The company has 36.5 gigawatt in total capacity coming across, of which 31.5 gigawatt is currently under PPA. The company plans to be selective in tenders, choosing those that provide predictable and better returns, rather than bidding aggressively toward its 50 gigawatt target. The company added 1.6-gigawatt of greenfield renewable capacity in Q1 FY '26 and 4.9 gigawatt in the past year. Energy sales grew 42% year-on-year to 10.5 billion units in Q1 FY '26, backed by capacity addition. The realised tariff for merchant wind is almost INR 5.7 per unit.

The numbers management gave

Results

  • Energy sales grew 42% year-on-year to 10.5 billion units in Q1 FY '26, backed by capacity addition.
    Show source
    Backed by a robust capacity addition, Adani Green Energy achieved a record growth of 42% in its energy sales on year-on-year basis, reaching 10.5 billion units in the quarter.
  • Revenue from power supply increased 31% year-on-year to INR 3,312 crores and EBITDA rose 31% to INR 3,108 crores in Q1 FY '26, delivering an EBITDA margin of 92.8%.
    Show source
    Coming to the financial performance, our revenue from power supply increased by 31% year-on-year to INR 3,312 crores and EBITDA rose by 31% to INR 3,108 crores, delivering industry-best EBITDA margin of 92.8%.
  • Cash profit surged 25% to INR 1,744 crores in Q1 FY '26.
    Show source
    Cash profit surged by 25% to INR 1,744 crores.
  • Run-rate EBITDA for Q1 FY '26 is about INR 13,600 crores.
    Show source
    Saurabh Shah: So, the current gross block of the company is INR 89,000 crores approximately, and the run rate EBITDA for the Q1, it is about INR 13,600 crores.
  • The company experienced certain back downs with respect to grid evacuations in Q1 FY '26; the impact is less than 5% of its EBITDA margins.
    Show source
    But at the current level, it is less than the 5% of our EBITDA margins as such.
  • Merchant prices are volatile, and lower merchant prices predominantly explain why revenue growth was below energy sales growth in the quarter discussed.
    Show source
    Predominantly you can attribute it to that.
Show 7 more statements

Results

  • CUF is adjusted for the availability factor.
    Show source
    Raj Kumar Jain: So yes, it is adjusted for the availability factor.
  • Availability in this period is slightly lower because it has a monsoon thing. Replaced by a later filing.
    Show source
    That's where you will see that availability in this period is slightly lower because it has a monsoon thing.
  • The CUF number would've been higher if no maintenance or upkeep kind of a shutdown had been taken. Replaced by a later filing.
    Show source
    Yes, mathematically, if you had not taken any maintenance or upkeep kind of a shutdown, yes, the number would've been higher.

Money and capital

  • Current gross block is approximately INR 89,000 crores.
    Show source
    Saurabh Shah: So, the current gross block of the company is INR 89,000 crores approximately, and the run rate EBITDA for the Q1, it is about INR 13,600 crores.
  • CapEx for the first quarter of current year booking was about Rs 6,500 crores.
    Show source
    So, the current CapEx for the first quarter of current year booking was about Rs 6,500 crores.
  • Gross debt was INR 78,000 crores as on June 30.
    Show source
    Saurabh Shah: So, the gross debt as on June 30 is INR 78,000 crores.
  • Borrowing cost was in the range of 9.1% to 9.2%.
    Show source
    And borrowing cost is generally, currently the range is 9.1% to 9.2% for us.

What it expects ahead

What management expects

  • The company plans to be selective in tenders, choosing those that provide predictable and better returns, rather than bidding aggressively toward its 50 gigawatt target.
    Show source
    We choose the tenders, which gives us the predictable and better returns.
  • The company has said that 25% of its capacities for FY '30 would be seeing markets including data centers as a potential source of off-take.
    Show source
    And that's where you see, in our overall mix for FY '30, we have said that 25% of our capacities would be seeing some of these kinds of markets.
  • The company does not expect much impact on wind from back downs because wind generation generally occurs more in the evening and morning hours.
    Show source
    And like I said, since in this quarter, the solar would be relatively less and the wind would be high, we do believe, and because of the timings of the wind, which are generally more in the evening hours and in the morning hours, we don't expect that much impact on the wind part of it.

Orders

  • The company has 36.5 gigawatt in total capacity coming across, of which 31.5 gigawatt is currently under PPA.
    Show source
    Within that, 31.5 gigawatt is what is currently with the PPA.
  • Adani Saur Urja (LA) Limited, a wholly-owned subsidiary of Adani Green Energy Limited, received a Letter of Award from Uttar Pradesh Power Corporation Limited (UPPCL) to procure 1,250 MW energy storage capacity from Pumped Hydro Storage Projects, secured through an e-Reverse Auction conducted by UPPCL.
    Show source
    Viral Raval: Just to add, so from our side, we have only declared 1,250 megawatt of PSP which is for UPPCL, which is what we have won.

What it is building and selling

Projects and capacity

  • The company added 1.6-gigawatt of greenfield renewable capacity in Q1 FY '26 and 4.9 gigawatt in the past year.
    Show source
    In Q1 FY '26, we added 1.6-gigawatt of greenfield renewable capacity, totalling 4.9 gigawatt in the past year, a record achievement for India's renewable energy sector.
  • Operational capacity stood at 15.8 gigawatt after a 45% year-on-year increase in Q1 FY '26.
    Show source
    With this 45% year-on-year increase, our operational capacity now stands at 15.8 gigawatt.
  • Operational capacity at Khavda stood at 5.6 gigawatt of solar, wind, and hybrid energy portfolios as of June 2025.
    Show source
    As of June 2025, our operational capacity at Khavda stands at 5.6 gigawatt of solar, wind, and hybrid energy portfolios.
  • The company had 15.8 gigs in operations and 16 gigs under execution, and had won recent tenders for another 5 gigawatts.
    Show source
    And the recent tenders, which we have won is another 5 gigawatts out there.
  • The company has announced 500 megawatts of PSP in Andhra Pradesh, where construction has begun.
    Show source
    And we have also announced 500 megawatts, where we began construction in Andhra Pradesh.
  • Of the 4,500 capacities with Total as a joint venture, about 4,000-odd capacity has already been commissioned, and another 500 is in the pipeline and will be commissioned by next six months to one year.
    Show source
    Saurabh Shah: So, see, out of, 4,500 capacities with Total as a joint venture, about 4,000-odd capacity has already been commissioned, and another 500 is in pipeline will be commissioned by next six months to one year.
Show 6 more statements

Projects and capacity

  • The company is constructing the world's largest renewable energy plant at Khavda in Gujarat; the 30-gigawatt project is set to become a global benchmark for ultra-large-scale renewable energy development.
    Show source
    A major highlight has been our continued progress in developing world's largest renewable energy plant of 30 gigawatt at Khavda, Gujarat.

Demand and pricing

  • The realised tariff for merchant wind is almost INR 5.7 per unit.
    Show source
    Viral Raval: So just to again quote, the realised tariff for merchant wind is almost INR 5.7 per unit.
  • Wind merchant prices were in the range of about INR 4.70 in Q4.
    Show source
    So, it was in the range of about INR 4.70 in wind.
  • Solar merchant prices were near to INR 3.00 in Q4.
    Show source
    And for solar it was near to INR 3.00.
  • Some data centers have a keen interest in green power. Replaced by a later filing.
    Show source
    And there is a keen interest from the -- some of these data centers.

Segments

  • About 50% of Adani Green Energy's merchant revenue is pure-play merchant and 50% is infirm revenue; infirm revenue sold in merchant markets is pre-COD revenue before commercial operation date and is incremental to revenue under a PPA of 25 years.
    Show source
    So, we have two parts, about 50% of it basically pure-play merchant and 50% is infirm revenue.

Everything else said on the call

Group structure

  • The company has a 25% stake in Mundra Solar Energy Limited and receives a 25% share of the profits it generates.
    Show source
    Saurabh Shah: It's Mundra Solar Energy Limited, where we have 25% stake within that company.
  • The Adani-Total JV has a 4.5-gigawatt portfolio, of which roughly 4 gigawatt is operational.
    Show source
    Viral Raval: So, total 4.5-gigawatt portfolio we have, and out of that, roughly 4 gigawatt is operational right now in the JV.

Other

  • The best benchmarks in case of wind have an availability factor of 96-odd percent to 96.5-odd percent for the full year, while solar plant availability can be as good as around 100%.
    Show source
    Second, even the best benchmarks in case of wind, because it is a moving equipment, so turbines have an availability factor of 96-odd percent to 96.5-odd percent for the full year because these are moving things and needs more maintenance than a solar plant where availability can be as good as what you see in our thing, which is around 100%.
  • Wind turbines in the country are generally overhauled ahead of the monsoon season so they work on a much better basis in the real wind season, which comes in the monsoons. Replaced by a later filing.
    Show source
    See, what Ashish was telling is ahead of the monsoon season, all wind turbines in the country have a practice of being overhauled.

What the company said on its earnings call, taken from its own transcript. Not advice.

Questions and answers

  1. Question

    Mohit Kumar: Good afternoon, sir, and congratulations on a very good quarter. Sir, my first question is on the gross block. Is it possible to share the gross block and run-rate EBITDA for 15.8GW capacity?

    Answer, saurabh shah

    Saurabh Shah: So, the current gross block of the company is INR 89,000 crores approximately, and the run rate EBITDA for the Q1, it is about INR 13,600 crores. And on a yearly basis, it will be about INR 17,000 crores.

  2. Question

    Mohit Kumar: And is it possible to share the capacity commissioned in terms of value rupees crores?

    Answer, saurabh shah

    Saurabh Shah: Okay. So, the CapEx, see, generally our CapEx is in the range of, for the solar, it is INR 4.5 crores; for wind, it is INR 6.5 crores. So, the current CapEx for the first quarter of current year booking was about Rs 6,500 crores.

  3. Question

    Mohit Kumar: Is it primarily due to Mundra green, Mundra technology, that solar manufacturer?

    Answer, saurabh shah

    Saurabh Shah: It's Mundra Solar Energy Limited, where we have 25% stake within that company. So, whatever profits they generate, we get a 25% share of the same.

  4. Question

    Mohit Kumar: But that's the only thing, which is driving the associate income, right?

    Answer, viral raval

    Viral Raval: It's only that. A 2-gigawatt manufacturing capacity which was set up under the PPA, which was basically linked to manufacturing.

  5. Question

    Mohit Kumar: My last question, sir, I think we are given the target of 5 gigawatt in this fiscal, and I think, if I'm not wrong, I think next year, we are also expecting 5 gigawatts, right? Given the fact that, all the -- most of the capacity are coming in Khavda, do you see any transmission challenges which are coming up, which are causing some challenges in commissioning these capacities?

    Answer, ashish khanna

    Ashish Khanna: It's a valid point, Mohit. I think it is very difficult to tie both the things, your capacities with the transmission capacities. There will be always some lag of weeks or months in that process. Having said that, in the current context, yes, there is a little bit of a challenge coming from Khavda evacuation. However, having said that, it's hardly less than 5% of our EBITDA as we speak. We are very closely monitoring and largely supporting how the evacuation from Khavda is coming out. And we do believe that this fiscal year and much before that, there will be enough evacuation for us to evacuate everything.

    Answer, ashish khanna

    So, we don't foresee a big challenge in the coming quarters. But yes, a few weeks here and there, can always be an overlap in this process. Good part is that, if you look at in the Q2, most of what is going to be evacuated will be wind more than the solar. And hence, that daytime challenge is also mitigated from that standpoint.

  6. Question

    Siddharth K: Good morning, sir. Sir, my first question is regarding the solar CUF, capacity utilization factor. In this quarter, we were close to 28%. But in the earlier presentations, we had mentioned that it was 32% in the Khavda region. So, the lower CUF this quarter is due to the early monsoon?

    Answer, ashish khanna

    Ashish Khanna: I think, you see Khavda has the distinction of one of the best irradiations possible. And so, our CUF there is always higher. As and when the proportion of Khavda in the overall portfolio is going to increase, we will appreciate more and more CUF come in on the higher side in our overall portfolio. So currently, since it's only one-third of it, you will find that it is much lower than Khavda. Siddharth K: Okay. Sir, for the full-year projection, what should be the solar CUF be? Like, what will be the range?

    Answer, ashish khanna

    Ashish Khanna: I think it'll be same, with a few percentile points above it because of Khavda, more and more capacities are going to come out there. So, we will have on the increasing side.

  7. Question

    Siddharth K: So, like the trend for the solar merchant prices have gone down sharply. So, going forward, like what are we projecting or how is the trend moving forward for the next two quarters, three quarters? Will it stay around INR 2.00, INR 2.50, or are we seeing any uptick?

    Answer, ashish khanna

    Ashish Khanna: You see, the merchant prices are always very volatile. We are not in the market of predicting, the prices. Having said that, our strategy is very clear. Almost all our capacities, majority are on the PPA front. And so, and the other advantage which we have is that if we have some merchant capacity, which are primarily coming because we are ahead of our PPAs, and we are selling that capacity as a merchant, so that becomes an add-on to our overall financial model. So that's an advantage to us. But to be frank to you, to predict how the prices will pan out in future, it is very difficult, and it remains volatile.

    Answer, ashish khanna

    We do expect – like last year, it has improved in the later part of the day. There have been pre monsoon this time, which has impacted certain solar prices. And then because of Operation Sindoor too, there has been certain curtailment which we have experienced. But like I said, this is too small a window to then predict how the year will pan out on this. But we remain steadfast in our strategy towards investing more on -- or building more on the PPA part and when our capacities come early, sell them on the merchant because that becomes an addon.

  8. Question

    Siddharth K: Right. And sir, going forward, like we have 3.5 gigawatt of like approximate target for this year. So, when can we expect, like what in Q2 or -- and Q3?

    Answer, ashish khanna

    Ashish Khanna: See, we are on track. If you see on a 5 gigawatt target for the year, we have already done around one-third. What is expected from the next three quarters, if you ask me, we are very well on track. We're on track for these capacities. You will be there with us after three months and we will share with you what we have added in the next Q2.

  9. Question

    Siddharth K: Sure, sir. Sir just a clarity on the ISTS waiver part. What and how exactly does this affect us being a renewable generator and this -- like, will we increase the tariff prices because of this?

    Answer, ashish khanna

    Ashish Khanna: As I said, we are not in a market of forecasting tariffs per se. All of us knew, this ISTS thing is going on and is going to be off from June 1. And I think we all have built our strategies based on that part. And ISTS has not gone off full. It remains, 75% remains, only 25% have gone off on this. We don't foresee a major change in the market pricing in near future. Let's see how it pans out in the longer term.

    Answer, raj jain

    Raj Kumar Jain: Yes, sure. I think, what's important is we have built certain capacities which was part of our merchant portfolio until June. So there -- obviously, there is a higher advantage of those capacities, so we could secure that for our portfolio. As Ashish mentioned, the taper down is in a timebound manner of three years, where today the taper down is by 25%. So, there would be some more merchant capacities we are adding now. So, these are valued in the market better than the capacities which will come later. So, we have that advantage.

    Answer, raj jain

    That advantage is realized when we do contracts with the parties because, ultimately, they are supposed to pay the cost. So, you will see some of these capacities getting advantage in the market.

  10. Question

    Siddharth K: Right, sir. And sir, just the line item on the sales of equipment. So, what exactly are we selling in this?

    Answer, saurabh shah

    Saurabh Shah: So, see from the sale of equipment that we do, it is mainly - from a standalone perspective, it is a sale to the various subsidiaries that are there, and on a consolidated basis, it is more to do with certain group companies where we are doing certain projects for them, on their behalf, there are certain kinds of sales that happens to them. But that is not having any major impact on the P&L. Moderator: Thank you.

Show 15 more questions
  1. Question

    Sabri Hazarika: Yes, good afternoon and congratulations on a good set of numbers. So, I have two questions. Firstly, this merchant and infirm power, that is, mostly wind only, right? I mean, the sale of power of say around 2,000 units. So that is mostly wind or what would be the segregation like?

    Answer, raj jain

    Raj Kumar Jain: No, it's a mix of solar and wind both. And it is also pre-COD power for some of our PPAs. So, what we do is, obviously, there are transmission connectivity deadlines. We commission the projects much ahead of that and see that our returns in those projects are enhanced because of this early commissioning of projects, which are not necessarily baked in when we do the bidding. So, we are adding that much value. So, there is revenue coming from those projects. Plus, we have pure-play merchant projects where we have multiple optionalities for future.

    Answer, raj jain

    There is revenue to that. So, it's predominantly solar if you ask me. On an overall merchant strategy, yes, you are right, that it is tilting towards more wind projects taking the shape of merchant revenue in proportions more.

  2. Question

    Sabri Hazarika: Okay. And regarding your wind, I think, this CUF also like, probably one of the best. So, how are you seeing the wind cycle currently around Khavda? Do you think that we would be at a higher level compared to what it has been for the past 1 year, 1.5 years?

    Answer, ashish khanna

    Ashish Khanna: Sabri, it is very difficult to predict wind like this time, we have seen, if you look at it from India standpoint, we have witnessed that the wind at Rajasthan was at a lower level than the wind at Khavda now. And since we have the better machines and 5.2 megawatt capacities, which are the largest in the country, of course, our CUF has been the best one can imagine on this. So, we do foresee, and we do expect that the forthcoming winds is going to help us. But if you 're asking us to predict the wind, then it is difficult for us. But yes, when the wind will come, our CUF will remain the best as they have been showcased in the last quarter.

  3. Question

    Sabri Hazarika: Right. So, second question is on your other expenditure. So, there has been some reclassification, I think the foreign exchange part, I think you've clubbed it in one of the expense. So, this INR 300 crores are basically, what could be the adjustments? Is it foreign exchange or something else is also there?

    Answer, saurabh shah

    Saurabh Shah: No. Where are you seeing that adjustment, Sabri, if you can just guide me, I will be able to then answer you.

  4. Question

    Sabri Hazarika: I think, I mean you have that foreign exchange gain and loss, I think, which is part of finance cost, right?

    Answer, saurabh shah

    Saurabh Shah: Yes. So, see, there is -- there are two parts to it. There is a foreign exchange gain loss, which is either shown in the part of other income, which is there as a gain in this quarter, very small number. In case of the finance cost, that foreign exchange is basically the hedging cost that we pay, plus whatever the ERD that we have to value the loans which are there as ECBs in terms of those valuation, fair valuation that we do at the end of the quarter, whatever the unrealized gain/loss that occurs is also part of the finance cost in that case.

    Answer, viral raval

    Viral Raval: So, the representation basically has changed to make it very clear whatever is attributable to finance cost is now part of the finance cost only.

  5. Question

    Sabri Hazarika: Right. Secondly, I mean, we have this -- we are -- we are amidst this high monsoon season, but have we seen any kind of, like, not -- have you seen any kind of similar experience what we faced last year, or we are like much better off this time?

    Answer, ashish khanna

    Ashish Khanna: I don't know what you mean by much better or similar experience, yes, we have seen monsoon in the past and monsoon is again here today. It has its own, I would say, impact, especially on Khavda. May not be to the same extent at our Rajasthan sites. We are well prepared, much better prepared this time from the monsoon -- for the monsoon. But yes, it is still going on. So, I would like you to be there in the next call for you to share with you how better we were placed this time. It also depends on the intensity of the monsoon, its impact on it.

    Answer, ashish khanna

    Still early days, but yes, to reassure you, we were, and we are much better placed this time from the lessons which we have of the last time, especially in Khavda. Viral Raval: Just to add, so last time, if you remember, across India, the monsoon had extended by about a month or so. This time, we'll have to see what happens, but I mean, normally these occurrences are less.

  6. Question

    Mahesh Patil: Yes, sir, my first question is on the growth of energy sales, if we see that is around 42% in this quarter by Y-o-Y. However, the revenue growth is around 30%. So just wanted to understand, and since we have sold, I think more than 40% in merchant market, so is this because -- solely because of that, the lower merchant prices?

    Answer, viral raval

    Viral Raval: Yes. Predominantly you can attribute it to that. So, as earlier said, so merchant prices are volatile, and it is basically part of the business case when you talk about pure-play merchant. So, we have two parts, about 50% of it basically pure-play merchant and 50% is infirm revenue. So, the infirm revenue where we have sold on merchant markets, it is basically the pre-COD revenue before commercial operation date. So that entire revenue is incremental to whatever, basically, we were going to earn under a PPA of 25 years. Second part, the merchant revenues, as I said, it is volatile.

    Answer, viral raval

    In Q1, it has been less because of the monsoon arriving early and possibly things could change in the later quarters. The third part is the new PPAs that we are implementing. Gradually, over many years, the tariffs have gone down and that is because of the technology evolution and CapEx going down. So, the return expectations on the PPAs remain the same, but the tariff trajectory is down, and the CapEx is also down. So, these are the combination of reasons because of which it appears so. But from a return expectation standpoint, we are not really compromising in any way.

    Answer, ashish khanna

    Ashish Khanna: And if I can add on, since the merchant rates for the wind are much better and this is a time for better winds in India, we do expect that in this quarter, with more and more wind going into the merchant with a higher rate, the proportion would be much better.

    Answer, viral raval

    Viral Raval: So just to again quote, the realised tariff for merchant wind is almost INR 5.7 per unit.

    Answer, ashish khanna

    Ashish Khanna: And sorry, just add more and especially with our CUF, things will be much better.

  7. Question

    Mahesh Patil: Got it. Thank you. Sir, my second question is on the -- because of this early monsoon onset and since there was this solar overcapacity, so was there any back down due to the grid during, particularly during the peak solar hours that we have faced in this quarter?

    Answer, ashish khanna

    Ashish Khanna: Yes, we did mention earlier too, there have been certain back downs with respect to grid evacuations. But at the current level, it is less than the 5% of our EBITDA margins as such. And I think we had a detailed discussion, I can say or explanation on how the evacuation capacities are going to come and how we are mapping them and monitoring them so closely in that particular manner. And like I said, since in this quarter, the solar would be relatively less and the wind would be high, we do believe, and because of the timings of the wind, which are generally more in the evening hours and in the morning hours, we don't expect that much impact on the wind part of it. And solar in any case would be lesser in the last year.

    Answer, raj jain

    Raj Kumar Jain: So, I'll just add one more thing, Mahesh. This is the way transmission works in India, when a capacity is given transmission connectivity, it is given with five, six elements. So, suppose in Khavda, we are asking for connectivity, it will be given to us for say 1,500-megawatt, 2,000 megawatt, or 3000 megawatts with certain elements. We are supposed to build the capacity of that much capacity by that date. So, one fine day, everything is available. Prior to that, some lesser amount of evacuation is available. So that's the nature of transmission.

    Answer, raj jain

    Now, that would obviously mean that I will set up the capacities prior to that period or in a gradual pace, and I may see certain kind of lesser capacity available in the system than what would be required for the overall number. And that is the reason you see this two month to three months plus/minus happening and some kind of curtailment or grid limitation coming in. But that's the nature, the way industry works, especially for people who want to finish things prior to their dates. So that's how it may happen. Sometimes we are lucky, and the system has some redundant capacities, which allows us to push in entire thing even though the full transmission has not come in. So, these are the things which we plan much ahead and we know what's happening, what's happening on each element, and what kind of evacuation we will see. So, we know it, what is happening, and we try to see that our capacities are aligned in a manner where we do not see big risk in this.

  8. Question

    Mahesh Patil: Okay, sir. Got it. And sir, one more question on the bidding strategy and the pipeline. So, do you see any major tenders like the 5 gigawatt from Maharashtra last year? Anything in the pipeline and what would be our bidding strategy going forward, since we already have, I think close to 33 gigawatts of locked-in capacity?

    Answer, ashish khanna

    Ashish Khanna: And if I can add, so on this, what Raj is saying, you see, if you look at our overall target of 50 gigawatt and if we map our current portfolio, so we don't need to be very hungry and go very aggressive on the tenders. We choose the tenders, which gives us the predictable and better returns. On an overall scheme of things, we are currently, as you know, is 15.8 gigs on our operations. We have 16 gigs on under execution right now. And the recent tenders, which we have won is another 5 gigawatts out there. So, if you look at it with our overall portfolio and our target of 50 gigawatts, we must be selective where we get the decent returns as per our benchmarks. And more importantly is then execute in a manner which gives us the return which are required for it.

  9. Question

    Mahesh Patil: Got it, sir. Sir, one last question. Out of this, around 33 gigawatt of locked-in capacity that we have, what is the capacity that is tied up under PPA, if you have that number?

    Answer, ashish khanna

    Ashish Khanna: Yes, we have, as I I talked about 36.5 gigawatt in total, which is coming across. Within that, 31.5 gigawatt is what is currently with the PPA. If you total what I have told you, it'll total to around at 36.5 gigawatt. Like I said, 31.5 gigawatt of it is under PPA. Mahesh Patil: And remaining is for merchant purpose, right?

  10. Question

    Mahesh Patil: Okay. And sir, this Adani-Total JV, how much capacity is operational and how much is in pipeline right now?

    Answer, viral raval

    Viral Raval: So, total 4.5-gigawatt portfolio we have, and out of that, roughly 4 gigawatt is operational right now in the JV. Mahesh Patil: Okay, sir. Thank you. Thank you, sir. Thank you so much. That's it from me.

  11. Question

    Siddharth K: Sir, can you tell us what is the gross debt levels for the quarter? And what was the borrowing cost?

    Answer, saurabh shah

    Saurabh Shah: So, the gross debt as on June 30 is INR 78,000 crores. And borrowing cost is generally, currently the range is 9.1% to 9.2% for us.

  12. Question

    Siddharth K: So, regarding the merchant price you mentioned, it was INR 2.20 for solar and INR 5.70 for the wind. What was the prices last quarter?

    Answer, saurabh shah

    Saurabh Shah: Q4, yes. So, see, what happens is that the wind merchant prices generally for Q3 and Q4 are generally a bit lower. So, it was in the range of about INR 4.70 in wind. And for solar it was near to INR 3.00.

  13. Question

    Anuj Upadhyay: Thanks for the opportunity. Sir, could you just elaborate on the two PSP projects in the Andhra Pradesh, which has been cancelled, but Kurukutty and the Karrivalasa PSP projects? And would this cancellation have any kind of an impact on our targeted 5 gigawatt of PSP edition by FY '30-'31?

    Answer, viral raval

    Viral Raval: Just to add, so from our side, we have only declared 1,250 megawatt of PSP which is for UPPCL, which is what we have won. And we have also announced 500 megawatts, where we began construction in Andhra Pradesh. So, there are multiple evaluations which keep on happening. So, you must take it into consideration only when we announce it when we have reached at a particular stage on that project.

  14. Question

    Siddhant K: Okay. So, if it this is adjusted, this CUF is adjusted for the availability factor, then the overall like, net CUF would be much higher than this?

    Answer, raj jain

    Raj Kumar Jain: So yes, it is adjusted for the availability factor. See, what Ashish was telling is ahead of the monsoon season, all wind turbines in the country have a practice of being overhauled. So that they work on a much better basis in the real wind season, which comes in the monsoons. That's where you will see that availability in this period is slightly lower because it has a monsoon thing. Second, even the best benchmarks in case of wind, because it is a moving equipment, so turbines have an availability factor of 96-odd percent to 96.5-odd percent for the full year because these are moving things and needs more maintenance than a solar plant where availability can be as good as what you see in our thing, which is around 100%. So, that's what the thing is. Yes, mathematically, if you had not taken any maintenance or upkeep kind of a shutdown, yes, the number would've been higher.

  15. Question

    Siddhant K: Great. Thank you, sir. Yes, that's it from my side.

    Answer, raj jain

    Raj Kumar Jain: Yes, sure. So that's an interesting market and with the way data is being now hosted in India, for India's consumption as well as the new A.I. demand as well as the focus of some of these data centers to have green power, it's a significant opportunity for us. And that's where you see, in our overall mix for FY '30, we have said that 25% of our capacities would be seeing some of these kinds of markets. So, it's pretty much part of our focus area as a potential source of off- take. And there is a keen interest from the -- some of these data centers.

    Answer, saurabh shah

    Saurabh Shah: So, see, out of, 4,500 capacities with Total as a joint venture, about 4,000-odd capacity has already been commissioned, and another 500 is in pipeline will be commissioned by next six months to one year. So, after that, that swing from that perspective should be minimal except for the distributions and the other things.

Questions about this call

When was the Adani Green Energy Q1 FY26 earnings call transcript filed?
Adani Green Energy filed the transcript with the exchange on 1 Aug 2025. This page is built from that transcript.
What does this page list?
34 statements from the transcript across 9 topics, 27 of them with a figure. Each statement is shown with the transcript sentence it came from.
Are the analysts' questions included?
Yes. 25 questions and management's answers are listed in the order they were asked, as the transcript prints them.
Who wrote this page?
DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.
Research and analysis only, not investment advice. Every statement on this page is the company's own, taken from its transcript; DalalOS adds no view on it and is not a SEBI-registered investment adviser. Something wrong? Report an error.
Adani Green Energy Q1 FY26 concall: Adani Green Energy has 36.5 gigawatt in total capacity coming across, of which 31.5 gigawatt is currently under PPA · DalalOS