Oil India Q2 FY27 earnings call: Oil India Limited expected production to be around 4, 4 plus/minus by the end of 31st March

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

The company expected production to be around 4, 4 plus/minus by the end of 31st March. The company is working to connect gas production within another 18 months or 20 months; connectivity is the issue. Combined oil and gas production was 1.807 million metric ton in Q2 and 3.514 million metric ton for the half year ended 30th of September 2026. Oil India Limited achieved 11,566 metric ton by the year end and subsequently achieved 11,000 plus metric ton; its average oil production growth with respect to last half year was around 20%. Total debt drawdown was close to INR20,500 crores against a total tie-up of INR28,000 crores.

The numbers management gave

Results

  • Combined oil and gas production was 1.807 million metric ton in Q2 and 3.514 million metric ton for the half year ended 30th of September 2026. Oil India Limited achieved 11,566 metric ton by the year end and subsequently achieved 11,000 plus metric ton; its average oil production growth with respect to last half year was around 20%.
    Show source
    So it is on a growth path, and if you look at the average growth path, you see, like he has said, that having with respect to last half year, we are around 20%.
  • Natural gas production was 0.786 BCM in Q2.
    Show source
    The natural gas production for the quarter is 0.786 BCM.
  • Average crude oil price realization was $95.38 per barrel, compared to $67.22 per barrel in the previous year, in Q2.
    Show source
    The average price realization of crude oil was $95.38 per barrel as compared to $67.22 per barrel as compared to previous year.
  • The natural gas price was $7.19 per MMbtu in Q2 of FY27, compared with $6.75 per MMbtu in Q2 of FY26.
    Show source
    The natural gas price was $7.19 per MMbtu, vis-a-vis $6.75 per MMbtu for Q2 of FY26.
  • Standalone operating revenue was INR16,029 crores for the half year ended 30th of September 2026.
    Show source
    The standalone operating revenue of Oil India Limited for the half year ended 30th of September 2026 was INR16,029 crores.
  • The company registered its highest ever half-yearly EBITDA of INR8,450 crores for the half year ended 30th of September 2026.
    Show source
    We have registered the highest ever half- yearly EBITDA of INR8,450 crores.
Show 39 more statements

Results

  • EBITDA margin was 48.58% for the half year ended 30th of September 2026, compared with 34.32% in the previous half year.
    Show source
    The EBITDA margin has raised to 48.58% from 34.32% as compared to the previous half year.
  • PBT was INR6,609 crores and PAT was INR5,130 crores for the half year ended 30th of September 2026; both were the company’s highest ever half-yearly figures. Oil India Limited’s standalone PAT for the half year ended 30.09.2026 was ₹ 5,130 crore, up 176% from ₹ 1,857 crore in the corresponding previous half year.
    Show source
    The PBT was INR6,609 crores and PAT was INR5,130 crores, which was highest ever half yearly PBT and PAT of the company.
  • NRL’s operating revenue was INR7,991 crores in Q2 FY27, 24% higher than in Q2 of FY 2026.
    Show source
    The operating revenue of NRL was INR7,991 crores for Q2 FY27, which is 24% higher as compared to Q2 of FY 2026.
  • NRL’s refinery capacity utilization was 107.02% and distillate yield was 87.01% in Q2 FY27.
    Show source
    The capacity utilization of our refinery was 107.02% for Q2 FY27, and the distillate yield was 87.01% for the quarter.
  • NRL’s EBITDA was INR1,108 crores in Q2 FY27, compared with INR988 crores in Q2 of FY 2026.
    Show source
    The EBITDA was INR1,108 crores for the quarter as compared to INR988 crores in the previous Q2 of FY 2026.
  • NRL’s PAT was INR2,007 crores for the half year ended 30th of September 2026, compared with INR1,213 crores in the previous year.
    Show source
    The half-yearly PAT of NRL was INR2,007 crores as compared to INR1,213 crores in the previous year.
  • NRL’s PAT was INR701 crores in Q2 FY27, compared with INR724 crores in Q2 of FY 2026.
    Show source
    The PAT for the Q2 of FY27 was INR701 crores as compared to INR724 crores in the previous Q2 of FY 2026.
  • Consolidated operating revenue was INR24,801 crores and its consolidated PAT was INR6,547 crores for the half year ended 30th of September 2026. Oil India Limited’s consolidated PAT for the half year ended 30.09.2026 was ₹ 6,548 crore, up 77% from ₹ 3,690 crore in the corresponding previous half year.
    Show source
    Page 3 of 18 Oil India Limited November 13, 2026 Our company has reported the consolidated operating revenue of INR24,801 crores and registered the PAT of INR6,547 crores for the half year ended 30th of September 2026.
  • The company is growing at a rate of 4 million ton.
    Show source
    Saloma Yomdo: No, no. The first question is, we are already growing at a rate of 4 million ton.
  • The company achieved 11,300 metric tons of production on 30th of September and subsequently reached 11,347 metric tons.
    Show source
    After that, we have also gone up to 11,347 metric tons.
  • Production was hovering around 11,000 to 11,200 metric tons, a rate around 4.05 million ton, and the company was hopeful it could maintain this production.
    Show source
    Now, it is hovering around 11,000, 11,200 metric tons, and we are hopeful that we will be able to maintain this production, which is the rate is around 4.05 million ton if you talk about today's rate, these days rate, 11,100, 11,200 metric tons.
  • The company achieved 15.9% growth in its oil production rate this year.
    Show source
    If you talk about this year, we are about 15.9% growth we have achieved in terms of oil rate production rate.
  • Material subsidiary NRL achieved a Gross Refining Margin (GRM) of $28 per barrel on a half-yearly basis, compared with $7.73.
    Show source
    So overall, if you see, on half-yearly basis, we have achieved a GRM of $28 per barrel as compared to $7.73.
  • Crude price was $98 per barrel in the first quarter and $92 per barrel in the second quarter, averaging $95 per barrel for the half year.
    Show source
    If you average it out for the whole half year, it is $95 per barrel.
  • The company produced around 1.968 million metric tons of normal crude oil and 0.003 million metric ton of condensate in the half year ended 30th of September 2026; condensate was a very negligible percentage of the crude oil condensate forming the entire crude oil revenue.
    Show source
    The crude oil production, if we see for the half year ended 30th of September 2026, it is around 1.968 million metric tons from our normal crude oil production.
  • The company provided around INR1,408 crores for its Vijayapuram-1 well in the current year, about INR280 crores more in provisions against wells than in the previous year; it had provided INR1,440 crores for wells in the previous half year, including around INR950 crores for Vijayapuram-2, and the previous year’s provisions covered its Gabon and Bangladesh overseas blocks.
    Show source
    But in the current year, we have taken provision for our Vijayapuram-1 well, which is the amount is around INR1,408 crores of rupees.
  • Numaligarh Refinery’s FOB price for MS fell from $129 per barrel in Q1 to $110 in Q2, and its FOB price for HSD fell from $175 in Q1 to $138 in Q2; the SAED it bears did not change as much, explaining the lower GRM in Q2 than in Q1.
    Show source
    You can say that the difference that whatever was there, so if you see FOB prices, which was for MS, was $129 per barrel in Q1, has come down to $110.
  • Numaligarh Refinery’s FOB price of crude oil fell from $100 in Q1 to $92 in Q2, explaining the lower GRM in Q2 than in Q1.
    Show source
    That is from $100, it has come down to $92.
  • Numaligarh Refinery’s GRM was $35.95 per barrel in Q1 and $20.71 per barrel in Q2.
    Show source
    Q1, as you said, it was $35.95 per barrel, whereas for Q2, it was $20.71.
  • Exploration wells had an 82% success ratio, while its development wells had a 100% success ratio.
    Show source
    Of course, that is significantly adding to your increased production because the exploration success ratio from the exploratory wells is 82%, while the development wells, the success ratio is 100%.
  • The company produced 20% more from its fields despite an average 12%-15% decline from the fields.
    Show source
    Production also, like the Director of Operations mentioned, even though there is an average 12%-15% decline from the fields, over and above that, we are producing 20% more from these fields itself.
  • NRL’s total production in Q2 FY27 was 810 TMT, including 542 TMT of HSD and 193 TMT of MS.
    Show source
    Sachidananda Maharana: For quarter two, if you see our production numbers, the total production was 810 TMT.
  • NRL’s diesel production in Q2 of last year was 507 TMT, and its MS production was 182 TMT.
    Show source
    If you compare with the Q2 of last year, it was 507 TMT for diesel, and for MS, it was 182 TMT.
  • The company drilled 42 wells during the first half of the year, its highest-ever half-year drilling performance.
    Show source
    Our company has drilled 42 new wells during the half year, out of which 16 were exploratory wells and 26 were development wells.
  • Material subsidiary NRL’s Gross Refining Margin (GRM) rose to US$ 28.24/bbl during the half year ended 30.09.2026, from US$ 7.73/bbl during the half year ended 30.09.2025, a 265% growth.
    Show source
    The gross refinery margin for the half year ended 30th of September 2026 was $28.24 per barrel as compared to $7.73 per barrel in the previous half year.
  • The company produced 1.021 MMT of crude oil from its matured and old oilfields in Q2FY27, compared with 0.848 MMT in Q2 FY26.
    Show source
    My production for the quarter was 1.021 MMT, out of which condensate is 0.002 MMT.
  • NRL’s Gross Refining Margin (GRM) is after SAED adjustment.
    Show source
    Sachidananda Maharana: This GRM is after SAED adjustment, to answer your first question.
  • The company achieved 11,566 metric ton by the year end and subsequently achieved 11,000 plus metric ton; its average oil production growth with respect to last half year was around 20%. Replaced by a later filing.
  • Vijayapuram-1 well was its first offshore well in the campaign, drilled in Andaman, Kerala-Konkan and KG Basin; the initial cost was INR1,400 crores, including mobilization and bundle services, while the second well cost INR950 crores because the first well incurred most initial costs. Replaced by a later filing.
  • Production volume is increasing. Replaced by a later filing.
    Show source
    The volume is increasing.

Money and capital

  • Total debt drawdown was close to INR20,500 crores against a total tie-up of INR28,000 crores.
    Show source
    Coming to the debt position, currently our total debt drawdown is close to INR20,500 crores.
  • Capex target for the current year was INR7,500 crores, and it was on target.
    Show source
    Sachidananda Maharana: Capex number for the current year, the target is INR7,500 crores, and we are on target.
  • Capex for FY 2028 will be close to INR6,000 crores as it completes projects which are online; next year’s capex will be slightly lower than the current FY.
    Show source
    Sachidananda Maharana: FY 2028 will be close to INR6,000 crores, as we are completing these projects which are online.
  • Actual capex as on 30th of September was INR6,000 crores and is expected to rise to around INR13,500 crores or INR14,000 crores; its estimated capex for this financial year includes around INR1,200 crores for survey, around INR4,000 crores for exploration and development drilling, around INR4,500 crores for normal capital equipment, and around INR300 crores or INR350 odd crores for other JVs and subsidiaries, with no significant overseas investment because of the update in the Mozambique project.
    Show source
    It will go up to maybe around INR13,500 crores or INR14,000 crores.
  • The company wrote off its first Andaman well for around INR1,400 crores and its second Andaman well for about INR950 crores. Oil India Limited’s Vijayapuram-1 well was its first offshore well in the campaign, drilled in Andaman, Kerala-Konkan and KG Basin; the initial cost was INR1,400 crores, including mobilization and bundle services, while the second well cost INR950 crores because the first well incurred most initial costs.
    Show source
    So, INR1,400 crores was the initial cost.
  • If Oil India Limited writes off the third Andaman well, the write-off will be in the range of INR850 crores or INR900 crores.
    Show source
    The third well, if we write it off, it will also be in the range of INR850 crores or INR900 crores.
  • Decision on whether to write off the third Andaman well is subject to the outcome of ongoing studies; the company is acquiring 600 square kilometres of 3D data and will thoroughly interpret the data before deciding.
    Show source
    That is subject to the outcome of the studies that are currently being undertaken.
  • The company wrote off one field in its western satellite for around INR168 crores, took INR65 crores in central fields, made a provision of INR44 crores for another well in Chandmari, and made a provision of around INR20 crores for the Ashoknagar JV block in West Bengal; these were major items in the incremental INR280 crores of write-offs.
    Show source
    Abhijit Das: See, the incremental INR280 crores write-offs, we have written one field in our western satellite, this is around INR168 crores.
  • Board approved a first interim dividend of INR7 per equity share. Replaced by a later filing.

What it expects ahead

What management expects

  • The company expected production to be around 4, 4 plus/minus by the end of 31st March.
    Show source
    By the end of 31st March, we should be around 4, 4 plus/minus.
  • The company expects to remain at 4 after achieving it, then reach 4.2, 4.3, and keep growing.
    Show source
    Once we achieve 4, I think we should remain there, 4.2, 4.3, and we will keep on growing.
  • NRL was targeting ramp-up of the additional refinery capacity to 50%-60% by Q3 of next financial year.
    Show source
    Page 7 of 18 Oil India Limited November 13, 2026 Sachidananda Maharana: Ramp-up, the target that we are having, we will be having by the, say, Q3 of next financial year, we will be achieving close to 50%, 50%-60%.
  • NRL will achieve 100% of the additional capacity in 2028-2029.
    Show source
    In 2028-2029, we will be achieving 100% of the additional capacity.
  • The company drilled 74 wells last year, compared with around 38–45 wells till a few years back; its internal target is to drill 100 wells this year, with 29 drilling rigs operating and five to six additional rigs in the pipeline. The company expects drilling close to 100 wells to become business as usual, as it is drilling deeper wells of 5,500 m–6,000 m and plans wells of 6,500 m in harder formations with more complicated subsurface problems.
    Show source
    This year, the internal target is to drill 100 wells.
  • The company targets drilling about 100-110 wells per year in the coming days.
    Show source
    This business as usual of about close to 100- 110 wells per year will be our target in the coming days.
Show 5 more statements

What management expects

  • The company expects gas production to be a little bit higher than last year's, but not very high because of constraints.
    Show source
    But in terms of gas, we will be achieving maybe the last year's little bit of higher -- just little bit of higher than the last year.
  • The company expects the cost of subsequent wells to come down, as the cost came down in the second well.
    Show source
    You will see that subsequently in the other wells, the cost will come down, like the cost has come down in the second well.
  • Capex and cost of production will be higher because the company is producing more.
    Show source
    So capex naturally would be more, and the cost of production accordingly will also be more because you are producing more.
  • The company is confident that it will achieve four this year and is targeting four, with internal targets a little bit more. Replaced by a later filing.
    Show source
    Yes, you can see, I think already we have -- the point is that we are on a path to four, and we are very confident that we will achieve four this year.
  • The company expects new additions from exploration and production, although they may not be very big like any other field. Replaced by a later filing.
    Show source
    In exploration front and also in production front, I think we will be getting some new Page 13 of 18 Oil India Limited November 13, 2026 additions, although that may not be very big like any other field, but this will also add to our kitty.

What it is building and selling

Projects and capacity

  • The company is working to connect gas production within another 18 months or 20 months; connectivity is the issue.
    Show source
    But for the gas, I already told that the connectivity is the issue, and we are doing all our best to connect it by another 18 months or 20 months.
  • NRL is targeting March 2027 as the completion target for the NREP project.
    Show source
    To answer your first question regarding completion of the project, we are targeting March 2027 as the completion target for the NREP project.
  • NRL’s pipeline was almost 95% completed and was likely to be completed in Q4 this financial year.
    Show source
    The pipeline also is almost 95% has been completed, and that is also we are likely to complete in the Q4, this financial year.
  • PNCPL had completed 1,600 km of its 1,640 km crude oil pipeline, with the balance 40 km still in progress.
    Show source
    Sachidananda Maharana: With regard to the completion of PNCPL, if you see the progress, it is almost out of 1,640 km of crude oil pipeline length, already 1,600 km has been completed, and balance 40 km is still in progress.
  • The company was targeting completion of the PNCPL pipeline in Q4, having achieved 95% progress, and expected it to be ready by March, ahead of completion of the NREP project.
    Show source
    As I already said, we have achieved 95%, and we are confident that we will be able to complete this PNCPL pipeline in the Q4, much ahead of the completion of the NREP project.
  • NRL’s existing 3 MMT refinery can operate separately from the additional 6 MMT refinery, so commissioning the additional capacity will not require a shutdown of the existing refinery.
    Show source
    There is no requirement of shutdown for the 3 MMT refinery, existing refinery, while commissioning this additional 6 MMT.
Show 18 more statements

Projects and capacity

  • NRL’s existing 3 MMT refinery will undergo a turnaround in October 2027, including a one-month shutdown; this is a regular activity done every four years.
    Show source
    So, there will be a shutdown of existing 3 MMT refinery during that period for a period of, say, one month, which is a regular thing, which is to be done in every four years.
  • The company drilled its first Kerala-Konkan well at a water depth of 60 m and a well depth of 6,250 m; the well is undergoing testing of five identified objects, and the company plans to drill a second well in Kerala-Konkan to potentially reach 6,500 meters to probe the basin’s hydrocarbon potential.
    Show source
    With the Mission Anveshan coming up, we plan to now drill a second well in Kerala-Konkan because we want to further go down to maybe 6,500 meters to actually fully probe the hydrocarbon potential in that particular basin.
  • The company acquired around 600 square kilometers of additional 3D seismic for Vijayapuram-3, beyond its committed work program, after positive testing results in Vijayapuram-2 and Vijayapuram-3; the wells established the presence of gas based on 2D seismic data, and the new 3D data will help plan appraisal wells around them.
    Show source
    Saloma Yomdo: Vijayapuram-3, actually, we have taken additional seismic, around 600 square kilometers of additional 3D seismic, which was not part of our committed work program.
  • The company plans to drill at least a couple of appraisal wells in the Vijayapuram-2 and Vijayapuram-3 area, based on processing and interpretation of the new 3D data; it has provisioned Vijayapuram-3 but has not written it off, and expects study results by January before deciding whether to use or write off the well.
    Show source
    We plan to drill at least a couple of appraisal wells in that area, considering the processing and interpretation of the new 3D data that we have acquired.
  • The company has okayed the investment, and the 168 km pipeline is under construction.
    Show source
    Trailukya Borgohain: What is going on actually is that we have already okayed for this investment and 168 km pipeline is under— Saloma Yomdo: Construction.
  • The gas processing plant in Madhuban will have a maximum capacity of 5 million standard cubic meters, and Oil India Limited is planning for an average of 3.5 million standard cubic meters.
    Show source
    The maximum capacity will be 5 million standard cubic meters, but on an average, we are planning for 3.5 million standard cubic meters.
  • The company was targeting mechanical completion of the entire NREP project by March, when it expected the project to be online.
    Show source
    And definitely by March, when our entire NREP project will be online, that commissioning we are targeting, mechanical completion we will be targeting by March.
  • The company announced a notice of discovery of gas in a new zone in its KG-DSF appraisal well; another zone is being tested and is currently producing oil, and the company plans to revisit its field development plan and review its KG-DSF exploration strategy. Oil India Limited has made a discovery in KG-DSF that will be shortly reported.
    Show source
    Saloma Yomdo: Yes, in KG-DSF, we have drilled this appraisal well, and we are very happy to share that we have already announced the notice of discovery of gas in this particular well in one of the zones.
  • The company expects to spot its fourth Andaman well on the west side of the island by middle of December this year and complete it within this financial year. Oil India Limited’s fourth Andaman well is going to be drilled by December this year, and the company expects to complete it within this financial year.
    Show source
    We expect that the fourth well in Andaman on the west side of the island, we will be able to spot the well by middle of December this year, so that we can complete it within this financial year itself.
  • The company has established an exploration discovery in Cambay Basin. Oil India Limited has made a discovery in Cambay.
    Show source
    This has already been also established, and we have already given this, I think… Saloma Yomdo: Notification.
  • The company found high pour point oil at a shallow depth and is deploying faster monetization procedures there.
    Show source
    We have seen the oil physically, and we went there, and we have seen the oil coming out, and now we are deploying faster monetization procedures there.
  • The company expects to get the complete bypass of the ITF, and the oil that was in the ITF can be taken out.
    Show source
    Most surely, we are going to get the complete bypass of the ITF.
  • The company initially planned to drill four wells in Andaman, has drilled three and written off two; the third well remains provisioned because it may be used for reentry based on new seismic data being acquired.
    Show source
    Saloma Yomdo: Well, in Andaman, currently, the initial plan was to drill four wells, out of which we have drilled three, and we have written off two.
  • The company is trying to increase production from mature fields and arrest decline, while near-field exploration is yielding new hopes, with production from near fields and fast monetization. Replaced by a later filing.
    Show source
    The near-field exploration is giving us new hopes because we are on and off, we are producing from the near fields, and we are able to do the monetization very fast.
  • NSPL was almost complete. Replaced by a later filing.
    Show source
    NSPL is almost complete.
  • Fourth Andaman well is going to be drilled by December this year, and the company expects to complete it within this financial year. Replaced by a later filing.
  • The company has made a discovery in KG-DSF that will be shortly reported. Replaced by a later filing.
  • The company has made a discovery in Cambay. Replaced by a later filing.

Risks, rules and outside factors

Risks and disputes

  • The fire at ITF slightly impacted Oil India Limited’s operations; ITF handles around 1,000 kilolitres of oil per day. Oil India Limited is using a bypass system, taking oil to nearby OCS, and plans to compensate for the impact later.
    Show source
    Trailukya Borgohain: Mr. Sabri, the fire has a little bit impacted because ITF handles around 1,000 kilolitres of oil per day.
  • The company is holding onto wellheads and controlling some production because of the ITF fire, but expects the impact not to be very high.
    Show source
    We are just a little bit of kind of holding onto the wellheads, and we are controlling a little bit of production, but it is not going to impact very high.

Outside factors

  • Basket is linked to around 12 - 14 international crude grades, with different areas having combinations of international crude; the basket formed from 11 - 12 benchmarked crudes is calculated monthly using their international prices.
    Show source
    Those crudes has been benchmarked for calculating our basket, and on the basis of the international price of those 11 - 12 crudes, which is forming our three basket, is calculated on monthly basis.
  • NRL’s Q2-to-Q1 GRM dip was associated with lower FOB prices of products in Q2 than in Q1, while the SAED impact remained more or less the same.
    Show source
    If you compare Q2 to Q1, the FOB prices of products have come down.
  • Crude price is linked to Brent and Dubai crude in some ratio and is determined using a basket based on monthly average prices in three areas of its fields in Digboi, Moran, and Naharkatiya.
    Show source
    It is getting fully monitored with the international price which we are getting, and the price is determined, an average monthly average price is determined based on the basket in three areas in our fields in Digboi, Moran, and Naharkatiya.
  • The company applies the same price to condensate as to crude and bills condensate as crude.
    Show source
    Whatever is my crude price, the same applies to condensate.
Show 1 more statement

Outside factors

  • FOB prices of products came down more than the crude price decline, while the FOB prices came down slightly.
    Show source
    It is basically the FOB prices has come down slightly, but as compared to that, as I already said, that FOB prices of product has come down much more than the decline in the crude price.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Probal Sen: Thank you for the opportunity. Very good morning, sir. Just on the production numbers, oil production, of course, is running even ahead of guidance that was given probably a few quarters ago. We are already at the 4 million ton run rate. Just wanted your thoughts on what is next in terms of oil production. If we look at the next two to three years, as a trend, what would be the objective? Is it to maintain this 4 million ton run rate, or do we have prospects enough that we can even achieve a slightly higher run rate? On the same vein, if you can also talk a little bit about how the gas production guidance is looking like for the next two, three years. Obviously, there has been so

    Answer, saloma yomdo

    Saloma Yomdo: No, no. The first question is, we are already growing at a rate of 4 million ton.

    Answer, trailukya borgohain

    Trailukya Borgohain: Yes. Thank you. Yes, you can see, I think already we have -- the point is that we are on a path to four, and we are very confident that we will achieve four this year. Maybe four, we are targeting internal targets are a little bit more, but we are targeting four, and definitely we are on that path. Little bit of hiccup here and there, but we will be able to achieve that number. But in terms of gas, we will be achieving maybe the last year's little bit of higher -- just little bit of higher than the last year. But we will not be achieving very high, because we have lot of constraints.

  2. Question

    I cannot hear you.

    Answer, trailukya borgohain

    Trailukya Borgohain: Yes. If you look at the current production rate, at present, we are more than 11,000 metric tons, which is all-time high. In fact, 11,300 metric tons we achieved on 30th of September itself. After that, we have also gone up to 11,347 metric tons. Now, it is hovering around 11,000, 11,200 metric tons, and we are hopeful that we will be able to maintain this production, which is the rate is around 4.05 million ton if you talk about today's rate, these days rate, 11,100, 11,200 metric tons. So 4.05 million tons. By the end of 31st March, we should be around 4, 4 plus/minus.

    Answer, trailukya borgohain

    Just maybe plus/minus, that is the figure I can tell you. But for the gas, I already told that the connectivity is the issue, and we are doing all our best to connect it by another 18 months or 20 months.

  3. Question

    Probal Sen: Just to stand some of my understanding, sir, if you will forgive me. Oil production, we should basically be looking at this 4 million ton run rate being maintained, plus minus maybe 2%-3% here and there, at least for the next couple of years or at least for the next year. In gas production, this run rate is maintained by pending the improvement in the completion of the various connectivity options or monetization options. Is that a fair way to look at it?

    Answer, trailukya borgohain

    Trailukya Borgohain: Yes, yes. You see, if you look at the last year's figure, it was around maximum, the year before, we were achieving 9,700 metric ton per day in oil. I am not talking about gas, 9,700 metric ton per day. Now, by the year end, we achieved 11,566 metric ton. That was around 10,566 metric ton. Now, even after that, we achieved 11,000 plus metric ton now. So it is on a growth path, and if you look at the average growth path, you see, like he has said, that having with respect to last half year, we are around 20%.

    Answer, trailukya borgohain

    If you talk about this year, we are about 15.9% growth we have achieved in terms of oil rate production rate. That is what I can tell Page 5 of 18 Oil India Limited November 13, 2026 you as of now. So we are trying our level best to increase our production from our mature field and arrest decline. At the same time, we are doing the near field exploration. The near-field exploration is giving us new hopes because we are on and off, we are producing from the near fields, and we are able to do the monetization very fast. That is the best part about the near field. Yes.

  4. Question

    Probal Sen: Right. If we can ask… Trailukya Borgohain: We will not, we should not.

    Answer, trailukya borgohain

    Once we achieve 4, I think we should remain there, 4.2, 4.3, and we will keep on growing. That is what is our outlook at present. Yes.

  5. Question

    Probal Sen: Perfectly clear. Sir, one more question, if I may, in terms of NRL's performance and guidance. If you can kindly update us, where does the expansion basically stand as of now? Was the Q-o- Q dip in GRM related maybe to some expansion-related testing or stabilization? Or we should not read too much into the fact that from Q1, Q2 GRM has actually declined a bit. If you can just throw some colour on that.

    Answer, sachidananda maharana

    Sachidananda Maharana: Yes, good morning. I am Maharana this side, Director of Finance at NRL. To answer your first question regarding completion of the project, we are targeting March 2027 as the completion target for the NREP project. The pipeline also is almost 95% has been completed, and that is also we are likely to complete in the Q4, this financial year. Coming to the second question with regard to the dip in GRM, as you know, this first quarter was, of course, a bumper where FOB prices of the products were very high. If you compare Q2 to Q1, the FOB prices of products have come down. But if you see the SAED impact on that had remained more or less same.

    Answer, sachidananda maharana

    The crude prices also has not declined much. It is, Q1 it was close to $100, and now it is around $92. For us, it is close to $92. So that is the impact. So overall, if you see, on half-yearly basis, we have achieved a GRM of $28 per barrel as compared to $7.73.

  6. Question

    Probal Sen: Right, sir. Thank you so much. I will come back if I have more questions, and all the best. Thank you so much.

    Answer, trailukya borgohain

    Trailukya Borgohain: Okay. Actually, I think there is a little bit of this thing. NSPL is almost complete. Only thing is that Numaligarh-Siliguri, what happens is that once the expansion happens, that will come up. I think you are asking about PNCPL, which will be answered by NRL. Yes. Sachidananda Maharana: With regard to the completion of PNCPL, if you see the progress, it is almost out of 1,640 km of crude oil pipeline length, already 1,600 km has been completed, and balance 40 km is still in progress.

    Answer, trailukya borgohain

    That is why we are expecting that there will be earlier, of course, we had given a date of December, but we are feeling that there will be a little bit spillover. And definitely by March, when our entire NREP project will be online, that commissioning we are targeting, mechanical completion we will be targeting by March. So this PNCPL also will be ready by then. There are small bits of land where some certain issues were there, so that we are closing in now. As I already said, we have achieved 95%, and we are confident that we will be able to complete this PNCPL pipeline in the Q4, much ahead of the completion of the NREP project. Coming to the debt position, currently our total debt drawdown is close to INR20,500 crores. That is the drawdown that we have taken as against the total tie-up of INR28,000 crores.

    Answer, sachidananda maharana

    Sachidananda Maharana: Capex number for the current year, the target is INR7,500 crores, and we are on target. Vivekanand: FY 2028, sir?

    Answer, sachidananda maharana

    Sachidananda Maharana: FY 2028 will be close to INR6,000 crores, as we are completing these projects which are online. Next year the capex will be slightly lower than the current FY. Vivekanand: One last follow-up on NRL's expansion. Will the capacity expansion require you to shut down some part of NRL for any period of time? If you can help us understand how the scale-up will happen from 3 MMT to 9 MMT. Again, if you can give us some fiscal milestones as well. Thank you.

    Answer, sachidananda maharana

    Sachidananda Maharana: Basically, this 3 MMT refinery is a standalone refinery. We have configured this refinery as these two can be operated separately. There is no requirement of shutdown for the 3 MMT refinery, existing refinery, while commissioning this additional 6 MMT. What was the second question? Vivekanand: Quick timeline of ramp-up. Page 7 of 18 Oil India Limited November 13, 2026 Sachidananda Maharana: Ramp-up, the target that we are having, we will be having by the, say, Q3 of next financial year, we will be achieving close to 50%, 50%-60%.

    Answer, sachidananda maharana

    In 2028-2029, we will be achieving 100% of the additional capacity. Vivekanand: Okay. Thank you.

    Answer, sachidananda maharana

    Sachidananda Maharana: With regard to the refinery turnaround, if you see this now for existing 3 MMT refinery, that will be the turnaround, action will be taken somewhere in October 2027. So, there will be a shutdown of existing 3 MMT refinery during that period for a period of, say, one month, which is a regular thing, which is to be done in every four years. Vivekanand: Okay. Thank you very much and all the best.

  7. Question

    Yogesh Patil: Thanks for taking my question, sir. Sir, if we look into the crude price realization of $92 per barrel for the quarter, which is $5 per barrel lower than the spot Brent prices, what is the major reason of such a high discount to the dated Brent price? Because historically, we have seen a very limited discounts of $1.5 to $2 per barrel. This is my first question.

    Answer, abhijit das

    Abhijit Das: The crude price which we have witnessed in the first quarter was $98 per barrel, and in the second quarter, we have seen it is $92 per barrel. If you average it out for the whole half year, it is $95 per barrel. Our crude price is related to Brent and the Dubai crude in some ratio. When we calculate our price, it is based on the basket which is defined by us in three different areas. That crude oil price is calculated based on the benchmark which we have for our calculation of basket price. Discounting is not done in such way. It is getting fully monitored with the international price which we are getting, and the price is determined, an average monthly average price is determined based on the basket in three areas in our fields in Digboi, Moran, and Naharkatiya.

    Answer, abhijit das

    Abhijit Das: Our basket is linked with international crude around 12 - 14 crude, and different areas is having a combination of different international crude. Those crudes has been benchmarked for calculating our basket, and on the basis of the international price of those 11 - 12 crudes, which is forming our three basket, is calculated on monthly basis.

  8. Question

    Yogesh Patil: Okay. Sir, my second question is related to the share of condensate into the overall oil production. As you have guided that 4 million metric ton plus kind of oil production in the FY27, how much share of condensate one can expect out of that? If you could break it down of crude oil and the condensate, that would be helpful. Page 8 of 18 Oil India Limited November 13, 2026 Abhijit Das: Okay.

    Answer, abhijit das

    The crude oil production, if we see for the half year ended 30th of September 2026, it is around 1.968 million metric tons from our normal crude oil production. The condensate is 0.003 million metric ton. It is a very negligible percentage of crude oil condensate which is forming the entire crude oil revenue.

  9. Question

    Yogesh Patil: Okay. My reason was to ask this question is related to overall price realization, which I believe is at a sizable discount to the, again, the basket also or the dated Brent also. If we consider the condensate production, if it is going to increase, then the overall price realization will take a little bit hit, considering the discount in the upcoming trade. Sir, last question from my side related to the higher other expenses and the cost on the dry well side. Could you please a little bit elaborate on that side?

    Answer, abhijit majumder

    Abhijit Majumder: Sure, I can do that. See, as far as condensate is concerned, condensate is same as crude. So far as my price realization goes, there is hardly any difference. We bill it as crude, right. Whatever is my crude price, the same applies to condensate. What my colleague has just now explained, condensate is a very, very negligible share in the overall crude production. My production for the quarter was 1.021 MMT, out of which condensate is 0.002 MMT.

  10. Question

    Yogesh Patil: Second question was related to other expenses and dry well cost during the quarter Q2 FY27.

    Answer, abhijit das

    Abhijit Das: If you compare with the previous half year, our total provision for wells was INR1,440 crores. Out of this INR1,440 crores, the total for our Vijayapuram-2 well, we had around INR950 crores of total provision. But in the current year, we have taken provision for our Vijayapuram-1 well, which is the amount is around INR1,408 crores of rupees. That is the only primary reason that there is an increase of around INR280 crores of extra provisions against our wells as in compared to the previous year. Last previous year, we have provided for our two overseas blocks of Gabon and Bangladesh. Current year, we don't have any provision again about any overseas operation, but only reason of increase of around INR280 is for the provision against our Vijayapuram-1 well.

Show 7 more questions
  1. Question

    Bineet Banka: Hi, sir. Thanks for the opportunity. I have a couple of questions. Firstly, again, following up on the question of previous participant on the Numaligarh Refinery GRM. GRM was down from $35 to $20, while the crack spreads were higher on a Q2 basis. Was it due to some inventory gain/loss adjustment? Because I think the GRM that you report is inclusive of inventory gain/loss, or was the actual SAED-related discount in Q1 was lower than what you realized in second quarter? What was driving the difference? Page 9 of 18 Oil India Limited November 13, 2026 Sachidananda Maharana: As I said already that the basic reason is that FOB prices of the products have come down in the internati

    Answer, sachidananda maharana

    You can say that the difference that whatever was there, so if you see FOB prices, which was for MS, was $129 per barrel in Q1, has come down to $110. Similarly, HSD, which was $175 in Q1, has come down to $138 in Q2. Moreover, the SAED that we bear, that has not changed as much. As we said already, the FOB prices of crude oil has not come down much. That is from $100, it has come down to $92. So, that explains the difference why that GRM is lower in Q2 as compared to Q1. Q1, as you said, it was $35.95 per barrel, whereas for Q2, it was $20.71.

  2. Question

    Bineet Banka: Got it, sir. Second question is on well write-off. I think the usual run rate was around INR700- 800 crores. This quarter it's INR1,480 crores. Why such large write-off in a similar, I think, it's Vijayapuram, if I'm not wrong. What happened there?

    Answer, saloma yomdo

    Saloma Yomdo: Actually, this Vijayapuram-1 was the first offshore well which we drilled during this campaign, where we were drilling in Andaman, we were drilling in Kerala-Konkan, and we have also drilled in KG Basin. When the rig was mobilized from Nigeria and the campaign started, the first well obviously incurs most of the initial costs. That's why the initial capex is generally high allotted to the first well. The second well you have seen significantly, we have reduced it to INR950 crores. So, INR1,400 crores was the initial cost. Actually, it covers your mob and everything, including the bundle services. That's why the overall cost in the first well was higher.

    Answer, saloma yomdo

    You will see that subsequently in the other wells, the cost will come down, like the cost has come down in the second well.

  3. Question

    Hardik Solanki: My question is already answered. Thank you.

    Answer, saloma yomdo

    Saloma Yomdo: Kerala -Konkan? Management: Kerala-Konkan. Saloma Yomdo: Kerala-Konkan, actually, the first well we drilled, that was drilled at a water depth of 60 m, but the well depth was 6,250 m. So in that part of the basin, we have drilled one of the deepest wells in the country. Currently, as we speak, the well is undergoing testing, and we have identified five objects to be tested, and we are sequentially testing all these objects currently. With the Mission Anveshan coming up, we plan to now drill a second well in Kerala-Konkan because we want to further go down to maybe 6,500 meters to actually fully probe the hydrocarbon potential in that particular basin. Does that answer your question? Somaiah: It does, sir.

    Answer, saloma yomdo

    Saloma Yomdo: Yes, in KG-DSF, we have drilled this appraisal well, and we are very happy to share that we have already announced the notice of discovery of gas in this particular well in one of the zones. That zone is a completely new zone, so it is a discovery which was not discovered earlier. Today, as we speak, another zone is being tested, and currently, it's producing oil, and we will come out with the detailed press release and statement in a couple of days because the well is flowing at a very good oil rate. So, we have now made a plan to revisit our field development plan because of this appraisal well has given us some very good surprises where we have tested unknown sands hitherto unexplored. Our exploration strategy in KG-DSF will be reviewed very shortly. After this well is tested in Kerala, in KG Basin, the one that we are drilling and testing, this rig will now go to Andaman to drill the fourth well. We expect that the fourth well in Andaman on the west side of the island, we will be able to spot the well by middle of December this year, so that we can complete it within this financial year itself.

    Answer, saloma yomdo

    Saloma Yomdo: On the third well? Management: Vijayapuram-3. No, no, this will go from KG. Saloma Yomdo: Vijayapuram-3, actually, we have taken additional seismic, around 600 square kilometers of additional 3D seismic, which was not part of our committed work program. Because of the positive testing results we got in Vijayapuram-2 and Vijayapuram-3, it necessitated us to have a relook into the geology. Because Vijayapuram-2 and 3, which established presence of gas, was drilled based on the availability of 2D seismic data. 3D seismic data was missing, which could have given us a better imagery, and that will help us to plan for the appraisal well, especially around Vijayapuram-2 and 3.

    Answer, saloma yomdo

    We plan to drill at least a couple of appraisal wells in that area, considering the processing and interpretation of the new 3D data that we have acquired. We have provisioned Vijayapuram-3. We have not let it go as yet, because you might never know that this current well may come in handy, where we can maybe re-enter this well and side-track it to a more better position, which is structurally much better. Or maybe this well can be still utilized if required for deepening. We have not yet written it off. But based on the interpretation and study results that we are expecting by January, then we will take a call on the Vijayapuram-3 well, whether we will use it or then we will have to write it off. Somaiah: Understood, sir.

    Answer, abhijit das

    Abhijit Das: The capex as of -- actual capex as on 30th of September was INR6,000 crores. The capex has to go up. It will go up to maybe around INR13,500 crores or INR14,000 crores. The breakup of the capex for this financial year, we have estimated the survey, which will be around INR1,200 crores, whereas our exploration and development drilling capex is around INR4,000 crores. With a normal capital equipment will be around INR4,500 crores. With an overseas as of now, because of our update in the Mozambique project, we don't have significant investment for that. But for other JVs and subsidiaries, we will have around INR300 crores or INR350 odd crores of rupees.

    Answer, saloma yomdo

    Saloma Yomdo: Well, you will realize that till a few years back, we were drilling around 38 - 45 wells, and then last year we drilled 74 wells. This year, the internal target is to drill 100 wells. For that, 29 drilling rigs are already under operation, and five to six more are in the pipeline, additional rigs. This momentum of drilling close to about 100 wells will be a business as usual case for us from now onwards. Then you will question that, why with additional rigs we cannot drill more? The answer is that we are drilling deeper now. We are drilling wells which are 5,500 m- 6,000 m. We are going to drill wells which are 6,500 m, where the formations are going to be harder and the subsurface problems will be more complicated because it's a very tectonically active, geologically active region that we're working.

    Answer, saloma yomdo

    This business as usual of about close to 100- 110 wells per year will be our target in the coming days. Of course, that is significantly adding to your increased production because the exploration success ratio from the exploratory wells is 82%, while the development wells, the success ratio is 100%. These are contributing significantly towards production. Production also, like the Director of Operations mentioned, even though there is an average 12%-15% decline from the fields, over and above that, we are producing 20% more from these fields itself. That also speaks huge about this sort of reservoir management that we deploy in our fields.

    Answer, abhijit majumder

    Abhijit Majumder: I think you all must appreciate this point that despite the fields being very old and mature, we are still able to kind of produce at a reasonably good pace, surpassing our previous records. That goes to show that we are going deeper, we are using more resources, and thereby achieving higher targets. So capex naturally would be more, and the cost of production accordingly will also be more because you are producing more. The volume is increasing.

    Answer, trailukya borgohain

    Trailukya Borgohain: Another point actually, this is Director of Operations again. Already, the Director of Exploration has already said about it, but one point I would like to say here is that another exploration also is giving us a ray of hope in Cambay Basin. This has already been also established, and we have already given this, I think… Saloma Yomdo: Notification.

    Answer, saloma yomdo

    Trailukya Borgohain: Notification of discovery. This is a little bit high pour point oil and at a shallow depth. We have seen the oil physically, and we went there, and we have seen the oil coming out, and now we are deploying faster monetization procedures there. How we monetize that. This work is also going on. In exploration front and also in production front, I think we will be getting some new Page 13 of 18 Oil India Limited November 13, 2026 additions, although that may not be very big like any other field, but this will also add to our kitty.

  4. Question

    Sabri Hazarika: Yes, hi. Sabri from Emkay. First of all, there is this PNGRB document regarding hookup of IGGL and DNPL. Any comments on that? What exactly is the status right now?

    Answer, trailukya borgohain

    Trailukya Borgohain: What is going on actually is that we have already okayed for this investment and 168 km pipeline is under— Saloma Yomdo: Construction.

    Answer, saloma yomdo

    Trailukya Borgohain: —under construction. It will take 18 months from now, from the date of construction in this. At the same time, Mr. Sabri, we are working on the -- I already told that the gas processing plant in Madhuban, which will process from where we will be sending the additional gas. The maximum capacity will be 5 million standard cubic meters, but on an average, we are planning for 3.5 million standard cubic meters.

  5. Question

    Thanks. Last small question, this fire in this tank farm, is it affecting our operations in any way or it's not much there?

    Answer, trailukya borgohain

    Trailukya Borgohain: Mr. Sabri, the fire has a little bit impacted because ITF handles around 1,000 kilolitres of oil per day. What we have is that we are doing is that we have a bypass system there. We are taking it in other OCS nearby. The total impact we have reduced by a lot. Although this will impact a little bit, what we will do is that we will compensate it at a later time. We are just a little bit of kind of holding onto the wellheads, and we are controlling a little bit of production, but it is not going to impact very high. Our people are there in PESO office today.

    Answer, trailukya borgohain

    Most surely, we are going to get the complete bypass of the ITF. Also, we got yesterday whatever oil was there in ITF, it can be taken out from the ITF. There should not be much more impact in the coming days. Maybe two, three days, there will be a little bit of issue. Otherwise, our people are working day and night to have the bypass. Yes.

  6. Question

    Nitin Tiwari: Hi, sir. Good morning. I hope I am audible. Thanks for the opportunity. My first question is with respect to NRL. The refinery margin that is reported, it is pre-SAED or after SAED adjustment? Also if you can help us with the distillate yield, I mean, broadly in terms of gasoline, gas oil, etcetera, for NRL in this quarter as well as in the previous quarter.

    Answer, sachidananda maharana

    Sachidananda Maharana: This GRM is after SAED adjustment, to answer your first question. Distillated for the half year is 87.15%.

  7. Question

    Nitin Tiwari: Sir, I wanted actually a breakdown in terms of how much diesel we produce in this quarter versus what we produced in the previous quarter. The $36 that you reported in the first quarter was also post-SAED?

    Answer, sachidananda maharana

    Sachidananda Maharana: For quarter two, if you see our production numbers, the total production was 810 TMT. Out of that, the major component, as you know, that it is a HSD is 542 TMT, and MS was 193 TMT.

Questions about this call

When was the Oil India Q2 FY27 earnings call transcript filed?
Oil India filed the transcript with the exchange on 18 Nov 2026. This page is built from that transcript.
What does this page list?
87 statements from the transcript across 6 topics, 60 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 17 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
Oil India Q2 FY27 concall: Oil India Limited expected production to be around 4, 4 plus/minus by the end of 31st March · DalalOS