HUDCO is trying to achieve a loan book of INR3 lakh crores by 2030; HUDCO has planned a loan book of INR 3 lakh crores by 2030 and is very sure it will achieve it; it will review progress in mid-FY ’28 based on FY ’27 achievements and inform the market if a mid-course correction is required; HUDCO had set a target of INR 3 lakh crores for its loan book through 2030, working to avoid disturbing its ratios. HUDCO is continuing to grow its loan book around 25%. The high-level committee report estimates that urban investment of around INR80 lakh crores is required between '21 and '36, or around INR7 lakh crores to INR8 lakh crores annually. Around 60% of HUDCO's book is 1-year linked, 30% is 3-year linked and around 5% to 7% is fixed rate.

The numbers management gave

Results

  • HUDCO is continuing to grow its loan book around 25%.
    Show source
    We are continuing to grow around 25% in our loan book.
  • HUDCO has successfully resolved most of its NPA assets and its net NPA is around 0.06%.
    Show source
    It is around 0.06%.
  • HUDCO's total FCNR loss for 9 months is INR470 crores.
    Show source
    The total loss on FCNR for 9 months is INR470 crores.
  • Adding the INR470 crores FCNR loss to HUDCO's profits would bring them to around INR2,500 crores against INR2,000-odd crores.
    Show source
    So if you add this value of INR470 crores in our profits, it will be around INR2,500 crores against INR2,000-odd crores.
  • For HUDCO-sanctioned projects, disbursement generally starts 6 months to 1 year after sanction; generally 20% is disbursed in the first year, infrastructure projects take 3 to 4 years, and disbursement of INR2.5 lakh crores of sanctioned projects is expected to rise from INR30,000 crores to INR40,000 crores in the last sanctioned projects, with the last year around 20% to 25% total.
    Show source
    So, for INR2.5 lakh crores, you can say starting from the INR30,000 crores, INR40,000 crores in the last sanctioned projects, it will continue to rise from 30% and 40% and the balance one, then the last year will be around 20% to 25% total.
  • HUDCO receives repayments of around INR5,000 crores, or around INR4,000 crores to INR5,000 crores every quarter and around INR17,000 crores to INR18,000 crores per annum.
    Show source
    So, you can say around INR17,000 crores to INR18,000 crores per annum.
Show 12 more statements

Results

  • HUDCO resolved around INR500 crores of NPA assets in the previous financial year and around INR385 crores in the current financial year; it has INR1,600 crores of gross NPAs remaining, around INR800 crores of which is under liquidation through NCLT, and HUDCO is hopeful it will resolve most of the remaining INR700 crores to INR800 crores by the end of next financial year.
    Show source
    So we'll be left with around another INR700 crores to INR800 crores, and we are hopeful that we'll be able to resolve most of them by the end of next financial year.
  • HUDCO did not have a plan to add Stage 3 assets; HUDCO has had no addition of Stage 3 assets to its book in the last 8 to 12 quarters.
    Show source
    Daljeet Singh Khatri: I mean in the last 8 to 12 quarters, we have no addition of Stage 3 assets in our book.
  • HUDCO's SMA-2 accounts had all been resolved as of the call.
    Show source
    And as we speak, all the SMA-2 has been resolved.
  • HUDCO's FCNR loss is a one-time loss, and the current quarter will be the last quarter for it.
    Show source
    So, there is a loss which is onetime, and this quarter will be the last for that.
  • HUDCO said it is presently doing only INR2 crores to INR2.5 crores yearly. Replaced by a later filing.
    Show source
    Presently, we are doing only INR2 crores, INR2.5 crores yearly.
  • HUDCO is reducing its cost of funds and diversifying. Replaced by a later filing.
    Show source
    At the same time, we are reducing our cost of funds and diversifying.

Money and capital

  • Around 60% of HUDCO's book is 1-year linked, 30% is 3-year linked and around 5% to 7% is fixed rate.
    Show source
    February 04, 2026 Daljeet Singh Khatri: I think, around 60% of my book is 1-year linked and 30% to 40% -- 30% is 3-year linked, and rest is fixed -- around 5% to 7% is fixed rate.
  • HUDCO's debt-to-equity ratio was 7.28x as at December 31, 2025.
    Show source
    Daljeet Singh Khatri: Presently, my debt-to-equity ratio as at the end of December 31, 2025 is 7.28x, right?
  • HUDCO is primarily going to focus on issuing perpetual debt instruments that qualify as Tier 1 capital to improve its debt-to-equity ratio.
    Show source
    Primarily, we are going to focus on coming out with the perpetual debt instruments, which qualify as Tier 1 capital.
  • Most of HUDCO's bank borrowings are linked with an external benchmark; its bonds are fixed in nature, while its entire banking is variable and linked to the repo rate or the T-bill.
    Show source
    Only the bonds, they are of fixed nature, but entire banking is of variable nature linked to repo rate or the T-bill.
  • HUDCO has hedged its entire ECB borrowings through option structures with extended protection under EKI (European Knock-In) options, including knock-in/knock-out options that provide additional safeguards over forwards.
    Show source
    As coming to your question on hedging, we have hedged the entire ECB borrowings through the option structures with extended protection under the EKI options like European Knock-In or Page 9 of 12 Housing and Urban Development Corporation Limited.
  • HUDCO had not yet decided on the slightly costly measures to address pressure on its debt-to-equity ratio and will decide at the right time.
    Show source
    We will decide regarding that measure and the call will be taken at the right time.

What it expects ahead

What management expects

  • HUDCO is trying to achieve a loan book of INR3 lakh crores by 2030; HUDCO has planned a loan book of INR 3 lakh crores by 2030 and is very sure it will achieve it; it will review progress in mid-FY ’28 based on FY ’27 achievements and inform the market if a mid-course correction is required; HUDCO had set a target of INR 3 lakh crores for its loan book through 2030, working to avoid disturbing its ratios.
    Show source
    And second is, we are trying to achieve this INR3 lakh crores loan book, which we are trying by 2030 and a lot of efforts we are taking.
  • HUDCO's target for disbursement for this financial year is around INR50,000 crores.
    Show source
    For this financial year, our target is around INR50,000 crores of disbursement.
  • HUDCO is giving a result of around 25% alongside its disbursement target for this financial year.
    Show source
    And -- with this, you can calculate the kind of loan book and we are giving a result of around 25%.
  • HUDCO expects to maintain NIM of around 3%, 3.1% on a year-to-year basis; some disbursements were backloaded.
    Show source
    So, on a year-to-year basis, you will see that it will be around 3%, 3.1% kind of NIM that we will maintain, and there is no internal issue on that.
  • HUDCO plans to bring its debt-to-equity ratio back to less than 6 in the next 2 to 3 months.
    Show source
    And we plan to bring it back to less than 6 in the next 2, 3 months.
  • HUDCO plans to keep its debt-to-equity ratio at around 7.
    Show source
    And we are aware that it is around plus 7, and we have to be -- remain at around 7.
Show 7 more statements

What management expects

  • HUDCO expects the debt-to-equity ratio figures to be slightly improved when its '25-'26 results are out.
    Show source
    And you will see that the figures are slightly improved.
  • PMAY 2.0 is gradually picking up, with most states assessing schemes and a majority of states in the Northern sector having started; HUDCO expects it to pick up in a big way next financial year.
    Show source
    Maybe I think next financial year, it will pick up in a big way.
  • Government of India schemes, policies, legislations and capital infusion support HUDCO's efforts to achieve its loan book target.
    Show source
    And there are a lot of support from the government of India schemes, policies or legislations and capital infusion.
  • HUDCO may review improvement in its debt-to-equity ratio through perpetual loans or another option.
    Show source
    And at the same time, we will take a call on improvement as Director of Finance has said, to review -- to revisit this through the perpetual loans or something else.
  • HUDCO did not have a plan to add Stage 3 assets. Replaced by a later filing.
  • HUDCO expects a push for creation of urban infrastructure, with clarity in the urban sector. Replaced by a later filing.
    Show source
    So, a lot of clarity had came in the urban sector that definitely, there will be a push for creation of urban infrastructure.
  • HUDCO says it will continue its growth path for the year. Replaced by a later filing.
    Show source
    And I can assure you that the growth path that we are continuing, it will be continued for the year.

What it is building and selling

Projects and capacity

  • HUDCO has funded transit-oriented development across four metro stations in Chennai.
    Show source
    Plus in the city of Chennai, transit-oriented development across 4 metro stations, which is a very unique project we have funded.
  • HUDCO is funding land acquisition for transport-sector projects.
    Show source
    I didn't touch upon land acquisition for transport sector, number of projects we are funding it in the transport sector.
  • HUDCO has funded and has in its pipeline projects on the Nagpur-to-Goa Shaktipeeth Expressway.
    Show source
    Some of the highways I would like to give an example from Nagpur to the Goa, this is called Shaktipeeth Expressway, and many such projects we are in the funding, already funded plus also Page 8 of 12 Housing and Urban Development Corporation Limited.

Demand and pricing

  • The high-level committee report estimates that urban investment of around INR80 lakh crores is required between '21 and '36, or around INR7 lakh crores to INR8 lakh crores annually.
    Show source
    So, if you see as per the high-level committee report, the urban investment to the tune of around INR80 lakh crores is required between '21 to '36.
  • REC and PFC take 10%, 15% or 30% of the requirement, but not 100%.
    Show source
    So, maybe 10%, 15% or 30%, whatever they can take, they are taking, but they are not taking 100%.
  • REC and PFC work primarily in power and energy, where demand across power, energy, distribution, transmission, renewable energy, energy transition and hydrogen is enormously high. Replaced by a later filing.
    Show source
    And if you see the requirement in power, energy, distribution, transmission, renewable, energy transition, hydrogen, it is enormously high, enormously high.
Show 3 more statements

Segments

  • HUDCO is extending and diversifying its asset base into various segments following RBI's mandate for it to become an infrastructure finance company.
    Show source
    By the time RBI has given us a mandate to become infrastructure finance company, we are extending and diversifying our asset base into the various segments.
  • HUDCO recently launched the Urban Invest Window, a platform intended to provide a one-stop solution for project creation, making projects bankable, financial closure, inviting investors, HUDCO loans and convergence with Government of India schemes.
    Show source
    Recently, you may be aware, we have launched a very big platform, you can say, in terms of urban invest window, which will become a one-stop solution for -- from creation of the projects to make it bankable, financial closures, inviting the investors, HUDCO loan and convergence from the Government of India scheme.

Deals and partners

  • HUDCO is adding a lot of new borrowers. Replaced by a later filing.
    Show source
    We are adding up a lot of new borrowers in our kitty.

Risks, rules and outside factors

Outside factors

  • Over a period of 5 or 10 years, the average depreciation has been 3% to 3.5%.
    Show source
    But considering the period of 5 years or 10 years, there has been only an average depreciation of 3%, 3.5%.

Rules and policy

  • The finance commission has a grant of INR56,000 crores for water recycling, to be extended to ULBs for water projects.
    Show source
    And I will just like to extend, in this finance commission also, there is a grant of INR56,000 crores for, say, water recycling, which will be extended to the ULBs for coming up with the water kind of projects.
  • A grant of INR100 crores on INR1,000 crores of bond issuance will be given for performance or issuance of bonds.
    Show source
    February 04, 2026 But there is another grant for the performance or issuance of the bonds also that INR100 crores of -- on INR1,000 crores of the bond issuance will be given.
  • The Urban Challenge Fund is a Government program to upgrade and enhance the capacity of project implementation for ULBs, and its policy is under discussion.
    Show source
    Government has also announced one big program to upgrade and enhance the capacity of the project implementation for ULB that is Urban Challenge Fund.

Everything else said on the call

What management stressed

  • HUDCO says it adheres to the guidance it gives the market and does not seek to overachieve or underachieve it. Replaced by a later filing.
    Show source
    At the same time, whatever guidance we give to the market, we adhere to that guidance.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Sumeet Rohra: Now sir, I have a few questions. I'll just take -- I'll just take it step by step. So, sir, firstly, if I recall correctly, in this budget, the government has actually authorized more money to the states, which is to the tune of INR2 trillion, okay? Now this is actually a 33% increase in the allocation to states. Now sir, since we basically lend to states and we focus on infrastructure, is my understanding correct that this will be very, very positive for us? That's my first question, sir. My second question, sir, is basically that if I see your 9 months, the earlier participant did touch upon the FCNR issue. So, sir, if I just put the entire foreign exchange loss, what we have

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: Yes. Thank you, Sumeet. I think -- very pertinent questions, I think. First, you had asked regarding the FCNR. The total loss on FCNR for 9 months is INR470 crores. So if you add this value of INR470 crores in our profits, it will be around INR2,500 crores against INR2,000-odd crores. So, there is a loss which is onetime, and this quarter will be the last for that.

    Answer, sanjay kulshrestha

    So, yes, you are right. Actually, it is not INR360 crores, it is INR470 crores. And second is, we are trying to achieve this INR3 lakh crores loan book, which we are trying by 2030 and a lot of efforts we are taking. And there are a lot of support from the government of India schemes, policies or legislations and capital infusion. So, a lot of clarity had came in the urban sector that definitely, there will be a push for creation of urban infrastructure. So, with 2% Page 4 of 12 Housing and Urban Development Corporation Limited. February 04, 2026 of the spread, it's an arithmetic on INR3 lakhs, which will be double from INR1.5 lakh to INR3 lakhs.

    Answer, sanjay kulshrestha

    So, you are right, we will be something around that with 2% of the spread. Total MOUs that we have signed around INR7 lakh crores to INR8 lakh crores, but of late, now we had made a slight change in our policy that first, we need to identify the project. And after identification only, we will be going for the MOU signing because we need -- we want to see that what is the preparedness of the states. Already INR7 lakh crores to INR8 lakh crores MOUs are signed and out of which we have a committed loan sanction pipeline of around INR2.5 lakh crores. So, it is not like that everything is coming out of MOU. There are many other projects which are not a part of the MOU. But since we are working through our regional offices and understanding the need of the utilities and the states.

    Answer, sanjay kulshrestha

    So other than the MOU also, there are a lot of projects that we have sanctioned during the current year. And if you have seen, in the present year only, we have sanctioned around INR1.4 lakh crores. So, with a commitment sanction of around INR2.5 lakh crores, I'm very sure that we will be achieving the figures of INR3 lakh crores.

  2. Question

    Sumeet Rohra: So, sir, I mean -- if I may ask you that this INR2.5 lakh crores, which is now sanctioned, so you should disburse this by when, sir? So normally, what's the timeline between sanctioning and disbursement?

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: Generally, if I sanction project, so it takes 6 months to 1 year of the time to start the disbursement. Generally, 20% disbursement comes in the first year. And these projects have long gestation infrastructure projects, so it takes 3 to 4 years of the time. So, for INR2.5 lakh crores, you can say starting from the INR30,000 crores, INR40,000 crores in the last sanctioned projects, it will continue to rise from 30% and 40% and the balance one, then the last year will be around 20% to 25% total.

  3. Question

    Sumeet Rohra: Understand. Understand. Okay. Great, sir. And sir, just on the first point, which I asked you about the state in this budget because today only, I was just on a call with one of the global analysts, and they highlighted this statistic very clearly that the money allocated to states is about 33% higher than the preceding year. So, I mean, will that actually help stimulate our growth as well?

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: Yes. You are very right. These are the SASCI loans extended by the Government of India, and this initiative has been taken just 3 years back, and now it stands at INR2 lakh crores. Actually, these loans are long-term loans, 50 years loan. Earlier also, it was around INR1.5 lakh crores in the last financial year, which has raised to INR2 lakh crores because if you see government wants to push the reform. These are all reform-based kind of incentives that the government of India is extending to the state government. And SASCI loan is one of that, which has a lot of strings attached, but I'm very happy that the states are complying to those strings and they are developing that kind of sustainable infrastructure.

    Answer, sanjay kulshrestha

    And I will just like to extend, in this finance commission also, there is a grant of INR56,000 crores for, say, water recycling, which will be extended to the ULBs for coming up with the water kind of projects. Page 5 of 12 Housing and Urban Development Corporation Limited. February 04, 2026 But there is another grant for the performance or issuance of the bonds also that INR100 crores of -- on INR1,000 crores of the bond issuance will be given. So, all these things, which are supporting the cause of creation of the urban infrastructure, I think HUDCO will be the best beneficial institution out of all these initiatives because without borrowing, completion of the big infrastructure project is not possible. So, this will become a catalytic kind of agent. This will become a VGF kind of support. This will come as a viable -- to create a viable kind of project for the state.

  4. Question

    Sumeet Rohra: Got it. And sir -- and just one last thing. I mean, firstly, many congratulations to you and your team because you had guided for INR1,50,000 crores by FY '26, but you've crossed INR1,55,000 crores already. So, what's your guidance now, sir? I mean, now -- I mean, how are you looking at guidance for -- I mean, end of this quarter plus for next year? So, if you can just share your guidance then that will be wonderful, sir.

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: See, we had made an internal policy that we will divide the disbursement across the year, and the same principle we are following. For this financial year, our target is around INR50,000 crores of disbursement. And -- with this, you can calculate the kind of loan book and we are giving a result of around 25%. So, I think it's a simple arithmetic that you can do.

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: So, repayment is around INR5,000 crores that we are getting. So, around INR4,000 crores to INR5,000 crores every quarter. So, you can say around INR17,000 crores to INR18,000 crores per annum. This is our repayment. And regarding the NIMs, as you have asked, you are right that there are some disbursements which were backloaded. So, on a year-to-year basis, you will see that it will be around 3%, 3.1% kind of NIM that we will maintain, and there is no internal issue on that.

  5. Question

    Rati Pandit: Okay. And with respect to bank borrowings, what part of them are EBLR linked and MCLR linked?

    Answer, daljeet khatri

    Daljeet Singh Khatri: Rati, I'm Daljeet Singh Khatri, Director of Finance. As CMD sir has said, most of my bank borrowings are linked with external benchmark. Only the bonds, they are of fixed nature, but entire banking is of variable nature linked to repo rate or the T-bill. Rati Pandit: Okay. And on the asset side, what part of the assets are fixed and how many are on 1-year reset and the 3-year reset? Page 6 of 12 Housing and Urban Development Corporation Limited. February 04, 2026 Daljeet Singh Khatri: I think, around 60% of my book is 1-year linked and 30% to 40% -- 30% is 3-year linked, and rest is fixed -- around 5% to 7% is fixed rate.

  6. Question

    Rati Pandit: Okay. Okay. And my last question is on the NPA resolution. So, for the remaining lot of projects which we are having, which are under consortium and outside consortium, how does the resolution trajectory look like ahead?

    Answer, daljeet khatri

    Daljeet Singh Khatri: As CMD sir has said in the beginning that our total focus is on resolution of NPA assets, and we have resolved around INR500 crores in the previous financial year. And in this current financial year also, NPA is aggregating to around INR385 crores, we have already resolved. And now we are left with only INR1,600 crores of NPAs, gross NPAs out of which around INR800 crores is under liquidation through NCLT. So we'll be left with around another INR700 crores to INR800 crores, and we are hopeful that we'll be able to resolve most of them by the end of next financial year.

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: So, I think we have our own space of working, and that's why our loan book is continually increasing even though the competition is there. But I think the competition is good for the country. And I think every institution, if you are talking about the competition from the banks, we are working in some of the projects along with the banks also. There are some forte where only HUDCO can fund, and -- because of our reach and penetration across the states and the understanding of their policies, supporting the Government of India’s projects in terms of, say, counterpart requirement under Amrit or Swachh Bharat. Generally, these kind of products didn't work well with the bankers. So, we have our niche kind of projects identified for HUDCO. Banks have their own.

    Answer, sanjay kulshrestha

    But apart from that, we are working with the banks and now we had came out with the financing of the private sector also, the PPP models, and we had identified 5 sectors where we generally will work with the bankers and other financial institutions, like real estate, road, port, airport and the energy transition. Other than that, for metro projects, we are converging with other financial institutions working in the same space of metro. So, it is not like that there is only the completion. It is the collaboration also. It is the specific area also where the HUDCO works.

  7. Question

    Devyam Joshi: Okay. Okay. And one last question. What is the total value of loans under moratorium or restructured status that have not been classified as Stage 3 NPAs yet?

    Answer, daljeet khatri

    Daljeet Singh Khatri: I mean in the last 8 to 12 quarters, we have no addition of Stage 3 assets in our book. Page 7 of 12 Housing and Urban Development Corporation Limited. February 04, 2026 Devyam Joshi: Okay.

  8. Question

    And in future, are we planning to add any?

    Answer, daljeet khatri

    Daljeet Singh Khatri: No, no, never. We didn't have a plan to add some Stage 3 assets.

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: I don't think because of the strict monitoring being adopted by the company and from -- starting from the cash flows to security to the progress of the project, cost, quality. So extensive monitoring is being done. And if you see, the SMA-2 is also continuously reducing. And as we speak, all the SMA-2 has been resolved.

  9. Question

    Sumeet Rohra: Okay. Fine, I just wanted to get that clarity.

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: Right. Our Director Mr. Nagaraj will be answering this. Muniappa Nagaraj: Yes. Very rightly, you asked that. Let me give you a small example of HUDCO's portfolio. To begin with the metro. So we're already planning to have a 2 metro -- already we have given a sanction under like Indore, Bhopal.

    Answer, sanjay kulshrestha

    And in addition to that, we are working with many number of metros in consultation with other like-minded parties. Then let me come to airport. In the state of Andhra Pradesh in Tier 2, Tier 3 cities, they are coming out with a big way in airports. We have funded four airports and also international level airport at Kangra, we are funding it. So, this is in the airport sector. When it comes to construction of water supply and sewage, like Godavari water supply scheme in Andhra Pradesh and also Jal Jeevan mission in 2 states, we have funded in a water supply. And one more very unique area, desalination of water in the state of Tamil Nadu nearby the coastal cities, we are doing it.

    Answer, sanjay kulshrestha

    Plus in the city of Chennai, transit-oriented development across 4 metro stations, which is a very unique project we have funded. Plus also like a tourism, we are into different sectors in different places. I didn't touch upon land acquisition for transport sector, number of projects we are funding it in the transport sector. Some of the highways I would like to give an example from Nagpur to the Goa, this is called Shaktipeeth Expressway, and many such projects we are in the funding, already funded plus also Page 8 of 12 Housing and Urban Development Corporation Limited. February 04, 2026 in the pipeline. This is a small list of projects, which I've just narrated. There are huge scope of funding infra.

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: So, just to give you a general perspective as Nagaraj sir has given you the specific projects. If you see the ecosystem in the country is like every state wants to develop. They don't want to miss the opportunity. All states have a very diversified resources available with them. If AP has some geographical resource available with them from the coastal line to, say, solar radiations to trunk infrastructure of the national highways, then if you see the UP has land monetization, lot of new towns being developed. So, every state is working to monetize their assets coming up with big infrastructure project. And if you see, all the states are coming with the theme of some investment plan, state investment plan or Swarnim Andhra Pradesh or Viksit Rajasthan.

    Answer, sanjay kulshrestha

    So, every state is coming with a road map of development. And that's why we are talking about Viksit Bharat. And a lot of FDI is coming continually. Government of India is working on that. A lot of interest is coming. And now the aspirations of the public that they need as a right that there should be good road, there is good sewerage, there is good water, tap water, there is good energy that is clean -- green energy. So, all these kinds of aspirations are putting pressure on the system that they need this kind of infrastructure.

    Answer, sanjay kulshrestha

    And our models starting from the BOT EPC, HAM, all these things are so matured that now we are trying HAM model even in the housing sector. So, I think it is an era of development and another 20, 22 years by 2047, lot of infusion will come, a lot of new infrastructure will come. And the way we are growing, the economy will grow on that part. Parth: Got it, Sir, one more thing I just wanted to understand. Just -- sorry to double touch on this. You mentioned that transition losses would likely get over by Q4, more so because of your 1-year FCNR borrowings being, I mean, completely running down. So, sir, all the ECB borrowings, which we still have, which you said you are hedged like for 15 years or so.

    Answer, sanjay kulshrestha

    So those are complete hedging? And how confident is it that from next year, we wouldn't have any specific translation losses or meaningful translation losses from here? Just some details here would be really helpful.

    Answer, daljeet khatri

    Daljeet Singh Khatri: Yes., these ECBs aggregating to around INR10,000 crores, they are having a maturity of roughly 5 -- original maturity of 5, 5.5 years and they will be due for redemption after 3, 3.5 years. As coming to your question on hedging, we have hedged the entire ECB borrowings through the option structures with extended protection under the EKI options like European Knock-In or Page 9 of 12 Housing and Urban Development Corporation Limited. February 04, 2026 knock-in/knock-out options are there, which provide additional safeguard over and above the forwards, which are shown in the Bloomberg based on the date of maturities. So -- and in the near term, we see this kind of volatility, which we have seen in the last 1 year or so. But considering the period of 5 years or 10 years, there has been only an average depreciation of 3%, 3.5%. So, we are confident that these protection levels are sufficient to protect us from any kind of volatility over a period of 3 to 4 years.

    Answer, daljeet khatri

    Daljeet Singh Khatri: Presently, my debt-to-equity ratio as at the end of December 31, 2025 is 7.28x, right? But we are in -- and we understand we are continuously monitoring it that this is going up. But as such, being NBFC, there is no upper cap on my debt-to-equity ratio, except that in case of external commercial borrowings, there is a cap of 10:1. But we are already on the job, and we will -- shortly, we will be coming out with the instruments to improve our debt-to-equity ratio. Primarily, we are going to focus on coming out with the perpetual debt instruments, which qualify as Tier 1 capital. And then we'll think about other options which are available to us. And we plan to bring it back to less than 6 in the next 2, 3 months.

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: So just to add, since there is a growing demand in the market, and we also want to grow. So, definitely, you are right, there is a pressure on debt-to-equity, but there are measures to attend. There are slightly costly measures. So that's why we had not yet decided. We will decide regarding that measure and the call will be taken at the right time. And we are aware that it is around plus 7, and we have to be -- remain at around 7. But if you see -- you have to see on the yearly basis.

    Answer, sanjay kulshrestha

    So please wait till our results are out for the '25-'26. And you will see that the figures are slightly improved. And at the same time, we will take a call on improvement as Director of Finance has said, to review -- to revisit this through the perpetual loans or something else.

  10. Question

    Nemin Doshi: Perfect. Got it. Secondly, sir, if I look at your overall loan book, your PMAY -- any updates on PMAY 2.0? And how are we focused on growing this housing pie and any talks or MOUs with the states on this front?

    Answer, daljeet khatri

    Daljeet Singh Khatri: So, PMAY 2.0, a little slow, it started up. I think gradually, we are picking up. Most of the states have started doing an assessment. This time, what they are planning is that a very structured way they are going it. They're making an assessment, then coming out scheme by scheme. So, a majority of the states in the Northern sector has already started up in a way. Maybe I think next financial year, it will pick up in a big way.

Show 2 more questions
  1. Question

    Nemin Doshi: Got it. And lastly, sir, what do you -- in your sense, what could be your potential competitor in this space because the kind of growth and the kind of contract that we are witnessing coming Page 10 of 12 Housing and Urban Development Corporation Limited. February 04, 2026 from states, is there a thing that government would come up or there would be another organization who would -- there would be a duopoly or players coming up in this space?

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: See, there are already organizations and institutions starting from the banks to NaBFID, NABARD, to some extent, REC and PFC. So, I think institutions are already there working with the urban infrastructure segment. But if you see the demand is too much. We need the multilateral loans, we need the investors, we need the FDI. So, if you see as per the high-level committee report, the urban investment to the tune of around INR80 lakh crores is required between '21 to '36. It amounts to around INR7 lakh crores to INR8 lakh crores on annual basis. Presently, we are doing only INR2 crores, INR2.5 crores yearly.

    Answer, sanjay kulshrestha

    So, there is a long jump that we need to do. And all these institutions are geared up to support this. And that's why this Urban Challenge Fund or a lot of new activities like issuance of the bonds to attract the investors. All these activities have been started by the Government of India.

  2. Question

    Nemin Doshi: Got it, sir. Just a follow-up on this. What would be our right-to-win considering the competition, like we said, there is PFC. REC also coming up with the merger soon. So, I mean, just to understand our right-to-win in this space in urban infra development space?

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: So, REC PFC are a big organization, and they are primarily working towards the power and energy. And if you see the requirement in power, energy, distribution, transmission, renewable, energy transition, hydrogen, it is enormously high, enormously high. And these institutions are catering to that kind of demand. And at the same time, they are supplementing our efforts in some way. So, maybe 10%, 15% or 30%, whatever they can take, they are taking, but they are not taking 100%. The requirement is of 100%. So, that's why I will start from my last answer only.

    Answer, sanjay kulshrestha

    That's where the NaBFID is required, NaBFID is created, NABARD is required, HUDCO is required, IIFCL is required. So I think all these institutions have their own roles and responsibility. And since we are an institution of strategic importance working under MoHUA, who is actually taking care of the urban infrastructure, knowing the policies of the government of India from, say, Urban Challenge Fund or metro or water or waste or sewerage. So, all these things are the domain of HUDCO. So, their domain is energy, our domain is urban infrastructure.

    Answer, sanjay kulshrestha

    Sanjay Kulshrestha: Thank you so much. It was very good answering the questions from the fraternity. And we have taken note of the concerns, and we had answered and I'm sure that you will be satisfied with the answers. And if there is any follow-up information required and then Mr. Achal Gupta and his team will be there to support you. Page 11 of 12 Housing and Urban Development Corporation Limited. February 04, 2026 We are open for all the market information from time to time. And I hope we will be meeting very soon.

    Answer, sanjay kulshrestha

    At the same time, whatever guidance we give to the market, we adhere to that guidance. So, we don't want that we will be overachieving or underachieving. So whatever we have chance, we come out to the market in a very transparent and very clear terms, whether it is forex losses, whether it is cost of funds, whether it is loan book, whether it is different kind of infrastructure that we are doing or whatever works we are doing, and I think on a week-to-week basis, we have a very close kind of interactions through the media, through electronic media or through interviews. So please stay connected with HUDCO. And I can assure you that the growth path that we are continuing, it will be continued for the year. And thank you so much for having interest in the HUDCO. Thank you so much.

Questions about this call

When was the Housing & Urban Development Corporation Q3 FY26 earnings call transcript filed?
Housing & Urban Development Corporation filed the transcript with the exchange on 6 Feb 2026. This page is built from that transcript.
What does this page list?
45 statements from the transcript across 10 topics, 26 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 12 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
Housing & Urban Development Corporation Q3 FY26 concall: what the company said · DalalOS