NCC Q2 FY25 earnings call: NCC Limited had an order book of Rs. 52,370 crore

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

The transcript names the quarter but not the year. The year is worked out from the date it was filed.

The company had an order book of Rs. 52,370 crore. The company reiterated guidance for FY25 of order inflow of Rs. 20,000 to Rs. 22,000 crore, revenue growth of 15% upwards and EBITDA margin of 9.5% to 10%. The company has not received annuity under the smart metering contract because it must demonstrate successful connectivity for a sample size of about 5% of the project; the annuity has not started. Consolidated turnover was Rs. 5,196 crores for the quarter, 96% of the budgetary turnover of Rs. 5,425 crores. Debt at the beginning of the year stood at Rs. 1005 crores, and net debt after cash and cash equivalent was Rs. 518.36 crores.

The numbers management gave

Results

  • Consolidated turnover was Rs. 5,196 crores for the quarter, 96% of the budgetary turnover of Rs. 5,425 crores.
    Show source
    And against this, we achieved a turnover of Rs. 5,196 crores which is 96%.
  • Consolidated turnover was Rs. 10,724 crores for 6 months ending September 24, against budgeted turnover of Rs. 10,545 crores, 102% of budget.
    Show source
    And against 6 months that is ending September 24, we achieved a turnover of Rs. 10,724 crores as against the budgeted turnover of Rs. 10,545 which is 102% of the budget.
  • Standalone gross margin was 15.15% for Q2, compared with 11.70% in the corresponding quarter of the previous year.
    Show source
    Next coming to the Profitability: At the standalone level, we achieved a gross margin of 15.15% for Q2 as against 11.70% of the corresponding quarter of the previous year.
  • Standalone gross margin was 14.96 for H1-25, compared with 13.44% in H1 of the previous year.
    Show source
    And for H1-25 , we achieved a gross margin of 14.96 as against 13.44% in H1 of the previous year.
  • Consolidated EBITDA was 9%, PBT was 4.9% and PAT was 3.6% in the current quarter Q2, compared with 6.5%, 2.3% and 1.6%, respectively, in the corresponding quarter; the reduction was due to lower turnover in the water project in UP because of unprecedented rainfall, lower turnover in the Mallad project in Maharashtra due to rains and delays in approvals and permission for cutting the mangroves, and lower turnover in the Smart Meter projects.
    Show source
    At the consolidated level, we achieved EBITDA of 9% and PBT of 4.9% and PAT of 3.6% in the current quarter Q2 as against EBITDA of 6.5% and PBT of 2.3% and PAT of 1.6% of the corresponding quarter .
  • Working capital at the end of Q2 stood at Rs. 4,987 crores, 27% of turnover and 87 days, calculated after excluding cash and margin money deposits.
    Show source
    Coming to the working capital: Working capital at the end of Q2 stands at Rs. 4,987 crores which is 27% of the turnover and in terms of working capital days, it is 87 days and it is calculated after excluding cash and margin money deposits.
Show 28 more statements

Results

  • Outstanding debtors at the end of Q2 were Rs. 2,793 crores, down from Rs. 3,654 crores at the end of Q1, and debtor days were 65 days, down from 85 days.
    Show source
    Page 4 of 19 NCC Limited November 07, 2024 Coming to the debtors : Outstanding at the end of Q2 has come down from Rs. 3,654 crores at the end of Q1 to Rs. 2,793 crores and the number of days also has come down from 85 days to 65 days in the current quarter.
  • Unbilled revenue stood at Rs. 5,220 crores, 29% of revenue for Q2, compared with Rs. 4,790 crores at Q1; the increase was due to UP projects, where about Rs. 400 crores was billed and realized in October.
    Show source
    The unbilled revenue stands at Rs. 5,220 crores which is 29% of the revenue for Q2 as against Rs. 4,790 crores at Q1.
  • Mobilization advances were 11% of turnover, compared with 13% in the previous quarter.
    Show source
    It is standing at 11% of turnover as against 13% of the previous quarter.
  • ROE stood at 13.61, compared with 14.04 at FY24 end.
    Show source
    So, next coming to the investor -related ratios: The ROE stands at 13.61 as against 14.04 at FY24 end.
  • Return on net worth against PBT was 14.02, compared with 13.88.
    Show source
    Return on net worth against PBT is 14.02 as against 13.88.
  • Return on net worth against PAT was 10.44, compared with 9.62.
    Show source
    Return on net worth against PAT is 10.44 as against 9.62.
  • EPS stood at Rs. 5.80 paisa at the end of Q2, and Rs. 10.10 paisa for March that is the year end.
    Show source
    EPS stands at Rs. 5.80 paisa as at the end of Q2 for March that is the year end, it is Rs. 10.10 paisa.
  • Book value per share was Rs. 112, compared with Rs. 108.50 paisa at the Financial Year ‘2 4 end.
    Show source
    Book value per share is at Rs. 112, as against Rs. 108.50 paisa at the Financial Year ‘2 4 end.
  • Compounding average turnover growth ratio over the last 3 years was about 35%.
    Show source
    So, at the same time, already in the last 2 -3 years, the Company increased its turnover, you have seen this average ratio, compounding average ratio of the last 3 years in vice-versa, about 35% is there.
  • Finance cost, net of interest income, was 3.12% for the half year last year and 2.99% for the current year; loan-only finance cost was 0.88% last year and 0.86% in the current year.
    Show source
    3.12% in the last year and 2.99% in the current year, that entire finance cost of netting off the interest income.
  • Employee benefit expenses increased due to an approximately 8% salary increase and an approximately 2.5% increase in employee count.
    Show source
    The increase is on account of one is on the salary increase which is about 8% and on account of the count of employees increased, the number of employees also increased, that is about 2.5% .

Money and capital

  • Debt at the beginning of the year stood at Rs. 1005 crores, and net debt after cash and cash equivalent was Rs. 518.36 crores.
    Show source
    Coming to the debt movement: The debt at the beginning of the year stood at Rs. 1005 crores and net debt after cash and cash equivalent is Rs. 518.36 crores.
  • Debt at the end of Q1 was Rs. 1,820 crores and net debt was Rs. 1,679.56 crores; at the end of Q2, debt was Rs. 1,732.70 crores and net debt was Rs. 1,624.36 crores.
    Show source
    At the end of Q1, it stood at Rs. 1,820 crores and net debt at Rs. 1,679.56 crores and at the end of the Q2, the same is standing at Rs. 1,732.70 crores and net debt is Rs. 1,624.36 crores.
  • Debt levels reduced by Rs. 87.03 crores compared with the earlier quarter.
    Show source
    There is a reduction in debt levels by Rs. 87.03 crores compared to the earlier quarter.
  • Debt equity ratio stood at 0.25 at the end of Q2, compared with 0.26 at the end of Q1.
    Show source
    The debt equity ratio stands at 0.25 at the end of Q2 as against 0.26 at the end of Q1.
  • Mobilization advances stood at Rs. 2096 crores, compared with Rs. 2417 crores in the previous quarter, showing recovery of mobilization advance by Rs. 321 crores; the recovery was another reason for rising debt levels.
    Show source
    The mobilization advances stood at Rs. 2096 crores as against Rs. 2417 crores in the previous quarter showing a recovery of mobilization advance by Rs. 321 crores.
  • Of NCC Limited's mobilization advances, 81% were interest bearing and the average interest rate was around 9.5%.
    Show source
    Of these mobilization advances, 81% are interest bearing and the average interest rate comes to around 9.5%.
  • The company incurred CAPEX of Rs. 143 crores in the current financial year up to end of September 24.
    Show source
    Coming to the CAPEX: We have incurred a CAPEX of Rs. 143 crores in the current financial year up to end of September 24.
  • The company received nearly Rs. 220 crores from the AP government towards running projects in the last two months.
    Show source
    So, we have received nearly Rs. 220 crores in the last two months from the AP government towards the running projects.
  • The company has received most of the payment for the project, with about Rs. 10 crore remaining to be received; the full payment for the project's equity portion has been received.
    Show source
    What remains to be received from them is let us say that negligible amount of Rs. 10 crore and with that receipt it is also important to understand that we have received the full payment as far as the equity portion of that project is concerned.
  • The company received about Rs. 15 crores in the last month from the interest-bearing loan given to them.
    Show source
    Since there is some progress, some sales are happening out of that the consideration what they received, they started paying the loan about Rs. 15 crores we received in the last month.
  • The loan is close to Rs. 477 crore and is expected to be paid out in the next 2 years.
    Show source
    Neerad Sharma: I think the loan is close to Rs. 477 crore which is expected to be paid out in the next 2 years.
  • The outstanding loan, including interest, is Rs. 384 crores; NCC Limited has received around Rs. 15 crores this year and expects to receive the balance over the next couple of years, with a 2-3 year time frame for payment through an escrow mechanism funded by sales.
    Show source
    Sanjay Pusarla: No, it is 320 plus another 64, Rs. 384 crores including the interest that is outstanding.
  • The company has invested barely Rs. 10 crores in smart metering; one smart meter project is within NCC Limited and two other projects are with SPVs, and the projects will be funded after financial closure is completed and they take off.
    Show source
    Sanjay Pusarla: Still we have not invested anything, we have invested barely Rs. 10 crores in that and once the financial closure is completed and the project takes off it will be done and as you know that one smart meter project is within NCC itself and the two other projects are with the SPVs.
  • The company received around Rs. 200 crores in AP for AAIB projects, ADB projects and APMSIDC projects, and received money for running projects other than capital city projects.
    Show source
    R. S. Raju: We received around Rs. 200 crores in AP.
  • The company had about Rs. 150 crores to receive from the old AP Capital City project and had received about Rs. 220 crores for running projects.
    Show source
    From the old project that is AP Capital City, we have to receive about Rs. 150 crores.
  • Debt levels were almost similar at the ends of quarter one and quarter two; if expected collections come in, debt may come down by Rs. 500 crores to the same range as at the end of last year.
    Show source
    Maybe by Rs. 500 crores it may come down.
  • The outstanding amount for NCC Limited's AP capital city projects is approximately Rs. 150 crores, which NCC Limited expects to receive before March of this fiscal. Replaced by a later filing.
    Show source
    As far as capital city projects are concerned, the outstanding is about approximately Rs. 150 crores is there.

What it expects ahead

What management expects

  • The company reiterated guidance for FY25 of order inflow of Rs. 20,000 to Rs. 22,000 crore, revenue growth of 15% upwards and EBITDA margin of 9.5% to 10%.
    Show source
    The first guidance that we have shared with the street is order inflow of Rs. 20,000 to Rs. 22,000 crore, revenue growth of 15% upwards and EBITDA margin of 9.5% to 10% in the FY25.
  • Order book guidance was about 20,000 to 22,000; although the order book in the first half year was lower than intended, the pipeline of orders gave confidence to achieve easily 20 to 20,000 crores, with visibility to surpass the order booking limit given.
    Show source
    So, though the order book in the first half year is lower than what we supposed to do, but the kind of the pipeline of the orders giving a good confidence to us to achieve easily the 20 to 20,000 crores.
  • The company achieved 13% invoice booking in the first half year; heavy rains and floods prevented it from achieving its target in the 2nd Quarter, and it was confident of achieving 15% guidance for invoice booking in the second half, including the 2% backlog.
    Show source
    And ultimately at this moment, we are confident we achieve 15% guidance whatever is given for the invoice booking.
  • The company had achieved about 41% of the lower band when adding the two numbers for submissions made in October.
    Show source
    If we really add these two numbers, we have already achieved about 41% of the lower band.
  • The company expects a pipeline of projects worth Rs. 2.10 lakh crore to come up for bidding, primarily from buildings, transportation, water and electrical T&D, with a few projects possibly from irrigation and mining.
    Show source
    Going forward, we expect a very healthy pipeline of projects, more than Rs. 2 lakh crore, to be exact, Rs. 2.10 lakh crore pipeline of projects to come up for bidding.
  • The company may book beyond 20,000, 25,000, 30,000 orders as market opportunities arise.
    Show source
    And one way also the management is looking to expand and there is also chance to even book beyond 20,000, 25,000, 30,000 orders also since market also opportunities for themselves is there.
Show 27 more statements

What management expects

  • The company is not confined to booking only 20,000 or 22,000 orders.
    Show source
    So, it is not that only we confined to 20,000 or 22,000.
  • Margin guidance shared with the state is an EBITDA margin of 9.5%-10%; it is sticking with that guidance and may reach the lower end of the band.
    Show source
    The guideline, the margin that we have shared with the state is EBITDA margin of 9.5%- 10%.
  • The company expects most of the work to be completed by March ‘25 and a fraction to be completed before June 25; the shortfall in turnover in the current quarter was also due to unprecedented rains in UP and elections.
    Show source
    Now we are expecting that majority of the work will be completed by March ‘25 and maybe a fraction of work will be left over which will be done before June 25.
  • The company is waiting for the government to issue the LOAs for the MSRDC 2 packages; the election code has prevented issuance, and it is likely to happen once the elections are over.
    Show source
    Once the elections are over, it's likely can happen.
  • The company saw no reason to revise its order inflow guidance shared with the trade.
    Show source
    And I think we don't see any reason to revise the order inflow guidance that we have shared with the trade.
  • The company expects concrete action on AP project awards by Q3 or Q4 of the current financial year, after the previous project is closed and the award process starts.
    Show source
    So, as per the information that has been made available to us, we should be able to see concrete action by Q3 or Q4 of the current financial year.
  • Project pipeline may be realised over six to nine months, depending on the new government’s priorities and preferences in states where elections have been announced.
    Show source
    But yes, overall in the six months or this could also spill to nine months also, depending on the new government that comes to the power, their priorities, their preferences.
  • The company said it is not sure whether the prospect pipeline will convert into contracts, as the time between an L1 announcement and formal contract award or receipt of the LOA can be substantial and is difficult to predict.
    Show source
    We have seen in the past that the L1 announcement is made and it takes a substantial amount of time to receive the LOA.
  • The company sees metro projects across the country, new railway lines, water projects and projects for transmission and distribution among the sectors with projects in its pipeline.
    Show source
    So, these are the verticals that have most of the projects in the pipeline.
  • For BharatNet, some packages have not yet been opened, the client will decide which to award and when, and the award is expected to take some time.
    Show source
    If you a re talking about this BharatNet, we understand that some packages have still not been opened, the client will decide which one to award, when to award, this is something that is expected to take some time.
  • The company is studying the solar EPC sector and is not currently participating in its bids; it will evaluate the sector and decide at an appropriate point of time whether to participate.
    Show source
    We are not participating currently in these bi ds, but we will evaluate and decide an appropriate point of time.

Orders

  • The company had an order book of Rs. 52,370 crore.
    Show source
    We are currently sitting o n an order book of Rs. 52,370 crore.
  • Buildings and transportation division had an order book of Rs 19,486 crore, about 37% of NCC Limited's total order book.
    Show source
    We are sitting o n an order book of Rs 19,486 crore which is about 37% of our total order book.
  • Transportation division had an order book of Rs 11,151 crore, about 21% of NCC Limited's total order book.
    Show source
    In the second large division we have an order book of Rs 11,151 crore that is about 21% of our total order book in the transportation division.
  • Electrical division (T & D) had an order book of Rs. 10,931 crore as of September end, about 21% of NCC Limited's order book.
    Show source
    In this division, we have an order book of Rs. 10,931 crore as of September end, which is about 21% of our order book.
  • Water division had an order book of Rs. 6,071 crore, about 12% of NCC Limited's total order book.
    Show source
    It has an order book of Rs. 6,071 crore, which is about 12% of our total order book.
  • Including the announcement made for October, NCC Limited's total order book was 8,256, about 41% of the lower band.
    Show source
    If you really include the announcement that we have made for the month of October, the total order book is 8,256, which is about 41% of the lower band.
  • Historical bidding conversion percentage generally varies from 10% to 15%, depending on contract lumpiness; winning or losing very large projects such as bullet train packages can change the percentage drastically.
    Show source
    Generally, this number would vary for 10% -15% anywhere in that range.
  • The company enters private-sector projects only in exceptional cases, after thoroughly evaluating the client, business relationship, performance and payments; private-sector projects are 2%- 3% of the total order book.
    Show source
    It is hardly 2%- 3% of the total order book.
  • There is no bullet train project of Rs. 25,000 crore on NCC Limited’s horizon; it was in the past.
    Show source
    There is no project line of the bullet train of Rs. 25,000 crore on the horizon.
  • Bharat Broadband Net projects are part of NCC Limited’s total L1 value, which is upwards of Rs. 9,000 crore.
    Show source
    And I said this is upwards of Rs. 9,000 crore.
  • The company bagged three smart metering projects: two in Maharashtra with an order value close to Rs. 5,700 crores and one in Bihar with an order value of about Rs. 2,300 crores.
    Show source
    The order value of these two projects is close to Rs. 5,700 crores.
  • Standalone order book at the end of September was Rs. 48,027 crores; generally, 20% to 30% is executable, and Rs. 12,000 crores is executable in the current year using 30%.
    Show source
    Sanjay Pusarla: The order book standing for the standalone as at the end of September is Rs. 48,027 crores.
  • JJM order book received was around Rs. 17,000 crores; work executed through September 30 was Rs. 11,137 crores, leaving a balance order book of Rs. 5,467 crores at the end of September.
    Show source
    R. S. Raju: Just to give you a clarification, the order book which was received by us is around Rs. 17,000 crores and the work executed till date that is end of 30th September is Rs. 11,137 crores and the balance order book as at the end of September is Rs. 5,467 crores.
  • The company has received few projects from Maharashtra and few Jal Jeevan Mission projects.
    Show source
    We have also received few Jal Jeevan Mission projects.
  • The company does not disclose details of L1 projects before receiving formal communication from the client, because it does not know when they will convert into LOAs.
    Show source
    So, unless and until we receive a formal communication from the client, we do not really wish to announce that.
  • Most of the difference between NCC Limited’s consolidated and standalone order books is from Pachhwara, with a small part from smart meters.
    Show source
    Neerad Sharma: Majority of the part is from Pachhwara, one small part from the smart meters.

What it is building and selling

Projects and capacity

  • The company has not received annuity under the smart metering contract because it must demonstrate successful connectivity for a sample size of about 5% of the project; the annuity has not started.
    Show source
    We have to demonstrate the successful connectivity for the sample size of the project, which is about 5%.
  • The number of smart meters installed was 2 lakhs, not 2 million.
    Show source
    Sanjay Pusarla: One small correction it was not 2 million, it was 2 lakhs.
  • The company has placed orders for the GMLR TBM machines and is waiting for clearance from both partners; following a change in location and a likely increase in tunnel length, it is waiting for BMC permission, expected by the third quarter end, after which the project will take off.
    Show source
    It is expected to come in maybe the third quarter end.
  • The company has started trials for the Bihar smart metering project and has installed a couple of lakh meters in Bihar.
    Show source
    We have already installed some meters, a couple of lakh meters have already been installed in the state of Bihar.
  • The company has installed a couple of lakh smart meters in Bihar and is making good progress there; the Maharashtra smart metering project has been deferred for a few months following the election announcement, and NCC Limited is hopeful execution will start after the new government comes to power.
    Show source
    The government has decided to defer this project for a few months and as you are aware, the election has already been announced in the state of Maharashtra.
  • The company will receive the client’s green signal to roll out the smart metering project to the remaining households after sample testing is done; that rollout cycle has not started.
    Show source
    Once the sample testing is done, then we will receive the green signal from the client to start rolling out the project, for the rest of the households.
Show 6 more statements

Projects and capacity

  • Both smart metering projects with SPVs are in Maharashtra, as required by the tender events.
    Show source
    Sanjay Pusarla: Both are in Maharashtra.
  • The company said nothing in its order book was yet to start execution; the Maharashtra smart meter EPC contract had a delay, while the Malad project has restarted following a Supreme Court order, with land filling complete, tree cutting underway and permissions awaited. Rain in the Mumbai region slowed progress, but NCC Limited expects good progress in the coming quarter.
    Show source
    Sanjay Pusarla: Yet to start there is nothing right now because the project is regarding only the smart meters where the EPC contract was there where there was a whole little bit in the case of Maharashtra Page 15 of 19 NCC Limited November 07, 2024 but there we are going ahead.
  • The company is waiting for BMC approvals for G MLR projects after changes in alignment or location; work will take off once approvals are received, while its other projects are running.
    Show source
    And as far as the other projects like G MLR, we said very clearly explained before that because of change in alignment or change in the location they are, we are waiting for the approvals from the BMC.

Segments

  • The company has private-sector projects in its building division, including data centers from one of the leading power producers.
    Show source
    There are some data centers from one of the leading power producers.
  • The company is always open to consider private-sector contracts in the building space and decides whether to bid after assessing the projects’ value, location, proponent and risks.
    Show source
    Depending on that, we do a thorough risk assessment and then decide whether to bid or not.
  • The company has executed projects with a significant part of bought out items and evaluates large opportunities in emerging areas before deciding whether to participate.
    Show source
    So, that is the reason we are always open to look at these kind of opportunities.

Everything else said on the call

Other

  • Stance had not changed. Replaced by a later filing.
    Show source
    R. S. Raju: At this moment, that stance there is no change.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Vaibhav Shah: Yes, thank you, Dorwin. On behalf of J M Financial, I welcome everybody to 2 Q FY25 earnings conference call of NCC Limited. We have from the Management today, Shri R S Raju - Director of Projects; Shri Sanjay Pusarla - Executive Vice President (Finance & Accounts); and Shri Neerad Sharma – Head (Strategy & Investor Relations). Now, I hand over the call to the Management for “Opening Remarks” and then we can have a Q&A session. Over to you, sir.

    Answer, neerad sharma

    In the third part, we will attempt to answer all your questions and clarifications. We are seeing a very healthy pipeline of future prospects. As we speak, we have a prospective project pipeline of more than Rs 2 ,10,000 crore. We are currently sitting o n an order book of Rs. 52,370 crore. I also take this opportunity to reiterate the guidance that we have shared with the market participants. The first guidance that we have shared with the street is order inflow of Rs. 20,000 to Rs. 22,000 crore, revenue growth of 15% upwards and EBITDA margin of 9.5% to 10% in the FY25. Now I will touch upon very briefly on our important divisions: In our buildings and transportation division, we continue to see good traction and healthy pipeline of projects.

    Answer, neerad sharma

    We are sitting o n an order book of Rs 19,486 crore which is about 37% of our total order book. In the second large division we have an order book of Rs 11,151 crore that is about 21% of our total order book in the transportation division. The third largest division that we have is our electrical division (T & D). In this division, we have an order book of Rs. 10,931 crore as of September end, which is about 21% of our order book. The fourth large division that we have in our Company is our water division. It has an order book of Rs. 6,071 crore, which is about 12% of our total order book. The flagship scheme of Government of India, Jal Jeevan Mission that has been launched in partnership with the states continues to be in full operation.

    Answer, neerad sharma

    And against this, we achieved a turnover of Rs. 5,196 crores which is 96%. And against 6 months that is ending September 24, we achieved a turnover of Rs. 10,724 crores as against the budgeted turnover of Rs. 10,545 which is 102% of the budget. Next coming to the Profitability: At the standalone level, we achieved a gross margin of 15.15% for Q2 as against 11.70% of the corresponding quarter of the previous year. And for H1-25 , we achieved a gross margin of 14.96 as against 13.44% in H1 of the previous year. At the consolidated level, we achieved EBITDA of 9% and PBT of 4.9% and PAT of 3.6% in the current quarter Q2 as against EBITDA of 6.5% and PBT of 2.3% and PAT of 1.6% of the corresponding quarter . The main reason for the reduction in Q2 of FY25 compared to Q2 of FY24 is on account of lower turnover in our water project in UP as explained by Mr. Neerad before, due to unprecedented rainfall, lower turnover in one of the project, Mallad project in Maharashtra due to the rains, and also granting of approvals and delay in the granting of permission for cutting the mangroves there and also lower turnover in the S mart Meter projects. Coming to the debt movement: The debt at the beginning of the year stood at Rs. 1005 crores and net debt after cash and cash equivalent is Rs. 518.36 crores.

    Answer, neerad sharma

    At the end of Q1, it stood at Rs. 1,820 crores and net debt at Rs. 1,679.56 crores and at the end of the Q2, the same is standing at Rs. 1,732.70 crores and net debt is Rs. 1,624.36 crores. There is a reduction in debt levels by Rs. 87.03 crores compared to the earlier quarter. The debt equity ratio stands at 0.25 at the end of Q2 as against 0.26 at the end of Q1. Coming to the working capital: Working capital at the end of Q2 stands at Rs. 4,987 crores which is 27% of the turnover and in terms of working capital days, it is 87 days and it is calculated after excluding cash and margin money deposits. Page 4 of 19 NCC Limited November 07, 2024 Coming to the debtors : Outstanding at the end of Q2 has come down from Rs. 3,654 crores at the end of Q1 to Rs. 2,793 crores and the number of days also has come down from 85 days to 65 days in the current quarter. The unbilled revenue stands at Rs. 5,220 crores which is 29% of the revenue for Q2 as against Rs. 4,790 crores at Q1. The reason for increase is in UP projects where we have billed them about Rs. 400 crores in the next month i.e. October and realized the money also.

    Answer, neerad sharma

    The mobilization advances stood at Rs. 2096 crores as against Rs. 2417 crores in the previous quarter showing a recovery of mobilization advance by Rs. 321 crores. This is also another reason for rising reason of debt levels. It is standing at 11% of turnover as against 13% of the previous quarter. Of these mobilization advances, 81% are interest bearing and the average interest rate comes to around 9.5%. Coming to the CAPEX: We have incurred a CAPEX of Rs. 143 crores in the current financial year up to end of September 24. So, next coming to the investor -related ratios: The ROE stands at 13.61 as against 14.04 at FY24 end. Return on net worth against PBT is 14.02 as against 13.88.

    Answer, neerad sharma

    Return on net worth against PAT is 10.44 as against 9.62. EPS stands at Rs. 5.80 paisa as at the end of Q2 for March that is the year end, it is Rs. 10.10 paisa. Book value per share is at Rs. 112, as against Rs. 108.50 paisa at the Financial Year ‘2 4 end. With this, I conclude my presentation on the financials for the quarter two. Thank you. Back to Mr. Neerad.

  2. Question

    Shravan Shah: Just to recheck, you are maintaining the previous revenue and EBITDA margin guidance I understand. So, just to recheck on that, if I look at 15% revenue growth, we need a (+ 17%) kind of revenue growth in the second half and in terms of the margin level, we need at least 9.7% to 10% kind of EBITDA margin in the second half. So, are we confident that we will be able to do that? Page 5 of 19 NCC Limited November 07, 2024 R. S. Raju: Now the guidance what we given at the beginning of the year and we are still confident to achieve the guidance what we given.

    Answer, r raju

    As far as order book guidance is concerned, we have given about 20,000 to 22,000. So, though the order book in the first half year is lower than what we supposed to do, but the kind of the pipeline of the orders giving a good confidence to us to achieve easily the 20 to 20,000 crores. Even there is a good visibility to surpass the limit what we given for the order booking. As far as invoice booking is concerned, as in the first half year we achieved 13% that you know already we explained. P articularly in the 2nd Quarter because of the rains and floods, we couldn't achieve because of the difficulties happened because of the heavy rains in the season. So, in the second half, so whatever 15% is there, we easily achieve, but the 2% whatever is there, now the backlog, that also we are confident we achieve that one. And ultimately at this moment, we are confident we achieve 15% guidance whatever is given for the invoice booking.

  3. Question

    Shravan Shah: Just to clarify sir, in terms of the order inflow including the October 1 is I think 8660 odd and L1 is how much sir, Rs. 8700 odd crore?

    Answer, neerad sharma

    Neerad Sharma: The total L1 value would be as of September end would be let us say that close to more than Rs. 9000 crore. And Shravanji, if I may add one point, you talked about the submissions that we have made for the month of October. If we really add these two numbers, we have already achieved about 41% of the lower band. If you really include the announcement that we have made for the month of October, the total order book is 8,256, which is about 41% of the lower band. So, we are on the journey. And I think we don't see any reason to revise the order inflow guidance that we have shared with the trade.

  4. Question

    So, that stance remains the same.

    Answer, r raju

    R. S. Raju: At this moment, that stance there is no change. As you are aware, generally the collections are good in the fourth quarter. And this is what makes us believe that we should be able to hit that number.

  5. Question

    Parth Thakkar: My first question is, what are the outstanding receivables from AP and how much recovery are we expecting in 2H?

    Answer, r raju

    R. S. Raju: As far as the AP projects are concerned, there are two categories. One is capital city projects and other category is running projects. So, we have received nearly Rs. 220 crores in the last two months from the AP government towards the running projects. As far as capital city projects are concerned, the outstanding is about approximately Rs. 150 crores is there. That also we expect to receive. There is a good movement and discussions going on with the client . And before March of this fiscal, we expect to receive that amount.

  6. Question

    Parth Thakkar: Yes.

    Answer, neerad sharma

    Neerad Sharma: What remains to be received from them, we have received most of the payment. What remains to be received is about Rs. 23 crore. This is what we had disclosed in the last quarter. What remains to be received from them is let us say that negligible amount of Rs. 10 crore and with that receipt it is also important to understand that we have received the full payment as far as the equity portion of that project is concerned.

    Answer, r raju

    R. S. Raju: They started paying the loan amount. Since there is some progress, some sales are happening out of that the consideration what they received, they started paying the loan about Rs. 15 crores we received in the last month. Page 7 of 19 NCC Limited November 07, 2024 Moderator: Thank you.

  7. Question

    Prithvi Raj: Yes, that's right. The projects which are in the pipeline, and which are being awarded now.

    Answer, neerad sharma

    Neerad Sharma: See, primarily we are getting projects. We have shared one slide. I would encourage you to download and see the slide. But we have received few projects from the state of Maharashtra. We have also received few Jal Jeevan Mission projects. Going forward, we expect a very healthy pipeline of projects, more than Rs. 2 lakh crore, to be exact, Rs. 2.10 lakh crore pipeline of projects to come up for bidding. Primarily, it would come from four divisions, buildings, transportation, water and electrical T&D and we might get few projects in the irrigation and mining as well.

  8. Question

    Prithvi Raj: And then one specific question on AP, are you seeing any traction there when you're having conversations with the state government?

    Answer, neerad sharma

    Neerad Sharma: We are hopeful. They have initiated the whole process. And we have been given to understand that the previous project they are planning to close. And they will start the process of award soon. So, as per the information that has been made available to us, we should be able to see concrete action by Q3 or Q4 of the current financial year.

  9. Question

    Parikshit Kandpal: Sir, first question is on the prospect pipeline. You said that 2 trillion almost 2 lakh crores for the business. I understand for the next 6 months, right?

    Answer, neerad sharma

    Neerad Sharma: Yes, but maybe few states difficult to predict subject to the elections. You are aware that elections have been announced in two of the key states. But yes, overall in the six months or this could also spill to nine months also, depending on the new government that comes to the power, their priorities, their preferences.

  10. Question

    Parikshit Kandpal: So, balance 2 trillion when you are bidding. So, typically, when you look at your historical bidding ratios, so what kind of conversion have you seen? F or the rest of the year, when you are targeting, so Rs. 20,000-Rs. 22,000 crores, do you think there is a decent possibility of this number exceeding like Rs. 30,000 crores of inflows , given that you are talking about a very large number of 2 trillion for the rest of the year?

    Answer, neerad sharma

    Neerad Sharma: Two questions, firstly, there is no fixed percentage. It really depends on the lumpiness of the contract. Generally, this number would vary for 10% -15% anywhere in that range. It really depends on the lumpiness of the contract. What I essentially mean by that is let us say that there are few very large projects, Rs. 25,000 crores we have seen, very big projects like bullet train, so big packages if we win or lose, this will change the percentage drastically. So, this is the range that we have seen in the past.

Show 17 more questions
  1. Question

    Parikshit Kandpal: So, 10% itself will mean around 20,000. So, that means, are you targeting almost another Rs. 20,000 crores of inflows for the rest of the year?

    Answer, neerad sharma

    Neerad Sharma: But we are not very sure whether that will really get converted into contracts or not. You have seen that there is a delay. There is a timeline between L1 and the formal award of the contract, receipt of the LOA. So, it is really difficult to predict a timeline. This is not something that is really in our span of control, this is a call that our client has to take. We have seen in the past that the L1 announcement is made and it takes a substantial amount of time to receive the LOA. So, that is the reason we want to be a bit on this side.

  2. Question

    Parikshit Kandpal: Just on this advances loans, now you said equity portion has come in for the DP project, sorry I could not get, what is the total quantum of loans which were there and how much we have received and what is the timeline for the balance to come in?

    Answer, neerad sharma

    Neerad Sharma: I think the loan is close to Rs. 477 crore which is expected to be paid out in the next 2 years.

    Answer, sanjay pusarla

    Sanjay Pusarla: No, it is 320 plus another 64, Rs. 384 crores including the interest that is outstanding. And this year we have already received around Rs. 15 crores and it is expected that we will receive the balance money also the next couple of years. As Mr. Raju has said before, there is a traction going on there and now the sale is also happening and we are expecting that the market will improve there because it is near to the airport which is coming up in Vishakhapatnam. So, likely that these sales will happen and we also have an understanding with them whatever sale that happens that they need to share the money with us through escrow mechanism. There is escrow mechanism in place. Whatever sales happen will go to the escrow account and we will get paid. The time frame is 2-3 years.

  3. Question

    Parikshit Kandpal: Sir, just on the building segment, if you can help us understand how much, is it all the government projects or do you also have some private projects, private residential projects in that?

    Answer, neerad sharma

    Neerad Sharma: There are some projects from the private sector as well. There are some data centers from one of the leading power producers. We have some contracts in the building division from the private sector as well.

  4. Question

    Parikshit Kandpal: But you are not looking at adding more projects on the private sector because given that we have a strong presence in the building segment and there is shortage of good quality contractors in the private real estate, which is now doing well. So, do you think there is an opportunity for us to again look at that segment and add incremental orders?

    Answer, neerad sharma

    Neerad Sharma: We are always open to look at the private sector contracts in the building space. It depends on what kind of projects are coming? What is the value of the projects? What is the location of the project? Who is the project proponent? Depending on that, we do a thorough risk assessment and then decide whether to bid or not.

  5. Question

    Parikshit Kandpal: But often talks with developers, leading developers like L1_30.51__ developers, are they considering you for their projects like residential, private residential?

    Answer, r raju

    R. S. Raju: Yes, we are right about our participation in the private sector and we have internally taken not to participate in the private sector. Only in exceptional cases where the client is good, where the business relationship is there, so only in exceptional cases, after evaluating thoroughly about the clients, our private clients, performance and payments, then only we are entering. That is why the order book is also not much. It is hardly 2%- 3% of the total order book.

  6. Question

    Parikshit Kandpal: Sir, just one more question. We have a very strong balance sheet now, you have settled some claims, you have received some money, we are receiving the real es tate monetization money, so we are talking about Rs. 500 crores of debt by the CRM, but when I look at the order inflows, you talk about very robust prospect pipeline of 2 trillion, you have already got 17,000 and potentially if your conversion at the lower end happens, you are looking at another Rs. 20,000 crores for the rest of the year, even if it fits in L1. So, in the past, we have had the best year in Page 10 of 19 NCC Limited November 07, 2024 order inflow was about 27,000. We have been doing 25 to 27 for some

    Answer, r raju

    R. S. Raju: Yes, you are right on that point of view. And in the same similar line also the management is working to expand its business. So, at the same time, already in the last 2 -3 years, the Company increased its turnover, you have seen this average ratio, compounding average ratio of the last 3 years in vice-versa, about 35% is there. So, we have grown to a particular level. From here again, growing to that level, we have to consolidate the business and strengthen all the department. That process is going on. And one way also the management is looking to expand and there is also chance to even book beyond 20,000, 25,000, 30,000 orders also since market also opportunities for themselves is there.

    Answer, r raju

    Both the ways we are looking that one. So, it is not that only we confined to 20,000 or 22,000.

  7. Question

    Parikshit Kandpal: And this, I think Neerad earlier spoke about some bullet train projects, so which is this 25,000 crore project in that pipeline? And if you can name a few large projects in that 2 trillion pipeline, which you spoke about?

    Answer, neerad sharma

    Neerad Sharma: No, Parikshit, I did not mean that. What I was trying to do was to explain to you that how this percentage could vary widely. There is no project line of the bullet train of Rs. 25,000 crore on the horizon. It was in the past.

  8. Question

    Parikshit Kandpal: But this 2 trillion, what are the larger opportunities, like, which are the larger projects that you have come up with in your prospect?

    Answer, neerad sharma

    Neerad Sharma: The projects, I couldn't identify, but I will talk about the sectors, for example, the metro projects, all the length and breadth of the country, there are metro projects coming up. There are also plans to lay new railway lines. So, these kind of projects, there are projects planned in the water space, RDSS, lot of projects are expected to come up for transmission and distribution. So, these are the verticals that have most of the projects in the pipeline.

  9. Question

    One was, would you be able to share some more on the L1 pipeline that you have almost around Rs. 9,000 odd crores, which all segments were taken? What do you think you would, the BharatNet phase bringing awards, is there anything to say about that?

    Answer, neerad sharma

    Neerad Sharma: The first question, Mr. Khurana is, as a matter of policy, we do not really talk about the L1 project except to share the value. We do not know by what time these L1s are going to get converted into LOAs. So, we just talk about because we were asked these questions, so we have put it in number. But yes, this project that you just talked about is Bharat Broadband Net, we also got to know about these L1 projects. So, unless and until we receive a formal communication from the client, we do not really wish to announce that.

  10. Question

    Prem Khurana: So, does it mean that we are saying that this 9000 would not include any of these news that has been there in the market because you have yet to receive any communication, and it is still not a part of this?

    Answer, neerad sharma

    Neerad Sharma: No, but L1 I shared, we have not, we don't share the details of all the projects, but this is part of the total value that I just. And I said this is upwards of Rs. 9,000 crore. If you a re talking about this BharatNet, we understand that some packages have still not been opened, the client will decide which one to award, when to award, this is something that is expected to take some time.

  11. Question

    Prem Khurana: If you just to understand the thought process, we recently picked up the smart metering orders where in mind there will be a significant amount of bought out component, I have been assuming you have these BharatNet orders, Bharat Broadband, there again, there will be optical fiber that you would have to source from someone else. So, has there been some change in the thought process wherein we are going for projects wherein there is a significant portion which is in the form of bought out components? Or is it that the size is so favorable that you can't ignore th is sort of opportunities?

    Answer, neerad sharma

    Neerad Sharma: These are really the large opportunities and otherwise also in few of the projects that we execute, other than these two new areas, there is a significant part of the bought out items. So, we have been executing those kind of projects in the past. And we have the expertise, and these are the emerging areas, so why not whenever big opportunities come up in front of us, it is better to evaluate those opportunities and decide not to participate. So, that is the reason we are always open to look at these kind of opportunities.

  12. Question

    Prem Khurana: And just one last if I may, would you be able to share status on the GMLR project?

    Answer, sanjay pusarla

    Sanjay Pusarla: As far as the GMLR project is concerned, we have already placed the orders for the TBM machines and both the partners and for clearance, we are waiting for the clearance. There was a change in the location and there is a likely that the tunnel length also will get increased. So, that is the reason we are waiting for permission from BMC. It is expected to come in maybe the third quarter end. So, once it comes, then the project will completely take off.

  13. Question

    Nikhil Abhyankar: I had a specific question regarding the smart metering project that we are doing, the two projects. Sir, can you tell us about the experience as in how is the execution going on, and when should we expect to complete? Have we completed a part of the project wherein we have already started receiving the….

    Answer, neerad sharma

    Neerad Sharma: Firstly, as you are aware, we have bagged three projects. Two projects are from the state of Maharashtra. The order value of these two projects is close to Rs. 5,700 crores. And the third project that we have bagged is from the state of Bihar. The value would be about Rs. 2,300 crores order value. As we have shared in the last conversation with you, we have started the trials for the Bihar state. We have already installed some meters, a couple of lakh meters have already been installed in the state of Bihar.

    Answer, neerad sharma

    Maharashtra, we have been asked to go a bit slow. The government has decided to defer this project for a few months and as you are aware, the election has already been announced in the state of Maharashtra. So, we will wait for a couple of month s’ time, let the new government come to power and then we are hopeful that the execution would start. But to answer your question specifically, this project we have been asked to go slow, Maharashtra project. Bihar, we are making good progress. Nkhil Abhyankar: I wanted to ask about you mentioned that we have commissioned a couple of million of smart meters. So, have you started receiving annuities on those?

    Answer, neerad sharma

    Neerad Sharma: No, we have not received the annuity as per the contract. We have to demonstrate the successful connectivity for the sample size of the project, which is about 5%. So, once we install, it is not about the installation of the meters only. There is a network connectivity. These meters are Page 13 of 19 NCC Limited November 07, 2024 expected to work like a mobile phone, either on RF, radio frequency or mobile network. Then we have to connect this with the local server that is going to get connected to the billing server of the DISCOMs. So, the annuity hasn't started.

    Answer, neerad sharma

    Once the sample testing is done, then we will receive the green signal from the client to start rolling out the project, for the rest of the households. Then this cycle would start. As we speak, this hasn't started.

    Answer, sanjay pusarla

    Sanjay Pusarla: One small correction it was not 2 million, it was 2 lakhs. So, that is the reason you are asking whether annuity has started.

  14. Question

    Nikhil Abhyankar: And just a final question regarding sir, there is a lot of opportunities coming out in the renewable sector, especially in the solar EPC segment. So, are we looking to participate in those?

    Answer, neerad sharma

    Neerad Sharma: Currently, we are studying the sector. We are not participating currently in these bi ds, but we will evaluate and decide an appropriate point of time.

  15. Question

    Vishal Periwal: So, in this smart metering one, how much?

    Answer, sanjay pusarla

    Sanjay Pusarla: Still we have not invested anything, we have invested barely Rs. 10 crores in that and once the financial closure is completed and the project takes off it will be done and as you know that one smart meter project is within NCC itself and the two other projects are with the SPVs. Vishal Periwal: The two in subsidiary is the Maharashtra one?

    Answer, sanjay pusarla

    Sanjay Pusarla: Both are in Maharashtra. That is the requirement as per the tender events .

  16. Question

    Vishal Periwal: And on this order book sir, the console minus standalone order book that if you do, then the difference is coming from the Pachhwara or anything else also?

    Answer, neerad sharma

    Neerad Sharma: Majority of the part is from Pachhwara, one small part from the smart meters. Page 14 of 19 NCC Limited November 07, 2024 Moderator: Thank you.

  17. Question

    Priyesh Babariya: And another thing is that it would be really difficult to actually to change the margin beyond 10% or so, considering that this project will be very large?

    Answer, neerad sharma

    Neerad Sharma: See, we have already shared the margin guidance with you, and we do not wish to revise that. The guideline, the margin that we have shared with the state is EBITDA margin of 9.5%- 10%. And we continue to stick with the same number. Maybe, we might hit at the lower end of the band, as things stand today. But we have to wait and watch.

Questions about this call

When was the NCC Q2 FY25 earnings call transcript filed?
NCC filed the transcript with the exchange on 11 Nov 2024. This page is built from that transcript.
What does this page list?
80 statements from the transcript across 7 topics, 59 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 27 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
NCC Q2 FY25 concall: NCC Limited had an order book of Rs. 52,370 crore · DalalOS