Adani Green Energy Q4 FY25 earnings call

By . Assembled by software from the company's transcript. Not reviewed by a person.

Transcript filed .

The company has 14,243 gigawatts already operational and is targeting close to 5 gigawatts for the coming year, with a roughly 25% year-on-year increase growth rate. The company added 3.3 gigawatt of new capacity in FY '25. The company accounted for 16% of India's utility scale solar and 14% of wind power installation in FY '25. Adani Green refinanced its new construction facility of $1.06 billion; the long-term refinancing is rated AA+ and has a door-to-door tenure of 19 years. Of the 9.6 gigawatt Adani Green Energy Limited won in the last year, roughly 6.25 gigawatt had been signed up and roughly 3 gigawatt remained unsigned.

The numbers management gave

Results

  • The company accounted for 16% of India's utility scale solar and 14% of wind power installation in FY '25.
    Show source
    Our efforts accounted for Page 2 of 13 Adani Green Energy Limited April 29, 2025 16% of India's utility scale solar and 14% of wind power installation in FY '25.
  • Khavda's solar CUF was more than 32% in the last quarter.
    Show source
    The potential of Khavda can also be reflected from the fact that in the last quarter, the solar CUF was more than 32%.
  • Solar merchant capacities generated weighted average revenues of around 3.1 - 3.2, plus REC revenues, for an expected overall realization of around 3.6 to 3.7 last year.
    Show source
    So the overall number would be around 3.6 to 3.7 as our expected realization.
  • Wind merchant realizations are around INR5.5, or roughly 6 with REC, and the ISTS waiver would create better value.
    Show source
    On the wind side, the realizations are around INR5.5, with the REC we are talking about roughly 6 and then as there again the ISTS waiver would again be a better value creation for us.
  • The company sold around 2.2 billion units on merchant basis and an additional 5.3 billion units on merchant basis under PPPA in Q4 and FY '25.
    Show source
    Viral Raval: We sold it in total around 2.2 billion units on merchant basis and additional 5.3 billion units on merchant basis which were under PPPA.

Money and capital

  • Adani Green refinanced its new construction facility of $1.06 billion; the long-term refinancing is rated AA+ and has a door-to-door tenure of 19 years.
    Show source
    This long-term refinancing, rated AA+, represents door- to-door tenure of 19 years, and it's well aligned with the cash flow lifecycle of the underlying asset portfolio.
Show 1 more statement

Money and capital

  • Merchant capacities set up until now have the ISTS waiver, which goes off from June 2025 and provides additional value.
    Show source
    At the same time, I just want to convey in our merchant capacities which we have set up until now, we have the ISTS waiver also with them, which gives an additional value as the ISTS waiver goes off from June 2025.

What it expects ahead

What management expects

  • The company has 14,243 gigawatts already operational and is targeting close to 5 gigawatts for the coming year, with a roughly 25% year-on-year increase growth rate.
    Show source
    We are targeting to add 5 gigawatts in this financial year too.
  • The current Khavda evacuation plan indicates an additional capacity of 4 gigawatt by June this year and 7 gigawatt by December; Adani Green Energy Limited expects this to be fine as it commissions additional capacities at Khavda.
    Show source
    Ashish Khanna: We are expecting another 4 gigawatts to be added by June and 7 by the end of this year.
  • The company is targeting 50 gigawatts by 2030, with 25% targeted towards merchant, C&I, and other types of contracts and the balance towards traditional PPAs.
    Show source
    As I just explained to you, out of the 50 gigawatts, 25% is supposed to be targeted Page 6 of 13 Adani Green Energy Limited April 29, 2025 towards the merchant, C&I, and other types of contracts.
  • The company is confident of adding 150% of its last year capacity addition this year.
    Show source
    And that is why we are confident about adding 150% of our last year capacity addition.
  • The company is looking to commission 5 gigawatt of capacity in FY '26, nearly 95% of which is under various sanctions; debt tie-up is done for that capacity.
    Show source
    Saurabh Shah: So, in FY '26, as he said, there is a 5 gigawatt of capacity that we are looking to commission, out of which nearly about 95% of that is now under various sanctions as such.
  • The company expects solar merchant market realizations to be around the same number this year as last year.
    Show source
    We expect markets likely around the same number for this year, and then probably let us see how it picks up.

What it is building and selling

Projects and capacity

  • The company added 3.3 gigawatt of new capacity in FY '25.
    Show source
    At Adani Green Energy, we have contributed significantly by adding 3.3 gigawatt of new capacity.
  • The company is developing the world's largest renewable energy plant at Khavda in Gujarat and has operationalized more than 4 gigawatt of renewable energy from the plant in two years, with a target to complete 30 gigawatt by 2029.
    Show source
    In a short span of two years, we have been able to operationalize more than 4 gigawatt of renewable energy from that particular plant itself and are well on track to complete 30 gigawatt by 2029.
  • The company has close to 33 gigawatts of projects in contracted PPAs or merchant capacities that it is already implementing, comprising roughly 30-odd gigawatts of PPA and 3-odd gigawatts of merchant capacity.
    Show source
    So we have close to 33 gigawatts of projects, which are either in the form of contracted PPAs or the merchant capacities which we are already implementing.
  • Plan to build a gigawatt in Rajasthan and 250 megawatt at Kadapa has been on track; the slippages occurred only in Khavda.
    Show source
    It was only, like you rightly understood, it was only in Khavda.
  • Environmental conditions, including soil conditions and the effects of rain beyond the rainy months, were the prime reason Adani Green Energy's FY25 capacity addition fell short of its target; the effects have now been taken care of.
    Show source
    And these environmental aspects and our preparedness for the same is the prime reason.
  • The company has both the options open for the Chitravathi PSP project: keeping it or entering the commercial market and later signing it up, or tying it up if attractive opportunities arise.
    Show source
    We have both the options open as I mentioned for keeping it or entering in the commercial market and then later signing it up or see if there are opportunities which are attractive for us to tie it up.
Show 3 more statements

Projects and capacity

  • Current strategy is to execute the Chitravathi project in the least possible time, aiming to make it the earliest among the PSPs being developed by others and gain leverage to tap available market opportunities.
    Show source
    And like I said, the strategy today is to execute that project in the least possible time.

Deals and partners

  • Of the 9.6 gigawatt Adani Green Energy Limited won in the last year, roughly 6.25 gigawatt had been signed up and roughly 3 gigawatt remained unsigned.
    Show source
    Raj Kumar Jain: Yes, so roughly out of 9.6 gigawatt which we won in the last year, roughly 6.25 gigawatt we have already signed up.
  • Of the 9.6 gigawatt Adani Green Energy Limited won in the last year, roughly 1.4 gigawatt had cleared the LOA process.
    Show source
    Even within this 9.6 gigawatt, roughly 1.4 gigawatt even currently have got the LOA process is clear.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Ketan Jain: Thank you. Hi, sir. So just to follow up on the question, you said what is the capacity under construction right now? Is it 30 gigawatt of project currently under construction? And the follow up was that, as you said, is 30 gigawatt of capacity contracted already? Like, have we identified or have we signed the PPAs already?

    Answer, ashish khanna

    Ashish Khanna: Yes, when we say 33 gigawatt out of which, as I said, close to three gigawatts is merchant and the balance is contracted PPAs except for a small percentage, for which we have already got the LOAs which are in the process getting converted to PPAs. Ketan Jain: Understood. So how much capacity is currently under construction for the group, all the locations? Can you hear me, sir? Yes, sir. Sir, how much of capacity is currently under construction for Adani Green?

    Answer, raj jain

    Raj Kumar Jain: So I think what we are saying, we are targeting 50 gigawatts by 2030. We today have 14,243 gigawatts already operational. Then we have a run rate. Currently we are targeting close to 5 gigawatts for the coming year. And then we have a growth rate of roughly 25% as a year-on- year increase. As I just explained to you, out of the 50 gigawatts, 25% is supposed to be targeted Page 6 of 13 Adani Green Energy Limited April 29, 2025 towards the merchant, C&I, and other types of contracts. And the balance is towards the PPAs of the traditional nature, but we will be doing high-grade within those PPAs so that we have a better revenue profile there.

  2. Question

    Ketan Jain: Understood. Sir, also for FY25 also we had a target of 5 gigawatts, and we achieved around 3.2. What were the major challenges we faced?

    Answer, ashish khanna

    Ashish Khanna: I think the important factor which we discussed across earlier today, which has been shared with you in our earlier meetings too, our interactions too, is the environment has not helped us. Our assumptions with respect to the environment remain there and the soil conditions there and the effect of the rains beyond the months where it was raining. I think there was some effect to it, which has now been taken care of. And these environmental aspects and our preparedness for the same is the prime reason. That's where we are coming back that in the last quarter after having all the learning, because once you have these impacts, then re-mobilization takes a short time, and sometimes it takes longer than it, because the labor has to come from outside and all those things. So we are taking a lot of, I would say, new initiatives to make sure that this year we are much better in respect to most of the learnings, or in fact all the learnings which we had last year. And that is why we are confident about adding 150% of our last year capacity addition.

    Answer, ashish khanna

    It is primarily coming from the learnings and how do we deal with it.

  3. Question

    Ketan Jain: Understood, sir. Thank you. My last question is on the merchant sales. What kind of realizations are we getting at merchant and do we sell most of it on the exchanges?

    Answer, raj jain

    Raj Kumar Jain: Yes, so we have merchant capacities and both say in case of solar, the market is giving us around 3.1 - 3.2 as the weighted average revenues there, plus we also have the REC revenues attached to that. So the overall number would be around 3.6 to 3.7 as our expected realization. Now, that is for the last year. We expect markets likely around the same number for this year, and then probably let us see how it picks up. At the same time, I just want to convey in our merchant capacities which we have set up until now, we have the ISTS waiver also with them, which gives an additional value as the ISTS waiver goes off from June 2025. On the wind side, the realizations are around INR5.5, with the REC we are talking about roughly 6 and then as there again the ISTS waiver would again be a better value creation for us.

  4. Question

    Ketan Jain: Understood. So my last question is just a follow-up on this. Going forward, we are seeing excess solar power in the system in maybe the next 2 to 3 years. What is the incentive for a developer to have merchant capacities at that point in time if the solar prices are going to be as low as INR1 rupee or less than INR1 during the day?

    Answer, raj jain

    Raj Kumar Jain: So I think what's -- just to be very -- so from a strategy perspective, we have been increasing share of the wind in our merchant portfolio, and you would see more and more such capacities being there. The solar capacity merchant has been targeted in a manner to also realize the value around the ISTS waiver until June '25. Page 7 of 13 Adani Green Energy Limited April 29, 2025 Capacities post-June '25, which we are putting up, have the capability of either serving the C&I market, as well as then be available as an input for some of the pumped storage which we are putting up. But at the same time, this is a market which you are seeing today, and as we move forward, we play this strategy dynamically to ensure that there is a maximum value which is realized for the capacities which we are putting up. Just a year back, you had merchant prices of even solar hours realizing more than INR 4. So we have to see how things move up. Last year, the overall growth of energy sector in India was 4.2% because of the lower growth rate in certain quarters.

    Answer, raj jain

    We expect much better scenarios playing out with India's growth now actually picking up. So some of these things will again help in some of the merchant prices.

  5. Question

    Ketan Jain: Understood. Thank you.

    Answer, ashish khanna

    Ashish Khanna: I would add here that we should not be taking a very myopic view on a short-term basis for a business opportunity. I think merchant remains, and I think we are very balanced in our approach towards merchant. And of course, like Raj said, whenever there are PPA opportunities, we are well-placed to take full advantage of that. I think one factor is how cost-effectively we can execute our projects and how excellent we are in our operations. If we have these two strengths, then the opportunities can always be taken full advantage of as and when it comes.

  6. Question

    Anuj Upadhyay: Yes, hi, sir. Thanks for the opportunity. So you mentioned the slippages of 1 gigawatt, which happened most largely because of the impact of the rainfall which we had last year. Fair to assume the slippages was fully in Khavda, or there were some other places as well where we saw these kind of slippages?

    Answer, ashish khanna

    Ashish Khanna: No, Anuj. On other places, our plan to build a gigawatt in Rajasthan and 250 megawatt at Kadapa has been on track, absolutely on track. They are performing well. It was only, like you rightly understood, it was only in Khavda. Anuj Upadhyay: Okay. Okay. And any other transmission constraints which we are looking at which might have an impact on the project commissioning?

    Answer, ashish khanna

    Because this is what we have been hearing from other players as well, you know, like ROW is becoming an issue which are delaying project commissioning. So is there anything which you are witnessing in Khavda or Rajasthan as well?

    Answer, ashish khanna

    Ashish Khanna: Like we said, in the earlier remarks to the evacuation, we like you are also looking at it very closely and so is the government too. We have been trying, we have been you know, mapping our capacity expansion in line with what is promised to us, and not only promised, we are also looking at the reality which is happening at site. Page 8 of 13 Adani Green Energy Limited April 29, 2025 Like I shared with you, the capacity expansion in June and further on till December are going to help us a long way from our capacity expansion in Khavda, the way we have mapped it across. There could be a week here or a week there sorts of issues or a month here or a month there, but I think on a overall basis, it is on track, at least for us.

  7. Question

    Nikhil Nagania: Hi. Thank you for taking my question. There is one very interesting chart in the presentation where you show the mix of sales, how power was sold across the years. And a large volume sold in FY '25 seems to be volume where you have a PPA, but it was sold on merchant. It happened a couple of years back as well, some infirm power sale. But if you could please share some color on this, how was such a big chunk of sale on the merchant where PPA was already there, was it all early commissioning or was it a grid constraint at the receiver end -- receiving end? What was the reason for that?

    Answer, ashish khanna

    Ashish Khanna: Yes, Nikhil, it is again what I mentioned earlier, the testimony of the execution excellence of Adani Green, that our projects have come earlier than what they were scheduled to be and the distribution company, where to go, has given us the NOC of selling this power in the merchant. So you have rightly guessed it, it is the project early commissioning and which is being fully utilized by us in selling this power in merchant.

  8. Question

    Nikhil Nagania: Got it. But just to clarify on that, the most of the capacity which came online on the solar side seems to be the solar plus manufacturing linked PPA, where the PPA was signed for majority in December 2021 for 6 gigawatts. So it is still early commissioning on those assets or am I missing something here?

    Answer, raj jain

    Raj Kumar Jain: Yes, Nikhil, a lot of this capacity is prior to their expected COD dates as per the PPA and that is where we have got the clearances from the offtakers that yes, this can be in the interim sold in the exchange market. Over a period, this obviously will move into the PPAs. At the same time, this is some kind of a cycle. So you would see for at least near future also that some of these capacities will be available for us for selling in the merchant market.

  9. Question

    Nikhil Nagania: Got it. So FY '26 also we could see a similar quantum or something around this range come in a similar way?

    Answer, raj jain

    Raj Kumar Jain: No, I am not guiding that way. I am just saying this is one strategy we adopt if it gets worked and you see the result here. We expect some of the capacity which we have finished this year will get into the PPAs in the near future. We will have few capacities should come in and where we will seek NOCs from discoms and we may be able to have pre-COD power because these are early commissioned. Because as Ashish mentioned, with the way we have planned our capacity execution we are able to commission the projects well ahead of their commissioning timelines. Page 9 of 13 Adani Green Energy Limited April 29, 2025 Nikhil Nigania: Got it.

    Answer, nikhil nigania

    Understood. My second question was on the Chitravathi PSP. Any update on any PPAs for that asset or we do not plan to contract it in the near term?

    Answer, raj jain

    Raj Kumar Jain: Chitravathi PSP, the progress is going really well. We are on time when it comes to our execution. We have good amount of time still left for deciding on that revenue strategy with respect to that particular project. And we continue to watch the market. We have both the options open as I mentioned for keeping it or entering in the commercial market and then later signing it up or see if there are opportunities which are attractive for us to tie it up. So we keep our options open and we have good time to decide on that.

    Answer, ashish khanna

    Ashish Khanna: So Nikhil, if I can add to it. I think important factor from a strategic standpoint for us is to execute project early and best in the class. Now that gives us opportunity which you have been mentioning whether we get it on merchant or otherwise. So, currently our focus is to make sure that the Chitravathi project should be the project which is from the earliest among all the PSPs which anyone else is doing. And that gives us the leverage as well as the advantage of then tapping it across to various opportunities which are available in the market. And like I said, the strategy today is to execute that project in the least possible time.

    Answer, ashish khanna

    Ashish Khanna: Keeping our close watch on it. It's not that we are oblivious of this whole process of battery storage. There are lots of things which are happening within the company and I think in the times to come you will be one of the first ones to hear from us on that aspect.

    Answer, nikhil nigania

    Nikhil Nigania: Got it. And one last question if I may ask. There were a few assets, a few sort of projects which were listed as under construction a year back. For example, a 600 megawatt hybrid project with 2.41 tariff. I think it's what …. or a similar name. And there were a couple of wind assets as well where the tariff was about 2.7, 2.71, ARE-7 and another one. We don't see that in the list of operating assets.

    Answer, raj jain

    Raj Kumar Jain: So the 600 megawatt hybrid is currently under implementation. As it finishes, you will hear the announcements regarding that particular project. We expect to have that commissioned sometime this year.

  10. Question

    Mohit Kumar: Yes. Good afternoon sir and congratulations on a good set of numbers. My first question is on the what is the timeline for the 5 gigawatt Maharashtra? Is it fair to assume that the timeline is two years? Page 10 of 13 Adani Green Energy Limited April 29, 2025 Raj Kumar Jain: Yes.

    Answer, raj jain

    It starts from two years and then every six months we have additional 1 gigawatt, 1 gigawatt each. So that is how it is there and we expect to execute it as per the PPA plan dynamics.

Show 9 more questions
  1. Question

    Mohit Kumar: So it's 2 gigawatt plus 1 gigawatt, 1 gigawatt each every year, is that right?

    Answer, raj jain

    Raj Kumar Jain: Yes. So we intend to follow the timelines as per the contract agreement which has been signed. And if there are any changes on the same, of course it will be known to you.

  2. Question

    Mohit Kumar: Understood. A second question is it possible to give us how much you sold a merchant basis during this quarter and what was the merchant utilization?

    Answer, viral raval

    Viral Raval: We sold it in total around 2.2 billion units on merchant basis and additional 5.3 billion units on merchant basis which were under PPPA. That is part of the presentation.

  3. Question

    Mohit Kumar: No, I'm talking about this quarter?

    Answer, viral raval

    Viral Raval: We can give you the quarterly numbers separately.

  4. Question

    Mohit Kumar: I will take it separately understood. My third question is what is the capacity or LOI in the entire 33 gigawatt where PPA is still due to be signed or concluded and an expectation on the PPA signings because we keep hearing that PPA signings are getting delayed. And does it also mean that the biddings have slowed down in the interim?

    Answer, raj jain

    Raj Kumar Jain: Yes, so roughly out of 9.6 gigawatt which we won in the last year, roughly 6.25 gigawatt we have already signed up. The balance of roughly 3 gigawatt which is yet to be signed. We are already in process of that capacity also something in the future. So, and in the recent capacities only. So as we know it takes some time for capacities to be signed. There is process and all of that which happens. So, from an exposure perspective we do not have much capacity which are supposed to be signed the PPAs, where the PPAs are pending.

    Answer, raj jain

    Even within this 9.6 gigawatt, roughly 1.4 gigawatt even currently have got the LOA process is clear.

    Answer, ashish khanna

    Ashish Khanna: Okay. So, if I can add on, see, I think it is not right on us to generalize the whole point of view about the PPAs being delayed. From our standpoint, two-third of what we have won in the last year has already been signed off as part of the PPAs. The balance are very recent and I do not see much challenge at least for us, but it is not right on us to generalize on a general comment on whether they have been delayed or not. We are very focused on actually what we are doing in the process.

  5. Question

    Mohit Kumar: Understood, sir. So, what is the capex expected in F '26. And any color on data will be helpful?

    Answer, saurabh shah

    Saurabh Shah: So, in FY '26, as he said, there is a 5 gigawatt of capacity that we are looking to commission, out of which nearly about 95% of that is now under various sanctions as such. So, we have the debt tie-up done for that and we do not see any challenge on that kind of debt tie-up.

  6. Question

    Mohit Kumar: Is it right to say that all of this has come from the domestic sources, mostly REC and PFC? Page 11 of 13 Adani Green Energy Limited April 29, 2025 Saurabh Shah: It will be generally from domestic sources for the current year, because we already have the sanctions in place.

    Answer, saurabh shah

    So, it is generally coming from domestic sources, yes.

  7. Question

    Mohit Kumar: Understood, sir. On the wind portfolio, CUF seems to be on the lower side at 27%. Is it by design or do you expect it to improve as the entire F '26?

    Answer, ashish khanna

    Ashish Khanna: I think you have to look into the age of this portfolio as such and I am very hopeful. So, we have assets which are of a different class and have been built at a different time frame, but I am very sure that the next year when you will be looking at us and more and more of our capacities in the range of 5.2 megawatt turbines, which has more than 35% of the CUF in Khavda is going to come in place, you will find that the overall basis to this year will rise, notwithstanding the fact that the last year wind has not been as per what we have been assuming and that you would have seen across all developers. The wind is not only specific to us as a cause of lower CUF as such, but like I said, in our portfolio with more and more inclusion of these 5.2 megawatt amazing India's largest machines at Khavda, you would see a much better CUFs on an overall basis too when their majority increases.

  8. Question

    Baiju Joshi: Thank you for the opportunity. I just had a couple of questions. Firstly, on the evacuation capacity from Khavda, you briefly touched upon it, but I just want to understand near term and the 7 gigawatt you mentioned by the end of this year and even in long term. I just wanted to understand how bottlenecks in creating this capacity can impact Adani Green, and how insulated or impacted could we be from this evacuation capacity expansion? Secondly, my question was, I just wanted your thoughts on ISTS waiver that is ending in June. So, the first question was on evacuation capacity from Khavda that you briefly touched upon. I just wanted to understand how insulated or impacted would

    Answer, ashish khanna

    Ashish Khanna: Thanks, Baiju. So, I think we touched upon very clearly. We not only touched upon, but we discussed in detail that the current plan of evacuation, especially from Khavda, which are also monitored by the Ministry of Power very closely, and in many of the meetings, we are also participants out there, gives us an indication that by the June this year, there would be an additional capacity of 4 gigawatt, and by December, we will have a 7 gigawatt. Page 12 of 13 Adani Green Energy Limited April 29, 2025 In our scheme of things, it should be fine with us as we are looking at their additional capacities with our commissioning of projects at Khavda. Regarding the point on the ISTS waiver, I think it's a generic question. We all know what the Government of India is currently taking its view on. We are also closely watching the situation.

    Answer, ashish khanna

    As you know, we are not the decision makers. We will follow that, but the policies of it. Currently, our strategy is to go with the policies and not to take over risk on any assumptions with respect to the ISTS waiver is concerned. That we are enhancing our organization from it, but if there is any change, of course, we will re-strategise accordingly.

  9. Question

    Baiju Joshi: Thank you very much.

    Answer, ashish khanna

    Ashish Khanna: So let me, again, thank you, each and every participant, including the organizer. I'd like to reiterate again here that we are committed as a team to deliver the best in the country and are also committed to have the best of the operational excellence for it. The technologies which we have deployed in the last year, have actually paid us very well and is also testimony of our performance in operations as well as execution. We are very confident on what we have projected in this particular year with all the learning and the dedication and the motivation of the team which we have here. We look forward for having more success as a part of our organization. Thank you so much.

    Answer, viral raval

    Viral Raval: Thank you very much. Thank you Emkay team for organizing this call. Thank you, Chorus. Thank you all the participants for taking the time out to join this call. Please feel free to reach out to us if you have any further questions. Thank you.

Questions about this call

When was the Adani Green Energy Q4 FY25 earnings call transcript filed?
Adani Green Energy filed the transcript with the exchange on 6 May 2025. This page is built from that transcript.
What does this page list?
22 statements from the transcript across 5 topics, 18 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 19 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.