Housing & Urban Development Corporation Q2 FY26 earnings call: HUDCO has outstanding MOUs signed to the extent of around INR 7 lakh to INR 8 lakh crores

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

The transcript names the quarter but not the year. The year is worked out from the date it was filed.

HUDCO has outstanding MOUs signed to the extent of around INR 7 lakh to INR 8 lakh crores. HUDCO is maintaining loan growth guidance of plus 25%, sees nothing obstructing that path, and expects to maintain growth between 25% and 30%; the private sector and urban invest window products are expected to act as catalysts for company growth. HUDCO’s disbursements during H1 increased around 19% to around INR 26,000 crores from around INR 21,700 crores in H1 last year. HUDCO’s external commercial borrowings are around INR 9,900 crores, have a maturity of 5 years, and are protected by SGL options within the protection levels.

The numbers management gave

Results

  • HUDCO’s disbursements during H1 increased around 19% to around INR 26,000 crores from around INR 21,700 crores in H1 last year.
    Show source
    And this year, there is an enhancement of around 19%, and we had achieved around INR 26,000 crores during H1.
  • HUDCO’s loan book grew around 30% from INR 111,000 crores to INR 144,000 crores; its growth during H1 was around 15.8%.
    Show source
    Similarly, on the loan book side, if you see, we had grew up around 30% from INR 111,000 crores to INR 144,000 crores, we had grown.
  • HUDCO reduced its cost to 6.32% through the measures discussed, making it more competitive.
    Show source
    So, all these measures has contributed in reduction of cost up to 6.32%, and that makes us more competitive.
  • HUDCO’s debt-equity ratio is below 7% and will be maintained at around 8%.
    Show source
    We are under 7%.
  • HUDCO’s revenue from operations grew 31% year on year to around INR 6,100 crores from INR 4,700 crores in the similar H1 last year.
    Show source
    So it has raised to around INR 6,100 crores from INR 4,700 crores in the similar H1 last year.
  • HUDCO’s weighted average cost declined from 7.45% to 7.12%.
    Show source
    There is a decline in the blended cost of funds from 7.12% to 6.32% sorry, a decline in weighted average cost from 7.45% to 7.12%.
Show 18 more statements

Results

  • HUDCO recorded a reversal of INR 120 crores in the ECL and recovery of around INR 339 crores during the first year.
    Show source
    And similarly, we have been able to resolve our NPA assets also during first year, there is a reversal of INR 120 crores in the ECL and recovery of around INR 339 crores.
  • HUDCO’s profitability increased by 7.55%.
    Show source
    Profitability has also increased by 7.55%, even though we have not compromised on the quality of the assets and the scenario is very, very competitive in the country.
  • HUDCO’s gross NPA was INR 1,750 crores, or 1.21%.
    Show source
    Our gross NPA has reduced and now it is only INR 1,750 crores, which is only 1.21%.
  • HUDCO’s net NPA was 0.07%.
    Show source
    We are very promising towards the net NPA and now we are at net NPA of 0.07%.
  • Excluding the INR 20,000 crores EBR raised on behalf of Government of India, HUDCO’s NIM was 3.43%; including it, HUDCO’s NIM was around 3%.
    Show source
    Similarly, if you see the NIM, if we exclude this EBR, which we had raised around INR 20,000 crores on behalf of Government of India, our NIMs are standing at 3.43%.
  • HUDCO’s spread was 2.42% and 2.02%, including the INR 20,000 crores of the government.
    Show source
    Similarly, spread on the same lines, it is 2.42% and 2.02%, including the INR 20,000 crores of the government.
  • HUDCO’s ROE improved from the last quarter to 1.93%, and return on equity was around 15%.
    Show source
    Similarly, ROE has also improved from the last quarter and now it is 1.93% and return on equity is also around 15%.
  • HUDCO’s CRAR ratio was around 38%.
    Show source
    So, if you see, we are maintaining everything, including the CRAR ratio of around 38%.
  • HUDCO incurred a loss of around INR 176 crores in H1 2025, '26, compared with zero loss in H1 of 2024, '25.
    Show source
    In the H1 2025, '26, we have taken -- we have incurred a loss of around INR 176 crores as compared to zero loss in the H1 of 2024, '25.
  • HUDCO’s yield is around 9%, or 9.21%, and it has sustained a yield of around 9.2% despite falling market yields and a lower cost of funds.
    Show source
    Even though the market has came down, our cost of funds has came down, we have been able to sustain that kind of yield of around plus 9% -- 9.2% rather.
  • HUDCO’s profit came in slightly lower in the quarter, partly due to impairment reserve and some loss of profit; loan book enhancement helped manage the stress and NIM levels.
    Show source
    So the profit has came in this quarter to slightly lower.
  • HUDCO had not sanctioned any loan under PMAY because no state had come forward to take a loan against that state’s counterpart requirement.
    Show source
    No state has came forward to take the loan against the counterpart requirement of that state.
  • HUDCO resolved many projects this year and has more in the pipeline. Replaced by a later filing.
    Show source
    Similarly, regarding the resolutions, yes, this year, we have resolved many projects, but there are many which are in pipeline.

Money and capital

  • HUDCO’s external commercial borrowings are around INR 9,900 crores, have a maturity of 5 years, and are protected by SGL options within the protection levels.
    Show source
    So as far as the external commercial borrowings are concerned, which are around INR 9,900 crores, we have taken adequate protection by way of SGL options, and we are very much within the protection levels.
  • HUDCO’s FCNR loans have maturity up to 1 year; the company booked losses on them in the last 2 quarters and has taken protection for the remaining FCNR loans through SGL options and an additional European knock-in barrier option structure.
    Show source
    And we have also taken additional protection by way of European knock-in barrier option structure, which gives us added protection beyond forward levels.
  • HUDCO had around USD 400 million of FCNR maturing in Q3, of which USD 175 million was due in November and the remainder in December.
    Show source
    We have around USD 400 million of FCNR coming for maturity in Q3.
  • HUDCO was partially unwinding some foreign-exchange deals and taking full hedges again at a cost, as leaving them unattended could cause a higher loss; unwinding and taking unlimited protection could save around 50% of the potential loss.
    Show source
    But if I unwind and take unlimited protection, again, it will lead to a saving of around 50% of what the potential loss could be.
  • HUDCO is planning to issue perpetual debt in the third or fourth quarter, depending on market conditions; the issuance is not an emergent need.
    Show source
    And in the meantime, we are also planning to have some perpetual debt, and we will be going to the market maybe in the third or fourth quarter, depending on the market conditions.

What it expects ahead

What management expects

  • HUDCO is maintaining loan growth guidance of plus 25%, sees nothing obstructing that path, and expects to maintain growth between 25% and 30%; the private sector and urban invest window products are expected to act as catalysts for company growth.
    Show source
    So we are maintaining our growth rate of around 30%.
  • HUDCO is maintaining profitability in line with guidance of around 2% spread and 3% NIM.
    Show source
    I think we are maintaining our profitability in line with our guidance that is around 2% of the spread and 3% of the NIM irrespective.
  • HUDCO is targeting around INR 200 crores of resolutions in quarter 3, which are at an advanced stage.
    Show source
    And in quarter 3 also, we are targeting around INR 200 crores of the resolutions, which are in the advanced stage.
  • HUDCO achieved 50% of its INR 50,000 crore disbursement target in the first half; the target represents growth of around 25% year over year, and management is confident it will be achieved with the committed pipeline.
    Show source
    For this year, we have a target of INR 50,000 crores of the disbursement out of which in the first half yearly, we had achieved 50%.
  • HUDCO’s loan book had reached INR 1.44 lakh crore or INR 1.45 lakh crore and is expected to reach INR 1.5 lakh crore by March; HUDCO revised its target upward to INR 1.6 lakh crores, and targets a loan book of INR 3 lakh crores for FY 2030, requiring growth of around 25% to 26%.
    Show source
    So it is a statement that we will be achieving this INR 1.5 lakh crore by March, and that's why we had revised upper side, and we have now revised to INR 1.6 lakh crores.
  • HUDCO expects loan-book growth of 25% to 27% to be achievable with its sanction guidance.
    Show source
    Sanjay Kulshrestha: Yes, I think with this kind of sanction guidances, it's achievable 25%, 27% of the growth is a... Gaurav Kochar: Understood.
Show 13 more statements

What management expects

  • HUDCO expects the repo rate to fall by at least 25 basis points in the December monetary policy, which would further reduce its interest expenditure.
    Show source
    And at the same time, we are also expecting that repo will come down by at least 25 basis points in December monetary policy, which will further extend -- further reduce our expenditure on the interest expenditure.
  • HUDCO expects to improve its margin by at least 10 basis points in Q3.
    Show source
    Sanjay Kulshrestha: Yes, yes, definitely, at least 10 basis points.
  • HUDCO has identified around 10 projects with around INR730 crores of principal for resolution in quarter 3 and quarter 4, and is expecting a recovery of around INR 900 odd crores; even a 50% success rate would result in around INR 400 crores or INR500 crores.
    Show source
    Sanjay Kulshrestha: See, around 10 projects we have identified for resolution in quarter 3 and quarter 4 total of around INR730 crores of the principal.
  • HUDCO is targeting recovery of INR 900 crores, with around 50% of the revenue expected to come in H2 of this financial year and the remainder in the next financial year.
    Show source
    Sanjay Kulshrestha: Yes, recovery of INR 900 crores, we are targeting around 50% of the revenue should come in H2 of this financial year and then in the next financial year.
  • The Urban Challenge Fund launched by the Government of India provides INR 1 lakh crores from the central government as a subsidy, requires INR 1 lakh crores to be arranged by state governments, and INR 2 lakh crores to be arranged by PPP players; HUDCO is targeting the state government requirement of INR 1 lakh crores as business potential and sees private-sector participation as another potential opportunity for growth.
    Show source
    So we are targeting INR 1 lakh crores of the state government requirement.
  • HUDCO expects sanctions to be completed within 1 year or so, 18 months, and disbursement to take another 2 to 3 years.
    Show source
    Sanjay Kulshrestha: Sanction will be done, I think, within a 1 year or so, 18 months of the time and the disbursement will take another 2 to 3 years of the time.
  • HUDCO expects its strong overall sanction pipeline to maintain the same pace for a couple of years.
    Show source
    Sanjay Kulshrestha: So overall sanction pipeline is already very strong, and I think the same pace will be maintained in a couple of years.
  • HUDCO will maintain its current rate of plus 2% of the spread and plus 3% of the NIMs so projects can sustain repayments and remain viable, sustainable and bankable. Replaced by a later filing.
  • HUDCO expects accelerated growth in its loan book in line with national objectives, with strong loan book and asset quality. Replaced by a later filing.
    Show source
    The asset quality will be strong, and there will be an accelerated growth in the loan book in line with the national objectives.

Orders

  • HUDCO has outstanding MOUs signed to the extent of around INR 7 lakh to INR 8 lakh crores.
    Show source
    So we have outstanding MOUs signed up to the extent of around INR 7 lakh to INR 8 lakh crores.
  • HUDCO has documented schemes of around INR 2 lakh crores, which will be converted into disbursement.
    Show source
    Then the documented schemes are also around INR 2 lakh crores, which will be converted into the disbursement.
  • HUDCO has another INR 1 lakh crores of non-documented schemes comprising projects at several stages that need loan agreements and documentation.
    Show source
    So non-documented another INR 1 lakh crores is scheme, the projects which are there, which needs a loan agreement and documentation, which are at several stages.
  • HUDCO has a pipeline of around INR 3 lakh crores of sanctioned projects, of which INR 2 lakh crores has been documented and agreements have been done, while INR 1 lakh crores is at various stages of documentation discussions.
    Show source
    So we have a clear pipeline of around INR 3 lakh crores of the sanctioned projects, out of which INR 2 lakh crores has already been documented, agreements have been done.

What it is building and selling

Projects and capacity

  • HUDCO plans to create rental spaces to contribute to its bottom line and has a dedicated plan for construction and enhancing carpet areas.
    Show source
    We want to create space, rental spaces so that it will contribute towards our bottom line, and we had a very dedicated plan for that kind of construction and enhancing our carpet areas.
  • HUDCO's Urban Invest window is a proactive initiative with the Government of India that will support loan growth and build the capacity and absorption capacity of urban local bodies, cities and states.
    Show source
    And with this perspective, this UI window is a very proactive initiative of the HUDCO and the government of India.
  • HUDCO's Urban Invest window will maintain asset registers and convert these assets into bankable projects.
    Show source
    Then it will be the asset registers, maintaining of the asset registers and converting these assets into the bankable projects.
  • HUDCO will provide financial closure through its Urban Invest window and take help from multilateral institutions to spread best practices.
    Show source
    So HUDCO will be doing the financial closure and taking the help of the multilateral institution for that to spread the best practices.

Segments

  • HUDCO recently launched an urban infrastructure window to support infrastructure creation in ULBs in cities and states; collaborative activities are expected to enhance the company’s business volumes.
    Show source
    November 12, 202 5 activities that we are doing, and it will be resulting in enhancing the business volumes of the company.
  • HUDCO’s urban infrastructure window program will start with capacity building, asset monetization and project preparation.
    Show source
    The program will start from their capacity building, asset monetization, project preparation.
Show 4 more statements

Segments

  • HUDCO is targeting through its urban invest window the funds and loans required for the Urban Challenge Fund, which will become a bigger subset of the urban invest window.
    Show source
    So, we are targeting the funds, the loans required for the Urban Challenge Fund through this urban invest window.
  • HUDCO is opening its private sector business in five sectors: port, airport, road, energy and real estate.
    Show source
    So after a lot of discussions with the stakeholders, we are opening up to the private sector in five sectors.
  • HUDCO’s loans generally reset after one year, while some loans are fixed for three years before reset; repo cuts reset domestic borrowing costs on the day they occur, but pass through to the lending portfolio at the one-year reset.
    Show source
    So, there is a reset on the day the repo cut comes for a domestic borrowing, but the transfer or transmission of that rate cut on lending portfolio comes after -- at the time of 1 year reset.
  • HUDCO describes the Urban Invest window as a comprehensive approach to creating bankable assets across the country and says it is the only sector agnostic company looking at bankable urban infrastructure projects.
    Show source
    So if we are talking about any bankable project in urban infrastructure sector, I think HUDCO is the only sector agnostic company, which we'll be looking upon.

Risks, rules and outside factors

Risks and disputes

  • Around 90% of HUDCO's asset quality is backed by state government guarantees.
    Show source
    Sanjay Kulshrestha: Actually, if you see our asset quality is very strong, around 90% is backed by the state government guarantees.
  • For the last 3 years, the states have given no NPA or similar signs to HUDCO.
    Show source
    And from last 3 years, there is no NPA or no that kind of signs given by the states.
  • HUDCO does not see any risk towards recovery, although there may be a delay of a few days. Replaced by a later filing.
    Show source
    There may be a delay of a few days only, but I don't see any risk towards the recovery.

Everything else said on the call

What management stressed

  • HUDCO is working towards monetization of its land bank.
    Show source
    We are working very hard towards monetization of our land bank.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Mohit Oza: Sir, I have two questions. First is what would be the risk evaluation and underwriting criteria for assessing the private loans? And second, if you could tell us about your loan growth guidance?

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: Yes. Thank you, Mohit. Regarding the private sector, we will be going with the best practices available in the market. And we will be very, very vigilant regarding the quality of the assets since we are starting this private sector after 12 years of the time frame. Initially, the bankability of the project has to be seen and the investment grade of the entity has to be seen. So, it will be two graded approach, for the appraisal. And for monitoring, it will be 3 graded approaches.

    Answer, sanjay kulshrestha

    We will be taking support from the PMC also to take care of the project progress and the quality. So, the entity should be at least IR1, IR2 and IR3. So first pre-integrated rating, we will be catering the loans. So, it will be an integrated rating of entity and the project. So, the process is very stringent and so that there should not be any doubt regarding any NPA or that kind of this thing. And initially, till the time our capability is enhanced, we will be taking support of the external consultants parallelly who will appraise the project in line with our guidelines. So, this is number one.

    Answer, sanjay kulshrestha

    Second is the guidance on the loan. So, as we already -- I had already discussed that it will be plus 25% that we are maintaining. And I don't see anything to obstruct this path of 25%. Page 4of 13 Housing & Urban Development Corporation Limited . November 12, 202 5 So definitely, it will be between 25% to 30% that we will be maintaining. And now since these two products are also added in our portfolio, that is the private sector and this urban invest window. So, I think they will be working as a catalyst towards the growth of the company.

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: So you had asked 3 questions. One is regarding the sanction. So the sanction process starts from the signing of MOUs. So we have outstanding MOUs signed up to the extent of around INR 7 lakh to INR 8 lakh crores. This is number one. Then the documented schemes are also around INR 2 lakh crores, which will be converted into the disbursement. So non-documented another INR 1 lakh crores is scheme, the projects which are there, which needs a loan agreement and documentation, which are at several stages.

    Answer, sanjay kulshrestha

    So we have a clear pipeline of around INR 3 lakh crores of the sanctioned projects, out of which INR 2 lakh crores has already been documented, agreements have been done. INR 1 lakh crores at various stages, and we are discussing regarding the documentation. So this is number one. You had requested regarding the profitability. I think we are maintaining our profitability in line with our guidance that is around 2% of the spread and 3% of the NIM irrespective. If you see, there is a lot of fluctuation in the international market, and we are making some expenditures towards that. And because of that impairment reserve, some loss of profit, you can say.

    Answer, sanjay kulshrestha

    So the profit has came in this quarter to slightly lower. But finally, because of the loan book enhancement, we have been managed to have their levels of this stress and the NIM. Similarly, regarding the resolutions, yes, this year, we have resolved many projects, but there are many which are in pipeline. And we are very aggressive towards resolutions of our assets. And in quarter 3 also, we are targeting around INR 200 crores of the resolutions, which are in the advanced stage. Actually, what happened in the resolutions because resolution, we are on the one side and other side is the borrower and third side is a legal proceeding. So sometimes it is very difficult, even though you are very aggressive to have that kind of timelines on quarter-to -quarter basis.

    Answer, sanjay kulshrestha

    But definitely, in this financial year, I think a lot of resolutions will come.

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: Yes, sure. Our Director of Finance will be answering this question.

    Answer, daljeet khatri

    Daljeet Singh Khatri: We have two kinds of foreign currency borrowings. One is FCNR loans having maturity up to 1 year, and then we have external commercial borrowings having maturity of 5 years. So as far as the external commercial borrowings are concerned, which are around INR 9,900 crores, we have taken adequate protection by way of SGL options, and we are very much within the protection levels. But we have some foreign currency FCNR loan also, which are having tenure up to 1 year. There, the volatility is more and there is -- there we have some losses we have booked in the last 2 quarters. But now we have protection for the remaining FCNRs, we have taken the protection levels by way of SGL options. And we have also taken additional protection by way of European knock-in barrier option structure, which gives us added protection beyond forward levels.

    Answer, daljeet khatri

    And side by side, we are also monitoring the levels of USB INR and US CSF on day-to -day basis, and we are taking the CKB remedial action as and when required.

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: I would also like to add. We all know that this is a very disturbing year as far as this currency fluctuation is there. From last 6 months, 7 months, we have seen the how the CSF has gone strengthened and how the dollar is moving. But I'm very happy that we are having some issues in the FCNR, which we are taking all the mitigation help. But on dollar side, which are long-term loans, 5 -year loans, we didn't have any problem and sufficient protection levels have been taken. And we will be sorting out the CSF issue by this March. So, and we will not be creating another FCNR obligation on the company now.

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: Yes. In the H1 2025, '26, we have taken -- we have incurred a loss of around INR 176 crores as compared to zero loss in the H1 of 2024, '25. So, most of my FCNR -- I mean, more than 50% of my FCNR stands matured and now around 30% to 40% of FCNR is remaining, which will get matured by February, March, coming February, March that is Q4. And after that, we do not have any FCNRs to mature in the next FY.

    Answer, sanjay kulshrestha

    But yes, there are covenants when we borrow from the external market, and that covenant is 10%, but it is far off to achieve that 10%. I think now we are at sub-7% of debt equity ratio. And we have done our mathematics for this growth, and we will be around 8%, we will be there. So, debt equity ratio will be maintained at around 8%. And in the meantime, we are also planning to have some perpetual debt, and we will be going to the market maybe in the third or fourth quarter, depending on the market conditions. Because it is not an emergent need. But yes, you are right in our plan of action.

    Answer, sanjay kulshrestha

    This is also one of the matter that we need to resolve at the appropriate time. Nemin: Okay. Got it. Secondly, sir, on your yields, what would be our incremental yields, disbursement yield?

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: If you see the yield in the markets are coming down. The repo is coming down, and we are expecting further rate cuts. And now it is around 2%, and I think that will be maintained. So that will not -- so regarding the yield, it's around 9%, 9.21%. Even though the market has came down, our cost of funds has came down, we have been able to sustain that kind of yield of around plus 9% -- 9.2% rather. Nemin: Okay. Okay.

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: There is no fixed actually. If you see everything is floating after a year. So, all our loans are 1- year reset, and there are some loans may not be 2%, 3%, 4% more than that. They are fixed for 3 years and then the reset is done. So, it's a win-win approach as an NBFC. So, there is a reset on the day the repo cut comes for a domestic borrowing, but the transfer or transmission of that rate cut on lending portfolio comes after -- at the time of 1 year reset. Nemin: Okay, sir.

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: Actually, there is no straight-line answer for this. But yes, at least these levels will be maintained. Finally, it depends on what kind of rating that the project is getting. If it is IR1, it will be very competitive because of the asset quality and the type of entity. If it is IR3, yes, of course, it will be higher. And similarly, on segment to segment, if it is a HAM project backed by strong concessionaire agreement, the rates will be different. But if it is loosely bound kind of concessionaire agreement, but it is in IR 3, then the rate of interest will be different.

    Answer, sanjay kulshrestha

    Nemin: Got it, sir. Got it. Sir, next on your NIM, when you say that 3% to 3.3% NIM could be maintained. So, is there any fixed percentage of fee that certain projects have been charged? Is there any particular benchmark that is supposed to be charged over and above your yield?

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: Yes. For private sector, we had adopted the practice that is processing fees and legal fees. All these fee structure will be there. But we don't want to overburden our product. Rather, we don't Page 7of 13 Housing & Urban Development Corporation Limited . November 12, 202 5 want to compromise on the quality of the assets. So, these fees or these kind of things will be as minimum as possible.

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: Starting from 3 months to 1 year. Nemin: Starting from 3 months to 1 year. Okay. Okay, sir. Got it. And lastly, sir, on your PMAY , I think would you like to comment anything that we will be seeing any disbursement coming in the second half of this year? Or will it be in FY '27?

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: I cannot comment on the time of disbursement, but as of now, we have not sanctioned. No state has came forward to take the loan against the counterpart requirement of that state.

    Answer, daljeet khatri

    Daljeet Singh Khatri: Yes. Good afternoon again, Daljeet Singh Khatri this side. We have around USD 400 million of FCNR coming for maturity in Q3. And out of that 175 million is in November itself, remaining will be in December. And protection levels as of now, all the 3 are in the -- I mean, within the limits as far as dollar is concerned, USD-INR is concerned, they are above 89. And USD-CHF are also around 79. But yes, protection levels, all these deals are presently within the protection levels.

    Answer, daljeet khatri

    But going forward, seeing the volatility, we are taking alternative measures. We are trying to partially unwind some of them and taking the full hedge again by bearing cost. Because if I leave it with unattended, it may lead to a loss, a higher loss. But if I unwind and take unlimited protection, again, it will lead to a saving of around 50% of what the potential loss could be. So we are on a day-to -day basis, monitoring the situation and taking the extra protection as and when it is felt appropriate.

  2. Question

    Understood. Perfect. Sir, my next question is with respect to the sanction to disbursement that you mentioned. And given that this quarter, we saw a very strong sanction. So, our H1 sanction is already INR 90,000 crores plus. So maybe if you can highlight and with overall pipeline you mentioned is very strong, what kind of disbursement are we looking at for this year, given that INR 50,000 crores was the guidance, we are more than half already in H1. And with a very strong sanction in 2Q, the second half, do you expect to better the INR 50,000 crore number that you've guided?

    Answer, sanjay kulshrestha

    For this year, we have a target of INR 50,000 crores of the disbursement out of which in the first half yearly, we had achieved 50%. So the target is 50%, which is a growth of around 25% on a year- to-year basis. But I'm very sure that this INR 50,000 will be achieved, with this committed pipeline.

  3. Question

    Gaurav Kochar: Understood. Understood. And sir, with respect to the AUM growth, if the sanction or the disbursement will be INR50,000 crores, the AUM growth can be 30%, which is the number we've reported this quarter as well. And going forward, if the sanction pipeline is strong, what kind of growth are you expecting for FY '27?

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: So 2 years back, we had targeted that by March '26, our loan book will become INR 1.5 lakh crores. And we had already achieved INR 1.44 lakh crore or INR 1.45 lakh crore. So it is a statement that we will be achieving this INR 1.5 lakh crore by March, and that's why we had revised upper side, and we have now revised to INR 1.6 lakh crores. So -- and for FY 2030, we have a target that it will become INR 3 lakh crores of the loan book. So it may be around twice within the 4 years. So you can see that we have to grow at around 25%, 26%, then only we can be able to achieve that kind of target.

  4. Question

    Gaurav Kochar: Okay. So maybe in FY '27, 25% growth looks possible, 25% plus growth looks possible even for FY '27...

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: Yes, I think with this kind of sanction guidances, it's achievable 25%, 27% of the growth is a... Gaurav Kochar: Understood.

  5. Question

    Sir, my next question is on margins. So in the last quarter, you mentioned that margins will expand and probably go towards 3.1%, 3.2% mark. So this quarter, we already -- we have seen improvement. If I look at just this quarter, there was an 8 basis point kind of an improvement, but still lower than what you had guided. Page 9of 13 Housing & Urban Development Corporation Limited . November 12, 202 5 So maybe in the second half, with cost of fund coming down, you have indicated that the incremental cost of fund is at 6.32%. So with all these measures, where do you think the second half margin trajectory could be? Can we get closer to the 3.1%, 3.2% sort of range that we were there earlier in

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: Yes, definitely, we will be achieving. Actually, if you see the NIM is slightly down because the resolution has not came in that particular quarter. If you compare the last on year-to -year, Q2 of the last financial year, we had got income of more than INR 200 crores after resolution of some of prices. This year, it is only INR16 crores, INR16 crores is recovery. So you see around INR 200 crores we have lost on account of recovery or you can say it has not been added into our income and enhanced our NIMs. But I'm sure that in quarter 3, we will be able to get that kind of momentum, and we will be easily achieving the NIMs of more than 3.1%. And at the same time, we are also expecting that repo will come down by at least 25 basis points in December monetary policy, which will further extend -- further reduce our expenditure on the interest expenditure.

  6. Question

    Gaurav Kochar: Okay. So, 10 basis point improvement in Q3 is what you're expecting in terms of margin?

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: Yes, yes, definitely, at least 10 basis points.

  7. Question

    Gaurav Kochar: Sure, sure, sure. And sir, just the last point that you mentioned regarding the resolution and the interest recovery on that. You also alluded to there are certain accounts which are under advanced stage of resolution. So maybe if you can -- what is the quantum of asset and what would be the recovery rate? And since we are already almost 95% provided on majority of the loans, will that entire recovery come on the P&L in the form of maybe interest income or provision reversal?

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: See, around 10 projects we have identified for resolution in quarter 3 and quarter 4 total of around INR730 crores of the principal. And we are expecting a recovery of around INR 900 odd crores. So that is our plan on which we are working. So if we at all the success of 50%, then also it will be around INR 400 crores or INR500 crores kind of amount.

  8. Question

    Gaurav Kochar: Got it. So, 10 projects worth INR730 crores are in advanced stages of resolution and you expect this in Q3 and Q4. The timing could be different. But by end of this year, you expect this to get resolved. Sure. And sir, you've guided...

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: Yes, recovery of INR 900 crores, we are targeting around 50% of the revenue should come in H2 of this financial year and then in the next financial year.

  9. Question

    Okay. Okay. That was for net NPA. Sure, sure, sir. And sir, any incremental risk of any slippage, any account which is showing stress? If you can give some data around your Stage 2, if there are any accounts which could come in Stage 3 in the next couple of quarters? Any risk that you see?

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: Actually, if you see our asset quality is very strong, around 90% is backed by the state government guarantees. There may be a delay of a few days only, but I don't see any risk towards the recovery. And from last 3 years, there is no NPA or no that kind of signs given by the states. And the states are very prudent in planning in their capital expenditure now.

  10. Question

    Great, sir. And sir, just one last question from my side. Regarding this urban invest window that you indicated, maybe if you can throw some light on the size of the opportunity and as the organization, what kind of maybe in FY '27 or over a medium term, what kind of opportunity do you see yourself participating into this loan? And whether this new opportunity would be with similar spreads as we currently hold? Or will it be at a higher spread?

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: I think we are repurposing the business of the HUDCO in line with the objective of the Government of India of Viksit Bharat 2047 and just 22 years are left for that target. And for any country to become a developed, cities are the face of that country. We are identifying 50-odd cities, which will come to the global standards, and we are discussing with our ministry and the government. So huge funds are required, and we have seen the studies around INR 80 lakh crores of the funds are required in 2036, if you see around INR 5 lakh to INR8 lakh crores of the funds are required on a year-to -year basis. Presently, we are spending around INR 2.5 lakh crores on a yearly basis. A part of this is coming from the government of India and state government and HUDCO and other financial institutions. So, it's -- so accelerated growth is required.

    Answer, sanjay kulshrestha

    And with this perspective, this UI window is a very proactive initiative of the HUDCO and the government of India. Wherein it will be the business, it will be the loan growth. But at the same time, the capacity building, the absorption capacity of the urban local bodies, the cities, the states. So, we will be working from 3 fronts. One will be the capacity building, and we have our institution. So, there will be a big program, which will be supporting the states. Then it will be the asset registers, maintaining of the asset registers and converting these assets into the bankable projects.

    Answer, sanjay kulshrestha

    And third will be the financial closure. So HUDCO will be doing the financial closure and taking the help of the multilateral institution for that to spread the best practices. So it's a very inclusive kind of step that HUDCO has taken. And definitely, the loan book will be strong. The asset quality will be strong, and there will be an accelerated growth in the loan book in line with the national objectives. Page 11of 13 Housing & Urban Development Corporation Limited . November 12, 202 5 Gaurav Kochar: Sure, sir.

Show 4 more questions
  1. Question

    But specific to this, any numbers internally maybe you have targeted or budgeted for next year under this program. Any sort of numbers that you can share, that will be helpful.

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: Definitely, definitely. You may be knowing that the Urban Challenge Fund has been launched by Government of India in the budget speech of the Finance Minister. So INR 1 lakh crores will come from the central government as a subsidy. INR 1 lakh crores has to be arranged by the state government. So we are targeting INR 1 lakh crores of the state government requirement. So that will be one part of INR 1 lakh crores that is a business potential for HUDCO and INR 2 lakh crores has to be arranged by the PPP players. And now since we are starting this private sector also, so that can also be a potential opportunity for HUDCO to grow.

  2. Question

    Gaurav Kochar: Okay. Understood. And sir, under how many years -- or total how many years will this entire INR1 lakh Crore plus INR2 lakh Crore will be sanctioned or disbursed over what time period?

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: Sanction will be done, I think, within a 1 year or so, 18 months of the time and the disbursement will take another 2 to 3 years of the time.

  3. Question

    Gaurav Kochar: Understood. That's very helpful, sir. And just on the spread, will this incrementally be at a similar spread, higher spread, lower spread versus what you are currently holding?

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: Actually, if you see the HUDCO belief or our mission, we doesn't mean we didn't load our projects with a lot of spread. So we will be maintaining our current rate of plus 2% of the spread and plus 3% of the NIMs because we want finally the projects should sustain the repayments, it should be viable, sustainable and bankable.

  4. Question

    Mohit Oza: Sir, just again, if you could give additional details on this urban invest window and some color on the overall sanctions pipeline?

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: So overall sanction pipeline is already very strong, and I think the same pace will be maintained in a couple of years. A lot of opportunities are there. Urban Invest window, actually, if you see, it's a comprehensive approach towards creation of the asset in the entire country, and we are talking about the bankable projects. So if we are talking about any bankable project in urban infrastructure sector, I think HUDCO is the only sector agnostic company, which we'll be looking upon. And we are in the Ministry of Housing and Urban Affairs, which is looking after all the urban affair projects. So we are getting that kind of natural benefit. And as I had already spoken that this window will work in 3 phases.

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: So thank you, friends, for joining. It's a wonderful discussions and a lot of takeaways we had taken from your questions. And I can assure you that our growth story is not temporary. Whatever we are saying and we are believing that is being translated as you may have witnessed. And the same way, we will be catering to our responsibility as a listed company. And rest assured that our names, our spreads will go on like on the same manner and business growth will always be there. there are a lot of opportunities in the country. If you see the Housing for -- all program is there, Amrit is there.

    Answer, sanjay kulshrestha

    We are also trying to start how we will be funding these metro projects, and we are working with a lot of multinational institutions. So I will not talk in length about that. But what I can tell you that the potential is enormous. And as a company, as a sector-agnostic company, the 75% stakeholder by Government of India, a strategic company in the action plan of the government. So we have a lot of roles and responsibility across creation of the urban infrastructure for Viksit Bharat . So that is my assurance, my team's assurance that the next quarter, we will be again meeting and we will be talking about the same growth story. Thank you so much.

Questions about this call

When was the Housing & Urban Development Corporation Q2 FY26 earnings call transcript filed?
Housing & Urban Development Corporation filed the transcript with the exchange on 17 Nov 2025. This page is built from that transcript.
What does this page list?
57 statements from the transcript across 8 topics, 39 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 14 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
Housing & Urban Development Corporation Q2 FY26 concall: HUDCO has outstanding MOUs signed to the extent of around INR 7 lakh to INR 8 lakh crores · DalalOS