Oil India Q1 FY26 earnings call: Oil India set a target of 3.70 MMT for oil and 3.65 for gas for '25-'26

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

The company set a target of 3.70 MMT for oil and 3.65 for gas for '25-'26. The company expects the downstream side expansion of Numaligarh Refinery to be commissioned in December 2025 in a phased manner. The company sustained oil and gas production from its mature fields in Northeast at 1.680 million metric ton oil and gas equivalent in Q1 FY '26, compared with 1.689 million metric ton of oil equivalent in the previous quarter of '25. Strategic investment in Indian Oil Corporation generated substantial other comprehensive income as the share price increased around INR1,400 crores; Oil India holds 7.284 million equity shares of INR10 each.

The numbers management gave

Results

  • The company sustained oil and gas production from its mature fields in Northeast at 1.680 million metric ton oil and gas equivalent in Q1 FY '26, compared with 1.689 million metric ton of oil equivalent in the previous quarter of '25.
    Show source
    In production front, we are continuing in growth story during the quarter, OIL has pursued its efforts towards ensuring national energy security by sustaining oil and gas production from its mature fields in Northeast at 1.680 million metric ton oil and gas equivalent for the current quarter as compared to 1.689 million metric ton of oil equivalent in the previous quarter of '25.
  • The company produced 0.85 million metric tons of crude oil in Q1 FY '26, down 2% year-to-year and up 1.07% quarter-to-quarter.
    Show source
    There has been a marginal decrease of 2% on year-to-year, but we have been achieving 1.07% on quarter-to-quarter basis increase in production of crude oil.
  • The company produced 0.83 bcm of natural gas in Q1 FY '26, up 2.61% quarter-to-quarter and 1.1% year-to-year.
    Show source
    On quarter-to-quarter, it has increased by 2.61%, and on a year-to-year, it is 1.1%.
  • Average crude oil realization in Q1 FY '26 decreased around 22% year-to-year.
    Show source
    The average crude oil realization, there was a slight decline during the quarter, which has decreased around 22% as compared to year-to-year basis.
  • Crude oil realization was $66.2 per barrel in Q1 FY '26, compared with $84.89 per barrel.
    Show source
    In the current quarter, we had a realization of $66.2 per barrel as compared to $84.89 per barrel.
  • Natural gas price stood at 6.72 MMBTU in Q1 FY '26, aligned with the regulatory benchmark guided by the Government of India.
    Show source
    The natural gas price stood at 6.72 MMBTU, aligned with the regulatory benchmark has been guided by the Government of India.
Show 33 more statements

Results

  • Stand-alone revenue was INR5,012 crores in Q1 FY '26, compared with INR5,839 crores in the previous year.
    Show source
    Our stand-alone revenue has -- we have registered a stand- alone revenue during the quarter of INR5,012 crores as compared to INR5,839 crores in the previous year.
  • Total income was INR5,188 crores in Q1 FY '26, compared with INR6,001 crores in the first quarter of the previous year.
    Show source
    We have a marginal other income, but our total income during the year was INR5,188 crores as compared to INR6,001 crores in the previous year of the first quarter.
  • PBT was INR1,097 crores in Q1 FY '26, compared with INR1,974 crores in the previous year; PAT was lower because of the sharp decline in crude oil prices.
    Show source
    Our PBT for the current quarter is INR1,097 crores as compared to INR1,974 crores in the previous quarter -- in the previous year, and our PAT has gone down because of the sharp decline in the price of crude oil.
  • Bottom line was INR813 crores in Q1 FY '26, compared with INR1,467 crores in the previous year.
    Show source
    We have registered the bottom line of INR813 crores as compared to INR1,467 crores in the previous year.
  • Earnings per share was INR5 in Q1 FY '26, down INR4 because of lower PAT.
    Show source
    We have earnings per share of INR5 in the current quarter.
  • EBITDA margin fell from 43% to 34% in Q1 FY '26 because of lower revenue and a small increase in operating expenses for provisions against well assets.
    Show source
    Page 3 of 17 Oil India Limited August 13, 2025 The EBITDA margin has gone down from 43% to 34% in the quarter because of lower revenue and small increase in our operating expenses for providing provisions against our well assets.
  • The company provided INR307 crores in its two Bangladesh blocks in Q1 FY '26.
    Show source
    Two major things which has happened in the current year is that we have provided of INR307 crores in our two Bangladesh block, which we have decided to increase in this quarter.
  • The company provided INR207 crores for its Gabon block in Q1 FY '26 because it was nonperforming as per the plan.
    Show source
    Another provision, which is having made of our another overseas joint venture is Gabon block, which is we have provided of INR207 crores because of nonperforming as per the plan.
  • Material subsidiary had revenue of INR6,208 crores in Q1 FY '26.
    Show source
    But the revenue of our material subsidiary is INR6,208 crores during this quarter.
  • Material subsidiary refinery operated at 106% capacity in Q1 FY '26.
    Show source
    The refinery has been operating at a capacity of 106%.
  • Material subsidiary had crude throughput of 799 TMT in Q1 FY '26, compared with 764 TMT in the previous financial year.
    Show source
    We had a crude throughput of 799 TMT as compared to 764 TMT in the previous financial year.
  • Consolidated PAT was around INR2,047 crores in Q1 FY '26 despite a dip in stand-alone PAT, with contributions from its material subsidiary and foreign subsidiary for its Russian investment.
    Show source
    The consolidated performance of the company -- the company has sustained a consolidated PAT of around INR2,047 crores in spite of dip in PAT in the stand-alone profit.
  • Actual achievement for '24, '25 was 3.458 for oil and 3.252 for gas.
    Show source
    Abhijit Majumder: So our actual achievement for '24, '25 has been 3.458 for oil and 3.341 for gas -- 3.252 for gas.
  • Shutdowns by BPCL -- VCPL for more than 20 days, BVFCL, and maintenance at APL, as well as Numaligarh taking less gas, affected Oil India Limited's production; these customers have now started taking gas.
    Show source
    So these are affecting our production, sir.
  • The company takes about INR400 crores of provisions annually on average; in the current quarter, Bangladesh accounted for INR285 crores and the other provisions were regular, not operational hiccups.
    Show source
    Abhijit Majumder: On average, we take about INR400 crores of provision annually.
  • Production is 3.2, and it supplies the entire gas to various customers located in the Northeast.
    Show source
    See, we are presently -- our production is 3.2, and we are supplying the entire gas to the various customers located in the Northeast.
  • Non-upliftment of gas is affecting Oil India Limited's production; production will ramp up once IGGL connectivity is built up and DNPL gets permission.
    Show source
    This shutdown of non-upliftment of gas is affecting our production.
  • The company made provisions for two wells, Mechaki and Bhojo.
    Show source
    These are the two wells in respect of which we made provisions.
  • The company said studies on the Mechaki and Bhojo wells were ongoing and that it might reverse the provisions if better results emerge; the decision had yet to be taken.
    Show source
    And if we get to see some better results in the days ahead, possibly we might take a different call and reverse it.
  • LPG plant was supposed to shut down for a month before. Replaced by a later filing.
    Show source
    Abhijit Das: I think the LPG plant was suppose to shut down for a month before.

Money and capital

  • Strategic investment in Indian Oil Corporation generated substantial other comprehensive income as the share price increased around INR1,400 crores; Oil India holds 7.284 million equity shares of INR10 each.
    Show source
    The share price has increased around INR1,400 crores or we are having 7.284 million equity shares of INR10 each but we have a very strong other comprehensive income, and it has increased as compared to the previous year.
  • The company planned capex expenditure of INR6,995 crores, or INR7,000 crores, for '25-'26.
    Show source
    For '25-'26, we have planned INR6,995 crores or you can say INR7,000 crores.
  • The company spent around INR1,100 crores on exploration and development, around INR900 crores on capital equipment and facilities, and INR250 crores on survey expenditure during the quarter ended in Q1 FY '26; E&D activities totaled around INR2,300 crores.
    Show source
    If we take this expenditure for our E&D activities, it is around INR2,300 crores.
  • The company spent around INR300 crores on overseas investment, mainly in G&P activity and drilling, during the quarter ended in Q1 FY '26.
    Show source
    After considering this, if we think of some overseas investment, also we have spend around INR300 crores majorly in G&P activity and drilling.
  • NRL investment would be INR7,300 crores in '26-'27.
    Show source
    Other than that, we have also contributed around INR550 crores for our investment in NRL, the final call amount which we have been due for payment.
  • The company had capex expenditure of INR3,350 crores for the current financial year against a target of around INR7,000 crores.
    Show source
    So for this quarter, if you can sum up, you can find it is INR3,350 crores for the current financial year as targeted around INR7,000 crores.
  • Numaligarh Refinery's capital expenditure target for the current year is around INR9,133 crores, largely for its current refinery expansion plan and the petrochemical unit that will be coming up.
    Show source
    Saket Garodia: With regard to Numaligarh Refinery, the capital expenditure target for the current year is around INR9,133 crores, which is largely on account of the expenditure to be made in its current refinery expansion plan and the petrochemical unit that will be coming up.
  • The company is planning capex of INR9,100-odd crores in the current year and around INR7,300-odd crores in the next year.
    Show source
    So current year, we are Page 5 of 17 Oil India Limited August 13, 2025 planning a capex of INR9,100-odd crores.
  • The company confirmed that its FY '26 capex guidance is INR6,995 crores.
    Show source
    Abhijit Majumder: Yes, that's the right number.
  • Material subsidiary would invest about INR9,100 crores in '25-'26, while Oil India Limited as parent would invest INR6,995 crores in '25-'26.
    Show source
    However, we have a material subsidiary who would be investing about INR9,100 crores for '25-'26.
  • The company would invest INR7,585 crores in '26-'27, covering the various heads under which the investments will be made.
    Show source
    So as far as '26-'27 is concerned, OIL would be investing INR7,585 crores, covering the various heads under which the investments will be made, and NRL...
  • Total investment would be INR14,000-plus crores in '26-'27.
    Show source
    So total would be INR14,000-plus crores for '26-'27.
  • The company has earmarked INR25,000 crores to achieve its net zero target by the year 2040.
    Show source
    Abhijit Majumder: See, yes, we have earmarked a sum of INR25,000 crores to kind of achieve our net zero target by the year 2040.

What it expects ahead

What management expects

  • The company set a target of 3.70 MMT for oil and 3.65 for gas for '25-'26.
    Show source
    I mean 3.65 for gas.
  • Oil's target for '27 is 3.95 MMT for crude oil and 4.31 for natural gas.
    Show source
    Abhijit Majumder: '27 is 3.95, that's crude oil, MMT.
  • Crude oil price outlook was 65 to 70, compared with a current level of around 66, 67, and it did not expect a major increase; its result was largely due to a 22% drop in crude oil price versus quarter 1 of '24, '25.
    Show source
    If that happens, that will be very good for us because the result that you have seen this time is largely because of a 22% drop in crude oil price vis-à-vis quarter 1 of '24, '25.
  • The company said city gas distribution networks in the Northeast might not come up before '28; if permitted to supply gas to NRL or other producers in the immediate term, it might fetch the premium provided for in the notification.
    Show source
    If that is granted, maybe we will be able to fetch the premium that the notification provides for.
  • The feeder line's objective is to achieve a target of supplying roughly 8 to 9 MMSCMD of gas in the whole of Northeast.
    Show source
    However, feeder line, the objective is to finally achieve our target of supplying roughly 8 to 9 MMSCMD of gas in the whole of Northeast.
  • The company said DNPL line completion will resolve the gas-output constraints associated with maintenance shutdowns and provide connectivity with IGGL.
    Show source
    And regarding your question that once the DNPL line is completed, then this type of problem will be resolved and they got the connectivity with IGGL.

What it is building and selling

Projects and capacity

  • The company expects the downstream side expansion of Numaligarh Refinery to be commissioned in December 2025 in a phased manner.
    Show source
    We are expecting to get it commissioned in the month of December 2025.
  • The company discovered hydrocarbons in the Namrup-Borhat OALP block in Upper Assam during Q1 FY '26.
    Show source
    We have a good news during the quarter that during the quarter, OIL has discovered a hydrocarbon discovery in Namrup-Borhat OALP block, which is in Upper Assam.
  • The company commenced natural gas production from its Bakhritibba Discovered Small Field in the district of Jaisalmer, Rajasthan, during Q1 FY '26.
    Show source
    And we have also commenced natural gas production from our Bakhritibba Discovered Small Field in Rajasthan in the district of Jaisalmer.
  • The company plans to drill 15 wells in the Barekuri area to support Mission 4 plus production ramp-up.
    Show source
    We are planning 15 wells to drill in this area, which will give that Mission 4 plus production ramp-up.
  • The company is in the process of setting up about 25 CBG plants across different states in India and has signed MOUs and other agreements with a few states.
    Show source
    We are in the process of setting up about 25 CBG plants across different states in India.
  • The company is going to set up nearly 1.9 gigawatt of solar energy, mostly in Assam and Rajasthan.
    Show source
    Additionally, we are going to set up nearly 1.9 gigawatt of solar energy, mostly in two states, one of which is in the Northeast, Assam, and the other one is Rajasthan.
Show 29 more statements

Projects and capacity

  • The company is aiming for 645 megawatts of solar in Assam, 1 gigawatt in Rajasthan and 200 megawatts of green energy projects in Rajasthan.
    Show source
    Regarding the solar projects, as already -- sir has already told, so we are aiming 645 megawatts in Assam, and 1 gigawatt in state of Rajasthan and 200 megawatts green energy projects in Rajasthan.
  • The company is establishing a 1-megawatt capacity green hydrogen plant in Baddi, Himachal Pradesh; the EPC contract has been awarded and work is in progress.
    Show source
    And as far as Himachal Pradesh is concerned, we are already establishing a 1-megawatt capacity of green hydrogen plant in a place called Baddi in Himachal Pradesh.
  • The company is discussing a 150-megawatt solar project with the Himachal Pradesh government team.
    Show source
    And as far as the 150- megawatt solar project is concerned, we are discussing with the Himachal Pradesh government team.
  • A bioethanol plant is coming up in the Northeast and is going to be inaugurated on 8th of September; it is meant for mixing bioethanol with HS and MSD.
    Show source
    That is going to be coming, I mean, inaugurated on 8th of September.
  • DNPL's capacity is being enhanced from 1 to 2.
    Show source
    DNPL is now being -- capacity is now being enhanced from 1 to 2.
  • The gas capacity would be 4 plus after DNPL's capacity enhancement from 1 to 2, and 4 bcm of gas would be supplied to customers in the Northeast without the feeder line having to come immediately.
    Show source
    So whatever we are saying that 4 bcm of gas would be supplied to customers in the Northeast, for which I do not really think that the feeder line has to come immediately.
  • The feeder line would raise gas capacity to maybe 7 plus and evacuate a larger quantity of gas than 5.
    Show source
    Feeder line would make it -- would make the capacity rise to maybe 7 plus because feeder line is a parallel line, and that would kind of evacuate much larger quantity of gas than the 5.
  • Own network within the fields between various wells, together with the DNPL line, would make capacity comfortably 5 plus without a feeder line.
    Show source
    For 5, we need some network within the fields between the various wells which is OIL's own network -- which would be OIL's own network, plus the DNPL line would make it comfortably 5 plus for which we don't need a feeder line.
  • DNPL is transporting 1 million gas, and its revamped line's capacity will ramp up to 2.5 million.
    Show source
    Dilip Goswami: Presently, DNPL line is transporting 1 million gas and they have revamped that line and that capacity will ramp up to 2.5 million.
  • The IGGL feeder line is a parallel line up to Duliajan, in addition to the 2.5 MMSCMD capacity.
    Show source
    That is the IGGL feeder line up to Duliajan.
  • The IGGL feeder line has been projected to MOPNG, and the line will be laid once approved, with a target of March '27.
    Show source
    Our target is March '27.
  • The pipeline is ready up to Numaligarh; the distance from Numaligarh to Oil India Limited's Duliajan oilfield is around 165- plus kilometers, and the Duliajan oilfield will be connected once permission is given by Ministry.
    Show source
    Once that permission is given by Ministry, then that Duliajan oil field will be connected, Oil India field will be connected.
  • NRL's capacity is being enhanced from 3 to 9, and its gas offtake would also go up.
    Show source
    Now the capacity is being enhanced from 3 to 9.
  • Wholly owned subsidiary, Oil Green Energy Limited, will set up the solar energy plants in Assam and Rajasthan.
    Show source
    In these two states, we will be setting up solar -- I mean, solar energy plants, and this will actually be done by our wholly owned subsidiary, Oil Green Energy Limited.
  • The first phase of the IGGL network had been commissioned, but Oil India Limited was unable to inject gas into the system because the upper end was not yet connected.
    Show source
    Upper end is not connected yet, we are unable to kind of inject gas into the system so that it can flow to Numaligarh and beyond.
  • The compressor station at Baihata near Guwahati had been commissioned; management said the remaining hurdle was the upstream connection.
    Show source
    Dilip Goswami: That compressor station already commissioned at Baihata near Guwahati.
  • Any surplus gas would be supplied through the IGGL network to Mainline India.
    Show source
    And the surplus, if any, that would be supplied through the IGGL network to Mainline India.
  • The expanded capacity of DNPL is pending common carrier approval.
    Show source
    So the expanded capacity of DNPL is what is pending for common carrier approval.
  • DNPL can be connected to IGGL if it gets PNGRB clearance, common carrier clearance.
    Show source
    And this can be connected to IGGL if they got the PNGRB clearance, common carrier clearance.
  • IGGL's upper-end connectivity will be available once the line is laid and permission is obtained.
    Show source
    Dilip Goswami: Once it can -- laid the line, get the permission, then only that upper end connectivity will be there.
  • Refinery is expected to be commissioned by end of this year. Replaced by a later filing.
    Show source
    Refinery is going to be commissioned by end of this year.

Demand and pricing

  • Once the Northeast is connected to Mainland India, CGDs can buy gas on IGX, and Oil India Limited would get a different price for the quantity of gas CGDs offtake, based on individual agreements between CGD buyers and suppliers and not dependent on the nomination price or premium gas.
    Show source
    And for that quantity of the gas, which the CGDs would offtake, I would certainly get a different price.
  • For gas sold to customers in other parts of the country, Oil India Limited will get the price at which gas is traded on IGX, irrespective of whether the gas is produced from nomination.
    Show source
    It is only IGX.
  • The company receives a different, higher price for gas produced from its Dirok field, and pricing for DSF fields and fields to be monetized is not dependent on the price in the notification.
    Show source
    That's a higher price.

Segments

  • The company can sell gas to customers elsewhere, including CGDs in other parts of the country, only after meeting the entire requirement of CGDs in the Northeast; any swapping depends on surplus after meeting the requirements of Northeast customers, including CGDs.
    Show source
    So swapping, whether it will happen or not, that would depend entirely on the surplus that I'm generating after meeting the requirements of the customers in the Northeast, including the CGDs.
  • The company can sell gas to customers, including customers outside the Northeast, but its only limitation is that it will not get the premium.
    Show source
    Apart from that, anything -- any gas that I am producing, I can sell it to customers, not just within Northeast, I can sell it to customers elsewhere also.

Deals and partners

  • The company has made a request to the ministry to sell gas to NRL, a steady customer and material subsidiary.
    Show source
    Abhijit Majumder: See, we have made a request to the ministry to let us sell gas to NRL because NRL is a steady customer, not just a customer, there are material ssubsidiary.
  • The company is requesting permission to supply gas to the refinery at the premium until the CGDs come up.
    Show source
    So let us allow -- let us be permitted to supply gas to the refinery at the premium.
  • The company is requesting the government to allow it to supply gas to the refinery until the CGDs come up.
    Show source
    But now the refinery is over in the least, we are requesting the government to let us allow supply to the refinery till the CGDs come up.

Risks, rules and outside factors

Outside factors

  • Upstream operations would have no impact from U.S. tariffs because its production is all internally consumed and it does not export anything.
    Show source
    Abhijit Majumder: As far as the impact of U.S. tariffs on oil's operations, I mean, the upstream operations are concerned, let me clarify that there would be no impact at all because ours is all internally consumed.

Rules and policy

  • The company requested ministry permission to let NRL lift its gas and provide marketing freedom, saying it had roughly 140 bcm of gas reserves and was ready to supply gas, but needed a network and a sector to supply.
    Show source
    However, we have made a request to the ministry to let us allow the gas to be lifted by NRL, give us that marketing freedom so that -- see, we are sitting on a reserve of roughly 140 bcm of gas.
  • PNGRB notifies two gas prices: the nomination price and the price other than nomination price. Replaced by a later filing.
    Show source
    One is the nomination price, other is the -- other than nomination price.

Everything else said on the call

Group structure

  • The company and OVL decided to quit the Bangladesh project after Petrobangla invoked a performance bank guarantee of roughly INR285 crores in the previous year; Oil India Limited charged the amount as expenses in the current year.
    Show source
    So this INR285 crores roughly, which the amount was invoked in the previous year, and this was charged as expenses in the current year.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Vivekanand: My first question is on the production outlook and guidance for FY '26 and '27. Could you refresh us on that? And that's my first question. The second question is on the capex that you have been guiding for FY '26 and '27, if you can give us the number as well as the split across key projects like contribution to NRL and also the upstream operations and other areas like CBG?

    Answer, dilip goswami

    Dilip Goswami: Yes, sir. Regarding first question, our incremental oil and gas columns were largely driven by a few high-performing domestic fields like Baghjan. Baghjan field is continuing delivering strong Page 4 of 17 Oil India Limited August 13, 2025 volumes supported by expanded gas infrastructure. Barekuri has emerged as a key contributor. We are planning 15 wells to drill in this area, which will give that Mission 4 plus production ramp-up. Kumchai, we developed that network delivery line and Kumchai also taking a step up for this -- after pipeline connectivity, Kumchai production is also ramping up. Vivekanand: Would you be able to help us with some quantitative guidance on FY '26 and '27?

    Answer, abhijit majumder

    Abhijit Majumder: So our actual achievement for '24, '25 has been 3.458 for oil and 3.341 for gas -- 3.252 for gas. Now for '25-'26, we have set a target of 3.70 MMT for oil and 3.40 for gas. I mean 3.65 for gas. Does that answer your query or you want data for '26, '27 as well? Vivekanand: Yes, yes. The latter would be helpful, '27 also would be great?

    Answer, abhijit majumder

    Abhijit Majumder: '27 is 3.95, that's crude oil, MMT. And natural gas would be 4.31. Vivekanand: All right, sir. This is very helpful. If you could just address my second question, that would be great.

    Answer, abhijit das

    Abhijit Das: In the previous year, as you have all known that there was an increase in our capex expenditure by about 123% as planned. For '25-'26, we have planned INR6,995 crores or you can say INR7,000 crores.

    Answer, abhijit das

    Abhijit Das: And during this quarter ended, what we have achieved for our capex expenditure. For exploration and development, we have already spent around INR1,100 crores. For our capital equipment and facilities, it is around INR900 crores. For our survey expenditure, it is INR250 crores. If we take this expenditure for our E&D activities, it is around INR2,300 crores. After considering this, if we think of some overseas investment, also we have spend around INR300 crores majorly in G&P activity and drilling. Other than that, we have also contributed around INR550 crores for our investment in NRL, the final call amount which we have been due for payment.

    Answer, abhijit das

    So for this quarter, if you can sum up, you can find it is INR3,350 crores for the current financial year as targeted around INR7,000 crores.

    Answer, abhijit majumder

    Abhijit Majumder: So would you like to -- Saket, another part of the capex? Saket Garodia: With regard to Numaligarh Refinery, the capital expenditure target for the current year is around INR9,133 crores, which is largely on account of the expenditure to be made in its current refinery expansion plan and the petrochemical unit that will be coming up. So current year, we are Page 5 of 17 Oil India Limited August 13, 2025 planning a capex of INR9,100-odd crores. And in the next year, the capex will be around INR7,300-odd crores.

  2. Question

    Probal Sen: The second question, sir, was with respect to capex. I did not get the audio completely. I just wanted to clarify that the FY '26 guidance mentioned was INR6,995 crores. Just wanted a clarity on that. Is that the correct number?

    Answer, abhijit majumder

    Abhijit Majumder: Yes, that's the right number. Yes, correct.

  3. Question

    Probal Sen: Got it, sir. One last question, if I can squeeze in on NRL, you already mentioned the capex plan. Can we also get a sense of the operational progress of the expansion in terms of physical progress, time line for the completion? Page 6 of 17 Oil India Limited August 13, 2025 Management: With regard to the physical performance, the company has achieved almost 106% utilization in the capacity utilization in the first quarter with nearly 799 TMT of throughput. And for the rest of the year, we expect to overshoot the capacity utilization of 100% again this year. So we'll be -- we are targeting for crude throughput of more than 3 MMT in this year. And with regard to refinery expansion,

    Answer, abhijit majumder

    Abhijit Majumder: As far as the impact of U.S. tariffs on oil's operations, I mean, the upstream operations are concerned, let me clarify that there would be no impact at all because ours is all internally consumed. We are not -- we don't export anything anywhere. So we are a hydrocarbon deficient country. Hence, everything will be internally consumed. So we don't have any apprehension as far as U.S. tariff is concerned. So with respect to capex for '26, '27, that's what you wanted to know?

  4. Question

    Karen Kwan: Yes, because I heard for the first one, FY '25, '26 is INR9,133 crores from the previous question. And then I heard INR7,300 crores for fiscal year '26, '27. Is that INR7,300 crores number correct? If not, what's the number?

    Answer, abhijit majumder

    Abhijit Majumder: No, your numbers are correct. However, we have a material subsidiary who would be investing about INR9,100 crores for '25-'26. And OIL as parent would be investing INR6,995 crores. These are all investment numbers for '25-'26. As far as '26-'27 is concerned -- sorry?

  5. Question

    Karen Kwan: Please go ahead.

    Answer, abhijit majumder

    Abhijit Majumder: Okay. So as far as '26-'27 is concerned, OIL would be investing INR7,585 crores, covering the various heads under which the investments will be made, and NRL... Abhijit Das: INR7,300 crores. Page 7 of 17 Oil India Limited August 13, 2025 Abhijit Majumder: And NRL investment would be INR7,300 crores.

    Answer, abhijit majumder

    So total would be INR14,000-plus crores for '26-'27.

  6. Question

    Karen Kwan: And can you just quickly comment on the ESG side?

    Answer, abhijit majumder

    Abhijit Majumder: See, yes, we have earmarked a sum of INR25,000 crores to kind of achieve our net zero target by the year 2040. So investments will be made in different segments, starting from solar, wind energy. We are also into CBG, which is the compressed biogas produced from -- I mean, mostly municipal solid waste. So these are some of the projects. We are in the process of setting up about 25 CBG plants across different states in India. We have already tied up with a few states, already the MOUs and other agreements have already been signed. Additionally, we are going to set up nearly 1.9 gigawatt of solar energy, mostly in two states, one of which is in the Northeast, Assam, and the other one is Rajasthan.

    Answer, abhijit majumder

    In these two states, we will be setting up solar -- I mean, solar energy plants, and this will actually be done by our wholly owned subsidiary, Oil Green Energy Limited. Dilip Goswami: And one more, sir, 150-megawatt solar plant at Himachal Pradesh. Karen Kwan: So for the 1.9 gigawatt solar in the North Eastern Rajasthan, what is the rough time line we expect it can be up and running? And lastly, we're not doing the hydrogen cell e-buses anymore, right?

  7. Question

    Karen Kwan: March '26, very fast. Okay.

    Answer, abhijit das

    Abhijit Das: March '26. Regarding the solar projects, as already -- sir has already told, so we are aiming 645 megawatts in Assam, and 1 gigawatt in state of Rajasthan and 200 megawatts green energy projects in Rajasthan. And as far as Himachal Pradesh is concerned, we are already establishing a 1-megawatt capacity of green hydrogen plant in a place called Baddi in Himachal Pradesh. EPC contract has been awarded and the work is in progress right now. And as far as the 150- megawatt solar project is concerned, we are discussing with the Himachal Pradesh government team. These discussions are going on. Hopefully, this will come up.

    Answer, abhijit majumder

    Abhijit Majumder: Yes. Just before we close, there's a bioethanol plant coming up in the Northeast. So that is going to be commissioned very soon. The date actually has already been finalized. That is going to be coming, I mean, inaugurated on 8th of September. That's a bioethanol plant, which is meant for mixing of bioethanol with HS and MSD.

  8. Question

    Somaiah V: Got it. Sir, also on the upstream part, in the quarter gone by, were there any shutdown by customers that impacted our production? And also for this quarter, are we seeing any shutdown- related impact to production?

    Answer, dilip goswami

    Dilip Goswami: Yes, sir. This shutdown of non-upliftment of gas is affecting our production. We are setting our wells frequently. So once it is that connection, IGGL connectivity is -- build up and DNPL also get that permission, and it will be -- that production will ramp up.

  9. Question

    Somaiah V: Yes, sir. I was just trying to understand whether the last quarter, whether any fertilizer or any other industry, there was a shutdown that led to marginal decline. So just want to understand that?

    Answer, dilip goswami

    Dilip Goswami: Yes, sir, that shutdown is one is that BPCL -- VCPL, they have shut down for more than 20 days. Then BVFCL also have shut down. Numaligarh also, some amount they have taken less. So all these are APL, they are taking maintenance up. So these are affecting our production, sir. Now these are now started taking gas.

    Answer, abhijit das

    Abhijit Das: I think the LPG plant was suppose to shut down for a month before.

  10. Question

    Somaiah V: Other part is your other expense, if you -- the breakup that you give as part of the...

    Answer, abhijit majumder

    Abhijit Majumder: Everything is [inaudible 0:0:34:57] only. However, what exactly -- see, Bangladesh was actually -- it is flowing from the previous year. Bangladesh, we had our performance bank guarantee invoked by Petrobangla, which is the equivalent of DGH in Bangladesh. So with respect to some MWP, our BG was invoked. However, both the companies, as you know that we are in partnership with OVL. So both of us decided to quit from that particular project. So this INR285 crores roughly, which the amount was invoked in the previous year, and this was charged as expenses in the current year.

    Answer, abhijit majumder

    This has got nothing to do with the current year as such. It is just flowing from the previous year. And there were a few other wells, which is a regular kind of a thing in an E&P business. We have full provisions with respect to a few wells. There were basically two wells. One is Mechaki and the other is Bhojo. These are the two wells in respect of which we made provisions.

    Answer, abhijit majumder

    However, studies are going on. And if we get to see some better results in the days ahead, possibly we might take a different call and reverse it. That decision is yet to be taken. These are broadly the provisions that we have taken in our books in the current quarter.

Show 10 more questions
  1. Question

    Somaiah V: Got it, sir. Sir, I was just looking at this -- the total other expense breakup of the INR1,700 crores, so where you have your contract cost expiration...

    Answer, abhijit majumder

    Abhijit Majumder: On average, we take about INR400 crores of provision annually. But this time, because of Bangladesh, which by itself took away INR285 crores, that -- apart from that, others are regular provisions. There are nothing -- I mean, these are not operational hiccups. These are normal provisions, which any E&P company would take, and we have also taken.

    Answer, abhijit majumder

    Abhijit Majumder: I mean it's a very difficult question. See, crude price, nobody can predict. And as conservative entities, we also cannot make a real prediction about a major increase in the crude oil price in the days ahead. So our outlook would be at best, maybe 65 to 70. We are currently hovering at around 66, 67. So we don't expect a major increase in the crude oil price in the days ahead. If that happens, that will be very good for us because the result that you have seen this time is largely because of a 22% drop in crude oil price vis-à-vis quarter 1 of '24, '25.

  2. Question

    Achal Shah: Understood, sir. Sir, any update on the time line for invoicing the gas as new well gas?

    Answer, abhijit majumder

    Abhijit Majumder: See, as far as new well gas is concerned, the notification says that it has to be supplied to the city gas distribution, which is on top of the list. There are other sectors as well, but CGDs have to be provided -- have to get the preference first. Since CGDs are yet to come up in the Northeast, we are facing that problem. However, we have made a request to the ministry to let us allow the gas to be lifted by NRL, give us that marketing freedom so that -- see, we are sitting on a reserve of roughly 140 bcm of gas. So as far as supplying gas is concerned, we are ready. But then we have to have the network there and also the sector to which the gas can be supplied. Now if CGDs have to be supplied, then we'll have to wait because CGDs will come up -- it will take some time.

    Answer, abhijit majumder

    Maybe not before '28. But in the immediate term, if we are permitted to supply gas to NRL or other producers, then we are okay. We have made a request to the ministry. If that is granted, maybe we will be able to fetch the premium that the notification provides for.

    Answer, abhijit majumder

    So IGGL would certainly be the common carrier in this case. Whereas DNPL will play a limited role to the extent that it would supply gas to the customers, various customers in the Northeast to whom they are already supplying. Beyond these -- if the gas has to flow beyond Numaligarh to other parts of the country, you need the IGGL network, which is the first phase. And that first phase is already commissioned. There's no compression issue, nothing is there. But because the lower end is not connected yet or the upper end -- I'm wrong, upper end. Upper end is not connected yet, we are unable to kind of inject gas into the system so that it can flow to Numaligarh and beyond.

  3. Question

    Vaibhav Badjatya: Right. Yes. Sir, my question was on that -- onward flow from -- onward flow itself. So on the Phase 1 itself. So I think if gas has to flow from Assam towards Barauni, I think at Guwahati, we need compressor station, right? Otherwise, the gas will not be able to flow freely till Barauni. I think that compressor station commissioning is still pending, if I'm not wrong?

    Answer, dilip goswami

    Dilip Goswami: That compressor station already commissioned at Baihata near Guwahati. Vaibhav Badjatya: Okay. That has been commissioned. Okay. So the only hurdle is basically our upstream connection? Management: Upstream connection, yes.

  4. Question

    Vaibhav Badjatya: And there is no proposal as such to use DNPL itself to supply to other customers apart from Numaligarh and local gas consumers. There is no proposal as such to declare DNPL as a common carrier?

    Answer, abhijit majumder

    Anyway, whatever I have understood of the question. See, we are presently -- our production is 3.2, and we are supplying the entire gas to the various customers located in the Northeast. So additional to -- make it 5, which is basically DNPL alone. DNPL is now being -- capacity is now being enhanced from 1 to 2. So that would, in any case, make it 4 plus. So whatever we are saying that 4 bcm of gas would be supplied to customers in the Northeast, for which I do not really think that the feeder line has to come immediately. Feeder line would make it -- would make the capacity rise to maybe 7 plus because feeder line is a parallel line, and that would kind of evacuate much larger quantity of gas than the 5.

    Answer, abhijit majumder

    For 5, we need some network within the fields between the various wells which is OIL's own network -- which would be OIL's own network, plus the DNPL line would make it comfortably 5 plus for which we don't need a feeder line. However, feeder line, the objective is to finally achieve our target of supplying roughly 8 to 9 MMSCMD of gas in the whole of Northeast. And the surplus, if any, that would be supplied through the IGGL network to Mainline India. Nitin Tiwari: So that's what I was referring to. So the expanded capacity of DNPL is what is pending for common carrier approval. So you're expanding the DNPL from 1 to 2.5 MMSCMD 2, 2.5 and the expanded capacity is pending for common carrier approval. Is that the right understanding?

    Answer, dilip goswami

    Dilip Goswami: Presently, DNPL line is transporting 1 million gas and they have revamped that line and that capacity will ramp up to 2.5 million. And this can be connected to IGGL if they got the PNGRB clearance, common carrier clearance.

  5. Question

    Nitin Tiwari: Understood. So the -- I mean, you also mentioned that there's a parallel line which you are planning along with DNPL, right?

    Answer, dilip goswami

    Dilip Goswami: Yes. That is the IGGL feeder line up to Duliajan. Nitin Tiwari: So this will be in addition to the 2.5 MMSCMD that you... Management: Yes.

  6. Question

    Nitin Tiwari: This is still in plan. This is not like incremented as of yet?

    Answer, dilip goswami

    Dilip Goswami: Already, this is projected to MOPNG. Once that approved, that line will be laid. Our target is March '27.

  7. Question

    Nitin Tiwari: March '27, okay. And in case of IGGL, the upper end connection that you mentioned, so what is that connection that is still pending for IGGL?

    Answer, dilip goswami

    Dilip Goswami: Once it can -- laid the line, get the permission, then only that upper end connectivity will be there.

  8. Question

    But the pipeline is ready and...

    Answer, dilip goswami

    Dilip Goswami: Pipeline is ready up to Numaligarh. To Numaligarh to this oilfield Duliajan, it is around 165- plus kilometers. Once that permission is given by Ministry, then that Duliajan oil field will be connected, Oil India field will be connected.

  9. Question

    Nitin Tiwari: Yes, sir, I'll elaborate on my question, sir. So if like suppose HPHT or any other gas is being used anywhere else in the country, I mean, gas molecule is gas molecule. I mean, can it not be like virtually swapped in terms of pricing only for Oil India to get a better pricing for its gas? I mean city gas companies in rest of India, I mean, are using HPHT and other -- gas from other sources and paying a higher price for that. And Oil India is not able to evacuate its gas from Northeast. But in terms of at least pricing, maybe Oil India can get NWG pricing and the city gas companies can accordingly pay NWG price in the rest of the country instead of like waiting for city gas to d

    Answer, abhijit majumder

    Abhijit Majumder: I'm just trying to answer your question according to my understanding of the question. So now I am saying that there are already CGDs coming up in the Northeast. So for us to sell gas to other CGDs in other parts of the country would arise only after we meet the entire requirement of the CGDs located in the Northeast. So swapping, whether it will happen or not, that would depend entirely on the surplus that I'm generating after meeting the requirements of the customers in the Northeast, including the CGDs. Now once the Northeast gets connected to the Mainland India, then gas can flow anywhere, and CGDs are buying gas on IGX, that is the exchange at which the gas is traded, that price is a different price. And for that quantity of the gas, which the CGDs would offtake, I would certainly get a different price. That is not dependent on the nomination price or on the premium gas, et cetera, because CGDs are buying gas based on individual agreements they're entering into with the CGD -- I mean, the buyers -- the CGD buyers are entering into with the suppliers.

  10. Question

    Nitin Tiwari: I mean in terms of priority order, city gas gets to the first priority, right? So what I was trying to say is that suppose like right now, we are limited by our evacuation capacity to rest of the country, right, because of the pipeline connectivity. Now I mean, is there a possibility that city gas companies in rest of the country because they are buying gas from exchange for HPHT, whether it's HPHT or any other gas for their consumption. So is there a possibility that a virtual swap can be done? I mean, in terms of like swapping only the differential pricing is what needs to be charged. And so -- I hope I'm able to make my point, I mean, that NWG pricing -- at NWG pricing, cert

    Answer, abhijit majumder

    Abhijit Majumder: See, we have made a request to the ministry to let us sell gas to NRL because NRL is a steady customer, not just a customer, there are material ssubsidiary. Now the capacity is being enhanced from 3 to 9. Obviously, their offtake of gas would also go up. So we are -- what we are saying is supposing every gas that I'm producing from the nomination area, the pricing is already fixed. It is fixed by the government notification. Only with respect to the gas produced from wells, through new well intervention or some work over operations, that would fetch the premium. But otherwise, the nomination gas price itself is fixed.

    Answer, abhijit majumder

    What we are saying, as you have mentioned, that if you are unable to supply gas to CGDs, who would you supply it to? I can always supply it to other customers. My only limitation is that I will not be able to get the premium. Apart from that, anything -- any gas that I am producing, I can sell it to customers, not just within Northeast, I can sell it to customers elsewhere also. Now when it goes to customers located in other parts of the country, who is the -- who will help me fix the price? It is only IGX. So whatever IGX, the price at which gas will be traded at the exchange, I will get that price, irrespective of whether it is produced from nomination, like suppose I'm saying, I have a few pre nelp exploration development fields in the Northeast itself, where the price is different because that's not a nomination area.

    Answer, abhijit majumder

    That price because your PNGRB notifies two prices. One is the nomination price, other is the -- other than nomination price. Even within Northeast, as we speak, I'm getting a different price for gas produced, say, from my Dirok field. So wherever there are DSF -- I am having DSF fields in the Northeast and some of the fields will soon be monetized. Once those fields are monetized, the pricing is not dependent on whatever is there in the notification. I mean, there is a notification, but that's a different price. That's a higher price.

    Answer, abhijit majumder

    So Page 15 of 17 Oil India Limited August 13, 2025 the point that is trying to make is that through well interventions, if you are increasing your production, you will get the premium only if you supply it to CGD first. Maybe after that, there are other companies, maybe third or fourth in the order is the refinery. Refinery is already there. Now our point is that since refinery -- for the refinery to finally get commissioned and finally operate at its full potential, it will take some time, till such time, let us -- I mean, till CGDs would -- for the CGDs to come up, it will take some time. Refinery is going to be commissioned by end of this year. So let us allow -- let us be permitted to supply gas to the refinery at the premium. We are not kind of compromising on the premium.

Questions about this call

When was the Oil India Q1 FY26 earnings call transcript filed?
Oil India filed the transcript with the exchange on 19 Aug 2025. This page is built from that transcript.
What does this page list?
84 statements from the transcript across 10 topics, 59 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 20 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
Oil India Q1 FY26 concall: Oil India set a target of 3.70 MMT for oil and 3.65 for gas for '25-'26 · DalalOS