Transcript filed .
The transcript describes the period as "financial year 25-26". Its filing date would suggest a different quarter; this page follows the transcript.
The company filed 2 other transcripts for this quarter. This page reads the one with the speakers marked, then the most statements.
The company estimates the transmission bid pipeline for the balance fiscal at around Rs. 45,000 crore worth or more, considering HVDC. POWERGRID is targeting capitalization of about Rs. 20,000 crores of projects in financial year 25-26 and expects to be in a position to commission up to Rs. 20,000 crores of projects by March 2026. The state of Haryana and Delhi issued guidelines in June and July based on the Government of India guidelines issued in March 2025, while other states are also issuing guidelines; land compensation rates are being finalized and adopted or notified by respective DMs, and the process has delayed some POWERGRID projects that are likely to be commissioned in Q3 and Q4. In the consolidated accounts, about Rs. 450 crores of smart-metering expenses recorded under the service concession agreement are included in other expenses, with corresponding income; FERV is a pass-through covered in the net movement of the regulatory deferral.
The numbers management gave
Results
- In the consolidated accounts, about Rs. 450 crores of smart-metering expenses recorded under the service concession agreement are included in other expenses, with corresponding income; FERV is a pass-through covered in the net movement of the regulatory deferral.
Show source
The expenses side in the consol around Rs. 450 crores is included in that.
- Other income normally includes interest and differential tariffs on CERC orders, which are normally one-time items; yearly variations of around Rs. 100 crores-Rs. 200 crores are normal.
Show source
So, on a yearly basis, the difference of variations of around Rs. 100 crores-Rs. 200 crores is the normal one.
- The company estimates that Rs. 15,000 crores of projects commissioned about 12 years earlier reduce revenue by about Rs. 1,350 crores each year, while Rs. 9,500 crores of projects commissioned last year may increase revenue by about Rs. 900 crores; the net revenue difference will be Rs. 400 crores to Rs. 500 crores, due to depreciation and interest on loan.
Show source
So, net difference will be Rs. 400 crores to Rs. 500 crores difference will be there in revenue.
- POWERGRID Southern Interconnector Transmission System Limited received a one-time order impact of around Rs. 209 crores in the last half year after appealing to regulatory authorities to waive penalties.
Show source
And last half year, we got an order of POWERGRID Southern Interconnector Transmission System Limited, where we appealed to the regulatory authorities for waiving of the penalties and where we got around Rs. 209 crores as a one-time order impact in the last half year.
- EBITDA is declining by 3% to 4% because smart metering business income and expenditure were added in the consolidation; the smart metering business has EBITDA of 10% to 15%.
Show source
So, that is why you are seeing a lesser EBITDA of like 3% to 4%, it is declining.
- EESL losses included in POWERGRID's consolidation were around Rs. 126 crores in the current half year, compared to Rs. 92 crores in the last half year.
Show source
Current half year -- around Rs. 126 crores in the half year has been included, from EESL compared to Rs. 92 crores in the last half year.
Show 3 more statements
Results
- An additional Rs. 29 crores against the last quarter of around Rs. 58 crores was included on account of EESL in POWERGRID's consolidation, again on adjustment of the final accounts.
Show source
And there is an additional Rs. 29 crores against the last quarter of around Rs. 58 crores, which is again on the adjustment of the final accounts.
- The company had no impact from CERC regulations this year; the impact was only last year, when it received less O&M charges for O&M recovery from various constituents under the new regulation.
Show source
Otherwise, there is no impact of CERC regulations.
- Expenses this year increased only nominally because of increased DA and other normal expenditure.
Show source
So, it is only nominal expenses which have increased.
What it expects ahead
What management expects
- POWERGRID is targeting capitalization of about Rs. 20,000 crores of projects in financial year 25-26 and expects to be in a position to commission up to Rs. 20,000 crores of projects by March 2026.
Show source
So we are still targeting about Rs. 20,000 crores projects to be Page 7 of 18 Power Grid Corporation of India Limited November 04, 2025 capitalized by this financial year 25-26.
- The company expects about Rs. 28,000 crores of capex this year and about Rs. 35,000 crores next year; it did capex of about Rs. 26,000 crores last year.
Show source
This year we are expecting about Rs. 28,000 crores and next year it will be about Rs. 35,000 crores.
- The company expects about Rs. 20,000 crores of projects to be commissioned and capitalized this year.
Show source
So, like this year, we will have Rs. 20,000 crores projects are likely to be commissioned, capitalized.
- The company expects about Rs. 25,000 crore of work projects to be capitalized next year, with capitalization following capex by about 2 years.
Show source
So, we expect that about Rs. 25,000 crore work projects will be capitalized next year.
- The company expects capitalization of around Rs. 28,000 crores in '27, '28, following about Rs. 25,000 crores next year.
Show source
Rs. 25,000 crores next year, Rs. 28,000 crores next to next year.
- The company says capitalization follows capex by about two years, with challenges including R oW; it cited Rs. 26,000 crores of capex last year and expects capitalization after two years of about Rs. 25,000 crores to Rs. 26,000 crores, and about Rs. 28,000 crores against contemplated capex of Rs. 28,000 crores.
Show source
And since we are considering Rs. 28,000 crores capex, so I am saying that this capitalization will be about Rs. 28,000 crores.
Show 6 more statements
What management expects
- The company is maintaining Rs. 20,000 crores for Leh-Ladakh because it has not received direction from the Government of India on DC or AC; it will revise its CAPEX guideline after receiving communication regarding the AC network.
Show source
As far as Leh -Ladakh, we are still maintaining Rs. 20,000 crores only, because we have not got direction from Government of India about DC or AC.
- POWERGRID does not foresee its effective tax rate returning to normal: when capitalization picks up, it expects to return to MAT because income-tax profit will fall below profit as per CERC rates.
Show source
But again, we don't foresee that because once the capitalization picks up again, we'll be going into the same MAT and then the profit as per Income Tax, it will come down and then again, we'll be switching over to the MAT only.
- The company does not expect the Brahmaputra project to be nominated to it; the project is a normal HVDC project in a plain area and may be under TBCB.
Show source
So far, we are not expecting that it will be based on nomination to POWERGRID.
- The company expects TBCB activity to pick up; it is cyclical, sometimes moving very fast and sometimes taking time. Replaced by a later filing.
Show source
So, it is likely to pick up.
- The company has many projects in pipeline, but approvals required for bidding cause variations in the speed of the bidding process; the process is likely to improve now. Replaced by a later filing.
Show source
So, it is likely to improve now.
Orders
- The company estimates the transmission bid pipeline for the balance fiscal at around Rs. 45,000 crore worth or more, considering HVDC.
Show source
Actually, considering HVDC, it will be more.
What it is building and selling
Projects and capacity
- The state of Haryana and Delhi issued guidelines in June and July based on the Government of India guidelines issued in March 2025, while other states are also issuing guidelines; land compensation rates are being finalized and adopted or notified by respective DMs, and the process has delayed some POWERGRID projects that are likely to be commissioned in Q3 and Q4.
Show source
So this has taken some considerable time because of that some projects have been delayed which are likely to be commissioned in Q3 and Q4.
- POWERGRID tendered the Leh Ladakh HVDC project and received one bid, which it did not accept because of numerous queries; POWERGRID concluded the HVDC project in the Leh to Kaithal project may not be feasible, and the Government of India is considering replacing it with an AC project comprising a 400 kV transmission line from Leh-Pang to Kaithal.
Show source
We came out with a tender and we also got one bid, but that bid was not acceptable to us because there were so many queries and we came to a conclusion that HVDC project may not be f easible in this Leh to Kaithal project.
- The Leh Ladakh HVDC project's estimated cost was about Rs. 20,000 crores when considered about three years ago; current cost estimates from bidders are about Rs. 42,000 crores because of supply-chain constraints and challenges raised by manufacturers or suppliers. POWERGRID says continuing with HVDC may not be possible; it is considering AC at a cost close to Rs. 30,000 crores, above the earlier Rs. 20,000 crores estimate.
Show source
Now, cost is coming about Rs. 42,000 crores, considering various challenges and constraints shown by manufacturers or suppliers, So, it may not be possible for us to continue with HVDC and we have already done detailed studies.
- POWERGRID expects the Leh Ladakh project to be commissioned by 2029, although synchronous condensers may take some time to become available.
Show source
So still we are expecting that by 2029, this project can be commissioned.
- Despite a shortage of GIS equipment, POWERGRID is getting the equipment on time and expects to commission its projects on time.
Show source
So similarly GIS also, there is a shortage, but still we are getting these equipment on time and we will be able to commission our projects on time.
- Khavda to South Olpad is finalized, and Barmer to South Kalamb is likely to be completed and finalized in this financial year; Barmer to South Kalamb is already approved in NCT.
Show source
So, we are expecting very soon that it is already approved in NCT and it is likely to be finalized in this financial year itself.
Show 6 more statements
Projects and capacity
- Data center project is delayed and may be commissioned by Q4, not Q3.
Show source
So maybe by Q4 only, we should be able to commission this, not in Q3.
- The Brahmaputra project remains at the study stage and is likely to take some time.
Show source
As far as this Brahmaputra, it is still in this study stage and it is likely to take some time.
- Government of India discussions and approvals for the Andaman HVDC project under sea are ongoing, and there is no firm communication.
Show source
Still there are discussion and approvals being taken by Government of India and there is no firm communication.
- There is no clear approval or direction from Government of India so far for the Andaman HVDC project under sea.
Show source
So, there is no clear approval or direction from Government of India so far.
- Finalizing a valuer and receiving the valuer's report for the RoW process will take somewhere about one month. Replaced by a later filing.
Show source
R.K.
Segments
- POWERGRID has participated in some battery energy storage tenders, lost one, and is participating in other projects; it will continue participating and hopes to execute some projects in days to come. Replaced by a later filing.
Show source
Tyagi: Battery energy storage, we have participated in some tender, but we lost that and we are again participating in some other projects.
Risks, rules and outside factors
Outside factors
- POWERGRID faces a shortage of transformers, GIS and HVDC equipment; transformer delivery takes more than one year because manufacturing and testing take more than one year, so it procures transformers and reactors in bulk well in advance and allocates them to future projects, while HVDC equipment cannot be procured in advance because it is project-specific and the Government of India allows 4 years to 5 years for commissioning.
Show source
So, what we are doing, we are procuring these transformers and reactors well in advance as bulk procurement and these procured transformers and reactors are allocated for various projects which we win in future so that this constraint of transformer supply is not there.
- Demand for equipment is increasing in power sector, in ISTS, intrastate, RE generation, and for green hydrogen transmission network and data center transmission network, and these supply challenges are going to increase in days to come. Replaced by a later filing.
Show source
As far as challenges of the supply of various equipment because of lot of demand in power sector, in ISTS, intrastate, then RE generation, and now we will be having more demand because Page 17 of 18 Power Grid Corporation of India Limited November 04, 2025 of green hydrogen transmission network, data center transmission network.
Rules and policy
- A delay between the Government of India's issuance of ROW guidelines and their adoption by state governments delayed execution or completion of transmission projects; in March 2025, the Government of India increased ROW compensation from 30% to 60% in urban areas and to 45% in semi-urban areas, and issued a methodology for land compensation using two valuers, one appointed by the transmission developer and one by the farmers.
Show source
We have got one guideline issued by Government of India on this 21st March, 2025 for increasing land compensation rates as against 30% for RoW in urban areas from 30% to 60% and 45% in semi-urban area.
- The company is following up with all states, and the Ministry of Power is also considering and discussing adoption of similar RoW guidelines with all states. Replaced by a later filing.
Show source
Tyagi: So, yes, we are following up with all the states, including Ministry of Power is also considering and talking with all the states to adopt similar guidelines.
Everything else said on the call
Group structure
- The company acquired 100% shareholding in KVB1B2PTL.
Show source
And another added to that, if you see the half year to half year, when you are comparing last half year, actually we have spent CSR of about Rs. 100 crores lesser than the current half year, which actually will get normalized over the full year.
- The Rajasthan transmission JV has made no progress because the Rajasthan Government has not communicated on the exemption being sought for projects beyond the regulator's limit for nomination-basis execution, which would otherwise be considered under TBCB.
Show source
So as of now, there is no progress.
Other
- Under RTM projects, Power Grid Corporation of India Limited used to get about 17% revenue on any project, including about 15.5% return on equity, which is about 30%, or about 4.65%.
Show source
In RTM, we used to get about 17% revenue on any project.
- For RTM projects, Power Grid Corporation of India Limited's revenue modeling includes 70% loan, about 4.9% interest on loan assuming a 7% interest rate, 5.28% depreciation for the initial 12 years, O&M charges of about 1.8% to 2%, and interest on working capital of about 0.2% to 0.3%, making about 17% or 17% plus of revenue against any project.
Show source
So, this makes about 17% or 17% plus of revenue against any project.
What the company said on its earnings call, taken from its own transcript. Not advice.
Questions and answers
Question
Mahesh Patil: Yes hi sir. Thanks for the opportunity. Sir my first question is on the capitalization number. Given that we had achieved around 46 billion of capitalization in the first half and we have guided about 220 billion for the full year. Do we still maintain that target and second related question is what are the challenges we are facing to get this number up and what are you doing to kind of accelerate the execution?
Answer, r.k tyagi
R.K. Tyagi: Okay so as far as capitalization is concerned we are committed for increasing capitalization or commissioning of our projects. Mainly we are facing problems from RoW from landowners and Government of India is very positive. They are helping us. We have got one guideline issued by Government of India on this 21st March, 2025 for increasing land compensation rates as against 30% for RoW in urban areas from 30% to 60% and 45% in semi-urban area. And earlier RoW and land compensation was paid based on circle rates. Now it is based on the actual market rate.
Answer, r.k tyagi
For market rate there is also methodology given in the guideline that there will be three valuers. First valuer will be selected by farmers. Second valuer will be selected by POWERGRID and third valuer will be selected by District Magistrate. Then first valuer of farmer and second valuer of POWERGRID they will submit the report. Then average of these two will be considered as the base value for market rate. If difference is more than 20% in that case the third valuer rate will be opened and if third valuer is closer to farmer's valuer then it will be average of farmer's valuer and the third valuer. If rate is closer to POWERGRID valuer, the average of these two valuers will be taken.
Answer, r.k tyagi
So this methodology is being used by Delhi, Haryana, and now other states. So based on the Government of India guidelines issued in March, 2025, the state of Haryana and Delhi have issued somewhere in June and July and other states are also issuing such guideline. So, Government of India guidelines are being adopted by various states and based on those guidelines the rates by valuers is being finalized which are being adopted or notified by respective DMs and based on that, we are working in various lines. So this has taken some considerable time because of that some projects have been delayed which are likely to be commissioned in Q3 and Q4. So we are still targeting about Rs. 20,000 crores projects to be Page 7 of 18 Power Grid Corporation of India Limited November 04, 2025 capitalized by this financial year 25-26. By March 2026, we should be in position to commission up to Rs. 20,000 crores projects.
Question
Mahesh Patil: Okay sir, thanks for the detail updates. My second question is on the equipment ordering. Have we tied up for the equipment for the next 2 years, 3 years of our execution and is there any shortage in terms of transmission equipment, HVDC etc.?
Answer, r.k tyagi
R.K. Tyagi: Yes, you are right that there is a shortage of some equipment like transformer, GIS, and HVDC equipment. For transformer, especially delivery time is more than one year because manufacturing and testing itself takes more than one year. So, what we are doing, we are procuring these transformers and reactors well in advance as bulk procurement and these procured transformers and reactors are allocated for various projects which we win in future so that this constraint of transformer supply is not there. As far as HVDC equipment are there, they cannot be procured in advance because they are specific to a specific project. For that, the Government of India is giving us 4 years to 5 years for commissioning. So, in that period, we are able to get this HVDC equipment also.
Answer, r.k tyagi
So similarly GIS also, there is a shortage, but still we are getting these equipment on time and we will be able to commission our projects on time. Thank you.
Question
Mahesh Patil: Okay, sir. And so my last question is, sir, have you started tendering for the Leh Ladakh HVDC project?
Answer, r.k tyagi
R.K. Tyagi: Leh Ladakh HVDC project, actually we have gone to the market. We came out with a tender and we also got one bid, but that bid was not acceptable to us because there were so many queries and we came to a conclusion that HVDC project may not be f easible in this Leh to Kaithal project. Now, Government of India is considering this project to be replaced by AC project. So, we will have 400 kV transmiss ion line from Leh-Pang to Kaithal and that project is under discussion and very shortly, we will get some information about that.
Question
Mahesh Patil: Okay, sir. Thank you so much.
Answer, r.k tyagi
R.K. Tyagi: Actually, this project when we considered HVDC project about three years back, that time cost was about Rs. 20,000 crores and now considering this supply chain constraint, even if we consider that this is a feasible project, we took even cost estimate from our various bidders. Now, cost is coming about Rs. 42,000 crores, considering various challenges and constraints shown by manufacturers or suppliers, So, it may not be possible for us to continue with HVDC and we have already done detailed studies. So, AC is another option which we are considering and cost of AC will be in the range Page 8 of 18 Power Grid Corporation of India Limited November 04, 2025 of about, it will be close to Rs. 30,000 crores. So, capex will not be less as compared to earlier estimate of Rs. 20,000 crores. It will be more than that. Puneet: And timeline?
Answer, r.k tyagi
R.K. Tyagi: Timeline we will be able to maintain as of now, because all 400 kV and these technologies are already available in the market except synchronous condensers which may take some time. So still we are expecting that by 2029, this project can be commissioned. Puneet: Understood. And on your standalone accounts, you in a way end up paying effective tax rate of 20% or even less than that. How long will that benefit last?
Answer, g ravisankar
G. Ravisankar: It will, see, it will come to normal when the capitalization comes down and when the income tax profit is more than your profit as per the CERC rates. But again, we don't foresee that because once the capitalization picks up again, we'll be going into the same MAT and then the profit as per Income Tax, it will come down and then again, we'll be switching over to the MAT only. Puneet: Understood. That's helpful. And lastly, any progress on the Rajasthan JV on the transmission side?
Answer, r.k tyagi
Actually, their regulator has put some limit on the projects which are to be considered on nomination basis, beyond which they are considering under TBCB. So, they were trying to take some exemption so that those projects can be executed by this JV company. But so far, we have not got any communication from Rajasthan Government. So as of now, there is no progress. Puneet: Okay, that's helpful. And lastly, your participation on the battery side, last time you said you would look at it as it progresses. Any further thoughts there?
Answer, r.k tyagi
R.K. Tyagi: Battery energy storage, we have participated in some tender, but we lost that and we are again participating in some other projects. And we will continue participation and hopefully we will execute some projects in days to come. Page 9 of 18 Power Grid Corporation of India Limited November 04, 2025 Puneet: Understood. That's very helpful. Thank you so much and all the best.
Question
Ketan Jain: Thank you. Good evening, sir. Thank you for the opportunity. Sir, my first question is on the other expenses. We've seen an increase by 77% of other expenses, O&M expenses. What is the primary reason for this and is this passed on or how is it?
Answer, g ravisankar
G. Ravisankar: The other expenses actually include the FERV, which is the pass-through. So that is covered in the net movement of the regulatory deferral. And then also you see now we are in the business of the smart metering where we are doing the accounting through the service concession agreement where it is shown as the income side as well as the expenses side. The expenses side in the consol around Rs. 450 crores is included in that. So, corresponding to that, we have an income also. So, that is why it is appearing to be on the higher side, but not like that.
Question
Ketan Jain: Understood. And also, sir, I have a question. Do we have any O&M expense impact from the new CERC regulations, which cap the O&M expenses and we are actually incurring more expenses? Is there any impact from that?
Answer, r.k tyagi
R.K. Tyagi: Last time there was impact that we got less O&M charges for O&M recovery, what we got from various constituents as per the new regulation. But this year there is no change from the last year. So, the impact was only last year. This year it is only incremental change because of increased DA and other normal expenditure will increase every year. So, it is only nominal expenses which have increased. Otherwise, there is no impact of CERC regulations.
Question
Ketan Jain: Sir, also what is your guidance on capitalization for 2026, you told Rs. 20,000 crores, but what would be that for '27 and '28? Any guidance?
Answer, r.k tyagi
R.K. Tyagi: Like last year we did capex of about Rs. 26,000 crores. This year we are expecting about Rs. 28,000 crores and next year it will be about Rs. 35,000 crores. So, from capex to capitalization, there will be a gap of about 2 years. So, like this year, we will have Rs. 20,000 crores projects are likely to be commissioned, capitalized. And next year it will follow like it may be about Rs. 25,000 crores, Rs. 26,000 crores because last year we got CAPEX of Rs. 26,000 crore. So, we expect that about Rs. 25,000 crore work projects will be capitalized next year.
Answer, r.k tyagi
And similarly, in '27, '28 also, it will be around Rs. 28,000 crores. So, it will be in that range. Rs. 25,000 crores next year, Rs. 28,000 crores next to next year. Page 10 of 18 Power Grid Corporation of India Limited November 04, 2025 Ketan Jain: Understood.
Question
Dhruv Muchhal: Yes. So, in the consolidated numbers, the other income last year same quarter was Rs. 560 crores and this year quarter is about Rs. 190 crores. There is a sharp drop here. So, anything abnormal probably in the last year quarter or this quarter?
Answer, g ravisankar
G. Ravisankar: Normally, the other income includes some of the like interest and differential tariffs on the CERC orders and all, which are all normally used to be one time. So, on a yearly basis, the difference of variations of around Rs. 100 crores-Rs. 200 crores is the normal one.
Question
Dhruv Muchhal: So, nothing abnormal in the numbers, either last quarter or current quarter?
Answer, r.k tyagi
R.K. Tyagi: Yes, TBCB, it is a cycle. Basically, sometimes it is very fast, sometimes it takes some time. So, it is likely to pick up.
Question
Dhruv Muchhal: It's not because there are already a lot of...
Answer, r.k tyagi
R.K. Tyagi: We have so many projects in pipeline, but because of various approvals and you understand that there will be a lot of approvals required for any bidding process. So, there will be variations in the speed of this bidding process. So, it is likely to improve now. So, there's nothing to worry. Page 11 of 18 Power Grid Corporation of India Limited November 04, 2025 Dhruv Muchhal: Okay.
Show 13 more questions
Question
Atul Tiwari: Yes, thanks a lot. Sir, you gave a guidance of about Rs. 25,000 crores to Rs. 26,000 crores capitalization in FY27 and Rs. 28,000 crore in FY28. I believe in some of the previous conference calls, you have guided to Rs. 35,000 crores to Rs. 40,000 crores rupees of capitalization in those years. So, is there some like persistent slowdown in the pace of capitalization that the company is seeing because of the issue or is this issue limited to this year only?
Answer, r.k tyagi
R.K. Tyagi: What we are saying that there is a time lag of about two years from capex to capitalization. So that is only because there will be many challenges of R oW and other things will be there. But considering that, you can assume that there will be two years of lagging. So last year, it was Rs. 26,000 crores. So, capitalization after two years will be about Rs. 25,000 crores to Rs. 26,000 crores. And since we are considering Rs. 28,000 crores capex, so I am saying that this capitalization will be about Rs. 28,000 crores.
Question
Sumit Kishore: Yes. Sir, my question was in relation to the bid pipeline for the balance fiscal second half for the market for transmission and the status of the two HVDC projects that were expected to be awarded this fiscal. Is the tendering and award activity on track or is there a risk of spillover the next financial year? That's my first question.
Answer, r.k tyagi
R.K. Tyagi: Yes. You are talking about this Khavda to South Olpad is already finalized. And this Barmer to South Kalamb, it is likely to be completed in this financial year. So, we are expecting very soon that it is already approved in NCT and it is likely to be finalized in this financial year itself. Other projects may take some time.
Question
Sumit Kishore: Okay. And so what is the total bid pipeline now for the balance fiscal for transmission?
Answer, r.k tyagi
R.K. Tyagi: We will exactly tell, but it may be around Rs. 45,000 crore worth. It may be more. Actually, considering HVDC, it will be more.
Question
Sir, my first question is on the RoW point. The process you laid out on three different valuers, I think it seems quite adverse. So, if you could tell us, how much time is it adding to a project timeline in months or so?
Answer, r.k tyagi
R.K. Tyagi: For this finalization of a valuer and giving report by this valuer will be somewhere about one month.
Question
Nikhil Nigania: That's it. Okay.
Answer, r.k tyagi
R.K. Tyagi: Because we are in the learning process. So, it took more time in Delhi. But the Government of India is in the process of issuing guidelines that within one month, this should be finalized.
Question
Nikhil Nigania: And other states are also close to adopting this guideline, Rajasthan, Gujarat, etc. R.K.
Answer, r.k tyagi
Tyagi: So, yes, we are following up with all the states, including Ministry of Power is also considering and talking with all the states to adopt similar guidelines.
Question
Nikhil Nigania: Yes.
Answer, r.k tyagi
R.K. Tyagi: Yes. This Chinese import, as far as the present situation is there, we are not expecting it will continue. But we will have some progress, like the Chinese companies, which have set up their companies in India. So, there is some progress or there is some development in that area. So, we may have some approval for manufacturers -- Chinese manufacturers, who have developed factories in India. So, there may be some development in that area.
Answer, r.k tyagi
But direct import from China, so far, we are not hearing anything.
Question
Apoorva Bahadur: Okay, sir. And on the data center bit?
Answer, r.k tyagi
R.K. Tyagi: And data center -- for data center, actually, it is a learning curve for us. There have been some issues being faced and there are so many clarifications, and it is delayed -- data center is delayed. So maybe by Q4 only, we should be able to commission this, not in Q3.
Question
Apoorva Bahadur: Understood sir. Page 14 of 18 Power Grid Corporation of India Limited November 04, 2025 Moderator: We'll take our next question from the line of Bharani from Avendus.
Answer, r.k tyagi
R.K. Tyagi: Actually, so far, we have been executing projects under RTM. And now we are executing projects under TBCB. So, there is a difference in financial modeling or revenue modeling of these two projects -- two types of projects. In RTM, we used to get about 17% revenue on any project. Breakup was that we will get about 15.5% return on equity, which is about 30%. So 15.5% into 30%, which will be about 4.65%.
Answer, r.k tyagi
Then there will be 70% loan. So, there will be about, say, 7%, assuming 7% interest rate. So, there will be about 4.9% will be interest on loan. And depreciation for initial 12 years will be 5.28%. Then there will be O&M charges in the range of about 1.8% to 2%. And then interest on working capital may be about 0.2% to 0.3%. So, this makes about 17% or 17% plus of revenue against any project.
Answer, r.k tyagi
After 12 years, because we have projects which have been commissioned in 2010, 2011, 2012, 2013, in that range, which are getting completed 12 years of age. So , after 12 years, 5.28% depreciation will reduce to about 1.2%, 1.3%, because by 12 years, most of the depreciation has been recovered. So only balance may be about 27% in 23 years. So , making it about 1.1% to 1.2% per year depreciation as against 5.28% depreciation in initial 12 yea rs. So, there will be net difference of about 4% revenue reduction only because of this. Second point will be that interest on loan because after 12 years, we will be paying most of the loan. So, interest on loan component will also become almost zero. So , this 4.9% plus 4%, so almost 9% reduction will be there in our revenue.
Answer, r.k tyagi
So , assuming that there will be say last 12 years back, we commissioned about say Rs. 15,000 crores projects. So , Rs. 15,000 crore projects into 9%, it makes about Rs. 1,350 crores revenue will reduce each year. So, this financials, also our revenue has come down because of these two reasons, depreciation, and interest on loan. Whereas whatever projects we have commissioned, so normally we will get projects because our tariff is fixed for 35 years. So, we get about 11% to 12% of project cost as revenue. So, if we commissioned projects last year, about Rs. 9,500 crores worth projects, so maybe about Rs. 900 crores will be the increase in revenue because of these commissioned projects. So, net difference will be Rs. 400 crores to Rs. 500 crores difference will be there in revenue.
Answer, r.k tyagi
So, that difference you will see in our revenue also. So, these are the basic, like you can say the rough calculations, the details we can share with you.
Answer, g ravisankar
G. Ravisankar: No. I'd like to add to this. Actually, you see in the regulatory framework, EBITDA is not actually a right parameter to monitor in the sense that when we commissioned a new project as the Chairman was explaining, the EBITDA used to be in the range of 89%. And when you complete the life for the 35 years, the EBITDA will come down to 74%. Page 15 of 18 Power Grid Corporation of India Limited November 04, 2025 But your profit will remain same because I have a return on equity constant for the entire period. So, there is no worry that the profit is going to come down, but the EBITDA is not the right parameter to monitor. And another added to that, if you see the half year to half year, when you are comparing last half year, actually we have spent CSR of about Rs. 100 crores lesser than the current half year, which actually will get normalized over the full year. And last half year, we got an order of POWERGRID Southern Interconnector Transmission System Limited, where we appealed to the regulatory authorities for waiving of the penalties and where we got around Rs. 209 crores as a one-time order impact in the last half year.
Answer, g ravisankar
So, these things added to only you are showing -- you are seeing a decline of around Rs. 300 crores. So, it is only because of this one-time impact. Otherwise, as such, there is no worry that the EBITDA is coming down or something. And added to that, you see going forward also, we have a smart metering business where the EBITDA is hardly 10% to 15%. So, we are merging that in the consol. So, where the income and expenditure side, it was added. So, that is why you are seeing a lesser EBITDA of like 3% to 4%, it is declining.
Answer, g ravisankar
But as such, there is no worry that the profits are taken away by any expenditure or something like that. Bharani: Sir, my follow-up...
Answer, r.k tyagi
R.K. Tyagi: Yes. As far as Leh -Ladakh, we are still maintaining Rs. 20,000 crores only, because we have not got direction from Government of India about DC or AC. So, as we get this communication regarding AC network, then we will accordingly revise this guideline also for our CAPEX. As far as this Brahmaputra, it is still in this study stage and it is likely to take some time. And third point, what you mentioned that whether it will be nominated to POWERGRID, it is unlikely because these are normal HVDC projects in plain area and it may be under TBCB. So far, we are not expecting that it will be based on nomination to POWERGRID.
Question
Mahesh Patil: Okay, sir. And sir, lastly on this Andaman -Paradeep project, what is the status there? If you can share some info.
Answer, r.k tyagi
R.K. Tyagi: Yes. Still there are discussion and approvals being taken by Government of India and there is no firm communication. You are talking about Andaman HVDC project under sea?
Question
Mahesh Patil: Yes, sir. Yes.
Answer, r.k tyagi
R.K. Tyagi: Yes. So, there is no clear approval or direction from Government of India so far.
Question
Mahesh Patil: Okay. And sir, last -- yes. If I may, sir, lastly, in terms of, sir, EESL, if you can share some update, what were the losses in this quarter and what are our plans regarding EESL, Energy Efficiency Services?
Answer, g ravisankar
G. Ravisankar: Yes. Current half year -- around Rs. 126 crores in the half year has been included, from EESL compared to Rs. 92 crores in the last half year. And there is an additional Rs. 29 crores against the last quarter of around Rs. 58 crores, which is again on the adjustment of the final accounts. You can say that around Rs. 30 crores has been added on account of EESL in our consol.
Question
Mahesh Patil: Okay, sir.
Answer, r.k tyagi
As far as challenges of the supply of various equipment because of lot of demand in power sector, in ISTS, intrastate, then RE generation, and now we will be having more demand because Page 17 of 18 Power Grid Corporation of India Limited November 04, 2025 of green hydrogen transmission network, data center transmission network. So, these challenges are going to increase in days to come. But rest assured that we are very competent -- we have very competent team to take these challenges and work for the interest of our stakeholders. Thank you very much.
Questions about this call
- When was the Power Grid Corporation of India Q4 FY26 earnings call transcript filed?
- Power Grid Corporation of India filed the transcript with the exchange on 12 Nov 2025. This page is built from that transcript.
- What does this page list?
- 41 statements from the transcript across 9 topics, 24 of them with a figure. Each statement is shown with the transcript sentence it came from.
- Are the analysts' questions included?
- Yes. 23 questions and management's answers are listed in the order they were asked, as the transcript prints them.
- Who wrote this page?
- DalalOS Data Desk. Assembled by software from the company's transcript. Not reviewed by a person. How it is made, and what it leaves out, is on the method page linked from the byline.