The company had INR38,000 crores of pending orders as of 31st December, excluding INR10,662 crores of L1 orders; Afcons Infrastructure Limited booked INR14,603 crores of orders in the first nine months. The company expected to achieve over INR30,000 crores of orders in the current year, with INR10,662 crores further L1 and some more tenders expected to be opened shortly. Afcons’ Bangladesh Package 3 road project, WP3, worth about INR600 crores, is probably heading toward cancellation and is likely to go out because Afcons will not commence work unless the rate revision is done; the contract was awarded 19 months after Afcons submitted its bid. Top line for the 9 months was INR9,635 crores, compared with INR9,837 crores in the previous year 9 months.
The numbers management gave
Results
- Top line for the 9 months was INR9,635 crores, compared with INR9,837 crores in the previous year 9 months.
Show source
Now, during this quarter, we had a growth of around 5% year on year and around 8% quarter on quarter.
- The company had around 5% year-on-year growth and around 8% quarter-on-quarter growth during the quarter.
Show source
Now, during this quarter, we had a growth of around 5% year on year and around 8% quarter on quarter.
- Increased turnover during Q3 narrowed the year-on-year gap to 2% in the 9 months from 5% in Q2, as execution accelerated in recent months.
Show source
Because of the acceleration in the turnover during Q3, this has narrowed the YoY gap to 2% in 9 months from the previous 9 month period because in Q2, we were 5% down from the previous year number.
- The company recorded INR448 crores of EBITDA during the quarter, compared with INR393 crores in Q3-24; EBITDA was 13.5%, up 111 basis points from the previous year.
Show source
Now moving to EBITDA, during this quarter we have done INR448 crores of EBITDA.
- The company recorded INR1,247 crores of EBITDA in the 9-month period, equal to 12.9%, up 175 basis points from 11.2% in the previous year.
Show source
In the 9 -month period, we have done INR1,247 crores of total EBITDA which is 12.9% and this again is up 175 basis points from the previous year wherein we had clocked 11.2%.
- The company recorded INR149 crores of profit after tax for the quarter, compared with INR110 crores in Q3 last year; the increase was 102 basis points in percentage point.
Show source
We have done for this quarter INR149 crores as against INR110 crores we have done Q3 last year.
Show 9 more statements
Results
- The company said 70%-75% of the projects it had bagged were interest-bearing, compared with 20-25% previously; bank interest was saved but interest from client advances increased, leaving no benefit on interest cost, while project margins were expected to remain intact because these aspects were factored into the tenders.
Show source
But this time around the projects we have bagged we are seeing 70%-75% projects are interest bearing.
- The company continued to account for accelerated depreciation on its TBMs; around one third of total depreciation of INR367 crores was due to accelerated depreciation.
Show source
Of the total INR367 crores of depreciation around one third is on account of accelerated depreciation in that.
- Trade receivables were INR3,140 crores, inventories were INR1,576 crores, unbilled revenue was INR6,134 crores and advances from customers were INR2,383 crores.
Show source
Now to give you the specific numbers, the trade receivables are INR3,140 crores.
- Trade payables were INR4,024 crores.
Show source
Ramesh Jha: Trade payables are INR4,024 crores.
- PAT for 9M FY25 was ₹ 376 Cr, up 23.3%.
Show source
So for the 9-month period, the INR311 crores of other income we have considered as operating income while calculating the EBITDA.
- Net working capital remained elevated because of delays in certification of work done and release of payments in some projects, which increased uncertified-work receivables and working capital requirements; the company expected elevated working capital requirements and borrowings in Q2 and Q3 to be sorted out by Q4.
Show source
As far as the net working capital is concerned, net working capital is still at an elevated level.
Money and capital
- Afcons incurred around INR250 crores of capex in the nine months.
Show source
Ramesh Jha: The capex we have incurred in the nine months is around INR250 crores.
- Move into the AA category will open up money market instruments like CP and NCDs and provide interest-saving arbitrage opportunities.
Show source
Moving into AA category, we'll open up the money market instruments like CP, NCDs to us.
- Credit rating was upgraded by CRISIL to AA- for long term and A1+ for short term. Replaced by a later filing.
What it expects ahead
What management expects
- The company expected to achieve over INR30,000 crores of orders in the current year, with INR10,662 crores further L1 and some more tenders expected to be opened shortly.
Show source
With INR10,662 crores further L1, I think we are slated to achieve about 30,000 plus in the current year, with some more tenders expected to be opened shortly.
- The company expected flat or marginally higher growth in the current year and 20% to 25% growth next year compared with the current year, more towards 25%.
Show source
And as we conveyed earlier, while the current year we expect ourselves to be the flat or marginally higher growth, next year we expect 20% to 25% growth from that of current year, more towards 25%.
- The company expected flat or nominal revenue growth this year because of muted order booking in the last 2 years.
Show source
As far as revenue guidance is concerned, this year we are looking at a flat growth or maybe a nominal growth.
- The company expected 20%-25% growth next financial year, toward the upper trajectory, as its projects matured for construction.
Show source
All these projects will mature for construction in next financial year where we are looking at a growth of 20%-25% more towards the upper trajectory.
- The company aimed to sustain its CAGR of around 15%, achieved over the last 10 years, over a medium to long term horizon.
Show source
So we should be around those numbers which is around 15%.
- The company said it would have an elevated EBITDA margin this financial year, having already achieved 12.9%.
Show source
But you know I again reiterate that this financial year we will be having an elevated EBITDA margin since we have already achieved 12.9%.
Show 15 more statements
What management expects
- Afcons expects debt to equity and debt to EBITDA to keep coming down, with absolute debt possibly around INR2,000 crores at year end and further improvement thereafter.
Show source
We will be generating positive cash flow and the debt on a continuous basis in terms of say debt equity, in terms of debt to EBITDA will keep coming down.
- Afcons’ EBITDA guidance will continue to be 11+; for the current year it could well cross 12, while guidance for subsequent years remains 11+, with the possibility of higher performance but not below 11.
Show source
While our guidance will continue to be 11+.
- Afcons expects full capex for this financial year to close at around INR450 crores to INR500 crores, much less than budgeted, as project awards and tunnel boring machines shifted to subsequent periods; it aligned capex procurement with project awards and expects higher capex over the next couple of years than budgeted earlier, with next financial year’s budget to be revised.
Show source
Ramesh Jha: For this financial year, we expect to close the full capex somewhere around say INR450 crores to INR500 crores.
- The company said its order book would give revenue visibility for the next couple of years.
Show source
And this will clearly give revenue visibility for the next couple of years.
- The company expected to close the year with a similar top line or nominal growth, given the increased pace of execution in recent months.
Show source
Since there is an increased pace of execution now we are seeing in recent months, so as things stand, we should close the year on a similar top line or a nominal growth for this financial year.
- The company expected its EBITDA number this year to be higher than the guidance it had given.
Show source
This year as things stand, we expect the number to be higher than what we have been given a guidance.
- The company is looking at EBITDA of 11% plus. Replaced by a later filing.
- Afcons is quite hopeful that a fresh influx of orders will bring the advances mix back to a similar situation. Replaced by a later filing.
Show source
But with a fresh influx of orders we are quite hopeful that we will get back to a similar situation.
Orders
- The company had INR38,000 crores of pending orders as of 31st December, excluding INR10,662 crores of L1 orders; Afcons Infrastructure Limited booked INR14,603 crores of orders in the first nine months.
Show source
And as of 31st December, we have a INR38,000 crores of pending order and which excludes about INR10,662 crores of L1 and INR14,603 crores is the amount of order we have booked in the first nine months.
- The company received INR1,283 crores from DP World in the first 45 days of the current financial year.
Show source
And in the first month of the current financial year, now before the first 45 days, we have already received INR1,283 crores from DP World.
- The company expected its order book at the end of the year to be between INR45,000 crores and INR50,000 crores, giving more than 3x visibility for the future period.
Show source
And with that, our order book is almost at INR16,000 crores as of now.
- The company had backed close to INR26,000 crores-INR27,000 crores of orders this year, including projects where it was L1 that it was hopeful of receiving shortly.
Show source
But since this year, we have already backed close to INR26,000 crores-INR27,000 crores of order including the projects where we are L1 which we are quite hopeful that we should be getting very shortly.
- The company received INR1,283 crores for a marine project from DP World in Gujarat.
Show source
Paramasivan Srinivasan: INR1,283 crores is a marine project from DP World in Gujarat.
- Afcons is about INR27,000 crores with L1 already considered and expects another one or two orders to bring the total closer to INR30,000 crores.
Show source
With L1 already considered, we are already at about INR27,000 crores.
- Afcons has an order book of INR38,000 crores, another INR1,283 crores, making about INR40,000 crores of pending order book, plus INR10,000 and odd crores at L1 status.
Show source
With that, it's about INR40,000 crores pending order book, plus INR10,000 and odd crores we have L1 status.
What it is building and selling
Projects and capacity
- Afcons’ Bangladesh Package 3 road project, WP3, worth about INR600 crores, is probably heading toward cancellation and is likely to go out because Afcons will not commence work unless the rate revision is done; the contract was awarded 19 months after Afcons submitted its bid.
Show source
That project is probably going towards cancellation and that is something which will be about INR600 crores.
Risks, rules and outside factors
Risks and disputes
- Afcons has contingent liabilities of INR1,400 crores in its books, including around INR480 odd crores, or close to INR500 crores, for a royalty claim; the Nagpur High Court set the matter aside, and the party then brought the case against the government of Maharashtra in the Bombay High Court, leaving the amount outstanding while litigation continues.
Show source
Ramesh Jha: So this INR1,400 crores we have talked about is contingent liability which is in our books.
- Afcons has close to INR500 crores in claims or disputes brought against it by subcontractors.
Show source
So those are around INR500 crores.
Everything else said on the call
Other
- The company was ranked 139th in the Top 250 international contractor list in Engineering News Record 2024 rankings of USA.
Show source
As per latest engineering news record 2024 rankings of USA, we are ranked 139th in the Top 250 international contractor list, reaffirming our global presence.
- The company was rated the 14th largest in marine.
Show source
In terms of marine, we are rated as the 14th largest.
- The company was rated the 12th largest in bridges.
Show source
In bridges, we are the 12th largest.
What the company said on its earnings call, taken from its own transcript. Not advice.
Questions and answers
Question
Vineet Prasad: Thank you, Muskan. Good afternoon, everyone. A warm welcome on behalf of Investec India to Q3FY25 earnings call of Afcons Infrastructure Limited. Today, we have with us the senior management team represented by Mr. Subramanian Krishnamurthy, Executive Vice-Chairman, Mr. Paramasivan Srinivasan, Managing Director, Mr. Ramesh Kumar Jha, Chief Financial Officer and Mr. Hitesh Singh, Head Corporate Strategy. Now I would like to hand over the call to Mr. Subramanian sir, Executive Vice Chairman for his opening remarks. Thank you and over to you, sir. Subramanian K: Good afternoon, ladies and gentlemen. I am pleased to welcome all of you to the Q3FY25 earnings conference call of Afco
Answer, paramasivan srinivasan
Paramasivan Srinivasan: Good afternoon, everybody. It is my pleasure to welcome you all to Afcons Q3 ‘25 earnings call. We appreciate your continued interest and support in our journey. I will just give a broader business landscape, business procurement and important updates. Page 3 of 20 Afcons Infrastructure Limited February 14, 2025 In the recent budget, despite significant measures to boost consumption and the associated pressures on fiscal consolidation, which is an excellent step taken on the fiscal consolidation, the government has allocated INR11.2 lakh crore per capital expenditure, a 10.1% increase over the revised estimate of the last year. This underscores the continued commitment of the government to infrastructure development, which is once again reiterated by FM's statement yesterday. It will be a middle class focused and an infrastructure focused approach towards reaching Viksit Bharat by 2047.
Answer, paramasivan srinivasan
The government's alignment with this perspective is evident in the healthy allocation for roads, railways and metro projects and special push through state governments. This will be very significant in many states, a INR1.5 lakh crores 50 year interest free loan that I think many states can use to raise resources using this fund, further using the resources that will go a long way in terms of infrastructure development. And national monetization plan, the phase one has been hugely successful, hardly INR20,000 crores is the shortfall in the phase one. And in the phase two now, whatever is announced, I am pretty sure with the three year pipeline what is made will go -- the national monetization pipeline will go a long way in terms of improving the finances. And there is a revised PPP model being attempted and there is a three year, along with a three year project pipeline and all, that I think will be a work in progress as you look at it in this thing. Because PPP in India, PPP has moved to HAM and again moving back to PPP, how it is going to work, we need to see. And the government has announced the establishment of export promotion mission, which is very positive.
Answer, paramasivan srinivasan
This is something which I must say government has acted based on feedback by many exporters as some of the areas of improvement required. And also government's own push to see that top Indian companies become top global players as well. So from that angle, they have created an export promotion mission, mission to address non-tariff barriers, facilitate credit access and provide other forms of support to enhance exports. This initiative is also expected to focus on project exports, including those funded by the government. And as I conveyed earlier, the government is developing a strategy to elevate select Indian project exporters to compete with global peers. Afcons along with other leading project exporters are engaged with key ministries and also with NITI Aayog to advocate for supportive policies in this regard and the initiatives required in this regard. If implemented, these recommendations could drive a substantial expansion in India's project export footprint.
Answer, paramasivan srinivasan
Overall, the government's continued focus on infrastructure development will provide a strong impetus to this sector. This positions large diversified EPC contractors such as Afcons to capitalize on emerging opportunities and contribute meaningfully to the nation's infrastructure development. And internationally with the export mission and also our continued focus with some strong private clientele like ArcelorMittal gives us better revenue visibility. The LOC projects by the government of India has seen a slowdown from its impact. And however, there are select geographies, as we have been mentioning, wherein there is a good Page 4 of 20 Afcons Infrastructure Limited February 14, 2025 visibility in terms of wherein the competition is restricted to some European players, Turkish, Indian players like that. And Eastern Europe and some of these countries. And also as we indicated as a part of our strategy, bigger projects in Middle East with local partners that is also taking shape from the futuristic angle.
Answer, paramasivan srinivasan
In terms of business development, Afcons continue to strengthen its position. And as of 31st December, we have a INR38,000 crores of pending order and which excludes about INR10,662 crores of L1 and INR14,603 crores is the amount of order we have booked in the first nine months. And in the first month of the current financial year, now before the first 45 days, we have already received INR1,283 crores from DP World. And with that, our order book is almost at INR16,000 crores as of now. With INR10,662 crores further L1, I think we are slated to achieve about 30,000 plus in the current year, with some more tenders expected to be opened shortly. With this, we would say we would have reached the highest ever order book in terms of for the year. And at the end of the year, we will be somewhere between INR45,000 crores to 50,000 crores order book giving us more than 3x visibility for the future period.
Answer, paramasivan srinivasan
And this will clearly give revenue visibility for the next couple of years. And as we conveyed earlier, while the current year we expect ourselves to be the flat or marginally higher growth, next year we expect 20% to 25% growth from that of current year, more towards 25%. That is what we are looking at. And Afcons continues to set the benchmark in the infrastructure sector with notable achievements and the industry at close. As per latest engineering news record 2024 rankings of USA, we are ranked 139th in the Top 250 international contractor list, reaffirming our global presence. In terms of marine, we are rated as the 14th largest. In bridges, we are the 12th largest.
Answer, paramasivan srinivasan
In transportation, 45th largest. In aquatics, 12th largest. And in water supply, 38th largest. In marine, we are the highest ranked Indian contractor. In bridges, we are the only Indian contractor within the top 25. In transportation, we are the only Indian contractor within the top 50. And these are very, very happy tidings in our international presence.
Answer, paramasivan srinivasan
And our Delhi-Meerut rapid rail project is inaugurated by our Honorable PM. Of course, it's not entirely our stretch. Partly our stretch is also included over there. And we have won several awards, IT infrastructure leadership awards for our Calcutta Metro and Maharashtra Samruddhi Package 14 Excellence in Transportation Infrastructure. National Safety Council has awarded five-star rating and a shield for our Liberian projects. So, unwavering commitment to innovation, execution, excellence and safety is continued to be given, accredited by various agencies. This reinforces Afcons position as a leader in delivering world-class infrastructure.
Answer, paramasivan srinivasan
In conclusion, Afcons remains strongly positioned to capitalize on emerging opportunities in the infrastructure sector with a robust order book. Page 5 of 20 Afcons Infrastructure Limited February 14, 2025 We are confident with a robust order book, a strategic approach to business development and a strong track record. We are confident on delivering sustained growth and value for our stakeholders. Thank you all once again. While I conclude my remarks, I'll hand over to our CFO for providing review of the financial results.
Answer, ramesh jha
Ramesh Jha: Good afternoon, everyone. Before I get into the numbers, first I'll just talk about the rating upgrade we have got done. We are very happy to inform you that we have got our credit rating upgraded to AA- for long term and A1+, which is the highest rating for short term from CRISIL. Moving into AA category, we'll open up the money market instruments like CP, NCDs to us. This will give us a lot of interest saving arbitrage opportunity. This should also help us bring down the interest rate going forward. Now, on the numbers, we have talked about last time also.
Answer, ramesh jha
I would just like to recreate. The company is into the business of construction. The margin in a quarter varies based on the nature, type and quantum of what we execute. So quarterly results may vary in different quarters and may not be indicative of annual results or trend. Now, moving to specific numbers, during Q3, we have done a top line of INR3,332 crores as compared to Q3 in the previous year, INR3,182 crores. And the previous quarter, Q2 ‘25, we had done INR3,090 crores. And if you look at the top line number for 9 months, we have done INR9,635 crores, as compared to previous year 9 months, INR9,837 crores.
Answer, ramesh jha
Now, during this quarter, we had a growth of around 5% year on year and around 8% quarter on quarter. Because of the acceleration in the turnover during Q3, this has narrowed the YoY gap to 2% in 9 months from the previous 9 month period because in Q2, we were 5% down from the previous year number. Since there is an increased pace of execution now we are seeing in recent months, so as things stand, we should close the year on a similar top line or a nominal growth for this financial year. As far as revenue guidance is concerned, this year we are looking at a flat growth or maybe a nominal growth. This is because of our muted order booking in last 2 years which we had talked about earlier. But since this year, we have already backed close to INR26,000 crores-INR27,000 crores of order including the projects where we are L1 which we are quite hopeful that we should be getting very shortly. All these projects will mature for construction in next financial year where we are looking at a growth of 20%-25% more towards the upper trajectory.
Answer, ramesh jha
On a medium to long term horizon, we would like to sustain our CAGR which we have achieved over a longer period of time, say last 10 years. So we should be around those numbers which is around 15%. Now moving to EBITDA, during this quarter we have done INR448 crores of EBITDA. As against Q3-24, we had done INR393 crores. So in terms of percentage, this quarter we have done 13.5% and this is up by 111 basis points from the previous year. In the 9 -month period, we have done INR1,247 crores of total EBITDA which is 12.9% and this again is up 175 basis points from the previous year wherein we had clocked 11.2%. Page 6 of 20 Afcons Infrastructure Limited February 14, 2025 Now in EBITDA, I would just like to clarify that in our EBITDA calculation, we have considered BG Commission as part of our operating expenditure.
Answer, ramesh jha
So EBITDA that we are talking about is after removal of BG Commission as an operating expenditure. Whereas we understand that the street considers BG Commission as part of interest or finance cost. Hence if you consider it that way, then the EBITDA will increase to the extent of INR125 crores which we have excluded. Also in our EBITDA calculation, we have included other income as part of revenue. Here we have explained earlier also that our other income needs to be understood in the perspective of our business. Arbitration interest, foreign currency exchange gain and miscellaneous incomes are recurring and very integral to our business. Hence this needs to be considered as other operating income.
Answer, ramesh jha
So for the 9-month period, the INR311 crores of other income we have considered as operating income while calculating the EBITDA. So this EBITDA percentage what we have achieved for the 9-month 12.9% for this financial year up till the 9-month. This year as things stand, we expect the number to be higher than what we have been given a guidance. We have always talked about that we are going to maintain our EBITDA 11% plus. Reason being we are maintaining this that construction is full of contingencies. Our endeavor will be to save on those contingencies or optimize it. But many a times we may not be able to save those contingencies.
Answer, ramesh jha
Hence our guidance will remain at around 11%. Now moving to profit after tax. But you know I again reiterate that this financial year we will be having an elevated EBITDA margin since we have already achieved 12.9%. Moving to profit after tax. We have done for this quarter INR149 crores as against INR110 crores we have done Q3 last year. This again is 102 basis points up in terms of percentage point. For the 9-month period we have done INR376 crores of profit after tax.
Answer, ramesh jha
This is 3.9% of the top line of the total income. This again is 80 basis points up than the last year number. In finance cost we have seen the kind of optimization we were expecting. So there is a saving in interest cost because of the IPO proceeds we used towards debt repayment. But this got negated because of change in mix of interest free versus interest bearing advances. Usually in the total portfolio of advances we were having 75% used to be interest free. And 20- 25% used to be interest bearing advances.
Answer, ramesh jha
But this time around the projects we have bagged we are seeing 70%-75% projects are interest bearing. So that's where we have saved on the bank interest but interest from client advances have increased. So that's where we are not seeing any benefit on the interest cost front. But the projects have been tendered in such a way that these aspects have been factored in the projects. So our margins are going to remain intact. We have also continued to account for accelerated depreciation on our TBMs. Of the total INR367 crores of depreciation around one third is on account of accelerated depreciation in that.
Answer, ramesh jha
So the trend continues. Now moving on the return ratios. For the 9 month period we have clocked ROCE of around 16.6% and ROE of around 12%. So here again I would like to clarify that the capital infusion has increased the capital base. But operations are yet to elevate. Hence returns in short term are Page 7 of 20 Afcons Infrastructure Limited February 14, 2025 showing some dips. Right indicator for the return ratios are annual numbers.
Answer, ramesh jha
Even though we have clocked in excess of 16% ROC and around 12% ROE. If we factor in the accelerated depreciation our ROE will be at a very high level. Also these returns need not be looked into isolation. This needs to be looked in the perspective that it is over and above the impact our projects are creating on the society. Moving to the debt. We have closed the 9 month period. Debt has come down to the level of INR2,692 crores.
Answer, ramesh jha
On gross basis and on the net basis it is around INR1,788 crores. On the net basis the debt equity is working out around 0.35 times of the net worth. Order book we have already talked about. So on behalf of Afcons Infrastructure Limited I thank everyone for attending this call. Now I request moderator to open the floor for Q&A. Moderator: Thank you very much.
Question
Jainam Jain: Okay. Are there any major projects which we are expecting the tenders to be floated in the coming months in terms of metro or urban infra projects? Hitesh Singh Sorry your voice was not clear. Can you please repeat the question? Page 8 of 20 Afcons Infrastructure Limited February 14, 2025 Jainam Jain: Are there any major projects which we are expecting the tenders to be floated in the coming months in which we are planning to bid?
Answer, paramasivan srinivasan
Paramasivan Srinivasan: There are quite a number of projects. Two specific projects which we can mention is one is Dubai municipality where there is a big sewage tunnels are coming up by tunnel boring machines where we are already pre-qualified. That is in this thing in consortium with couple of others. It is about $3.5 to $5 billion each. That is coming up by the next 3 to 4 months. And in domestic in Maharashtra we have the Bhayandar-Virar connectivity which is coming up which is about INR75,000 crores of jobs split into 6 packages JICA funded job. So that is something which is again a marine project, a marine bridge which will be a specialist project.
Answer, paramasivan srinivasan
So there also this is another big project. The third big project which is coming up is a tunnel under Brahmaputra in north east where in Assam. That is also in the pipeline. There are number of other projects. Vadhvan port is coming up with two projects breakwater and desalting tank. Andaman port is coming up with projects. And there are number of other bridge projects are in the pipeline.
Answer, paramasivan srinivasan
I am just giving the flavor of big projects where limited pre-qualification possibilities and other.
Question
Jainam Jain: Okay. And anything in metro segment?
Answer, paramasivan srinivasan
Paramasivan Srinivasan: In metro segment? Metro segment already we have bid for indoor underground metro. We have bid for Patna underground metro. And it is on a continuous basis. Recently government has announced expansion of NCRTC where we have done one elevated and one underground. So they are going to be a big investment coming up. They were already sanctioned long back.
Question
Jainam Jain: So I think inventory, trade receivables, unbilled revenue, trade payables and mobilisation advance. These numbers will help us to analyze the working capital.
Answer, ramesh jha
Ramesh Jha: Yes, so trade receivables, see I will tell you. As far as the net working capital is concerned, net working capital is still at an elevated level. Because we still see delays in certification of the work done and release of payments in some projects. This has led to the increased uncertified work done receivables, leading to jump in working capital requirements. Generally this trend remains during the year wherein bill certification and payments are not up to date. So we see the elevated working capital requirements and borrowings in Q2, Q3. And this gets sorted out by Q4 and that's what we are expecting this time around also.
Answer, ramesh jha
Now to give you the specific numbers, the trade receivables are INR3,140 crores. The inventories are INR1,576 crores, unbilled revenue is INR6,134 crores and advances from customers is INR2,383 crores.
Question
Jainam Jain: And trade payables?
Answer, ramesh jha
Ramesh Jha: Trade payables are INR4,024 crores.
Question
Bhavin Chheda: Good afternoon, sir. Overall good set of numbers and a very strong order intake and a very strong guidance for next year. So just a few questions. I think you mentioned in first 45 days of this quarter, you have received fresh orders of around INR1,100 crores. That's the number you mentioned. I missed that number.
Answer, paramasivan srinivasan
Paramasivan Srinivasan: INR1,283 crores is a marine project from DP World in Gujarat. Bhavin Chheda: Okay. So you mentioned there is INR10,600 crores L1 plus this INR1,200 and already our order intake for line 1 was INR14,600 crores. So for the entire fiscal, we would be crossing an order intake of over INR25,000 crores, right sir?
Answer, paramasivan srinivasan
Paramasivan Srinivasan: Yes. With L1 already considered, we are already at about INR27,000 crores. We do expect another one or two orders to flow into the company. With that, we will be closer to INR30,000 crores.
Question
Bhavin Chheda: Okay. The other question was on the higher interest cost. The reason you mentioned was the client advances now almost 75% of the advances we have to pay interest versus earlier where 75% of the advances were interest free. So has this happened on a specific segment or specific orders received now or now this has been the general phenomena across all orders?
Answer, ramesh jha
Maybe that number might be around say 50-50 at the moment. But with a fresh influx of orders we are quite hopeful that we will get back to a similar situation.
Question
Ayush Sabo: Yes, yes, exactly.
Answer, ramesh jha
Ramesh Jha: So see, what we have talked about, the company is on a year on year basis generating a very positive cash flow from the operations. And the orders we have banked are quite good orders, very quality orders. So going forward we are looking at the business generating sufficient amount of cash flow. We will be generating positive cash flow and the debt on a continuous basis in terms of say debt equity, in terms of debt to EBITDA will keep coming down. In terms of absolute number, maybe it could be in the range what we have indicated for the year end, say around INR2,000 crores. But I think we should look at improvement from there going forward for the future period.
Question
Parvez Qazi: Hi, good afternoon everyone and thanks for taking my question. So the first question is that of our INR38,000 crore order book, what is the quantum of projects where we are yet to receive the appointed date?
Answer, paramasivan srinivasan
Paramasivan Srinivasan: INR38,000 crores is the order book which is already there in the books. Apart from that, we have another INR1,300 crores, INR1,283 to be precise. With that, it's about INR40,000 crores pending order book, plus INR10,000 and odd crores we have L1 status.
Question
Parvez Qazi: Sure. And lastly, what was the capex that we have incurred in nine months?
Answer, ramesh jha
Ramesh Jha: The capex we have incurred in the nine months is around INR250 crores.
Show 5 more questions
Question
Prateek Bhandari: Yes. I'm talking about the claims. If you can give a split of this INR1,400 crores.
Answer, ramesh jha
Ramesh Jha: So this INR1,400 crores we have talked about is contingent liability which is in our books. Of this, around INR480 odd crores, so say close to INR500 crores, is towards one of the royalty claim which has been put on us. So this has been set aside by Nagpur High Court and then the same matter, the party had gone to Bombay High Court wherein they have actually put the case against the government of Maharashtra. So that is one item. Ideally, this should have gone up but since they have again gone into litigation, so the amount is outstanding. Closer to INR500 crores is various disputes or the claims put by our subcontractors against us. So those are around INR500 crores.
Answer, ramesh jha
And close to INR400 crores will be pertaining to some of the tax-related litigations we are fighting.
Question
Vineet Prasad: Understood. And if you can share some update on Bangladesh orders, where are we? Has the execution commenced again or we'll be dropping those orders? Where are we on that?
Answer, paramasivan srinivasan
Paramasivan Srinivasan: On Bangladesh, both the governments are insisting that we do the work, both Indian government and Bangladesh government. One particular project is in the process where we have not commenced as yet. We have conveyed earlier also Package 3 of a road project, WP3, where they awarded the contract 19 months later than we submitted the bid. Page 15 of 20 Afcons Infrastructure Limited February 14, 2025 And where we said unless rate revision is done, we will not commence the work. That project is probably going towards cancellation and that is something which will be about INR600 crores. About INR600 crores value. So that is likely to go out.
Question
Vineet Prasad: And sir, last question from my side. We spoke about maintaining 11% EBITDA margins. Now I understand 11% is after including other income layers of BG expenses. But we have done a lot higher, probably closer to 13% for the three consecutive quarters now in the nine months, this quarter as well. So do you think this 11% EBITDA guidance is slightly conservative and we can still do much better? Not saying that we may still continue to deliver 13% or so, but is it slightly on the conservative side?
Answer, paramasivan srinivasan
Paramasivan Srinivasan: Our construction industry, as we keep always telling, has a lot of contingencies happening continuously. While our guidance will continue to be 11+. For the current year, it could be well crossing 12. And for the subsequent years or otherwise, we would say 11+. Could happen higher, but we would not like it to fall below 11.
Question
Bhoomika Nair: Sure. So the other thing is in terms of capex, if you can just tell what is the status of the TBM machines? And while we've done some INR200 crores- INR250 crores of capex, what are we looking at for this year? And is that number, how does it look like for the next year as well?
Answer, ramesh jha
Ramesh Jha: For this financial year, we expect to close the full capex somewhere around say INR450 crores to INR500 crores. And this is much lesser than what we had budgeted for the year. Now, last time also, we had discussed that some of the project awards got shifted. So we have aligned our capex procurement in line with the project awards. And also the tunnel boring machines also got shifted to subsequent period. As this has reduced in this financial year, next financial year, we are looking at from the number what we had budgeted, we'll have to revise the number. So for next couple of years, we'll be having a higher number what we had budgeted earlier.
Question
Vineet Prasad: Thank you. I would like to thank the management team of Afcons for giving us a chance to host the call. Thank you so much. Thank you everyone for joining us. Sir, would you have any closing remarks?
Answer, paramasivan srinivasan
Paramasivan Srinivasan: We would only like to say that Afcons continues to hold its value. We continue to do a strong technologically complex and innovation-led project. And it would not be out of place to say that in terms of construction technology, we could well be the leader. And Afcons will continue to focus the way we are focusing on the risk management framework and knowledge management which helps the company to grow significantly. And we believe that we are poised for a continued growth for the next few years as advised earlier, 15% to 16% CAGR over the next few years as we had achieved a similar number over Page 19 of 20 Afcons Infrastructure Limited February 14, 2025 the last 10 years. And in terms of EBITDA, you would have seen we have been consistently improving. While our general guidance is 11 plus percent, we look forward to continued improvement in the areas to come.
Questions about this call
- When was the Afcons Infrastructure Q3 FY25 earnings call transcript filed?
- Afcons Infrastructure filed the transcript with the exchange on 18 Feb 2025. This page is built from that transcript.
- What does this page list?
- 42 statements from the transcript across 7 topics, 31 of them with a figure. Each statement is shown with the transcript sentence it came from.
- Are the analysts' questions included?
- Yes. 15 questions and management's answers are listed in the order they were asked, as the transcript prints them.
- Who wrote this page?
- DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.