Garden Reach Shipbuilders & Engineers Q4 FY25 earnings call: Garden Reach Shipbuilders & Engineers Limited’s order book as on 31st March, 2024 was ₹22,652 crores

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

Order book as on 31st March, 2024 was ₹22,652 crores. GRSE will deliver 1 P-17 Alpha, 2 Survey Vessel Large and 4 Anti-Submarine Shallow Watercraft in 2025-26, a total of seven ships. First P-17 Alpha ship completed its final machinery trial and had nearly 95% physical progress of construction; the company intends to deliver it two months from now, ahead of the contractual delivery period. EBITDA for the quarter increased from ₹166 crores to ₹335 crores, registering growth of 101%. Bulbar accounts for around 10% of the overall steel equipped in a ship.

The numbers management gave

Results

  • EBITDA for the quarter increased from ₹166 crores to ₹335 crores, registering growth of 101%.
    Show source
    EBITDA has moved up from ₹166 crores to ₹335 crores registering a growth of 101% and the profit after tax, has moved up from ₹114 crores to ₹244 crores, registering a 118% growth.
  • Profit after tax for the quarter increased from ₹114 crores to ₹244 crores, registering growth of 118%.
    Show source
    EBITDA has moved up from ₹166 crores to ₹335 crores registering a growth of 101% and the profit after tax, has moved up from ₹114 crores to ₹244 crores, registering a 118% growth.
  • Operating profit for the quarter increased from ₹77 crores to ₹209 crores.
    Show source
    And so, has the operating profit moved up from ₹77 crores to ₹209 crores.
  • Profit after tax for the financial year increased from ₹360 crores to ₹527 crores, registering growth of 46%.
    Show source
    We have broken the ₹5,000 crore barrier registering a growth of 41% and the profit after tax has moved up by 46% from ₹360 crores to ₹527 crores and the operating profit has moved up from ₹181.30 crores to ₹368 crores, registering a 103% growth.
  • Operating profit for the financial year increased from ₹181.30 crores to ₹368 crores, registering growth of 103%.
    Show source
    We have broken the ₹5,000 crore barrier registering a growth of 41% and the profit after tax has moved up by 46% from ₹360 crores to ₹527 crores and the operating profit has moved up from ₹181.30 crores to ₹368 crores, registering a 103% growth.
  • GRSE reversed a provision linked to the P-17 Alpha project based on reasonable clarity on cost to completion as the first ship nears delivery; the profit will be accounted over the next one to two years when the entire three-ship project is completed.
    Show source
    Accordingly, the provision is reversed, and we will be this profit will be accounted over the next one to two years, when the entire project gets completed.
Show 1 more statement

Results

  • GRSE has completed nearly 41 refits at its Syama Prasad Mookerjee Port facility, including multiple coast guard ships and naval ships.
    Show source
    And so far, we have completed nearly 41 refits in this facility, including multiple coast guard ships and naval ships.

What it expects ahead

What management expects

  • GRSE will deliver 1 P-17 Alpha, 2 Survey Vessel Large and 4 Anti-Submarine Shallow Watercraft in 2025-26, a total of seven ships.
    Show source
    So, in 2025-26 we will be delivering 1 P-17 Alpha, 2 Survey Vessel Large and 4 Anti-Submarine Shallow Watercraft, that covers four plus two plus one, seven ships.
  • GRSE will deliver 2 P-17 Alpha, the last three Anti-Submarine Shallow Watercraft, 1 Next Generation Offshore Patrol Vessels and the Acoustic Vessel Ship in 2026-27.
    Show source
    In 2026-27 we will be delivering 2 P-17 Alpha, this is our major high value projects, 3 then the last three Anti -Submarine Shallow Watercraft , and 1 Next Generation Offshore Patrol Vessels and the Acoustic Vessel Ship.
  • GRSE will deliver 2 Next Generation Offshore Patrol Vessels, the Oceanographic Research Vessel and the Coastal Research Vessels in FY’ 27-28; the Coastal Research Vessels contract is to be signed now.
    Show source
    And the next year that is FY’ 27-28, we will be delivering 2 N ext Generation Offshore Patrol Vessels, the O ceanographic Research Vessel and the Coastal Research Vessels for which we are going to sign the contract now.
  • GRSE expects to accrue 40:60 of the remaining P-17A project revenue this year and next year, respectively.
    Show source
    So, if you are asking me for a proportion of revenue from the project which is going to be accrued this year and next year, I would say 40:60.
  • GRSE assessed that conclusion of the next generation Corvette project contract could take around six months from then, optimistically, or another year and three months conservatively, with March 31st, 2026 stated as the conservative timeline.
    Show source
    This could take, in my appreciation a very optimistic timeline of around six months from now that means, let us say December this year, conclusion, or a c onservative timeline of another year, another three months.
  • The company expects the formal bid declaration for the Next Generation Corvette project in a couple of days.
    Show source
    We also expect the formal bid declaration of the Next Generation Corvette project in a couple of days.
Show 20 more statements

What management expects

  • GRSE expects the Next Generation Corvette contract conclusion by December this year on a very optimistic timeline and by March next year on a conservative timeline; the contract negotiation follows declaration of L1 and is a long-drawn process for major projects.
    Show source
    We expect very, very optimistic timeline of contract conclusion by December this year, and a conservative timeline of March next year.
  • GRSE is building hybrid ferries for the Government of West Bengal and a dredger, and may deliver a couple of ferries this year.
    Show source
    I have not mentioned about the hybrid ferries that we are building for the G overnment of West Bengal or the dredger, because of small value projects which will get covered during this period, maybe this year as well we will be able to deliver a couple of ferries.
  • The ministry and navy were likely to declare L1 and L2 for the next generation Corvette project in the next couple of days, followed by contract negotiations depending on project complexity.
    Show source
    Coming to your first question on the next generation Corvette , what is likely to happen in the next couple of days is the L1 declaration and L 2 declaration by the ministry and navy, and this will be followed by a natural process of contract negotiation, depending upon the complexity of a p roject.
  • GRSE was confident of meeting the committed timelines for ongoing projects, based on its stated ship-delivery figures. Replaced by a later filing.
    Show source
    So, yes, there is definite headway a nd with the figures, the numbers that I mentioned regarding delivery of ships to an earlier query, we are confident of meeting the timelines that they we have committed to our customer for the ongoing projects.

Orders

  • Order book as on 31st March, 2024 was ₹22,652 crores.
    Show source
    Our order book as on 31st March, 2024 was ₹22,652 crores.
  • The company will bid for 18 Next Generation Fast Patrol Vessels for the Indian Coast Guard; the advanced vessels have a helicopter staging facility.
    Show source
    Another bid that is live, is a bid for 18 Next Generation Fast Patrol Vessels for the Indian Coast Guard.
  • The Defence Acquisition Council obtained AON for 12 Mine Counter Measure Vessels, and there was no clarity on when the RFP would come out.
    Show source
    In addition, Navy has already obtained the AON of the Defence Acquisition Council for 12 Mine Counter Measure Vessels.
  • Order book stands at ₹22,680 crores, with around ₹11,435 crores remaining from the P-17 Alpha project, ₹3,946 crores from the Anti-Submarine Shallow Watercraft project, ₹530 crores from the Survey Vessel Large project, ₹3,327 crores from the Offshore Patrol Vessel (NGOPV) project, ₹785 crores from the NCPOR Ocean Research Vessel, ₹466 crores from the Acoustic Research Ship, ₹226 crores from the Ferry project, and around ₹1,200 crores from export projects including the Multipurpose Vessel and Dredger.
    Show source
    As I mentioned, our order book stands at ₹22,680 crores and P-17 Alpha still continues to be the biggest bread earner.
  • GRSE expects the total order value for the Next Generation Corvette project to be ₹40,000 plus crores, split between two shipyards, with the L1 shipyard's order value potentially ₹25,000 plus crores for 5 ships.
    Show source
    But this ₹40,000 crore will be split between two shipyards, with the L1 shipyard getting 5 ships, that is 5/8, which means the L1 shipyard, the order of value could be to the tune of ₹25,000 plus crores, which is a very big order .
  • GRSE estimates the Next Generation Survey Vessel order value at around ₹3,500 crores.
    Show source
    Coming to the Next Generation Survey Vessel, our appreciation is that the order value could be to the tune of around ₹3,500 crores.
  • The AON for the 12-ship Mine Counter measure Vessels project has been taken for ₹32,000 crores, with a single shipyard getting all 12 ships as per the AON conditions.
    Show source
    The big- ticket items, the Mine Counter measure Vessels project, the AON itself has been taken for ₹32,000 crores.
  • Of 61 warships under construction, 60 are being built by Indian Shipyard.
    Show source
    61 platforms are under construction and of this 61, 60 are being built by Indian Shipyard.
  • GRSE had around ₹11,400 crores remaining on the P-17A project as on 31st March, 2025; one ship was intended for delivery in the next three months, with most of its revenue already accrued, while the bigger chunk of the remaining revenue would come from the second and third ships.
    Show source
    Cmde P. R. Hari: Yes, we have around ₹11,400 crores remaining as on 31st March, 2025 and one of these ships we intent delivering in next three months, and in this ship, we have accrued most of the revenue, and the bigger chunk of this would be coming from the second and third ships.
  • GRSE had around ₹4,000 crores remaining in the ASW Shallow Watercraft project and ₹3,000 crore remaining in another project; other projects were also maturing.
    Show source
    Cmde P. R. Hari: You have taken a guess, maybe this year because see the other projects are also maturing now, because we got around ₹4,000 crores remaining in the ASW S hallow Watercraft, ₹3,000 crore and so.
  • GRSE is constructing eight of the 16 Anti-Submarine Shallow Watercraft ships for the Indian armed forces, Indian Navy, while another shipyard is constructing eight.
    Show source
    The first of this is being built by two shipyards, eight by us, and eight by another shipyard.
  • The company delivered an Unmanned Surface Vessel to a DRDO organization, the NSDL, Vishakhapatnam, and completed the patrol boat project for the Government of Bangladesh.
    Show source
    In addition, we delivered an Unmanned Surface Vessel to a DRD O organization, the NSDL, Vishakhapatnam, and also completed the patrol vessel, patrol boat project for the Government of Bangladesh.
  • The Navy issued an RFP for five Next Generation Survey Vessels Large, and Garden Reach Shipbuilders & Engineers Limited will bid for the project.
    Show source
    In addition, Navy has already come out with an RFP for five Next Generation Survey Vessels Large and GRSE will definitely be bidding for this project, and having the experience of building the S urvey Vessels Large and earlier platforms of similar kind.
  • The LPD project and the Next Generation Destroyer project are on the Navy’s perspective plan and are on the anvil.
    Show source
    But as per Navy's perspective plan, the LPD project and the Next Generation Destroyer project are also definitely on the anvil.
  • GRSE had delivered its first Anti-Submarine Shallow Watercraft ship, which was to be inducted into the naval fleet a month later.
    Show source
    And we are proud to state that our first ship has already been delivered and will be inducted into the naval fleet a month from now.
  • The second Anti-Submarine Shallow Watercraft ship had undergone the contractor feed trials.
    Show source
    And the second ship also has undergone the contractor feed trials.

What it is building and selling

Projects and capacity

  • First P-17 Alpha ship completed its final machinery trial and had nearly 95% physical progress of construction; the company intends to deliver it two months from now, ahead of the contractual delivery period.
    Show source
    We in tend delivering the ship two months from now, ahead of the contractual delivery period.
  • Second P-17 Alpha ship is moving along smoothly.
    Show source
    The second ship is moving along smoothly.
  • Third Survey Vessel Large ship had attained 88% physical progress, completed contractor fleet trials, and was being prepared for final machinery trials and delivery; the company intends to deliver it by July this year.
    Show source
    The third ship has attained 88% physical progress.
  • Fourth Survey Vessel Large ship had attained 77% physical progress and will be delivered by the end of this calendar year.
    Show source
    The last ship of the project, the Survey Vessel Large i.e. fourth, has attained 77% physical progress, and by end of this calendar year, we will be delivering this vessel.
  • Third Anti-Submarine Shallow Watercraft ship had attained 82% progress and its fourth had attained 68% progress.
    Show source
    The third ship has attained 82% progress, the fourth 68% and so on.
  • The company estimates that all ships in the Anti-Submarine Shallow Watercraft project will be delivered during calendar year 2026, with four of the vessels, including three more vessels, planned for delivery during 2025-26.
    Show source
    And as per our current estimate, all the ships of these projects will be delivered during calendar year 2026 with four of these vessels, that is three more vessels planned to be delivered during 2025-26.
Show 26 more statements

Projects and capacity

  • The first two Garden Reach Shipbuilders & Engineers Limited Next Generation Offshore Patrol Vessel ships had crossed 50% physical progress, while the last two had attained 43% physical progress.
    Show source
    Coming to the next generation O ffshore Patrol Vessel project, the first two ships have crossed 50% of physical progress, and the last two ships of the project have also moved along fast, and they have attained 43% physical progress.
  • Oceanographic Research Vessel production had commenced, its keel was laid in March 2025, and delivery is planned during October 2027.
    Show source
    In addition, the non- defence platforms, the O ceanographic Research V essel - the production has already commenced, and the keel of the vessel has already been laid in March 2025 , and the delivery of the ship is planned during October 2027 , as well as the A coustic Research Ship for the DRDO, the design and pre-production activities are in progress, and the project is well on track.
  • 13 Hybrid Ferries were in the design and pre-production stages, and the keel of all 13 ferries is planned to be launched during the end of this month.
    Show source
    The keel of all the 13 ferries is planned to be launched during end of this month.
  • The company increased its shipbuilding capacity from 12 to 20 after a modification, and from 20 to 24 ships during 2024 through rejuvenation of its existing facilities.
    Show source
    But during 2024 we have enhanced this capacity from 20 to 24 through rejuvenation of our existing facilities.
  • GRSE increased its capacity from 20 ships under concurrent construction about two years back to 24 ships through rejuvenating existing facilities, and intends to increase capacity to 28 ships by end of this year; it says this will not be adequate for shipbuilding demand over the next 5 to 10 years.
    Show source
    So, with this, we intend increasing this capacity to 28 ships by end of this year, but we fully acknowledge the fact that this will just not be adequate to meet demand, the shipbuilding demand that is going to be there in the next 5 to 10 years.
  • GRSE has taken over three dry docks from Syama Prasad Mookerjee Port on a long-term lease, paying nominal rent and sharing profits; it has also recently taken over another 125 meters by 25 meter dry dock on a similar model.
    Show source
    We are paying them a nominal rent , and we have a profit-sharing methodology with them.
  • GRSE's capacity is 24-25 ships as of today, and it intends to increase it to 28 by end of this year, a target it is confident of meeting.
    Show source
    Cmde P. R. Hari: Yes, as on today, it is 24-25, it is our intent to increase to 28 by end of this year, which we are well on track, and we are confident of meeting this target.
  • With the Syama Prasad Mookerjee Port facility and its existing facility, including rejuvenation and modernization, GRSE intends to increase capacity to 30 ships within the next two years.
    Show source
    So, with the facility in Syama Prasad Mookerjee Port , and our existing facility, including rejuvenation and modernization, we intend taking it up to 30 ships within the next two years.
  • The company targeted shipbuilding capacity for 28 ships concurrently and is at 24 ships now.
    Show source
    So, we intend increasing the shipbuilding capacity from 24 to 28 ships by 2025-year end.
  • Second Anti-Submarine Shallow Watercraft ship completed final machinery trials and was planned for delivery during July this year.
    Show source
    The second ship has completed the final machinery trials, and this ship was planned to be delivered during July this year.
  • The company had laid the keels of all four Next Generation Offshore Patrol Vessel ships and intends to launch two of them during the current financial year.
    Show source
    What I would like to state with respect to the N ext Generation Offshore Patrol Vessel project is that the keel of all the four ships have already been la id, and we intend launching two of these vessels during the current financial year .
  • Dredger project for the Government of Bangladesh was in the design and pre-production stages.
    Show source
    We are also executing one project for the Government of Bangladesh, dredger project , the design and pre- production activities are in progress, and the same is the case with the 13 Hybrid Ferries.
  • The company has put capital into reviving some of its defunct facilities and is taking dry docks on long-term lease from another agency in Kolkata to increase capacity.
    Show source
    And we feel this capacity itself is inadequate to meet the ongoing and the future requirements, so we have put in capital to revive some of the defu nct facilities earlier held with us, and also through certain long-term lease of dry docks from one of the other agencies in Kolkata.
  • GRSE has acquired dry docks within Kolkata on long-term lease.
    Show source
    Along with that, we are also gone ahead with acquiring dry docks within Kolkata, long term lease tradeoffs which are ours today.
  • GRSE is in the process of creating a greenfield shipbuilding facility and expects clarity within the next six months to nine months, with negotiations in progress with multiple agencies on both the West and East coast.
    Show source
    So yes, to an swer your question, we are, as with MDL, or as with Cochin Shipyard, or any other shipyard in India, we are in the process of creating a greenfield shipbuilding facility.
  • GRSE is in the process of creating a greenfield shipbuilding facility. Replaced by a later filing.
  • GRSE said project progress was satisfactory despite challenges and the cascading effects of COVID, which were still having an impact after five years, and said it had surmounted these challenges effectively as ships were being delivered. Replaced by a later filing.
    Show source
    Yes, we are happy with the project progress, despite the challenges faced and the cascading effects of the COVID, which many the impact is even after five years, there is impact, but we have surmounted the se challenges effectively, and that's how the ships are getting delivered.

Segments

  • Bulbar accounts for around 10% of the overall steel equipped in a ship.
    Show source
    It is around 10% of the overall steel equipped.
  • A 3,000 ton ship has around 2,000 tons of steel, ranging from 1,800 to 2,200 tons depending on the type of steel; a 3,000 to 3,300 ton displacement ship has around 1,800 to 2,000 tons of steel, of which around 10% is bulbar.
    Show source
    So, this, if you take a ballpark figure, this comes to around 1800 to 2000 tons of steel in a 3000 to 3300 ton displacement ship.

Deals and partners

  • GRSE is executing an order for a German client for 8 Multipurpose Vessel, with a contractual delivery timeline of four years for all 8 ships; delivery duration varies with ship size and complexity, and the first ship could be delivered in three years with follow-on ships in a series of four potentially delivered six months thereafter.
    Show source
    These are medium sized ships, advanced platforms but medium size ships, there the contractual delivery timeline for 8 ships put together is four years.
  • The company was declared L1 for two Geological Survey of India Coastal Research Vessel ships, received the letter of intent, and expects the contract to be signed during June this year.
    Show source
    We already received the letter of 4 intent, and the contract for this vessel is expected to be signed during June this year.
  • The company entered into Memorandum of Understanding with capable shipbuilders on the East and West coast to address capacity limitations and leads for commercial ship construction.
    Show source
    I would also like to state that to mitigate the existing limitations with respect to capacity and also to meet the leads that we are getting towards construction of commercial ships, we also got into M emorandum of Understanding with capable shipbuilders, both on the East and West coast.
  • GRSE's project-specific agreement with SWAN Defence is based on a revenue-sharing model, with terms and conditions to be concluded as each project comes.
    Show source
    Coming to SWAN Defence, the agreement is the project specific agreement, which means whenever a project is executed, it will be based on a revenue sharing model.
  • GRSE will execute the refit of an export platform at the Syama Prasad Mookerjee Port facility on a profit-sharing methodology with the port.
    Show source
    And we will also be executing the refit of an export platform t here, this one a profit-sharing methodology with them.
  • The SWAN relationship for shipbuilding collaboration is project specific and restricted to large size commercial ships.
    Show source
    The SWAN relationship for shipbuilding collaboration i s project specific, restricted to large size commercial ships.
  • GRSE has similar relationships with multiple shipyards, and has already exercised and expressed successfully a few of them. Replaced by a later filing.
    Show source
    And I would like to again reiterate that we have a similar relationship with multiple shipyards, and a few of them you already exercised and expressed successfully.

Risks, rules and outside factors

Rules and policy

  • The Ministry of Defence has a defined 30-month period from when an AON is accrued by DSP for issuance of RFP, and it has done so well within the time.
    Show source
    Yes, the processes take time, but when we fructify the construction phase starts, even the NGP, as per our own procurement timeline, from the time an AON is accrued by DSP, the acquisition, rather the Ministry of Defence has a 30-month period, which is a defined 30-month period for issuance of RFP.

Everything else said on the call

Other

  • none Replaced by a later filing.
    Show source
    In this regard and pursuant to Regulation 30 read with para A of Part A of Schedule III of the SEBI (LODR) Regulations, 2015, the Transcript of the Investors/Analyst Conference Call for Q4 & FY 25 of the Company is enclosed herewith.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    My question is very generic. I just want to ask you on the opportunity of shipbuilding here in India. So currently, how many naval ships do we have in the Indian Coast Guard and the Indian Navy, and how much is the M inistry of Defence (MoD) planning to add to the respective fields . And my second part of this question will be, out of the new shifts which the MoD is planning to add. The tendering has been done for, how many of the ships, you have any idea that will be great?

    Answer, cmde hari

    Cmde P. R. Hari: Thank you, Mr. Dalal. I would like to answer this question in two parts . One, as far as the current fleet, strength of Navy and Coast Guard are concerned. Navy has got around 150 platforms and Coast Guard about nearly 100 platforms, when I say platforms, they include small vessels like Fast Interceptor Crafts to larger platforms. Right now, currently 61 platforms are being built for both the forces put together and of these 61 , 60 are being built by Indian Shipyard. Now coming to their capacity augmentation plans, both the forces have got their perspective plan, and as per what is available in the open domain, both these forces, Navy and the Coast Guard, want to expand their numbers. The Navy perhaps to a figure of +200 and Coast Guard perhaps to a figure of around 150, why I am adding the term perhaps, is because I do not have absolute clarity on the exact numbers that they are looking at.

    Answer, cmde hari

    Now coming to the RFPs, which are live, as I had mentioned during my initial statement. Two, in addition to the Next Generation Corvette project, where the bids have already been opened and the formal results are awaited. We expect it to come in a couple of days now. There are two bids from the services which are active now. One is an 18 F ast Patrol Vessel, Next Generation Fast Patrol Vessel for the Indian Coast Guard, and 5 ship Next Generation Survey Vessel Project for the Indian Navy. In addition to that, again as I mentioned, multiple projects are on the anvil, where in few cases, they have already obtained the DFC approval. For example, the 12 Mine Countermeasure Vessels project for the Indian Navy, the P -17 Bravo project i t's a 7 ship project for the Indian Navy, 2 Multipurpose Vessels for the Indian Navy, 6 Next Generation Offshore Patrol Vessels for the Indian Coast Guard and so on.

    Answer, cmde hari

    So , I am trying to convey is that, what is available right now the order book of the Indian shipyards and what is likely to come up in the near future. The opportunities are phenomenal , does it answer your question or you want something more, any further clarification you need?

  2. Question

    Harshit Kapadia: Hi Sir, Good Evening and thank you for giving me this opportunity and Congratulations for very good set of numbers. Just wanted to get a sense on the order book breakup project wise and secondly, on the order inflow, which you have pipeline, which you have mentioned, can you also give the size, what is a tentative order size which one can expect and on the NGC you had said in few days, we will get to announce the order as in, the bids will be out in few days or what is the likely, is there any LOI which is expected, anything clarity on that and lastly, on the other expenses side sir, if you can explain there was one provision right back which you did of ₹433 crores. So, what

    Answer, cmde hari

    Cmde P. R. Hari: Thank you, I will start with the order book break up. As I mentioned, our order book stands at ₹22,680 crores and P-17 Alpha still continues to out in few days or what is the likely, is there any LOI which is expected, anything clarity on that and lastly, on the other expenses side sir, if you can explain there was one provision right back which you did of ₹433 crores. So, what was that related to and by when this complete amount will be dispensed out, as in would be added back to the profit?

    Answer, cmde hari

    Cmde P. R. Hari: Thank you, I will start with the order book break up. As I mentioned, our order book stands at ₹22,680 crores and P-17 Alpha still continues to be the biggest bread earner. We are left with around ₹11,435 crores from P-17 Alpha project. The Anti-Submarine Shallow Watercraft project ₹3,946 crores. T he Survey Vessel Large project, it is 6 actually on the anvil of closing so, ₹530 crores, the Offshore Patrol Vessel i.e. NGOPV project, ₹3,327 crores. The non-defence platforms, the NCPOR Ocean Research Vessel, ₹785 crores, the Acoustic Research Ship, ₹466 crores, the Ferry project, ₹226 crores. And the export projects, the M ultipurpose Vessel, Dredger and so on, around ₹1,200 crores.

    Answer, cmde hari

    And the 30 mm G un project, ₹201 crores. So, this is the order break up. Now coming to you had asked a question about, what is the likely the value of the projects that are on the anvil. As I had mentioned, the Next Generation Corvette project is a high value project, and here we expect, our anticipation is that the total order value could be to the tune of ₹40,000 plus crores. But this ₹40,000 crore will be split between two shipyards, with the L1 shipyard getting 5 ships, that is 5/8, which means the L1 shipyard, the order of value could be to the tune of ₹25,000 plus crores, which is a very big order . Coming to the Next Generation Survey Vessel, our appreciation is that the order value could be to the tune of around ₹3,500 crores. And the 18 NGFPV project could be to the tune of ₹3, 000 crores.

    Answer, cmde hari

    The OPV project could be to the tune of around ₹2, 500 crores. And the Multipurpose Vessel to the tune of around ₹1, 200 crores. The Water Jet FAC project, the 31 Water Jet FAC project, could be this tune of around ₹3,000 crores, it could be plus or minus ₹200 crores, depending upon how the bidding goes and the Fast I ntercepted Craft Vessel to the tune of around ₹1, 500 to ₹1,800 crores. The big- ticket items, the Mine Counter measure Vessels project, the AON itself has been taken for ₹32,000 crores. And that's a 12 ship project, single shipyard getting all the 12 ships as per the AON conditions and the P -17 Bravo project, this again is a high value project. There are two shipya rds being , there is a seven ship project. Two shipyards would be involved in this project, with the total AON value to the tune of around ₹70,000 crores.

    Answer, cmde hari

    And at this juncture, I would not like to give any assumptions on the LPD and NGT, because they are still in liquid form. You had asked something about this ₹433 crore.

  3. Question

    Harshit Kapadia: Yes, ₹433 crores of provision write back is something which you have mentioned in the press release. So, what is that related to which and when it would be?

    Answer, cmde hari

    Cmde P. R. Hari: This is linked to the P-17 Alpha project. The first ship is actually at the verge of delivery, I had mentioned that the first ship has completed her final machinery trials, and she is actually getting ready for delivery, so we have reasonable clarity on the cost to completion. Accordingly, the provision is reversed, and we will be this profit will be accounted over the next one to two years, when the entire project gets completed. Which means this a three ship project, so the first ship now ready for delivery, and the next two ships , as I had mentioned, will be one of them will be definitely spilling over to the next financial year. So, this will get recognized within one to two years.

  4. Question

    Harshit Kapadia: Okay. And is there a possibility this amount can even increase s ince now more ships will be in the, as in will be closer to the completion mode. So probably, is there a possibility this increase would be there of ₹433 crores, any number could be higher?

    Answer, cmde hari

    Cmde P. R. Hari: It will be more or less same. Since we know the cost to completion of the first ship, the condition is going to be more or less same, which is the positive side.

  5. Question

    Harshit Kapadia: Understood. And finally, on NGC you mentioned, when is the order likely to be awarded, just final one.

    Answer, cmde hari

    Cmde P. R. Hari: In the normal course of events, after the L1 is declared, then the contract negotiation starts . The contract negotiation is the long -drawn process for major projects like this. We expect very, very optimistic timeline of contract conclusion by December this year, and a conservative timeline of March next year. But, I personally feel if together over the L1 shipyard and the Navy pushes, the contract can be signed by end of this calendar year. 7 Moderator: Thank you.

    Answer, cmde hari

    Cmde P. R. Hari: Thank you. Mr. Rohit. See, the s hipbuilding of course, the revenue accrual, revenue recognitio n is depending upon the project e xecution phase. We are now at an execution phase where maximum revenue accrual takes place with our major breadwinner that is a P-17 Alpha project at a mature stage where the maximum number of equipment get lowered and integrated to the ship system. To answer your question, whether we have peaked, I would not like to say so, because from our appreciation okay, I will put it this way , when we started the last financial year our order book was ₹22,651 crores and as on 31 st March, 2025 it is almost same quantum. That means ₹22,680 crores, which means in the last one year, while we have generated revenue of over ₹5,000 crores, we have also got orders worth ₹ 5,000 crores. So, in our appreciation, the peak year perhaps could be the next year.

    Answer, cmde hari

    That is financial year, the current year. What I mean is , Financial Year ‘2 5-26 could be the peak year. Thereafter, it could flat out a nd hypothetically, if a big project comes to us, as you rightly said, the revenue recognition from that project will start only two years down the line. The gap which could happen is already being filled up with a plethora of orders r anging from coming from the non- defence platforms and the commercial ships. So, to answer your question in a simple sentence, this perhaps is not the peak year, the peak year is yet to come. Rohit: Got it, I really appreciate that part. My second question is more to do with the competitive positioning as in we see Mazagon Dock is going for a greenfield expansion.

    Answer, cmde hari

    Cochin Shipyard is also planning for a greenfield expansion, they are looking at a port nearby Cochin port, and they are planning something over there. What is our plan, as in we have been doing some leasing around as such? But is there any concrete g reenfield roadmap for us that can take us to another trajectory?

    Answer, cmde hari

    Cmde P. R. Hari: Today, with the Ministry of Shipping having started out a clear roadmap for enhancing the share of India in the global shipbuilding market from less than 1% to 10% in a finite period of time. There is a need for all the Indian shipyards to augment their shipbuilding capacity. What we had started was I had mentioned during my initial briefing, our capacity just about two years back, was to construct 20 ships, large and medium put together concurrently. We started off by rejuvenating our existing facilities and enhance the capacity to 24 ships. Along with that, we are also gone ahead with acquiring dry docks within Kolkata, long term lease tradeoffs which are ours today. So, with this, we intend increasing this capacity to 28 ships by end of this year, but we fully acknowledge the fact that this will just not be adequate to meet demand, the shipbuilding demand that is going to be there in the next 5 to 10 years. So yes, to an swer your question, we are, as with MDL, or as with Cochin Shipyard, or any other shipyard in India, we are in the process of creating a greenfield shipbuilding facility.

    Answer, cmde hari

    At this juncture, since negotiations are in progress with multiple agencies, both on the which are ours today. So, with this, we intend increasing this capacity to 28 ships by end of this year, but we fully acknowledge the fact that this will just not be adequate to meet demand, the shipbuilding demand that is going to be there in the next 5 to 10 years. So yes, to an swer your question, we are, as with MDL, or as with Cochin Shipyard, or any other shipyard in India, we are in the process of creating a greenfield shipbuilding facility. At this juncture, since negotiations are in progress with multiple agencies, both on the West and East coast, all I can say is that yes, we too are in the process, and we expect clarity on this in the next six months to nine months. 8 Rohit: Got it, sir. Sir, my final question is more on the industry perspective part, this naval perspective plan of 200 vessels that we had in the past, it seems that there is some sort of a delay, both in terms of awarding and subsequently commissioning of the vessels.

    Answer, cmde hari

    Is there a strategic realignment that is happening at a country level , some sort of a priority is going backwards on naval front, and probably are we putting more on electronic warfare front because we have been bidding lot of these defence analyst reports who has been saying that even the Chinese threat that we face is more towards the territorial part and not on the naval part. And we have had a military exercise in the past, just few weeks back, where we saw it's more of electronic warfare. So , I am just trying to understand, what happens to this naval perspective plan of 200 vessels. And we have also seen Next Generation Corvette getting delayed for a long time, AON has happened a long way back, and yet the awarding hasn't taken up, the last big order I could recollect was that NGOPV. So, are there any thoughts on those aspects?

    Answer, cmde hari

    Cmde P. R. Hari: Okay. I will put it this way, actually wouldn't like to agree with you, nor would like to disagree with you. But I will put a completely different perspective. For any nation to be a global power, she has to, she means the nation has to have a blue water n avy. And India's coastline from around 7600 kilometers have gone up, as per the latest survey to 11,000+ kilometers. So, there is no way that the naval progress that means the plans for N avy to augment, or Coast Guard to augment their capability is diminishing. Even in the current situation, the deployment of naval platforms is available in the open media.

    Answer, cmde hari

    So, coming to the ships under construction, when I say 61 ships under construction, 61 warships under construction, this is no mean number, 61 is the number of platforms many nations put together own. 61 platforms are under construction and of this 61, 60 are being built by Indian Shipyard. The numbers, if you are looking at 18 N ext Generation Fast Patrol Vessels, 5 Survey Vessel Large, 18 plus 5 i.e. 23, 31 Water Jet FACs, you add this number plus 120 FACs plus 8 NGFPV, these numbers are no mean numbers. Yes, the processes take time, but when we fructify the construction phase starts, even the NGP, as per our own procurement timeline, from the time an AON is accrued by DSP, the acquisition, rather the Ministry of Defence has a 30-month period, which is a defined 30-month period for issuance of RFP. They have done it well within the time. So, I don't see there is a shift in focus in developing the maritime capabilities. And I have just stated the numbers, the numbers are here for you to see.

    Answer, cmde hari

    And in our own perspective, from GRSEs perspective of the 16 platforms which we are currently building, four of them, one we have already delivered in the current calendar year, and three more of them we are confident delivering in this calendar year, plus one more on the financial year. So , I do not see any dilution, be it from the government or from the shipyard perspective, with respect to focus and delivery, delivery in terms of placement of order, delivery in terms of publishing the RFP, delivery in terms of active delivery of the ships. Thank you.

  6. Question

    Dhawan Shah: So, my question is on the agreement that you have signed with the Western player SWAN Defence. So, what is your strategy and plans over there, if you can share thoughts on this?

    Answer, cmde hari

    Cmde P. R. Hari: Okay, SWAN Shipyard with respect to infrastructure, they are one of the biggest shipyards in the country, with dry dock, which is perhaps the largest in the country, and the infrastructure is one the ships. Thank you.

    Answer, cmde hari

    Cmde P. R. Hari: Okay, SWAN Shipyard with respect to infrastructure, they are one of the biggest shipyards in the country, with dry dock, which is perhaps the largest in the country, and the infrastructure is one of the best in the count ry. As what is available in the o pen media and as you are fully aware, the facility has not been utilized for some time , for reasons know and as a shipyard, which is located in Kolkata, with the current order book that we are executing and few assured orders, which are on the anvil, we felt it necessary to open a front in the W estern front, where we can partner and build a commercial business. It is within this intent that we signed an MOU with SWAN, where 9 we will be jointly building commercial ships of the large size. It's an MOU at this juncture, we are negotiating with few clients for orders, and once this materializes, the MOU will get translated into an actual co-production. Thank you.

  7. Question

    Dhawan Shah: Yes, in the SWAN Defence?

    Answer, cmde hari

    Cmde P. R. Hari: It purely depends upon the order. I will put it in a different perspective, right now I am executing an order for a German client for 8 Multipurpose Vessel. These are medium sized ships, advanced platforms but medium size ships, there the contractual delivery timeline for 8 ships put together is four years. So, depending upon the size and complexity of the ship, this duration varies. It could be, the first ship could be delivered in a period of three years, because the first ship always takes time the follow -on ships that the second, third, fourth in a series of four, if it is a series of four, could be six months thereafter.

  8. Question

    Divyesh Shah: Yes, and second question is same regarding , we have entered lease agreement with S yama Prasad M ookerjee Port, Kolkata. So, what will be the financial implications of this agreement, whether and what will be the payout per year for this facility, and how many ships we will be building there. These are my two basic questions.

    Answer, cmde hari

    Cmde P. R. Hari: Okay, at that outset, let me thank you for congratulating the Indian armed forces. And since we deal very closely with the services, we shall convey your appreciation to the services. Coming to SWAN Defence, the agreement is the project specific agreement, which means whenever a project is executed, it will be based on a revenue sharing model. Again, project specific as the project comes we will conclude the terms and conditions of the project. Coming to Syama Prasad Mookerjee Port, we have taken over three dry docks fully from this port, and we have taken on a long -term lease. We are paying them a nominal rent , and we have a profit-sharing methodology with them. In addition, we have also taken over one more dry dock very recently it’s the 125 meters by 25 meter dry dock, again on a similar model.

    Answer, cmde hari

    Now, what we intend doing in these facilities for dry dock, and just to put you in the right perspective, dry docks are very vital assets towards shipbuilding and ship repair. Since, our primary facilities within the ph ysical confines of the company, my pre- shipbuilding units are focused on 10 shipbuilding, and since we wanted to venture into ship repairs, not today, it is almost three years back, we decided that we must have a facility which is completely separate from the ship building facility, so there is no dilution of attention. And that is the reason why we took over these facilities from Syama Prasad Mookerjee Port. And so far, we have completed nearly 41 refits in this facility, including multiple coast guard ships and naval ships. And we will also be executing the refit of an export platform t here, this one a profit-sharing methodology with them. So far, the project relationship has been successful. Thank you.

  9. Question

    Divyesh Shah: And sir, regarding what will be our total capacity, suppose everything goes well with the Syama Prasad Mookerjee Port and other which we have talked just now. So , from 28 where we will reach in next three years, billing capacity?

    Answer, cmde hari

    Cmde P. R. Hari: Yes, as on today, it is 24-25, it is our intent to increase to 28 by end of this year, which we are well on track, and we are confident of meeting this target. And since you asked this question two to three years down line, including and keeping the greenfield facility what we have in our plans away from the current discussions, because that is still in liquid form and under discussion. So, with the facility in Syama Prasad Mookerjee Port , and our existing facility, including rejuvenation and modernization, we intend taking it up to 30 ships within the next two years.

  10. Question

    Divyesh Shah: And one more last question, sir. This year , we had excellent EBITDA margin of about 13% sir, same margin is sustainable, or it is one of, will you please guide us for the future?

    Answer, cmde hari

    Cmde P. R. Hari: Very interesting question. Since you mentioned one off, it has not been one off it has been similar margins over the last few times. Yes, this time we have touched a new high. It is certainly not, it's not one off. But in ship building, ideally, we shouldn't be doing a quarter -to-quarter comparison to take a year because of most of our projects are long drawn projects where the execution structures over a period, ranging from for a small platform to two years, to a big platform five to six years. So, to answer your question, we will be able to maintain more or less the same margin, it is not one off anyway.

Show 11 more questions
  1. Question

    Utkarsh Somaya: Number of ships or revenue either.

    Answer, cmde hari

    Cmde P. R. Hari: I will rather go by number of ships , just one second, so in 2025-26 we will be, I will also try and correlate with revenue. So, in generally though, I will not get into specifics, but I will try and correlate with the projects, you can 11 make an estimate. So, in 2025-26 we will be delivering 1 P-17 Alpha, 2 Survey Vessel Large and 4 Anti-Submarine Shallow Watercraft, that covers four plus two plus one, seven ships. In 2026-27 we will be delivering 2 P-17 Alpha, this is our major high value projects, 3 then the last three Anti -Submarine Shallow Watercraft , and 1 Next Generation Offshore Patrol Vessels and the Acoustic Vessel Ship. And the next year that is FY’ 27-28, we will be delivering 2 N ext Generation Offshore Patrol Vessels, the O ceanographic Research Vessel and the Coastal Research Vessels for which we are going to sign the contract now. I have not mentioned about the hybrid ferries that we are building for the G overnment of West Bengal or the dredger, because of small value projects which will get covered during this period, maybe this year as well we will be able to deliver a couple of ferries. So does that give you an indication? because the major project there's a P-17 Alpha, first ship this year and the next two ships next year.

  2. Question

    Sanjeev Zarbade: Sir, my question was regarding the P-17A, in which we have ₹11,400 crore order, that order book that is pending. So how the distribution in the sense the revenue booking would be in FY’26 and FY’27, although you shared the delivery timelines, but would the revenue booking be also in the same kind of ratio, in the sense more would be booked in FY’27 because we would be delivering two vessels in FY’27 or would it be the other way around?

    Answer, cmde hari

    Cmde P. R. Hari: Yes, we have around ₹11,400 crores remaining as on 31st March, 2025 and one of these ships we intent delivering in next three months, and in this ship, we have accrued most of the revenue, and the bigger chunk of this would be coming from the second and third ships. So, if you are asking me for a proportion of revenue from the project which is going to be accrued this year and next year, I would say 40:60.

  3. Question

    Sanjeev Zarbade: Okay, 40 in FY’26 and 60 in FY’27?

    Answer, cmde hari

    Cmde P. R. Hari: You have taken a guess, maybe this year because see the other projects are also maturing now, because we got around ₹4,000 crores remaining in the ASW S hallow Watercraft, ₹3,000 crore and so. To an earlier query , I had mentioned that's a very specific question asked, are you flattening out? I said no, so that should give you a good enough answer. 12 Sanjeev Zarbade: Yes.

  4. Question

    Sunil Shah: First of all, heartly congratulations. Sir, just my two questions here. In next couple of days, we will be hearing on the next generation Corvette project, which has been long pending. So, what should be announced in next couple of days, would it be that L 1, L2 would be decided, and thereafter we get into a process of negotiating on the price, how does it work for agreement like me to understand this thing that is my first question. The second question is, since now we have got a tie up with S WAN Defence, so last time when we had met up, we were talking about clusters which Indian government is looking at for shipbuilding. Now that we have got into an MOU with SWAN. Does that t

    Answer, cmde hari

    Cmde P. R. Hari: Thank you, Mr. Sunil Shah. And at the outset, thank you on behalf of because, since we are a Ministry of Defence entity on behalf of the Indian A rmed Forces, thank you for your good wishes and appreciation. Coming first to SWAN and Clusters, I would like to clarify and clear that an answer to an earlier query. We have MOUs or agreements, not only with S WAN, we also have with competent private players, pr ivate and public players for collaboration towards the construction of vessels. I will give you an example, I have a running collaboration with one of the South based shipyards for construction, part construction of few of the vessels. So, these are project specific, and this has got nothing to do about the clusters that I mentioned, a cluster, what the ministry of shipping had talked about, and what we expect to be implemented is creation of a greenfield facility. When I say greenfield facility, which would mean a shipyard surrounded by its ancillary industries, this is still in liquid form, multiple state governments, these are all open domain information, multiple state governments, like Gujarat, Maharashtra, Karnataka, Odisha, Andhra and Tamil Nadu, have enhanced the interest and approached the various shipyards and also floated the expression of interest for creation of g reenfield shipyards there and we have also responded, responding to few of this .

    Answer, cmde hari

    The SWAN relationship for shipbuilding collaboration i s project specific, restricted to large size commercial ships. And I would like to again reiterate that we have a similar relationship with multiple shipyards, and a few of them you already exercised and expressed successfully. Coming to your first question on the next generation Corvette , what is likely to happen in the next couple of days is the L1 declaration and L 2 declaration by the ministry and navy, and this will be followed by a natural process of contract negotiation, depending upon the complexity of a p roject. This project definitely is a complex and high value project. This could take, in my appreciation a very optimistic timeline of around six months from now that means, let us say December this year, conclusion, or a c onservative timeline of another year, another three months. March 31st, 2026. I hope this clarifies.

  5. Question

    Hardik Gandhi: Sir just two questions from my end. First, on execution side, are you seeing any headwinds , and second, being that I know we usually this question comes up, but given that Mazagon and Cochin are in a similar industry, their 13 operating margins are quite high as compared to us. Of course, we have bettered our margins over the quarters. But again, is there a scope for further improvement, or are we seeing margins staying at these?

    Answer, cmde hari

    Cmde P. R. Hari: Okay, thank you for the question, Mr. Hardik, I will answer second question first regarding margins. Conventionally, one of the shipyards that you mentioned has been operating on projects which were awarded on nomination basis. The second shipyard, what you mentioned has been operating on ship repair projects primarily, and another nominated high, very high value project. And we have been more or less operating on projects, one on competitive bidding. As of now, all the projects that are coming out from the services are on competitive bidding. So, while we have improved, there could be a situation where all the Indian Shipyards, in addition to the shipyards that you named, will be at a n even platform with respect to margins . And coming to the headway, I am sure you would have, your question would have been specific to the project progress.

    Answer, cmde hari

    Yes, we are happy with the project progress, despite the challenges faced and the cascading effects of the COVID, which many the impact is even after five years, there is impact, but we have surmounted the se challenges effectively, and that's how the ships are getting delivered. I just made a specific mention in my introductory talk regarding one particular project, which is the map of great pride for us and every for all I would like to state this that there is a 16- ship project being constructed for the Indian armed forces , Indian Navy, the Anti -Submarine Shallow Watercraft project. The first of this is being built by two shipyards, eight by us, and eight by another shipyard. And we are proud to state that our first ship has already been delivered and will be inducted into the naval fleet a month from now. And the second ship also has undergone the contractor feed trials. The first P -17 Alpha is ready for delivery two months from now, the ship will be delivered. So, yes, there is definite headway a nd with the figures, the numbers that I mentioned regarding delivery of ships to an earlier query, we are confident of meeting the timelines that they we have committed to our customer for the ongoing projects.

  6. Question

    Hardik Gandhi: Understood sir, just a follow up. Is there any supply chain issue at present, given the geopolitical tension, as well as like if and how much are we importing from outside, and is there a bottleneck there?

    Answer, cmde hari

    Cmde P. R. Hari: See as of now , no direct impact. Yes, there is import content especially for the export platforms that we are building, but the sources from where we are procuring, they have not been impacted by the current situation and considering that the situation overall, including conflicts at various parts of the globe, are still going on, still we have not faced any impact, and we do not see any impact in our supply chain with res pect to the ongoing projects that we are executing.

  7. Question

    Vikas Kasturi: I had just one question. So, with respect to the ships that we are going to deliver, is there any retention amount that the client will withhold as a warranty or a guarantee kind of a thing?

    Answer, cmde hari

    Cmde P. R. Hari: Thank you for your appreciation. See in warship building orders which majority of the orders are warship building orders in all these contracts, as per the DAP, based on which these contracts are formulated, there are various 14 stage payments. One of the stage payments is the retention of, 10% of the project cost till completion of the guarantee refit, which in the conventional sense the guarantee refit will happen in one year. It means we are bound to provide one year of guarantee a nd once the guarantee period is completed, t he ship will undergo guarantee refit and on completion of that, the retained amount will be paid.

  8. Question

    Vikas Kasturi: Got it sir, and this is more or less this 10% is withheld for all ships, all your platforms?

    Answer, cmde hari

    Cmde P. R. Hari: Pardon me, yes. It is purely as for the DAP and for all the orders that are being executed and this is applicable in my appreciation to all the shipyards executing similar orders.

  9. Question

    Vaibhav Dalal: I just have a question around a very specific product which is being used in your ship building. So, these are the bulbar which are used in the construction of the hull of a ship. So , I just want to understand, how much bulbar are required in the overall making of a ship, in terms of volume, as well as in terms of the value of the ship?

    Answer, cmde hari

    Cmde P. R. Hari: Very interesting question and it's a very, very unique question that I am facing. I have been attending analyst and investors meet, now this is my 12th meet running, 12th or 13th meet running, very interesting question. Bulbar, since I know shipbuilding, I can answer this question. It is around 10% of the overall steel equipped.

  10. Question

    Vaibhav Dalal: So, in terms of the weight of the ship, or the displacement of the ship?

    Answer, cmde hari

    Cmde P. R. Hari: I will put it this way. See, in a ship, let us say, when we talk about a 3000 ton ship, when you say, a 3000 ton ship, the steel weight would be around 2000 tons, 1800 to 2200 tons, depending upon the type of steel that is being used. If you take a warship, there is a particular type of steel which again is open domain information DMR2 49 Alpha steel which is used. So, this could range depending upon the size, type and the type of platform. Sometimes the steel, thin steel is used for the hull, sometimes thick steel is used, various types of thickness is used in a particular ship. So, this, if you take a ballpark figure, this comes to around 1800 to 2000 tons of steel in a 3000 to 3300 ton displacement ship. The balance be it comes from the equipment and systems that is the plumbing, the main propulsion system, etc. Now within this 2000 tons, around 10% comes the bulbar.

  11. Question

    Vaibhav Dalal: Got it, sir. And my last question will be, sir. So where do you source these bulbar, are you importing these, or are there any domestic players you are buying these bulbar from. My last part of the question will be, since there are 61 warships which are being made here in India, like, out of the 61 warships, 60 are being made in the Indian Shipyard. So, I just want to understand, has the procurement for these bulbar already been done by the shipyards, or the process is still going on, just want to understand that.

    Answer, cmde hari

    Cmde P. R. Hari: Okay, I will answer this question in a broader perspective. Shipyards are platform integrators, big time platform integrators. We source equipment e verything is sourced, starting from steel to since you mentioned bulbar, to the piping material, to something as minor as the cables to cable clamps, to cable trays, you name it, to major equipment. We have platform indicator as customers the Indian Navy or Indian Coast Guard, they do the capacity and capability assessment of suitable firms , make them eligible in certain category of equipment like main propulsion system, main propulsion engines, maybe for example for a p roject maybe shortlist based on the 15 capacity and capability for source . Similarly for steel, the Navy or the Coast Guard determine who are the qualified sources from whom steel is to be procured. They go through a capacity assessment by the customer coming to bulbar, your specific question on bulbar. Bulbar are also not indiscriminately procured they have to be procured from the sources, rather the manufacturer, who are qualified by the customer t hat's the Navy .

Questions about this call

When was the Garden Reach Shipbuilders & Engineers Q4 FY25 earnings call transcript filed?
Garden Reach Shipbuilders & Engineers filed the transcript with the exchange on 27 May 2025. This page is built from that transcript.
What does this page list?
67 statements from the transcript across 8 topics, 42 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 21 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
Garden Reach Shipbuilders & Engineers Q4 FY25 concall: Garden Reach Shipbuilders & Engineers Limited’s order book as on 31st March, 2024 was ₹22,652 crores · DalalOS