Pace Digitek Q2 FY27 earnings call

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

As of September 30, 2026, Pace Digitek Limited's executable order book stood at Rs. 10,735 crore, comprising Rs. 8,528 crore from Energy and Rs. 2,208 crore from Telecom & ICT. The company commenced production of its 261 kilowatt-hour C&I cabinets, produced samples for a couple of customers, and expects much bigger orders in the C&I market in the days to come. The company has delivered about 1.8 GWh of BESS to its customers and commissioned about 1 GWh at its own project sites as of today. The company produced about 94% of the BESS capacity it produced in the last financial year during the first half of this financial year. The company sees a BESS opportunity of about 236 gigawatt-hour (GWh) by FY32 as demand for BESS has increased multi-fold in the last 1 year.

The numbers management gave

Results

  • The company produced about 94% of the BESS capacity it produced in the last financial year during the first half of this financial year.
    Show source
    To put this into perspective, about 94% of the capacity which we produced in the last financial year we have produced in this first half of this financial year.
  • Consolidated revenue from operations in Q2 was Rs.808 crores, up 51.5% year-on-year and 45.5% quarter-on-quarter.
    Show source
    Starting with the consolidated financial performance, the revenue from operations for Q2 stood at Rs.808 crores, registering a growth of 51.5% year-on-year and 45.5% quarter-on-quarter.
  • Consolidated revenue in H1 FY27 was Rs.1,364 crores, up 51.4% over H1 FY26.
    Show source
    For H1 FY27, the revenue stood at Rs.1,364 crores, representing a growth of 51.4% over H1 FY26.
  • Energy segment contributed about 80% of revenue and its telecom segment contributed 20% to the overall top line in the quarter ended September 30, 2026.
    Show source
    The energy segment contributed to about 80% of the revenue, while telecom segment contributed 20% to the overall top line.
  • Top-line growth in the quarter ended September 30, 2026 was supported by higher energy-segment execution, including BESS supplies and project deployment including EPC activities.
    Show source
    The growth in top line is supported by higher execution of energy segment including the BESS supplies and the project deployment including the EPC activities.
  • Telecom revenue in the quarter ended September 30, 2026 was supported mainly by BSNL supplies and ongoing O&M operations, including maintenance of BSNL's 4G network.
    Show source
    Page 3 of 17 Pace Digitek Limited November 02, 2026 The telecom revenue was supported majorly by BSNL supplies and ongoing O&M operations, including the maintenance of the 4G network of BSNL.
Show 20 more statements

Results

  • Employee expenses in Q2 were Rs. 37 crores compared to Rs. 24 crores in Q2 FY26; the increase was primarily driven by business growth and additional manpower across energy projects and manufacturing operations.
    Show source
    Our employee expenses in Q2 stood at R s. 37 crores compared to Rs. 24 crores in Q2 FY26.
  • Employee expenses in H1 were Rs. 70 crores compared to Rs. 44 crores in the previous financial year.
    Show source
    For H1, employee expenses stood at R s. 70 crores compared to Rs. 44 crores of the previous financial year.
  • EBITDA in H1 was Rs. 245 crores, up 40.5% compared to the last financial year.
    Show source
    H1 EBITDA stood at R s. 245 crores, registering growth of 40.5% compared to the last financial year.
  • Finance cost in Q2 increased to Rs. 36 crores compared to Rs. 28 crores in Q1, primarily due to funding requirements for the built-to-own-operate developer project and increased working capital to support increased BESS manufacturing capacity.
    Show source
    The finance cost increased to R s. 36 crores in Q2 compared to R s. 28 crores in Q1.
  • PAT in Q2 increased by 43.3% to Rs. 97 crores.
    Show source
    The PAT for Q2 increased by 43.3% to R s. 97 crores.
  • PAT in H1 was Rs.160 crores, up 30.4% year-on-year in line with sales, keeping margins constant.
    Show source
    PAT for H1 stood at Rs.160 crores, which is again an increase of 30.4% year-on-year.
  • Return on equity was 13.2% and return on capital employed was 12.6% for H1 FY27.
    Show source
    The return on equity stood at 13.2%, while the return on capital employed stood at 12.6% for this H1.
  • H1 FY2027 EBITDA margin was higher because a significant portion of the EBITDA margin contribution came from services in the Telecom segment, which has higher EBITDA margins than the energy business; energy EBITDA margins were 12% -13% and telecom EBITDA margins were around 20%.
    Show source
    The energy EBITDA margins stood in a range of 12% -13%, while the telecom EBITDA margins stood at around 20%.
  • The company maintained 2.5 GWh for Q2 and sold about 91 containers, with another 10 containers kept in stock, for about 100 containers in Q2.
    Show source
    In Q2, we have done about 91 containers which is sold and another 10 containers which is kept in stock.
  • Consolidated payables were about Rs.1,800 crores and reduced to Rs. 1,500 crores in September.
    Show source
    Rajavendhan P: Yes, so consolidated payable was about Rs.1,800 crores, which got reduced to Rs. 1,500 crores in September.
  • Standalone EBITDA margin declined because it started two projects, one from MAHAGENCO for the supply and erection of solar panel and another with Bondada, a balance of systems order of solar; their initial expenses exceeded revenues and initial mobilization and supplies had lower EBITDA margins, while subsequent project milestones are expected to have better margins.
    Show source
    These 2 projects we have started wherein the initial expenses are higher than the revenues, but the subsequent project milestones will have a better margin.
  • The company said project retentions from customers have started coming in, and that it releases retentions for payables when it receives customer retentions.
    Show source
    Rajavendhan P: As I stated that the retentions of the projects have started coming in.
  • The company delivered growth across its energy and telecom businesses in the first half of FY27. Replaced by a later filing.
    Show source
    We have delivered a strong performance in the first half of FY27 with growth across both our energy and telecom business es.
  • The company said growth in the energy segment is driving stronger company growth and a significant improvement in revenue. Replaced by a later filing.
    Show source
    Especially with the growth in the energy segment, we are seeing stronger growth for the company and a significant improvement in revenue.

Money and capital

  • Total equity as of 30th September was Rs. 2,428 crores compared to Rs. 2,252 crores, primarily due to the addition of PAT.
    Show source
    Moving to the balance sheet and return ratios, as of 30th September, the total equity stood at Rs. 2,428 crores compared to Rs. 2,252 crores which was primarily due to the addition of the PAT.
  • Build-to-own-operate asset stood at Rs. 1,311 crores as on 30th September 2026.
    Show source
    As on 30th September 2026, our build -to-own-operate asset stood at Rs. 1,311 crores.
  • Cash and bank balances stood at Rs. 515 crores, resulting in net debt of Rs. 856 crores as on 30th September.
    Show source
    The cash and bank balances stood at Rs. 515 crores, resulting in a net debt of Rs. 856 crores as on 30th September.
  • Total receivables declined to Rs. 2,177 crores as of 30th September, compared to Rs. 2,442 crores as on 31st of March 2026, reflecting improved collections including collection of retention portions of older projects.
    Show source
    On the working capital front, the total receivables declined to Rs. 2,177 crores as of 30th September, compared to Rs. 2,442 crores as on 31st of March 2026.
  • Net debt-to-equity ratio stood at 0.09x in FY2026.
    Show source
    As I explained, that the increase in this ratio is due to the increase in debt to support the build-to-operate project.
  • Capital requirements are mostly already taken care of. Replaced by a later filing.
    Show source
    Most of the capital requirements are already taken care of.

What it expects ahead

What management expects

  • The company commenced production of its 261 kilowatt-hour C&I cabinets, produced samples for a couple of customers, and expects much bigger orders in the C&I market in the days to come.
    Show source
    We have also successfully commenced production of our 261 kilowatt -hour C&I cabinets, and we have produced samples for couple of our customers, and we are expecting much bigger orders in the C&I market in the days to come.
  • The company expects its EBITDA margin to be in a range of 16 to 17% as revenue contribution from energy increases.
    Show source
    However, as revenue contribution from energy increased, the overall EBITDA margin will slightly come down and will be in a range of 16 to 17%.
  • The company expects its PAT margins to remain at about 10% for FY28, below the 11%-12% reported in H1 FY27 because energy is expected to play a bigger role; H1 margins were higher because telecom turnkey projects were completed in this financial year.
    Show source
    Rajavendhan P: For the FY28, we expect that the PAT margins to remain at about 10%.
  • The company expects blended margins to increase by at least 1% or 2% with the C&I business growing, but it cannot answer on the C&I side while it is still working on utility BESS products.
    Show source
    But with the C&I business growing, the margins will improve at least by 1% or 2%, Paras Chheda: And therefore, the PAT margins will not be impacted?
  • PAT margin guidance is about 10% to 11%; these numbers will increase as the C&I business comes in and more fabrication and other backward integration happens.
    Show source
    About 10% to 11%, is guidance standing today.
  • The company expects a higher number of containers next quarter because increased capacity came only in August and commercial production started only in September.
    Show source
    Rajavendhan P: No, because the increased capacity has come only in August where the commercial production has started only in September, so the next quarter we would expect a higher number.
Show 5 more statements

What management expects

  • The company has already factored in the benefit from container manufacturing; increased capacity will increase business top line, significantly improve absolute PAT, and slightly reduce margins.
    Show source
    In terms of the absolute numbers, PAT will have a significant improvement, but the margins will have a slight reduction.
  • The company expects to win a couple of other projects later this financial year. Replaced by a later filing.
    Show source
    We also have a couple of other projects in pipeline we expect to win later this financial year.

Orders

  • As of September 30, 2026, Pace Digitek Limited's executable order book stood at Rs. 10,735 crore, comprising Rs. 8,528 crore from Energy and Rs. 2,208 crore from Telecom & ICT.
    Show source
    Our executable order book stands at R s. 10,735 crores, compris ing Rs. 8,528 crores in energy and Rs. 2,208 crores in telecom.
  • The company secured BESS EPC orders from NLC India and DVC, a BESS BOOT order from BSES Rajdhani Power, and BESS supply orders from NGSL and other customers during the first half.
    Show source
    Page 2 of 17 Pace Digitek Limited November 02, 2026 During the first half, we have also secured significant orders in energy segment including BESS EPC orders from NLC India and DVC, a BESS BOOT order from BSES Rajdhani Power and BESS supply orders from NGSL and more other customers.
  • The company secured additional telecom orders during H1 FY27, especially from BSNL and in the BharatNet OFC projects.
    Show source
    During H1 FY27, we have also secured additional telecom orders, especially from the BSNL and in the BharatNet OFC projects .

What it is building and selling

Projects and capacity

  • The company has delivered about 1.8 GWh of BESS to its customers and commissioned about 1 GWh at its own project sites as of today.
    Show source
    As of today, we have delivered about 1.8 GWh of BESS to our customers, and we have commissioned about 1 GWh at our own project sites.
  • The company expanded its BESS manufacturing capacity from 2.5 to 5 GWh in August, 2026, and produced about 844 MWh of BESS capacity in the first half of the year.
    Show source
    Some key updates regarding our manufacturing expansion in August, 2026, we have expanded our capacity from 2.5 to 5 GWh capacity, and we have also produced about 844 MWh of BESS capacity in this first half of the year.
  • BESS production is currently running at full capacity of 5 GWh.
    Show source
    So, we are making good progress in our BESS capacity and our production is currently running at full capacity of 5 GWh.
  • The company plans to start trial production from November 2026 and full-scale production from January 2027 at its BESS container facility.
    Show source
    We plan to start trial production from November 2026 and full-scale production from January 2027 .
  • The company expanded its capacity to 5 GWh and is expanding it to 10 GWh by next quarter.
    Show source
    In terms of the capex plan, as Rajiv was explaining, we have expanded our capacity to 5 GWh and we are expanding it to 10 GWh by next quarter.
  • The company is in line to expand to 10 GWh and expects to complete the setup of an additional 5-GWh expansion during this quarter.
    Show source
    Page 9 of 17 Pace Digitek Limited November 02, 2026 Rajiv Maddisetty: Yes, and the expansion to 10 GWh is also in line and we would complete the setup of additional 5-GWh expansion during this quarter.
Show 15 more statements

Projects and capacity

  • The company expects in-house container fabrication to improve EBITDA margins and reduce cost by about 4%, and said it will significantly improve lead time.
    Show source
    Rajavendhan P: The container fabrication is expected to improve our EBITDA margins and reduce our cost by about 4%.
  • The company said container fabrication would meet 50% of its capacity, while the balance would be imported.
    Show source
    And as we also explained that 50% of our capacity would be met with the container fabrication, and balance anyway would get imported.
  • The company will continue to import lithium-ion cells and the BMS in the next 2 quarters, while localising all remaining components in India.
    Show source
    And in the next 2 quarters, we will continue to have the lithium-ion cells and the BMS imported, and localise all the remaining components in India.
  • The company commissioned 875 MWh of BESS capacity during H1 FY2027.
    Show source
    During our, H1 of FY27, we have commissioned about 875 megawatt-hour (MWh) of BESS capacity at our project sites.
  • The company developed an in-house BESS container prototype, with trial production scheduled for November 2026 and full-scale production from January 2027; the facility is expected to meet approximately 50% of its container requirements.
    Show source
    With this BESS fabrication facility, we will be able to meet about 50% of our container requirements through in-house manufacturing.
  • The company successfully developed its in-house BESS container facility and commenced production of BESS containers.
    Show source
    We have also successfully developed our in -house BESS container facility and commenced production of BESS containers.
  • The company has established its in-house container fabrication facility.
    Show source
    We have also established our in- house container fabrication facility.
  • The company expects the PLI tendering to complete by mid of November.
    Show source
    Rajavendhan P: The PLI tendering is expected to complete by mid of November.
  • Capex plan for cell manufacturing is on, and its R&D center is studying the required transfer of technology; it expects to kickstart in the next financial year once things settle down.
    Show source
    As explained that our capex plan for the cell manufacturing is on and our R&D center is studying the required transfer of technology.
  • The company is working on backward integration for BESS on the same timelines; its R&D center is working toward technology transfer, supply chain buildup and alternative technologies, and the company may have visibility in subsequent quarters. Replaced by a later filing.
    Show source
    Maybe in the subsequent quarters we may have some sort of visibility.

Demand and pricing

  • The company sees a BESS opportunity of about 236 gigawatt-hour (GWh) by FY32 as demand for BESS has increased multi-fold in the last 1 year.
    Show source
    As the demand for BESS has increased, multi-fold in the last 1 year and in the coming years, we are seeing a growth opportunity of about 236 gigawatt-hour (GWh) by FY32, of which we want to be major contributors.
  • The company said the landed price of Chinese BESS is almost in line with its manufacturing cost plus margins, and its BESS sale price is almost competitive with Chinese landed prices after transportation and customs duty.
    Show source
    The landed price of the Chinese BESS is almost in line with our manufacturing cost plus margins.
  • The company said C&I margins are better than margins on the utility-scale BESS products it is currently selling, and that it would start seeing these margins once larger commercial sales commence.
    Show source
    Rajiv Maddisetty: No, like we said, C&I margins are better than those on utility-scale BESS products that we are selling now.

Segments

  • Energy storage execution includes BESS supply, EPC and build-own-operate projects.
    Show source
    Our execution is spread across different types of contracts including BESS supply, EPC, build- own-operate projects.

Deals and partners

  • The company commissioned more than 8,000 sites for BSNL, and these sites entered the O&M phase for the next 5 years.
    Show source
    In telecom business, we have successfully commissioned more than 8,000 sites for BSNL, which is one of our largest projects in the telecom business.

Risks, rules and outside factors

Outside factors

  • Lithium-ion prices increased in the last quarter, started coming down this quarter and are expected to stabilize at this particular range; tenders Pace Digitek Limited started bidding over the last 3 to 4 months use the new prices.
    Show source
    Rajavendhan P: The lithium-ion prices have increased in the last quarter but this quarter it's again started coming down and are expected to stabilize at this particular range.

Everything else said on the call

What management stressed

  • The company is targeting further expansion into the energy business and to strengthen and scale up the business. Replaced by a later filing.
    Show source
    We are also targeting to expand further into the energy business and strengthen and scale up the business further.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Ishan Verma: Thank you, Anam. Good afternoon, everyone. On behalf of Antique Stock Broking, I welcome you all to the Q2 and H1 FY27 Post-Results Conference Call of Pace Digitek Limited. We have with us today from the management Mr. Rajiv - Whole-Time Director, Mr. Rajavendhan - CFO, and Mr. Ajay - Head of Investor Relations. We will begin with the brief opening remarks from the management followed by the Q&A session. Thank you and over to you, sir.

    Answer, rajiv maddisetty

    Rajiv Maddisetty: Good afternoon, everyone and thank you for joining Pace Digitek Limited Q2 and H1 FY27 conference call. I am Rajiv, Whole -Time Director, along with my team, we'd like to take you through the key developments and key figures for this financial year. So on behalf of Pace Digitek, I would like to welcome all the shareholders, investors, and analysts on this call. I hope you have had the opportunity to review our financial results and our investor presentation which we have uploaded in the exchanges. We have delivered a strong performance in the first half of FY27 with growth across both our energy and telecom business es. During this period, we have expanded our BESS manufacturing capacity, progressed in several of our battery energy storage projects and we have reached a much better stage in all of these projects. I'd like to take you through some of the key developments for the first half of this financial year.

    Answer, rajiv maddisetty

    Our energy business continues to be the growth driver for this company this year and the years to come. As the demand for BESS has increased, multi-fold in the last 1 year and in the coming years, we are seeing a growth opportunity of about 236 gigawatt-hour (GWh) by FY32, of which we want to be major contributors. So with this, we are seeing a good opportunity ahead of us, especially in the BESS segment. During our, H1 of FY27, we have commissioned about 875 megawatt-hour (MWh) of BESS capacity at our project sites. As of today, we have delivered about 1.8 GWh of BESS to our customers, and we have commissioned about 1 GWh at our own project sites. Our execution is spread across different types of contracts including BESS supply, EPC, build- own-operate projects. This gives us the ability to participate across different stages of energy storage value chain from manufacturing and supply to long-term developer projects.

    Answer, rajiv maddisetty

    Page 2 of 17 Pace Digitek Limited November 02, 2026 During the first half, we have also secured significant orders in energy segment including BESS EPC orders from NLC India and DVC, a BESS BOOT order from BSES Rajdhani Power and BESS supply orders from NGSL and more other customers. These are orders demons trate our ability to participate in large utility -scale storage projects across different business models. Some key updates regarding our manufacturing expansion in August, 2026, we have expanded our capacity from 2.5 to 5 GWh capacity, and we have also produced about 844 MWh of BESS capacity in this first half of the year. To put this into perspective, about 94% of the capacity which we produced in the last financial year we have produced in this first half of this financial year. So, we are making good progress in our BESS capacity and our production is currently running at full capacity of 5 GWh. We have also successfully developed our in -house BESS container facility and commenced production of BESS containers. We plan to start trial production from November 2026 and full-scale production from January 2027 .

    Answer, rajiv maddisetty

    With this BESS fabrication facility, we will be able to meet about 50% of our container requirements through in-house manufacturing. We have also successfully commenced production of our 261 kilowatt -hour C&I cabinets, and we have produced samples for couple of our customers, and we are expecting much bigger orders in the C&I market in the days to come. In telecom business, we have successfully commissioned more than 8,000 sites for BSNL, which is one of our largest projects in the telecom business. These 8,000 sites have also entered the O&M phase, which will continue for the next 5 years. During H1 FY27, we have also secured additional telecom orders, especially from the BSNL and in the BharatNet OFC projects . We also have a couple of other projects in pipeline we expect to win later this financial year. Our executable order book stands at R s. 10,735 crores, compris ing Rs. 8,528 crores in energy and Rs. 2,208 crores in telecom.

    Answer, rajiv maddisetty

    During H1 FY27, we have secured inflows of about R s. 2,437 crores, of which R s. 2,173 crores c ame from our energy and R s. 265 crores c ame from our telecom business. With that, I'd like to hand it over to our CFO, to take you through the numbers.

    Answer, rajavendhan p

    Rajavendhan P: Thank you, Rajiv. Good afternoon, everyone. Now I would like to take you through the financial and operational performance for the quarter and half year ended 30 th September 2026. Starting with the consolidated financial performance, the revenue from operations for Q2 stood at Rs.808 crores, registering a growth of 51.5% year-on-year and 45.5% quarter-on-quarter. For H1 FY27, the revenue stood at Rs.1,364 crores, representing a growth of 51.4% over H1 FY26. The energy segment contributed to about 80% of the revenue, while telecom segment contributed 20% to the overall top line. The growth in top line is supported by higher execution of energy segment including the BESS supplies and the project deployment including the EPC activities.

    Answer, rajavendhan p

    Page 3 of 17 Pace Digitek Limited November 02, 2026 The telecom revenue was supported majorly by BSNL supplies and ongoing O&M operations, including the maintenance of the 4G network of BSNL. Our employee expenses in Q2 stood at R s. 37 crores compared to Rs. 24 crores in Q2 FY26. For H1, employee expenses stood at R s. 70 crores compared to Rs. 44 crores of the previous financial year. The increase in employee cost is primarily driven by the growth in the business operations, and with the additional manpower deployed across the energy projects and manufacturing operations. These investments are intended to support the growing scale of the operations of our business and the expand ing order book. The EBITDA for Q2 increased to R s.159 crores compared to Rs. 94 crores in Q2 of the last financial year, registering a growth of 68.5% year-on-year. H1 EBITDA stood at R s. 245 crores, registering growth of 40.5% compared to the last financial year.

    Answer, rajavendhan p

    The finance cost increased to R s. 36 crores in Q2 compared to R s. 28 crores in Q1. The finance cost also increased primarily due to the funding requirements for the built -to-own-operate developer project and the increased working capital to support the increased capacity of our BESS manufacturing. The PAT for Q2 increased by 43.3% to R s. 97 crores. PAT for H1 stood at Rs.160 crores, which is again an increase of 30.4% year-on-year. This increase is in line with our sales, keeping the margins constant. Moving to the balance sheet and return ratios, as of 30th September, the total equity stood at Rs. 2,428 crores compared to Rs. 2,252 crores which was primarily due to the addition of the PAT. The total borrowing stood at Rs.1,371 crores as on 30 th September compared to Rs. 961 crores at the end of financial year 2026.

    Answer, rajavendhan p

    There is an increase of Rs. 410 crores. The increase of borrowing is primarily to meet funding requirement of the build-to-operate project expansion and also the increased requirement of working capital. As on 30th September 2026, our build -to-own-operate asset stood at Rs. 1,311 crores. This clearly indicates that our increased borrowing is supporting increased requirement of build -to-own-operate projects. The cash and bank balances stood at Rs. 515 crores, resulting in a net debt of Rs. 856 crores as on 30th September. The net debt-to-equity ratio stood at 0.35x compared to 0.09x as on 31 st of March 2026. As I explained, that the increase in this ratio is due to the increase in debt to support the build-to-operate project.

    Answer, rajavendhan p

    On the working capital front, the total receivables declined to Rs. 2,177 crores as of 30th September, compared to Rs. 2,442 crores as on 31st of March 2026. The reduction in these receivables reflects an improvement in overall collections, as we have been highlighting that we have started collecting the retention portions of the older projects. The return on equity stood at 13.2%, while the return on capital employed stood at 12.6% for this H1. In terms of the capex plan, as Rajiv was explaining, we have expanded our capacity to 5 GWh and we are expanding it to 10 GWh by next quarter. We have also established our in- house container fabrication facility. Most of the capital requirements are already taken care of. Page 4 of 17 Pace Digitek Limited November 02, 2026 The overall approach remains to align the capital deployment with project execution, the commissioning schedules, and the expected cash flow from these assets.

  2. Question

    Deepak Poddar: Yes, thank you very much, sir, for this opportunity and many congratulations for good set of numbers. I wanted to understand on your margins. We have seen a very sharp improvement in your EBITDA margins. I wanted to know what led to this improvement and how should we look at going forward?

    Answer, rajavendhan p

    Rajavendhan P: So, what we do is maintain EBITDA margins of about 17% to 19%, as reflected in our performance over the last few quarters and across the financial and half -yearly periods. The H1 FY2027 EBITDA margin is a mix of energy and telecom. In H1, what we saw was that a significant portion of the EBITDA margin contribution came from services in the Telecom segment, considering the fact that higher service revenues are recorded from telecom segment. Telecom business has a higher EBITDA margin and this contributed positively to overall EBITDA margins. While we always say that energy EBITDA margins are lower than those of telecom. The energy EBITDA margins stood in a range of 12% -13%, while the telecom EBITDA margins stood at around 20%. The combined weighted average was higher in this quarter .

    Answer, rajavendhan p

    However, as revenue contribution from energy increased, the overall EBITDA margin will slightly come down and will be in a range of 16 to 17%.

  3. Question

    Deepak Poddar: Okay, but, but this quarter itself energy shares were quite high, right?

    Answer, rajavendhan p

    Rajavendhan P: Yes, right, but what has happened is that during this quarter, the services portion of the telecom was higher.

  4. Question

    Deepak Poddar: Okay, got it. And, my second question is on volumes. The first quarter, I think your volume was about 90 containers. Just wanted to know, what was the volume in second quarter and how should one look at this volume in third and fourth? Page 5 of 17 Pace Digitek Limited November 02, 2026 Rajavendhan P: We have maintained the same 2.5 GWh for Q2.

    Answer, rajavendhan p

    In Q2, we have done about 91 containers which is sold and another 10 containers which is kept in stock. So, we have done about 100 containers for this Q2.

  5. Question

    Deepak Poddar: Are we were targeting around 200 this quarter?

    Answer, rajavendhan p

    Rajavendhan P: No, because the increased capacity has come only in August where the commercial production has started only in September, so the next quarter we would expect a higher number.

  6. Question

    Deepak Poddar: Okay, I got it. And just one last thing on, on your backward integration. Now as in-house container will now perform 50% post this commissioning, maybe by year -end or January. Can you throw some light that how will it benefit your margins? In terms of basis point or percentage, how will it benefit you?

    Answer, rajavendhan p

    Rajavendhan P: The cost of the containers is expected to come down by about 25%. In terms of the BESS overall cost, it is expected to come down by 4% to 5%.

  7. Question

    Deepak Poddar: Can one expect 4 to 5% EBITDA margin improvement on your energy revenue?

    Answer, rajavendhan p

    Rajavendhan P: This is on the gross level. If you consider the EBITDA level, we are expecting about 1.5 to 2%.

  8. Question

    Milandeep Jain: Hi sir, thank you for the opportunity, and I must congratulate you and the entire management for good set of results. My first question is about on the container fabrication. On the last call, the management shared that the production of container would st art in September 2026. Now the production is planned for November and full production is planned for January 2027. Why there was a slight delay on this front? Can you please share some more color on it?

    Answer, rajavendhan p

    Rajavendhan P: Maybe I'll slightly correct the understanding. The container fabrication facility is already commissioned as per the target that we had, but the commercial production will start only from November. Testing is currently underway, the plant is already commissioned.

  9. Question

    Milandeep Jain: Okay, I got that. Thank you. My other question was around the C&I batteries. So, you have developed like 261 kilowatt -hours of C&I cabinets and completed customer trials. What the order book for C&I particular look like as of now and how much revenue do you expect in the next 1 and 2 years? Page 6 of 17 Pace Digitek Limited November 02, 2026 Rajiv Maddisetty: As of now we have supplied sample quantities to our customers in India and in some countries abroad.

    Answer, rajiv maddisetty

    But the production orders and the bigger orders would come sometime end of Q3 or in Q4. Standing today, we have developed the product and the product is ready for production.

  10. Question

    Milandeep Jain: Got it, sir. My other question was about the Saudi Arabia. After the small shipment of container to Saudi Arabia, have you received any further orders on that front? What is the size of orders or revenue do you expect from Saudi in the near term?

    Answer, rajavendhan p

    Rajavendhan P: The order we received from Saudi Arabia was completed and it was sample containers order. With performance of our systems, we expect higher order s from this particular region, which is expected to come, which is not there as on date.

Show 18 more questions
  1. Question

    Milandeep Jain: One last question was about the finance cost, which rose in Q2 from Rs. 283 million in Q1 to Rs. 356 million, and the long -term borrowings went up from Rs. 6,067 million to 9,449 million between March and September. I just want to understand which projects was this new margin taken from, and where do you see finance costs settling in in the coming quarters?

    Answer, rajavendhan p

    Rajavendhan P: The borrowings are specifically for the build -to-operate projects, so the build-to-operate project asset stands at about Rs.1,300 crores, against the long-term borrowing around Rs. 950 crores. The Rs. 950 crores of long-term borrowings have been spent to create the asset of Rs. 1,300 crores. It's basically the assets for the built-to-operate project. I would say 60% of the asset is commissioned, and the complete project is expected to get completed by December or January of 2027, post that the revenue from this asset will start flowing in. The revenue from this asset is about Rs. 197 crores per annum, so which is expected to come for closing all these borrowings. The borrowing is supported with the fixed asset that we have created. And again, the increase in finance cost is again because of the same reason.

  2. Question

    Milandeep Jain: Do you mean in the coming quarter we could see finance cost like going back again to the Q1 level? Page 7 of 17 Pace Digitek Limited November 02, 2026 Rajavendhan P: Yes for this particular loan it is expected to go down partly.

    Answer, rajavendhan p

    But we have other projects in place. There are another three build -to-operate projects which have just commenced. For that, again, there'll be a borrowing, for about 70% of the overall assets. By the end of March 2027, we expect the borrowing addition for about another Rs. 1,100 crores. Which will be having a substantial back-to-back asset for about another R s. 1,600 crores.

  3. Question

    Milandeep Jain: Okay, so that is very helpful. Just one small question from my side. I want to understand what the progress has been made with the Megmeet on making their products in India and pairing them with your BESS. Can you share some more color on this specifically?

    Answer, rajiv maddisetty

    Rajiv Maddisetty: Yes, we are working on BESS products and power products for data centers with Megmeet, and the product development is still in progress. So, commercial orders will take some time, but we are still in the development of the product.

  4. Question

    Milandeep Jain: Okay, so could you share some timeline of this expectation of completion of the product phase?

    Answer, rajiv maddisetty

    Rajiv Maddisetty: I think we would take another year to have this product commercially ready.

  5. Question

    Milandeep Jain: Okay, and so can you just guide on the potential we could expect from it, if that's possible?

    Answer, rajiv maddisetty

    Rajiv Maddisetty: There is a very huge demand for data centers, and data center power by itself will be a big opportunity across India and across the world. With this product, we are seeing a good entry of our power and BESS products into the data center segment.

  6. Question

    Sweta Jain: I have two questions. One on the standalone business level, we see a sharp decrease in EBITDA margins. Any color to that, if you would like to highlight? I also want to understand why there is a sharp decrease, especially when the telecom services business is up this quarter?

    Answer, rajavendhan p

    Rajavendhan P: Yes, for the standalone Pace Digitek, there is a decline in the EBITDA margin because we have kickstarted 2 different projects. One is a project from MAHAGENCO. For the supply and erection of solar panel. The other one is the project with Bondada, which is again a balance of systems order of solar. These 2 projects we have started wherein the initial expenses are higher than the revenues, but the subsequent project milestones will have a better margin. Page 8 of 17 Pace Digitek Limited November 02, 2026 But the initial margins, which is in terms of the mobilization of the resources and the initial supplies, were at a lower EBITDA margin. So that's the major reason for a lower EBITDA margin for Pace Digitek.

  7. Question

    Sweta Jain: Okay, but do we foresee any cost increases with, or any timeline changes with respect to our own backward integration for BESS?

    Answer, rajavendhan p

    Rajavendhan P: No, we are keeping the same timelines on. We are still working on that, as we also already stated in the previous call. The R&D center is working towards technology transfer, supply chain buildup, and also the alternative technologies available, including the technologies available from the other countries. R&D center is studying, but still we are in the same state as compared to the last quarter. Maybe in the subsequent quarters we may have some sort of visibility. Page 9 of 17 Pace Digitek Limited November 02, 2026 Rajiv Maddisetty: Yes, and the expansion to 10 GWh is also in line and we would complete the setup of additional 5-GWh expansion during this quarter.

  8. Question

    Paras Chheda: Yes, good morning, sir, and congratulations for a strong set of results. I just wanted to understand, for FY28, do we expect these PAT margins to sustain in the range of 11.5% to 12%?

    Answer, rajavendhan p

    Rajavendhan P: For the FY28, we expect that the PAT margins to remain at about 10%. It is not going to be 11%-12% is as we reported in H1 FY27. In H1 it is higher it is because of the turnkey projects of telecom we have completed in this financial year. But for the next financial year where energy is going to play a bigger role, the PAT margins will be kept at about 10%.

  9. Question

    Paras Chheda: Okay, so benefit from container manufacturing will not add to this one or already factored in?

    Answer, rajavendhan p

    Rajavendhan P: Yes, it's already factored, but, but what is going to happen is that, the top line of the business will increase with the increased capacity. In terms of the absolute numbers, PAT will have a significant improvement, but the margins will have a slight reduction.

  10. Question

    Paras Chheda: Okay. And even in the C&I, so the blended EBITDA margins, you said about 16% to 17% for energy. Now even, when C&I is quite a significant proportion, the blended margins are expected about 16%-17%?

    Answer, rajiv maddisetty

    Rajiv Maddisetty: No, that with addition of C&I the blended margin will increase, further at least by 1% or 2%. But, again, so standing today, we are still working on the utility BESS products. So, we cannot answer on the C&I side. But with the C&I business growing, the margins will improve at least by 1% or 2%, Paras Chheda: And therefore, the PAT margins will not be impacted?

  11. Question

    Paras Chheda: But as of now, you're guiding for about 10%?

    Answer, rajiv maddisetty

    Rajiv Maddisetty: Yes. About 10% to 11%, is guidance standing today. As the C&I business comes in and more of the fabrication and other backward integration happens, these numbers will increase.

  12. Question

    Paras Chheda: On lithium cell prices front, are we still struggling? And, how is utility market faring out now?

    Answer, rajavendhan p

    Rajavendhan P: The lithium-ion prices have increased in the last quarter but this quarter it's again started coming down and are expected to stabilize at this particular range. The tenders that we have started Page 10 of 17 Pace Digitek Limited November 02, 2026 bidding over last 3 to 4 months are with the new prices. We expect that this price will get stabilized.

  13. Question

    Paras Chheda: You said about, this build and operate, the revenue will start flowing in from next year. What quantum did you mention? I just missed that .

    Answer, rajavendhan p

    Rajavendhan P: From the project that we are doing today, it is R s.197 crores. But there are another 2 projects which we are getting commissioned by March-27, which again will increase the revenue from these build-to-operate projects by another Rs. 200 crores. FY28, we expect somewhere around Rs. 325 crores to Rs. 375 crores as a revenue from these build-to-operate projects.

  14. Question

    Kapil Aggarwal: Receivables and payables both.

    Answer, rajavendhan p

    Rajavendhan P: As I stated that the retentions of the projects have started coming in. So, when we receive the retentions from the customers, we also release the retentions for the payables. Page 15 of 17 Pace Digitek Limited November 02, 2026 Kapil Aggarwal No, no, but if you see that our debtors have been reduced from Rs. 2,067 crores to Rs. 1,792 crores in from March to September, but our payables, there is not much difference in payable. It's around Rs. 2,100 crores in March also and in September also. So, there is not such reduction in payables?

    Answer, rajavendhan p

    Rajavendhan P: Yes, so consolidated payable was about Rs.1,800 crores, which got reduced to Rs. 1,500 crores in September. If you see the receivables and payables, it will have a similar reduction. Kapil Aggarwal Okay, mean to say that if we consider 90 days, the payables could potentially come down from Rs.1,500 crores to around Rs. 300 crores?

  15. Question

    Ishan Verma: Hi, sir. Thank you for taking my question. Can you give some color on the current BE SS system pricing for the grid-scale versus the C&I and versus the imported BESS?

    Answer, rajavendhan p

    Rajavendhan P: As Indian domestic manufacturer, we are competing directly with the Chinese imports. The landed price of the Chinese BESS is almost in line with our manufacturing cost plus margins. The sale price of our BESS is almost competitive with the Chinese landed prices after the transportation and customs duty. This is the answer you expect from your question?

    Answer, rajiv maddisetty

    Rajiv Maddisetty: No, like we said, C&I margins are better than those on utility-scale BESS products that we are selling now. But these margins we would start seeing once larger commercial sales commence.

  16. Question

    Ishan Verma: Okay. And now with the container manufacturing in-house, how have we seen the reduction in the overall system cost or like the improvement in lead times? And what portion of our BESS bill of material is still imported?

    Answer, rajavendhan p

    Rajavendhan P: The container fabrication is expected to improve our EBITDA margins and reduce our cost by about 4%. It will also significantly improve the lead time. And as we also explained that 50% of our capacity would be met with the container fabrication, and balance anyway would get imported. This is the answer to your first question. And, second thing, we are again trying to localize much of the components. And in the next 2 quarters, we will continue to have the lithium-ion cells and the BMS imported, and localise all the remaining components in India. So that's the target that we are working with.

  17. Question

    And lastly, sir, just if you can share some update on the 4 GWh PLI application status, like any timelines or capex for that?

    Answer, rajavendhan p

    Rajavendhan P: The PLI tendering is expected to complete by mid of November. As explained that our capex plan for the cell manufacturing is on and our R&D center is studying the required transfer of technology. Once things settle down, we expect to kickstart in the next financial year.

  18. Question

    Ishan Verma: Okay, got it. Thank you. Those are my questions.

    Answer, rajiv maddisetty

    Rajiv Maddisetty: Yes, thank you everyone. Thank you for the call and a very good session. We are looking forward to the rest of the financial year and years to come, which look very promising. Especially with the growth in the energy segment, we are seeing stronger growth for the company and a significant improvement in revenue. And we are very confident about the guidance we have provided. We are also targeting to expand further into the energy business and strengthen and scale up the business further. I would like to thank all of you for joining this call.

Questions about this call

When was the Pace Digitek Q2 FY27 earnings call transcript filed?
Pace Digitek filed the transcript with the exchange on 6 Nov 2026. This page is built from that transcript.
What does this page list?
60 statements from the transcript across 10 topics, 41 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 28 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.