Tata Power Company Q2 FY26 earnings call: Tata Power expected to add 700-megawatt capacity in renewable projects in the 3rd Quarter and 600 megawatts in the 4th Quarter

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

The transcript does not name its quarter. Q2 FY26 is worked out from the date it was filed.

Tata Power expected to add 700-megawatt capacity in renewable projects in the 3rd Quarter and 600 megawatts in the 4th Quarter. Initial work on the 1,125-megawatt Dorjilung project had started, including access roads, bridges, colony, construction and power arrangements; Tata Power expected financial closure by mid of next year, when work was expected to start. Odisha Discoms had PAT of Rs.174 crores in the quarter, compared to previous year's PAT growth of 362%. India had about 2 gigawatts of wafer and ingot manufacturing capacity and will require about 50 to 60 gigawatts in the next two to three years. The 1,125-megawatt Dorjilung project will have World Bank financing in a consortium with IFC and some other banks, which will syndicate the loan.

The numbers management gave

Results

  • Odisha Discoms had PAT of Rs.174 crores in the quarter, compared to previous year's PAT growth of 362%.
    Show source
    • One is our performance of Odisha Discoms have now come to age and we saw a PAT of Rs.174 crores compared to previous year’s PAT growth of 362%.
  • Odisha Discom had half yearly PAT of Rs.279 crores, and Tata Power expected this performance to be the template going forward because most initial issues had been sorted out.
    Show source
    Similarly, our half yearly PAT for the Odisha Discom is Rs.279 crores and we do expect that this will be the template going forward because most of the initial issues have been sorted out.
  • Tata Power's solar cell and module manufacturing plant stabilized production, reduced cost of production and optimized costs including input material cost; its PAT was Rs.240 crores, a 262% increase from the previous year, and its H1 PAT was Rs.340 crores.
    Show source
    • Similarly, our solar cell and module manufacturing plant has done exceedingly well, has stabilized production, the cost of production has reduced, we have been able to optimize lot of costs including the input material cost and that is why our PAT has gone to Rs.240 crores, which is a 262% increase from the previous year and our H1 PAT is Rs.340 crores and you can again see this happening in future quarters also.
  • Tata Power's rooftop PAT was Rs.123 crores, a 390% increase over the previous year, and H1 PAT was Rs.213 crores.
    Show source
    • Another big area that has happened in the last quarter is our rooftop PAT which has grown to Rs.123 crores and which is a 390% increase over the previous year , and on H1 basis it is Rs.213 crores.
  • Tata Power's EBITDA exceeded Rs.4,000 crores in the quarter for the first time, despite a loss in Mundra because the plant was not operating.
    Show source
    • We have also for the first time in the quarter crossed an EBITDA of Rs.4,000 crores and again this is in back of excellent performance from all our businesses in spite of the fact that we had loss in Mundra because the plant was not operating.
  • Tata Power's regulatory assets in Delhi were reduced by nearly Rs.600 crores this year.
    Show source
    And this year also nearly, I think, Rs.600 crores of regulatory assets have got reduced.
Show 9 more statements

Results

  • A long monsoon reduced power demand last quarter and prevented Mundra from operating under Sec.11; Tata Power was discussing finalization with the Government of Gujarat and expected to close it within the month.
    Show source
    • One is, last quarter was a tough quarter, in the sense that we had a very long monsoon and because of that, the demand of power was less; secondly, because of that, we also could not run Mundra under Sec.11 and while we are discussing with Government of Gujarat to finalize, which we expect that we are in the last stage and hopefully maybe within this month, we will be able to close it.

Money and capital

  • The 1,125-megawatt Dorjilung project will have World Bank financing in a consortium with IFC and some other banks, which will syndicate the loan.
    Show source
    We will have World Bank financing and they will of course come in consortium with IFC and some of the other banks and they will syndicate the loan and we do expect that this will be again a record in terms of the implementation of the project at a very fast pace as we have seen in the existing Khorlochhu project where the work started nearly a year back on 1st January 2025.
  • Tata Power invested nearly Rs.7,349 crores in this year and planned to spend Rs.25,000 crores in this financial year.
    Show source
    We invested nearly Rs.7,349 crores in this year and as we have mentioned to you we plan to spend Rs.25,000 crores in this financial year.
  • Tata Power's debt increased by Rs.6,400 crores to Rs.54,000 crores.
    Show source
    Our debt increased by Rs.6,400 crores reaching Rs.54,000 crores.
  • Tata Power's net debt-to-underlying EBITDA was 3.3 and its net debt-to-equity was 1.2.
    Show source
    Our net debt-to-underlying EBITDA remains 3.3 and our net debt -to-equity is 1.2, which is very competitive, especially in the infrastructure industry.
  • For the Khorlochhu project, Tata Power had a 40% partnership and its equity contribution would be about Rs.830 crores; for the second project with a Rs.13,000 crores CAPEX plan, Tata Power had a 40% equity stake and its investment would be close to Rs.1,500-1,600 crores. The two projects together would require about Rs.2,400 crores of equity from Tata Power.
    Show source
    Both these projects put together, our total equity from Tata Power side will be about Rs.2,400 crores.
  • Tata Power plans CAPEX of Rs. 25,000 crores in the coming year.
    Show source
    We are on track.
  • S&P Global upgraded Tata Power's outlook from BBB-/ positive to BBB Stable, which management said could help improve interest rates on its borrowings.
    Show source
    Having said that we continue to get one of the best credit ratings in corporate India with S&P Global Upgrade of Outlook from BBB-/ positive to BBB Stable and I think this will help us to further improve the interest rates for our borrowings that we have at present.
  • Debt for the two projects would be taken in those companies, not in Tata Power, and there would be no recourse to Tata Power.
    Show source
    The Tata Power Company Limited November 11, 2025 Management: Yes.

What it expects ahead

What management expects

  • Tata Power expected to add 700-megawatt capacity in renewable projects in the 3rd Quarter and 600 megawatts in the 4th Quarter.
    Show source
    In fact, we have huge target to add capacity in renewable projects, especially for our own utility projects in 3th and 4th Quarter and we are expecting about 700-megawatt capacity add in the 3rd Quarter and 600 megawatts in the 4th Quarter.
  • Tata Power expected to have nearly 7 gigawatts of operating renewable assets at the end of the year.
    Show source
    So, at the end of the year you will find that we would have crossed nearly 7 gigawatts of our operating renewable assets.
  • Tata Power expects to add about 1.3 gigawatt of capacity in Q3 and Q4, based on the availability of transmission line and land.
    Show source
    We expect that in Q3 and Q4, we will do about 1.3 gigawatt.
  • Tata Power will try to complete in the next financial year capacity additions missed in this financial year and expects to achieve its overall target by the end of financial year ‘27.
    Show source
    So, hopefully by end of financial year ‘27, you will see that our overall target that we have set, we will be able to achieve.
  • Tata Power expected its performance in future quarters to become more robust and substantially improve after sorting out the Mundra issue and adding renewable capacity in this and the subsequent quarter.
    Show source
    So, we do expect that our performance in future quarters will become more robust and will substantially improve once we are able to sort out the issue of Mundra and also with more capacity adds in renewable that is expected in this quarter and the subsequent quarter and all our other existing operations will continue to perform very well.
  • Tata Power expected much better performance from Odisha Discom in subsequent quarters.
    Show source
    In fact, you will see much better performance in the subsequent quarters.
Show 4 more statements

What management expects

  • Tata Power expects the UP discom privatization bidding process may happen in the next few weeks.
    Show source
    So, let us hope it happens in the next few weeks.
  • Tata Power expects a good trajectory of regulatory asset reduction over time and expects its regulatory assets in Mumbai to be liquidated.
    Show source
    Also, some of the regulatory assets we have in Mumbai and all, everything will get liquidated.
  • Tata Power expects the government’s action on discom debt and losses to open more opportunities in distribution PPPs, as in Odisha and Delhi, and through parallel licenses.
    Show source
    We do expect that we will open up more opportunities for Tata Power in doing the PPP of distribution as we have done in Odisha and Delhi and also the parallel license opportunity.
  • Tata Power expects capacity additions in Q3, Q4 and the next financial year to primarily meet its own internal requirements, with very little third-party work.
    Show source
    So, that is the whole plan, and you will see that that is why there will be a lot of capacity additions in Q3, Q4 and in the next financial year, which will primarily cater to our own internal requirements and very little of third-party.

What it is building and selling

Projects and capacity

  • Initial work on the 1,125-megawatt Dorjilung project had started, including access roads, bridges, colony, construction and power arrangements; Tata Power expected financial closure by mid of next year, when work was expected to start.
    Show source
    The initial work on this project has already started wherein access roads, bridges, colony, construction, power is all getting tied up, and we expect that the financial closure of this The Tata Power Company Limited November 11, 2025 project will be achieved by mid of next year by when we start the work also.
  • Tata Power was discussing state subsidies with various state governments and the Government of India PLI for its 10-gigawatt ingot and wafer plant, and expected to finalize this in the next few months.
    Show source
    Also, at some stage we are at evaluating the 10-gigawatt plant for manufacture of ingot and wafer.
  • Tata Power had 4.3 gigawatt of cell and module capacity and another 250 in Bangalore, for a total of 4.55 gigawatts of cell and module capacity; the new investment would be only in wafers and ingot.
    Show source
    So, we already have 4.55 gigawatts of cell and module.
  • The Dorjilung project had a Rs.13,000 crores CAPEX plan, and Tata Power expected construction work to start by mid of next year; initial pre-project activities were already underway.
    Show source
    The second one of 1,125, we expect the construction work to start by mid of next year.
  • Tata Power was examining the proposal for a 10-gigawatt ingot and wafer capacity and discussing subsidies and support with various state governments and the Government of India under the PLI scheme to determine the eventual project cost.
    Show source
    So, that will give us an idea based on that what sort of eventual cost of the project will be there.
  • Tata Power had decided in principle to go ahead with the 10-gigawatt ingot and wafer proposal, but needed to firm up some numbers in the next two months.
    Show source
    In principle, we have decided that we will go ahead but we need to firm up some of these numbers in the next two months.
Show 4 more statements

Projects and capacity

  • Tata Power is pursuing backward integration into wafer and ingot with a planned 10-gigawatt capacity, which it expects will supply wafers to its plants and other cell and module plants; details are under finalization and expected to be finalized and shared in the next two months.
    Show source
    That is why we are doing the backward integration going for the wafer and ingot and we feel that the 10-gigawatt capacity will be good capacity to not only supply wafers for our plants, but also for other cell and module plants.

Demand and pricing

  • India had about 2 gigawatts of wafer and ingot manufacturing capacity and will require about 50 to 60 gigawatts in the next two to three years.
    Show source
    Today, we have virtually very small capacity, just 2 gigawatts in the country, and the country will require about 50 to 60 gigawatts of wafer and ingot manufacturing capability in the next two, three years.
  • By September, 20 lakh rooftops had been installed in the country, and Tata Power’s expectation is that at least 5 crores homes will have a rooftop in the country.
    Show source
    Only 20 lakh rooftops have been installed till September, and my expectation is that in this country at least 5 crores homes will have a rooftop and so there is a long way that we have to go to cater to the country’s requirements.
  • Tata Power has more than 20% market share in rooftop installations in the country.
    Show source
    We are one of the best in the country with maximum market share of more than 20% and this is going to be a very sustained effort from Tata Power side for many more years in future.

Risks, rules and outside factors

Risks and disputes

  • The Supreme Court directed the D ERC to amortize regulatory assets within the seven-year period from when they accrued.
    Show source
    And now that the Supreme Court has asked the D ERC to amortize it within the seven-year period from the time they have been accrued .

Outside factors

  • Tata Power’s module and cell prices vary based on demand and supply, wafer import costs and prices, and other input material costs; stabilized plant operations and operating efficiencies are reflected in production costs and are expected to continue benefiting costs.
    Show source
    So, it will vary to certain extent, but what is important is that the plant operation has stabilized and many of the efficiencies in plant operation, those get reflected in the cost of production and those benefits will be there to come.

Rules and policy

  • Tata Power expects the electricity act amendment proposal may be passed in the budget session, after parliamentary consideration and examination by a select committee.
    Show source
    Hopefully, in the budget session, I expect that this may get passed.
  • The government’s discom bailout plan was not finalized, and the government still had to decide on it. Replaced by a later filing.
    Show source
    From whatever I know, it is still not finalized.
  • Tata Power is discussing a long-term resolution with the government of Gujarat; details are being finalized and remain subject to the government approval process. Replaced by a later filing.
    Show source
    So, we have been in discussion with the government of Gujarat and hopefully we should be able to come to some arrangement.

Everything else said on the call

Group structure

  • The 1,125-megawatt Dorjilung project will have a 60% stake from Bhutan government-owned DGPC and a 40% stake from Tata Power, on terms similar to the 600 Khorlochhu project.
    Show source
    It will be on similar terms as was done for the 600 Khorlochhu project where 60% stake will be from the Bhutan government-owned DGPC and we will have 40% stake and that will continue.
  • The financials of the two project companies would not be consolidated with Tata Power; Tata Power would show them as investments in its books.
    Show source
    Given that we have a 40% equity here, the financials of those two companies will not get consolidated with Tata Power.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Mohit Kumar: Good evening, sir, and thanks for the opportunity. My first question is on the solar manufacturing. I think I alluded to that you are going to set up 10-gigawatts of ingot and wafer. My question is that are you looking to set up this 10-gigawatt cumulative capacity of ingot, wafer, cell and module, everything? And are you expecting another PLI, because you mentioned the PLI? Dr. Praveer Sinha: So, it will be 10-gigawatt of wafer and ingot.

    Answer, praveer sinha

    We already have the 4.3 gigawatt of cell and module and another 250 in Bangalore. So, we already have 4.55 gigawatts of cell and module. But the new investment will be only in wafers and ingot.

  2. Question

    Mohit Kumar: Understood, sir. Thank you and all the best. Thank you.

    Answer, praveer sinha

    This is about Rs.13,000 crores and these projects require a lot of detailed analysis. Engineering has to be finalized , access arrangements have to be made to the site , and also we need to carry out many other studies relating to the type of water flow is there, environment issues, forest issues. So, these projects require lot of time in development. So, first project, already construction work is started. The second one of 1,125, we expect the construction work to start by mid of next year. Already initial work, pre -project activities are already going on at this point of time. Management: I will just add to a bit to what Dr. Sinha also said.

    Answer, praveer sinha

    Since you asked about the investment, in both the projects, the earlier Kho rlochhu one, we have a 40 % partnership over there our equity contribution would be about Rs.830 crores, and in the second one, which is Rs.13,000 crores CAPEX plan, we also have a 40% equity over there and our investment there would be about close to Rs.1,500-1,600 crores. Both these projects put together, our total equity from Tata Power side will be about Rs.2,400 crores. Given that we have a 40% equity here, the financials of those two companies will not get consolidated with Tata Power. Tata Power will be showing these as investment in the books. Puneet: And would you be guaranteeing the debt that will need to go into these projects? Management: No, the debt is taken in those companies, not in Tata Power. Puneet: And there is no recourse to Tata Power?

    Answer, praveer sinha

    The Tata Power Company Limited November 11, 2025 Management: Yes. Puneet: Okay, that is helpful. Secondly, your Odisha performance has been extremely good. So, just if you can elaborate a bit more on whether these numbers should be sustainable or there were some collections, etc., that got included this time? Dr. Praveer Sinha: There is no correction.

    Answer, praveer sinha

    In fact, you will see much better performance in the subsequent quarters. Puneet: That is very helpful. Thank you so much and all the best.

  3. Question

    Sumit Kishore: I was asking about a 10-gigawatt ingot wafer. What are the CAPEX that you will be looking for setting this up and over what timeframe do you expect to start commissioning this capacity and when does it reach peak capacity? That is my question. Dr. Praveer Sinha: We are examining the proposal.

    Answer, praveer sinha

    As I mentioned to you, we are in discussion with various state governments to understand what sort of subsidy and support they will provide and also from Government of India, the PLI scheme. So, that will give us an idea based on that what sort of eventual cost of the project will be there. So, I think we need to wait for some more time. In principle, we have decided that we will go ahead but we need to firm up some of these numbers in the next two months.

  4. Question

    Sumit Kishore: Sure. So, in the first half of the year, how much CAPEX has Tata Power incurred? Dr. Praveer Sinha: We have incurred about Rs.7,300 crores and our plan is Rs.25,000 crores.

    Answer, praveer sinha

    We are on track. You will see huge amount of those investments happening in Quarter 3 and Quarter 4. The Tata Power Company Limited November 11, 2025 Sumit Kishore: Okay.

  5. Question

    And on the cell and module plant numbers that you have shown, the EBITDA margin seems to be better this time around, around 26% or so, is this sustainable and what was the mix of module cell sale to third -party and in-house use this time around? Dr. Praveer Sinha: So, typically, the prices of modules and cells are governed by two things -- one is demand/supply and the other is what is the input cost where we import the wafers and what price we get wafers and some of the other input materials.

    Answer, praveer sinha

    So, it will vary to certain extent, but what is important is that the plant operation has stabilized and many of the efficiencies in plant operation, those get reflected in the cost of production and those benefits will be there to come.

  6. Question

    Sumit Kishore: Sure. Just one final clarification or a question on what is the status of the bidding for the UP discom privatization and what are the expected timelines here? Dr. Praveer Sinha: So, we are also waiting for the bidding process to happen.

    Answer, praveer sinha

    Every time they have told us that it will happen very quickly. So, let us hope it happens in the next few weeks.

  7. Question

    Apoorva Bahadur: Hi, sir. Thank you for the opportunity. So, we are seeing a lot of state government bids for thermal power projects. I would be interesting to know your thoughts if there is any intention of adding Greenfield or Brownfield thermal capacity over here. The Tata Power Company Limited November 11, 2025 Dr. Praveer Sinha: We are examining all these opportunities, and we will take a call depending upon what sort of land we have, what sort of tariff one would be in a position to bid.

    Answer, praveer sinha

    So, it is something that we keep on continuously evaluating.

  8. Question

    Apoorva Bahadur: Understood, sir. Also, any update on the Delhi regulatory asset liquidation? There was a Supreme Court order. Dr. Praveer Sinha: So, already, the regulatory assets in Delhi has been going down for the last two years.

    Answer, praveer sinha

    And this year also nearly, I think, Rs.600 crores of regulatory assets have got reduced. Last year also, there was a huge reduction. And now that the Supreme Court has asked the D ERC to amortize it within the seven-year period from the time they have been accrued . I think that will get completed. So, we do expect that there will be a good trajectory of regulatory asset reduction over a period of time. Also, some of the regulatory assets we have in Mumbai and all, everything will get liquidated.

  9. Question

    Apoorva Bahadur: Understood, sir. Sir, lastly, on parallel distribution licenses, we understand Tata Power had applied in a couple of circles, if you can provide some color on that? Dr. Praveer Sinha: That electricity act amendment proposal has come and they had asked for comments.

    Answer, praveer sinha

    We have given our comments. I do expect that this will go to the parliament and of course, it has to go through the process of select committee to examine it and all. Hopefully, in the budget session, I expect that this may get passed.

  10. Question

    Bharanidhar Vijayakumar: Good evening. So, my first question is on the media news on a discom bailout package by government to the tune of around Rs.1 trillion. My first question is whether this is finalized and what is the likely timeline when this will be implemented , and if so, how will Tata Power be benefiting because of this? Dr. Praveer Sinha: So, we have also read in the newspaper that the government has such a plan.

    Answer, praveer sinha

    From whatever I know, it is still not finalized. Government has to take a decision on this. But considering The Tata Power Company Limited November 11, 2025 that there is so much of debt as also losses of discoms, it will be necessary for some action to be taken. The nature of the action of course will depend on what the government decides. We do expect that we will open up more opportunities for Tata Power in doing the PPP of distribution as we have done in Odisha and Delhi and also the parallel license opportunity. So, I think Tata Power will play a very, very active role in power distribution in the coming years.

Show 8 more questions
  1. Question

    Bharanidhar Vijayakumar: Okay. My second question is on our renewable addition targets. We had some time back given a 2.6 gigawatt of addition target for ‘26 and about 2.3 for ‘27. Where are we to achieve that target? If not, could you highlight some of the reasons why there are challenges or delays -- is it because of PPAs not being in place or connectivity or transmission infrastructure not being placed or any other challenges? Dr. Praveer Sinha: So, our capacity addition in H1 has been 205 megawatts.

    Answer, praveer sinha

    We expect that in Q3 and Q4, we will do about 1.3 gigawatt. This is based on the availability of transmission line and the land and all that. Whatever will get missed out in this financial year, we will try to complete it within the next financial year. So, hopefully by end of financial year ‘27, you will see that our overall target that we have set, we will be able to achieve.

  2. Question

    Bharanidhar Vijayakumar: So, what I am hearing is 2.6-gigawatt target in ‘26, now, we will mostly read as 1.3 gigawatt plus 2 gigawatt already comes in around 1.5 gigawatt. Dr. Praveer Sinha: Agree.

    Answer, praveer sinha

    Bharanidhar Vijayakumar: Okay. My final question is on say Mundra plant. Two parts, one, on supplementary PPA you alluded to decision by Gujarat government getting finalized, but can you give broad contours of what we can expect given one bone of contention on this supplementary PPA was how much of the profit that the mining segment is doing will be knocked off from the proposed tariff, so, any contours you can give on what could be the primary tariff? And also what is our thoughts on when Sec. 11 if at all can be brought back by the government, is it likely that next year when demand increase s it will be back? Dr. Praveer Sinha: So, Sec. 11 is an emergency section whenever there is a shortage of power, the government has a right to call upon plants which are not operating to operate at full capacity.

    Answer, praveer sinha

    This year because of the monsoon coming early and a longish monsoon it was not imposed dur ing The Tata Power Company Limited November 11, 2025 summer months. Hopefully, it will be imposed next year. But in any case, we want to have a long-term resolution rather than going year-after-year on Sec. 11. So, we have been in discussion with the government of Gujarat and hopefully we should be able to come to some arrangement. The details are still getting finalized and it has to go to the government approval process, and once it is finalized we will be in a position to share.

  3. Question

    Satyadeep Jain: Hi, thank you. I just want to firstly ask on the decision or thought process to go long on ingot wafer versus cell. So, you are looking at 10-gigawatt ingot wafer versus cell line, what is the thought process there and does it mean that incrementally we should look at Tata Power as getting bigger on the third-party sales of cell module wafer, which currently most of the capacity is tied to internal, but it looks like increasingly that is the path we are going to choose? Dr. Praveer Sinha: So, based on the demand/supply and the plants which are under implementation, we feel that there will be enough supply of cell and module.

    Answer, praveer sinha

    That is why we are doing the backward integration going for the wafer and ingot and we feel that the 10-gigawatt capacity will be good capacity to not only supply wafers for our plants, but also for other cell and module plants. This is under finalization and hopefully in the next two months we will be in a position to finalize and share the details.

  4. Question

    Satyadeep Jain: Are you suggesting that the barriers to entry for wafer and ingot would be higher, so, incrementally not many players will be able to add ingot wafer, is that what you are trying to say? Dr. Praveer Sinha: Yes, it has not only the technology, which is very sophisticated, but also in terms of the ability of many people to execute such a complex project.

    Answer, praveer sinha

    Today, we have virtually very small capacity, just 2 gigawatts in the country, and the country will require about 50 to 60 gigawatts of wafer and ingot manufacturing capability in the next two, three years. So, we feel we are very well poised for this sort of investment opportunity. The Tata Power Company Limited November 11, 2025 Satyadeep Jain: Yes, fair enough sir.

  5. Question

    Satyadeep Jain: Okay. Just one quick question on the renewable energy addition for Tata Power in the first half. Just overall when we look at the industry, it seems like there is a spurt in commissioning maybe 27–28-gigawatt commissioning in the first seven months and 200 megawatt seems like less than 1% share. Is it taking really long and other players have succeeded, what exactly is going on in terms of, because some we are hearing challenges on transmission and all, but when you look at the entire industry commissioning, there is a jump, what exactly is going on, sir? Dr. Praveer Sinha: What has happened is in the first two quarters, we had commitment of third-party EPC projects and these

    Answer, praveer sinha

    We focus on completing all of them so that hereafter we will be in a position to execute only our project. So, that is the whole plan, and you will see that that is why there will be a lot of capacity additions in Q3, Q4 and in the next financial year, which will primarily cater to our own internal requirements and very little of third-party.

  6. Question

    Anuj Upadhyay: Hi, sir. Thanks for the opportunity. Sir, first question is on the rooftop sustainability. So, how big are we anticipating this market to be and are we directly tying up any of the states to supply the rooftop? Likewise, we have few new entrants who directly enter into The Tata Power Company Limited November 11, 2025 agreement with certain states to install a rooftop of around say 700 megawatts plus kind of a capacity. So, are we looking out for similar kind of an opportunity here? Dr. Praveer Sinha: So, rooftop, I think it is just tip of the iceberg.

    Answer, praveer sinha

    Only 20 lakh rooftops have been installed till September, and my expectation is that in this country at least 5 crores homes will have a rooftop and so there is a long way that we have to go to cater to the country’s requirements. So, this is a very good opportunity. We are one of the best in the country with maximum market share of more than 20% and this is going to be a very sustained effort from Tata Power side for many more years in future.

  7. Question

    And, sir, second related question, as you mentioned, close to 4 to 5 gigawatt we are planning to do over the next two years. So, what about some bidding projects, what are your thoughts on that, because I think the bidding has been slower, I mean, what about adding more to the pipeline? Dr. Praveer Sinha: So, we are looking at bidding projects such as FDRE and RTC and all that.

    Answer, praveer sinha

    As we had mentioned to you earlier, we are now in the process of constructing our pump hydro project, which will also be operational by 2029. So, a lot of planning will be done in such a way that we package this as a solution of RTC power or peak power for consumers and this can be discoms as well as industrial and commercial consumers. So, it will not only be just bidding for the discoms but also tying up with C&I customers.

  8. Question

    Rajesh Basu Majumdar: Okay. Thank you.

    Answer, praveer sinha

    And if you have any queries, you can always get in touch with my colleagues, Kasturi and Anshul, and we will be more than happy to provide you all the required information. Thank you and take care. The Tata Power Company Limited November 11, 2025 And Kasturi, you have informed everyone about that visit? Kasturi Soundararajan: Yes, we have started informing them. If you want, you can go ahead. Dr. Praveer Sinha: Okay.

    Answer, praveer sinha

    The next Analyst Meet is in Bhubaneswar on 15th of December. My colleagues will get in touch with you and provide you more details and the agenda.

Questions about this call

When was the Tata Power Company Q2 FY26 earnings call transcript filed?
Tata Power Company filed the transcript with the exchange on 16 Nov 2025. This page is built from that transcript.
What does this page list?
42 statements from the transcript across 9 topics, 27 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 18 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
Tata Power Company Q2 FY26 concall: Tata Power expected to add 700-megawatt capacity in renewable projects in the 3rd Quarter and 600 megawatts in the 4th Quarter · DalalOS