach Shipbuilders and Engineers Ltd. was accorded Navratna status by the Government of India, Department of Public Enterprises on 19 June 2026.
    Show source
    This was accorded to us on 19 June 2026, and this prestigious recognition marks a significant Page 3 of 18 milestone in the Co mpany's journey and reflects its constant and consistent financial and operational excellence over the years.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Amit Dixit: Hi. Good evening, everyone, and thanks for the opportunity. Congratulations for a good set of numbers again. Two questions. The first one is on Next-Generation Corvettes. Now, the order has been on anvil for quite some time. Just wanted to understand where is it stuck. Are there certain concerns around the orders that have been raised by the rel evant authorities? I just wanted to get a brief construct of this, because this order has been struck for quite some time. Part B of the question is assuming the order is given to us, let us say, today, then how much time will it take for us to actually start recording revenue? Page 7 of 18 P. R. Hari: Thank you.

    Answer, p hari

    Thank you for your compliments on the results. Yes, I would like to state that this is the 17th quarter on a trot that our financial s have been on an upward trend and hopefully we will be able to maintain this tempo in the coming quarters too. Coming to the much-awaited Next-Generation Corvette project, yes, the project contract has got delayed a bit. We were expecting the contract to be signed either during the end of the last financial year or during the first quarter, but we are confident that the contract will be signed this quarter. We do not see any red flags with respect to the contract conclusion. That is our appreciation. To answer your question as to when the revenue recognition would commence, now this project has got, as per the RFP conditions and naturally the contractual conditions, this has got a pre- production period where the design studies would take place.

    Answer, p hari

    And the material ordering, the equipment ordering will take place. The first revenue recognition will commence next year, that is the Financial Year 2028. Revenue recognition will commence in Financial Year 2 028 when we will be utilizing the activities involved in design, then the binding data information which we need to progress with the preparation of compartment design and equipment layout. So, this revenue recognition will start from the next financial year, assuming the contract is signed during this quarter. Now, in shipbuilding, we have a very peculiar kind of revenue recognition pattern where the initial phase, that is, for example, if a project is a five -year project, the first year the revenue recognition will come through design related inputs which will contribute maybe to five to ten percentage of the project cost. Then the physical construction, that comes the second phase, which should be between, let us say, the first year to the two and a half, that is 50 % of the project duration, where the revenue recognition will move up to about 20 to 25 percent. And then comes the very steep upward revenue recognition curve, where the equipment and systems which have been brought are lowered onto the ship and the integrations happen.

    Answer, p hari

    That is the phase where the maximum revenue recognition happens. And then, of course, the outfitting and the project completion. This is the broad revenue recognition pattern. To answer your specific question, yes, the revenue recognition will come in from the next financial year.

  2. Question

    Amit Dixit: Thank you. And how much time will it take for this order to be completed, NGC order?

    Answer, p hari

    P. R. Hari: NGC is an eight-ship project where two shipyards will build the ships concurrently, and the first ship delivery is after five years. And the project completion is eight years. Eight years is the project completion time which is given. That means if the order is placed now, the eighth ship of the project, which both shipyards put together, would get completed by 2034 -35. That's what I think. Page 8 of 18 Amit Dixit: Very clear, sir.

  3. Question

    The second question is essentially on the latest AON trend that we have seen, particularly for Navy. There is a lot of emphasis on the unmanned vessels and autonomous platforms. So, just wanted to understand our preparedness for that. Does our expansion plan also is focused on building certain capabilities on that front or we already have those capabilities, and we will be bidding for such RFPs as and when they come?

    Answer, p hari

    P. R. Hari: Yes, very interesting question. To answer your second part first, whether we have the capability, yes, we have the capability. And it is with good intent because we were clear that the Navy having a very clear autonomous roadmap. So, we were clear almost three, four years before that the Navy would go for it, and of course, followed by Coast Guard, both would go in for an autonomous environment where a large number of unmanned vessels would come in. So, we started with the prototype development of an unmanned surface vessel successfully approved. And just for information that we have also executed a project for the NSDL, Naval Scientific and Technological Laboratory, Vishakhapatnam, a DRD O organization for an unmanned surface vessel. In addition, an autonomous un derwater platform, which was developed by us.

    Answer, p hari

    Again, the prototype successfully proved in the Tengangsu Lake about a year back. So, we are technologically competent and technically ready for execution of this project. So, we have been actively participating in the NAIC projects of the government steered by the Navy. For example, for the ASV, that is the ASV NCM, there is a project which the Navy, an autonomous project which Navy is steering. We are one of the other companies taking part in that. We are agai n being shortlisted for another project of the Navy, which is again for an underwater unmanned platform. So, we are very much competent and interested and also actively taking part in these schemes and the projects which Navy has come up for autonomous unmanned platforms.

  4. Question

    Dipen Vakil: Thank you for this opportunity and congratulations on a great execution. My first question is on the line of your CAPEX announcement that you did. Can you help us with the quantum of CAPEX that you are envisaging for Greenfield as well as Brownfield side of it? And what kind of capabilities will it add to your current existing ecosystem in terms of whether the dry dock size will be the bigger one, especially in Gujarat? And how will it help you address Page 9 of 18 the bigger and more bigger and sizable opp ortunities either in defense or commercial side of it? That's my first question.

    Answer, p hari

    P. R. Hari: Thank you. We have a very clear expansion plan and in turn a clear CAPEX infusion plan. Now, if I divide this into two buckets, one is the minor projects that we are undertaking again with a very, very clear, let us say, capability enhancement pattern. For example, two facilities that we have taken over from the Kolkata Port Trust that Syama Prasad Mookerjee Port where the capital infusion is limited, where we already commenced the revitalization. And there the capital infusion is expected to be just about ₹200 crore and this will be completed within a year and half (18 months). Coming to the larger projects, we ar e just undertaking two projects, one in West Bengal, I mentioned it, towards the sea. The land is already with us again on a very long -term basis, a long-term lease from Kolkata Port Trust.

    Answer, p hari

    Here we are creating a full -fledged shipyard. We expect the capital infusion to the tune ₹2,200 crore of which DPR is in its final stages. So, this is an approximate figure. The setting up of the facility would take three to five years because it is a completely greenfield setup. Coming to the West, what we are intending, here the DPR is complete. The environmental clearance has already been obtained, which means this project is moving at a much faster pace. The capital infusion would be to the tune of again around ₹2,000 crore.

    Answer, p hari

    This will be a total ship solution facility , as I mentioned during my opening remarks, comprised of shipbuilding, green ship recycling, and ship repair capability under a single roof. Now coming to the specific question which you asked as to what does it add to our current capability. One, our curr ent capability, as I mentioned, is to undertake shipbuilding, concurrent construction of 28 platforms. When I say 28 platforms, that includes platforms up to about 10,000- ton displacement and 200 meters length. This would cater for most of the defense platform, but when we come to commercial ships, they're much, much larger in size. So, there we have difficulty at this moment, and that is the intent of creating these facilitie s. One, to circumvent the riverine constraints, and second, to obviate the length and displacement restrictions. So, we intend, with the creation of these two facilities, the capacity constraint will be completely obliterated, and we will have the capability to build 43 platforms, and the 11 platforms, 11 types of platforms, that means from 32 to 43 platforms, there will be large vessels of Aframax and VLGC type.

    Answer, p hari

    So, this is the benefit of this particular expansion project that will accrue to the shipyard. Second is here in Kolkata, where our core shipbuilding facilities exist, we will be focusing, utilizing them, focused towards defense shipbuilding, and the facility in Gujarat, while we will use spare capacity there for warship building, the primary focus will be for green ship recycling and building of large size ships. I hope I answ ered your question. Thank You.

  5. Question

    Dipen Vakil: Absolutely, sir. Second question is, you mentioned about the tenders which are already out on the commercial side, namely MR Tank , VLGC, Aframax , and even the container ship tender which is expected soon. So, sir, how does our technological capability stand for these large size Page 10 of 18 carriers, and at the same time, how do we participate in this tender with the current capacity? Are we looking to partner with some company or take some tech from a foreign company? How are we participating in such commercial vessels?

    Answer, p hari

    P. R. Hari: Okay, to start with, during the initial discussions, I had mentioned that we have already won an order for a set of four Platform Support Vessels, and what I given to understand that before order to be awarded, first, the letter of intent to be awarded among the lot that has been aggregated by the MOPSW from all the PSUs. So, we are happy about that. Now coming to the next few projects, that is the MR Tank, the VLGC, and of course, the container ship. MR Tanker, we are collaborating with one of our sister shipyards, and so are we doing so for the VLGC. In the VLGC tender itself, there is a condition that of the number of vessels they have promulgated, I think it's eight ships they have promulg ated, but two of them have been built at a shipyard which has already got proven capacity in building of VLGCs. So, we, along with our partnership here in India, we already tied up with one of the foreign shipyards with proven capability, and we will be bidding to the two Indian shipyards will be bidding to the vessels. Coming to the container ships, yes, currently we do not have the physical capacity because the size of the ships are large, but we are going in for a partnership with one of the other Indian shipyards who have got the dock and berth infrastructures to handle this project.

    Answer, p hari

    So, we have a very clear strategy for addressing the limitations that we currently have so that we don't miss out on any of the high value orders which are coming from this non-defense segment. Thank You.

  6. Question

    Dipen Vakil: That is very encouraging to hear, sir. Thank you so much. Sir, if I can squeeze in one last question. Sir, can you help us to understand the execution momentum in FY27? Will we maintain the similar execution momentum, or do you expect some softness in growth numbers from, say, for 38%, 35% to 40% might get slightly slower in FY27?

    Answer, p hari

    P. R. Hari: See, currently we are in an execution phase. Actually, if you see last year, we have delivered eight ships, so naturally when the ships are delivered, the revenue and in turn the profits would increase. We are still in that phase, but we all must be clear that the current order book is 13,596 crores, and of this, the two projects which are major, which means the P-17 Alpha and the anti-submarine shallow water craft. For example, the P -17 Alpha, we are left with about 4,500 crores and the anti-submarine shallow water craft of about 1,816 crores. These are the major projects which are on the anvil of completion. So, the current quarter’s performance will be able to replicate in the coming quarters too.

  7. Question

    Kavish Pare: Hi, sir. Thanks for the opportunity. My question is on GRSE's indigenization levels. Sir, could you elaborate on the current level of indigenization across our portfolio and also identify the key systems, subsystems, or components where we continue to remain dependent on imports?

    Answer, p hari

    P. R. Hari: Okay, thank you. A very i nteresting question, and this has been the focus of our government also, indigenization. See, one thing we all must clearly understand that we are platform integrators. Naturally, GRSE being shipbuilders and engineers. The other part, the engineer’s part, I will answer separately to come into the shipbuilding part. We are platform integrators. When we are platform integrators, most of the equipment and weapons or, let us say, the propulsion engine, they are all nominated by the customers, be it defense shipbuilding or be it commercial shipbuilding.

    Answer, p hari

    Then the nomination comes from the customers. For example, if a commercial ship customer wants an engine of, let us say, German made, we have to procure the German engine, which is a contractual obligation. Therefore, expecting indigenization there would be an infrastructure exercise. However, with respect to war shipbuilding, I will segregate this into four components, float, fight, move, survive. If you are taking the float component, float component mostly comprises of the ship's hull, where the stability aspects are involved. India has achieved, and so has GRSE, 100% indigenization. But the float component comprises only about 10% of ship cost.

    Answer, p hari

    Then comes the fight component. Fight components comprise of the weapons and systems. Here, I am happy to inform you that from a very, very modest indigenization percentage, we have gone up to almost 60% indigenization today. But many of the Indian defense manufacturers are producing weapons and systems, including my sister company that is well for the sensors. Now, coming to the float component, this is where currently there's a catch because float comprises, sorry, move, move comprises of the propulsion engines and the power generation and associated equipment. Here, while power generation, that is the diesel alternators, they are 100% indigenous, in case of propulsion engines, we have still not achieved indigenization, where the government has already initiated both for the marine gas turbines, as well as for marine diesel engines, but this will take a finite amount of time. Coming to survival, survival is the firefighting equipment, the safety equipment, and so on.

    Answer, p hari

    We are about 70% indigenous. So, net-net, if you take a 100% cost of a ship, we are talking by value. In the last few projects, two projects I will just take, which we have completed, the anti- submersible aircraft, then four ships already been delivered, we know exactly what is the kind of indigenization that they can achieve. Page 12 of 18 And the survey vessels l arge, which we have already completed the project. There, we have plus 80% indigenization overall. This is for the ship building sector. Coming to the other sector, let us take Bailey Bridge, which is one of my business verticals, where it is 100% indigeno us.

    Answer, p hari

    Every component is fabricated, including subcomponents are fabricated from Indian sources, sourced from India and fabricated here. So, 100% indigenization. Coming to the other products, let us say marine diesel engines, we have a collaboration with another foreign OEM, so co -production of marine diesel engines. When the project fructifies, the indigenization level would be about 55% to 60%. If you are talking about deck machinery, another business vertical of GRSE, we have about 90% indigenous. So, this is where we stand as of today, but then again, I go back to my first statement with respect to indigenization, that while all of us, the entire ecosystem is striving towards indigenization, it has got its limitations and the time implication, because indi genization does not come like a switch getting on, it takes time. So, currently, we are, let us say about 80-85%, maybe it will take about 5-10 years of achieving 100% indigenization.

  8. Question

    Kavish Pare: Very decent, sir. Thanks a lot for that. Sir, as a follow-up on the defense side, which domestic suppliers, in your view, are best positioned to substitute these imported components as procurement within the company becomes increasingly indigenous? Which private sector companies do you think could emerg e as meaningful beneficiaries? And lastly, also within the defense electronics part, apart from Bharat Electronics, which suppliers currently have a meaningful wallet share with us?

    Answer, p hari

    P. R. Hari: Very interesting question. Now, almost all the major private companies are into defense manufacturing, be it L&T, be it Adani, be it Mahindra, be it these guys, Kalyani, all of them are in defense manufacturing and each one of them has contributed extensiv ely towards indigenization. So, I think that gives you a broad answer about which are the major private companies. I may have missed out somebody, but I have just hinted that this is the big companies. Now, there are a host of startups, host of startups. Today, in India, about 17,000 MSMEs, about 1,000 startups, and about 675 innovators are involved in defense manufacturing. And most of them are focusing on new technology based, and I am talking about the innovators and startups, most of them are focusing on new technology based indigenous production.

    Answer, p hari

    Here, the limitation is there is still a percentage which comes from abroad. So, to encourage the startups and innovators, we ourselves, GR SE company has taken an initiative and started an open challenge team for startups. Page 13 of 18 We kept an acronym called GRS E Accelerator Innovation Engineering Team. Believe me, the response has been overwhelming. About 101 startups took part last year. So, the entire ecosystem is striving towards indigenization. Let us see how it moves or how fast it moves.

    Answer, p hari

    In addition to BEL, of course, HAL is a major contributor towards indigenization. We also have some links with HAL because the marine gas turbines that come fro m them, of course, it is rooted from abroad, but a certain amount of indigenization takes place there. ECIL is a part of indigenization, and there are other PSUs like Kelton, who also are contributing towards supplying indigenous products to shipbuilding. Thank you.

  9. Question

    Harshad Kapadia: Thanks for the opportunity and congratulations again for a good set of numbers, sir. Would you be able to share the order book breakup for GRSE, sir? Sure.

    Answer, p hari

    P. R. Hari: Thank you, Mr. Harsh ad. The current total order book is ₹ 13,596.26 crore. Within that, the shipbuilding contributes nearly 95 percent, that is ₹12,980 crore. With the other verticals, that is ship repair, about ₹96 crore, the naval vessel gun ₹219 crore the bailey bridge is ₹158 crore, the deck machinery is ₹ 58 crore, and our diesel engine plant ₹ 82 crore. Now, I will just give you a breakup of the shipbuilding order book. P 17 Alpha , the last ship was ₹4,519 crore. The Anti-Submarine Swallow Water Craft, about ₹1,815 crore.

    Answer, p hari

    Survey Vessel Large, we are left with about ₹. 225 crore. The NGOPV project, about ₹3,075 crore. The Ocean Research Vessel, ₹740 crore. The Acoustic Research ship, ₹450 crore. The Coastal Research Vessel, ₹258 crore. The ferry, ₹ 203 crore.

    Answer, p hari

    Multi Purpose Vessels and the Dredger put together about ₹1,355 crore. So, about 74% of the shipbuilding pie is from the four naval projects and the balance, 25% is coming from the non-defence sector. There was a period when 98% of the shipbuilding order book was comprised of defence orders, but now the split, the breakup has been different, mostly because we have been executing the research ship projects for various ministries, and of course the export orders. So, this in a nutshell is the breakup of our current order book.

  10. Question

    Harshad Kapadia: Yes, sir.

    Answer, p hari

    P. R. Hari: In the last quarter, we had three of the ships which were commissioned. So, the last phase of commissioning, a certain amount of expenditure was incurred for these activities. So, in the current quarter, we did not have such occasions. So, that has resulted in a drop in the other expenses. Thank you.

Show 5 more questions
  1. Question

    Kashyap Ramesh: Hello, sir. Congratulations on a great quarter. My question is on exports. After the German order, there is nothing significant coming, a bid pipeline or anywhere, you are not mentioning anything about exports. So, is the GRSE bid for export to Navratna, do you have the freedom or again, it should come from like an inter-government thing?

    Answer, p hari

    P. R. Hari: Okay, thank you for the question. Firstly, for exports of non-defense platforms, we do not need any government approval if the item is getting, if the product is getting supplied to a friendly foreign nation. Now, defense exports mostly are through G2G typ es and so, we rely on our government for defense exports. Coming to the non-defense exports, you had mentioned that we have not gone in for any export orders after the multipurpose contract. It is a very conscious act. When we went in for multipurpose vessel, obtaining the multipurpose vessel export order, at that point of time, our government had not aggregated the demand of the Indian non- defense requirements. So, now that demand has been aggregated and the opportunities are fantastic.

    Answer, p hari

    About 200 plus platforms are required. So, when we have, yes, export is interesting and we want to export more, we will export more, but right now, we are not taking any export order considering that there are huge opportunities available within India. Having said that, if a n attractive, profitable and visible order opportunity comes from Europe or any of the other customers, we will take it up. So, this is the strategy which we have taken. Again, to reassure you that there are enough opportunities available within India and India looks to India for giving the product. Page 15 of 18 Now, coming to the Navratna status, Navratna status definitely provides the autonomy for expansion, and we intend utilizing this privilege or the expansion autonomy to the hilt. Thank you.

  2. Question

    Kashyap Ramesh: One more question is about the water metro projects of Mumbai and other cities. Is GRSE actively bidding? Because I saw some of your officials meeting Mumbai metro water project people. So, you didn't mention anything about that.

    Answer, p hari

    P. R. Hari: We are currently executing one project for the government of West Bengal. It is a World Bank funded project for 13 hybrid ferries. Actually, you are absolutely right. We are pitching in with the various state governments for their respective water metros. And you will understand that even Goa, they are coming up with a water metro development. I think they have engaged KMRL, the Kerala water metro as a nodal agency for coordination. Yes, we are engaging with these various state governments.

    Answer, p hari

    And as and when the RFPs come out, we will definitely take part because this is an area where we have already established ourselves. Because our ferry that we have provided to the government of West Bengal is the largest and the fastest fully electric ferry in the country. And we intend leveraging and capitalizing on this edge that we have. And we will take part in the RFPs which are coming out. I expect some of them to come out in the coming one year. We will take part.

    Answer, p hari

    P. R. Hari: Sorry. Could you repeat the last part, the question part once again? Yash: So, I am talking about any corporate actions that are in the queue, sir, like a stock split or something like that.

    Answer, p hari

    P. R. Hari: I understood. I understood. We are fully aware that this is controlled by the government department. We are waiting for t heir instructions on this. And whatever instructions come from the Administrative Ministry and DIPAM, we will abide by that. Let us wait for their directives. Thank you.

  3. Question

    Harshad Kapadia: Thanks for the opportunity. Sir, your employee cost has also come down despite such a strong increase in revenue. Is that because you are nearing ending the completion time? So, mainly the contractual workers are reduced? Is it because of that?

    Answer, p hari

    P. R. Hari: Yes, you are absolutely right that the contract expense is have come down. The deployment of contract workers varies from the project execution phase. In the final stages of out fitting, if you see the contract expenditure during Q4, FY26, it would have been high. Because that is when we delivered in that last quarter, we delivered three ships. So, maximum deployment of personnel would have been there and so that the contract value would have been high. In this, it's a sinusoidal thing. You will definitely see some increase in that in the coming quarter because that is when we expect to deliver a couple of ships.

    Answer, p hari

    So, as you rightly said, it is purely on the project execution phase. No abnormality in that . It's very normal in the shipbuilding cycle.

  4. Question

    Harshad Kapadia: Understood. And just in relation to that, next year is going to be the pay commission which will happen. So, how much increase in employee cost can we expect? Will it be in the range of 15- 20% which we see earlier, or will it be lower? Sir, any number or any color on this would be helpful.

    Answer, p hari

    P. R. Hari: Okay, I understand the question. But our anticipation is that it could be of similar range 15-20% which is normal in every pay commission. We don't see any abnormality, and we have already factored those in our, let us say, future projections and calculations.

  5. Question

    Pratap Maliwal: Yes. Hi. Thanks for taking my question. I just wanted two clarifications. So, I believe you've mentioned water metro project that you may be executing. Could you give us some idea of what could be the tentative order size of these kinds of projects? And secondly, just regarding the next -gen destroyer program, I think that we have sp oken of in the past. Is there any incremental update that we could get maybe on the timeline or the order value? Page 17 of 18 P. R. Hari: Thank you.

    Answer, p hari

    The water metro project, as an earlier speaker, an analyst or an investor mentioned, many of the states are now looking at setting up a water metro. Kochi has already a facility and here we are doing one for the government of West Bengal. So, these are not very high-value projects. The order value could be to the tune of around ₹200 to 300 crore per metro. They are small platforms, but that but is the attractiveness or the overall necessity of a green platform. But here, again, the volumes are high. If for five states, let us say, going for this, the order value could be to the tune of around ₹1,500 crore.

    Answer, p hari

    And in terms of numbers, it could range from 30 to 40 platforms. So, this in a nutshell, I think, would give you a hint as to what are the numbers and the order value involved. Coming to the major project of the Navy, I think you asked about the next - generation destroyer. Is that what you asked? Yes, sir. Okay. This is one of the projects which, as we are given to understand, this is in their prospective plan.

    Answer, p hari

    This is a high -value project where, as per my understanding, this has not yet gone for a DAC approval, which means that after a DAC approval is taken, it will still take about a year -and-a- half to two for the RFP to be issued. So, I do not expect, in my appreciation again, that I do not expect the RFP to come out for NGD till FY29, because currently we are in FY27. Considering, depending upon the priority that Navy has got, even if a DAC approval is taken in the current financial year, it could take about a year-and-a-half for the RFP to come out. Now, keeping the NGD apart, as I mentioned during my introductory remarks, there are enough opportunities, as I stated, about 80,000 crores worth RFPs are currently out of life, and about 60,000 more is likely to come out during the current year. So, that itself, the volume is around 1,40,000, and the stakeholders, the contender s for these 1,40,000 to 150,000 crores are just about five to six shipyards. So, this is where we stand today. The opportunities are adequate.

    Answer, p hari

    This is excluding the NGC contract that we expect soon, and also excluding the commercial shipbuilding opportunities that are available in the domestic market. Thank you.

Questions about this call

When was the Garden Reach Shipbuilders & Engineers Q1 FY27 earnings call transcript filed?
Garden Reach Shipbuilders & Engineers filed the transcript with the exchange on 11 Aug 2026. This page is built from that transcript.
What does this page list?
72 statements from the transcript across 7 topics, 53 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 15 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
Garden Reach Shipbuilders & Engineers Q1 FY27 concall: what the company said · DalalOS