Earnings call
Tata Power Company Q2 FY27 earnings call
By DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person.
Transcript filed .
The transcript does not name its quarter. Q2 FY27 is worked out from the date it was filed.
The Tata Power Company Limited expects to conclude the SPPA with a majority of the states within 31st December and expects CERC approval by then; under the PPA condition, a majority decision becomes applicable to all states. The Tata Power Company Limited decided to add 1,800 MW of pumped hydro project in Shirwata near Lonavala, with an investment of INR 11,871 crores financed through 75% of debt and 25% equity. The Tata Power Company Limited reported its highest-ever quarterly profit after tax of INR1,652 crores in the quarter, up 33% year-on-year from INR 1,245 crores in the corresponding period last year. The Tata Power Company Limited had done INR 10,000 crores of capex and was on track to complete nearly INR 25,000 crores of capex for the year. The Tata Power Company Limited’s 1,800 MW pumped hydro project in Shirwata near Lonavala will be used to bid for state DISCOM pumped storage capacity tie-ups and bundled with renewable projects as RE RTC projects for DISCOMs, industrial customers and data centers.
The numbers management gave
Results
- The Tata Power Company Limited reported its highest-ever quarterly profit after tax of INR1,652 crores in the quarter, up 33% year-on-year from INR 1,245 crores in the corresponding period last year.
Show source
We have reported our highest- ever quarterly profit after tax of INR1,652 crores, which is an increase of 33% year-on- year compared to INR 1,245 crores in the corresponding period last year.
- The Tata Power Company Limited’s EBITDA increased by 5% year-on-year in the quarter.
Show source
EBITDA has increased by 5% on year-on -year basis.
- The Tata Power Company Limited’s revenue increased by nearly 26% in the quarter to INR 19,886 crores from INR15,769 crores.
Show source
We also see that our revenues have gone up by nearly 26% in the quarter from INR 19,886 crores from INR15,769 crores.
- The Tata Power Company Limited’s PAT was INR3,053 crores on a half yearly basis, 22% more than last year.
Show source
The PAT has gone up to INR3,053 crores, 22% more than last year.
- The Tata Power Company Limited’s EBITDA was INR 8,494 crores on a half yearly basis, up 7% from INR7,961 crores.
Show source
The EBITDA has gone up by 7% to INR 8,494 crores from INR7,961 crores.
- The Tata Power Company Limited’s revenue was INR 38,784 crores on a half yearly basis, up from INR33,233 crores in the previous year.
Show source
The revenue has gone up to INR 38,784 crores from INR33,233 crores in the previous year.
Show 9 more statements
Results
- RE Genco’s YTD EBITDA was INR2,231 crores, equivalent to INR4,500 crores per annum.
Show source
Sanjeev Churiwala: RE Genco, our YTD number is INR2,231 crores so INR4,500 crores per annum.
- Tata Power had about 8.8% curtailment in quarter one and about 11% curtailment in quarter two; the company expects connectivity in its pipeline to ease the issue in subsequent quarters.
Show source
In quarter two, there's about 11% of curtailment.
- The company provided INR96 odd crores of impairment for the Georgia asset after a business trigger from a cash flow perspective, because it had not been able to revive operating activities there.
Show source
So, from a cash flow perspective, there was a business trigger happened, and accordingly, we have provided these INR96 odd crores impairment.
- The Tata Power Company Limited bills all five DISCOMs under the SPPA, and the SPPA’s impact is already included in its quarterly accounts.
Show source
The billing to all the five DISCOMs is being done under the SPPA.
- Efficiency and DSM together contributed to the increase in traditional generation, including Mumbai and Hydro EBITDA in Q2; Tata Power's idea is to sustain that and find means of improving efficiencies going forward.
Show source
Sanjeev Churiwala: It is a combination of efficiency and DSM both together.
- Tata Power's DSM gains are better during the summer, but the DSM impact is not a very material amount.
Show source
It is not a very material amount, but yes, during the summer, you are getting better DSM gains.
Money and capital
- The company spent close to INR 10,000 crores of capex in H1, with roughly INR6,000 odd crores going to the renewable business and the remaining capex spread among various businesses, and was on track to complete nearly INR 25,000 crores of capex for the year.
Show source
Page 10of 11 The Tata Power Company Limited November 11, 2026 Sanjeev Churiwala: In Q2, we did about In H1, we did about close to about INR 10,000 crores of capex, and roughly about INR6,000 odd crores went to the RE business, renewable business, and the remaining is still among various businesses that we have.
- The company had close to INR 1,400-odd crores of cash in September.
Show source
So, in September, I think it was close to about INR 1,400-od d crores.
- The Tata Power Company Limited had done INR 10,000 crores of capex and was on track to complete nearly INR 25,000 crores of capex for the year. Replaced by a later filing.
What it expects ahead
What management expects
- The Tata Power Company Limited expects its capacity addition target for this year to be 2.5 GW and expects to meet it, after missing targets in the first and second quarter; some delayed evacuation lines are expected by December or January.
Show source
So, we expect that this year target is 2.5 GW of capacity addition, and we will be able to meet that.
- Tata Power expects the amortization process for regulatory assets to pick up pace in FY 2028, as states are interested in completing the process.
Show source
There is definitely lot of interest from all these states to complete the whole process, and we do expect that in the coming year, that is FY 2028, the amortization process will pick up pace.
- The Tata Power Company Limited has not decided whether to shift its existing solar cell and module plant to the TOPCon line; it already has a small TOPCon line and will take a call later if market demand is increasing.
Show source
At this stage, we have not decided, but at a later date, when we see that the market demand is increasing, we will take a call.
- Tata Power is working on connectivity and expects improvement in curtailment in subsequent quarters; BESS instalment will also help bring curtailment down.
Show source
Of course, we also have the BESS instalment coming through, and that will also help us in ensuring that this curtailment comes down.
- Tata Power expects coal prices, governed by geopolitical conditions, to continue at least for the next five to six months and expects the coal JV profitability momentum to continue for the next two quarters.
Show source
But yes, at least for next two quarters, you can expect this momentum to continue.
- The Tata Power Company Limited expects to conclude the SPPA with a majority of the states within 31st December and expects CERC approval by then; under the PPA condition, a majority decision becomes applicable to all states. Replaced by a later filing.
Show 1 more statement
What management expects
- The company continues to monitor opportunities in HVDC projects, which are moving targets. Replaced by a later filing.
Show source
We need to, again, these are things which are moving targets, and we continue to monitor them to see what are the opportunities that we get.
What it is building and selling
Projects and capacity
- The Tata Power Company Limited decided to add 1,800 MW of pumped hydro project in Shirwata near Lonavala, with an investment of INR 11,871 crores financed through 75% of debt and 25% equity.
Show source
We have also taken a decision today to add 1,800 MW of pumped hydro project in Shirwata near Lonavala.
- The Tata Power Company Limited received all approvals required to start work on its ingot and wafer plant, expects to start work in this month, and expects the plant to be fully operational by March 2028.
Show source
We expect to start the work in this month, and we expect that by March 2028, the plant will be fully operational.
- The company considers pumped storage plants over a period longer than 40 years of operation.
Show source
We also look at pumped storage in terms of not just 40 years, but even a longer period for which the plant can operate.
- Work is going on for Tata Power Company Limited’s first 1,000 megawatt pumped storage project.
Show source
Already work is going on for the first 1,000 megawatt .
- The Board has approved another 1,800 megawatt pumped storage project, and Tata Power Company Limited may bring forward more such proposals at its other reservoirs.
Show source
Today, Board has approved another 1,800 megawatt , and we may come back with more such proposals in our other reservoirs.
- Pumped storage capex figure of INR 11,871 crores is stated on a gross basis, without considering probable incentives or grants.
Show source
The number that you see that we have now already sent out a press release also, and is part of our SEBI filing, is INR 11,871 crores.
Show 13 more statements
Projects and capacity
- The company expects the Bhivpuri project to become operational in the first half of calendar year 2029, and Shirwata to be commissioned in Calendar year 2031.
Show source
Praveer Sinha: The Bhivpuri project, we expect that it will become operational in first half of calendar year 2029, and Shirwata will get commissioned in Calendar year 2031.
- Tata Power has not placed the order for the ingot and wafer plant equipment as yet and is examining the implications of China's proposed technology export controls; it expects more clarity by the end of November.
Show source
Praveer Sinha: We have not placed the order as yet.
- The company did not bid for the South K alamb HVDC project and has been examining it, especially the availability of OEMs with the required technology.
Show source
Praveer Sinha: We did not bid for the HVDC project, and we have been examining the HVDC project, especially in terms of the OEMs, and there are not many OEMs who have the type of technology which are being bid out.
- The Tata Power Company Limited has not taken steps to shift its existing solar cell and module plant to the TOPCon line; it already has a small TOPCon line. Replaced by a later filing.
Show source
As far as the existing solar cell and module plant, we have not taken steps to shift to the TOPCon line.
Segments
- Tata Power's rooftop business is going very fast in U.P., Odisha, Maharashtra and Rajasthan, and will now happen in Delhi.
Show source
In fact, it is going very fast in U.P. and Odisha, as also in Maharashtra and Rajasthan, and now it will happen in Delhi.
- Tata Power sees an opportunity in battery storage projects and continues to look at supplying power through them on a long-term basis and on a merchant basis.
Show source
That is a good opportunity for us, and we keep on looking at opportunities, how we can do it on a long-term basis, as also on merchant basis, supply of power through battery storage projects.
- Tata Power is able to drive its rooftop business to a very large scale with state government support. Replaced by a later filing.
Show source
I think many of these states, we have very good presence, and with the state government support, we are able to drive this to a very large scale.
Deals and partners
- The Tata Power Company Limited’s 1,800 MW pumped hydro project in Shirwata near Lonavala will be used to bid for state DISCOM pumped storage capacity tie-ups and bundled with renewable projects as RE RTC projects for DISCOMs, industrial customers and data centers.
Show source
This will be used not only to bid for some of the state DISCOMs which are now going for pumped storage capacity tie-ups, but also with bundling with our renewable projects as RE RTC projects to be provided not only to DISCOMs, but also to many of our industrial customer, and including data centers with whom we are in touch.
- The Tata Power Company Limited signed the SPPA with Gujarat and filed it in CERC, where it is reserved for order.
Show source
Praveer Sinha: We have signed the SPPA with Gujarat, and it has been filed in CERC, and it is now reserved for order.
- The Tata Power Company Limited is in discussion with the other four states about the SPPA; discussions with two states are at a very advanced stage, and the company expects to conclude them before December. The Tata Power Company Limited expects to conclude the SPPA with a majority of the states within 31st December and expects CERC approval by then; under the PPA condition, a majority decision becomes applicable to all states.
Show source
We expect to conclude the SPPA with majority of the states within 31st December.
- Tata AutoComp sources cells from China and makes battery sets, including the battery management part; Tata Power works closely with Tata AutoComp.
Show source
Praveer Sinha: We work very closely with Tata AutoComp, who sources the cell from China and makes the battery set, including the battery management part of it.
- Tata Power expects many battery cells to be manufactured in India going forward, including at a plant being set up by Agratas, another Tata Group company; local manufacturing may give better control of the supply chain.
Show source
We do expect that going forward, many of these cells will get manufactured in India also, including the plant that is being set up by another Tata Group company, Agratas.
- The company is working with some OEM partners on a back-to-back agreement for the South K alamb HVDC project before taking a call, because it is a huge project.
Show source
We need to have a back-to-back arrangement, and we are working with some of the OEM partners and take a call, because it is a huge project, and it is very important that we have a back- to-back agreement with the OEMs.
Risks, rules and outside factors
Risks and disputes
- The Tata Power Company Limited approached the Court of Appeal or the Supreme Court of Singapore after its appeal in the Singapore International Commercial Court was rejected; the matter is listed for 19th of January.
Show source
We have now approached the Court of Appeal or the Supreme Court of Singapore, and the matter is now listed for 19th of January.
- The Tata Power Company Limited expects to succeed in the Supreme Court of Singapore in the Kleros matter.
Show source
We expect that we will be able to succeed in the Supreme Court.
- Kleros is trying to enforce the order by attaching the shares of the Tata Power Company Limited’s two companies in Singapore, and the company is taking legal actions to prevent attachment.
Show source
We also have taken steps wherein the other side, that is Kleros, is trying to enforce the order by attaching the shares of the company, the two companies in Singapore.
- The shares in the Tata Power Company Limited’s two companies in Singapore are pledged with the consortium of lenders, which will also take suitable legal action to prevent enforcement by Kleros.
Show source
Also, since the shares are pledged with the consortium of lenders, they will have to approach them, who will also take a suitable legal action to ensure that this does not get enforced by the other side.
- The company expects the enforcement process concerning the shares in TPIPL and Bhira investments to take three to six months, during which finality in the Supreme Court of Singapore will come.
Show source
We expect that whole process will take three to six months, and within that period, finality in Supreme Court of Singapore will come.
- The Tata Power Company Limited will take all necessary actions to protect its shares and assets in the Kleros Singapore matter. Replaced by a later filing.
Show source
We will take all actions that are necessary to protect the shares and the assets that the company holds.
Show 5 more statements
Rules and policy
- The Supreme Court has advised that the regulatory asset in Delhi needs to be amortized over six years, till 2031.
Show source
As you are aware that in Delhi, now already the Supreme Court has advised them that this regulatory asset needs to be amortized in six years period, that is till 2031.
- In Delhi, there was no full quorum of the regulatory commission, causing regulatory assets to go up; with the full quorum now in place, Tata Power expects true-up orders and a tariff increase in this year so the regulatory asset will be amortized.
Show source
Now that the full quorum is there, we expect that in this year, they will come up with the true-up orders and will provide the increase in tariff so that the regulatory asset will be amortized.
- The commission in Odisha has to come up with a true-up, and Tata Power expects it will come and the regulatory asset will be amortized over a period of time.
Show source
We expect that will also come, and this also will get amortized over a period of time.
- Tata Power is waiting for government notifications and clarifications on private participation in distribution or parallel licensing; regulators have not decided on applications in a few places pending those clarifications.
Show source
While we have also applied in few places, the concerned regulators have not taken a decision, awaiting the government clarifications or government notifications of the new rules.
- The subsidy is there till March, and a new avatar of the subsidy will also come beyond March; the subsidy will continue but will be a little different than the existing subsidy. Replaced by a later filing.
Show source
My information is the subsidy will continue, but it will be little different than the existing subsidy.
What the company said on its earnings call, taken from its own transcript. Not advice.
Questions and answers
Question
My first question is, sir, is there any element of exceptional or one-time non -recurring income in profit from associate? That is pretty high on Q-o -Q basis?
Answer, sanjeev churiwala
Sanjeev Churiwala: No, there is none. If you are looking at exception Mohit Kumar: Understood.
Question
My second question is, what is the status of long-term resolution of PPA for Mundra? And the related question is, are you booking revenue, etc , based on Section 11 or as per the new PPA?
Answer, praveer sinha
Praveer Sinha: We have signed the SPPA with Gujarat, and it has been filed in CERC, and it is now reserved for order. We are in discussion with all the other four states. Two states, we are in a very advanced stage of discussion, and we expect that we will be able to conclude that before December. The billing to all the five DISCOMs is being done under the SPPA. Whatever is the impact because of the SPPA is already considered in our reports, and that is part of our quarterly accounts.
Question
Mohit Kumar: Understood. My last question, sir, do you plan to change your solar module manufacturing from mono PERC to TOPCon? And can you spell out the associated cost, and what is the status of ingot and wafer plant?
Answer, praveer sinha
Praveer Sinha: On the ingot and wafer plant, we have now received all the approvals that are required to start the work. We expect to start the work in this month, and we expect that by March 2028, the plant will be fully operational. As far as the existing solar cell and module plant, we have not taken steps to shift to the TOPCon line. We already have a small TOPCon line, but we are still seeing the market condition. There is still huge demand for the product that we are making. At this stage, we have not decided, but at a later date, when we see that the market demand is increasing, we will take a call.
Question
Mohit Kumar: Understood, sir. Thank you, and all the best, sir. Thank you.
Answer, praveer sinha
Praveer Sinha: As you are aware, we have in discussion on SPPA. We expect to conclude the SPPA with majority of the states within 31st December. And as per the PPA condition, once majority decides, it becomes applicable to all of them. We also expect the regulator approval, that is CERC approval, by then. So, I think this will get admitted and accepted by all states as a common PPA applicable to all of them. Page 4of 11 The Tata Power Company Limited November 11, 2026 Puneet: Okay. Second, on your Renewables, can you talk about what is your run rate EBITDA for the 7.1-gigawatt capacity?
Answer, sanjeev churiwala
Sanjeev Churiwala: RE Genco, our YTD number is INR2,231 crores so INR4,500 crores per annum. Puneet: That is only for first half, right? I mean, if you were to run 7.1 gigawatt on a full year steady state normalized PLF, what should EBITDA be?
Answer, praveer sinha
Praveer Sinha: INR4,500 crores EBITDA Praveer Sinha: It should be a little more than double of H1 because many of the plants have come up in last three months or six months. The full impact will come in the subsequent quarter. You can expect more than what we have done. At least it will be 60% to 70% of the first quarter. Puneet: Understood. And Your capacity addition, Q2 is also slightly lower than expected. We thought 500 MW was close to getting completed.
Answer, praveer sinha
Praveer Sinha: Yes, we have missed the targets in first and second quarter, but many of the projects are now ready. The evacuation lines which were delayed, we are expecting some of them to come by December or January. So, we expect that this year target is 2.5 GW of capacity addition, and we will be able to meet that. Puneet: Understood. And lastly, on the rooftop business, do you think the rooftop business still remains viable without subsidy? Whether it has any implications for your Delhi DISCOM piece as the rooftop penetration is going up very fast in Delhi?
Answer, praveer sinha
Praveer Sinha: The rooftop business is going very fast everywhere. In fact, it is going very fast in U.P. and Odisha, as also in Maharashtra and Rajasthan, and now it will happen in Delhi. I think many of these states, we have very good presence, and with the state government support, we are able to drive this to a very large scale. Puneet: Without subsidy, do you still expect the same run rate to continue?
Answer, praveer sinha
Praveer Sinha: I think the subsidy is there till March, and the new avatar of the subsidy will also come beyond March. My information is the subsidy will continue, but it will be little different than the existing subsidy. Puneet: Understood. That's all from my side. Thank you so much and all the best.
Question
Sumit Kishore: Thanks for the opportunity. My first question is on the regulatory assets in distribution business, which seem to have gone up almost by 28% year-on- year to INR 83.1 billion. This is excluding Page 5of 11 The Tata Power Company Limited November 11, 2026 your transmission and generation business regulatory assets. This is led mainly by increases across Delhi and Odisha. Any specific comment given the slightly sharper increase here?
Answer, praveer sinha
Praveer Sinha: Regulatory assets have gone up because in Delhi, there was no full quorum of the regulatory commission. Now that the full quorum is there, we expect that in this year, they will come up with the true-up orders and will provide the increase in tariff so that the regulatory asset will be amortized. As you are aware that in Delhi, now already the Supreme Court has advised them that this regulatory asset needs to be amortized in six years period, that is till 2031. We do expect that the commission will be able to come up with the tariff revisions which is required. Similarly, in Odisha, they have to come up with the true-up. The full commission was not there. We expect that will also come, and this also will get amortized over a period of time.
Answer, praveer sinha
There is definitely lot of interest from all these states to complete the whole process, and we do expect that in the coming year, that is FY 2028, the amortization process will pick up pace.
Question
Sumit Kishore: The traditional generation, including Mumbai and Hydro EBITDA for Q2 in cluster-wise financials is up to INR 3.51 billion from INR 2.55 billion, roughly 37% year-on- year. Is that on account of higher DSM revenue of Mumbai generation? Can you please explain this and whether it is sustainable?
Answer, sanjeev churiwala
Sanjeev Churiwala: It is a combination of efficiency and DSM both together. Of course, our idea is to sustain that. We will have to find means of improving on our efficiencies as we move forward.
Question
Sumit Kishore: A 37% increase in a business that is pretty much stable, I just thought was worth checking on. How much is the DSM impact?
Answer, sanjeev churiwala
Sanjeev Churiwala: We will share it with you. It is not a very material amount, but yes, during the summer, you are getting better DSM gains.
Question
Sumit Kishore: Okay. This is a business where typically you shouldn't have this kind of growth. The third one is the impact of curtailment or transmission constraints on performance of RE Gencos in Q2 particularly.
Answer, sanjeev churiwala
Sanjeev Churiwala: So if you look at Q2, in quarter one, we had about 8.8% of curtailment. In quarter two, there's about 11% of curtailment. I think if you look at industry, there has been a curtailment throughout, and we're also facing the issue. I think looking at all the connectivity that we have in the pipeline, hopefully this will ease out in subsequent quarters.
Question
Sumit Kishore: 11% curtailment is among the highest numbers that we have heard in results so far. I mean, what is the progress on lines, and do you expect this to remain in high single-digit percentage for remaining fiscal and the outlook for FY 2028? Page 6of 11 The Tata Power Company Limited November 11, 2026 Sanjeev Churiwala: Subsequently, it will come down.
Answer, sanjeev churiwala
So we are working on the connectivity. I think we see a good line of sight. So fully in the subsequent quarters, you will see an improvement. But yes, this is something I guess you'll find across the industry. We are not specifically called out here. Of course, we also have the BESS instalment coming through, and that will also help us in ensuring that this curtailment comes down.
Question
Sumit Kishore: Got it. Just one last clarification. For the ingot and wafer plant, do you see any impact of China's proposed technology export controls, or have you already secured the equipment required for manufacturing? As a result, do you see any risk of ALMM 3 getting deferred? That is my last question. Thank you.
Answer, praveer sinha
Praveer Sinha: We have not placed the order as yet. We are definitely examining the implication, and there is also a rethink that is happening in the Chinese government. So, let us see. We will get more clarity within end of November. Sumit Kishore: Okay. Thank you. Wish you all the best.
Show 12 more questions
Question
Apoorva Bahadur: Hi, sir. Thank you for the opportunity. Sir, I want to know your opinion on this recent DISCOM sort of parallel license granted in Gurgaon, which was subsequently sort of rolled back or held in abeyance. How should we think about this? Does it change anything, our progress on private licenses? Also, the fact that I think a few of the state-owned DISCOMs are probably approaching the public markets, that has been reported by media. Does that also change the overall distribution privatization opportunity which is available for the private players like us?
Answer, praveer sinha
Praveer Sinha: Yes, so I think much more clarity is required from the various state governments as well as from the central government in terms of whether it is through amendment to the Electricity Act or amendment in the new electricity rules and tariff rules which are coming. I think there has to be much better clarity from the government side in terms of allowing private participation in distribution or parallel licensing. We are waiting for the necessary notifications to be issued. While we have also applied in few places, the concerned regulators have not taken a decision, awaiting the government clarifications or government notifications of the new rules. We will have to wait and watch how it is taken up.
Question
Apoorva Bahadur: I understand. Sure. My second question is on the recent BESS VGF scheme which the cabinet has approved. I know the contours of this scheme are still awaited, but, I think, a tie-up with our sister entity, Tata AutoComp. They already manufacture batteries. How are we thinking about this local value addition opportunity over there? What is the local value addition that has already Page 7of 11 The Tata Power Company Limited November 11, 2026 been achieved by Tata AutoComp, and will this sort of scheme change Tata Power's strategy towards these VGF-supported BESS projects in future?
Answer, praveer sinha
Praveer Sinha: We work very closely with Tata AutoComp, who sources the cell from China and makes the battery set, including the battery management part of it. We do expect that going forward, many of these cells will get manufactured in India also, including the plant that is being set up by another Tata Group company, Agratas. Possibly there will be a much better control on the supply chain once we have local manufacturing. That is a good opportunity for us, and we keep on looking at opportunities, how we can do it on a long-term basis, as also on merchant basis, supply of power through battery storage projects.
Question
Apoorva Bahadur: Sure, sir. Probably last question from my side is on the sharp improvement in coal JV profitability. Should we sort of, sir, extrapolate the Q2 improvement trend throughout this year, or do you expect further improvement in profitability based on the prevailing prices and conditions?
Answer, praveer sinha
Praveer Sinha: The coal prices are governed by geopolitical conditions. At least for next five to six months, I expect this will continue. Beyond that, it is very difficult to comprehend how things will change. But yes, at least for next two quarters, you can expect this momentum to continue.
Question
Satyadeep Jain: Hi. Thank you. The first question on transmission. If I am not mistaken, Tata Power was one of the bidders for the South K alamb HVDC project. I just want to confirm that, and if that is correct, what is the thought or strategy? Is Tata Power looking at bidding for HVDC projects also, and what do you think of transmission as a business for the next few years?
Answer, praveer sinha
Praveer Sinha: We did not bid for the HVDC project, and we have been examining the HVDC project, especially in terms of the OEMs, and there are not many OEMs who have the type of technology which are being bid out. We need to have a back-to-back arrangement, and we are working with some of the OEM partners and take a call, because it is a huge project, and it is very important that we have a back- to-back agreement with the OEMs. We need to, again, these are things which are moving targets, and we continue to monitor them to see what are the opportunities that we get. Page 8of 11 The Tata Power Company Limited November 11, 2026 Satyadeep Jain: Okay.
Question
On the Shirwata PSP, there seems to be a sharp appreciation in capex cost compared to initial estimates. The Brownfield project, now compared to initial expectation of INR 8,000 crores, there's almost a 50% jump. Just want to see what's been driving this, and this is Brownfield capital cost, what do we see as Greenfield capital cost for a pumped storage right now?
Answer, praveer sinha
Praveer Sinha: Again, it depends what sort of pumped storage is there. If you have to make both the reservoirs, then it has a different project cost and timeline. If you have just one reservoir, then it has a different timeline and cost. So, we typically look at it from the perspective that ours is a one reservoir. That means there's already one existing reservoir, and this one more reservoir we will take, and which will be the settling reservoir that we will be utilizing. So, that's the way that we look at pumped storage. We also look at pumped storage in terms of not just 40 years, but even a longer period for which the plant can operate.
Answer, praveer sinha
So, we are definitely going big time into pumped storage. Already work is going on for the first 1,000 megawatt . Today, Board has approved another 1,800 megawatt , and we may come back with more such proposals in our other reservoirs. So, as a long-term storag e, this is a very attractive solution.
Question
Satyadeep Jain: What specifically drove such a large jump in capex expectation for Shirwata versus what you were looking at earlier? I think it was INR 8,000 crores for 1,800 megawatt, INR7,850 crores. Now it has gone to INR 12,000 crores. That seems like a sharp… Sanjeev Churiwala: I think there is some confusion.
Answer, sanjeev churiwala
It cannot be INR 8,000 crores. It has always been this ballpark number. The number that you see that we have now already sent out a press release also, and is part of our SEBI filing, is INR 11,871 crores. Normally, the way we look at the capex is without considering if there are probable incentives that we will raise. Many companies would announce net of incentives and net of grants of it all. We would normally take a conservative stand and want to announce capex on a gross basis.
Question
Satyadeep Jain: Okay. Just one last quick clarification on these INR90 crores impairment. It seems like you have taken this impairment for the Georgia asset in last financial year also. Is it the same impairment, or is there additional impairment on this asset?
Answer, sanjeev churiwala
Sanjeev Churiwala: No, it is the same impairment. This was the leftover amount of INR 96 crores. We were trying to revive some of the operating things over there, which we have not been able to do that. So, from a cash flow perspective, there was a business trigger happened, and accordingly, we have provided these INR96 odd crores impairment.
Question
Subhadip Mitra: Good evening and thank you for the opportunity. So, first question from my side is on this Kleros issue. While you clarified in the opening comments that the next hearing is expected in January, just wanted to understand if you can just flesh it out for us to understand that, could there be some further measures that could be taken by Kleros in this intervening period between now and January, which could probably further jeopardize the issue or how watertight do you think the case is from your perspective?
Answer, praveer sinha
Praveer Sinha: So, as we have informed you that they had approached us for enforcement, and that meant that they wanted to attach the company shares in TPIPL and Bhira investments. We have informed them that the shares are not with us, and formally and legally, we will inform them within 14 days of the notice. We expect that since these shares are pledged, they will approach the banks also. The banks will also inform them that since it is pledged, they cannot take the shares. All these things are now going through a process, and then there is a mechanism whereby we will approach the courts also on the shares being taken by them. We expect that whole process will take three to six months, and within that period, finality in Supreme Court of Singapore will come. Based on that, we will take next steps.
Question
Subhadip Mitra: Understood. Secondly, in terms of the PSP projects, are there any timelines by when you are anticipating Bhivpuri and then Shirwata to get commissioned? By when are you expecting cash flows from both of these projects?
Answer, praveer sinha
Praveer Sinha: The Bhivpuri project, we expect that it will become operational in first half of calendar year 2029, and Shirwata will get commissioned in Calendar year 2031. That is the timeline that we are looking at.
Question
Subhadip Mitra: Understood. Thank you. That is it from my side.
Answer, sanjeev churiwala
Sanjeev Churiwala: I think, are you looking at an H1 allocation, or you want to give a tentative idea about the full year? Puneet: No, H1 and reported numbers. How much is it towards the renewables piece? Page 10of 11 The Tata Power Company Limited November 11, 2026 Sanjeev Churiwala: In Q2, we did about In H1, we did about close to about INR 10,000 crores of capex, and roughly about INR6,000 odd crores went to the RE business, renewable business, and the remaining is still among various businesses that we have.
Answer, sanjeev churiwala
Puneet: No, what I meant was the INR 11,165 crores of cash that you have in your books. How much of it is in the RE piece, and how much is it in the rest?
Answer, sanjeev churiwala
Sanjeev Churiwala: It is spread across hundreds of businesses, a nd renewable businesses, roughly depending upon the repayment, capex requirement, will have INR 1,000 crores-INR 1,400 crores of cash lying over there. Over there also, there are various businesses. So, in September, I think it was close to about INR 1,400-od d crores. Puneet: INR1,400 crores, okay. That's all from my side. Thank you so much.
Question
Dheeraj Kripalani: Yes. Thanks for the opportunity, and thanks for the clarity on the Singapore case process. Just to close it, if the, let's suppose, if the Court of Appeal Rules against us, then would the full amount of around $650 million would be provided in that quarter, or how would it be funded, or how will it work? Just wanted more clarity on that.
Answer, sanjeev churiwala
Sanjeev Churiwala: No, I think we have a very strong case, right? That is why this has not been provided for. So, there's no need for us to think that we will lose the case.
Question
Dheeraj Kripalani: Okay. Thank you, sir.
Answer, praveer sinha
Praveer Sinha: Thank you, everyone, for joining for the call, and I would like to wish all of you a happy Diwali, happy Bhai Dooj, and Chhath. If you have any more queries, please get in touch with Gautam and Anshul from our Investor Relations team, and we will be able to provide you all the details. Any feedback on the presentation, whatever changes had been suggested last time have been incorporated. But we will be more than happy to receive your feedback to further enhance and improve the quality of presentation, and also to provide all details information that is feasible. So, once again, all the best, and stay safe and take care.
Questions about this call
- When was the Tata Power Company Q2 FY27 earnings call transcript filed?
- Tata Power Company filed the transcript with the exchange on 17 Nov 2026. This page is built from that transcript.
- What does this page list?
- 52 statements from the transcript across 8 topics, 24 of them with a figure. Each statement is shown with the transcript sentence it came from.
- Are the analysts' questions included?
- Yes. 22 questions and management's answers are listed in the order they were asked, as the transcript prints them.
- Who wrote this page?
- DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.