NTPC Q1 FY27 earnings call: NTPC intends to raise coal production to a level where it can meet around 25% in the next 3 to 4 years

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

The company intends to raise coal production to a level where it can meet around 25% in the next 3 to 4 years. THDC commissioned its 1,000 megawatt pump storage plant. Generation growth had become healthy, and all-India energy met had increased by 9.28% till date. The company aimed to maintain its market share of around 25% as electricity demand grew. Share of the country's electricity generation is 24%, while its share of installed capacity is 17%.

The numbers management gave

Results

  • Generation growth had become healthy, and all-India energy met had increased by 9.28% till date.
    Show source
    So, on all-India basis, the energy met has till date increased by 9.28%.
  • The company generation was around 8% higher year-to-date, generation for the day was 24% higher, and NTPC rail-fed stations generated 40% more for the day and 18% more year-to-date.
    Show source
    If you see the same thing for NTPC, it is around 8% for the year-to -date, but bringing the perspective in the present situation, our generation for the day has increased by 24%.
  • PLF was almost around 77% despite daytime backing down and must-run renewable generation; around 5 years, 6 years back, it was more than 80% plus.
    Show source
    On the PLF side also, we have started touching, even after the backing down during the day, still it is almost around 77% kind of thing, which if you translate into about 5 years, 6 years back, it is more than 80% plus.
  • The company generated around 432 billion units, around one-fourth of total generation, despite curtailments and backing down in coal-based power plants.
    Show source
    We had generated around 432 billion units, which is again around one-fourth of the total generation.
  • Forced outage rate was about 4.1% about a year earlier, 3.9% in the previous year, and about 3.75% in this year.
    Show source
    So, that has come in the previous year 3.9%, and in this year it is maintained at about 3.75%.
  • The company Green Energy Limited generation was around 15 billion units, compared with 7 billion units in the previous year, almost doubling.
    Show source
    Generation from NGEL is around 15 billion units as compared to 7 billion units in the previous year.
Show 29 more statements

Results

  • The company coal production was around 47.8 million ton, a growth of around 8.5%.
    Show source
    And this has produced around 47.8 million ton, which is a growth of around 8.5%.
  • Outstanding receivable days improved to 15 days from 31 days.
    Show source
    Outstanding receivable days improved to 15 days from 31 days.
  • The company achieved coal production of 48.66 million tons in FY26.
    Show source
    In FY26, the company achieved a production milestone of 48.66 million tons, reflecting a strong operational efficiency in mining.
  • The company had debtors' days of 15 days in FY25-26, compared with the 45-day industry benchmark, reflecting payment discipline.
    Show source
    Page 10of 24 NTPC Limited July 27, 2026 Strong payment discipline is reflected in debtors' days of just 15 days in FY25- 26, enabling trade receivable realization to consistently outperform the industry benchmark of 45 days.
  • The company imported no coal in financial year 2026.
    Show source
    No coal was imported in financial year 2026.
  • The company group's profit after tax grew from INR16,960 crores in FY22 to INR27,546 crores in FY26, a CAGR of 12.89%.
    Show source
    Demonstrating a strong performance, the group's profit after tax grew from INR16,960 crores in FY22 to INR27,546 crores in FY26, delivering a healthy CAGR of 12.89%.
  • The company standalone PAT increased from INR16,282 crores in FY22 to INR23,162 crores in FY26, a CAGR of 9.21%.
    Show source
    On a standalone basis, PAT increased from INR16,282 crores to INR23,162 crores over the same period, reflecting a CAGR of 9.21%.
  • The company group's net worth increased from INR1,34,657 crores in FY22 to more than INR2 lakh crores in FY26, a CAGR of 11%.
    Show source
    The group's net worth has crossed INR2 lakh crores in FY26 from INR1,34,657 crores in FY22 at a CAGR of 11%.
  • Profits from JVs and subsidiaries increased 15% to INR27,546 crores in FY26.
    Show source
    In FY26, the group achieved a notable 15% increase in profits from JVs and subsidiaries at INR27,546 crores.
  • Gross fixed assets grew at a CAGR of over 11% to nearly INR4.7 lakh crores over the last five years, reflecting sustained asset creation and execution of its capacity expansion program.
    Show source
    Over the last five years, our balance sheet has expanded steadily, with gross fixed assets growing at a CAGR of over 11% to nearly INR4.7 lakh crores, reflecting sustained asset creation and execution of our capacity expansion program.
  • The company achieved its highest-ever standalone profit of INR23,162 crores in FY26.
    Show source
    In FY26, the company achieved its highest-ever standalone profit of INR23,162 crores.
  • Profit after tax was INR5,343 crores in Q1 FY27, an increase of 12% over Q1 of FY26.
    Show source
    The profit after tax for Q1 FY27 stood at INR5,343 crores, an increase of 12% over Q1 of FY26.
  • The company group's net energy intensity decreased from 10.01 in FY22 to 9.69 megajoules per kWh in FY26 through efficiency measures.
    Show source
    NTPC's group net energy intensity reduced to 9.69 megajoules per kWh in FY26 from 10.01 in FY22 through efficiency measures.

Money and capital

  • Capex in the financial year '26 was INR 49,000 plus crores, compared with INR 44,636 in the previous year.
    Show source
    In the financial year '26, we have done a capex of INR 49,000 plus crores as compared to INR 44,636 in the previous year.
  • The company standalone capex in the financial year '26 was INR 28,462 crore, compared with INR 22,965 crores in the previous year.
    Show source
    And on standalone, capex was INR 28,462 crore as compared to INR 22,965 crores in the previous year.
  • The company had paid INR 5.50 as interim dividend; the Board recommended INR 3.50 as final dividend, which would make almost INR 9 as a dividend when approved.
    Show source
    Board has recommended INR 3.50 as final dividend, which will make almost INR 9 for NTPC as a dividend when once it is approved.
  • The company estimated investment of around 16.8 lakh crores over almost the next 10 years, considering around FY37.
    Show source
    One of the most important thing which I would like to share, considering the revised capacity addition target, which is around 149 gigawatt by 2032, but if we consider around FY37, so almost in the next 10 years, estimate is that we are going to incur around 16.8 lakh crores.
  • Weighted average interest rate on borrowing stood at 5.98%, compared with 6.61% in the financial year 25.
    Show source
    The weighted average interest rate on the borrowing stood at 5.98% compared to 6.61% in the financial year 25.
  • The company group-level capex is estimated at INR1,08,000 crores for FY26 and FY27, of which INR56,000 crores was incurred in FY26.
    Show source
    Group-level capex is INR1,08,000 crores estimates.
  • Total capex for FY28 to FY32 would be INR5,97,000 crores, driven primarily by renewable energy projects as it moves towards its goal of becoming a 60 gigawatt company in the renewable space.
    Show source
    In the second phasing, comprising five years from FY28 to FY32, total capex would be INR5,97,000 crores, driven primarily by renewable energy projects as we move towards our goal of becoming a 60 gigawatt company in the renewable space.
  • Capex for FY33 to FY37 is approximately INR9,63,000 crores, with a major shift towards nuclear power while continuing renewable energy projects.
    Show source
    We'll see a major shift towards nuclear power as well, while continuing with the RE project as well, with an approximately INR9,63,000 crores as capex.
  • The company envisages total capex of INR17 lakh crores over the next 11 years, up to financial year 37.
    Show source
    So, the total capex envisaged is INR17 lakh crores, as CMD sir was mentioning, over the next 11 years, that is up to financial year 37.
  • Debt-equity ratio improved to 1.32.
    Show source
    The debt-equity ratio has improved to 1.32, while stable cash accruals provide ample headroom to support future capital expenditure and resource mobilization.
  • The company said 5 gigawatt of battery storage will be very helpful and is allowed a similar regulated tariff.
    Show source
    And 5 gigawatt is going to be very helpful, which is on the same regulated tariff, similar regulated not the same regulated tariff is being allowed.
  • Dividend payout ratio has been 36% to 40%, and the company plans to maintain its dividend trend through its FY37 projection.
    Show source
    Director (Finance): It will be hovering around 36% to 40%.
  • The company said its regulated return after a plant is commissioned is around 15.50%, which it described as around 12% to 13%.
    Show source
    So, we are quite happy to make the return, what is regulated return, which is at the end when it is commissioned after that it is around 15.50%, which in nutshell is around between 12% to 13%, which is a healthy kind of return which is sustainable.
  • The company plans for its dividend not to decrease and to keep increasing slightly.
    Show source
    CMD: So, the dividend should not decrease; it should keep increasing slightly… Participant: But it is not tax efficient.
  • The company said the additional capex for batteries and other storage would be included in its ROE calculations.
    Show source
    CMD: Yes.
  • Director (Finance) said NTPC would not rule out using the competitive bidding route, but its scalability was limited and it would first optimize the available cost-plus route, which offered steady, assured returns.
    Show source
    So, with that scalability, if this route is available to me on a cost- plus basis which is giving me a steady return, assured returns, I would like to put your money into a thing and optimize that first of all.

What it expects ahead

What management expects

  • The company intends to raise coal production to a level where it can meet around 25% in the next 3 to 4 years.
    Show source
    And we intend to take our coal production to a level where we can meet around 25% in next 3 to 4 years.
  • Revised capacity addition target was around 149 gigawatt by 2032.
    Show source
    One of the most important thing which I would like to share, considering the revised capacity addition target, which is around 149 gigawatt by 2032, but if we consider around FY37, so almost in the next 10 years, estimate is that we are going to incur around 16.8 lakh crores.
  • New corporate plan targets a capacity portfolio of 150 gigawatts by FY32 and 250 gigawatts by FY37.
    Show source
    Guided by our new corporate plan, NTPC is charting an ambitious growth trajectory, targeting a capacity portfolio of 150 gigawatts by FY32 and on to 250 gigawatts by FY37.
  • The company expects the share of fossil fuel-based capacity to decline from 82% today to 56% by FY32 and 39% by 2037.
    Show source
    With renewable energy driving a significant share of this expansion, as you can see, the share of fossil fuel-based capacity is expected to gradually decline from 82% today to 56% by FY32 and further to 39% by 2037.
  • Overall generation is expected to grow by nearly 7% to reach 943 billion units by FY37, while renewable energy's share is expected to rise from 4.00% currently to nearly 33% by FY37.
    Show source
    In billion unit terms, while the overall generation will grow by nearly 7% to reach 943 billion units by FY37, the share of renewable energy is expected to increase from the current 4.00% to nearly 33% by FY37.
  • Share of fossil-based generation is expected to decline from 93% to 58%.
    Show source
    In the process, the share of fossil-based generation would have declined from 93% to 58%, which augurs quite well with our larger national goal of achieving net zero by 2070.
Show 8 more statements

What management expects

  • Renewable portfolio is targeted to reach 60 gigawatts by FY32 and 136 gigawatts by FY37.
    Show source
    Our renewable portfolio is targeted to reach 60 gigawatts by FY32 and expand further to 136 gigawatts by FY37.
  • The company added around 4.2 gigawatt to its renewable capacity during FY26 and, subject to transmission infrastructure, is targeting another 7 gigawatts to 8 gigawatts in FY27.
    Show source
    During FY26, we have added around 4.2 gigawatt, and further, subject to transmission infrastructure, we are targeting to add another 7 gigawatts to 8 gigawatts for the renewable capacity in FY27.
  • The company has a path to 250 gigawatt by FY37 and a diversified portfolio spanning conventional, renewable, nuclear, and emerging energy businesses.
    Show source
    As we lead India's energy transition, we are balancing growth with sustainability, innovation with reliability, and ambition with disciplined execution, with a clear path to 250 gigawatt by FY37 and a diversified portfolio spanning conventional, renewable, nuclear, and emerging energy businesses.
  • The company plans for its group coal capacity to increase to almost around 97 gigawatt after the last 30 to 32 gigawatt of planned capacity.
    Show source
    So as of now, what we have planned is for the last 30 to 32 gigawatt, our group coal capacity, will go up to almost around 97 gigawatt.
  • Capacity addition target for FY27 remained as previously discussed. Replaced by a later filing.
    Show source
    Our capacity addition target for FY27 remains as we had been discussing, and we will deliberate on that further.
  • The company said sizable investment will go into renewable energy plus storage and nuclear. Replaced by a later filing.
    Show source
    Page 14of 24 NTPC Limited July 27, 2026 But the sizable investment will start going into renewable plus storage and nuclear.
  • The company Mining Limited is exploring all kinds of possibilities within or outside in relation to nuclear. Replaced by a later filing.
    Show source
    But as I was mentioning that this is the NTPC Mining Limited, so we are exploring all kind of possibilities within or outside, whatever it is.
  • Planning for coal gasification is under process, and NTPC is confident coal gasification will be a significant business opportunity alongside mining. Replaced by a later filing.
    Show source
    But as of now, we are quite confident that coal gasification is also going to be one of the significant business opportunity along with the mining.

What it is building and selling

Projects and capacity

  • THDC commissioned its 1,000 megawatt pump storage plant.
    Show source
    All of you know that THDC has commissioned its storage plant, 1,000 megawatt pump storage plant.
  • Ashvini, NTPC's joint venture with NPCIL for a 4x700 megawatt nuclear power plant, started construction and was at an advanced stage.
    Show source
    Ashvini has started construction, and this is coming to a n advanced stage.
  • Pipeline was around 37 gigawatt under construction and around 12 gigawatt at the tendering stage.
    Show source
    Our present pipeline is around 37 gigawatt, which is under construction, and another around 12 gigawatt under tendering stage.
  • The company group operates over 90 gigawatt of commercial capacity, with another 35.7 gigawatt under construction.
    Show source
    NTPC group currently operates over 90 gigawatt of commercial capacity, while another 35.7 gigawatt is under construction, underscoring the scale of its growth ambitions.
  • The company added 9.6 gigawatt of new capacity in FY26 and had added 1.9 gigawatt in FY27 till date.
    Show source
    In FY26, we added 9.6 gigawatt of new capacity, and 1.9 gigawatt has already been added in FY27 till date.
  • The company group's portfolio stands at around 127 gigawatt, with around 91 gigawatt operational and another 36 gigawatt under construction.
    Show source
    As can be seen in the slide, our group portfolio stands at around 127 gigawatt, with around 91 gigawatt as operational and another 36 gigawatt as under-construction assets.
Show 55 more statements

Projects and capacity

  • Nearly 41% of NTPC's capacity would be contributed from its JVs and subsidiaries.
    Show source
    Nearly 41% of the capacity would be contributed from our JVs and subsidiaries.
  • The company group manages nine coal mines with a combined peak capacity of 92 million metric ton per annum.
    Show source
    Turning to our mining business, NTPC group manages an asset base of nine coal mines with a combined peak capacity of 92 million metric ton per annum.
  • The company meets 18% of its coal requirement through captive coal mines and expects captive mining to fulfil 25% by FY30.
    Show source
    Presently, 18% of our coal requirement is met through our captive coal mines, which would go up to 25% fulfilment through captive mining by FY30, thus enhancing the fuel security and supply reliability.
  • First international thermal project, a 2 x 660 MW project in Bangladesh through a 50-50 joint venture with Bangladesh Power Development Board, has been fully operational since 2024.
    Show source
    Coming to some of the international ventures, our first international thermal project, 2 x 660 MW in Bangladesh, through a 50-50 joint venture with Bangladesh Power Development Board, is fully operational since 2024.
  • First solar project, 50 megawatt in Sri Lanka through a 50-50 joint venture with Electricity Generation Lanka Private Limited, is under construction.
    Show source
    First solar project, 50 megawatt under construction in Sri Lanka through a 50- 50 joint venture with Electricity Generation Lanka Private Limited.
  • The first phase of NTPC's Sri Lanka solar project is under development, and the second phase of 70 megawatt is under planning.
    Show source
    First phase of the project is under development, and second phase of 70 megawatt is under planning.
  • The company incorporated a subsidiary company in Mauritius to develop its first floating solar PV project, 15 megawatt with BESS, at Tamarind Falls reservoir in Mauritius.
    Show source
    Recently, NTPC has incorporated a subsidiary company in Mauritius for developing its first floating solar PV project, 15 megawatt with BESS in Mauritius at Tamarind Falls reservoir.
  • Operational renewable energy portfolio capacity stands at 12 gigawatts.
    Show source
    Presently, the operational capacity of RE portfolio stands at 12 gigawatts.
  • The company group has a battery energy storage systems portfolio of 38.9 gigawatt-hours, including 6.62 gigawatt-hours under execution and 5 gigawatt-hours at thermal power stations under the regulated returns framework.
    Show source
    As regards battery energy storage systems, NTPC group has a portfolio of 38.9 gigawatt-hours, which comprise of 6.62 gigawatt-hours under execution, including a 5 gigawatt -hours at the thermal power stations under the regulated returns framework.
  • The company has a further 1.8 gigawatt-hours of battery energy storage system projects under planning.
    Show source
    A further 1.8 gigawatt-hours of BESS projects are under planning to strengthen our near-term storage portfolio.
  • The company is developing a non-solar hour battery energy storage system pipeline of 30.4 gigawatt-hours, of which 18.6 gigawatt-hours have already been tendered.
    Show source
    Beyond this, NTPC is developing a substantial non-solar hour BESS pipeline of 30.4 gigawatt-hours, of which 18.6 gigawatt-hours have already been tendere d. Coming to newer frontiers, steps being undertaken on the nuclear front, we have an ambitious goal of installing 30 gigawatts of nuclear capacity by FY47.
  • ASHVINI, NTPC's joint venture with NPCIL, is developing a 2,800-megawatt project at Mahi Banswara; all necessary government approvals are in place and NTPC floated an NIT for the nuclear island mega EPC package on 15th July 2026.
    Show source
    All necessary government approvals are in place, and we have recently floated NIT for nuclear island mega EPC package on recently 15th July 2026.
  • The company group has a plan to develop 18+ gigawatt of pump storage capacity.
    Show source
    NTPC group has an ambitious plan to develop 18+ gigawatt of pump storage capacity.
  • The company group has 1 gigawatt of Tehri PSP under commercial operation.
    Show source
    Currently, NTPC group has 1 gigawatt of Tehri PSP under commercial operation.
  • The company has been allocated 13.2 gigawatt of PSP projects across Tamil Nadu, Maharashtra, Chhattisgarh, Madhya Pradesh, and Odisha, and aims to commission 3 to 5 gigawatt of capacity by FY33 and nearly 6 gigawatt by FY2037.
    Show source
    We have been allocated 13.2 gigawatt of PSP project across Tamil Nadu, Maharashtra, Chhattisgarh, Madhya Pradesh, and Odisha, and we aim to commission 3 to 5 gigawatt of capacity by FY33 and nearly 6 gigawatt by FY2037.
  • The company is developing a green hydrogen hub at Pudimadakka, spread across 1,200 acres with an envisaged investment of around INR 1 lakh crores, to produce green chemicals including green methanol, ammonia, ethanol, sustainable aviation fuel, and green urea.
    Show source
    Spread across 1,200 acres with an envisaged investment of around INR 1 lakh crores, the project will create an integrated ecosystem encompassing hydrogen production, derivative manufacturing, and export infrastructure, producing green chemicals such as green methanol, ammonia, ethanol, sustainable aviation fuel, and green urea.
  • The company has pilot projects for a 3 megawatt-hour vanadium redox flow battery, 144 megawatt-hour CO2 battery storage at Kudgi station of NTPC, and CCUS at Vindhyachal for production of methanol.
    Show source
    Some of the pilot projects are 3 megawatt-hour vanadium redox flow battery, 144 megawatt-hour CO2 battery storage at Kudgi station of NTPC, and CCUS at Vindhyachal for production of methanol.
  • The company is conducting studies in different states to identify locations for setting up nuclear plants and plans to acquire land patches, with a target of 30 gigawatt.
    Show source
    And I would request the Director Project, who is the concerned director, to just add how many locations what we are working on that, and then parallelly we have to acquire those land patches so that we are becoming future-ready, not for 4 gigawatt, 5 gigawatt, but 30 gigawatt.
  • The company is exploring close to 34 sites for nuclear plants.
    Show source
    Director (Projects): Close to 34 sites are being explored.
  • The company is presently working on nuclear projects in around 10 states and is exploring Tamil Nadu and Karnataka.
    Show source
    It's AP, MP, Gujarat, Maharashtra, Odisha, Bihar, Chhattisgarh, and we are also exploring with Tamil Nadu and Karnataka.
  • Nuclear technology plan combines PHWR and PWR, with a target of 30 gigawatt.
    Show source
    And as sir has rightly said, the target is 30 gigawatt.
  • Renewable investment will include storage alongside solar and wind; CMD said one per megawatt hour costs roughly INR1 crore plus.
    Show source
    And one per megawatt hour is roughly about INR1 crore plus on that side.
  • Example compares pure 8 gigawatt or 7 gigawatt with storage, which could bring it to almost 4 gigawatt; CMD said 7 gigawatt with storage may be higher than 8 gigawatt in this case.
    Show source
    Maybe pure 8 gigawatt or 7 gigawatt with storage you can bring it to almost even 4 gigawatt.
  • The Government of India is earmarking INR37,000 crores for coal gasification, and NTPC is a serious contender; NTPC has done substantial work on it through its R&D and mining sides, and tenders are expected soon.
    Show source
    Coal gasification, I think I did mention that coal gasification is big, I think INR37,000 crores then which is Government of India is earmarking.
  • Coal capacity stood at 66 gigawatts by March 2026 and is planned to rise to 77 gigawatts.
    Show source
    Director (Finance): As far as NTPC is concerned, the coal capacity stood at 66 gigawatts by March 2026.
  • The company has 17 gigawatts of coal capacity in the pipeline, which would take coal capacity to 91 gigawatts under its current planning scenario.
    Show source
    We have a 17 gigawatt in the pipeline, which would at then go reach 91 gigawatts.
  • The company expects to achieve 6 gigawatts of nuclear capacity out of the 30 gigawatts it is discussing.
    Show source
    And nuclear is something which we would have achieved 6 gigawatts out of the 30 gigawatt what we are talking, 6 gigawatts would be achieved.
  • The company is seriously working on smaller thermal units suited to fast starting and stopping, ideally at load-center rather than pithead power plants, which may operate around 300 days or less for non-solar hours; capacity charges will be an issue, while energy charges are expected to be more or less under control.
    Show source
    So, the capacity charges will be an issue, but at the same time, I think the energy charges will be more or less under control because it will be designed to fast start and fast stop on that side.
  • The company said that transmission unavailability was the reason for delay in the 7 gigawatts of renewable capacity, and described the 7 gigawatt target as more than 8 gigawatts with storage.
    Show source
    CMD: But 7 gigawatt -- I explained that 7 gigawatt is more than 8 gigawatts, with the storage.
  • The company said it is not paying for land for the Singrauli expansion because the land was acquired around 50 years back.
    Show source
    In Singrauli when we are going for expansion, the land which was acquired around 50 years back, I'm not paying anything for land.
  • The company has a goal of installing 30 gigawatt of nuclear capacity by 2047, contributing to the nation's 100 gigawatt target.
    Show source
    Beyond this, NTPC is developing a substantial non-solar hour BESS pipeline of 30.4 gigawatt-hours, of which 18.6 gigawatt-hours have already been tendere d. Coming to newer frontiers, steps being undertaken on the nuclear front, we have an ambitious goal of installing 30 gigawatts of nuclear capacity by FY47.
  • Biomass co-firing was being carried out in the NCR region.
    Show source
    Our biomass co-firing has started now gathering steam, and this is being done in the NCR region.
  • The company initiated site studies across multiple locations and, through MOUs with state governments, is identifying suitable land parcels for future nuclear projects.
    Show source
    Page 9of 24 NTPC Limited July 27, 2026 As part of our strategic entry into nuclear energy, NTPC has initiated site studies across multiple locations and, through MOUs with state governments, is identifying suitable land parcels for the development of future nuclear projects.
  • Green hydrogen initiatives include hydrogen fuel cell buses in Leh and Delhi, India's first green hydrogen blending project at Kawas, and a hydrogen-based microgrid at Ladakh.
    Show source
    Flagship initiative has been hydrogen fuel cell buses in Leh and Delhi, India's first green hydrogen blending project at Kawas, and a hydrogen- based microgrid at Ladakh.
  • Mahi Banswara project will use PHWR (Pressurized Heavy Water Reactor) technology.
    Show source
    So our Mahi Banswara is going to be PHWR, which is Pressurized Heavy Water Reactor.
  • The company is working on PWR, fast breeder, and other technologies and studying them.
    Show source
    We are studying on that.
  • The company has completed one nuclear-project study and submitted it.
    Show source
    Already we have completed one study and we have submitted also.
  • The company said continued large-scale integration will happen only if it interlaces with batteries or different storage technologies.
    Show source
    And the current imperative is that any kind of continued large-scale integration will happen only if we interlace with batteries or different storage technologies.
  • CO2 battery is another technology it is going to commission very soon by October-November.
    Show source
    It is another technology what we are going to commission very soon by October-November is the CO2 battery what we just explained.
  • Tehri storage plant is commissioned.
    Show source
    On Tehri, I think this is the storage plant is commissioned.
  • Pipalkoti project is progressing fast, and NTPC's endeavour is to commission it by the end of next financial year; CMD estimated it may slip by another few months because of guidelines requiring further precautions.
    Show source
    So our endeavour is to commission next financial year end, but I think then just maybe you will have to bear that my estimate is that it may slip by another few months because of the some guidelines where then there is a further precautions etcetera has to be used on that side.
  • The company is looking at converting coal into synthetic natural gas (SNG), which is mainly methane, and also at converting it into chemicals.
    Show source
    Let me take half a minute and try to explain that this gas, what we are trying to do is convert the coal into SNG, which is called synthetic natural gas.
  • The company is looking at how to use its gas-based power plants with coal gasification by injecting gas near the coal gasification facility and drawing it at power stations to run them during peak hours.
    Show source
    We can inject gas at the near to our coal gasification and draw the gas at the power stations and run those power stations during the peak hours.
  • The company proposed setting up a battery energy storage system (BESS) co-located with a thermal plant to ameliorate the situation.
    Show source
    The third thing is that we tried to ameliorate the situation by again through an idea which was noted by CMD himself, that you allow us to set up a BESS co-located with the thermal plant.
  • The company advocated storage systems because it will not put its machines at risk from operating at technical minimum, although storage systems will have a cost.
    Show source
    And that is the reason this we had advocated the storage systems.
  • Engineering-cum-Director Projects team is working on whether it can design smaller units suitable for cycling, which can be stopped in the morning and started in the evening.
    Show source
    You would have seen that our engineering-cum -Director Projects team is working on whether we can design some of the smaller units which is suitable for the cycling in the sense that it can be stopped in the morning and start in the evening.
  • CMD said potential for smaller thermal units could be sizable, to the tune of tens of gigawatt.
    Show source
    CMD: In my opinion, there is going to be sizable, again to the tune of let's say tens of gigawatt.
  • The company said it had shared six or seven years earlier that it would set up new plants primarily as brownfield expansion, and said that is what it is doing.
    Show source
    That is what we are doing.
  • The company is working on CO2 capture, compression, utilization, and storage in various thermal power projects. Replaced by a later filing.
    Show source
    NTPC is also working on all four verticals of carbon capture: CO2 capture, compression, utilization, and storage in various thermal power projects as well.

Demand and pricing

  • The company aimed to maintain its market share of around 25% as electricity demand grew.
    Show source
    So, as I explained that there is a huge growth which is happening, and there is no reason that we will be left behind to maintain our market share of around 25%.
  • Peak demand had crossed 270 gigawatt and was projected to reach around 450 plus by financial year 2036.
    Show source
    Peak demand, as all of you know that it has already crossed 270 gigawatt, and as per the projections, I think we will be having around 450 plus by financial year 2036.

Segments

  • Share of the country's electricity generation is 24%, while its share of installed capacity is 17%.
    Show source
    Our share, as CMD sir was saying, in the country's electricity generation is 24% with just 17% of installed capacity.
  • The company may consider putting the unit on a merchant basis, but has not committed to anything; if CEA, the Government of India or the regulator asks NTPC to use a cost-plus approach, NTPC may consider it, otherwise NTPC would be free to choose what to do.
    Show source
    So, I as of now, I'm not committing anything.
  • The company said it is undertaking no plant without a PPA.
    Show source
    There is no plant which we are undertaking which is without PPA.

Deals and partners

  • The company secured PMC contracts for 6.6 gigawatt of solar projects under the International Solar Alliance.
    Show source
    NTPC continues to expand its consultancy footprint, securing PMC contracts for 6.6 gigawatt of solar projects under the International Solar Alliance and training nearly 560 plus participants from 40 countries.

Risks, rules and outside factors

Risks and disputes

  • The company may need to secure its assets and returns if the technical minimum is redrawn, and says it will protect its financial interest and returns on investment when required to operate thermal plants in ways that stress the plants.
    Show source
    So we are the custodian of the investors, we will say that, okay, the situation in the country demands that I run my thermal plant in a certain way, even creating some kind of a stress, internal stress to the plant, then I have to protect my financial interest.

Outside factors

  • The company has observed curtailment caused by a constraint on the transmission side.
    Show source
    What I was explaining that there has been some kind of constraint which is more on the transmission side which has come, and there is a curtailment which has been observed.

Rules and policy

  • Coal-based plants can operate at a technical minimum of 55%; NTPC worked with the regulator, which considered that if operation is below 55%, NTPC may stop the unit and restart it after about a day.
    Show source
    If it is less than 55%, now we have worked with the regulator and thankful to the regulator that they have considered that if it is less than 55%, we will stop the unit.
  • The company worked with the regulator and the ministry on a policy allowing battery storage to become part of a thermal plant, so energy can be stored during the daytime and fed into the grid in the evening.
    Show source
    This is what has been done, and this is the first time, and you must appreciate that NTPC had worked with the regulator and the ministry to come out with this policy that it will become the part of the thermal plant itself.
  • The company advocated that if it is asked to operate below technical minimum, its obligation to supply power during the evening will not remain.
    Show source
    The first thing we did is we impressed upon, we did a policy advocacy that if you are asking us to operate below a technical minimum, okay, then my obligation to supply during the evening will not remain.
  • The company is advocating a uniform technical minimum across the country, rather than a selective one.
    Show source
    The second thing we are doing is we are advocating a uniform technical minimum across the country, not selective.
Show 1 more statement

Rules and policy

  • The company is advocating that regulators have states draw on cheaper power available anywhere in the country rather than have a sister company sell costlier power when cheaper power is available.
    Show source
    So we are pushing the forum of regulator that you take it up with the respective state that if a cheaper power is available anywhere in the country, that should be drawn upon, not a sister company should not be selling to a sister company a costlier power if a cheaper power is available.

Everything else said on the call

What management stressed

  • The company said that if curtailment is required for one or two hours, curtailing renewable generation is preferable to stopping thermal units.
    Show source
    Having said that, there is another phenomenon you should not be getting surprised that if it has to be curtailed for one hour or two hours, it is better to curtail the renewable rather than stopping the thermal units.
  • The company curtails renewable generation rather than stopping thermal plants for one or two hours, because stopping thermal plants would leave the company without power in the evening.
    Show source
    Page 18of 24 NTPC Limited July 27, 2026 So if it is about an one hour or two hours, it is better to curtail the renewable rather than stopping the thermal plant because in the evening you will be left without power.
  • The company is watching renewable round-the-clock (RE RTC) as a pragmatic solution to reduce grid ups and downs.
    Show source
    So, RE RTC is the solution which can be implemented in a pragmatic way so that this ups and downs can be reduced.
  • Endeavour is to try to avoid backing down its supercritical units and, if they are backed down, to keep them operating in the supercritical range so that the efficiency impact is minimal.
    Show source
    And if it is backed down, it is backed down to a situation where it remains in the supercritical so that the efficiency impact is minimal.
  • The company aims for coal-based plants to run at base load, with the remaining grid requirements managed by storage and other elements, including pump storage and batteries using lithium, vanadium, sodium or carbon dioxide.
    Show source
    Participant: So, in that kind of a scenario will we go back to ordering more of 220… CMD: No, no. We will try to see that this battery storage or the pump storage etcetera, once these are coming so that the requirement of the coal-based -- the ideal situation is that your coal-based plants whatever capacity that is running at base load, and rest of the things are being managed through the not hydro alone, but the other kind of elements in the grid, whether it is battery in the form of pump storage, battery itself, whether it's lithium, whether it's vanadium, whether it's sodium, or the carbon dioxide what we are seeing.
  • The company said that increasing load during daytime by reducing the cost of power to the consumer, and increasing load during non-solar hours, would encourage people to consume less.
    Show source
    The best part is that during the daytime you increase the load by reducing the cost of power to the consumer and during the non-solar hours you start increasing, so that the people will start consuming less.
Show 7 more statements

What management stressed

  • The company said it wants healthy returns on its investment while keeping prices under control and completely transparent. Replaced by a later filing.
    Show source
    And we want to have the healthy returns on our investment, but at the same time we want to keep the prices under control and that too also very kind of completely transparent.

Group structure

  • The company and Mahagenco acquired Sinnar thermal power station, which has 1,350 megawatt capacity; NTPC is making best efforts to commission one unit in this calendar year and then one after the other.
    Show source
    We have acquired, along with Mahagenco, Sinnar thermal power station, which is 1,350 megawatt, and we are putting best efforts to commission one unit in this calendar year and then one after the other.
  • NPUNL is NTPC's newly formed 100% subsidiary dedicated to harnessing advanced nuclear technologies.
    Show source
    The other initiative is NPUNL, our newly formed 100% subsidiary is dedicated to harnessing advanced nuclear technologies.
  • The company transferred all its mines to NTPC Mining Limited (NML).
    Show source
    Coal production, which is very, very important part --as you know that we have transferred all mines now to NML, which is NTPC Mining Limited.
  • The company carved out NTPC Mining Limited as a separate company.
    Show source
    And we have now carved it out as a separate company, as you all know, this is the NTPC Mining Limited.
  • The company transferred all its existing assets to NTPC Mining Limited.
    Show source
    All the assets, existing assets in NTPC have been transferred.
  • The company is exploring formation of JVs with key players in the nuclear value chain. Replaced by a later filing.
    Show source
    We are also exploring formation of JVs with key players in the nuclear value chain.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

This transcript does not separate questions and answers, so they are not listed here.

Questions about this call

When was the NTPC Q1 FY27 earnings call transcript filed?
NTPC filed the transcript with the exchange on 2 Aug 2026. This page is built from that transcript.
What does this page list?
130 statements from the transcript across 12 topics, 85 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
No. This transcript does not separate the questions from the answers, so they are not listed. The statements by topic still cover what management said.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
NTPC Q1 FY27 concall: NTPC intends to raise coal production to a level where it can meet around 25% in the next 3 to 4 years · DalalOS