Earnings call

Pace Digitek Q1 FY27 earnings call: Pace Digitek Limited had an order book of about Rs.10,800 crore, giving it revenue visibility

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

The company had an order book of about Rs.10,800 crore, giving it revenue visibility. The company believes it is on track to achieve its revenue guidance of Rs. 3,200 to 3,400 crore. A major project of 4GWh in Maharashtra was cancelled. The company has supplied over 300 containers on project execution. The company has 4 Build-Own-Operate (BOO) projects and is balancing EPC and BOO projects to maintain revenues and cash flows.

The numbers management gave

Results

  • The company has supplied over 300 containers on project execution.
    Show source
    Page 2 of 15 Pace Digitek Limited August 06, 2026 On the project execution side, we have supplied over 300 containers, which is again a remarkable achievement from our manufacturing side.
  • Around 30% of Pace Digitek Limited's Railway Kavach project work has been completed.
    Show source
    For the Kavach project, around 30% work has been completed.
  • Consolidated revenue from operations was Rs.555 crore in Q1 FY27, representing 51.3% YoY growth.
    Show source
    We commenced our FY27 on a healthy note, supported by strong execution across both our energy and telecom sector s. Starting with the quarterly performance, our consolidated revenue from operations in Q1 FY27 stood at R s.555 crore, representing 51.3% YoY growth.
  • Energy business contributed 79.5% of overall revenue and Telecom & ICT contributed 20.5% in Q1 FY27.
    Show source
    The energy business continued to be the primary growth driver, contributing 79.5% to the overall revenue, while Telecom & ICT segment contributed to 20.5%.
  • Revenue declined from Rs.1,097 crore in Q4 to Rs. 555 crore in Q1, primarily because of project-execution timing and milestone-based revenue recognition; Q4 had exceptionally strong execution across multiple projects as energy projects were kicked off, while several projects in Q1 were at initial execution and revenue-recognition stages.
    Show source
    Now talking about the quarter-on-quarter change in revenue, it is a declined from Q4 to Q1 from Rs.1,097 crore to Rs. 555 crore.
  • Gross profit was Rs.155.5 crore and gross margin was 28% in the quarter ended June 30, 2026.
    Show source
    The gross profit stood at Rs.155.5 crore, translating to a gross margin of 28%.
Show 17 more statements

Results

  • EBITDA was about Rs. 86.1 crore with a margin of 15.5% in the quarter ended June 30, 2026, compared with 14.9% in the preceding quarter; the sequential improvement reflected project mix while the company continued investing in manufacturing and execution capabilities.
    Show source
    EBITDA for the quarter stood at about Rs. 86.1 crore with a margin of 15.5% compared to 14.9% in the preceding quarter.
  • Employee expenses were Rs. 33 crore in the quarter ended June 30, 2026, compared with Rs. 27 crore in the last quarter, reflecting investment in manpower particularly for energy projects and manufacturing operations.
    Show source
    On employee expenses, for the quarter, they stood at Rs. 33 crore compared to Rs. 27 crore in the last quarter.
  • Finance cost was Rs. 28 crore in the quarter ended June 30, 2026, compared with Rs. 34 crore in the previous quarter; the reduction was mainly due to treasury management and optimization of borrowing cost.
    Show source
    On finance cost, the current quarter stood at Rs. 28 crore compared to Rs. 34 crore in the previous quarter.
  • Other income increased to Rs. 28 crore in the quarter ended June 30, 2026, mainly due to foreign exchange gains and interest income on bank deposits.
    Show source
    Other income increased to Rs. 28 crore, majorly due to the foreign exchange gains and also on the interest income on the bank deposits.
  • Profit after tax was Rs. 63 crore in Q1 FY2027, compared with Rs.55 crore in Q1 FY26.
    Show source
    Profit after tax stood at Rs. 63 crore compared to Rs.55 crore in Q1 FY26.
  • The company receives Rs. 120 crore in annuity revenue from the 975 MWh commissioned in this project.
    Show source
    Rajavendhan P: No. It is like this: Rs. 120 crore is the annuity revenue that comes in from th is project for the 975 MWh commissioned.
  • For the MSEDCL project, including the previous financial year, Pace Digitek had completed around 975 MWh of commissioning to date, resulting in approximately Rs. 900 crore of revenue recognized in the P&L.
    Show source
    However, for the MSEDCL project, including the previous financial year, we have completed around 975 MWh of commissioning to date, which has resulted in approximately Rs. 900 crore of revenue being recognised in the P&L. Deepak Poddar: And you mentioned that first half, we are looking at 40-45% revenue mix, and based on the annual guidance, so we are looking at execution of close to Rs.900-1,000 crore in the second quarter.
  • The company reported Rs.555 crore sales in Q1 and had Rs.2,700 crore remaining for the year.
    Show source
    Venugopal Maddisetty: Yes, you are correct, we reported Rs.555 crore sales in Q1 and then we have Rs.2,700 crore remaining.
  • The company achieved turnover of Rs.367 crore in Q1 last year, as revenue recognition efforts mostly occur toward Q4 rather than because of a lack of orders or business.
    Show source
    You need to look at last year we have achieved only Rs.367 crore the turnover in Q1 it's not because that we do not have the orders or we do not have the business.
  • Q1 revenue increased from Rs.367 crore in the previous year to Rs.555 crore, an increase of almost 50%.
    Show source
    However, we have improved a lot from previous year of Rs.367 crore odd crore to now Rs. 555 crore, which is almost 50% increase.
  • Net working capital is about four to five months for telecom and its expected working capital cycle is about 90 to 100 days for energy.
    Show source
    Rajavardhan P: For telecom, the net working capital when I say net working capital, it is inventory, debtors, net of debtors, so the net working capital is about four to five months, whereas in energy, it is expected to be about say 90 to 100 days is the working net working capital cycle which is expected.
  • Revenue from operations was INR 555.4 crore in Q1FY27, up 51.3% year on year; EBITDA was INR 86.1 crore, up 7.5%, with an EBITDA margin of 15.5%; profit after tax was INR 62.5 crore, up 14.3%, with a PAT margin of 11.3%.
    Show source
    Profit after tax stood at Rs. 63 crore compared to Rs.55 crore in Q1 FY26.
  • Primary revenue growth in Q1 FY27 came from battery energy storage systems and renewable energy projects, while Telecom & ICT contributed through ongoing project execution.
    Show source
    The primary growth came from our battery energy storage systems and the renewable energy projects, while our telecom and ICT business continued to contribute through our ongoing project execution.
  • The company said Q1 is lower in infrastructure businesses because projects are linked to funded projects and funding availability, and players tend to execute projects and receive payments toward Q4, which is its strongest quarter.
    Show source
    That is why the Q4 is always strongest quarter for any infra company, likewise ours also.
  • The company said its operating cash flow position mainly reflects telecom cash flows, with the majority of balance-sheet receivables from the telecom sector due to milestone-based payments and deferred revenue; energy has better payment terms, segregated into an advance, payment on supply, payment on commissioning and a retention portion released within a maximum of six months. Inventory and receivables have come down and are expected to come down further by September; the company expects them to stabilize between December and March.
    Show source
    Rajavardhan P: What you are seeing in the balance sheet is majorly related to the telecom cash flows, which are reflected in operating cash flow, because energy business has started in the Q4 of the last financial year.

Money and capital

  • Total capex for the complete setup is about Rs.300 crore, with land cost playing a key role.
    Show source
    The cost of land plays a key role, so the total cost is about Rs.300 crore for the complete setup.
  • The company funded the capex using the amount raised through its private placement.
    Show source
    We have funded using that amount.

What it expects ahead

What management expects

  • The company believes it is on track to achieve its revenue guidance of Rs. 3,200 to 3,400 crore.
    Show source
    These are the opening remarks and I strongly believe that we are on the right track to achieve the revenue guidance we have given in a range of Rs. 3,200 to 3,400 crore.
  • The company is targeting about 40-45% of overall revenue in H1 FY2027, compared with 35% in H1 FY2026.
    Show source
    In H1 FY2027, we are targeting about 40-45% of the overall revenue vs. 35% in H1 FY2026.
  • The company expects its telecom order book to go up and estimates that the energy and telecom order book ratio will be somewhere in the range of 65 :35 or 70: 30 when it closes the financial year.
    Show source
    We estimate that this ratio should be between somewhere in the range of 65 :35 or 70: 30 when we close the financial year between energy and telecom.
  • The company estimates revenue of Rs. 3,400 crore because solar plus BESS BOO project execution is treated as a fixed asset rather than revenue; revenue recognition will be from EPC and standalone BESS of BOO, so physical execution will exceed revenue reflected in the same period.
    Show source
    So, that's the reason that we have Rs. 3,400 crore of estimated revenue.
  • Once Pace Digitek commissions all these four BOO projects, they will add almost about Rs.750 crore as revenue on an annual basis.
    Show source
    On the BOO, once we commission all these four projects, they will add to almost about Rs.750 crore as a revenue, which is also going to be a good situation because that is an asset -owned business.
  • The company is trying to have PAT margins of about 10.5% to 11% for the mix of BESS products and projects.
    Show source
    Rajavendhan P: PAT margins we are trying to have about 10.5% to 11% for the mix of products and the projects.
Show 23 more statements

What management expects

  • EPC projects have manufacturing and project-level margins, with the overall margin at about 12% to 15%.
    Show source
    There are two different margins, one at the manufacturing level, the second one is at the project level, where the overall margin is about 12% to 15%.
  • Revenue target for this year is Rs.3,200 -3,400 crore, and management said it saw no concern about achieving it.
    Show source
    Achieving this year’s revenue target of Rs.3,200 -3,400 crore, I do not see any concern at all.
  • The company expects energy and telecom to contribute in a 70:30 ratio or 65:35 ratio toward the revenue target of Rs. 3,200 crore, with most revenue coming from the existing order book and a few additions possibly contributing.
    Show source
    Answer to point number one as I stated, we expect energy and telecom to contribute to about 70:30 ratio or 65:35 ratio.
  • Margin guidance for this financial year is about 10.5% to 11%, factoring in the anticipated increase in lithium-ion prices; it stocked inventory in March for the Q1 quantum to secure lower lithium-ion cell prices, and project margins for the balance of the quarters factor in the increase in lithium-ion prices.
    Show source
    Rajavardhan P: When we have given the margin guidance for this financial year, which is about 10.5% to 11%, we have taken care of the increase in the lithium-ion prices, which we which we have anticipated during the starting of the financial year.
  • The company believes there is strong demand for BESS for the remaining three quarters.
    Show source
    On the outlook for the remaining three quarters, we do believe that there's a strong demand for BESS.
  • The company plans to reduce the revenue concentration in H2 seen in the previous financial year and spread revenue more evenly between H1 and H2 this year.
    Show source
    This year we are trying to reduce the revenue concentration in H2 and spread more evenly between H1 and H2.
  • Management expects prices to be corrected and bidding players to be more careful and bid at higher levels, based on the Maharashtra and Punjab instances.
    Show source
    These two instances suggest that the prices would be corrected and bidding players will be more careful and bid at higher levels.
  • The company said Q2 was planned and it had a strong execution pipeline, with execution expected to be much bigger than Q1.
    Show source
    We do see that Q2 has been planned and now we have a strong execution pipeline where we are going to be much bigger than that.
  • The company has approached some companies and hopes to give a concrete plan about revenue and how it will work in the next one quarter for its data-center-related opportunity.
    Show source
    We have already have approached some companies and hopefully in the next one quarter, we will be able to give a concrete plan about the revenue, how it will work and all.
  • The company expects cash flow from operations to be positive by March as energy projects contribute a bigger quantum to overall top line; telecom receivables are bulky because of deferred revenue and milestone-based revenues, and these are expected to ease down by March. By the end of this financial year, the company expects cash flow from operation to improve significantly compared with the last financial year.
    Show source
    By March, we are expecting that cash flow from operations to be positive because, the energy projects will be giving a bigger quantum of contribution to the overall top line.

Orders

  • The company had an order book of about Rs.10,800 crore, giving it revenue visibility.
    Show source
    We have an order book of about Rs.10,800 crore, which gives us a strong revenue visibility.
  • The company has received first orders for its C&I product; a customer is giving about 25 units as first trial orders while looking at thousands of such products in a year.
    Show source
    The customer is giving us about 25 units as the first trial Page 3 of 15 Pace Digitek Limited August 06, 2026 orders, but they are looking at thousands of such products in a year.
  • The company is bidding for almost 27 GWh of tenders and has a strong order pipeline.
    Show source
    We also have the strong order pipeline and we are bidding for almost 27 GWh of tenders.
  • The company had an executable order book of Rs.10,803 crore to be executed, which management said gave confidence in achieving FY2027 revenue guidance.
    Show source
    We have an executable order book of Rs.10,803 crore to be executed, which gives us confidence that we will be able to achieve our FY2027 revenue guidance.
  • As of 30th June, Pace Digitek Limited had an executable order book of Rs. 8,453 crore in energy and Rs. 2,350 crore in telecom ICT.
    Show source
    As of 30th June, we have executable order book of Rs. 8,453 crore in energy and Rs. 2,350 crore in telecom ICT.
  • The company won two EPC contracts from NLC and DVC on the energy side, worth about Rs. 1,412 crore, and an optical fibre project from BSNL worth about Rs. 265 crore.
    Show source
    On the energy side, we won two EPC contracts from NLC and DVC, which is about R s. 1,412 crore.
  • Build-own-operate executable order book is about Rs.4,074 crore and its EPC executable order book is about Rs. 4,367 crore.
    Show source
    Our build-own-operate executable order book is about Rs.4,074 crore And the EPC executable order book of about Rs. 4,367 crore.
  • EPC contracts majorly have a timeline of 1.5 years of execution, with subsequent O&M as per the contract.
    Show source
    EPC contracts majorly have a timeline of 1.5 years of execution, and the subsequent O&M is as per the contract.
  • Build-Own-Operate (BOO) solar plus BESS projects have an execution timeline of 2 years, while standalone BESS projects have an execution timeline of 1.5 years.
    Show source
    One is the solar plus BESS, where the execution timeline is 2 years.
  • Standalone BESS projects have a 12-year maintenance period, while its Solar plus BESS projects are 25-year projects.
    Show source
    In standalone BESS projects, it is 12 years and Solar plus BESS is 25-year project.
  • NTPC Renewable Energy has floated big tenders, and Pace Digitek Limited hopes to get business from them.
    Show source
    Recently one or two customers , –such as NTPC Renewable Energy have floated big tenders, so we are hoping to get some good business out of that as well.
  • EPC projects are to be executed over the next one year, while its BSNL OFC project is to be executed over the next two and half years; revenue recognition will be based on execution timelines.
    Show source
    While the EPC projects will be executed over a period of next one year time, the OFC project to be executed over the period of next two and half years.
  • The company has secured four BOO projects and is working to complete them on time and start generating revenue; it is working with investors to bring them on board for investment at project and portfolio level, and is seeking investment for more projects before moving more aggressively on a BOO basis because funding requirements are very high.
    Show source
    We have secured four good projects on the BOO and our effort is to complete those projects on time and start getting the revenues.

What it is building and selling

Projects and capacity

  • A major project of 4GWh in Maharashtra was cancelled.
    Show source
    One, a major project of 4GWh cancelled in Maharashtra.
  • The company supplies almost about 70 containers a month and expects this to grow to almost 150 containers probably next year.
    Show source
    We supply almost about 70 containers a month, which will grow to almost 150 containers probably next year.
  • The company has taken a decision to increase BESS capacity from 5 to 10 GWh by adding a third line of 5 GWh.
    Show source
    Now, we have taken a decision to go from 5 to 10 GWh by adding a third line which is 5 GWh.
  • The company is going to install one 5 GWh line in October.
    Show source
    So, one single line of 5 GWh we are going to install in October.
  • The company will not need a technical partnership for BESS because its plant is running 24 hours, it has internal teams, and it has selected suppliers for the equipment.
    Show source
    We will not need any technical partnership for this because we already have our plant running 24 hours, and we have our internal teams, we have selected the right suppliers for these equipments and all.
  • BESS setup comprises Phase 1 of 5 GWh, Phase 2 of another 5 GWh, and a container fabrication unit alongside the plant.
    Show source
    The Phase 1 is the 5 GWh, the Phase 2 is another 5 GWh, and 3 is the container fabrication unit, which is there along Page 9 of 15 Pace Digitek Limited August 06, 2026 with the plant.
Show 36 more statements

Projects and capacity

  • The company is planning to supply 210 containers in Q2; after commissioning its second line of 2.5 GWh, it expects to ramp up production further and be fully operational from January with a capacity of 10 GWh, equivalent to total production capacity of 2,000 containers per year at full efficiency, or about 1,800 containers in a year at 90% efficiency and about 140 to 150 containers per month.
    Show source
    Venugopal Maddisetty: In Q2, we are planning for 210 container supply.
  • The company plans to raise container production to at least 125 per month in the next calendar year, compared with 210 per quarter now.
    Show source
    Whereas we are now doing 210 per quarter , it will become 125 at least per month in the next calendar year.
  • Subsequent to the quarter, Pace Digitek Limited commissioned an additional 2.5 GWh BESS manufacturing line, increasing total installed BESS manufacturing capacity to 5 GWh to meet growing customer demand.
    Show source
    On the manufacturing side, we have commissioned the additional 2.5 GWh line, which means that we now have 5 GWh of BESS capacity operational.
  • The company is looking to expand capacity from 5 GWh to 10 GWh by September 2026.
    Show source
    Hopefully, by beginning of December, we would have 10 GWh operational facility, which would be the biggest operational plant in India by that time.
  • Subsequent to the quarter, Pace Digitek Limited commissioned an additional 2.5 GWh BESS manufacturing line, taking total installed capacity to 5 GWh, and remained on track to expand it to 10 GWh.
    Show source
    The reason for going for higher capacity line is basically to reduce the operational cost, because if I have two separate 2.5 GWh lines, manpower cost and the operational cost including electricity is more compared to a one single 5 GWh line.
  • The company has started container manufacturing within its factory to address a bottleneck in its BESS business; it had been dependent on sourcing containers from outside the country because there is no established container-manufacturing ecosystem in India.
    Show source
    In addition to that, we have also started the container manufacturing within our factory, because this was one of bottlenecks we had in the BESS business.
  • The company has set up its own container-manufacturing facility, where trial runs are underway; it is trying to complete trials within this month and plans to start batch production from next month.
    Show source
    On this front, we have set up our own manufacturing facility and the trial runs are going on.
  • The company has started a research center in Pune, inaugurated about three weeks ago and led by Professor Ogale, who is also its Independent Director.
    Show source
    We have started a research center in Pune.
  • The company has started planning cell manufacturing, including evaluation of technology, chemistry and related aspects.
    Show source
    We have already started the planning for the cell manufacturing, including evaluating the right technology, chemistry and other related aspects.
  • The company plans indigenous cell manufacturing probably two years from now.
    Show source
    We also plans for the indigenous cell manufacturing, probably two years from now.
  • Around three to four players had won the Maharashtra project, which was awarded almost six to eight months earlier, but they found it was not possible to execute at those rates, approached APTEL over a contract lacuna, won the case, and the project was subsequently cancelled.
    Show source
    They won the case, and the project was subsequently cancelled.
  • The cancellation of the Maharashtra project resulted in an almost one-year loss of time for the customer.
    Show source
    In the process, customer realized that it is almost a one-year loss of time.
  • Planned capacity configuration allows flexibility to change the product mix going forward. Replaced by a later filing.
    Show source
    It also allows us a flexibility of change in the produc t mix going forward.

Demand and pricing

  • In Punjab, during the last three months, only one bid was opened and prices were discovered.
    Show source
    And second incident is in Punjab, where, in the last three months, there was only one bid that was opened and the prices were discovered.
  • The prices discovered in Punjab were at a far better price compared to previous bids.
    Show source
    This was at a far better price compared to the previous bids.
  • Venugopal Maddisetty said the volume in telecom is not there.
    Show source
    Venugopal Maddisetty: The volume is not there in telecom.

Segments

  • The company has 4 Build-Own-Operate (BOO) projects and is balancing EPC and BOO projects to maintain revenues and cash flows.
    Show source
    We also have a 4 Build-Own-Operate (BOO) projects.
  • The company currently supplies mainly for grid-scale applications, which use 5 MWh containers; its Commercial & Industrial (C&I) applications are typically below 5 MWh or in the kilowatt range.
    Show source
    Currently, we are supplying is majorly for grid -scale applications, which uses 5 MWh container.
  • Each battery energy storage system container is valued at about Rs. 4 - 4.5 crore.
    Show source
    Venugopal Maddisetty: The battery energy storage systems are in the capital equipment business and the value of each container itself is about Rs. 4 - 4.5 crore.
  • The company said the C&I segment's profit profile will be better than grid-scale business because it is done at a larger scale, while grid-scale business is more through tenders and competitive bidding; C&I business depends mainly on product performance, company reputation and customer approvals, a process that takes about 5 to 6 months for a bigger customer segment, and profitability could be about 3% to 5% more.
    Show source
    Now, if you want to estimate that, it could be about 3% to 5% could be more.
  • BESS product for grid scale has a product margin of about 13% to 15%, and the margin in the C&I segment will go up by another 4% to 5%.
    Show source
    The BESS product for the grid scale, we have a product margin of about 13% to 15%.
  • The company says C&I will improve its cash flows and has far better profits compared with its grid-scale business.
    Show source
    So, C&I is another good segment for us, which will also improve our cash flows and the profits are far better when compared to the grid-scale business.
  • Standalone battery system is treated as rental power: the company invests money and receives rental, which helps it recognize the sale.
    Show source
    That means we invest money and receive rental from it.
  • Solar-plus-BESS projects are treated as power selling rather than rental, with a tariff on a per unit basis; the asset remains on the books and recognized revenue is the monthly power selling revenue.
    Show source
    The asset is on the books, while revenue recognised is only the revenue that is coming as a monthly power selling.
  • Telecom business is project-based, and the product it manufactures in telecom is smaller compared to the value of the project.
    Show source
    Whereas, telecom is a project-based business where it Page 8 of 15 Pace Digitek Limited August 06, 2026 is not just a product that we manufacture.
  • The company has two verticals and is nurturing both, while its manufacturing output is currently much bigger in the energy sector than in the telecom sector.
    Show source
    Yes, we keep nurturing both, but right now, the manufacturing output is much bigger on the energy sector as compared to the telecom sector.
  • The company said EPC is its forte and it will try to win every project it bids for. Replaced by a later filing.
    Show source
    Whereas EPC, it is our own forte and we will try to win every project that we bid.

Deals and partners

  • The company has tied up with a Big 4 consulting firm to assist with preparing its bids.
    Show source
    We have also tied up with a Big 4 consulting firm to assist us in preparing the bids.
  • The company participated in three major tenders from NTPC Green last week; there were only seven bidders in one or two tenders and eight bidders in another, compared with as many as 51 bidders in Rajasthan and 32 bidders in Maharashtra in previous cases.
    Show source
    The number of bidders were only seven, whereas in the previous cases, there were as many as 51 bidders in Rajasthan and 32 bidders in Maharashtra, but in NTPC tenders, there were only seven bidders in one or two tenders, whereas there were only eight bidders in another tender.
  • The company has started project execution on the ground for other customers including SECI, KPTCL, MAHAGENCO and Bondada.
    Show source
    We have also started the project executions for other customers like SECI, KPTCL, MAHAGENCO and Bondada, with work already begun on the ground.
  • The company signed a cooperation agreement with MEGMEET, whose products are approved by Nvidia and other major chip manufacturers, to provide MEGMEET power solutions coupled with Pace Digitek Limited's battery storage for new-age AI data centers in India.
    Show source
    For India, we have tied up with them for providing those power solutions, coupled with our battery storage for all the new -age AI data centers in India.
  • The company signed an MOU with a company in Saudi Arabia and is exploring the Saudi Arabia market for battery storage systems; it expects some portion of revenue from exports this year and executed a small order in Q1, supplying a few containers to a company in Saudi Arabia, which it expects to increase in the subsequent quarter.
    Show source
    So, what we have done today is that we have signed a MOU with a company in Saudi Arabia and we are also trying to explore the market in Saudi Arabia for the battery storage systems .
  • The company has tied up with Megmeet for the India market to manufacture Megmeet’s AI data center power-system products with Megmeet’s support, coupled with Pace Digitek Limited’s BESS.
    Show source
    We have tied up with them is for India market where we will try to manufacture their products, using their support coupling that with our BESS.
  • Megmeet has developed power-system products for AI data centers that are approved by large customers like Nvidia.
    Show source
    They have developed power system for the AI data centers and these products are approved by the large customers like Nvidia and others.
  • The company has had a relationship with Megmeet for other telecom projects for four years.
    Show source
    Megmeet is our partner for other telecom projects also from last four years.
  • The company will integrate products from Megmeet and products it manufactures into a solution for AI data center customers.
    Show source
    We'll integrate them together as a solution and give it to the AI data center customers.

Risks, rules and outside factors

Outside factors

  • The company is still buying battery cells from China and considers this dependence unsustainable in the long term.
    Show source
    On the research and development side, we are still buying the battery cells from China, which we do believe is not sustainable in long term, given our dependence on China for these battery cells.
  • Lithium-ion cost is a variable factor affecting the overall price of the commodity; recent tenders have a price variation clause, while previous tenders do not.
    Show source
    So, the recent tenders are coming up with the price variation clause, while the previous tenders, the old tenders have doesn't have the price variation clause.
  • The company said its impact from raw material price increases is lesser because it is both the manufacturer and the project company, though there could be a small impact that would not be visible on the balance sheet.
    Show source
    But since we are the manufacturer and we are the project company, so the impact is lesser.
  • The company builds a contingency into its bid prices to protect itself. Replaced by a later filing.
    Show source
    Rajavendhan P: And we are well-protected in terms of in terms of building a contingency in the bid prices.

Rules and policy

  • The company is applying for a 4 GWh cell-manufacturing PLI scheme, which would provide support similar to a viability gap fund; the scheme covers five years of manufacturing operations after a two-year gestation period, for a total duration of seven years.
    Show source
    We are applying for 4 GWh PLI scheme, which would provide support similar to a viability gap fund.

Everything else said on the call

What management stressed

  • Focus has been on the energy sector because it is a new sector and lucrative in terms of order value. Replaced by a later filing.
    Show source
    Our focus has been on the energy sector because that is the new sector and is lucrative in terms of order value.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Prathamesh Sawant: Thank you for the opportunity. Sir, just one question on my front. We have seen a Rs.1,677 crore order inflow during the quarter. Can we have a break up on how much was it from the Telecom & ICT side? Also, of the total Telecom & ICT executable order book of Rs. 2,350 crore, what will be the execution timeline, because this quarter, on execution front, our telecom revenues were down? Just wanted to understand that. Page 5 of 15 Pace Digitek Limited August 06, 2026 Rajavendhan P: Yes, we have about Rs.1,677 crore of order inflows during Q1.

    Answer, rajavendhan p

    On the energy side, we won two EPC contracts from NLC and DVC, which is about R s. 1,412 crore. And the third one is from BSNL, which is optical fibre project, which is about Rs. 265 crore. While the EPC projects will be executed over a period of next one year time, the OFC project to be executed over the period of next two and half years. The revenue recognition will be based on the execution timelines. Hope this answers your question.

  2. Question

    Prathamesh Sawant: Okay. And secondly, on the BESS front, how is the competitive intensity right now on the bidding front?

    Answer, venugopal maddisetty

    Venugopal Maddisetty: There is a bit of correction in the bidding side. In the last six months till March, many people had bid aggressively. Though they are not from the energy sector or do not have background in this area. They were basically trying to see battery energy storage system as a very new and lucrative business. But now, they have all realized that it is not that easy to execute such projects. There are two reasons for this. One, a major project of 4GWh cancelled in Maharashtra.

    Answer, venugopal maddisetty

    Around three to four players had won this project, which was awarded almost six to eight months back. And subsequently they realized that it was not possible to execute at those rates. So, they found some lacuna or point in the contract and approached APTEL, which is an arbitration-type forum for the energy sector. They won the case, and the project was subsequently cancelled. In the process, customer realized that it is almost a one-year loss of time. So, that is one incident that we have seen. And second incident is in Punjab, where, in the last three months, there was only one bid that was opened and the prices were discovered.

    Answer, venugopal maddisetty

    This was at a far better price compared to the previous bids. These two instances suggest that the prices would be corrected and bidding players will be more careful and bid at higher levels. If I also give one more example, last week, there were three major tenders from NTPC Green, in which we were also participated. The number of bidders were only seven, whereas in the previous cases, there were as many as 51 bidders in Rajasthan and 32 bidders in Maharashtra, but in NTPC tenders, there were only seven bidders in one or two tenders, whereas there were only eight bidders in another tender. This also makes it little clear that market is getting corrected and only serious players will be in this game. I hope I have answered the question.

  3. Question

    Deepak Poddar: Yes. Thank you very much, sir, for this opportunity. Sir, I wanted to understand the order book of Rs. 8,400 crore odd in energy segment. What's the execution timeline?

    Answer, rajavendhan p

    Rajavendhan P: We have two types of orders. One is the build-own-operate project and the other one is EPC project. Our build-own-operate executable order book is about Rs.4,074 crore And the EPC executable order book of about Rs. 4,367 crore. EPC contracts majorly have a timeline of 1.5 years of execution, and the subsequent O&M is as per the contract. On the Build-Own-Operate Page 6 of 15 Pace Digitek Limited August 06, 2026 (BOO) project, it has two different parts. One is the solar plus BESS, where the execution timeline is 2 years. Second is standalone BESS, where the timeline is 1.5 years.

    Answer, rajavendhan p

    And post that, the maintenance period starts . In standalone BESS projects, it is 12 years and Solar plus BESS is 25-year project.

  4. Question

    Deepak Poddar: Correct. Given the revenue mix in this quarter was about 80/20 and order book mix is also 80/20. Do you expect this mix to continue, in terms of energy versus telecom?

    Answer, rajavendhan p

    Rajavendhan P: No. We expect the order book in telecom to go up. We are in the process of bidding for couple of projects. We estimate that this ratio should be between somewhere in the range of 65 :35 or 70: 30 when we close the financial year between energy and telecom.

  5. Question

    Deepak Poddar: I got it. Given the kind of visibility we have, only 65%-70% you expect from energy and energy the cycle is in largely in the range of 1 year to 2 years, right? So, isn't our this Rs. 3,200 to Rs. 3,400 crore a little on the conservative side? Ideally, we would execute more, right, given the execution timeline and order book visibility?

    Answer, rajavendhan p

    Rajavendhan P: What will eventually happen is that the physical work on ground will be more. However, because of the Build-Own-Operate (BOO) project and the way revenue is recognized for these project. The revenue recognition will be basically from the EPC plus the standalone BESS of BOO. The solar plus BESS project of BOO will not be treated as a revenue as it goes as a fixed asset. So, even though the physical execution on the ground will be higher, not all of it will be reflected as revenue in the same period. So, that's the reason that we have Rs. 3,400 crore of estimated revenue.

  6. Question

    Deepak Poddar: So, BOO execution will come as an asset, whereas the EPC will come as a revenue, right?

    Answer, venugopal maddisetty

    Venugopal Maddisetty: Yes. Absolutely. And these revenues would go on annual basis. On the BOO, once we commission all these four projects, they will add to almost about Rs.750 crore as a revenue, which is also going to be a good situation because that is an asset -owned business.

  7. Question

    Deepak Poddar: Okay. So, I'm a little confused.

    Answer, venugopal maddisetty

    Venugopal Maddisetty: Basically, the standalone battery system goes as a rental power. That means we invest money and receive rental from it. That is the technical way looking at it and this helps us to recognize the sale. If we go for the solar-plus-BESS, which we have in two other projects, it is basically treated as a power selling and not rental. That means the tariff is on a per unit basis . The asset is on the books, while revenue recognised is only the revenue that is coming as a monthly power selling.

  8. Question

    Deepak Poddar: Correct. And that is about R s.900 crore or what?

    Answer, venugopal maddisetty

    Venugopal Maddisetty: That is standalone, which recognizes on the balance sheet.

  9. Question

    Deepak Poddar: Okay. So, I was just trying to understand this 975 MWh, so what is the revenue potential for us, I mean, on tariff per unit?

    Answer, rajavendhan p

    Rajavendhan P: No. It is like this: Rs. 120 crore is the annuity revenue that comes in from th is project for the 975 MWh commissioned. However, for the MSEDCL project, including the previous financial year, we have completed around 975 MWh of commissioning to date, which has resulted in approximately Rs. 900 crore of revenue being recognised in the P&L. Deepak Poddar: And you mentioned that first half, we are looking at 40-45% revenue mix, and based on the annual guidance, so we are looking at execution of close to Rs.900-1,000 crore in the second quarter. So, what will drive the revenue in the second quarter for us?

    Answer, venugopal maddisetty

    Venugopal Maddisetty: The battery energy storage systems are in the capital equipment business and the value of each container itself is about Rs. 4 - 4.5 crore. We supply almost about 70 containers a month, which will grow to almost 150 containers probably next year. Our focus has been on the energy sector because that is the new sector and is lucrative in terms of order value. We do not want you to look at mix from the perspective of a fixed percentage. We are trying to see what is good for our company and what is appropriate in the current scenario, we are going in that direction. Whereas, telecom is a project-based business where it Page 8 of 15 Pace Digitek Limited August 06, 2026 is not just a product that we manufacture. The product we manufacture in telecom is smaller compared to the value of the project.

    Answer, venugopal maddisetty

    So, the project execution will take lot of time on the ground , like fibre optic cable network. we, as a company now have two verticals. Yes, we keep nurturing both, but right now, the manufacturing output is much bigger on the energy sector as compared to the telecom sector.

  10. Question

    Deepak Poddar: Okay. Understood. And what's the margin profile in BESS?

    Answer, rajavendhan p

    Rajavendhan P: PAT margins we are trying to have about 10.5% to 11% for the mix of products and the projects.

Show 16 more questions
  1. Question

    Deepak Poddar: Okay. 10.5% to 11%. And telecom has better margins, right, as compared to BESS?

    Answer, venugopal maddisetty

    Venugopal Maddisetty: The volume is not there in telecom. You must be aware of it.

  2. Question

    Meet Shah: Yes. Thank you for the opportunity. So, since you're targeting 10 GWh capacity by Q3, can you roughly share what the capex for gigawatt -hour looks like and do you have like a technical partnership for or tie -up for BESS or is this entirely developed in -house?

    Answer, venugopal maddisetty

    Venugopal Maddisetty: Okay. On the second part, I'll answer, the capex part Rajavendhan will explain. On the capabilities, as you are aware that we already have commissioned two lines of 2.5 GWh each, which means now our plant is operational at 5 GWh. Now, we have taken a decision to go from 5 to 10 GWh by adding a third line which is 5 GWh. So, one single line of 5 GWh we are going to install in October. The reason for going for higher capacity line is basically to reduce the operational cost, because if I have two separate 2.5 GWh lines, manpower cost and the operational cost including electricity is more compared to a one single 5 GWh line. When we reach 10 GWh, there'll be one single line of 5 GWh and there'll be two lines of each 2.5 GWh.

    Answer, venugopal maddisetty

    It also allows us a flexibility of change in the produc t mix going forward. We will not need any technical partnership for this because we already have our plant running 24 hours, and we have our internal teams, we have selected the right suppliers for these equipments and all. There's absolutely no issue on that. The capex part, Rajavendhan will explain that.

    Answer, rajavendhan p

    Rajavendhan P: Yes. So, on the capex, I would say that we have three different phases. The Phase 1 is the 5 GWh, the Phase 2 is another 5 GWh, and 3 is the container fabrication unit, which is there along Page 9 of 15 Pace Digitek Limited August 06, 2026 with the plant. All together, we have a capex spend of about Rs.300 crore. This capex spend is a majorly the land plays a key role. The cost of land plays a key role, so the total cost is about Rs.300 crore for the complete setup.

    Answer, rajavendhan p

    Rajavendhan P: Funded internally from our private say initial fundraising that we have done in terms of the private placement. We have funded using that amount.

  3. Question

    Meet Shah: Right. So, the second question from my side is, so about half of your order book is build -own- and-operate. So, for these BOO contracts, what kind of margins in BOO and EPC are there, and how exposed are these to cell price changes over the contract period?

    Answer, rajavendhan p

    Rajavendhan P: BOO and EPC has a different margin profile. In EPC, there's a product supply from our side plus the EPC that we do. There are two different margins, one at the manufacturing level, the second one is at the project level, where the overall margin is about 12% to 15%. Whereas on the BOO projects, we have three different margins, one is at the product level, second is the EPC level, and third is on annuity business, which is at the SPV. There are three different margin profiles. While we have 12% to 15% as a margin profile between product manufacturing and projects, there will be a separate IRR of about 12% to 13% on the SPV levels, so we have three different margins profile for the build-own-operate projects.

  4. Question

    Meet Shah: Okay.

    Answer, rajavendhan p

    Rajavendhan P: Lithium-ion cost is a variable factor which is impacting the overall price of the commodity. So, the recent tenders are coming up with the price variation clause, while the previous tenders, the old tenders have doesn't have the price variation clause.

  5. Question

    Meet Shah: Right.

    Answer, rajavendhan p

    Rajavendhan P: And we are well-protected in terms of in terms of building a contingency in the bid prices.

    Answer, venugopal maddisetty

    Venugopal Maddisetty: One point to add here is that being the manufacturer, we can absorb some of these issues in terms of the raw material price increase because if imagine someone who is executing this kind of projects, by procuring the products from manufacturers like us, he would probably have impacted significantly more than us. But since we are the manufacturer and we are the project company, so the impact is lesser. There could be a small impact, but not that much which will be visible on the balance sheet.

  6. Question

    Sir, my first question is after reporting Rs.555 crore of revenue in Q1, we'll have to get around R s.2,700 crore of revenue in the remaining year to meet our FY27 guidance. How much business are we expecting from our each segment in the rest of the year? And how much are we expecting from the African OEM partnership which we recently announced and what are the EBITDA margins in that segment?

    Answer, venugopal maddisetty

    Venugopal Maddisetty: Yes, you are correct, we reported Rs.555 crore sales in Q1 and then we have Rs.2,700 crore remaining. But the nature of the infra business which we are into, for that matter, any infra company, whether it is a road making company or electricity or the telecom sector, Q1 is always lower. I'll tell you why. For the simple reason that we are all working in a government sector. What happens is these projects are linked to funded projects and the availability of funding . Most of the players, would try to execute most of these projects towards the Q4 and receive the payments. That is why the Q4 is always strongest quarter for any infra company, likewise ours also.

    Answer, venugopal maddisetty

    You need to look at last year we have achieved only Rs.367 crore the turnover in Q1 it's not because that we do not have the orders or we do not have the business. It is basically because most of the efforts required to recognize the revenue happen towards Q4. Q1 will always be a little slow because of some approval from the government's departments and other such processes. Q1 is always a slower one for any infra company including ours. However, we have improved a lot from previous year of Rs.367 crore odd crore to now Rs. 555 crore, which is almost 50% increase. We do see that Q2 has been planned and now we have a strong execution pipeline where we are going to be much bigger than that. Achieving this year’s revenue target of Rs.3,200 -3,400 crore, I do not see any concern at all.

  7. Question

    Sanket Sadh: Yes. Sir, I completely understand that Q1 is a bit slower than the remaining part of the year. My question was - what is the segment-wise contribution you see in the next three quarters to achieve this goal?

    Answer, rajavardhan p

    Rajavardhan P: Yes. Answer to point number one as I stated, we expect energy and telecom to contribute to about 70:30 ratio or 65:35 ratio. The second point to your question is regarding revenue target of Rs. 3,200 crore. Yes, majorly of revenue will come from the order book that we have as on date. There maybe be few additions to the order book, which will contribute to the revenue, but majorly will come from the existing order book.

    Answer, venugopal maddisetty

    The C&I segment involves smaller capacities, but it is more voluminous business. The profit profile of this business will be better compared to the grid-scale because it is done at a larger scale, where as grid scale business is more through the tenders and on a competitive bidding. Whereas on the C&I segment, it goes majorly by the product performance , reputation of the company and the customer approvals. That process alone will take about 5 to 6 months to get into a bigger customer segment. So, the profitability is better. Now, if you want to estimate that, it could be about 3% to 5% could be more. Rajavardhan, is that about 5%?

    Answer, rajavardhan p

    Rajavardhan P: I'll explain this way. The BESS product for the grid scale, we have a product margin of about 13% to 15%. What sir was trying to say, in the C&I segment, this particular margin will go up by another 4% to 5%. Shubhi Gupta And sir, this is PAT margin that you're mentioning or EBITDA margin?

  8. Question

    Raj Kumar: Yes, thank you for taking my question. My question is that regarding our current order book on EPC and BOO, what could be the impact of recent cell price rise and at these levels, are those projects still sustainable?

    Answer, rajavardhan p

    Rajavardhan P: When we have given the margin guidance for this financial year, which is about 10.5% to 11%, we have taken care of the increase in the lithium-ion prices, which we which we have anticipated during the starting of the financial year. As a steps to mitigate this risk, we have done couple of things. One, as we explained in the previous investor call, for the Q1 quantum, we have we had stocked the inventory in March, which has enabled us to have a lower cost of the lithium-ion cell prices. For the balance of the quarters, the project margins will take care of the increase in the lithium- ion prices and that is well factored in the guidance that we have given.

  9. Question

    India is projected to have like billions of dollars of data centers established in next couple of years. Do are we looking into any like optical fibre work or any specific technology services that we can provide related to BESS on those? Are we talking to any potential customers?

    Answer, venugopal maddisetty

    Venugopal Maddisetty: The works has already started and we are speaking to some customers. We are trying to bring some demo equipment, prepare it and showcase them in our exhibition centers. Yes, probably it will be a long journey, but we are going with proper plan. There is a long-term plan and we are working on it. We have already have approached some companies and hopefully in the next one quarter, we will be able to give a concrete plan about the revenue, how it will work and all. We are not at a stage to give any further update, but the planning is going on, and work is in progress.

  10. Question

    Rohan Barnawal: Hello. Thank you for the opportunity, sir. My question was on the container fabrication side. We have delivered around 90-plus containers in Q1 versus if you compare it in the FY26, it was 178. How do we see the new quarterly run rate ramp-up, for the whole year?

    Answer, venugopal maddisetty

    Venugopal Maddisetty: In Q2, we are planning for 210 container supply. As we recently commissioned our second line of 2.5 GWh, we'll be able to ramp up production further. From January, we'll be fully operational with a capacity of 10 GWh. Basically, with 10 GWh our total production capacity will be 2,000 containers per year at a full efficiency. However, we always have to take some efficiency factor in terms of machine downtime and such other factors. Even if I take 90% efficiency, it will be about 1,800 containers in a year. If we divided that by 12 months, it would be about 140 to 150 numbers per month.

    Answer, venugopal maddisetty

    Whereas we are now doing 210 per quarter , it will become 125 at least per month in the next calendar year. This is the plan we are now working on.

  11. Question

    Rohan Barnawal: Got it. And, on the all new three Q1 wins which we have in NLC, DVC and BSNL, all are EPC projects and is this a deliberate shift and what would what would be expect for the FY27 EPC versus BOO in-text mix?

    Answer, venugopal maddisetty

    Venugopal Maddisetty: BOO needs significant investments, so we are going in a balanced way. We have secured four good projects on the BOO and our effort is to complete those projects on time and start getting the revenues. We are also working with some investors to bring them on board for the investment and we are planning with them not just at a project level but at the overall portfolio level . We are looking for investments for more projects Once that is secured, we'll be able to further move aggressively on the BOO basis because funding requirement is very high. Whereas EPC, it is our own forte and we will try to win every project that we bid. That is our moto for the EPC. So, that's the difference between EPC and developer project.

  12. Question

    Dhananjai Bagrodia: Hi, sir. Most of my questions are answered. Just wanted to understand, our operating cash flow has been negative for some time. I understand we are obviously stacking up for inventory because we have a high growth rate. But for each segment, what is the unit economics, just to understand what cash flow can we expect for each segment and which segment is consuming most of the cash flow?

    Answer, rajavardhan p

    Rajavardhan P: What you are seeing in the balance sheet is majorly related to the telecom cash flows, which are reflected in operating cash flow, because energy business has started in the Q4 of the last financial year. Moreover, the majority of the receivables in the balance sheet is from the telecom sector, where we have milestone -based payments and also deferred revenue. On the energy side, we have better payment terms. The payment terms are segregated into an advance, a payment on supply and payment on commissioning, and there is retention portion, which will be released within a maximum of six months. The inventory and receivables have come down and by September they are expected to come down further. We should stabilize in terms of the these numbers between December and March. By September, we expect them to reduce further.

  13. Question

    Dhananjai Bagrodia: Okay. Okay, fine. So, but any like little more quantifiable in terms of, let's say for each segment, what is your working capital days?

    Answer, rajavardhan p

    Rajavardhan P: For telecom, the net working capital when I say net working capital, it is inventory, debtors, net of debtors, so the net working capital is about four to five months, whereas in energy, it is expected to be about say 90 to 100 days is the working net working capital cycle which is expected.

  14. Question

    Dhananjai Bagrodia: This is for telecom?

    Answer, rajavardhan p

    Rajavardhan P: As I stated, it will improve over a period of time. By March, we are expecting that cash flow from operations to be positive because, the energy projects will be giving a bigger quantum of contribution to the overall top line. The second point as I stated, the telecom in terms of the accounting concept, we need to have the receivables built in terms of the deferred revenue and also the milestone -based revenues. So, that is causing a bulky position for the receivables. Page 14 of 15 Pace Digitek Limited August 06, 2026 These two are expected to ease down by March. By end of this financial year, we can expect that the cash flow from operation to significantly improve compared to the last financial year.

  15. Question

    Het Pradhan: Okay. I have question on as we expanding globally, as we are getting contracts from the Saudi Arabia and all, could you please throw some light on it?

    Answer, rajavardhan p

    Rajavardhan P: Let me answer this. So, what we have done today is that we have signed a MOU with a company in Saudi Arabia and we are also trying to explore the market in Saudi Arabia for the battery storage systems . We are actively exploring this opportunity and we expect this year we should have some portion of the revenue coming from the exports. We have some small order which is executed in Q1, where we supplied a few containers to one of the companies in Saudi Arabia for a smaller quantum . But we expect that this has to go up in the subsequent quarter. We are actively exploring Saudi market for the battery storage systems.

  16. Question

    Het Pradhan: Okay. As we get partnership with the Megmeet to enter into AI data center, what type of service we are providing to them? Can you throw some light on it?

    Answer, venugopal maddisetty

    Venugopal Maddisetty: Yes, I'll answer that. Megmeet is our partner for other telecom projects also from last four years. We have a very good relationship with them. They have developed power system for the AI data centers and these products are approved by the large customers like Nvidia and others. We have tied up with them is for India market where we will try to manufacture their products, using their support coupling that with our BESS. For this AI data center, you also need BESS because the traditional data centers will use UPS and diesel generators. The new data centers will migrate into this kind of green energy solutions.

    Answer, venugopal maddisetty

    There are some products that will come from Megmeet and there are some products which we are manufacturing. We'll integrate them together as a solution and give it to the AI data center customers. That is the idea of partnering with them.

Questions about this call

When was the Pace Digitek Q1 FY27 earnings call transcript filed?
Pace Digitek filed the transcript with the exchange on 12 Aug 2026. This page is built from that transcript.
What does this page list?
100 statements from the transcript across 11 topics, 58 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 26 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
Pace Digitek Q1 FY27 concall: Pace Digitek Limited had an order book of about Rs.10,800 crore, giving it revenue visibility · DalalOS